Loading...
HomeMy WebLinkAboutMFP19005443.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19005443 IVR Number: 19005443 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :10/09/2019Application Date:0323059112Parcel Number:2712 DUVALL AVE NE Permit Type:11/14/2019Issue Date:Franchise Permit Work Class:11/13/2020Expiration Date:Minor Utility Job Number:101123484Franchise Type:Electric Description:Crew to replace B/O pad mounted XF at V01. Will require a single lane closure of north bound Duvall Ave NE/Coal Creek Parkway SE adjacent to SE 95th Way and V01 W/ Police and flaggers for intersection. Work to take place at night or weekend. Outage for City of Newcastle traffic signals to be coordinated by PSE. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101123484 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 2712 DUVALL AVE NE CREW TO REPLACE B/O PAD MOUNTED XF AT V01(319140-167269). WILL REQUIRE SHOULDER SIDE SINGLE LANE CLOSURE OF NB DUVALL AVE NE/COAL CREEK PARKWAY SE ADJACENT TO SE 95TH WAY& V01 W/ POLICE & FLAGGERS FOR INTERSECTION DURING NON-CORE HOURS. OUTAGE FOR CITY OF NEWCASTLE TRAFFIC SIGNALS TO BE COORDINATED BY PSE. NO DISTURBANCE OF HARD SURFACES REQUIRED. NO HS CUTS ANTICIPATED ✔✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.09 13:30:21 -07'00'10/9/19 MFP19005443 Scott Warlick 10/9/2019 Justin Johnson 11/14/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101123484 Potelco, Inc MIGUEL REYNA (425) 748-6365 6905 S 228th St, Kent, WA 98032 MIGUEL.REYNA@PSE.COM 2712 DUVALL AVE NE TBD TBD CORRIE RYDBERG 10/9/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.10.09 13:30:08 -07'00' MFP19005443 Scott Warlick Work after 10pm will require a noise variance because you are within 300' of a Residence. A noise variance requires council approval which typically takes 6 weeks. 10/9/201912/4 - 12/6 or 12/9 - 12/13 8:00am - 10:00pm SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 2712 319140-167269 37.5 kVA 120/240V (A) 319105-167307 15 kVA 120/240V (C) 319112-167265 319107-167287 15kVA 120/240v 25T UNKROWROWROWR OW ROWROWROW ROW ROW ROWROW R OWROW319127-167262 319125-167262 319124-167263 319098-167270 R OW R OWROWROWROW DUVALL AVE NECOAL CREEK PKWY SESE 95TH WAY J J GAS PHONE CABLE TV N/A 584044856 N/A 594130660 N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior UG XFMR Removal UG Expense Removal Temporary Job Order Distribution HP Svc/MSA Owner / Developer Contact Info officeATTN: N/A N/A N/A N/A N/A N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X XX SCALE: 1" = 50'101123484THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 101123484 N/A N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. REYNA 425-748-6365 9/26/19 D. FIELDS 714-893-2405 9/26/19 J. WARNER 714-893-2405 9/26/19 N/A RENTON PRE-14 / CREW2 / 2712 DUVALL AVE NE REPL B.O. PM XFMR 2712 DUVALL AVE NE, RENTON, WA. 98059 O-563152 101123484 AS NOTED 1/1 KING FAC-SVC NW 3-23N-05E 2305E010 2305E040 2305E010 PRE-14 11536813 N/A OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E040 UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' MAP#: 2305E010 CIRCUIT FEET ADDED: NONE SITE SPECIFIC NOTES V01 (319140-167269) -REPL B.O. 37.5kVA 120/240v PM XFMR W/ NEW PM 37.5kVA 120/240v PM XFMR -TRANSFER ALL UG CONDUCTORS & DEVICES **PM XFMR IS STARTING TO LEAK OIL DUE TO LIGHTNING HIT **GEO ENGINEERING REQUIRED FOR OIL CLEANUP **PSE TO COORDINATE WITH CITY OF NEWCASTLE FOR TRAFFIC SIGNAL OUTAGE THOMAS GUIDE 626-H5 E-Mail: Cell Phone: Project Manager Contact Information: Manager:MIGUEL REYNA 425-429-1201 MIGUEL.REYNA@PSE.COM WORKSITERemoved at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 319140-167269 37.5kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#:6247050 37.5kVA 319140-167269 V01 MFP19005443 V01271211111111111111111111111111 11 BIKESMERGE W ITH TRAFF IC W4-1B USE MAXIMUM AVAILABLESPACE FOR SIGNSM6-2 ARRW-BRD COAL CREEK PARKWAY SEDUVALL AVE NESE 95TH WAYDUVALL AVE NEPOLICEUPO TRAFFIC SIGNALSET TO FLASHW20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100' 100' 100' W20- 7 A ROADWORKAHEAD W20-1 B EPRE P ARED TOSTO P W3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20- 7 A350'ROADWORKAH EA D W20-1350'350'350'RI G H T L A N E C L O S E D AH E AD W20- 5 R W4-2 LCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-OB1011234842712 DUVALL AVE NE, RENTON, WA 98059REVISED 10/8/2019jason.bisenius@pse.com425-424-7316SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431TEMPORARY TRAFFIC CONTROL PLANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPUG BOX/VAULTVaultCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP19005443