HomeMy WebLinkAboutMFP19004618DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP19004618 IVR Number: 19004618 Permit Informaon Permit Name:Puget Sound Energy Gas Permits Address/Locaon :08/22/2019Application Date:2023059052Parcel Number:1600 GRANT AVE S Permit Type:11/07/2019Issue Date:Franchise Permit Work Class:11/06/2020Expiration Date:Major Utility Job Number:107058140Franchise Type:Natural Gas Description:Trenching west 30' across Grant Ave. Trench 545' south along Grant ave to the intersection of S 18th st. Trench 585' east tieing into existing 2". Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Gas 107058140 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 1600 GRANT AVE TRENCHING APRROX 30FT ACROSS GRANT AVE (WEST), APPROX 545FT (SOUTH) ALONG GRANT AVE TO THE INTERSECTION OF S. 18TH ST, APPROX 585FT (EAST ) TIEING INTO EXISTING 2" (HIGH VOLUME TAPPING TEE), LOCATED AT 216FT (W) AND 20FT(N) OF CENTERLINE. 4 4 4 1130'X3'X4' Infrasource (253) 234-6410 INFRASL871C2 BL036742 8/22/19 MFP19004618 Scott Warlick 11/6/2019 RESTORATION PER CITY OF RENTON STANDARDS This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR Nathan Janders 11/7/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 107058140 Infrasource RANDY BLACKIE (253) 395-6850 6905 S 228th St, Kent, WA 98032 RANDY.BLACKIE@PSE.COM 1600 GRANT AVE TBD TBD CORRIE RYDBERG 8/22/19 MFP19004618 Scott Warlick 11/6/2019Monday - Friday 8:00AM - 3:00PM SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). BLDG. A BLDG. B BLDG. C BLDG. D BLDG. E BLDG. FBLDG. G BLDG. H 5MM 5MM 5MM 5MM 4MM 4MM 4MM 4MM 9'E, 24'S OF BEND 26'E OF BEND 8" STW HP 9'E 31-195728'E3/4" STW-U1970 PLRS-131970E15723 6 ' N8" STW HP 9 'E31-1957'B''C''D''E''F' 'G''H'21'22° 45°21''A'60' 70' 60'2" MPE IP 566'E107006641-200055'N 25/8" MPE 2000 2" MPE IP 10'N 107006641-2000 20'N 216'W22° THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105091676107058140Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-7. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 253-395-6850 5/28/2019 R. MILLER 253-234-6558 6/3/2019 R. MILLER 253-234-6558 6/3/2019 REDT # (RW-114244)CITY OF RENTON GRANT PLACE TOWNHOMES R1 2" MPE-7 GAS MAIN EXTENSION - 8 M/F BLDG (36 UNITS) 1600 Grant Ave S., RENTON, WA 98055 PUGET SOUND ENERGY 107058140 105091676 1" = 50'1 OF 2 KING 32 CIKNC SW 20-23-05 208.080 211.082 CABLE BILL WALKER 253-288-7535 TELEPHONE N/A N/A RIGHT OF WAY PEI-FANG YANG 425-456-2774 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 507569325 107058140 N/A 106353890 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:RANDY BLACKIE 253-395-6850 randy.blackie@pse.com 60 IP 132-60 N/A N/A SITE PLAN xx 9/2/19 A.PAULSEN CUST. ROUTE CHANGE ... ... pmvrsingh@gmail.com N Vicinity Map 47.4655,-122.1986 SITE STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2"MPE-7 604 FT JOINT 2"MPE-7 623 FT INSTALL 4"MPE-7 552 FT .... .... .... DEVELOPER TO COORDINATE WITH PSE ON UTILITY CONFLICTS. Owner / Developer Contact Info officeATTN: SATWANT SINGH 15445 53RD AVE S TUKWILA, WA 98188 SATWANT SINGH 206-391-3311 SERVICE PROVIDER TO VERIFY EXACT HORIZONTAL AND VERTICAL LOCATION OF EXISTING. 8"HP MAIN PRIOR TO CONSTRUCTION CROSSING. PLEASE CONTACT PSE INSPECTOR MEL LASENBY AT 360-239-2473 PRIOR TO AND DURING CONSTRUCTION ACTIVITIES INSTALL 4" MPE-7 479' @ 4' ECL (______)' @ _____'ECL 2" 90° ELBOW 12'SCL & 418'ECL ______'SCL & _____'ECL 2" INLINE TEE 12'SCL & 196'ECL ______'SCL & _____'ECL JOINT 2" MPE-7 122' @ 196'ECL (______)' @ _____'ECL 2" CAP EOM/WIREBOX 110'NCL & 196'ECL ______'NCL & _____'ECL JOINT 2" MPE-7 113' @ 418'ECL (______)' @ _____'ECL 2" CAP EOM/WIREBOX 101'NCL & 418'ECL ______'NCL & _____'ECL JOINT 2" MPE-7 222' @ 12'SCL (______)' @ _____'SCL JOINT 2" MPE-7 166' @ 14'SCL TO 12' SCL (______)' @ _____'SCL TO _____'SCL SERVICE PROVIDER TO VERIFY EXACT HORIZONTAL AND VERTICAL LOCATION OF EXISTING. 8"HP MAIN PRIOR TO CONSTRUCTION CROSSING. PLEASE CONTACT PSE INSPECTOR MEL LASENBY AT 360-239-2473 PRIOR TO AND DURING CONSTRUCTION ACTIVITIES CONSTRUCTION DETAIL (NTS) T01 SEE CONST. DETAIL GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS SS SINGLE 2" MAIN BLDG A 1 1/4 MPE-7 10 ( ')NCL 2600 SS SINGLE 2" MAIN BLDG B 1 1/8 MPE-7 10 ( ')NCL 2600 SS SINGLE 2" MAIN BLDG C 1 1/8 MPE-7 10 ( ')NCL 2600 LS SINGLE 2" MAIN BLDG D 1 1/4 MPE-7 40 ( ')NCL 2600 LS SINGLE 2" MAIN BLDG E 1 1/4 MPE-7 40 ( ')NCL 2600 SS SINGLE 2" MAIN BLDG F 1 1/8 MPE-7 10 ( ')NCL 2600 SS SINGLE 2" MAIN BLDG G 1 1/8 MPE-7 10 ( ')NCL 2600 SS SINGLE 2" MAIN BLDG H 1 1/4 MPE-7 10 ( ')NCL 2600 SS SINGLES =6 140 FT 1 1/8" PE PIPE LS SINGLES =2 MRT NOTE: Project is within emergency section 29. The ES boundary line will need to be adjusted so the plat can be included in ES 32. NO valves will need to be installed. A note will need to be added to the drawing stating the change so MRT will know it needs to be adjusted. INSTALL TEST LEAD BOX ______'SCL & _____'ECL 8" STW HP 9 'E31-1957 INSTALL 2" MPE-7 15' @ 501'NCL (______)' @ _____'NCL 4" x 2" REDUCER 10'ECL & 501'NCL ______'ECL & _____'NCL INSTALL 4" MPE-7 6' @ 501'NCL (______)' @ _____'NCL 4" INLINE TEE 501'NCL & 4'ECL ______'NCL & _____'ECL INSTALL 4" MPE-7 9' @ 4'ECL (______)' @ _____'ECL CONSTRUCTION DETAIL (NTS) T02SEE CONST. DETAIL SERVICE PROVIDER TO VERIFY EXACT HORIZONTAL AND VERTICAL LOCATION OF EXISTING. 8"HP MAIN PRIOR TO CONSTRUCTION CROSSING. PLEASE CONTACT PSE INSPECTOR MEL LASENBY AT 360-239-2473 PRIOR TO AND DURING CONSTRUCTION ACTIVITIES 2" 90° ELBOW 5'SCL & 216'WCL ______'SCL & _____'WCL 2" HVTT TIE-IN 13'NCL & 216'WCL ______'NCL & _____'WCL INSTALL 2" MPE-7 579' @ 5'SCL (______)' @ _____'SCL R1 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 'A''B'4 40 1 E GAS ONLY 30 GAS MAIN X02 'C''D'4 40 1 E 2 SCH 80 1 30 GAS MAIN, PRIMARY X03 'E''F'4 40 1 S GAS ONLY 40 GAS SVC X04 'G''H'4 40 1 S GAS ONLY 40 GAS SVC 4" PVC PLUG /CAPS = 8 4" YELLOW SCH 40 PVC = 160 FT 2" SCH 80 = 30 FT 2" PVC PLUG /CAPS = 2 4" CAP EOM/WIREBOX 510'NCL & 4'ECL ______'NCL & _____'ECL SERVICE PROVIDER TO VERIFY EXACT HORIZONTAL AND VERTICAL LOCATION OF EXISTING. 8"HP MAIN PRIOR TO CONSTRUCTION CROSSING. PLEASE CONTACT PSE INSPECTOR MEL LASENBY AT 360-239-2473 PRIOR TO AND DURING CONSTRUCTION ACTIVITIES 9'E, 24'S OF BEND 26'E OF BEND 8" STW HP 9'E 31-19574" INLINE TEE 5'SCL & 22'ECL ______'SCL & _____'ECL 4" CAP EOM/WIREBOX 12'SCL & 22'ECL ______'SCL & _____'ECL INSTALL 4" MPE-7 7' @ 5'SCL (______)' @ _____'SCL 4" x 2" REDUCER 5'SCL & 24'ECL ______'SCL & _____'ECL INSTALL 4" MPE-7 7' @ 22'ECL (______)' @ _____'ECL INSTALL 4" MPE-7 44' @ 4' ECL TO 22' ECL (______)' @ _____'ECL TO 22' ECL 2" POLYVALVE/OPEN 5'SCL & 26'ECL ______'SCL & _____'ECL INSTALL 2" MPE-7 10' @ 5'SCL (______)' @ _____'SCL INSTALL 2" MPE-7 579' @ 5'SCL (______)' @ _____'SCL INSTALL 2" = 604 FT JOINT 2" = 623 FT INSTALL 4" = 552 FT 2" POLYVALVE/OPEN 25'ECL & 501'NCL ______'ECL & _____'NCL MFP19004618 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 253-395-6850 5/28/2019 R. MILLER 253-234-6558 6/3/2019 R. MILLER 253-234-6558 6/3/2019 REDT # (RW-114244)CITY OF RENTON GRANT PLACE TOWNHOMES R1 2" MPE-7 GAS MAIN EXTENSION - 8 M/F BLDG (36 UNITS) 1600 Grant Ave S., RENTON, WA 98055 PUGET SOUND ENERGY 107058140 105091676 AS SHOWN 2 OF 2 KING 32 CIKNC SW 20-23-05 208.080 211.082 CABLE BILL WALKER 253-288-7535 TELEPHONE N/A N/A RIGHT OF WAY PEI-FANG YANG 425-456-2774 . . . N/A N/A N/A ... 9/2/19 A.PAULSEN CUST. ROUTE CHANGE ... ... Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 3'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 3' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 IP 132-60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 8' 30'30' 5'18' 60' ROW NOT TO SCALE GRANT AVENUE S - CROSS SECTION E LOOKING NORTH W EX. 8" STW HP - 9'ECL ROW18'ROWPROP. 2" MPE IP - 2'ECL 21' ROW 10'10' 20'PROPERTY LINE7' PROP. 2" MPE IP - 12'SCL NOT TO SCALE GRANT CIRCLE S.E. (PUBLIC ALLEY - SOUTH) LOOKING EAST N S 31-1957 JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 TYPICAL GAS SERVICE LINE TRENCH DETAIL RESIDENTIAL Excavated Dirt Pile 24" Min NOTE: Install 12" shading if the backfill contains rocks greater than 6" dia. 18" Min Cover Gas Service Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 12" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. NOT TO SCALE TYPICAL GAS MAINLINE TRENCH DETAIL NOT TO SCALE Excavated Dirt Pile 24" Min NOTE: Install 12" shading if the backfill contains rocks greater than 6" dia. 24"Min Cover TO 36" Max Cover Gas Main Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 12" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. EX PLAT MAP 211.082 SCALE: 1" = 100' SITESITE 8' 30'30' 5'18' 60' ROW NOT TO SCALE GRANT AVENUE S - CROSS SECTION E LOOKING NORTHEAST W EX. 8" STW HP - 7'ECL ROW18'ROWPROP. 2" MPE IP - 11'ECLG 31-1957 G G GG NOT TO SCALE CROSS SECTION - S. 18TH ST. LOOKING WEST 8' 35'35' 5'18' 70' ROW EW ROW18'ROWPROP. 2" PE IP - 5' SCL G 8'5' R1 STOPSTOPG R A N T AV E S GRANT AVE S GRANT AVE S GRANT AVE SGRANT CIRCLE SE GRANT CIRCLE SE S 18TH ST S 1 8 T H S T STOPSTOPH MatchLine MatchLine S 18TH ST UTILITYWORK AHEAD W21-7 ONE LANEROAD AHEAD CW20-4W20-7A UTILITY WORKAHEAD W21-7 ONE LANEROAD AHEAD CW20-4 W20-7A W20-7A ONE LANEROADAHEAD CW20-4 UTILITYWORKAHEAD W21-7 UTILITYWORK AHEAD W21-7 BE PREPAREDTO STOP W20-7b W20-7A UTILITY WORKAHEAD W21-7 UTILITYWORK AHEAD W21-7 BE PREPAREDTO STOP W20-7b BE PREPARED TO STOP W20-7bW20-7A W20-7A 200' +/- 200' +/- 200' +/- 200' +/- 200' +/-200' +/- 200' +/- 200' +/- 100' +/-100' +/- 100' +/-100' +/- TRENCHING APRROX 30FT ACROSS GRANT AVE (WEST), APPROX 545FT (SOUTH) ALONG GRANT AVE TO THE INTERSECTION OF S. 18TH ST, APPROX 585FT (EAST ) TIEING INTO EXISTING 2" (HIGH VOLUME TAPPING TEE), LOCATED AT 216FT (W) AND 20FT(N) OF CENTERLINE Description of work to be performed: K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN Legend CONEONE LANEROADAHEAD CW20-4 one lane road ahead Flagger W20-7A Flagger AheadBE PREPAREDTO STOP W20-7b be prepared to stopUTILITYWORKAHEADW21-7 utility work ahead INVENTORY: 6-utility work ahead 3-one lane road ahead 3-be prepared to stop 6-flagger ahead 4-flaggers NOT TO SCALE N S EW NOTIFY EMS, FIRE AND POLICE 72 HOURS IN ADVANCE CUSTOMER: CONTACT: LOCATION: DATE:W/O # Designed By: Garrett Hooper Off:800-343-4049 Ext 5860 Cell # 425-551-8297 WATCP@KNDSERVICES.NET WSTCS#010855 PUGET SOUND ENERGY MITCH PETERSON 425-398-6071 1600 GRANT AVE S RENTON, WA 7-3-19 107058140 SLOW www.invarion.com