Loading...
HomeMy WebLinkAboutStorage One TIR TECHNICAL INFORMATION REPORT Storage One Renton, Washington Our Job. No. 12740 12740.008.doc TABLE OF CONTENTS PAGE NUMBERS 1.0 PROJECT OVERVIEW ............................................................................................................................. 1 Figure 1 – Technical Information Report (TIR) Worksheet ....................................................................... 2 Figure 2 – Vicinity Map ............................................................................................................................. 8 Figure 3 – Drainage Basins, Subbasins, and Site Characteristics .......................................................... 10 Figure 4 – Soils Map ............................................................................................................................... 13 2.0 CONDITIONS AND REQUIREMENTS SUMMARY................................................................................ 18 2.1 Analysis of the Eight Core Requirements ........................................................................................ 18 2.2 Analysis of the Five Special Requirements .............................................................................. 19 3.0 OFF-SITE ANALYSIS .................................................................................................................. 21 4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ............................. 172 A. Existing Site Hydrology .................................................................................................................. 172 A-1. Predeveloped Hourly Time Step Modeling Input A-2. Predeveloped Hourly Time Step Modeling Output B. Developed Site Hydrology .................................................................................................... 172 B-2. Developed Hourly Time Step Modeling Input B-3. Developed Hourly Time Step Modeling Output B-4. Bypass Input B-5. Bypass Output B-6. Discharge From Pond B-7. Discharge From Site C. Performance Standards ................................................................................................................. 173 D. Flow Control System ..................................................................................................................... 173 D-1. Flow Control BMP Selection & Design D-2. Flow Control Facility Design Output D-2.1 Raingarden D-2.2 Modular Grid Pavement D-2.3 Permeable Pavement E. Water Quality System .................................................................................................................... 174 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN ........................................................................... 199 6.0 SPECIAL REPORTS AND STUDIES ................................................................................................... 209 7.0 OTHER PERMITS ................................................................................................................................ 235 8.0 CSWPPP ANALYSIS AND DESIGN .................................................................................................... 237 9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ...................... 239 10.0 OPERATION AND MAINTENANCE MANUAL ..................................................................................... 250 12740.008.doc 1.0 PROJECT OVERVIEW The proposed Storage One on 4th Expansion project is a 1.83 acre site located within a portion of the Northwest quarter of Section 15, Township 23 North, Range 5 East, Willamette Meridian, King County, Washington. More specifically, the site is located approximately 500 feet east of NE 4th Street and Duvall Avenue NE in Renton, Washington. The enclosed Figure 2 – Vicinity Map, depicts the approximate location of the proposed site. The site is currently partially developed. There is a concrete driveway and small gravel lot on site. The remainder of the site is grass and trees. There is an isolated Class 3 Wetland (9,529 square feet) located on this project as well as a Class 4 Stream that runs along the east boundary of the site. The existing topography tends to slope to the east side of the site to the existing stream that runs south through the project. There are no existing buildings on the site. The storm drainage facility is proposed to be located near the southwest corner of the project site and discharge to the existing stream at the southeast corner. The flow control calculations are for the development and do not include the stream or buffer. The existing row is currently paved and runoff is collected in existing catch basins along the project frontage. The northern boundary of the project site is formed by NE 4th Street. Existing commercial developments are to the west and residential developments are to the east and south. The proposal for this development is to construct an expansion of the adjacent Storage One facility. This will include new driveways and parking, a new storage building and a new retail/office building with restrooms. In addition, public road improvements will be constructed along NE 4th Street. Elevations on the site are 398 for the majority of the site, down to 395 at the west and east boundaries of the project site. Infiltration is not feasible for this site as the on-site soils do not percolate well enough. A Flow Control BMP is required for this site. This project is a non-subdivision project on an individual lot that meets the requirements for a large lot, high impervious BMP. An area of the impervious site equal to 40 percent of the site impervious area will be treated with a flow control BMP. An on-site rain garden and modular grid pavement will be used before runoff is sent to the detention pond and water quality system. The site has been designed according to the 2010 City of Renton Amendments to the 2009 King County Surface Water Design Manual. The Flow Control Duration Standard Matching Forested Site Conditions performance standard has been applied to this site. Enhanced Basic Water Quality is also required as this is a commercial site. 1 2 3 4 5 6 7 8 9 10 11 12 13 Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/9/2014 Page 1 of 35259690525970052597105259720525973052597405259750525976052597705259780525979052596905259700525971052597205259730525974052597505259760525977052597805259790563620563630563640563650563660563670563680563690563700563710563720563730563740563750563760563770 563620 563630 563640 563650 563660 563670 563680 563690 563700 563710 563720 563730 563740 563750 563760 563770 563780 47° 29' 18'' N 122° 9' 19'' W47° 29' 18'' N122° 9' 12'' W47° 29' 15'' N 122° 9' 19'' W47° 29' 15'' N 122° 9' 12'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 35 70 140 210Feet 0 10 20 40 60Meters Map Scale: 1:756 if printed on A landscape (11" x 8.5") sheet.14 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 10, Sep 30, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 8, 2014—Jul 15, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/9/2014 Page 2 of 315 Map Unit Legend King County Area, Washington (WA633) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AgC Alderwood gravelly sandy loam, 8 to 15 percent slopes 0.0 0.1% EvB Everett gravelly sandy loam, 0 to 5 percent slopes 1.8 99.9% Totals for Area of Interest 1.8 100.0% Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/9/2014 Page 3 of 3 16 17 12740.008.doc 2.0 CONDITIONS AND REQUIREMENTS SUMMARY 2.1 Analysis of the Eight Core Requirements Core Requirement No. 1: Discharge at the Natural Location. Response: This project site will discharge to the existing Class IV stream, the same as current conditions. Core Requirement No. 2: Off-Site Analysis. Response: This project has prepared an off-site analysis that is located in Section 3.0 of this Technical Information Report. Please refer to that document for the off-site analysis. Core Requirement No. 3: Flow Control. Response: The project is located within the Flow Control Duration Standard - Matching Forested flow control area as depicted on the City of Renton Flow Control Applications Map and this is the standard applied to this project. The difference between existing and developed 100-yr peak flows is greater than 0.1-cfs, therefore a flow control facility will be required. This project will provide flow control in the form of a detention pond located in the southwest corner of the project site discharging to the same location as it does under existing conditions. A Flow Control BMP is also required. A rain garden is proposed in the southeast portion of the site. The emergency access road will be comprised of a grassed modular grid pavement. The proposed rain garden and modular grid pavement satisfy the requirement for flow control BMP. Core Requirement No. 4: Conveyance System. Response: The conveyance system for this project site was sized according to the 2010 City of Renton Amendments to the 2009 King County, Washington Surface Water Design Manual (KCSWDM). Since the project site is less than 10 acres in size, the pipe conveyance system was sized based on the Rational method utilizing an initial time of concentration of 6.3 minutes and a Manning's "n" value of 0.014. The 100-year event was analyzed. A backwater calculation has been completed and shows that 0.19 feet of freeboard is provided in the 100-yr storm event. The requirement is that a new pipe conveyance system be designed to convey the 25-year peak flow at a minimum, therefore this requirement is satisfied as this system is capable of conveying the 100-yr event. Core Requirement No. 5: Temporary Erosion and Sediment Control. Response: This project site will follow the erosion and sediment control measures as delineated in City of Renton Core Requirement 5, section 8.0 of this report and the Demolition and TESC Plan included in the construction plans. Clearing limits will be specified, cover measures will be instituted, perimeter protection will be installed in the form of silt fences, a rock construction entrance will be installed, and the streets will be swept clean of sediment after construction at the end of each day. Core Requirement No. 6: Maintenance and Operations. Response: This project will concur with all maintenance and operations requirements as delineated in the 2009 KCSWDM for projects of this nature. Core Requirement No. 7: Financial Guarantees and Liability. 18 12740.008.doc Response: This project will concur with all financial guarantees and liability requirements of the 2009 KCSWDM as delineated for projects of this nature. Core Requirement No. 8: Water Quality. Response: This project will create/add more than 5,000 square feet of pollution generating impervious surface and therefore will require water quality treatment. The Water Quality Menu followed for this project site requires that the Enhanced Basic Water Quality Menu be followed for this development due to its commercial nature. This project is proposing the use of a modular wetland which has DOE GULD approval for enhanced treatment. An adjustment has been approved by the City for the use of a Modular Wetland and a copy of the approval letter is included in Section 4.E. This system uses media to treat storm water runoff. Per section 6.2.1 of the KCSWDM this facility is designed to treat the full 2-year release rate from the detention facility. There will also be two flow control BMPs, a rain-garden in the southeast corner of the site to further treat roof runoff, as well as an emergency access road paved with a grassed modular grid pavement. 2.2 Analysis of the Five Special Requirements Special Requirement No. 1: Other Adopted Area-Specific Requirements. Response: To the best of our knowledge, the site is not located in an Other Adopted Area-Specific Requirement area; therefore, Special Requirement No. 1 does not apply. Special Requirement No. 2: Flood Hazard Area Delineation. Response: This project does not contain, nor is it adjacent to a flood hazard area for a river, stream, lake, wetland, closed depression, marine shoreline, or a King County mapped channel migration zone. Therefore, the requirements of this Special Requirement do not apply. Special Requirement No. 3: Flood Protection Facilities. Response: This proposed project will not rely on an existing flood protection facility, nor does it propose to modify or construct a new flood protection facility. Therefore, the requirements of this Special Requirement do not apply. Special Requirement No. 4: Source Control. Response: This project is a commercial site development; therefore, source control is required. Sources controls on this project include covering dumpster areas. Special Requirement No. 5: Oil Control. Response: This site does not qualify as a high-use site. Therefore, the requirements of this Special Requirement do not apply. Special Requirement No. 6: Aquifer Protection Area. Response: This site is not located in an aquifer protection area. The onsite soils are not conducive to infiltration. The only runoff to the proposed rain garden is from the building roof and emergency access road, both of which are non-pollution generating impervious surface. 20 12740.008.doc 3.0 OFF-SITE ANALYSIS Runoff leaves the site at the southeast corner of the property discharging east to Maplewood Creek. Maplewood Creek continues south and eventually joins another branch of Maplewood Creek before it flows through the Maplewood Golf Course and discharges to the Cedar River. A Level 1 Off-Site Drainage Analysis has been prepared for this project site. That document is attached herewith in its entirety. This document should meet all of the requirements of the City of Renton for off-site analysis for this development. 21 22 15432.003.doc TABLE OF CONTENTS TASK 1 STUDY AREA DEFINITION AND MAPS EXHIBIT A Vicinity Map EXHIBIT B Downstream Drainage Map EXHIBIT C Upstream Basin Map TASK 2 RESOURCE REVIEW EXHIBIT D FEMA Map EXHIBIT E Sensitive Areas Map EXHIBIT F SCS Soils Map EXHIBIT G Assessor’s Map EXHIBIT H Wetland Inventory Map EXHIBIT I Basin Reconnaissance Summary Report TASK 3 FIELD INSPECTION EXHIBIT J Off-Site Analysis Drainage System Table 3.1 Conveyance System Nuisance Problems (Type 1) 3.2 Severe Erosion Problems (Type 2) 3.3 Severe Flooding Problems (Type 3) TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS EXHIBIT K Drainage Complaints 23 24 15432.005.doc TASK 1 STUDY AREA DEFINITION AND MAPS The proposed Storage One project is a 1.83 acre site located within a portion of the Northwest quarter of Section 15, Township 23 North, Range 5 East, Willamette Meridian, King County, Washington. More specifically, the site is located approximately 500 feet east of NE 4th Street and Duvall Avenue NE in Renton, Washington. The enclosed Exhibit A – Vicinity Map, depicts the approximate location of the proposed site. The site is currently partially developed. There is a concrete driveway and small gravel lot on site. The remainder of the site is grass and trees. The existing topography tends to slope to the east side of the site. There are no existing buildings on the site. The storm drainage facility is proposed to be located in near the southwest corner of the project site such that the site will discharge in the same location it does under existing conditions. There is an isolated Class 3 Wetland (9,529 square feet) located on this project as well as a Class 4 Stream that runs along the east boundary of the site. The northern boundary of the project site is formed by NE 4th Street. Existing commercial developments are to west and residential developments are to the east and south. The proposal for this development is to construct an expansion of the adjacent Storage One facility. This will include new access drives and parking, a new storage building and a new retail/office building with restrooms. In addition, public road improvements will be constructed along 4th Street. Elevations on the site are 398 for the majority of the site, down to 395 at the west and east boundaries of the project site. Infiltration is not feasible for this site as the on-site soils do not percolate well enough. A Flow Control BMP is required for this site. This project is a non-subdivision project on an individual lot that meets the requirements for a large lot, high impervious BMP. An area of the impervious site equal to 40 percent of the impervious site area will be directed to an on-site rain garden or will be constructed on Grassed Modular Grid Pavement before being sent to the detention pond. UPSTREAM DRAINAGE ANALYSIS Based on review of the project survey and our site visit, there is no offsite runoff contributing to the project site. The site has been filled and raised relative to the surrounding properties. 25 26 27 28 29 30 31 15432.005.doc TASK 2 RESOURCE REVIEW · Adopted Basin Plans: The site is part of the Lower Cedar River drainage basin, and is in the Maplewood Sub Basin. · Finalized Drainage Studies: This is not applicable. · Basin Reconnaissance Summary Report: Once again, the site is located in the Lower Cedar River drainage basin and is in the Maplewood Sub Basin. · Critical Drainage Area Maps: According to the city of Renton, Enhanced Basic Water Quality treatment is required. Also, Level 2 (Duration standard) flow control is required for this site. · Floodplain and Floodway FEMA Maps: Please the enclosed Exhibit D – FEMA Map utilized for this analysis. Panel No. 982 of 1,725, Map No. 53033C0982 F, revised May 16, 1995, indicates that the proposed project site does not lie within a floodplain or floodway of a stream. · Other Off-Site Analysis Reports: A review of Exhibit I – Basin Reconnaissance Summary Report and the site investigation work conducted in the preparation of this Level 1 Drainage Analysis. The U.S. Department of Agriculture Soils Conservation Service (SCS) soils map is also provided (see Exhibit F – SCS Soils Map). · Sensitive Areas Folios: Based on a review of the sensitive areas as shown on the City of Renton GIS maps, it was found that there is a wetland on subject site. A Wetland Delineation Report was done for the site there is a 9,529ft Category III wetland on site as well as a Category II wetland by the south boundary. The Category III wetland is believed to be the result of filling the site and as such should be exempt from regulation. The Category II wetland shall require a 25-foot buffer. There is also a surveyed Class 4 stream which runs along the east property boundary that shall require a 35’ buffer. There are no landslide, flood, seismic or coal mine hazards, etc., associated with this project site. · Road Drainage Problems: This is not applicable. · United States Department of Agriculture King County Soils Survey: Based on our review of the soils map for this area, the entire site is 95% EvB (Everett gravelly sandy loam) and 5% AgC (Alderwood gravelly sandy loam). · Wetland Inventory Map: There is a Category III wetland on site as well as a Category II wetland. The Category III wetland is due to prior filling of the property and as such should be exempt from regulation requirements. The Category II wetland shall require a 25-foot buffer. · Migrating River Studies: This is not applicable. 32 33 34 35 2,257 188 WGS_1984_Web_Mercator_Auxiliary_Sphere City of Renton Print map Storage One This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes None Legend 128 0 64 128 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov 12/09/2014 City and County Boundary Other City of Renton Addresses Parcels 1st Floor 1st Floor 2nd Floor 1st Floor Other Buildings Buildings Slope City of Renton >15% & <=25% >25% & <=40% (Sensitive) >40% & <=90% (Protected) >90% (Protected) Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions36 37 Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/9/2014 Page 1 of 35259690525970052597105259720525973052597405259750525976052597705259780525979052596905259700525971052597205259730525974052597505259760525977052597805259790563620563630563640563650563660563670563680563690563700563710563720563730563740563750563760563770 563620 563630 563640 563650 563660 563670 563680 563690 563700 563710 563720 563730 563740 563750 563760 563770 563780 47° 29' 18'' N 122° 9' 19'' W47° 29' 18'' N122° 9' 12'' W47° 29' 15'' N 122° 9' 19'' W47° 29' 15'' N 122° 9' 12'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 35 70 140 210Feet 0 10 20 40 60Meters Map Scale: 1:756 if printed on A landscape (11" x 8.5") sheet.38 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 10, Sep 30, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 8, 2014—Jul 15, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/9/2014 Page 2 of 339 Map Unit Legend King County Area, Washington (WA633) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AgC Alderwood gravelly sandy loam, 8 to 15 percent slopes 0.0 0.1% EvB Everett gravelly sandy loam, 0 to 5 percent slopes 1.8 99.9% Totals for Area of Interest 1.8 100.0% Soil Map—King County Area, Washington Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/9/2014 Page 3 of 3 40 41 42 43 2,257 188 WGS_1984_Web_Mercator_Auxiliary_Sphere City of Renton Print map Storage One This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION Notes None Legend 128 0 64 128 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov 12/09/2014 City and County Boundary Other City of Renton Addresses Parcels 1st Floor 1st Floor 2nd Floor 1st Floor Other Buildings Buildings Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) 1 2 3 4 Wetlands44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 15432.005.doc TASK 3 FIELD INSPECTION There were no problems observed during the resource review. Based on a review of the drainage complaints of the downstream drainage course, there were a few minor drainage issues in the Maplewood Creek drainage basin, downstream of the site. 3.1 Conveyance System Nuisance Problems (Type 1) Conveyance system nuisance problems, in general, are defined as any existing or predicted flooding or erosion that does not constitute a severe flooding or erosion problem. Conveyance system nuisance problems are defined as flooding or erosion that results in the overflow of the constructed conveyance system for runoff events less than or equal to a 10-year event. Examples include inundation of a shoulder or lane of a roadway, overflows collecting in yards or pastures, shallow flows across driveways, minor flooding in crawlspaces or unheated garages/outbuildings and minor erosion. Based on a review of the drainage complaints, there were complaints of localized flooding approximately 1700 feet downstream of the site where Maplewood Creek crosses NE 2nd. The localized flooding was due to plugged roadside culverts and the drainage ditch and fallen trees blocking the drainage. Other localized flooding of backyards were due to a depression that has since been corrected by the home builder. The Maplewood Creek Sedimentation Pond also has heavy siltation but it is maintained annually as needed. These complaints all occurred prior to 2006 when this area was annexed to the City of Renton. With the improvements of this project site, there is the potential that problems on the downstream drainage course may be helped somewhat by providing onsite detention of storm water. 3.2 Severe Erosion Problems (Type 2) Severe erosion problems are defined as downstream channels, ravines, or slopes with evidence of or potential for erosion/incision, sufficient to pose a sedimentation hazard to downstream conveyance systems or propose a landslide hazard by undercutting adjacent slopes. Severe erosion problems do not include roadway or minor ditch erosion. The site visit did not find erosion problems evident anywhere along the downstream drainage course. 3.3 Severe Flooding Problems (Type 3) Severe flooding problems can be caused by conveyance system overflows or the elevated water surfaces of ponds, lakes, wetlands, or closed depressions. Severe flooding problems warrant additional attention because they pose a significant threat either to health and safety or to public or private property. Neither the review of the drainage complaints nor the site visit noted any severe flooding problems in the downstream drainage course. Portions of the downstream drainage course investigated by the site visit and a review of the soils map indicates that the downstream drainage course occurs through till type soils. The field reconnaissance for this off-site analysis drainage report was conducted on the morning of September 19, 2012. The skies were clear and the temperature on this day was approximately 65 degrees. 158 159 12740.005.doc OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE Surface Water Design Manual, Core Requirement #2 Basin: Cedar River Subbasin Name: Maplewood Creek Subbasin Number: Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope Distance from Site Discharge Existing Problems Potential Problems Observations of Field Inspector, Resource Reviewer, or Resident See Map Type: sheet flow, swale, stream, channel, pipe, pond; size, diameter, surface area Drainage basin, vegetation, cover, depth, type of sensitive area, volume % Ft. Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion Tributary area, likelihood of problem, overflow pathways, potential impacts 1. Sheetflow to the southeast corner of the site Discharges to existing wetland 2 0 - 10 None Noted None Noted 2. Storm Pond Flows from Wetland into Pond 0.5 500 None Noted None Noted 3. Catch Basin Pond Outlet Structure 0 550 None Noted None Noted 4. Catch Basin Pond Outlet Structure 0 550 None Noted None Noted 5. 24-inch pipe Flows from structure to ditch (south) unknown 575 None Noted None Noted 6. Vegetated Ditch Flows from pipe to structure (south) 2 575 None Noted None Noted 7. Catch Basin Flows from ditch to pipe (west) N/a 875 None Noted None Noted 8. 12-inch pipe Flows from structure to structure (east) 0.60 875 None Noted None Noted 9. 36-inch pipe Flows from structure to structure (south) 0.70 550-875 None Noted None Noted 10. Stormwater Manhole Flows from structure to structure (south) 0.22 875 None Noted None Noted Solid lid 11. 36-inch pipe Flows from structure to structure (south) 0.70 1320 None Noted None Noted Continues south then east eventually rejoining Maplewood Creek 160 161 15432.005.doc TASK 4 DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS Runoff leaves the site by discharging east into Maplewood Creek. Maplewood Creek continues south and eventually joins another branch of Maplewood Creek before it flows through the Maplewood Golf Course and discharges into the Cedar River. The drainage complaints were forwarded to this office by Gary Fink, City of Renton Utility Systems Division – Surface Water Utility and are located on the following pages of this report; however, none of them were within ¼ mile downstream of the project site. They were placed into this report for reference and there are no anticipated problems associated with the development of this project site. 162 163 1 Karen Harris From:Colleen Allen Sent:Thursday, October 16, 2014 9:42 AM To:Karen Harris Subject:FW: Request for Drainage Complaints / Storage One Project / BCE #12740 Attachments:12740 Storage One - Renton.pdf; 15432 email from Gary.pdf; AreaMap_Complaints.pdf Follow Up Flag:Follow up Flag Status:Flagged From: Gary Fink [mailto:GFink@Rentonwa.gov] Sent: Thursday, October 16, 2014 9:36 AM To: Colleen Allen Cc: Steve Lee Subject: RE: Request for Drainage Complaints / Storage One Project / BCE #12740 Good Morning Colleen, Review of subject parcels, 152305-9002 & 9178, do not show any significant drainage issues other than those specified in the 2012 e-mail you referenced. Review of the King County IMap drainage complaints map indicated a 1989 complaint regarding fill on the adjacent parcel 152305-9112, and an unspecified 2011 water quality issue on adjacent lot 152305-9231. Renton Maintenance division notes a history of water overtopping of NE 4th St from the wetland north of NE 4th St, across from the subject parcels, during severe storm events. Please note that the above information provided is sourced from recorded issues logged in City of Renton drainage complaint records, City Maintenance records, & King County IMap drainage complaint maps and cannot be deemed a comprehensive list of all past issues. Best Regards, Gary Fink City of Renton Utility Systems Division - Surface Water Utility Phone:(425) 430-7392 / Fax:(425) 430-7241 GFink@RentonWa.gov From: Colleen Allen [mailto:callen@barghausen.com] Sent: Tuesday, October 14, 2014 4:06 PM To: Gary Fink Cc: Karen Harris Subject: FW: Request for Drainage Complaints / Storage One Project / BCE #12740 164 2 Hi Gary. I’m following up on the email I sent you below. Any progress on researching the drainage complaints? Colleen From: Colleen Allen Sent: Tuesday, October 07, 2014 1:56 PM To: Gary Fink (GFink@Rentonwa.gov) Cc: Karen Harris (kharris@barghausen.com) Subject: Request for Drainage Complaints / Storage One Project / BCE #12740 Hi Gary. We are requesting drainage complaints for two adjacent parcels in Renton: 152305-9002 (no address) 152305-9178 (13839 S.E. 128th Street) This site is roughly 500 feet east of the 4th and Duvall intersection and has the same downstream drainage path as a site for which we requested drainage complaints back in September 2012 (see attached). Hopefully, there haven’t been any new drainage complaints. Thanks for your help! --------------------------------- Colleen Allen Engineering Assistant Barghausen Consulting Engineers, Inc. 18215 72nd Avenue South Kent, WA 98032 (425) 251-6222 - Phone (425) 251-8782 - Fax http://www.barghausen.com --------------------------------- 165 1 Colleen Allen From:Karen Harris Sent:Monday, October 06, 2014 3:36 PM To:Colleen Allen Subject:RE: Drainage Complaints- 4th & Duvall, Renton -Question / BCE #15432 Would you email Gary about the 12740 site, it is roughly 500 feet east of the 4th and Duvall intersection and has the same downstream drainage path? Hopefully there haven’t been any new drainage complaints. ☺ Thanks, Karen From: Colleen Allen Sent: Friday, September 14, 2012 3:12 PM To: File Cc: Karen Harris Subject: FW: Drainage Complaints- 4th & Duvall, Renton -Question / BCE #15432 Karen, I will also save these in Filing. From: Gary Fink [mailto:GFink@Rentonwa.gov] Sent: Friday, September 14, 2012 3:05 PM To: Colleen Allen Subject: RE: Drainage Complaint Request - 4th & Duvall, Renton -Question Good Afternoon Colleen, Per the Renton manual, I’ve reviewed drainage issues for a distance of one mile downstream of your project at NE 4th Ave & Duvall Ave NE. While the manual requires one mile downstream, I’ve reviewed to a radius of one mile as the remainder of the course runs through Maplewood Creek channel. The drainage course reviewed is as follows: From parcel #1523059124, east on NE 4th Ave approximately 650’ to an outfall contained in a drainage easement. South from NE 4th Ave, approximately 990’ via channel to a City-maintained detention facility. South from detention pond via conveyance appr. 910’ along Field Avenue undeveloped right-of-way, turning southeast across residential property to NE 1st St. East on NE 1st St, South on Hoquiam Ave NE Outfall to tributary of Maplewood Creek, South of SE 2nd St. Maplewood Creek to City of Renton Maplewood sedimentation pond, continuing to Cedar River. We have reports of minor drainage issues at properties located on NE 2nd Ct & NE 1st Ct. All occurred prior to 2006 annexation: NE 2nd Ct – 4901, 4907, , 5003: Localized flooding due to plugged roadside culverts and ditch line. 4921: Localized flooding on property due to fallen trees and plugged seasonal stream channel. NE 1st Ct – 4904, 4905, 4910, 4913: Localized backyard flooding due to depression. Addressed through builder. Maplewood Creek Sedimentation pond – heavy siltation due to erosion for storm events. Maintained annually as needed. 166 2 Please feel free to contact me if you need further information. Best Regards, Gary Fink City of Renton Utility Systems Division - Surface Water Utility Phone:(425) 430-7392 / Fax:(425) 430-7241 GFink@RentonWa.gov From: Colleen Allen [mailto:callen@barghausen.com] Sent: Thursday, September 13, 2012 2:54 PM To: Gary Fink Cc: Karen Harris; File Subject: RE: Drainage Complaint Request - 4th & Duvall, Renton -Question Gary, page 2-10 of the City of Renton Drainage Manual requires a 1-mile radius for the Task 2 Resource Review of a Level 1 Off-Site Drainage Analysis. Thank you. Colleen From: Gary Fink [mailto:GFink@Rentonwa.gov] Sent: Thursday, September 13, 2012 2:47 PM To: Colleen Allen Subject: Drainage Complaint Request - 4th & Duvall, Renton -Question Hi Colleen, I’m pulling the information you’re requested together today, my apologies for the delay. Just wanted to confirm that you were looking for drainage issues within a one mile radius of 4th & Duvall. Typical request in a ¼-mile radius. Thanks, Gary Fink City of Renton Utility Systems Division - Surface Water Utility Phone:(425) 430-7392 / Fax:(425) 430-7241 GFink@RentonWa.gov 167 iMAP The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 10/16/2014 Source: King County iMAP - Stormwater (http://www.metrokc.gov/GIS/iMAP) COMMENTS: Drainage Complaint History - Storage One Project 168 iMAP The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 9/15/2014 Source: King County iMAP - Property Information (http://www.metrokc.gov/GIS/iMAP) 169 iMAP The information included on this map has been compiled by King County staff from a variety of sources and is subject to change without notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 9/15/2014 Source: King County iMAP - Property Information (http://www.metrokc.gov/GIS/iMAP) 170 171 12740.008.doc 4.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN A. Existing Site Hydrology Of the 1.83 acre site, only 1.34 acres will be developed and therefore will be modeled as till forest for pre-developed condition. The flow control facility will be located near the southwest corner of the project site and will discharge to the existing stream along the east site boundary. A-1 Predeveloped Hourly Time Step Modeling Input 1.34 Acres - Till Forest - SeaTac A-2 Predeveloped Hourly Time Step Modeling Output Q2 = 0.037 cfs Q25 = 0.084 cfs Q10 = 0.065 cfs Q100 = 0.108 cfs See attached print for additional return periods B. Developed Site Hydrology Under developed conditions, the site has 0.79 acres of impervious and 0.38 acres of landscape. Because this site is using a rain garden as a flow control BMP, 50 percent of the roof area being directed to it is being modeled as pervious landscape area. For the modular grid pavement, that area is modelled as grass. See the detention and water quality sizing criteria on the following pages of this report. B-2 Developed Time Step Modeling Input 0.76 Acres Impervious, 0.41 Acres Till Grass - SeaTac B-3 Developed Hourly Time Step Modeling Output Q2 = 0.221 cfs Q25 = 0.266 cfs Q10 = 0.287 cfs Q100 = 0.446 cfs See attached print for additional return periods B-4 Bypass Input 0.05 Acres Impervious, 0.12 Acres Till Grass - SeaTac 172 12740.008.doc B-5 Bypass Output Q2 = 0.019 cfs Q25 = 0.024 cfs Q10 = 0.028 cfs Q100 = 0.049 cfs See attached print for additional return periods B-6 Discharge from Pond Q2 = 0.015 cfs Q25 = 0.065 cfs Q10 = 0.059 cfs Q100 = 0.070 cfs B-7 Discharge from Site Discharge from site includes pond outlet and bypass. Q2 = 0.029 cfs Q25 = 0.072 cfs Q10 = 0.080 cfs Q100 = 0.099 cfs C. Performance Standards The Area-Specific Flow Control Standard required for this project site is determined to be Flow Control Duration Standard – Matching Forested. The applicable conveyance system capacity standard was mentioned in the Conditions and Requirements Summary, which is to size the on-site conveyance system by the Rational Method utilizing an initial time of concentration of 6.3 minutes and a Manning's "n" value of 0.014 with the 100-year precipitation. The Area-Specific Water Quality Treatments Menu followed for this project was the Enhanced Basic Water Quality Menu, and the treatment selected is to use a DOE approved modular wetland. D. Flow Control System D-1 Flow Control BMP Selection and Design The Flow Control BMPs for this site will be sized to treat runoff from 40 percent of the site impervious area. This will be accomplished with a rain garden, modular grid pavement, and permeable pavement. Flow control for this project will be in a detention pond utilizing 4 feet of live storage. Discharge will be through a control structure and then to a modular wetland unit for water quality treatment. The required area to be treated by BMPs is 13,795 square feet. 173 12740.008.doc D-2 Flow Control Facility Design Output A total of 13,795 square feet is required to be treated by the BMPs, 13,870 square feet is provided. A summary of BMPs and their sizing is attached in the following pages. D-2.1 Raingarden The raingarden accepts 8,956 square feet of impervious surface and has a required volume of 2,239 cubic feet. D-2.2 Modular Grid Pavement There will be a total of 2,690 square feet of modular grid pavement installed on the project site. D-2.3 Permeable Pavement There will be a total of 2,224 square feet of permeable pavement installed in the parking lot. 1,900 square feet will be installed in the parking stalls in front of the pond and 324 square feet will be installed in parking stalls in near the building. E. Water Quality System The Enhanced Basic Water Quality requirement will be achieved with a modular wetland unit. Sizing calculations for the modular wetland are included. The facility is sized to treat the full 2-yr release rate from the pond per the KCSWDM section 6.2.1. 174 175 12740.003.doc FLOW CONTROL BMP SIZING Site Area = 79,715 sf 20% of site area = 15,943 sf Site Impervious area = 34,487 sf 40% of the site impervious area = 13,795 sf Therefore 40% of the site impervious area will be used in sizing the Flow Control BMP Rain Garden A portion of the building roof will be sent to the rain garden Impervious area to the rain garden = 8,956 sf Rain Garden volume required = Impervious area x 3 inches = 2,239 cf Rain Garden volume provided = 2,239 cf (1,839 cf in large rain garden and 400 cf in planter) Maximum depth = 12 inches Grassed Modular Grid Pavement area = 2,690 SF (2,133 sf to pond, 557 sf to bypass) Permeable Pavement = 2,224 sf (1,900 by pond, 324 sf near building) Total treated area = 13,870 SF 176 Rain Garden (5/12/16)3:1 side slopeselevcell 1cell 2cell 3planter 1planter 2total areavolumesum volume397.5530510222400016620039876568436840002217969.75969.75398.51020878563400028611269.52239.25177 15432.001.doc DETENTION VAULT CALCULATIONS 178 12740.003.doc DETENTION AND WATER QUALITY SIZING CRITERIA Flow Control Duration Standard – Matching Forested Site Conditions Pre-Developed: 1.34 acres of till forest Developed: Bypass = 0.17 acres (0.013 ac modular grid pavement) 0.05 ac impervious 0.12 ac grass/pervious To Pond = 1.17 acres 0.79 acres of on-site impervious 0.38 acres of landscape (includes pond and rain garden areas) Total = 1.17 acres = 0.79 + 0.38 Modular grid pavement to be modeled as grass = 0.05 ac = 0.79 - 0.05 = 0.74 ac impervious = 0.38 + 0.05 = 0.43 ac pervious Roof Area to rain garden to be modeled as 50% grass, 50% impervious = 0.21 ac = 0.105 ac impervious 0.74 - 0.105 = 0.635 ac impervious = 0.105 ac grass 0.43 + 0.105 = 0.535 ac pervious Pervious Pavement to be modeled as 50% grass, 50% impervious = 0.05 ac = 0.61 ac impervious 0.635 - 0.025 = 0.61 ac impervious 0.535 + 0.025 = 0.56 ac grass Pond is approximately 0.15 acres, model as impervious for flow control 179 12740.003.doc For modeling: = 0.61 + 0.15 = 0.76 acres impervious = 0.56 - 0.15 = 0.41 acres grass The KCRTS calculations are on the following pages. 180 181 182 183 Retention/Detention Facility Type of Facility: Detention Pond Side Slope: 2.00 H:1V Pond Bottom Length: 75.00 ft Pond Bottom Width: 50.00 ft Pond Bottom Area: 3750. sq. ft Top Area at 1 ft. FB: 6486. sq. ft 0.149 acres Effective Storage Depth: 3.75 ft Stage 0 Elevation: 0.00 ft Storage Volume: 17859. cu. ft 0.410 ac-ft Riser Head: 3.65 ft Riser Diameter: 12.00 inches Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter (ft) (in) (CFS) (in) 1 0.00 0.60 0.019 2 2.70 1.45 0.057 4.0 Top Notch Weir: None Outflow Rating Curve: None Stage Elevation Storage Discharge Percolation Surf Area (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq. ft) 0.00 0.00 378. 0.009 0.000 0.00 3800. 0.01 0.01 416. 0.010 0.001 0.00 3805. 0.02 0.02 454. 0.010 0.001 0.00 3810. 0.03 0.03 492. 0.011 0.002 0.00 3815. 0.04 0.04 530. 0.012 0.002 0.00 3820. 0.05 0.05 568. 0.013 0.002 0.00 3825. 0.15 0.15 953. 0.022 0.004 0.00 3876. 0.25 0.25 1343. 0.031 0.005 0.00 3927. 0.35 0.35 1739. 0.040 0.006 0.00 3978. 0.45 0.45 2139. 0.049 0.007 0.00 4030. 0.55 0.55 2545. 0.058 0.007 0.00 4082. 0.65 0.65 2955. 0.068 0.008 0.00 4134. 0.75 0.75 3371. 0.077 0.008 0.00 4187. 0.85 0.85 3793. 0.087 0.009 0.00 4239. 0.95 0.95 4219. 0.097 0.010 0.00 4293. 1.05 1.05 4651. 0.107 0.010 0.00 4346. 1.15 1.15 5089. 0.117 0.010 0.00 4400. 1.25 1.25 5531. 0.127 0.011 0.00 4454. 1.35 1.35 5979. 0.137 0.011 0.00 4509. 1.45 1.45 6433. 0.148 0.012 0.00 4563. 1.55 1.55 6892. 0.158 0.012 0.00 4619. 1.65 1.65 7357. 0.169 0.013 0.00 4674. 1.75 1.75 7827. 0.180 0.013 0.00 4730. 1.85 1.85 8303. 0.191 0.013 0.00 4786. 1.95 1.95 8784. 0.202 0.014 0.00 4842. 2.05 2.05 9271. 0.213 0.014 0.00 4899. 2.15 2.15 9764. 0.224 0.014 0.00 4956. 2.25 2.25 10262. 0.236 0.015 0.00 5013. 2.35 2.35 10767. 0.247 0.015 0.00 5071. 2.45 2.45 11277. 0.259 0.015 0.00 5129. 2.55 2.55 11792. 0.271 0.016 0.00 5187. 184 2.65 2.65 12314. 0.283 0.016 0.00 5246. 2.70 2.70 12577. 0.289 0.016 0.00 5275. 2.72 2.72 12683. 0.291 0.016 0.00 5287. 2.73 2.73 12736. 0.292 0.018 0.00 5293. 2.75 2.75 12842. 0.295 0.020 0.00 5305. 2.76 2.76 12895. 0.296 0.023 0.00 5311. 2.78 2.78 13001. 0.298 0.027 0.00 5323. 2.79 2.79 13054. 0.300 0.032 0.00 5329. 2.81 2.81 13161. 0.302 0.035 0.00 5340. 2.82 2.82 13214. 0.303 0.036 0.00 5346. 2.84 2.84 13321. 0.306 0.037 0.00 5358. 2.94 2.94 13860. 0.318 0.044 0.00 5418. 3.04 3.04 14405. 0.331 0.050 0.00 5478. 3.14 3.14 14956. 0.343 0.055 0.00 5538. 3.24 3.24 15513. 0.356 0.059 0.00 5598. 3.34 3.34 16076. 0.369 0.063 0.00 5659. 3.44 3.44 16644. 0.382 0.067 0.00 5721. 3.54 3.54 17220. 0.395 0.071 0.00 5782. 3.64 3.64 17801. 0.409 0.074 0.00 5844. 3.65 3.65 17859. 0.410 0.074 0.00 5850. 3.75 3.75 18447. 0.423 0.385 0.00 5912. 3.85 3.85 19042. 0.437 0.951 0.00 5975. 3.95 3.95 19642. 0.451 1.680 0.00 6037. 4.05 4.05 20249. 0.465 2.480 0.00 6101. 4.15 4.15 20863. 0.479 2.760 0.00 6164. 4.25 4.25 21482. 0.493 3.020 0.00 6228. 4.35 4.35 22108. 0.508 3.260 0.00 6292. 4.45 4.45 22741. 0.522 3.480 0.00 6356. 4.55 4.55 23379. 0.537 3.690 0.00 6421. 4.65 4.65 24025. 0.552 3.880 0.00 6486. 4.75 4.75 24677. 0.566 4.070 0.00 6551. 4.85 4.85 25335. 0.582 4.250 0.00 6617. 4.95 4.95 26000. 0.597 4.420 0.00 6683. 5.05 5.05 26672. 0.612 4.580 0.00 6749. 5.15 5.15 27350. 0.628 4.740 0.00 6816. 5.25 5.25 28035. 0.644 4.900 0.00 6883. 5.35 5.35 28726. 0.659 5.050 0.00 6950. 5.45 5.45 29425. 0.676 5.190 0.00 7018. 5.55 5.55 30130. 0.692 5.330 0.00 7086. 5.65 5.65 30842. 0.708 5.470 0.00 7154. Hyd Inflow Outflow Peak Storage Stage Elev (Cu-Ft) (Ac-Ft) 1 0.45 0.07 3.51 3.51 17066. 0.392 2 0.22 0.07 3.39 3.39 16370. 0.376 3 0.27 0.06 3.25 3.25 15552. 0.357 4 0.29 0.04 2.93 2.93 13808. 0.317 5 0.23 0.02 2.47 2.47 11397. 0.262 6 0.18 0.01 2.18 2.18 9926. 0.228 7 0.24 0.01 2.22 2.22 10107. 0.232 8 0.20 0.01 1.43 1.43 6339. 0.146 Hyd R/D Facility Tributary Reservoir POC Outflow Outflow Inflow Inflow Target Calc 1 0.07 0.05 ******** 0.11 0.07 2 0.07 0.02 ******** ******* 0.08 3 0.06 0.03 ******** ******* 0.07 4 0.04 0.02 ******** ******* 0.05 5 0.02 0.02 ******** ******* 0.04 6 0.01 0.02 ******** ******* 0.03 185 7 0.01 0.02 ******** ******* 0.03 8 0.01 0.01 ******** ******* 0.02 ---------------------------------- Route Time Series through Facility Inflow Time Series File:12740-dev.tsf Outflow Time Series File:rdout POC Time Series File:dsout Inflow/Outflow Analysis Peak Inflow Discharge: 0.446 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.070 CFS at 14:00 on Jan 9 in Year 8 Peak Reservoir Stage: 3.51 Ft Peak Reservoir Elev: 3.51 Ft Peak Reservoir Storage: 17071. Cu-Ft : 0.392 Ac-Ft Add Time Series:12740-bypass.tsf Peak Summed Discharge: 0.099 CFS at 9:00 on Jan 9 in Year 8 Point of Compliance File:dsout.tsf Flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) (ft) Period 0.065 2 2/09/01 20:00 0.070 3.51 1 100.00 0.990 0.014 7 1/07/02 4:00 0.065 3.39 2 25.00 0.960 0.059 3 3/06/03 22:00 0.059 3.25 3 10.00 0.900 0.012 8 8/26/04 8:00 0.043 2.93 4 5.00 0.800 0.015 6 1/08/05 6:00 0.015 2.47 5 3.00 0.667 0.015 5 1/19/06 14:00 0.015 2.22 6 2.00 0.500 0.043 4 11/24/06 9:00 0.014 2.18 7 1.30 0.231 0.070 1 1/09/08 14:00 0.012 1.43 8 1.10 0.091 Computed Peaks 0.068 3.47 50.00 0.980 Flow Frequency Analysis Time Series File:dsout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.080 2 2/09/01 18:00 0.099 1 100.00 0.990 0.029 6 1/05/02 16:00 0.080 2 25.00 0.960 0.072 3 3/06/03 19:00 0.072 3 10.00 0.900 0.025 8 8/26/04 2:00 0.052 4 5.00 0.800 0.027 7 1/05/05 8:00 0.037 5 3.00 0.667 0.037 5 1/18/06 16:00 0.029 6 2.00 0.500 0.052 4 11/24/06 7:00 0.027 7 1.30 0.231 0.099 1 1/09/08 9:00 0.025 8 1.10 0.091 Computed Peaks 0.092 50.00 0.980 Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % % % 0.001 27634 45.065 45.065 54.935 0.549E+00 0.003 7757 12.650 57.715 42.285 0.423E+00 0.005 5495 8.961 66.676 33.324 0.333E+00 0.006 5061 8.253 74.930 25.070 0.251E+00 186 0.008 6748 11.005 85.934 14.066 0.141E+00 0.010 2114 3.447 89.382 10.618 0.106E+00 0.012 2827 4.610 93.992 6.008 0.601E-01 0.014 2018 3.291 97.283 2.717 0.272E-01 0.015 1154 1.882 99.165 0.835 0.835E-02 0.017 324 0.528 99.693 0.307 0.307E-02 0.019 23 0.038 99.731 0.269 0.269E-02 0.021 16 0.026 99.757 0.243 0.243E-02 0.023 9 0.015 99.772 0.228 0.228E-02 0.024 9 0.015 99.786 0.214 0.214E-02 0.026 6 0.010 99.796 0.204 0.204E-02 0.028 5 0.008 99.804 0.196 0.196E-02 0.030 2 0.003 99.808 0.192 0.192E-02 0.032 2 0.003 99.811 0.189 0.189E-02 0.033 6 0.010 99.821 0.179 0.179E-02 0.035 5 0.008 99.829 0.171 0.171E-02 0.037 11 0.018 99.847 0.153 0.153E-02 0.039 7 0.011 99.858 0.142 0.142E-02 0.041 8 0.013 99.871 0.129 0.129E-02 0.042 7 0.011 99.883 0.117 0.117E-02 0.044 8 0.013 99.896 0.104 0.104E-02 0.046 3 0.005 99.901 0.099 0.995E-03 0.048 5 0.008 99.909 0.091 0.913E-03 0.050 6 0.010 99.918 0.082 0.815E-03 0.051 7 0.011 99.930 0.070 0.701E-03 0.053 8 0.013 99.943 0.057 0.571E-03 0.055 8 0.013 99.956 0.044 0.440E-03 0.057 5 0.008 99.964 0.036 0.359E-03 0.059 5 0.008 99.972 0.028 0.277E-03 0.060 7 0.011 99.984 0.016 0.163E-03 0.062 3 0.005 99.989 0.011 0.114E-03 0.064 3 0.005 99.993 0.007 0.652E-04 Flow Duration from Time Series File:dsout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % % % 0.001 29386 47.922 47.922 52.078 0.521E+00 0.003 7262 11.843 59.765 40.235 0.402E+00 0.006 6137 10.008 69.773 30.227 0.302E+00 0.008 6210 10.127 79.901 20.099 0.201E+00 0.010 4420 7.208 87.109 12.891 0.129E+00 0.012 3403 5.550 92.658 7.342 0.734E-01 0.014 2187 3.567 96.225 3.775 0.378E-01 0.017 1167 1.903 98.128 1.872 0.187E-01 0.019 644 1.050 99.178 0.822 0.822E-02 0.021 183 0.298 99.477 0.523 0.523E-02 0.023 83 0.135 99.612 0.388 0.388E-02 0.025 36 0.059 99.671 0.329 0.329E-02 0.028 32 0.052 99.723 0.277 0.277E-02 0.030 23 0.038 99.760 0.240 0.240E-02 0.032 13 0.021 99.781 0.219 0.219E-02 0.034 8 0.013 99.795 0.205 0.205E-02 0.037 8 0.013 99.808 0.192 0.192E-02 0.039 9 0.015 99.822 0.178 0.178E-02 0.041 8 0.013 99.835 0.165 0.165E-02 0.043 8 0.013 99.848 0.152 0.152E-02 0.045 9 0.015 99.863 0.137 0.137E-02 0.048 8 0.013 99.876 0.124 0.124E-02 0.050 6 0.010 99.886 0.114 0.114E-02 0.052 5 0.008 99.894 0.106 0.106E-02 187 0.054 7 0.011 99.905 0.095 0.946E-03 0.056 7 0.011 99.917 0.083 0.832E-03 0.059 10 0.016 99.933 0.067 0.669E-03 0.061 7 0.011 99.945 0.055 0.554E-03 0.063 6 0.010 99.954 0.046 0.457E-03 0.065 8 0.013 99.967 0.033 0.326E-03 0.068 3 0.005 99.972 0.028 0.277E-03 0.070 4 0.007 99.979 0.021 0.212E-03 0.072 4 0.007 99.985 0.015 0.147E-03 0.074 3 0.005 99.990 0.010 0.978E-04 0.076 4 0.007 99.997 0.003 0.326E-04 0.079 1 0.002 99.998 0.002 0.163E-04 Duration Comparison Anaylsis Base File: 12740-pre.tsf New File: dsout.tsf Cutoff Units: Discharge in CFS -----Fraction of Time----- ---------Check of Tolerance------- Cutoff Base New %Change Probability Base New %Change 0.018 | 0.97E-02 0.95E-02 -1.9 | 0.97E-02 0.018 0.018 -1.0 0.023 | 0.63E-02 0.39E-02 -38.9 | 0.63E-02 0.023 0.020 -13.6 0.029 | 0.49E-02 0.26E-02 -47.4 | 0.49E-02 0.029 0.021 -25.1 0.034 | 0.37E-02 0.21E-02 -42.9 | 0.37E-02 0.034 0.024 -28.2 0.039 | 0.29E-02 0.18E-02 -38.4 | 0.29E-02 0.039 0.027 -30.2 0.044 | 0.22E-02 0.15E-02 -33.8 | 0.22E-02 0.044 0.032 -27.6 0.049 | 0.15E-02 0.12E-02 -20.7 | 0.15E-02 0.049 0.043 -11.4 0.054 | 0.10E-02 0.96E-03 -4.8 | 0.10E-02 0.054 0.053 -2.4 0.059 | 0.62E-03 0.67E-03 7.9 | 0.62E-03 0.059 0.060 1.9 0.064 | 0.34E-03 0.41E-03 19.0 | 0.34E-03 0.064 0.065 1.9 0.069 | 0.21E-03 0.23E-03 7.7 | 0.21E-03 0.069 0.071 2.3 0.074 | 0.16E-03 0.82E-04 -50.0 | 0.16E-03 0.074 0.072 -3.3 0.079 | 0.11E-03 0.16E-04 -85.7 | 0.11E-03 0.079 0.073 -7.6 0.084 | 0.16E-04 0.00E+00 -100.0 | 0.16E-04 0.084 0.079 -5.8 Maximum positive excursion = 0.002 cfs ( 3.4%) occurring at 0.065 cfs on the Base Data:12740-pre.tsf and at 0.067 cfs on the New Data:dsout.tsf Maximum negative excursion = 0.013 cfs (-30.9%) occurring at 0.041 cfs on the Base Data:12740-pre.tsf and at 0.028 cfs on the New Data:dsout.tsf ---------------------------------- Route Time Series through Facility Inflow Time Series File:12740-dev.tsf Outflow Time Series File:rdout POC Time Series File:dsout Inflow/Outflow Analysis Peak Inflow Discharge: 0.446 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.070 CFS at 14:00 on Jan 9 in Year 8 Peak Reservoir Stage: 3.51 Ft Peak Reservoir Elev: 3.51 Ft Peak Reservoir Storage: 17071. Cu-Ft : 0.392 Ac-Ft Add Time Series:12740-bypass.tsf Peak Summed Discharge: 0.099 CFS at 9:00 on Jan 9 in Year 8 Point of Compliance File:dsout.tsf Flow Frequency Analysis 188 Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) (ft) Period 0.065 2 2/09/01 20:00 0.070 3.51 1 100.00 0.990 0.014 7 1/07/02 4:00 0.065 3.39 2 25.00 0.960 0.059 3 3/06/03 22:00 0.059 3.25 3 10.00 0.900 0.012 8 8/26/04 8:00 0.043 2.93 4 5.00 0.800 0.015 6 1/08/05 6:00 0.015 2.47 5 3.00 0.667 0.015 5 1/19/06 14:00 0.015 2.22 6 2.00 0.500 0.043 4 11/24/06 9:00 0.014 2.18 7 1.30 0.231 0.070 1 1/09/08 14:00 0.012 1.43 8 1.10 0.091 Computed Peaks 0.068 3.47 50.00 0.980 Flow Frequency Analysis Time Series File:dsout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.080 2 2/09/01 18:00 0.099 1 100.00 0.990 0.029 6 1/05/02 16:00 0.080 2 25.00 0.960 0.072 3 3/06/03 19:00 0.072 3 10.00 0.900 0.025 8 8/26/04 2:00 0.052 4 5.00 0.800 0.027 7 1/05/05 8:00 0.037 5 3.00 0.667 0.037 5 1/18/06 16:00 0.029 6 2.00 0.500 0.052 4 11/24/06 7:00 0.027 7 1.30 0.231 0.099 1 1/09/08 9:00 0.025 8 1.10 0.091 Computed Peaks 0.092 50.00 0.980 Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % % % 0.001 27634 45.065 45.065 54.935 0.549E+00 0.003 7757 12.650 57.715 42.285 0.423E+00 0.005 5495 8.961 66.676 33.324 0.333E+00 0.006 5061 8.253 74.930 25.070 0.251E+00 0.008 6748 11.005 85.934 14.066 0.141E+00 0.010 2114 3.447 89.382 10.618 0.106E+00 0.012 2827 4.610 93.992 6.008 0.601E-01 0.014 2018 3.291 97.283 2.717 0.272E-01 0.015 1154 1.882 99.165 0.835 0.835E-02 0.017 324 0.528 99.693 0.307 0.307E-02 0.019 23 0.038 99.731 0.269 0.269E-02 0.021 16 0.026 99.757 0.243 0.243E-02 0.023 9 0.015 99.772 0.228 0.228E-02 0.024 9 0.015 99.786 0.214 0.214E-02 0.026 6 0.010 99.796 0.204 0.204E-02 0.028 5 0.008 99.804 0.196 0.196E-02 0.030 2 0.003 99.808 0.192 0.192E-02 0.032 2 0.003 99.811 0.189 0.189E-02 0.033 6 0.010 99.821 0.179 0.179E-02 0.035 5 0.008 99.829 0.171 0.171E-02 0.037 11 0.018 99.847 0.153 0.153E-02 0.039 7 0.011 99.858 0.142 0.142E-02 0.041 8 0.013 99.871 0.129 0.129E-02 0.042 7 0.011 99.883 0.117 0.117E-02 0.044 8 0.013 99.896 0.104 0.104E-02 189 0.046 3 0.005 99.901 0.099 0.995E-03 0.048 5 0.008 99.909 0.091 0.913E-03 0.050 6 0.010 99.918 0.082 0.815E-03 0.051 7 0.011 99.930 0.070 0.701E-03 0.053 8 0.013 99.943 0.057 0.571E-03 0.055 8 0.013 99.956 0.044 0.440E-03 0.057 5 0.008 99.964 0.036 0.359E-03 0.059 5 0.008 99.972 0.028 0.277E-03 0.060 7 0.011 99.984 0.016 0.163E-03 0.062 3 0.005 99.989 0.011 0.114E-03 0.064 3 0.005 99.993 0.007 0.652E-04 Flow Duration from Time Series File:dsout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % % % 0.001 29386 47.922 47.922 52.078 0.521E+00 0.003 7262 11.843 59.765 40.235 0.402E+00 0.006 6137 10.008 69.773 30.227 0.302E+00 0.008 6210 10.127 79.901 20.099 0.201E+00 0.010 4420 7.208 87.109 12.891 0.129E+00 0.012 3403 5.550 92.658 7.342 0.734E-01 0.014 2187 3.567 96.225 3.775 0.378E-01 0.017 1167 1.903 98.128 1.872 0.187E-01 0.019 644 1.050 99.178 0.822 0.822E-02 0.021 183 0.298 99.477 0.523 0.523E-02 0.023 83 0.135 99.612 0.388 0.388E-02 0.025 36 0.059 99.671 0.329 0.329E-02 0.028 32 0.052 99.723 0.277 0.277E-02 0.030 23 0.038 99.760 0.240 0.240E-02 0.032 13 0.021 99.781 0.219 0.219E-02 0.034 8 0.013 99.795 0.205 0.205E-02 0.037 8 0.013 99.808 0.192 0.192E-02 0.039 9 0.015 99.822 0.178 0.178E-02 0.041 8 0.013 99.835 0.165 0.165E-02 0.043 8 0.013 99.848 0.152 0.152E-02 0.045 9 0.015 99.863 0.137 0.137E-02 0.048 8 0.013 99.876 0.124 0.124E-02 0.050 6 0.010 99.886 0.114 0.114E-02 0.052 5 0.008 99.894 0.106 0.106E-02 0.054 7 0.011 99.905 0.095 0.946E-03 0.056 7 0.011 99.917 0.083 0.832E-03 0.059 10 0.016 99.933 0.067 0.669E-03 0.061 7 0.011 99.945 0.055 0.554E-03 0.063 6 0.010 99.954 0.046 0.457E-03 0.065 8 0.013 99.967 0.033 0.326E-03 0.068 3 0.005 99.972 0.028 0.277E-03 0.070 4 0.007 99.979 0.021 0.212E-03 0.072 4 0.007 99.985 0.015 0.147E-03 0.074 3 0.005 99.990 0.010 0.978E-04 0.076 4 0.007 99.997 0.003 0.326E-04 0.079 1 0.002 99.998 0.002 0.163E-04 190 191 Detention Pond 5/23/2016 elev cell 1 total area volume sum volume ft sf sf cf cf 394.25 4685 4685 0 0 394.5 4875 4875 1195 1195 395 5247 5247 2530.5 3725.5 395.5 5626 5626 2718.25 6443.75 396 6009 6009 2908.75 9352.5 396.5 6391 6391 3100 12452.5 397 6774 6774 3291.25 15743.75 397.5 7162 7162 3484 19227.75 398 7566 7566 3682 22909.75 14640 CF REQ. 399 8262 8262 7914 30823.75 192 WATER QUALITY CALCULATIONS 193 isLawr’\JIrDCommunity&EconomicDevelopmentDepartmentJune21,2016C.E.”Chip”Vincent,AdministratorMr.JasonHubbellBarghausenConsultingEngineers1821572ndAvenueSouthKent,WA98032RE:StorageOneon4thExpansion(U1500$468)—MWS-LinearModularWetlandStormwaterTreatmentSystemforPrivateUse-Adjustment2016-04DearMr.Hubbell:TheCityofRentonhascompletedreviewoftheadjustmentrequestforStorageOneon4thExpansion(U15008434)inaccordancewithCityadopted2009KingCountySurfaceWaterDesignManualandassociatedCityAmendments.Astheapplicant’sengineer,youarerequestinganadjustmentfromthe2009KingCountySurfaceWaterDesignManualtoSection6.1.2,EnhancedBasicWaterQualityMenu,requirements.Morespecifically,youarerequestinganadjustmentfortheimplementationoftheMWSLinearModularWetlandStormwaterTreatmentSystemlocatedonaprivatecommercialpropertythatwillbeownedandmaintainedbythepropertyowner(s).Findings:1.Theprojectsiteislocatedat4215NE4thStreet.Theprojectisacommerciallanduse,whichpertheCity’sAmendmentstothe2009KingCountySurfaceWaterDesignManualSection1.2.8.1,isrequiredtoprovideEnhancedBasicWaterQualityTreatment.2.ThesurfacewaterfromtheproposeddevelopmentwillbecollectedthenroutedthroughadetentionsystempriortoenteringtheMWS-LinearModularWetlandStormwaterTreatmentSystem.3.TheMWS-LinearModularWetlandStormwaterTreatmentSystem,andotheron-sitedrainagefacilitieswillbeprivatelyownedandmaintained.4.TheMWS-LinearModularWetlandStormwaterTreatmentSystemisnotanapprovedfacilityintheCity’sadoptedstormwatermanual,thereforeanadjustmentisrequiredtoallowtheuseoftheMWS-LinearModularWetlandRentonCityHall.1055SouthGradyWay.Renton,Washington98057.rentonwa.gov Mr.JasonHubbellPage2of4June21,2016StormwaterTreatmentSystemonprivateorpubliclyownedandmaintainedstormsystems.5.TheWashingtonStateDepartmentofEcologyhasapprovedtheMWS-LinearModularWetlandStormwaterTreatmentSystemforGeneralUseLevelDesignationforBasic,Phosphorous,andEnhancedtreatment.Basedontheinformationprovidedintheenclosedadjustmentrequest,theMWS-LinearModularWetlandStormwaterTreatmentSystemisapprovedfortheproposedStorageOneon4thExpansionwiththefollowingconditions:Conditions:1.Thepropertyowner(s)isresponsibleforthemaintenanceandoperationoftheMWS-LinearModularWetlandStormwaterTreatmentSystem.2.Thepropertyowner(s)shallenterintoaservicecontractwithanapprovedcontractororLinearModularWetlandrepresentativeforthelongtermmaintenanceofthesystem.3.TheMWS-LinearModularWetlandinstalleddownstreamofdetentionshallbedesignedwithawaterqualitydesignflowrateofthefull2-yearreleaserateofthedetentionfacility.4.TheMWS-LinearModularWetlandStormwaterTreatmentSystemunitsshallbedesigned,assembled,installed,operatedandmaintainedinaccordancewiththeModularWetlandSystems,Inc.applicablemanualsanddocumentsandtheEcologyDecision.5.EachsiteplanmustundergoModularWetlandSystems,Inc.reviewandapprovalbeforesiteinstallation.ThisensuresthatsitegradingandslopeareappropriateforuseofaMWS-LinearModularWetlandStormwaterTreatmentSystemunit.6.MWS-LinearModularWetlandStormwaterSystemmediashallconformtothespecificationssubmittedto,andapprovedby,theWashingtonStateDepartmentofEcology.7.Facilityinspection,maintenance,andreportingarerequiredbytheCityofRentonSurfaceWaterUtilityforthePropertyOwnermaintainedMWS-LinearModularWetlandStormwaterTreatmentSysteminperpetuity.Thefacilityinspection,maintenanceandreportingisrequiredpertheEcologyNationalPollutantDischargeEliminationSystemPhaseIIMunicipalStormwaterPermit(SectionS5.C.4.c.iii).Facilityownersareresponsibleforensuringthat Mr.JasonHubbellPage3of4June21,2016stormwaterfacilitiesareproperlymaintainedandfunctioningasdesignedandpermitted.8.TheMWS-LinearModularWetlandStormwaterTreatmentSystemshallbeinspectedandmaintainedinaccordancewithmanufacturerrecommendationsand,inaddition,beinspectedandmaintainedasdetailedbelow:a.Forthefirstyearafterconstruction,theMWS-LinearModularWetlandStormwaterTreatmentSystemshallbeinspectedeverysixmonthstoassureproperperformance.Inspectionreportswillbeusedtodeterminefuturesite-specificmaintenanceschedulesandrequirements.b.Followingthefirstyearofoperation,thefacilityowner(s)shallannuallyhavetheMWS-LinearModularWetlandStormwaterTreatmentSysteminspectedandmaintainedpertheproceduresinthemostrecentversionoftheMWS-LinearModularWetlandStormwaterTreatmentSystemOperationandMaintenanceManuals.AllwrittenrecordsoftheinspectionandmaintenanceshallbesubmittedtotheCityofRentonSurfaceWaterUtility,totheattentionofSurfaceWaterUtilityPrivateStormwaterFacilityInspectionProgram.IfmorefrequentinspectionandmaintenanceoftheMWS-LinearModularWetlandStormwaterTreatmentSystemisrequiredbythemanufacturerorisneededtoensureperformanceofthefacility,thentheadditionalinspectionandmaintenancereportscompletedwithintheyearshallbeprovidedwiththeannualreport.c.Uponcompletionofthetwo-yearinspectionperiod,afterconstructionoftheMWS-LinearModularWetlandStormwaterTreatmentSystem,theCitywillreviewtheinspectionreportandfacilitymaintenancelogtoreevaluatefutureinspectionfrequencyofthesystem.Theinformationwillbeusedtodetermineiftheminimuminspectionfrequencyofonceayearcanbeallowed.U.Maintenanceactivities,toassureproperperformanceoftheMWS-LinearModularWetlandStormwaterTreatmentSystem,shallbeasneeded,orasdeterminedintheannualinspection,tocomplywiththerequirementsinthe2009KingCountySurfaceWaterDesignManualformaintenanceofdrainagefacilities.Inaddition,maintenanceproceduresshouldfollowthosegiveninthemostrecentversionoftheMWS-LinearModularWetlandStormwaterTreatmentSystemOperationandMaintenanceManuals. Mr.JasonHubbellPage4of4June21,20169.TheapplicantwillneedtosubmitaDrainageFacilityCovenanttoallowtheCityaccesstothefacilityforinspectionoftheprivateMWS-LinearModularWetlandStormwaterTreatmentSystemandotherstormwaterfacilitiesonthesitethatwillbeprivatelymaintained.TheDrainageFacilityCovenantmustbeapprovedforrecordingpriortotheCity’sutilitypermitbeingissuedfortheconstructionofthefacilities.Thisadjustmentapprovalletteristobeincludedwiththerecordedcovenant.TheDrainageFacilityCovenantcanbefoundinReferenceJoftheCityofRentonAmendmentstothe2009KingCountySurfaceWaterDesignManual.AsiteplanshowingthelocationofthetreatmentfacilitymustbeincludedasExhibitAwiththedeclarationofcovenant.ThesiteplanmustmeetallKingCountyrecordingdocumentrequirements(i.e.textsize,clarity,etc.).10.Alettersignedbythepropertyowner(s)agreeingtotherequiredinspectionandmaintenancescheduleisrequiredasaconditionofgrantingthisadjustment.ThelettershallbesubmittedtotheCitypriortoconstructionpermitapproval.11.Theapprovalofthisadjustmentdoesnotrelievetheapplicantfromothercity,state,orfederalrequirements.Ifyouhaveanyquestionsaboutthisadjustment,pleasecontactBrianneBannwarth,DevelopmentEngineeringManager,at(425)430-7299orRonStraka,SurfaceWaterUtilityEngineeringManager,at(425)430-7248.Sincerely,BrianneBannwart,P.E.RonStraka,P.E.‘DevelopmentEngineeringManagerSurfaceWaterUtilityEngineeringManagercc:LysHornsby,P.E.,UtilitySystemsDirectorMikeStenhouse,MaintenanceServicesDirectorRohiniNair,CivilEngineerIllClarkClose,SeniorPlannerStrickerCatoMurphyArchitects—ProjectApplicantH:\FiIeSys\SWP-SurfaceWaterProjects\SWP-27-SurfaceWaterProjects(CIP)\27-3129RentonStormwaterManual\ADJUSTMENTS\2016\2016-4StorageOne-PrivateModularWetland.doc 194 7 0.01 0.02 ******** ******* 0.03 8 0.01 0.01 ******** ******* 0.02 ---------------------------------- Route Time Series through Facility Inflow Time Series File:12740-dev.tsf Outflow Time Series File:rdout POC Time Series File:dsout Inflow/Outflow Analysis Peak Inflow Discharge: 0.446 CFS at 6:00 on Jan 9 in Year 8 Peak Outflow Discharge: 0.070 CFS at 14:00 on Jan 9 in Year 8 Peak Reservoir Stage: 3.51 Ft Peak Reservoir Elev: 3.51 Ft Peak Reservoir Storage: 17071. Cu-Ft : 0.392 Ac-Ft Add Time Series:12740-bypass.tsf Peak Summed Discharge: 0.099 CFS at 9:00 on Jan 9 in Year 8 Point of Compliance File:dsout.tsf Flow Frequency Analysis Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) (ft) Period 0.065 2 2/09/01 20:00 0.070 3.51 1 100.00 0.990 0.014 7 1/07/02 4:00 0.065 3.39 2 25.00 0.960 0.059 3 3/06/03 22:00 0.059 3.25 3 10.00 0.900 0.012 8 8/26/04 8:00 0.043 2.93 4 5.00 0.800 0.015 6 1/08/05 6:00 0.015 2.47 5 3.00 0.667 0.015 5 1/19/06 14:00 0.015 2.22 6 2.00 0.500 0.043 4 11/24/06 9:00 0.014 2.18 7 1.30 0.231 0.070 1 1/09/08 14:00 0.012 1.43 8 1.10 0.091 Computed Peaks 0.068 3.47 50.00 0.980 Flow Frequency Analysis Time Series File:dsout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.080 2 2/09/01 18:00 0.099 1 100.00 0.990 0.029 6 1/05/02 16:00 0.080 2 25.00 0.960 0.072 3 3/06/03 19:00 0.072 3 10.00 0.900 0.025 8 8/26/04 2:00 0.052 4 5.00 0.800 0.027 7 1/05/05 8:00 0.037 5 3.00 0.667 0.037 5 1/18/06 16:00 0.029 6 2.00 0.500 0.052 4 11/24/06 7:00 0.027 7 1.30 0.231 0.099 1 1/09/08 9:00 0.025 8 1.10 0.091 Computed Peaks 0.092 50.00 0.980 Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % % % 0.001 27634 45.065 45.065 54.935 0.549E+00 0.003 7757 12.650 57.715 42.285 0.423E+00 0.005 5495 8.961 66.676 33.324 0.333E+00 0.006 5061 8.253 74.930 25.070 0.251E+00 195               Date: 12‐1   Subject:  S     To Whom   The MWS Linear. Th rate) and  approved   4th Ave:    Tr  M  P  Su  To  Lo     If you hav   Sincerely,     Zachariha Stormwat Modular W 10‐2014  Storage One,  m It May Conc S Linear will b he system is s the pre‐filter  by an a Mod reatment Flow MWS‐Linear‐4 re‐Filter Cartr urface Area p otal Surface A oading Rate = ve any questio     a J. Kent  ter Engineer  Wetland Syst Renton, WA  ern,   e sized in acc ized at a load rs are sized at dular Wetland w Rate = 0.02 4‐6 Treatment ridges = 1 Ha per Cartridge  Area 12.8 * 1  = 11.7/12.8 =  ons please fee em, Inc.     cordance the  ding rate of 0. t a loading rat d representat 2 cfs  t Capacity = 0 lf Size  = 25.6 sq ft  = 12.8 sq ft 0.91 gpm/sq  el free to con TAPE GULD a .5 gpm/sq ft ( te less than 2 ive before fin 0.026 cfs or 11 ft (less than 2 ntact us at you approval for t (downstream 2.1 gpm/sq ft. nal approval.  1.7 gpm @ 2. 2.1 gpm/sq ft ta ur convenien he Modular W m of storage –  . Design, sizin Below are th .5 ft Operatin arget)  ce.   Wetland Syste – 2 year releas ng, loading wi e calculations ng HGL  em,  se  ill be  s:   196 198 12740.008.doc 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN The conveyance system for this project is sized to convey the 100-year storm event based on the modified rational method with an initial time of concentration of 6.3 minutes. This site is approximately 1.34 acres in size, which is significantly less than the 10-acre maximum requirement for using the modified rational method. For this project, we are using the modified rational method. Backwater calculations are included to show the 0.19 foot of freeboard being provided for the 25- yr storm event and that there will be no overtopping of the system in the 100-yr storm event. Design requirements per the 2009 King County Storm Water Design Manual section 1.2.4.1 state that new pipe systems shall be designed to convey at a minimum the 25-year event therefore the conveyance system exceeds design requirements. 199 200 12740-conveyance-25yr.xlsBARGHAUSEN CONSULTING ENGINEERS - PIPE FLOW CALCULATORusing the Rational Method & Manning FormulaKING COUNTY DESIGN FOR 25YEAR STORMJOB NAME: Storage One NOTE: ENTER DEFAULTS AND STORM DATA BEFORE BEGINNING JOB#: 12740 DEFAULTS C= 0.9 n= 0.014REVISED:5/18/2016 d=12Tc=6.3A= Contributing Area (Ac) Qd= Design Flow (cfs) COEFFICIENTS FOR THE RATIONAL METHOD "Ir"-EQUATIONC= Runoff Coefficient Qf= Full Capacity Flow (cfs)STORMAr BrTc= Time of Concentration (min) Vd= Velocity at Design Flow (fps) 2YR 1.58 0.58I= Intensity at Tc (in/hr) Vf= Velocity at Full Flow (fps) 10YR 2.44 0.64 PRECIP=4d= Diameter of Pipe (in) s= Slope of pipe (%) 25YR 2.66 0.65 Ar=2.66L= Length of Pipe (ft) n= Manning Roughness Coefficient 50YR 2.75 0.65 Br=0.65D= Water Depth at Qd (in) Tt= Travel Time at Vd (min) 100YR 2.61 0.63FROM TO A s L d Tc n C SUM A A*C SUM A*C I Qd QfQd/QfD/d D Vf Vd Tt====== ====== ====== ====== ================== ====== ====== ====== ===================== ====== ====== ====== ====== ====== ====== ====== ======CB2 CB7 0.21 0.51 35 12 6.3 0.014 0.9 0.21 0.19 0.19 3.22 0.61 2.360.2570.346 4.15 3.01 2.52 0.23CB8 CB7 0.07 0.50 20 12 6.5 0.014 0.9 0.28 0.06 0.25 3.14 0.79 2.340.3390.402 4.82 2.98 2.70 0.12CB7 CB3 0.30 0.50 62 12 6.7 0.014 0.9 0.58 0.27 0.52 3.10 1.62 2.340.6930.612 7.34 2.98 3.22 0.32CB4 CB3 0.35 0.51 88 12 6.3 0.014 0.9 0.35 0.32 0.32 3.22 1.01 2.360.4290.459 5.51 3.01 2.92 0.50CB3 Pond 0.93 0.58 43 15 6.3 0.014 0.9 0.93 0.84 0.84 3.22 2.69 4.570.5900.551 8.27 3.72 3.87 0.19Page 1201 12740-conveyance.xlsBARGHAUSEN CONSULTING ENGINEERS - PIPE FLOW CALCULATORusing the Rational Method & Manning FormulaKING COUNTY DESIGN FOR 100YEAR STORMJOB NAME: Storage One NOTE: ENTER DEFAULTS AND STORM DATA BEFORE BEGINNING JOB#: 12740 DEFAULTS C= 0.9 n= 0.014REVISED:5/18/2016 d=12Tc=6.3A= Contributing Area (Ac) Qd= Design Flow (cfs) COEFFICIENTS FOR THE RATIONAL METHOD "Ir"-EQUATIONC= Runoff Coefficient Qf= Full Capacity Flow (cfs)STORMAr BrTc= Time of Concentration (min) Vd= Velocity at Design Flow (fps) 2YR 1.58 0.58I= Intensity at Tc (in/hr) Vf= Velocity at Full Flow (fps) 10YR 2.44 0.64 PRECIP=4d= Diameter of Pipe (in) s= Slope of pipe (%) 25YR 2.66 0.65 Ar=2.61L= Length of Pipe (ft) n= Manning Roughness Coefficient 50YR 2.75 0.65 Br=0.63D= Water Depth at Qd (in) Tt= Travel Time at Vd (min) 100YR 2.61 0.63FROM TO A s L d Tc n C SUM A A*C SUM A*C I Qd QfQd/QfD/d D Vf Vd Tt====== ====== ====== ====== ================== ====== ====== ====== ===================== ====== ====== ====== ====== ====== ====== ====== ======CB2 CB7 0.21 0.51 35 12 6.3 0.014 0.9 0.21 0.19 0.19 3.27 0.62 2.360.2620.350 4.20 3.01 2.53 0.23CB8 CB7 0.07 0.50 20 12 6.5 0.014 0.9 0.28 0.06 0.25 3.20 0.81 2.340.3450.406 4.87 2.98 2.71 0.12CB7 CB3 0.30 0.50 62 12 6.7 0.014 0.9 0.58 0.27 0.52 3.16 1.65 2.340.7060.621 7.45 2.98 3.23 0.32CB4 CB3 0.35 0.51 88 12 6.3 0.014 0.9 0.35 0.32 0.32 3.27 1.03 2.360.4370.464 5.57 3.01 2.93 0.50CB3 Pond 0.93 0.58 43 15 6.3 0.014 0.9 0.93 0.84 0.84 3.27 2.74 4.570.6000.557 8.36 3.72 3.88 0.18Page 1202 203 BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:12740-1.bwp Surcharge condition at intermediate junctions Tailwater Elevation:397.42 feet Discharge Range:0.69 to 2.69 Step of 0.1 [cfs] Overflow Elevation:398.1 feet Weir:NONE Channel Width:3. feet PIPE NO. 1: 43 LF - 15"CP @ 0.58% OUTLET: 393.90 INLET: 394.15 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 398.10 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.66 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.69 3.29 397.44 * 0.012 0.33 0.31 3.52 3.52 3.28 3.29 0.44 0.79 3.29 397.44 * 0.012 0.35 0.33 3.52 3.52 3.28 3.29 0.48 0.89 3.29 397.44 * 0.012 0.38 0.35 3.52 3.52 3.28 3.29 0.51 0.99 3.30 397.45 * 0.012 0.40 0.37 3.52 3.52 3.28 3.30 0.54 1.09 3.31 397.46 * 0.012 0.42 0.39 3.52 3.52 3.28 3.31 0.57 1.19 3.31 397.46 * 0.012 0.44 0.41 3.52 3.52 3.28 3.31 0.60 1.29 3.32 397.47 * 0.012 0.45 0.42 3.52 3.52 3.28 3.32 0.63 1.39 3.33 397.48 * 0.012 0.47 0.44 3.52 3.52 3.29 3.33 0.66 1.49 3.34 397.49 * 0.012 0.49 0.46 3.52 3.52 3.29 3.34 0.69 1.59 3.35 397.50 * 0.012 0.50 0.47 3.52 3.52 3.29 3.35 0.72 1.69 3.36 397.51 * 0.012 0.52 0.49 3.52 3.52 3.30 3.36 0.74 1.79 3.37 397.52 * 0.012 0.54 0.50 3.52 3.52 3.30 3.37 0.77 1.89 3.38 397.53 * 0.012 0.55 0.52 3.52 3.52 3.30 3.38 0.80 1.99 3.39 397.54 * 0.012 0.57 0.53 3.52 3.52 3.30 3.39 0.83 2.09 3.41 397.56 * 0.012 0.58 0.55 3.52 3.52 3.31 3.41 0.85 2.19 3.42 397.57 * 0.012 0.60 0.56 3.52 3.52 3.31 3.42 0.88 2.29 3.43 397.58 * 0.012 0.61 0.58 3.52 3.52 3.32 3.43 0.91 2.39 3.45 397.60 * 0.012 0.62 0.59 3.52 3.52 3.32 3.45 0.93 2.49 3.46 397.61 * 0.012 0.64 0.61 3.52 3.52 3.32 3.46 0.96 2.59 3.48 397.63 * 0.012 0.65 0.62 3.52 3.52 3.33 3.48 0.99 2.69 3.49 397.64 * 0.012 0.66 0.63 3.52 3.52 3.33 3.49 1.01 2.79 3.51 397.66 * 0.012 0.68 0.65 3.52 3.52 3.34 3.51 1.04 PIPE NO. 2: 62 LF - 12"CP @ 0.50% OUTLET: 394.15 INLET: 394.46 INTYP: 5 JUNC NO. 2: OVERFLOW-EL: 398.58 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 1.66 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.42 3.00 397.46 * 0.012 0.27 0.27 3.29 3.29 2.99 3.00 0.36 0.48 3.00 397.46 * 0.012 0.29 0.29 3.29 3.29 2.99 3.00 0.39 0.54 3.01 397.47 * 0.012 0.31 0.31 3.29 3.29 3.00 3.01 0.42 0.60 3.02 397.48 * 0.012 0.33 0.32 3.30 3.30 3.01 3.02 0.44 0.66 3.03 397.49 * 0.012 0.34 0.34 3.31 3.31 3.01 3.03 0.46 0.72 3.04 397.50 * 0.012 0.36 0.35 3.31 3.31 3.03 3.04 0.49 0.78 3.06 397.52 * 0.012 0.37 0.37 3.32 3.32 3.04 3.06 0.51 0.84 3.07 397.53 * 0.012 0.39 0.39 3.33 3.33 3.05 3.07 0.53 0.90 3.09 397.55 * 0.012 0.40 0.40 3.34 3.34 3.06 3.09 0.56 0.96 3.11 397.57 * 0.012 0.42 0.41 3.35 3.35 3.08 3.11 0.58 1.02 3.13 397.59 * 0.012 0.43 0.43 3.36 3.36 3.09 3.13 0.60 1.08 3.15 397.61 * 0.012 0.44 0.44 3.37 3.37 3.11 3.15 0.62 1.14 3.17 397.63 * 0.012 0.45 0.46 3.38 3.38 3.12 3.17 0.64 1.20 3.20 397.66 * 0.012 0.47 0.47 3.39 3.39 3.14 3.20 0.66 204 1.26 3.22 397.68 * 0.012 0.48 0.48 3.41 3.41 3.16 3.22 0.68 1.32 3.25 397.71 * 0.012 0.49 0.50 3.42 3.42 3.18 3.25 0.70 1.38 3.27 397.73 * 0.012 0.50 0.51 3.43 3.43 3.20 3.27 0.72 1.44 3.30 397.76 * 0.012 0.51 0.52 3.45 3.45 3.22 3.30 0.74 1.50 3.33 397.79 * 0.012 0.52 0.53 3.46 3.46 3.25 3.33 0.76 1.56 3.36 397.82 * 0.012 0.54 0.55 3.48 3.48 3.27 3.36 0.78 1.62 3.39 397.85 * 0.012 0.55 0.56 3.49 3.49 3.29 3.39 0.80 1.68 3.42 397.88 * 0.012 0.56 0.57 3.51 3.51 3.32 3.42 0.81 PIPE NO. 3: 35 LF - 12"CP @ 0.51% OUTLET: 394.46 INLET: 394.64 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.16 2.82 397.46 * 0.012 0.17 0.17 3.00 3.00 2.82 2.82 0.22 0.18 2.82 397.46 * 0.012 0.18 0.18 3.00 3.00 2.82 2.82 0.23 0.20 2.83 397.47 * 0.012 0.19 0.19 3.01 3.01 2.83 2.83 0.25 0.22 2.84 397.48 * 0.012 0.20 0.20 3.02 3.02 2.84 2.84 0.26 0.25 2.85 397.49 * 0.012 0.21 0.21 3.03 3.03 2.85 2.85 0.27 0.27 2.87 397.51 * 0.012 0.22 0.22 3.04 3.04 2.87 2.87 0.29 0.29 2.88 397.52 * 0.012 0.23 0.22 3.06 3.06 2.88 2.88 0.30 0.31 2.90 397.54 * 0.012 0.24 0.23 3.07 3.07 2.90 2.90 0.31 0.34 2.92 397.56 * 0.012 0.24 0.24 3.09 3.09 2.91 2.92 0.32 0.36 2.94 397.58 * 0.012 0.25 0.25 3.11 3.11 2.93 2.94 0.33 0.38 2.96 397.60 * 0.012 0.26 0.26 3.13 3.13 2.95 2.96 0.35 0.41 2.98 397.62 * 0.012 0.27 0.26 3.15 3.15 2.97 2.98 0.36 0.43 3.00 397.64 * 0.012 0.28 0.27 3.17 3.17 3.00 3.00 0.37 0.45 3.03 397.67 * 0.012 0.28 0.28 3.20 3.20 3.02 3.03 0.38 0.47 3.05 397.69 * 0.012 0.29 0.28 3.22 3.22 3.05 3.05 0.39 0.50 3.08 397.72 * 0.012 0.30 0.29 3.25 3.25 3.07 3.08 0.40 0.52 3.11 397.75 * 0.012 0.30 0.30 3.27 3.27 3.10 3.11 0.41 0.54 3.14 397.78 * 0.012 0.31 0.30 3.30 3.30 3.13 3.14 0.42 0.56 3.17 397.81 * 0.012 0.32 0.31 3.33 3.33 3.16 3.17 0.43 0.59 3.20 397.84 * 0.012 0.32 0.32 3.36 3.36 3.19 3.20 0.44 0.61 3.23 397.87 * 0.012 0.33 0.32 3.39 3.39 3.22 3.23 0.45 0.63 3.27 397.91 * 0.012 0.34 0.33 3.42 3.42 3.25 3.27 0.46 205 BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:12740-1.bwp Surcharge condition at intermediate junctions Tailwater Elevation:397.55 feet Discharge Range:0.74 to 2.74 Step of 0.1 [cfs] Overflow Elevation:398.1 feet Weir:NONE Channel Width:3. feet PIPE NO. 1: 43 LF - 15"CP @ 0.58% OUTLET: 393.90 INLET: 394.15 INTYP: 5 JUNC NO. 1: OVERFLOW-EL: 398.10 BEND: 90 DEG DIA/WIDTH: 4.0 Q-RATIO: 0.66 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.74 3.42 397.57 * 0.012 0.34 0.32 3.65 3.65 3.41 3.42 0.46 0.84 3.42 397.57 * 0.012 0.36 0.34 3.65 3.65 3.41 3.42 0.49 0.94 3.43 397.58 * 0.012 0.39 0.36 3.65 3.65 3.41 3.43 0.53 1.04 3.43 397.58 * 0.012 0.41 0.38 3.65 3.65 3.41 3.43 0.56 1.14 3.44 397.59 * 0.012 0.43 0.40 3.65 3.65 3.41 3.44 0.59 1.24 3.45 397.60 * 0.012 0.44 0.41 3.65 3.65 3.41 3.45 0.62 1.34 3.46 397.61 * 0.012 0.46 0.43 3.65 3.65 3.42 3.46 0.65 1.44 3.46 397.61 * 0.012 0.48 0.45 3.65 3.65 3.42 3.46 0.67 1.54 3.47 397.62 * 0.012 0.50 0.46 3.65 3.65 3.42 3.47 0.70 1.64 3.48 397.63 * 0.012 0.51 0.48 3.65 3.65 3.42 3.48 0.73 1.74 3.49 397.64 * 0.012 0.53 0.50 3.65 3.65 3.43 3.49 0.76 1.84 3.50 397.65 * 0.012 0.54 0.51 3.65 3.65 3.43 3.50 0.79 1.94 3.52 397.67 * 0.012 0.56 0.53 3.65 3.65 3.43 3.52 0.81 2.04 3.53 397.68 * 0.012 0.57 0.54 3.65 3.65 3.44 3.53 0.84 2.14 3.54 397.69 * 0.012 0.59 0.56 3.65 3.65 3.44 3.54 0.87 2.24 3.56 397.71 * 0.012 0.60 0.57 3.65 3.65 3.44 3.56 0.89 2.34 3.57 397.72 * 0.012 0.62 0.58 3.65 3.65 3.45 3.57 0.92 2.44 3.58 397.73 * 0.012 0.63 0.60 3.65 3.65 3.45 3.58 0.95 2.54 3.60 397.75 * 0.012 0.64 0.61 3.65 3.65 3.46 3.60 0.97 2.64 3.62 397.77 * 0.012 0.66 0.63 3.65 3.65 3.46 3.62 1.00 2.74 3.63 397.78 * 0.012 0.67 0.64 3.65 3.65 3.47 3.63 1.03 2.74 3.63 397.78 * 0.012 0.67 0.64 3.65 3.65 3.47 3.63 1.03 PIPE NO. 2: 62 LF - 12"CP @ 0.50% OUTLET: 394.15 INLET: 394.46 INTYP: 5 JUNC NO. 2: OVERFLOW-EL: 398.58 BEND: 0 DEG DIA/WIDTH: 4.0 Q-RATIO: 1.66 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.45 3.14 397.60 * 0.012 0.28 0.28 3.42 3.42 3.13 3.14 0.38 0.51 3.13 397.59 * 0.012 0.30 0.30 3.42 3.42 3.12 3.13 0.40 0.57 3.14 397.60 * 0.012 0.32 0.31 3.43 3.43 3.13 3.14 0.43 0.63 3.15 397.61 * 0.012 0.33 0.33 3.43 3.43 3.14 3.15 0.45 0.69 3.17 397.63 * 0.012 0.35 0.35 3.44 3.44 3.15 3.17 0.48 0.75 3.18 397.64 * 0.012 0.37 0.36 3.45 3.45 3.16 3.18 0.50 0.81 3.20 397.66 * 0.012 0.38 0.38 3.46 3.46 3.17 3.20 0.52 0.87 3.21 397.67 * 0.012 0.40 0.39 3.46 3.46 3.19 3.21 0.54 0.93 3.23 397.69 * 0.012 0.41 0.41 3.47 3.47 3.20 3.23 0.57 0.99 3.25 397.71 * 0.012 0.42 0.42 3.48 3.48 3.21 3.25 0.59 1.05 3.27 397.73 * 0.012 0.44 0.43 3.49 3.49 3.23 3.27 0.61 1.11 3.29 397.75 * 0.012 0.45 0.45 3.50 3.50 3.25 3.29 0.63 1.17 3.31 397.77 * 0.012 0.46 0.46 3.52 3.52 3.26 3.31 0.65 1.23 3.34 397.80 * 0.012 0.47 0.48 3.53 3.53 3.28 3.34 0.67 206 1.29 3.36 397.82 * 0.012 0.48 0.49 3.54 3.54 3.30 3.36 0.69 1.35 3.39 397.85 * 0.012 0.50 0.50 3.56 3.56 3.32 3.39 0.71 1.41 3.42 397.88 * 0.012 0.51 0.51 3.57 3.57 3.34 3.42 0.73 1.47 3.44 397.90 * 0.012 0.52 0.53 3.58 3.58 3.36 3.44 0.75 1.53 3.47 397.93 * 0.012 0.53 0.54 3.60 3.60 3.39 3.47 0.77 1.59 3.50 397.96 * 0.012 0.54 0.55 3.62 3.62 3.41 3.50 0.79 1.65 3.54 398.00 * 0.012 0.55 0.57 3.63 3.63 3.44 3.54 0.80 1.65 3.54 398.00 * 0.012 0.55 0.57 3.63 3.63 3.44 3.54 0.80 PIPE NO. 3: 35 LF - 12"CP @ 0.51% OUTLET: 394.46 INLET: 394.64 INTYP: 5 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.17 2.96 397.60 * 0.012 0.17 0.17 3.14 3.14 2.96 2.96 0.22 0.19 2.95 397.59 * 0.012 0.18 0.18 3.13 3.13 2.95 2.95 0.24 0.21 2.97 397.61 * 0.012 0.19 0.19 3.14 3.14 2.96 2.97 0.25 0.24 2.98 397.62 * 0.012 0.20 0.20 3.15 3.15 2.98 2.98 0.27 0.26 2.99 397.63 * 0.012 0.21 0.21 3.17 3.17 2.99 2.99 0.28 0.28 3.01 397.65 * 0.012 0.22 0.22 3.18 3.18 3.00 3.01 0.29 0.30 3.02 397.66 * 0.012 0.23 0.23 3.20 3.20 3.02 3.02 0.31 0.33 3.04 397.68 * 0.012 0.24 0.24 3.21 3.21 3.04 3.04 0.32 0.35 3.06 397.70 * 0.012 0.25 0.24 3.23 3.23 3.05 3.06 0.33 0.37 3.08 397.72 * 0.012 0.26 0.25 3.25 3.25 3.07 3.08 0.34 0.39 3.10 397.74 * 0.012 0.26 0.26 3.27 3.27 3.09 3.10 0.35 0.42 3.12 397.76 * 0.012 0.27 0.27 3.29 3.29 3.12 3.12 0.36 0.44 3.15 397.79 * 0.012 0.28 0.27 3.31 3.31 3.14 3.15 0.37 0.46 3.17 397.81 * 0.012 0.29 0.28 3.34 3.34 3.16 3.17 0.38 0.48 3.20 397.84 * 0.012 0.29 0.29 3.36 3.36 3.19 3.20 0.39 0.51 3.22 397.86 * 0.012 0.30 0.29 3.39 3.39 3.21 3.22 0.40 0.53 3.25 397.89 * 0.012 0.31 0.30 3.42 3.42 3.24 3.25 0.41 0.55 3.28 397.92 * 0.012 0.31 0.31 3.44 3.44 3.27 3.28 0.42 0.58 3.31 397.95 * 0.012 0.32 0.31 3.47 3.47 3.30 3.31 0.43 0.60 3.35 397.99 * 0.012 0.33 0.32 3.50 3.50 3.33 3.35 0.44 0.62 3.38 398.02 * 0.012 0.33 0.33 3.54 3.54 3.37 3.38 0.45 0.62 3.38 398.02 * 0.012 0.33 0.33 3.54 3.54 3.37 3.38 0.45 207 208 12740.008.doc 6.0 SPECIAL REPORTS AND STUDIES A geotechnical engineering report has been prepared for this site by Geotech Consultants, Inc. dated May 29, 2014. The report is enclosed. 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 12740.008.doc 7.0 OTHER PERMITS Other permits for this project include: · Building Permit · Right-of-Way Use Permit · NPDES Permit 235 236 12740.008.doc 8.0 CSWPPP ANALYSIS AND DESIGN This project will utilize appropriate erosion and sediment control measures in order to protect the site and adjacent properties. See also the Stormwater Pollution Prevention Plan (SWPPP) prepared for this project. 1. Mark Clearing Limits – To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of construction will be clearly marked before land- disturbing activities begin. Trees that are to be preserved, as well as all sensitive areas and their buffers, shall be clearly delineated, both in the field and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed state to the maximum extent possible. The BMPs relevant to marking the clearing limits that will be applied for this project include: · Buffer Zones (BMP C102) · High Visibility Plastic or Metal Fence (BMP C103) Clearing Limits and Buffer Zones shall be as shown on the plans and all vegetation outside the clearing limits shall be preserved. 2. Establish Construction Access - Construction access or activities occurring on unpaved areas shall be minimized, yet where necessary, access points shall be stabilized to minimize the tracking of sediment onto public roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent sediment from entering state waters. All wash wastewater shall be controlled on site. The specific BMPs related to establishing construction access that will be used on this project include: · Stabilized Construction Entrance (BMP C105) A stabilized construction entrance shall be installed as shown on the plans. 3. Control Flow Rates – In order to protect the properties and waterways downstream of the project site, stormwater discharges from the site will be controlled. The specific BMPs for flow control that shall be used on this project include: · Temporary Sediment Pond (BMP C241) The final pond will be constructed during the TESC phase and will be used as a sediment pond during construction. The pond will have a sediment pond riser with an orifice to control the flows being discharged offsite. 4. Install Sediment Controls - All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP before leaving the construction site or prior to being discharged to an infiltration facility. The specific BMPs to be used for controlling sediment on this project include: · Silt Fence (BMP C233) · Materials on Hand (BMP C150) may also be applicable Silt fence is to be installed along the perimeter of the project site, wherever the onside grades will be higher than the adjacent properties. Locations of silt fence installation are marked on the plans. 12740.008.doc Material shall be contained onsite using good housekeeping practices to reduce the chance that any construction materials or chemicals be introduced to surface water runoff. 5. Stabilize Soils - Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be used on this project include: · Temporary and Permanent Seeding (BMP C120) · Nets and Blankets (BMP C122) · Topsoiling (BMP C125) · Dust Control (BMP C140) · Early application of gravel base on areas to be paved All areas disturbed by construction activities shall be hydro-seeded upon completion of grading activities or if they will be unworked for more than 2 days in the wet season or 7 days in the dry season. Jute mesh maybe required to stabilize the 2:1 slopes adjacent to the pond. 6. Protect Slopes – All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes erosion. The following specific BMPs will be used to protect slopes for this project: · Temporary and Permanent Seeding (BMP C120) · Interceptor Dike and Swale (BMP C200) · Check Dams (BMP C207) Steep slopes will be protected from erosion by not directing runoff toward them. When necessary, such as where the interceptor ditches enter the stormwater ponds, riprap is to be used to limit the bank erosion. 7. Protect Drain Inlets – All storm drain inlets and culverts made operable during construction shall be protected to prevent unfiltered or untreated water from entering the drainage conveyance system. However, the first priority is to keep all access roads clean of sediment and keep street wash water separate from entering storm drains until treatment can be provided. Storm Drain Inlet Protection (BMP C220) will be implemented for all drainage inlets and culverts that could potentially be impacted by sediment-laden runoff on and near the project site. The following inlet protection measures may need to be applied on this project: · Catch Basin Filters Existing catch basins will be protected from sediment-laden runoff by a geotextile fabric catch basin insert. These insert shall be installed on the existing catch basins in NE 4th Street as well as any newly constructed catch basins onsite. Please refer to the TESC plans for placement of the catch basin inserts and the insert detail. 8. Stabilize Channels and Outlets – Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for channel and outlet stabilization that shall be used on this project include: 12740.008.doc · Outlet Protection (BMP C209) Runoff from the graded site is directed to temporary ‘v’-ditches with rock check dams. The checks will slow the velocity of the runoff in the channel and reduce the amount of sediment transported. Where there is an elevation change in the ‘v’-ditches, riprap will be installed to protect the channel from erosion. Riprap will also be used to protect the inlets of the bypass system and the bank on the sediment pond where the ditches enter. 9. Control Pollutants – All pollutants, including waste materials and demolition debris, that occur onsite shall be handled and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping and preventative measures will be taken to ensure that the site will be kept clean, well-organized, and free of debris. 10. Control Dewatering– All dewatering water from open cut excavation, tunneling, foundation work, trench, or underground vaults shall be discharged into a controlled conveyance system prior to discharge to a sediment trap or sediment pond. Channels will be stabilized, per Element #8. Clean, nonturbid dewatering water will not be routed through stormwater sediment ponds, and will be discharged to systems tributary to the receiving waters of the State in a manner that does not cause erosion, flooding, or a violation of State water quality standards in the receiving water. Highly turbid dewatering water from soils known or suspected to be contaminated, or from use of construction equipment, will require additional monitoring and treatment as required for the specific pollutants based on the receiving waters into which the discharge is occurring. Such monitoring is the responsibility of the contractor. However, the dewatering of soils known to be free of contamination will trigger BMPs to trap sediment and reduce turbidity. At a minimum, geotextile fabric socks/bags/cells will be used to filter this material. Other BMPs to be used for sediment trapping and turbidity reduction include the following: · Concrete Handling (BMP C151) · Temporary Sediment Pond (BMP C241) 11. Maintain BMPs – All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. Maintenance and repair shall be conducted in accordance with each particular BMP’s specifications. Visual monitoring of the BMPs will be conducted at least once every calendar week and within 24 hours of any rainfall event that causes a discharge from the site. If the site becomes inactive, and is temporarily stabilized, the inspection frequency will be reduced to once every month. All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently stabilized. 12. Manage Project - Project management will incorporate the key components listed below: · Phasing of Construction The construction project is being phased to the extent practicable in order to prevent soil erosion, and, to the maximum extent possible, the transport of sediment from the site during construction. 12740.008.doc Re-vegetation of exposed areas and maintenance of that vegetation shall be an integral part of the clearing activities during each phase of construction, per the Scheduling BMP (C 162). · Seasonal Work Limitations From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if shown to the satisfaction of the local permitting authority that silt-laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and Limitations on activities and the extent of disturbed areas; and Proposed erosion and sediment control measures. Based on the information provided and/or local weather conditions, the local permitting authority may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations: o Routine maintenance and necessary repair of erosion and sediment control BMPs; o Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover to soil; and o Activities where there is 100 percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. · Coordination with Utilities and Other Jurisdictions Care has been taken to coordinate with utilities, other construction projects, and the local jurisdiction in preparing this SWPPP and scheduling the construction work. · Inspection and Monitoring o All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. Site inspections shall be conducted by a person who is knowledgeable in the principles and practices of erosion and sediment control. This person has the necessary skills to: Assess the site conditions and construction activities that could impact the quality of stormwater, and Assess the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. o A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times. 12740.008.doc o Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. · Maintaining an Updated Construction SWPPP o This SWPPP shall be retained on-site or within reasonable access to the site. o The SWPPP shall be modified whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could have, a significant effect on the discharge of pollutants to waters of the state. o The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) days following the inspection. Because this site is greater than 1 acre, a General Permit from the Department of Ecology is required. The NPDES was received from the DOE on June 6, 2016 and is included in this section. STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47600 • Olympia, WA 98504-7600 • 360-407-6000 711 for Washington Relay Service • Persons with a speech disability can call 877-833-6341 June 6,2016 Travis Ameche Urban Development & Construction LLC 918 S Horton St Seattle, WA 98134-1952 RE: Coverage under the Construction Stormwater General Permit Permit number: W4R304097 Site Name: Storage One on 4th Expansion Location: NE 4111 Street, between Duvall Ave NE & Field Place NE Renton, WA County: King Disturbed Acres: 1.48 Dear Mr. Ameche: The Washington State Department of Ecology (Ecology) received your Notice of Intent for coverage under Ecology's Construction Stormwater General Permit (permit). This is your permit coverage letter. Your permit coverage is effective on June 6, 2016. Please retain this permit coverage letter with your permit (enclosed), stormwater pollution prevention plan (SVVPPP), and site log book These materials are the official record of permit coverage for your site. Please take time to read the entire permit and contact Ecology if you have any questions. Appeal Process You have a right to appeal coverage under the general permit to the Pollution Control Hearing Board (PCHB) within 30 days of the date of receipt of this letter. This appeal is limited to the general permit's applicability or non-applicability to a specific discharger. The appeal process is governed by chapter 43.21B RCW and chapter 371-08 WAC. "Date of receipt" is defined in RCW 43.21B.001(2). To appeal, you must do the following within 30 days of the date of receipt of this letter: • File your appeal and a copy of the permit cover page with the PCHB (see addresses below). Filing means actual receipt by the PCHB during regular business hours. • Serve a copy of your appeal and the permit cover page on Ecology in paper form - by mail or in person (see addresses below). E-mail is not accepted. Travis Ameche June 6,2016 Page 2 You must also comply with other applicable requirements in chapter 43.21B RCW and chapter 371- 08 WAC. Address and Location Information: Street Addresses: Department of Ecology Attn: Appeals Processing Desk 300 Desmond Drive SE Lacey, WA 98503 Pollution Control Hearings Board (PCHB) 1111 Israel Road SW, Suite 301 Tumwater, WA 98501 Mailing Addresses: Department of Ecology Attn: Appeals Processing Desk PO Box 47608 Olympia, WA 98504-7608 Pollution Control Hearings Board PO Box 40903 Olympia, WA 98504-0903 Electronic Discharge Monitoring Reports (WQWebDMR) This permit requires that Permittees submit monthly discharge monitoring reports (DMRs) electronically using Ecology's secure online system, WQWebDMR. To sign up for WQWebDMR go to: www.ecy.wa.gov/programs/wq/permits/paris/webdmr.html. If you have questions, contact the portal staff at (360) 407-7097 (Olympia area), or (800) 633-6193/option 3, or email WQWebPortal@ecy.wa.gov. Ecology Field Inspector Assistance If you have questions regarding stormwater management at your construction site, please contact Tracie Walters of Ecology's Northwest Regional Office in Bellevue at tracie.walters@ecy.wa.gov or (425) 649-4484. Questions or Additional Information Ecology is committed to providing assistance. Please review our web page at: www.ecy.wa.gov/programs/wq/stormwater/construction. If you have questions about the construction stormwater general permit, please contact Melinda Wilson at melinda.wilson@ecy.wa.gov or (360) 407-6556. Sincerely, Bill Moore, P.E., Manager Program Development Services Section Water Quality Program Enclosure 238 12740.008.doc 9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT Bond quantities are included in the following pages. 239 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Department of Development & Environmental Services900 Oakesdale Avenue SouthwestRenton, Washington 98057-5212206-296-6600 TTY 206-296-7217Project Name: Date: Location: Project No.: Activity No.: Note: All prices include labor, equipment, materials, overhead and Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database._____________yes __________________no If yes, Forest Practice Permit Number: (RCW 76.09)Page 1 of 9Storage One on 4th Expansion4815 NE 4th Street, Renton WA For alternate formats, call 206-296-6600. __________________5/23/201612740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02 Version: 11/26/2008Report Date: 5/23/2016240 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Unit# ofReference #PriceUnitQuantity ApplicationsCostEROSION/SEDIMENT CONTROLNumberBackfill & compaction-embankmentESC-15.62$ CYCheck dams, 4" minus rockESC-2SWDM 5.4.6.3 67.51$ EachCrushed surfacing 1 1/4" minusESC-3WSDOT 9-03.9(3) 85.45$ CYDitchingESC-48.08$ CYExcavation-bulkESC-51.50$ CYFence, siltESC-6SWDM 5.4.3.1 1.38$ LF 1040 11435Fence, Temporary (NGPE)ESC-71.38$ LFHydroseedingESC-8SWDM 5.4.2.4 0.59$ SYJute MeshESC-9SWDM 5.4.2.2 1.45$ SYMulch, by hand, straw, 3" deepESC-10SWDM 5.4.2.1 2.01$ SYMulch, by machine, straw, 2" deepESC-11SWDM 5.4.2.1 0.53$ SYPiping, temporary, CPP, 6"ESC-1210.70$ LFPiping, temporary, CPP, 8"ESC-1316.10$ LFPiping, temporary, CPP, 12"ESC-1420.70$ LFPlastic covering, 6mm thick, sandbaggedESC-15SWDM 5.4.2.3 2.30$ SYRip Rap, machine placed; slopesESC-16WSDOT 9-13.1(2) 39.08$ CYRock Construction Entrance, 50'x15'x1'ESC-17SWDM 5.4.4.1 1,464.34$ EachRock Construction Entrance, 100'x15'x1'ESC-18SWDM 5.4.4.1 2,928.68$ Each 1 12929Sediment pond riser assemblyESC-19SWDM 5.4.5.2 1,949.38$ Each 1 11949Sediment trap, 5' high berm ESC-20SWDM 5.4.5.1 17.91$ LFSed. trap, 5' high, riprapped spillway berm section ESC-21SWDM 5.4.5.1 68.54$ LFSeeding, by handESC-22SWDM 5.4.2.4 0.51$ SYSodding, 1" deep, level groundESC-23SWDM 5.4.2.5 6.03$ SYSodding, 1" deep, sloped groundESC-24SWDM 5.4.2.5 7.45$ SYTESC SupervisorESC-2574.75$ HR 40 12990Water truck, dust controlESC-26SWDM 5.4.7 97.75$ HRWRITE-IN-ITEMS **** (see page 9)EachESC SUBTOTAL:9,303.26$ 30% CONTINGENCY & MOBILIZATION:2,790.98$ ESC TOTAL:12,094.24$ COLUMN:APage 2 of 912740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02 Version: 11/26/2008Report Date: 5/23/2016241 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Existing Future Public PrivateRight-of-Way Road Improvements Improvements & Drainage FacilitiesQuant.Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete CostGENERAL ITEMSNo.Backfill & Compaction- embankment GI - 1 5.62$ CYBackfill & Compaction- trench GI - 2 8.53$ CYClear/Remove Brush, by hand GI - 3 0.36$ SYClearing/Grubbing/Tree Removal GI - 4 8,876.16$ AcreExcavation - bulk GI - 5 1.50$ CY1800 2,700.00Excavation - Trench GI - 6 4.06$ CYFencing, cedar, 6' high GI - 7 18.55$ LFFencing, chain link, vinyl coated, 6' high GI - 8 13.44$ LF410 5,510.40Fencing, chain link, gate, vinyl coated, 20' GI - 9 1,271.81$ Each1 1,271.81Fencing, split rail, 3' high GI - 10 12.12$ LFFill & compact - common barrow GI - 11 22.57$ CYFill & compact - gravel base GI - 12 25.48$ CYFill & compact - screened topsoil GI - 13 37.85$ CYGabion, 12" deep, stone filled mesh GI - 14 54.31$ SYGabion, 18" deep, stone filled mesh GI - 15 74.85$ SYGabion, 36" deep, stone filled mesh GI - 16 132.48$ SYGrading, fine, by hand GI - 17 2.02$ SYGrading, fine, with grader GI - 18 0.95$ SY7116 6,760.20Monuments, 3' long GI - 19 135.13$ EachSensitive Areas Sign GI - 20 2.88$ EachSodding, 1" deep, sloped ground GI - 21 7.46$ SYSurveying, line & grade GI - 22 788.26$ DaySurveying, lot location/lines GI - 23 1,556.64$ AcreTraffic control crew ( 2 flaggers ) GI - 24 85.18$ HRTrail, 4" chipped wood GI - 25 7.59$ SYTrail, 4" crushed cinder GI - 26 8.33$ SYTrail, 4" top course GI - 27 8.19$ SYWall, retaining, concrete GI - 28 44.16$ SFWall, rockery GI - 29 9.49$ SF640 6,073.60Page 3 of 9SUBTOTAL22,316.01Quantity Completed (Bond Reduction)**KCC 27A authorizes only one bond reduction.12740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016242 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Existing Future Public PrivateBond Reduction*Right-of-way Road Improvements Improvements & Drainage FacilitiesQuant.Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete CostROAD IMPROVEMENTNo.AC Grinding, 4' wide machine < 1000sy RI - 1 28.00$ SYAC Grinding, 4' wide machine 1000-2000syRI - 2 15.00$ SYAC Grinding, 4' wide machine > 2000sy RI - 3 7.00$ SYAC Removal/Disposal/Repair RI - 4 67.50$ SYBarricade, type I RI - 5 30.03$ LFBarricade, type III ( Permanent ) RI - 6 45.05$ LFCurb & Gutter, rolled RI - 7 17.00$ LFCurb & Gutter, vertical RI - 8 12.50$ LF260 3,250.00Curb and Gutter, demolition and disposalRI - 9 18.00$ LF260 4,680.00Curb, extruded asphalt RI - 10 5.50$ LFCurb, extruded concrete RI - 11 7.00$ LF770 5,390.00Sawcut, asphalt, 3" depth RI - 12 1.85$ LFSawcut, concrete, per 1" depth RI - 13 1.69$ LF330 557.70Sealant, asphalt RI - 14 1.25$ LF330 412.50Shoulder, AC, ( see AC road unit price )RI - 15 -$ SYShoulder, gravel, 4" thick RI - 16 15.00$ SYSidewalk, 4" thick RI - 17 35.00$ SY1322 46,270.00 2150 75,250.00Sidewalk, 4" thick, demolition and disposalRI - 18 29.50$ SYSidewalk, 5" thick RI - 19 38.50$ SYSidewalk, 5" thick, demolition and disposalRI - 20 37.50$ SYSign, handicap RI - 21 85.28$ Each1 85.28Striping, per stall RI - 22 5.82$ Each21 122.22Striping, thermoplastic, ( for crosswalk ) RI - 23 2.38$ SFStriping, 4" reflectorized line RI - 24 0.25$ LFPage 4 of 9SUBTOTAL 55,170.20 80,847.50*KCC 27A authorizes only one bond reduction.12740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016243 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Existing Future Public PrivateBond Reduction*Right-of-way Road Improvements Improvements & Drainage FacilitiesQuant.Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete CostROAD SURFACING (4" Rock = 2.5 base & 1.5" top course) For '93 KCRS ( 6.5" Rock= 5" base & 1.5" top course)For KCRS '93, (additional 2.5" base) add:RS - 1 3.60$ SY1050 3,780.00AC Overlay, 1.5" AC RS - 2 11.25$ SYAC Overlay, 2" AC RS - 3 15.00$ SYAC Road, 2", 4" rock, First 2500 SY RS - 4 21.00$ SYAC Road, 2", 4" rock, Qty. over 2500SY RS - 5 19.00$ SYAC Road, 3", 4" rock, First 2500 SY RS - 6 23.30$ SY1050 24,465.00AC Road, 3", 4" rock, Qty. over 2500 SY RS - 7 21.00$ SYAC Road, 5", First 2500 SY RS - 8 27.60$ SYAC Road, 5", Qty. Over 2500 SY RS - 9 25.00$ SYAC Road, 6", First 2500 SYRS - 1033.10$ SY115 3,806.50AC Road, 6", Qty. Over 2500 SYRS - 1130.00$ SYAsphalt Treated Base, 4" thickRS - 1220.00$ SYGravel Road, 4" rock, First 2500 SYRS - 1315.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRS - 148.50$ SYPCC Road, 5", no base, over 2500 SYRS - 1527.00$ SYPCC Road, 6", no base, over 2500 SYRS - 1625.50$ SYThickened EdgeRS - 178.60$ LFPage 5 of 9SUBTOTAL3,806.50 28,245.00*KCC 27A authorizes only one bond reduction.12740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016244 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Existing Future Public PrivateBond Reduction*Right-of-way Road Improvements Improvements & Drainage FacilitiesQuant.Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete CostDRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.Access Road, R/D D - 1 21.00$ SY177 3,717.00Bollards - fixed D - 2 240.74$ EachBollards - removable D - 3 452.34$ Each* (CBs include frame and lid)CB Type I D - 4 1,257.64$ EachCB Type IL D - 5 1,433.59$ Each4 5,734.36CB Type II, 48" diameter D - 6 2,033.57$ Each2 4,067.14 for additional depth over 4' D - 7 436.52$ FTCB Type II, 54" diameter D - 8 2,192.54$ Each1 2,192.54 for additional depth over 4' D - 9 486.53$ FTCB Type II, 60" diameter D - 10 2,351.52$ Each for additional depth over 4' D - 11 536.54$ FTCB Type II, 72" diameter D - 12 3,212.64$ Each for additional depth over 4' D - 13 692.21$ FTThrough-curb Inlet Framework (Add) D - 14 366.09$ EachCleanout, PVC, 4" D - 15 130.55$ EachCleanout, PVC, 6" D - 16 174.90$ Each3 524.70Cleanout, PVC, 8" D - 17 224.19$ EachCulvert, PVC, 4" D - 18 8.64$ LFCulvert, PVC, 6" D - 19 12.60$ LF84 1,058.40Culvert, PVC, 8" D - 20 13.33$ LFCulvert, PVC, 12" D - 21 21.77$ LFCulvert, CMP, 8" D - 22 17.25$ LFCulvert, CMP, 12" D - 23 26.45$ LFCulvert, CMP, 15" D - 24 32.73$ LFCulvert, CMP, 18" D - 25 37.74$ LFCulvert, CMP, 24" D - 26 53.33$ LFCulvert, CMP, 30" D - 27 71.45$ LFCulvert, CMP, 36" D - 28 112.11$ LFCulvert, CMP, 48" D - 29 140.83$ LFCulvert, CMP, 60" D - 30 235.45$ LFCulvert, CMP, 72" D - 31 302.58$ LFPage 6 of 9SUBTOTAL 17,294.14*KCC 27A authorizes only one bond reduction.12740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016245 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Existing Future Public PrivateBond Reduction*Right-of-way Road Improvements ImprovementsDRAINAGE CONTINUED & Drainage FacilitiesQuant.No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Complete CostCulvert, Concrete, 8" D - 32 21.02$ LFCulvert, Concrete, 12" D - 33 30.05$ LFCulvert, Concrete, 15" D - 34 37.34$ LFCulvert, Concrete, 18" D - 35 44.51$ LFCulvert, Concrete, 24" D - 36 61.07$ LFCulvert, Concrete, 30" D - 37 104.18$ LFCulvert, Concrete, 36" D - 38 137.63$ LFCulvert, Concrete, 42" D - 39 158.42$ LFCulvert, Concrete, 48" D - 40 175.94$ LFCulvert, CPP, 6" D - 41 10.70$ LF400 4280Culvert, CPP, 8" D - 42 16.10$ LFCulvert, CPP, 12" D - 43 20.70$ LF203 4202.1Culvert, CPP, 15" D - 44 23.00$ LF45 1035Culvert, CPP, 18" D - 45 27.60$ LFCulvert, CPP, 24" D - 46 36.80$ LFCulvert, CPP, 30" D - 47 48.30$ LFCulvert, CPP, 36" D - 48 55.20$ LFDitching D - 49 8.08$ CYFlow Dispersal Trench (1,436 base+) D - 50 25.99$ LFFrench Drain (3' depth) D - 51 22.60$ LFGeotextile, laid in trench, polypropylene D - 52 2.40$ SYInfiltration pond testing D - 53 74.75$ HRMid-tank Access Riser, 48" dia, 6' deep D - 54 1,605.40$ EachPond Overflow Spillway D - 55 14.01$ SYRestrictor/Oil Separator, 12" D - 56 1,045.19$ EachRestrictor/Oil Separator, 15" D - 57 1,095.56$ EachRestrictor/Oil Separator, 18" D - 58 1,146.16$ EachRiprap, placed D - 59 39.08$ CY10 390.8Tank End Reducer (36" diameter) D - 60 1,000.50$ EachTrash Rack, 12" D - 61 211.97$ Each1 211.97Trash Rack, 15" D - 62 237.27$ EachTrash Rack, 18" D - 63 268.89$ EachTrash Rack, 21" D - 64 306.84$ EachPage 7 of 9SUBTOTAL10119.87*KCC 27A authorizes only one bond reduction.12740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016246 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Existing Future Public PrivateBond Reduction*Right-of-way Road Improvements Improvements & Drainage FacilitiesQuant.Unit Price Unit Quant. Price Quant. Cost Quant. Cost Complete CostPARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrow PL - 1 21.00$ SY2" AC, 1.5" top course & 2.5" base coursePL - 2 28.00$ SY4" select borrow PL - 3 4.55$ SY1.5" top course rock & 2.5" base course PL - 4 11.41$ SYUTILITY POLES & STREET LIGHTINGUtility pole relocation costs must be accompanied by Franchise Utility's Cost StatementUtility Pole(s) Relocation UP-11 10,000.00Street Light Poles w/Luminaires UP-2 8,000.00$ Each2 16,000.00WRITE-IN-ITEMS(Such as detention/water quality vaults.)No.Modular Wetland System WI - 1 40,000.000$ Each1 40,000.00Modular Grid Pavement WI - 2 5.00$ SF2700 13,500.00Permeable Pavement WI - 3 40.00$ SY250 10,000.00WI - 4 LFWI - 5 FTWI - 6WI - 7WI - 8WI - 9WI - 10SUBTOTAL 26,000.00 63,500.00SUBTOTAL (SUM ALL PAGES):84,976.70 222,322.5230% CONTINGENCY & MOBILIZATION:25,493.01 66,696.76 GRANDTOTAL: 110,469.71 289,019.28COLUMN: B C D EPage 8 of 9Lump Sum*KCC 27A authorizes only one bond reduction.12740 - Bond Quantity Worksheet.xlsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016247 Site Improvement Bond Quantity WorksheetWeb date: 12/02/2008Original bond computations prepared by:Name:Date:PE Registration Number:Tel. #:Firm Name:Address:Project No: Stabilization/Erosion Sediment Control (ESC) (A)Existing Right-of-Way Improvements (B)Future Public Road Improvements & Drainage Facilities(C)Private Improvements (D)Calculated Quantity Completed(E)Total Right-of Way and/or Site Restoration Bond*/** (A+B)(First $7,500 of bond* shall be cash.)Performance Bond* Amount (A+B+C+D) = TOTAL (T)T x 0.30 ORMinimum bond* amount is $1000.Reduced Performance Bond* Total *** Use larger of Tx30% or (T-E)Maintenance/Defect Bond* TotalNAME OF PERSON PREPARING BOND* REDUCTION:Date:* NOTE:The word "bond" as used in this document means any financial guarantee acceptable to King County.** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be(C+D)-EREQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES123,475.0$ (B+C) x 0.25 =12,094.2$ 289,019.3$ 411,583.2$ -$ 9/29/2015425-251-6222ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTSPUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND*Brandon ChaisyBarghausen Consulting Engineers18215 72nd Avenue South, Kent WA 98032PERFORMANCE BOND*AMOUNT47626BOND* AMOUNT REQUIRED AT RECORDING ORTEMPORARY OCCUPANCY ***399,489.0$ 27,617.4$ 411,583.2$ 12,094.2$ (T-E)-$ 110,469.7$ Page 9 of 912740 - Bond Quantity Worksheet.xlsCheck out the DDES Web site at www.kingcounty.gov/permitsUnit prices updated: 02/12/02Version: 11/26/08Report Date: 5/23/2016248 249 12740.008.doc 10.0 OPERATION AND MAINTENANCE MANUAL An Operation and Maintenance Manual is included in this section. 250 OPERATIONS AND MAINTENANCE MANUAL Renton Self Storage N.E. 4th Street Renton, Washington Prepared for: Jackson|Main Architects 311 1st Avenue South, Suite 300 Seattle, WA 98104 May 18, 2016 Our Job No. 12740 18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX BRANCH OFFICES ¨ TUMWATER, WA ¨ LONG BEACH, CA ¨ ROSEVILLE, CA ¨ SAN DIEGO, CA www.barghausen.com 251 12740.006.doc TABLE OF CONTENTS 1.0 INTRODUCTION/GENERAL INFORMATION EXHIBIT A MAINTENANCE GUIDELINES 252 12740.006.doc 1.0 INTRODUCTION/GENERAL INFORMATION Catch basins are located on the Renton Self Storage site that collect runoff from the project site and route that runoff through conveyance piping to the southwest corner of the site where runoff enters a detention pond which provides flow control for the new land covers on the project site. Level 2 Flow Control is the required means of providing Flow Control for this project. Water quality treatment will be provided in a modular wetland to meet the City of Renton’s Enhanced Basic Water Quality. The release mechanism from the detention pond is a control structure located on the east side of the pond, which has a riser pipe inside of it that releases runoff at a slow rate and tends to back up water in the pond during peak storm events. The release to the downstream drainage course is also through the modular wetland, to the existing wetland onsite. All facilities on the project site should be maintained on a regular basis of at least twice a year at an interval of every six months. Should vegetation become sparse or should it die out, then it should be replaced around the site to match what the design conditions of the site were when the site was initially constructed. The following pages of this report delineate the requirements for flow control, conveyance, and water quality facilities maintenance. Please refer to these documents when performing your maintenance on the project site. 253 254 12740.006.doc GENERAL PUMP MAINTENAINCE GUIDELINES The storm water pump(s) shall be inspected per the manufacturer's operation and maintenance manual. Listed below are general maintenance guidelines for storm water pumps. 1) Inspect cables and cable entry for damage and/or leaks 2) Check motor insulation. 3) Check external parts (screws, bolts and nuts are tight) 4) Check seal chamber oil 5) Check impeller for wear or damage 6) Inspect floats and switches and test that the pump(s) are starting and stopping at the set elevations 7) Operate pumps and test the operating release rate(s) to ensure the pump(s) are functioning properly 255 256 257 258 259 260 261 262 263 264 265 www.modularwetlands.com Maintenance Guidelines for Modular Wetland System - Linear Maintenance Summary o Remove Trash from Screening Device – average maintenance interval is 6 to 12 months.  (5 minute average service time). o Remove Sediment from Separation Chamber – average maintenance interval is 12 to 24 months.  (10 minute average service time). o Replace Cartridge Filter Media – average maintenance interval 12 to 24 months.  (10-15 minute per cartridge average service time). o Replace Drain Down Filter Media – average maintenance interval is 12 to 24 months.  (5 minute average service time). o Trim Vegetation – average maintenance interval is 6 to 12 months.  (Service time varies). System Diagram Access to screening device, separation chamber and cartridge filter Access to drain down filter Pre-Treatment Chamber Biofiltration Chamber Discharge Chamber Outflow Pipe Inflow Pipe (optional) 266 www.modularwetlands.com Maintenance Procedures Screening Device 1. Remove grate or manhole cover to gain access to the screening device in the Pre- Treatment Chamber. Vault type units do not have screening device. Maintenance can be performed without entry. 2. Remove all pollutants collected by the screening device. Removal can be done manually or with the use of a vacuum truck. The hose of the vacuum truck will not damage the screening device. 3. Screening device can easily be removed from the Pre-Treatment Chamber to gain access to separation chamber and media filters below. Replace grate or manhole cover when completed. Separation Chamber 1. Perform maintenance procedures of screening device listed above before maintaining the separation chamber. 2. With a pressure washer spray down pollutants accumulated on walls and cartridge filters. 3. Vacuum out Separation Chamber and remove all accumulated pollutants. Replace screening device, grate or manhole cover when completed. Cartridge Filters 1. Perform maintenance procedures on screening device and separation chamber before maintaining cartridge filters. 2. Enter separation chamber. 3. Unscrew the two bolts holding the lid on each cartridge filter and remove lid. 4. Remove each of 4 to 8 media cages holding the media in place. 5. Spray down the cartridge filter to remove any accumulated pollutants. 6. Vacuum out old media and accumulated pollutants. 7. Reinstall media cages and fill with new media from manufacturer or outside supplier. Manufacturer will provide specification of media and sources to purchase. 8. Replace the lid and tighten down bolts. Replace screening device, grate or manhole cover when completed. Drain Down Filter 1. Remove hatch or manhole cover over discharge chamber and enter chamber. 2. Unlock and lift drain down filter housing and remove old media block. Replace with new media block. Lower drain down filter housing and lock into place. 3. Exit chamber and replace hatch or manhole cover. 267 www.modularwetlands.com Maintenance Notes 1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. 2. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to the governing municipality for inspection upon request at any time. 3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. 4. Entry into chambers may require confined space training based on state and local regulations. 5. No fertilizer shall be used in the Biofiltration Chamber. 6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may require irrigation. 268 www.modularwetlands.com Maintenance Procedure Illustration Screening Device The screening device is located directly under the manhole or grate over the Pre-Treatment Chamber. It’s mounted directly underneath for easy access and cleaning. Device can be cleaned by hand or with a vacuum truck. Separation Chamber The separation chamber is located directly beneath the screening device. It can be quickly cleaned using a vacuum truck or by hand. A pressure washer is useful to assist in the cleaning process. 269 www.modularwetlands.com Cartridge Filters The cartridge filters are located in the Pre-Treatment chamber connected to the wall adjacent to the biofiltration chamber. The cartridges have removable tops to access the individual media filters. Once the cartridge is open media can be easily removed and replaced by hand or a vacuum truck. Drain Down Filter The drain down filter is located in the Discharge Chamber. The drain filter unlocks from the wall mount and hinges up. Remove filter block and replace with new block. 270 www.modularwetlands.com Trim Vegetation Vegetation should be maintained in the same manner as surrounding vegetation and trimmed as needed. No fertilizer shall be used on the plants. Irrigation per the recommendation of the manufacturer and or landscape architect. Different types of vegetation requires different amounts of irrigation. 271 www.modularwetlands.com Inspection Form Modular Wetland System, Inc. P. 760.433-7640 F. 760-433-3176 E. Info@modularwetlands.com 272 For Office Use Only (city) (Zip Code)(Reviewed By) Owner / Management Company (Date) Contact Phone ( )_ Inspector Name Date / / Time AM / PM Weather Condition Additional Notes Yes Depth: Yes No Modular Wetland System Type (Curb, Grate or UG Vault):Size (22', 14' or etc.): Other Inspection Items: Storm Event in Last 72-hours? No Yes Type of Inspection Routine Follow Up Complaint Storm Office personnel to complete section to the left. 2972 San Luis Rey Road, Oceanside, CA 92058 P (760) 433-7640 F (760) 433-3176 Inspection Report Modular Wetlands System Is the filter insert (if applicable) at capacity and/or is there an accumulation of debris/trash on the shelf system? Does the cartridge filter media need replacement in pre-treatment chamber and/or discharge chamber? Any signs of improper functioning in the discharge chamber? Note issues in comments section. Chamber: Is the inlet/outlet pipe or drain down pipe damaged or otherwise not functioning properly? Structural Integrity: Working Condition: Is there evidence of illicit discharge or excessive oil, grease, or other automobile fluids entering and clogging the unit? Is there standing water in inappropriate areas after a dry period? Damage to pre-treatment access cover (manhole cover/grate) or cannot be opened using normal lifting pressure? Damage to discharge chamber access cover (manhole cover/grate) or cannot be opened using normal lifting pressure? Does the MWS unit show signs of structural deterioration (cracks in the wall, damage to frame)? Project Name Project Address Inspection Checklist CommentsNo Does the depth of sediment/trash/debris suggest a blockage of the inflow pipe, bypass or cartridge filter? If yes, specify which one in the comments section. Note depth of accumulation in in pre-treatment chamber. Is there a septic or foul odor coming from inside the system? Is there an accumulation of sediment/trash/debris in the wetland media (if applicable)? Is it evident that the plants are alive and healthy (if applicable)? Please note Plant Information below. Sediment / Silt / Clay Trash / Bags / Bottles Green Waste / Leaves / Foliage Waste:Plant Information No Cleaning Needed Recommended Maintenance Additional Notes: Damage to Plants Plant Replacement Plant Trimming Schedule Maintenance as Planned Needs Immediate Maintenance 273 www.modularwetlands.com Maintenance Report Modular Wetland System, Inc. P. 760.433-7640 F. 760-433-3176 E. Info@modularwetlands.com 274 For Office Use Only (city) (Zip Code)(Reviewed By) Owner / Management Company (Date) Contact Phone ( )_ Inspector Name Date / / Time AM / PM Weather Condition Additional Notes Site Map # Comments: 2972 San Luis Rey Road, Oceanside, CA 92058 P. 760.433.7640 F. 760.433.3176 Inlet and Outlet Pipe Condition Drain Down Pipe Condition Discharge Chamber Condition Drain Down Media Condition Plant Condition Media Filter Condition Long: MWS Sedimentation Basin Total Debris Accumulation Condition of Media 25/50/75/100 (will be changed @ 75%) Operational Per Manufactures' Specifications (If not, why?) Lat:MWS Catch Basins GPS Coordinates of Insert Manufacturer / Description / Sizing Trash Accumulation Foliage Accumulation Sediment Accumulation Type of Inspection Routine Follow Up Complaint Storm Storm Event in Last 72-hours? No Yes Office personnel to complete section to the left. Project Address Project Name Cleaning and Maintenance Report Modular Wetlands System 275