HomeMy WebLinkAboutC18006462 - Civil Construction Permit.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construction Permit: C18006462
IVR Number: 18006462
Permit InformaƟon
Permit Name:Wang Short Plat
Address/LocaƟon:11/27/2018Application Date:6198400125Parcel Number:19016 116TH AVE SE
Permit Type:10/30/2019Issue Date:Engineering
Permit Work Class:10/29/2020Expiration Date:Construction
Plan Reviewer:Jonathan Chavez 425-430-7288
Description:Wang Short Plat Stormwater Infrastructure improvements, detention/water quality vault, frontage improvements, new
public road. Soos Creek Water and Sewer.
Contacts
Name Address PhoneTypeBilling
Scott Jepson
Anaiyah Homes
1402 Lake Tapps Pkwy SE
Auburn, WA 98092
B: (253) 245-4454ApplicantX
Ben Madeo
Core Design Inc.
14711 NE 29th Pl, Suite 101
Bellevue, WA 98007
B: (425) 885-7877Contact
Scott Jepson
19016 116th LLC
1402 Lake Tapps Pkwy SE
Auburn, WA 98092
B: (253) 245-4454Owner
General CondiƟons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES