HomeMy WebLinkAboutExhibit B of Bill of sale for Storage One pdfWTR -3896
WWP - 3896
SWP - 3896
TRO - 3896
TED - 3896
PROJECT NAME:
CONSTRUCTION PERMIT NO.
PROJECT FILE NUMBER:
ROADWAY, STREET LIGHTS AND SIGNALS
DESCRIPTION QTY UNIT TOTAL COST
Curb and Gutter 260 L.F.3,835.00$
Sidewalk 1322 S.Y.52,219.00$
Asphalt Concrete Pavement 0 S.Y.-$
Monument Case and Cover 0 EA.-$
Traffic Signs - Complete System 0 L.S.-$
Number of Luminaires and Poles 2 EA.16,000.00$
Subtotal 72,054.00$
Sales Tax 6,845.13$
Grand Total Roadway, Street Lights and Signals 78,899.13$
STORMWATER SYSTEM IMPROVEMENTS
QTY UNIT SIZE TYPE TOTAL COST
1 EA.48"TYPE 1 Catch Basin 1,500.00$
Subtotal 1,500.00$
Sales Tax 142.50$
Grand Total Stormwater System Improvements 1,642.50$
WATER SYSTEM IMPROVEMENTS
QTY UNIT SIZE TYPE TOTAL COST
644 EA.6"DI Water Main Pipe and Fittings 51,520.00$
2 EA.10"Gate Valve Assembly 2,000.00$
6 EA.12"Gate Valve Assembly 7,200.00$
2 EA.6"Fire Hydrant Assembly 8,000.00$
1 EA.Permanent Blow-Off Assembly 1,800.00$
Subtotal 70,520.00$
Sales Tax 6,699.40$
Grand Total Water System Improvements 77,219.40$
Per the request of the City of Renton the following information is furnished concerning final costs for
improvements installed and turned over to the City for the referenced project.
DESCRIPTION
ITEM
(City Staff Use Only)
EXHIBIT "B"
Contributary Assets
City Project Numbers:
Storage One on 4th Expansion
U15008468
LUA14-001641
Return Address:
City Clerkâs Office
City of Renton
1055 South Grady Way
Renton, WA 98057
Page 1 of 1