Minor Franchise Permit: MFP19005443
IVR Number: 19005443
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :10/09/2019Application Date:0323059112Parcel Number:2712 DUVALL AVE NE
Permit Type:11/14/2019Issue Date:Franchise
Permit Work Class:11/13/2020Expiration Date:Minor Utility
Job Number:101123484Franchise Type:Electric
Description:Crew to replace B/O pad mounted XF at V01. Will require a single lane closure of north bound Duvall Ave NE/Coal
Creek Parkway SE adjacent to SE 95th Way and V01 W/ Police and flaggers for intersection. Work to take place at
night or weekend. Outage for City of Newcastle traffic signals to be coordinated by PSE.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101123484
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
2712 DUVALL AVE NE
CREW TO REPLACE B/O PAD MOUNTED XF AT V01(319140-167269). WILL REQUIRE SHOULDER SIDE SINGLE LANE CLOSURE OF NB
DUVALL AVE NE/COAL CREEK PARKWAY SE ADJACENT TO SE 95TH WAY& V01 W/ POLICE & FLAGGERS FOR INTERSECTION DURING NON-CORE HOURS.
OUTAGE FOR CITY OF NEWCASTLE TRAFFIC SIGNALS TO BE COORDINATED BY PSE. NO DISTURBANCE OF HARD SURFACES REQUIRED. NO HS CUTS ANTICIPATED
✔✔✔
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.09 13:30:21 -07'00'10/9/19
MFP19005443
Scott Warlick 10/9/2019
Justin Johnson 11/14/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101123484
Potelco, Inc
MIGUEL REYNA (425) 748-6365
6905 S 228th St, Kent, WA 98032
MIGUEL.REYNA@PSE.COM
2712 DUVALL AVE NE
TBD
TBD
CORRIE RYDBERG
10/9/19
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.10.09 13:30:08 -07'00'
MFP19005443
Scott Warlick
Work after 10pm will require a noise variance because you are within 300' of a Residence. A noise
variance requires council approval which typically takes 6 weeks.
10/9/201912/4 - 12/6 or 12/9 - 12/13
8:00am - 10:00pm
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
2712
319140-167269
37.5 kVA 120/240V (A)
319105-167307
15 kVA 120/240V (C)
319112-167265
319107-167287
15kVA 120/240v
25T
UNKROWROWROWR
OW
ROWROWROW ROW
ROW
ROWROW
R
OWROW319127-167262
319125-167262
319124-167263
319098-167270
R
OW
R
OWROWROWROW DUVALL AVE NECOAL CREEK PKWY SESE 95TH WAY
J
J
GAS
PHONE
CABLE TV
N/A 584044856
N/A 594130660
N/A N/A
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG XFMR Removal
UG Expense
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
Owner / Developer Contact Info
officeATTN:
N/A
N/A
N/A
N/A N/A
N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
XX
SCALE: 1" = 50'101123484THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Service Stubs
101123484
N/A
N/A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. REYNA 425-748-6365 9/26/19
D. FIELDS 714-893-2405 9/26/19
J. WARNER 714-893-2405 9/26/19
N/A RENTON
PRE-14 / CREW2 / 2712 DUVALL AVE NE
REPL B.O. PM XFMR
2712 DUVALL AVE NE, RENTON, WA. 98059
O-563152
101123484
AS NOTED 1/1
KING FAC-SVC
NW 3-23N-05E
2305E010 2305E040 2305E010 PRE-14
11536813
N/A
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E040
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 50' MAP#: 2305E010
CIRCUIT FEET ADDED: NONE SITE SPECIFIC NOTES
V01 (319140-167269)
-REPL B.O. 37.5kVA 120/240v PM XFMR W/ NEW PM 37.5kVA 120/240v PM XFMR
-TRANSFER ALL UG CONDUCTORS & DEVICES
**PM XFMR IS STARTING TO LEAK OIL DUE TO LIGHTNING HIT
**GEO ENGINEERING REQUIRED FOR OIL CLEANUP
**PSE TO COORDINATE WITH CITY OF NEWCASTLE FOR TRAFFIC SIGNAL OUTAGE
THOMAS GUIDE
626-H5
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:MIGUEL REYNA
425-429-1201
MIGUEL.REYNA@PSE.COM
WORKSITERemoved at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V01
319140-167269
37.5kVA
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:6247050
37.5kVA
319140-167269
V01
MFP19005443
V01271211111111111111111111111111 11
BIKESMERGE W
ITH
TRAFF
IC
W4-1B USE MAXIMUM AVAILABLESPACE FOR SIGNSM6-2
ARRW-BRD COAL CREEK PARKWAY SEDUVALL AVE NESE 95TH WAYDUVALL AVE NEPOLICEUPO TRAFFIC SIGNALSET TO FLASHW20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'
100'
100'
W20-
7
A
ROADWORKAHEAD
W20-1
B
EPRE
P
ARED
TOSTO
P
W3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-
7
A350'ROADWORKAH
EA
D
W20-1350'350'350'RI
G
H
T
L
A
N
E
C
L
O
S
E
D
AH
E
AD
W20-
5
R
W4-2
LCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-OB1011234842712 DUVALL AVE NE, RENTON, WA 98059REVISED 10/8/2019jason.bisenius@pse.com425-424-7316SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431TEMPORARY TRAFFIC CONTROL PLANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPUG BOX/VAULTVaultCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP19005443