Loading...
HomeMy WebLinkAboutPre-App Comments 15-000585PREAPPLICATION MEETING FOR Bird Island Shoreline Enhancement 1201 Lake Washington Blvd N PRE 15-000585 CITY OF RENTON Department of Community & Economic Development Planning Division August 27, 2015 Contact Information: Planner: Jill Ding, 425.430.6598 Public Works Plan Reviewer: Vicki Grover, 425.430.7291 Fire Prevention Reviewer: Corey Thomas, 425.430.7024 Building Department Reviewer: Craig Burnell, 425.430.7290 Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre-application meeting is informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: August 27, 2015 TO: Jill Ding, Planner FROM: Vicki Grover, Plan Review SUBJECT: Pre-Application Comments for Bird Island Shoreline Enhancement Gene Coulon Park Pre-Application 15-000585 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official City decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal located at parcel 3344500775. The following comments are based on the pre-application submittal made to the City of Renton by the applicant. EXISTING CONDITIONS WATER Water service is not a requirement for this project. SEWER Sewer service is not a requirement for this project. STORM There are not any required detention, water quality or conveyance systems for this project. STREETS There are no street frontage improvements required for this project. GENERAL INFORMATIONAL COMMENTS 1. A building permit will be required (in addition to structural calculations) if your proposed path/trail is an elevated structure that is greater than 30 inches above the ground. CONDITIONS 1. During construction, the contractor shall prevent all dust, drips, debris and spills from coming in contact with the water’s surface. Needs to be shown on the TESC (Temporary Erosion & Sediment Control Plan).