Loading...
HomeMy WebLinkAboutStorage One - REQUEST FOR PROJECT NUMBER PUBLIC WORKS/PLANNING PROJECT REQUEST FORM Contact: Rohini Nair (Brianne Bannwarth for Rohini) Date: 06/24/2016 File Status:  Existing OR  New TYPE:  Developer OR  CIP Project Phase:  Bid  Construction  Construction “As-Built”  Design  Pre-Design Project Name: Storage One (70 characters max) Description of Project: UTILITY CONSTRUCTION FOR NEW STORAGE ONE BUILDING WITH SELF STORAGE, OFFICE AND RETAIL SPACE Street Lighting Permit # : and/or Utility permit#: U15008468 Plan #: LUA13-000642 / LUA15-000026 BUILDING PERMIT #: ADDRESS/STREET NAME(S): 4815 NE 4th St Developer: Stricker Cato Murphy Architects Contractor: NW Steel System LLC Owner: Minkler Trust Consulting Engineer: Barghausen Consulting Engineers OTHER ALIASES:__Renton Self Storage, Urban Self Storage___________________________________________ CHECK EACH DISCIPLINE INVOLVED IN PROJECT:  TED (Roadway/drainage/off-site improvements)  TRO (Signalization, channelization, lighting)  WWP (Wastewater/sanitary sewer main- include basin name)  WTR (Water – mains, valves, hydrants)  SWP (Surface water improvements/CIP only – include basin name)  PLR (Plan review) PLEASE CHECK THE DISCIPLINES WHICH NEED TO SIGN MYLARS:    WATER  WASTEWATER  SURFACE WATER  TRANSPORTATION  FIRE   PLAN REVIEW   CIP PROJECT FILE PICKLIST  UTILITES  FILE TITLE FOLDER SIZE* QUANTITY   Choose Folder Size   CORRESPONDENCE     □ General---------------------------------------------------------------------     □ Consultant-----------------------------------------------------------------     □ City---------------------------------------------------------------------------     □ Other Agencies------------------------------------------------------------     □ Contractor------------------------------------------------------------------     □ Grants/Loans--------------------------------------------------------------         DESIGN/PLANNING     □ Design-----------------------------------------------------------------------     □ Consultant Selection-----------------------------------------------------     □ Contracts-------------------------------------------------------------------     □ Reports/Studies/Calculations-----------------------------------------         AGREEMENTS---------------------------------------------------------------------------         □ SEPA         □PERMITS/PLAN REVIEW         □ EASEMENTS/DEEDS         CONSTRUCTION     □ Bid Info----------------------------------------------------------------------     □ Insurance & Legal Review----------------------------------------------     □ Contract Document-----------------------------------------------------     □ Submittals-----------------------------------------------------------------     □ Pay Estimates-------------------------------------------------------------     □ Change Orders------------------------------------------------------------     □ Inspection/Progress Reports------------------------------------------     □ Construction Management Services---------------------------------     □ Operations & Maintenance--------------------------------------------         □ LITIGATION        LID------------------------------------------------------------------------------------------     □ Public Notification--------------------------------------------------------     □ Public Meeting------------------------------------------------------------     □ Final Assessment Roll----------------------------------------------------     □ Miscellaneous ------------------------------------------------------------         SAD-----------------------------------------------------------------------------------------     □ Public Notification--------------------------------------------------------     □ Public Meeting------------------------------------------------------------     □ Final Assessment Roll----------------------------------------------------     □ Miscellaneous ------------------------------------------------------------