HomeMy WebLinkAboutCO 3 CITY OF RENTON CAG-19-152, CO #3-19
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: Lake Youngs Ct SE Storm&Water Improvement Project CAG-19-152 C.O.# 3
CONTRACTOR: Oceanside Construction, Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor,equipment,subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below and shown in the contractor's proposal:
ITEM Alteration Under This Change Order Unit Qty. Unit Price Total Price
CO#3A NEW ITEM: LS 1 $7,344.52 $7,344.52
Force account costs for sawcutting and the lost overhead/profit for removal of
the remainder of hot mix asphalt work,Surface Water Utility bid item A-12.
Note actual change order costs were split between Surface Water and Water
Utilities(CO#3A&CO#3B).
A-12 REMOVED ITEM: LS (625) $50.00 ($31,250.00)
Removal of Hot Mix Asphalt Patch Including CSTC from contract.
CO#38 NEW ITEM: LS 1 $6676.84 $6,676.84
Force account costs for sawcutting and the lost overhead/profit for removal of
the remainder of hot mix asphalt work,Water Utility bid item B-11.
Note actual change order costs were split between Surface Water and Water
Utilities(CO#3A&CO#38).
13-11 REMOVED ITEM: LS (625) $50.00 ($31,250.00)
Removal of Hot Mix Asphalt Patch Including CSTC from contract.
10%Sales Washington State Sales Tax IS 1 ($2,457.32) ($2,457.32)
Tax For Water Utility items only(B-11&CO#3B).
Total
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT
THIS ORDER TOTAL AFTER CHANGE
S501,986.60 $521,742.78 ($50,935.96) $470,806.82
SIGNATURES:
Contractor: Date: i
Project Engineer: 1 YN�/V4 Date: l
Approved By: aene.47 ,A;4, 1Date: it t y//1
Ron Str..a,Utility Sy ector /
Approved By: A .F / // /h. Date: J//5 /e1
Gregg), ,• Pl11P-f :r
Approved By: Date: II-51 T
Shane Moloney,Renton City Attorney
Attest: Date:
Jason Seth,City Clerk
H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-4017 2617 Lake Youngs CT SE\1600
Construction\1606a-Change Orders\CO#3\Working\CO#3-Oceanside Construction.doc\JHmc
NO EXCEPTIONS TAKEN.
-JM,COR,1 O/14/19
I,P7
4,� Oceanside Construction Inc.
{ 1511 Mt. Baker Hwy Bellingham, WA. 98226
Phone 360-933-1728 Fax 360-933-4152
Change Order Proposal
201903 — Lake Youngs Ct. SE Storm &Water Subject: Changes to "Hot Mix Asphalt
Improvements Patch"
TO Jared McDonald Number: COP-3A
City of Renton Revision No. : 0
1055 South Grady Way, 5th Floor Date: 10/7/2019
Renton, Washington 98057 Price / Do Not
425-430-7293 Work Type: Proceed
— — Days Valid: 5
Return To Auden Schilder
Oceanside Construction Inc
(360) 933-1728
asatosc@yahoo.com
Scope Of Work/Time Extension Request
As requested by the City of Renton, attached are the actual costs for sawcutting and the cost associated with
the lost overhead/profit by removing the Bid Items A-12.
Details
Cot, .Qty
tine No Code Description -type /Rate /Hrs Workers Est
A-12-20190S
- HOT MIX
ASPHALT General Laborer Labor $56.65 4.00 1.00 $226.60
001 PATCH Hrs
"INCLUDING V V V
CSTC"
Used with Sawcutting Subcontractor
A-12-20190Z
- HOT MIX Shovel , Excavator,
002 ASPHALT Backhoe, Tractors Labor $73.25 1.00 1.00 $73.25
"PINCLUDING ATCHUnder 15 TN Hrs
CSTC„ V V V -
A-12-201903 -
HOT MIX
ASPHALT 2015 Chev 3500
003 PATCH with tools Equipment $36.25 4.00 - $145.00
"INCLUDING
CSTC"
Line Na Code. , Description 'type /Rate " I firs Workers . Ext.
A-12-201903 -
HOT MIX
ASPHALT
004 PATCH JD 085 Excavator Equipment $43.75 1.00 - $43.75
"INCLUDING
CSTC"
A-12-201903 -
HOT MIX
ASPHALT Delmar Concrete
005 PATCH Cutting Subcontractor $986.00 1.00 - $986.00
"INCLUDING 4
CSTC"
1/2 of Total Invoice Cost
A-12-201903 -
HOT MIX Lost
006 ASPHALT Overhead/Profit Overhead $5,625.00 1.00 - $5,625.00
PATCH from Removing Bid
"INCLUDING Item A-12
CSTC"
Breakout
Labor : $299.85V
Overhead Percent @ 29%: $86.96V
Equipment : $188.75V
Overhead Percent @ 21%: $39.64V
Subcontractor : $986.00�
Overhead Percent @ 12%: $118.32�
Overhead : $5,625.00V
Total: $7,344.52
Signed By: .�, Dated: 10/7/2019
Auden Schilder
Project Manager
Oceanside Construction Inc.
1511 Mt. Baker Hwy Bellingham, WA. 98226
Phone 360-933-1728 Fax 360-933-4152
Change Order Proposal
201903 — Lake Youngs Ct. SE Storm &Water Subject: Changes to "Hot Mix Asphalt
Improvements Patch"
To Michael Mitchell Number: COP-3B
City of Renton Revision No. : 0
1055 South Grady Way, 5th Floor Date: 10/9/2019
Renton, Washington 98057 Price/ Do Not
(425)-430-7265 Work Type: Proceed
— -- — Days Valid: 5
Return To Auden Schilder
Oceanside Construction Inc
(360) 933-1728
asatosc@yahoo.com
Scope Of Work/Time Extension Request
As requested by the City of Renton, attached are the actual costs for sawcutting and the cost associated with
the lost overhead/profit by removing the Bid Items B-11.
Details
Cost Qty
Line No ' Code Description Type t Rate, =/firs workers Ext
B-11-201902
- HOT MIX
ASPHALT
PATCH General Laborer Labor ✓$56.65 4.00 1.00 $226.60
001 INCLUDING Hrs
CSTC FOR
WATER
TRENCH
Used with Sawcutting Subcontractor
B-11-201902
- HOT MIX
ASPHALT
PATCH Shovel , Excavator, 1.00
002 Backhoe, Tractors Labor ✓$73.25 1.00 $73.25
INCLUDING Under 15 TN Hrs
CSTC FOR
WAT E R
TRENCH
B-11-201903 - 2015 Chev 3500
003 HOT MIX Equipment 1$36.25 4.00 - $145.00
with tools
Line No code Description Type f iitate Hrs Workers Ezt'
ASPHALT
PATCH
INCLUDING
CSTC FOR
WATER
TRENCH
B-11-201903 -
HOT MIX
ASPHALT
004 PATCH JD 085 Excavator Equipment ✓$43.75 1.00 - $43.75
INCLUDING
CSTC FOR
WATER
TRENCH
B-11-201903 -
HOT MIX
ASPHALT
PATCH Delmar Concrete
005 INCLUDING Cutting Subcontractor ✓$986.00 1.00 - $986.00
CSTC FOR
WATER
TRENCH
1/2 of Total Invoice Cost
B-11-201903 -
HOT MIX
ASPHALT Lost
006 PATCH Overhead/Profit Overhead '45,625.00 1.00 - $5,625.00
INCLUDING from Removing Bid
CSTC FOR Item A-12
WATER
TRENCH
Breakout
Labor : ✓$299.85
Overhead Percent @ 29%: " $86.96
Equipment : ✓$188.75
Overhead Percent @ 21%: ✓ $39.64
Subcontractor : ✓ 986.00
Overhead Percent @ 12%:_ $118.32
Overhead : "$5,625.00
Total: $7,344.52✓
Signed By: Dated: 10/9/2019
Auden Schilder
Project Manager
Q/14/2019
NO EXCEPTIOPIS TAKEN
4t/ t.MIT tC
WATER UT1LITY
CflT F REnTTON
-----
EL-MAR CONCRETE
CUTTING & CORING Invoice
152 100th St. S. 38705
Tacoma, WA 98444
Ph # (253) 537-0109
FAX # (253) 535-0507
17 19
TO 0C-6i4N91 S21-)f- COOD A) Cri DATE , ' / r JOB NO. 21)/ Ci 693
/C/ / /14 /. /SAKE 0 1")Y CONTACT PERSON --T'ENcE-Z-360-220- /511,
--8 f / I'm /loll kili , ? tisc) 6 JOB LOCATION -R6... 0,\/
TERMS: NET 30 DAYS, UNLESS OTHERWISE NOTED.
..r.......... _
DATE DESCRIPTION AMOUNT
C1 /1- ii cA\Q C t I ;, V .(2 Li1V Li "
i
Asp 6 e.Sci --Trz-if/q c (A-T:
-- MO v i'A/ 7 ( Pi yivo-o j) 15 Cres s --Wcidr‘ ur, 31/Ap0
6-to-e r&i-rkr / VA a,i'%.. i/ F-L,,,p 7$-:0-._...---
imu 1 /4-1AJ4/ 3 --er4ppecs or- Vt/Rptil I 9 C•vp
MUM
if Intent!Affidavit of
Prevailing Wages Paid
forms are required,
please add S40.00
4'TR- ; •ii 1193 170
ckl
A FINANCE CHARGE OF 1.5% ON THE UNPAID PREVIOUS BALANCE WILL BE A fy
COMPUTED AT THE END OF EACH MONTH. IF CUSTOMER DEFAULTS OR IF SUIT \V -1k W
IS BROUGHT TO COLLECT ANY OF THE PRINCIPAL OR INTEREST DUE OR OWING Z
UNDER THIS BILL, DEL-MAR MAY CHARGE CUSTOMER REASONABLE ATTORNEY . .
FEES AND COLLECTION COSTS.