Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Storage One - REQUEST FOR PROJECT NUMBER
PUBLIC WORKS/PLANNING PROJECT REQUEST FORM Contact: Rohini Nair (Brianne Bannwarth for Rohini) Date: 06/24/2016 File Status: Existing OR New TYPE: Developer OR CIP Project Phase: Bid Construction Construction “As-Built” Design Pre-Design Project Name: Storage One (70 characters max) Description of Project: UTILITY CONSTRUCTION FOR NEW STORAGE ONE BUILDING WITH SELF STORAGE, OFFICE AND RETAIL SPACE Street Lighting Permit # : and/or Utility permit#: U15008468 Plan #: LUA13-000642 / LUA15-000026 BUILDING PERMIT #: ADDRESS/STREET NAME(S): 4815 NE 4th St Developer: Stricker Cato Murphy Architects Contractor: NW Steel System LLC Owner: Minkler Trust Consulting Engineer: Barghausen Consulting Engineers OTHER ALIASES:__Renton Self Storage, Urban Self Storage___________________________________________ CHECK EACH DISCIPLINE INVOLVED IN PROJECT: TED (Roadway/drainage/off-site improvements) TRO (Signalization, channelization, lighting) WWP (Wastewater/sanitary sewer main- include basin name) WTR (Water – mains, valves, hydrants) SWP (Surface water improvements/CIP only – include basin name) PLR (Plan review) PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN MYLARS: WATER WASTEWATER SURFACE WATER TRANSPORTATION FIRE PLAN REVIEW CIP PROJECT FILE PICKLIST UTILITES FILE TITLE FOLDER SIZE* QUANTITY Choose Folder Size CORRESPONDENCE □ General--------------------------------------------------------------------- □ Consultant----------------------------------------------------------------- □ City--------------------------------------------------------------------------- □ Other Agencies------------------------------------------------------------ □ Contractor------------------------------------------------------------------ □ Grants/Loans-------------------------------------------------------------- DESIGN/PLANNING □ Design----------------------------------------------------------------------- □ Consultant Selection----------------------------------------------------- □ Contracts------------------------------------------------------------------- □ Reports/Studies/Calculations----------------------------------------- AGREEMENTS--------------------------------------------------------------------------- □ SEPA □PERMITS/PLAN REVIEW □ EASEMENTS/DEEDS CONSTRUCTION □ Bid Info---------------------------------------------------------------------- □ Insurance & Legal Review---------------------------------------------- □ Contract Document----------------------------------------------------- □ Submittals----------------------------------------------------------------- □ Pay Estimates------------------------------------------------------------- □ Change Orders------------------------------------------------------------ □ Inspection/Progress Reports------------------------------------------ □ Construction Management Services--------------------------------- □ Operations & Maintenance-------------------------------------------- □ LITIGATION LID------------------------------------------------------------------------------------------ □ Public Notification-------------------------------------------------------- □ Public Meeting------------------------------------------------------------ □ Final Assessment Roll---------------------------------------------------- □ Miscellaneous ------------------------------------------------------------ SAD----------------------------------------------------------------------------------------- □ Public Notification-------------------------------------------------------- □ Public Meeting------------------------------------------------------------ □ Final Assessment Roll---------------------------------------------------- □ Miscellaneous ------------------------------------------------------------