HomeMy WebLinkAbout20191114144334.pdfEa rth
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Develyyment
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane(a,accrete.build
No. of
Date: November 14, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
uo ies uaie uescription
1 1 11/5-11/8/19 Daily Field Report(s) # 67 & 70
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vo ele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN: iohnwCa.rinocon.com
ATTN:
mark accrete build
ATTN
ieff(a.accrete.build
ATTN.
Jenniferpaccrete. build
ATTN.
_19havez@rentonwa gov
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NWLLC Field Rep. Project No. Page of Report No.
AK 0895.06 1/2 67
E {
1805136 1h Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 12:00 PM; 12:15 PM; 11/5/19 Tuesday
(425) 449-4704 (866) 366-8710 3:15 PM 4:15 PM
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By
Rino Construction Rod
Are approved Plans/Permits onsite YES ❑ NO Project No Permit No.
Test Reference Maximum Fill Test Dry % of
Number Test Location (Water Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu.ft. % lbs./cu.ft. Dry Density
57 See map for approximate location 4 1 130.7 12.1 124.8 96
58 See map for approximate location -2' 1 130.7 10.9 1 123.6 1 95
59 See map for approximate location SG 1 130.7 11.3 123.9 1 95
Test Reference Maximum Fill Test Dry % of
Number Test Location (Vault Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu.ft. % lbs./cu.ft. Dry Density
60 See map for approximate location -8' 1 130.7 12.0 124.6 95
61 See map for approximate location -6' 1 130.7 11.1 124.9 96
62 See map for approximate location -8' 1 130.7 10.7 124.8 96
63 See map for approximate location -6' 1 130.7 12.4 124.1 95
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and backfill and
earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep observed contractor
place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction
tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation and Backfill
Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe
pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry
density (130.7 lbs./cu. ft.). Contractor expressed plans to continue backfilling vault tomorrow, November 5, 2019. Rep
will return to observe and test compaction as needed.
ESNW rep will return to observe earthwork activities when requested by client.
4—L, �—
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Field Rep. Project No. Page of Report No.
Earth Solutions NiN«C
AK 0895.06 2/2 67
t t
1805136 ffi Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 12:00 PM: 12:15 PM, 11/5/19 Tuesday
(425) 449-4704 (866) 366-8710 3:15 PM 4:15 PM
DTravel Time .Weather
DAILY FIELD REPORT
1.25 Hr. RT 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
................
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Grading Foreman
Rod
LJ YES ❑ NO Project No.
Checked By
Permit No.
CONTINUED ON NEXT PAGE
Earth S01UH0111S NVVLLC
Field Rep.
'
0895.06
1 1805136 1h Place NE, FAX:
_AK
Time On Site
Suite 201 (425) 449-4711
Date
Bellevue, WA 98005 TOLL FREE:
12:15 PM;
(425) 449-4704 (866) 366-8710
3:15 PM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Grading Contractor
Rino Construction
Grading Foreman
Rod
Project No.
Page of
Report No.
0895.06
1/2
70
Time Off Site
Date
Day of Week
1:45 PM;
11/8/19
Friday
4:45 PM
_
Weather
50s°F, Clear
7Client /Owner
RJ Development,
LLC
Received Onsite By
Checked By
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No '
At the client's request, ESNW rep was onsite to observe and test lock and load wall, vault excavation and backfill and
earthwork activities.
Lock and Load Wall
While onsite, rep observed contractor use a large excavator to excavate the slope and excavation for the lock and
load wall. Rep observed contractor excavate the keyway for the wall. Although over -steepened (near vertical), rep
observed that the cut was stable in its current configuration. ESNW recommends that ENSW representative be onsite
while contractor is working near or within the cut slope. Rep recommended that contractor place plastic sheeting over
the exposed slope to prevent stormwater from permeating the surface. Rep will return Monday, November 11, 2019,
to observe the conditions of the slope.
Vault Excavation and Backfill
Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe
pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry
density (130.7 lbs./cu. ft.). Contractor expressed plans to continue backfilling vault Monday, November 11, 2019. Rep
will return to observe and test compaction as needed.
ESNW rep will return to observe earthwork activities when requested by client.
4-4-S �_
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NINLLC Field Rep. Project No. Page of Report No.
t AK 0895.06 2/2 70
{ 1805136 1h Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 12:15 PM; 1:45 PM; 11/8/19 Friday
(425) 449-4704 (866) 366-8710 3:15 PM 4:45 PM
................
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 50s°F, Clear
I----
Project Name
L Weatherly Inn
...........
General Contractor
Job Location
4500 Talbot Rd. S_., Renton, WA
General Contractor's Superintendent
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite El YES F� NO Project No.
Test
Number
67+8 68
COPY TO:
Test Location (Vault Backfill)
See map for approximate location
See map for approximate location
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
CONTINUED ON NEXT PAGE ❑
Reference
Maximum
Fill
.............
Test Dry % of
Elevation
Compaction
Dry Density
Moisture
Density Maximum
Curve
lbs./cu.ft.
%
lbs./cu.ft.
Dry Density
6'
1
130.7
12.0
124.7
95
-4'
1
130.7
11.8 i
124.0
95
CONTINUED ON NEXT PAGE ❑