HomeMy WebLinkAbout2013 Correspondence CITY OF RENTON,WASHINGTON RESOLUTION NO. 4161 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2013-2018. WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of the Public Works Department, held a public hearing on August 13, 2012, after notice to the public as provided by law for the purpose of considering adoption, modification, and amendments of the plan and program; and WHEREAS, at the public hearing held on August 13, 2012, due consideration was given to the proposed changes and amendments for the purpose of updating the plan and program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above findings are true and correct in all respects. SECTION II. The City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits "A", "B" and "C" incorporated herein as if fully set forth. SECTION III. The plan and program, as evidenced by said Exhibits, shall be and constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan", and shall remain in full force and effect until further revised, amended, and modified as provided by law. 1 RESOLUTION NO. 4161 SECTION IV. The Administrator of the Public Works Department and the City Clerk are hereby authorized and directed to file this Resolution, together with the Exhibits, with the Director of Highways for the State of Washington and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 17thday of September . , 2012. t<h-tert- Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this 17thdayof September , 2012. Denis Law, Mayor Approved as to form: • Lawrence J. Warren, City Attorney , RES.1563:6/21/11:scr , 4 � 2 September 17, 2012 Renton City Council Minutes Page 259 RESOLUTION#4158 A resolution was read authorizing the Mayor and City Clerk to enter into an Attorney: NPDES II Permit interlocal agreement with the cities of Auburn, Bainbridge Island, Bellevue, Appeal Interlocal Agreement, Burlington, Des Moines, Everett, Issaquah, Kent, Mount Vernon,SeaTac, Various Agencies Snoqualmie and Sumner,and Cowlitz County regarding legal services. MOVED BY ZWICKER,SECONDED BY BRIERE, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. RESOLUTION#4159 A resolution was read authorizing the Mayor and City Clerk to enter into an Transportation: F Line interlocal agreement with King County and the cities of Burien,SeaTac, and RapidRide Fiber Optic Cables, Tukwila entitled "Agreement on the Design, Construction, Ownership, and King County, Burien,SeaTac& Maintenance of the F Line RapidRide Fiber Optic Project." MOVED BY ZWICKER, Tukwila SECONDED BY BRIERE, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. RESOLUTION#4160 A resolution was read authorizing the Mayor and City Clerk to enter into an Transportation: F Line interlocal agreement with King County entitled "RapidRide Intelligent RapidRide Intelligent Transportation System Agreement." MOVED BY ZWICKER,SECONDED BY Transportation System (ITS) BRIERE, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. Improvements, King County RESOLUTION#4161 A resolution was read updating the City's Six-Year Transportation Improvement Transportation:Six-Year TIP Program (TIP)2013-2018. MOVED BY CORMAN,SECONDED BY ZWICKER, 2013-2018 f/` ft;Icie COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. NEW BUSINESS Councilmember Persson reported that he recently toured the South Executive:Tours of SCORE Correctional Entity(SCORE)jail. He remarked that after speaking to fellow Facility councilmembers some have indicated that they too would like a tour of the facility. He requested that the administration facilitate a tour of the SCORE jail for any Councilmembers who are interested. Library:Open House Meetings Mayor Law remarked that an open house regarding the Highlands and Cedar River libraries is occurring tomorrow,September 18, 2012 at 6 p.m. in the 7th Floor Conferencing Center. AUDIENCE COMMENT Beth Asher(Renton) questioned the City's reimbursement policy regarding the Citizen Comment:Asher— construction of the Cedar River Library. She stated that KCLS currently makes a Cedar River Library payment then the City reimburses that payment without reviewing it. She suggested that the City and KCLS jointly review all invoices before they are paid. Citizen Comment:Oullette— Paul Oullette(Renton) remarked that he would like to volunteer his services as Cedar River Library a technical advisor to the City. He remarked that KCLS has technical staff, but he would like to assist the City in reviewing library design schematics. Citizen Comment: Bray— Richard Bray(Renton) remarked that the Cedar River Library should be built Cedar River Library according to the desires of the Renton community. He stated that residents should have the maximum number of opportunities to provide input into the design process. He implored Council to work in that spirit. ADJOURNMENT MOVED BY ZWICKER,SECONDED BY PERSSON,COUNCIL ADJOURN. CARRIED. Time: 8:02 p.m. $-ic,2.r.r c. 4Ja tor✓ Bonnie I.Walton,CMC, City Clerk Jason Seth, Recorder September 17,2011 September 17, 2012 Renton City Council Minutes Page 258 Transportation (Aviation) Transportation (Aviation) Committee Chair Corman presented a report Committee recommending concurrence in the staff recommendation to award the low CAG: 12-081,Taxiway Bravo bidder, ICON Materials,the contract in the amount of$2,364,463.61 for the System Rehabilitation—North Taxiway Bravo System Rehabilitation—North Portion Reconstruction &Airfield Portion Reconstruction& Signage Modifications Project. A federal grant in the amount of$2.75 million Airfield Signage Modifications, will cover 90 percent of the costs of this project, and the Committee ICON Materials recommends that$305,555.56 be transferred from the Airport's End Fund Balance to cover the other ten percent of the project. The Committee further recommended that the Mayor and City Clerk be authorized to sign the lease. MOVED BY CORMAN,SECONDED BY PERSSON, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Transportation:Six-Year TIP Transportation (Aviation) Committee Chair Corman presented a report 2013-2018 recommending concurrence in the staff recommendation to approve the Pt! f i e( annual updates to the Six-Year Transportation Improvement Program (TIP Pt! .o 2013-2018)and approve the 2012 Arterial Street Plan. The Committee further recommended that the resolution regarding this matter be presented for reading and adoption. MOVED BY CORMAN,SECONDED BY PERSSON,COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See page 259 for resolution.) Lease: New 40-Year, Bosair, Transportation (Aviation) Committee Chair Corman presented a report LLC recommending concurrence in the staff recommendation to approve a new 40- year ground lease with Bosair, LLC. This lease will cover the seven years remaining on the existing lease, plus 33 additional years. Bosair will demolish one old hangar(Building 289) and construct a new hangar and office building. Bosair will retrofit the other hangar(Building 287). This will allow Bosair's main tenant,Ace Aviation,to further their aircraft maintenance business. Along with the reconstruction of their hangar buildings, Bosair, LLC, will increase their leased area by approximately 29,552 square feet in order to better accommodate their customers' aircraft. The Committee further recommended that the Mayor and City Clerk be authorized to sign the lease. MOVED BY CORMAN,SECONDED BY PERSSON,COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Finance Committee Finance Committee Chair Briere recommended approval of Claim Vouchers Finance:Vouchers 315113-315405,six wire transfers, and one payroll run with benefit withholding payments totaling$4,312,083.55,and payroll vouchers including 808 direct deposits and 92 payroll checks totaling$1,663,384.20. MOVED.BY BRIERE, SECONDED BY PERSSON, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. RESOLUTIONS AND The following resolutions were presented for reading and adoption: ORDINANCES ' AP PROVED.B TRANSPORTATION/AVIATION COMMITTEE. CIT`fCOUNCIL-; Date • 9: �7-.ao September 17,2012. ,'.'201'3-2018 Six-Ye'arTransportation Improvement Program (TIP) '._ • ' - and:Arterial Street Plan'Update ,(Referred July 16,2012). The TransportationCommittee recommends concurrence.in'the staff recommendationto 'approve the annual updatestolhe'Six-Year'-Transportation;Innpr,.ovement Program (TIP,2013' 2018) and approve the,2012 Arterial Street'Plan. • - The-Committee further recommends that�the resolution r,•egardingthis-matter b.e.presented.for reading and adoption. ; • • andy,Corman, Chair, : - • • i • • • - • .Don:Pe Vice_Char: , Marcie Palmer, Member cc: 'Juliana Fries,•Transportation.Program•Development Coordinator', Connie Brundage,=Transportation Administrative Secretary. ,. • RENTON CITY COUNCIL Regular Meeting August 13, 2012 Council Chambers Monday, 7 p.m. MINUTES Renton City Hall CALL TO ORDER Mayor Law called the meeting of the Renton City Council to order and led the Pledge of Allegiance to the flag. ROLL CALL OF RICH ZWICKER, Council President;TERRI BRIERE; ED PRINCE; DON PERSSON; COUNCILMEMBERS MARCIE PALMER; RANDY CORMAN;GREG TAYLOR. (Rich Zwicker left the meeting at 8:57 p.m.) CITY STAFF IN ATTENDANCE DENIS LAW, Mayor; MARK BARBER,Senior Assistant City Attorney; BONNIE WALTON,City Clerk;GREGG ZIMMERMAN, Public Works Administrator; IWEN WANG,Administrative Services Administrator; Doug Jacobsen; Deputy Public Works Administrator-Transportation; PREETI SHRIDHAR, Deputy Public Affairs Administrator;SUZANNE DALE ESTEY, Economic Development Director; PETER RENNER, Facilities Director;JIM SEITZ;Transportation Planning& Program Supervisor; COMMANDER FLOYD ELDRIDGE, Police Department. PUBLIC HEARING This being the date set and proper notices having been posted and published in Transportation: 2013-2018 accordance with local and State laws, Mayor Law opened the public hearing to Six-Year Transportation consider the annual update of the Six-Year Transportation Improvement Improvement Program (TIP) Program (TIP),2013-2018. f)P Transportation Planning and Program Supervisor Jim Seitz reported that transportation programs and projects are required to be incorporated into the TIP in order to receive State or Federal funding. He explained that the purpose of the TIP is to develop a multi-year plan for the development of transportation facilities and to develop funding plans for each project or program. He also stated that the TIP is coordinated with public and private utilities in an effort to coordinate their facility improvements. Mr.Seitz reported that the TIP supports the City's business plan by promoting planned growth for the community, providing infrastructure for economic development,and supports overall objectives, policies,capital facilities plan, and transportation elements of the Comprehensive Plan. He reported that the City allocates its funds in order to leverage outside funding for the programs and projects in the TIP. Mr.Seitz further reported that the TIP contains 42 programs and projects including 16 corridor projects,seven system preservation programs,six non- motorized programs,two safety programs,two area transit programs,and nine other programs such as the 1%for Arts and Neighborhood Plan. Mr.Seitz highlighted current projects including Rainier Ave.S.-S. Grady Way to S.2nd St.,Garden Ave. N.Widening and Intersection Improvements, NE 4th St. -Union Ave. NE to Whitman Ave. NE Improvements,SW 27th St./Strander Blvd Connection,and the Highlands to Landing/Boeing Pedestrian Connection. He also noted that two collector streets were added to the Arterial Street Plan due to the Gale Annexation. August 13, 2012 Renton City Council Minutes Page 231 Concluding, Mr.Seitz reported that of the total expenditures for the 2013-2018 TIP,approximately$47 million is funded and$149 million is unfunded. He reviewed the various funding sources,options for unfunded needs, and the impact that the economy has had on the TIP. He reviewed revenue sources and stated that 66%of funding is from grants, 23%is from City business license fees,9%is from the gas fuel tax,and 2%is from mitigation fees. Mr.Seitz remarked that questions had come up during the Transportation (Aviation) Committee and that staff recommends that Council take no action on the TIP at this meeting. Public comment was invited. Mark Martinez(Renton)expressed concern that the City was paying for a pedestrian walkway that will likely not be used because it is located on a very long and steep hill. He suggested that there are better ways to spend the funds including enhancing the downtown area and mitigating traffic. Councilmember Persson remarked that quite a few citizens have requested that the walkway be built. He shared stories of residents who have to walk that way to work,and noted that the State is contributing most of the funding because the walkway should have been included when the road was constructed. Kathie Ossenkop (Renton)expressed concern about the quality of the air along the Sunset Blvd.corridor. She explained that she tested the air quality on a Friday afternoon and became sick from inhaling too much automobile exhaust. She stated that Council should consider the affect of the exhaust fumes on children with asthma who may utilize the walkway. Dave Beedon (Renton) asked for clarification of the term collector street. Mr. Seitz responded that the term is a street classification and that a collector street collects vehicles and pedestrians from residential streets and delivers them to major arterial streets. Continuing, Mr. Beedon remarked that the number of pedestrians walking on Puget Dr.S. increased dramatically after a sidewalk was constructed. There being no further public comment, it was MOVED BY ZWICKER,SECONDED BY.CORMAN, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. ADMINISTRATIVE REPORT Mayor Law reported that overwhelming preference was expressed by voters in the 8/7/2012 election for the downtown library to remain over the Cedar River. He stated that the City is moving forward with discussions with the King County Library System (KCLS)to facilitate design work and other issues required at that location. AUDIENCE COMMENT Stuart Avery(Renton)expressed concern regarding the 8/6/2012 action taken Citizen Comment:Avery- to reduce the time allotted to citizens during audience comment periods. He Audience Comment Policy also expressed disappointment with the new restriction that limits the second Change audience comment period to new topics. Mr.Avery stated that the speaking times are beneficial to the public because residents not in attendance can have transparent access to the view-points. He also stated that overly redundant • messages coming from the public are an indicator that an issue may require more attention. SI X• *de '1' 4 geiida Item No.: S a g RENTON CITY COUNCIL MEETING PUBLIC HEARING/MEETING SPEAKER SIGN-UP SHEET (Page 1) CITIZENS MUST PROVIDE NAME AND ADDRESS IN ORDER TO BE CONTACTED OR TO BE A PARTY OF RECORD WHEN APPROPRIATE DATE:1000M PLEASE PRINT 5 Minute Time Limit 1 5 Name: r # ` 6 a Name: Address: f 1 00!IV Address: City Zip Code City Zip Code Topic: Topic: 2 6 Name: Name: Address: • Address: City Zip Code City Zip Code Topic: Topic: 3 7 Name: Name: Address: Address: City Zip Code City Zip Code • Topic: Topic: 4 8 Name: Name: Address: Address: City Zip Code City • Zip Code Topic: Topic: (CONTINUED ON REVERSE SIDE) (Continued from Reverse Side- Page 2) RENTON CITY COUNCIL MEETING PUBLIC HEARING/MEETING SPEAKER SIGN-UP SHEET CITIZENS MUST PROVIDE NAME AND ADDRESS IN ORDER TO BE CONTACTED OR TO BE A PARTY OF RECORD WHEN APPROPRIATE PLEASE PRINT 5 Minute Time Limit 9 13 Name: Name: Address: Address: City Zip Code City Zip Code Topic: Topic: 10 14 Name: Name: Address: Address: City Zip Code City Zip Code Topic: Topic: 11 15 Name: Name: Address: Address: City Zip Code City Zip Code Topic: Topic: 12 16 Name: Name: Address: Address: City Zip Code City Zip Code Topic: Topic: 8/13/2012 Purpose 2013 - 2018 TIP • Mandated by State law (Transportation Improvement Program) • Required for State and Federal funding programs • Reflects involvement with citizens and elected officials Public Worfr§Department • Details multi-year work plan and funding plan for Transportation Systems Division the development of transportation facilities Date • Used to coordinate transportation projects and Staff Presentation for Public Hearing programs with other jurisdictions and agencies August 13,2012 ury•f,r Ggaf,T, 2013-2018 TIP --��i anl[(7• t c'. TIP Supports What is in the TIP 42 Projects/Programs • City's Business Plan IRentimBusime Plant •vie.. • 16 Corridor Projects --__ • 7 System Preservation Programs • Comprehensive Plan • 6 Non-Motorized Projects/Programs • 2 Safety Programs • 2 Transit Programs • 9 Others ' • Growth Management Act r;. `. ..gym. • 1%for Arts • Neighborhood Plans 2013-2018 TIP eltr, ](] 2013-2018 TIPitCslf)i"it 0 • New Projects .,- 2012 Highlights ILAR • Rainier Ave Phase II—S 3'd St to Airport Way(TIP#7) !L*) " r"i� :7 • S Grady Way—Main Ave to West City Limits(TIP#15) P•P•'tr • Lake Washington Loop Trail(TIP#17) r`"i`"'Y,trovh-""""ter. • :a �rrr Yb• m'p- Garden Ave N Widening and Intersection Improvements GMof.4.- City 1,f, ., F 2013-2018 TIP d 2013-2018 TIP �.�-��'�i���� 1 ) ' .. . 8/13/2012 • . _ ......____.— , ...., 2012 Highlights 2012 Highlights '';;"'-'7",:-.1 "410,---: 'Ilk` '....'-'2g'‘ -**. ..S?r'"*" .! 6°-','i'CA .' .-,#,-.4-e-,......,.,.'",'"F .' .--.'---v.1;..,'- ,"'• -,,;,-.-1 0. •., - .::-.__. ....q.,,.. -e' '-'-:2 I 24'A- ..,..--7:',-.,,,,,,,,,,.,- '''- ,.., 1'''-;::1--/' -'r -' -'"' -.-._.'" . '''••yal.'"q1,411:',?••IR -C ER -' ,,..r r., •'.. = - ••-.',..44--7...f•••,..4. •:1'•:n P..4 ff.4•••••' l':-4*7. ...,..;' 41. -;7,:es± .411.....;r .... -...t.,.. '-'?'-'-.41 ..4 1-•,.... ,1-4 '.7 = ..... ,..-4. •- .,, ..-• 4,. ..g1777-•.....---,.--........ 47'4,LTUIL,,.?•41?1,17--;-:* t''.-t,%'•;•,'''',S,-',..=4:3 -t;r: ,••••• '4-,4 3 4'."•:; -t" "t•':'' :r.•.L ' 4,1,-'0 .44„;,ogr- .,:-.4-,-,3 -•-.-- '4.--ttv:7--.7,-:-..-4-..",=.,,,,,::---, . ...,..,,f-. .. ,§,AM\-'s1L ki.z.,, .. -.. --.;.d-L,....-a-f.-.......7.-....e.:.:,,..-_,,,it...- --..c..1 ,:-..,--.1.*, '7." F4c-,,. '"_"' Rainier Ave S-S Grady Way to S 2,d St SW 27.St/Strander Blvd Connection-Phase 1,Segment 2a 2013-2018 TIP ''''''w°1,..Rtel drat.0 2013-2018 TIP -r) .r77-7-7-7-,gPfs --- ----‘—ls.,,..v.41011..M ek ,,,..,?,7+, *'-•'-.".7 ;!-1r.f'',•:" ..-----",-.- -.------'—'*'---2012 Highlights Highlights 4;14' 7, ,:,,,---:-..,.-.",1.y.^ •--'-'-%?.'^,,-,i,,i,....frik 4•1-'f,:---`-'.-, If','.-,`,..-.1.,If-. 1.,"1,,..:a...,ii.10:;;;Ir.:,;':tirk ,,,,,,,,t„•;;----‘,..-, ,._ •,,,,,,, ‘....4.7,,.A•i,..4..,,,,i ,•-• ,u ..,-.-LA -,-7,:-L:':-,--,.,A,„..,i,=,:f-ft:•-.,;:..-z...:73- -iii..,;,r,;:i 77. -,.."1 L :i';,2-: --X' -."'--- - - - .- -- ----F, v----,.<-'`--'• - '1:7• ••• ' '':-....:.,lk.--,.,,,4 ,,fifivj, ;',..,,f-r.,-.Lr'S-,1,,,-,_: --..:-`4 4,• r,r'' ,it:tcr.1 :.... --,, .1.4-,.......,...---,.., . .,m.,%-.. ,,,,Er.ty.,,.3,„,,,,,,„,i, ,,,, -,..: -,7,,,,,,..--,. -i,-,-, ,,.. /.. :- -. vi.q -or , 1:,''''.,•- .9,-; r7.771....-.., --- 4 :1;. - -!-,‘,-.. illa.-61:1 Highlands to Boeing/Landing Pedestrian Connection NE 4.St-Union Ave NE to Whitman Ave NE ,.„; 2013-2018 TIP •-• ''''''.°1-rgril'CribrEnra "; 2013-2018 TIP •"-- Ini:,,,,Intwiftt_-*‘ 11-: _....--.- -, -,--- - - - .-,,:....- -- -,,.-- -r-- -5,--,- .-=--„,;-,:,;-.:.:i-:,-,:,3-...---....,-..-:, Highlights 2013-2018 TIP Funding Summary -,.-.•6IF,,,,-,:::-:.. .,-;.-:-:::-... ... :-.--..--..; %-::::- - Ty,,,,2id...::,..„-,1 -iitif..., • ,--.,-- ,!..141,.. .1,,,,,----Ly-7-1-ifz- .7 - ....A. . .."1.4 „. ,;=.1.1...I.. 1.4 ..... . . . .. .Unfunded suutom--- - ,•• •: ea Grants/Other 7---"' '- '' =•.' a City Funds r - :,[.! --- ._. _. -,_;,-• t 1 111 -. . '' .. . ._ . , - . .. ..-, Overlay Program 2011 2014 2015 2016 0017 2018 —2— Ger a, 2013-2018 TIP --.-.`"""'...11S11119.2 0 2013-2018 TIP 2 8/13/2012 Project Funding Six-Year Period Funding Sources „5160 , SIX-Year Total Revenues:$47,035,444 e s1'0 ; 5120 f- __.._______..„__�__.� ,.�.__ ---=-. . e Limn. 7. •-- __.. 1 _ CC+.Foci T t. 9".$100 e\Wl:mwnl'.ra $so eGrants !r---,--_ CL'nntdOdrcr $60- mCityFunds . ti funded Unfunded -.e 2013-2018 TIP .,. r — ry'efh 2013-2018 TIP n re-41=1.s: ts-' City Funding Sources �`'---2011`/2012 Grants Awarded $:,.tea —,�ate-., S Lake Washington Roadway and Intersection TIB $1,755,500 sot saa A.K.A.Garden Ave N - ssmo •-"""" —e .teu� ' i".1/ 27t Highlands ef81dPhase 1,Seg 2a --TIB $'1;650,000 a� Improvements-Sf nts-Boeing/Landing Ivd Ped Connection 'CNIAQ $1,700,000 s,,,p_ Carr Rd/SE 176th/Benson Dr lotersection and.: • .. ................. — .... - WSDOT $3,241,000-. ............. Corridor Improvements.. .......s„aa�,s•„a,�,• 511:00 - A.00 Citywide Safety Improvements WSDOT $ 300,000 ....................... —a. „v.., Logan Ave N-N Airport Way to N 8th St STP , $ 951,000 sp 57th St @ Shattuck Ave S - _ ; STP $ 500,000 2000 2022 2004 20:6 MS 2010 2012 2014 11 •rddgmleuincreasednlees p,opod to neincrgraduallyeasedgraduallyover aNow-year 6 2' period,starling x015.This revenue SW Grady Way-Preservation STP, $ 700,000 analysis does not account say the potential increase,as it is otn undo,discussion el the council level. - . TOTAL' $10,797,SOD 2013-2018 TIP t�`;Pf�i(,(7 .e 2013-2018 TIP ?nl ct� ..�.:: i. 4. Arterial Street Plan Update rl^ Recommended Action: Changes from 2011: '-'t-,,i'-'77-1-..1 1� r`=,=,.-• .i<.: • Approve the Six-Year Transportation Improvement GaileAnnexation: "— ^- '',7,-- : �G;.)" Program(TIP 2013-2018). • Added a Collector Street:SE 1 ,..,,,,1:-.,-.6-,:-.4.,,...)u,•,„,,4 ,z1, 164th St(from 128th Ave SE to +-tr_'" ;-! " `+_ �''L 132nd PI SE) r-- ?cam,' • Approve the 2012 Arterial Street Plan. tet_„i:-Izi • Added a Collector Street:132nd ti }6"q l' Eug I J( - 2 �:n 1- PI SE(from SE 164th St to east ”" II--' i .,-'!,!-.1,21,,,,_ i- • Present the resolution regarding this matter for City limits =.7.-7,--,-,-i--,_ „� _ " reading and adoption. 2013-2018 TIP —_gyp [} 2013-2018 TIP ��,()1 • • 3 8/13/2012 QUESTIONS umdri 2013-2018 TIP .._.. , �, • • • 4 CITY OF RENTON NOTICE OF PUBLIC HEARING RENTON CITY COUNCIL NOTICE IS HEREBY GIVEN that the Renton City Council has fixed the 13th day of August, 2012, at 7:00 p.m. as the date and time for a public hearing to be held in the seventh floor Council Chambers of Renton City Hall, 1055 S. Grady Way, Renton, WA 98057,to consider the following: Annual updates to the Six-Year Transportation Improvement Program (TIP 2013- 2018) Information regarding the Six-Year Transportation Plan is available via the City web site at www.rentonwa.gov, or by calling 425-430-7232. The 2013-2018 draft can be viewed at the City Clerk office in Renton City Hall and on the City web page at http://rentonwa.gov/government/default.aspx?id=1012. All interested parties are invited to attend the hearing and present written or oral comments regarding the proposal. Letters may also be submitted to City Council c/o City Clerk by 5 pm on the hearing date for inclusion in the hearing record. Renton City Hall is in compliance with the American Disabilities Act, and interpretive services for the hearing impaired will be provided upon prior notice. For information, call 425-430-6510. 13674-1m4. Watto- Bonnie I. Walton City Clerk Published Renton Reporter July 20, 2012 and August 10, 2012 Account No. 50640 • July 16, 2012 Renton City Council Minutes Page 212 Mr. McNabb explained that this project is mitigation for the Thunder Hills Creek Culvert emergency repair project that was completed in order to avoid jeopardizing 1-405 in 2008. Ms.Javeri stated that the SR 167 closure between 1-405 and S 180th St./SW 43rd St.exit will occur from Friday,August 10, at approximately 8 p.m.through Monday,August 13,at 5 a.m. She described the detour routes,and reported that a 65' long,25' deep trench will be dug in order to install a 19'wide pipe archway across SR 167. Ms.Javeri added that there will be extensive community outreach to drivers and affected businesses, and the key message to media outlets will be that Renton is open for business. CONSENT AGENDA Items listed on the consent agenda are adopted by one motion which follows the listing. Council: Meeting Minutes of Approval of Council meeting minutes of 7/9/2012. Council concur. 7/9/2012 City Clerk: Quarterly Contract City Clerk submitted quarterly contract list for period 4/1/2012 through List,4/1/2012-6/30/2012 6/30/2012, and expiration report for agreements expiring 7/1/2012 to 12/31/2012. Information. Executive: Reclassification of Executive Department recommended approval of the reclassification of the Communications Director to Communications Director(grade m38)to Deputy Public Affairs Administrator Deputy Public Affairs (grade m45), resulting in an annual increase of$8,748. There is an overall net Administrator savings of$131,034 over the next 12 months due to the elimination of the Assistant Chief Administrative Officer position. Council concur. Transportation:Six-Year TIP, Transportation Systems Division submitted the annual update of the Six-Year 2013-2018 Pt folde/ Transportation Improvement Program (TIP) and Arterial Street Plan. Refer to Transportation (Aviation) Committee; set public hearing on 8/13/2012 to consider the TIP. Utility: Rainier Ave Utility Systems Division recommended approval of a FY 2011 Stormwater Stormwater Retrofit,WS DOE Retrofit and LID Grant Program- Proviso Funding Agreement with the Grant Washington State Department of Ecology to accept$644,000 in grant funds for the Rainier Ave.Stormwater Retrofit project;and requested authorization to transfer$216,000 from the Lower Cedar River Sediment Management project to the Rainier Ave. Retrofit project. City's match is$214,667. Council concur. MOVED BY ZWICKER,SECONDED BY CORMAN, COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED. CARRIED. UNFINISHED BUSINESS Transportation (Aviation) Committee Chair Corman presented a report Transportation (Aviation) recommending concurrence in the staff recommendation to accept the low bid Committee submitted by Lakeside Industries in the amount of$1,272,052.20 and Change CAG-12-083, 2012 Street Order#1 in the amount of-$145,926.49 for the 2012 Street Patch and Overlay Patch &Overlay with Curb with Curb Ramps project. Ramps, Lakeside Industries The Committee further recommended that the Mayor and City Clerk be authorized to sign the contract. MOVED BY CORMAN,SECONDED BY PALMER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. 4 CITY OF RENTON COUNCIL AGENDA BILL i } d. Subject/Title: Meeting: 2013-2018 Six_Year Transportation Improvement Regular Council- 16 Jul 2012 Program and Arterial Street Plan Update Exhibits: Submitting Data: Dept/Div/Board: Issue Paper Public Works Draft 2013-2018 TIP including Project Map (Exhibit A) and Map Index(Exhibit B) within the document Staff Contact: Arterial Street Plan (Exhibit C) Juliana Fries, Program Development Resolution Coordinator,x7232 Recommended Action: • Refer to Transportation Committee and set Public Hearing date for August 13, 2012 Fiscal Impact: Expenditure Required: $ N/A Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ I City Share Total Project: $ SUMMARY OF ACTION: The City is required by law to annually review the Six-Year Transportation Improvement Program (TIP) and adopt the update by resolution. In conjunction with this,the Arterial Street Plan is also updated. • STAFF RECOMMENDATION: 1. Approve the annual updates to the Six-Year Transportation Improvement Program (TIP 2013-2018) 2. Approve the 2012 Arterial Street Plan 3. Set August 13, 2012, as the Public Hearing on the 2013-2018 TIP 4. Present the resolution regarding this matter for reading and adoption I PUBLIC WORKS DEPARTMENT D eM tOra MEMORANDUM 8 DATE: July 16, 2012 TO: Rich Zwicker, Council President Members of the Renton City Council VIA: Denis Law, Mayor FROM: Gregg Zimmermar2Ad inistrator(x7311) STAFF CONTACT: Juliana Fries, Program Development Coordinator (extension 7232) SUBJECT: 2013-2018 Six-Year Transportation Improvement Program ISSUE: Should the City approve the annual updates to the Six-Year Transportation Improvement Program (TIP 2013-2018) and to the 2012 Arterial Street Plan? RECOMMENDATION: 1. Approve the annual updates to the Six-Year Transportation Improvement Program (TIP 2013-2018). 2. Approve the 2012 Arterial Street Plan. 3. Set August 13, 2012, as the Public Hearing on the 2013-2018 TIP. 4. Present the resolution regarding this matter for reading and adoption. BACKGROUND: The City is required by law to annually review and update the Six-Year Transportation Improvement Program (TIP) and formally adopt it by resolution. We are proposing three new projects in the 2013-2018 TIP: • 1) Rainier Avenue South Phase II—S 3`d St to Airport Way(TIP No. 7). This new project will extend improvements from where the current phase ends to Airport Way. The roadway cross section will be determined during the planning phase of the project. The project is unfunded at this time. 2) South/SW Grady Way—Main Avenue to West City Limits(TIP No. 15). This new project will evaluate potential transit improvements along this corridor. Phase 1 Rick Zwicker,Council President Members of the Renton City Council Page 2 of 3 July 16,2012 will remove islands at the intersections of Lake Avenue South and Shattuck Avenue South to-allow for a continuous eastbound lane from Rainier Avenue South to Talbot Road. The project is unfunded at this time. 3) Lake Washington Loop Trail (TIP No. 17). This new project will separate pedestrians and bicyclists from vehicular traffic along Airport Way and Rainier Avenue South (north of Airport Way). The project is unfunded at this time. Recently four City projects were recommended for funding under the STP/CMAQ countywide project competition. This funding requires 13.5 percent match that was provided by reallocating/reducing programmed expenses as shown in the Table 1. Project/Program TIP.# Award Match .Source Arterial Rehabilitation 2 $700,000 $700,000 .2013 and 2014 Arterial Rehabilitation funds will be utilized for match. Overlay along Grady • . Way to occur in 2014. . South 7th Street 14 $500,000 $100,000 Reduced Intersection Safety and Mobility 2013-2014 programmed funds. Reduction in 2013 from $250,000 to$218,000 and 2014 from$250,000 to$182,000. Highlands to 16 $1,700,000 $300,000 CED contribution. Boeing/Landing - Pedestrian Connection Logan Avenue North 42 • $951,000 $149,000 Reduced NE 4th Corridor 2013-2014 programmed funds. Reduction in 2013 from$171,000 to$63,000 and 2014 from$255,000 to $214,000. Table 1—Funding award and match for 2012 STP grants • H:\Division.s\TRANSPOR.TAT\PIANNING\Juliana\Issue Papers\2012\TIP 2013 2018 IP.doc . - Rick Zwicker,Council President Members of the Renton City Council Page 3 of 3 July 16,2012 • Funding for most programs has been reduced due to decline in revenues,as shown in Graph 1. Transportation Revenues City Funds ,, $4,000 Total Revenues Si 53,500 _ Projected c Revenues ~ 53,000. -- Business License.. • Fee(BLF) $2,500 — .. BLF Projection • :::: Mitigation .. .. . . Mitigation Projection* $1,000 • ' Vehicle Fuel Tax s500 - Vehicle Fuel Tax SO _ Projection' • 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 Graph 1—Transportation Revenues from City Funds(excludes grants) The draft TIP is presented to the Council and referred to the Transportation Committee for review in advance of the public hearing. In addition to the projected revenues and expenditures for the future six years,the TIP also includes current-year project allocations and past project expenditures. All projects in the TIP are presented to Council for review and approval collectively during the budget process and again individually when approval is requested for design and construction contracts. :cc: Jay Covington,Chief Administrative Officer Gregg Zimmerman,Administrator Doug Jacobson,Deputy PW Administrator—Transportation i - I*Mitigation fees proposed to be increased gradually over a three-year period,starting in 2015. This revenue analysis does not account for the potential mitigation fee increase,as it is still under discussion at the Council level. H: Division.s\TRANSPOR.TAT\PLANNING\Juliana\Issue Papers\2012\TIP 2013 2018 IP.doc i. S Y4 ,, City of Renton Washington B n A F 7 2013 — 2018 Six-Year Transportation Improvement Program j _�.. .S S 9 i ks:: , -...,T F's , .„,,,-...,,,,- - Y o- - '�' firr_ F'^-., .sem I s ° fit+ 7 j-' f" JIa�.��i�,•ems -.. 7 r< � ars- -� F _w. .. :?'- 71-,,".::„..--, "'''.. :- - -,'.- ry '-, .is", "Y3�. ",. ..re ;r k '}M,;ys-2. '` '� -"- a ,: --,:-.--',.*--;72-,,T,,,,;-„ :- `'.* ,,,; I Maplewood Glen Sidewalk Replacement Mayor Denis Law Hearing: August ...., 2012 Gregg Zimmerman Adopted: August...., 2012 Public Works Administrator Resolution: f 4_-�. Cit • y of ~� RENTON. AHEAD of THE Cv`R , NC( Public Works Department _— 4 SECTION ONE PURPOSE OF SIX-YEAR TIP PROGRAM • Purpose of Six-Year TIP 1-1 • Vision Statement 1-2 • Mission Statement 1-2 • City Business Plan 1-2 CITY OF RENTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2013-2018 PURPOSE • Reflects involvement by citizens and elected officials. • Implements the City of Renton Mission Statement. • Used to coordinate transportation projects and programs • with other jurisdictions and agencies. • Multi-year planning tool for the development of the transportation facilities within the City. • Required for State and Federal funding programs. • Vital part of planning under the Growth Management Act. • Mandated by State Law. 1-1 F LEFT BLANK TO REPLACE WITH BUSINESS PLAN GOALS 2013-2018 (ANTER ADOPTION) • • SECTION TWO SIX-YEAR TIP MAP • TIP Map, Exhibit A 2-1 • Map Index, Exhibit B 2-2 • 1 l� . =� i- ;t ,-->-f t lt% !'t 'I f .k-3., a-:>:.•:::..;s,?�,.::�:�.�; .,?:`�)5•�!S` s'� i`r: _1^ 'A�_ :0A, i ♦ -- 4-------,---re,---1.-,c-----0,L4-11, t,'r-:riL.y,1. .�,.,,c, t„t„ *•. l 1 oblh Ave 3 We °'I • I t�: •' ''f Yin).. y ui _ 4.'4%:„,,, rf S' j -*,.o.Iii P VIR Tii.'y%,4:`' l,;41i ii?:.,; lye y '#1% 0,. ✓✓ .+..+ ,il 'i`I� '-- ,. d7y 5e e,• `.'1' ,,i',1-4f,,F '/,',44=eb ,p',p�,"�.I�,y ✓:,', .f tySk 'y �� �. I �---t!,,' .� „i' a J -5f't' F•;. :,'y 2�,. Ri!. 'iRY ¢*i _-.L�"-: - l !� _ -I ''s II ] c r 4_'4`Aii �,'{}- ""f' S` '',1'tk Ney g' R- 1. •_ fe. ;�,�•: I. .m� r[n I:i° Ave 3. „+,,:�.••'�� °�Jy le,� 0. { ,�,' y: ,k�' £}'�'�e;W�C'1g'�k rl fq..X,.{':=W:E. 1 •II _ _ , I •L .:rr '- _dr. '1-1.;,n °Fd S "-,4P"''t�'3� .S�-�i, '' I't'La�3A'4 7rti I`"i' �.-•5i I' {' . • • I. 1- von, _AIWA °N'4`1I Fti ! r m'C.1- t'.7 "r.'S' °,,°. '{,tl s'`�.�.:'f?.�YC7'''1:sj'i' -lr ,,'FM',+r�:,z:I7yE'<7+ 7ri�i,-'t.Fi,• #v1 II i3•+H \;1•• ♦...°,. I •_1711.-•„;k .!. 4-' -"'37_ i' i:'. 3}-C .t 0 7 1 ,f t nt - ? ,.„„,4..,,..-,',..-,-.:r...„. •„ 4..,, .-t..: ".c L 7 j-tr•f,`.<.!ear4.,N s ,-a .,,•1,y;;. 'uj,„,,, n v a - ;,y; _ ,�.: -;,, _ y:-,' ;ifA'.t:.r. ••,t: �•k�'t`. 4„ <ti TM3•''tL St k.. i 0 'iinwyi.%r I I': N :: y. -:,s!�r+�'=•' {: �sP'f'.�%:�;i r c: 1,1}s'T,'}�F,, M ,i• 1Vis,;._, .�r ��a�::�(j sr' i,•�x'�a±i4. :'�iwe.'-f, s '',,,,A40�}?,�5:4.1£a?;::i�"' r`. i 1 s1 1 1 ;l I1 NI,i o+"✓ `� _ .. .'r:] - •,"ef 41).�,7'V'�,1 }f'` -i i;iR, ,4 k?7 ;k;, "tS1,0..r '• 'i4,• " }-fig :Y :-. �.,.t-,l. a .:,,'Fslt.Ttres m 'Y- 1 rte ,.L,-�ri_r' >s.; '£;?,".:. w�714 • 1 i n�., r /5„, W , ,g'.,�aq�';"Y' '-�I`TL_�I, '::!'• :tr'j'''�•' IOakeed°Se Av. < ' ..,r.-�:- -J v.i it'-lli�A.`7 it _ •'LI l8 ""z ,� .I' l...t, m =7'.,N`, .v,i ::�.(,J.F��''',: 4 t: 5•.y�F,.p�;a•�;..,..:,, t.'y , , _ v\ T ;:, '• , r�"�fai...r ..T__' __ j Y, .:,;,,.a,.1s`.t-v.p e''•,mq.,, ,. t+=.5:.:w"c' J_ \ I °N {F- rl`s , t•, .. tf Y:e(: m 1ee�• Blfh Ave + � I J e1 ti, I; ivi w tl I17 I1 + 4`/, of , ,c,11t, ii•"'iy.�•;�' `,<, `ia•;i,:•.,?- _ _r"`� � \ .. 12 �� if, I O ..44.::..4, 8 ate.:,-...F f I ?,.,t ,�•'�,J'.., '- e'c C�' k s-,-" !'`rt'^��-,rs� Y�,.. ��' -- -}ii-.r..-�.F "' 'e,. •('�- I .. at .�i ��_ '�,;'ii�'�«i'if'Ci"�t., ry t,Is'�fi� a�;�,f�i;. {r, i� � °, I>;. u_____„.„,{�Lt,t II -;;•- - _ % �14.If � f � �.: 1.9"4,-,,,,,...q,,�,t..;,.•t �iil:. �, \J• q ';<• �- 5• __ :� .a tyrw !?"'�'�. "102.P A:•: 0 l� S4i). 1- I,i Wll , I II `,lit1''i, ,r, 1 ! _'Sw~-.AI rt--77-nr• _ : i%r. ? F+y` -'r,.il-A it. 'SR 1s/ I t ti -- "_� ,®']J2r. .• �1 �I� ^ I.1:'!:fir: x_.:sY, �•. a' �_'.•L•,d Llr,d� -: r. r`:r '��.-2��. � y t':;tr,. t�._r,,�y�.1=�-i:�,`tr�'�'rs� .__.1 1 • u dAv.SW ,, V_ "---, _I..Q 1•+',drt:. fl.'•',.k:.. --rig T [:i.�_��:n•ay^"�;ti• -- _ ..t �iG-. -".,I .,r.x Lkldtsve -,�. :,T�t_1i•. r+,'f. ,:,, ti#,"r'�;,,,..,..,• r:wr-', 1 'i;, A'''''' t. r s, Au,..„,„.. ^ra 4 ;f,.. iu•. yr y.:•U+yEy,^s a`1•.fit..;„.`. m 1 ..� (r ;.rJ'�'* saj.. r 1, jj;,rF,`.<.i ':'�-y. s sf .Y wy..i y_- 1 'ri�� .tl Valley Rd` l:_ .�,1 .I"- r-••-'- .r. 11 Y ,1" 1 �[" ` Y;' ,1•. t`.,s, t..v_'1 t 'i 1 1,0 ;•j Ls-vg.:" .,-r,,, & Rrs.: ��'i` --i.l�=:'r'U �, .n�r.rtrrSt�i•�'+�t�S,,;'Y.=�,�i�M��sAd•�}:?,�r�Frs�,tfi.`3��Y}lyi�': ;f'a, i� I:,i.-.1,-.,i,„,,,,,,,,.,,_ � '--- �- • 11 ut �tl rg4eai iz Nin woe • •• .yu�{�,',,tz•a1's{'SL',�t.G -t �,f' 4� 'ir s =u* �'y N �"'- _ _ `2!---r-.4.19,....,R5.?,,-----,-;-;,:,,e ,.� PI - _ _66�I rn l ,?I I Yi'.•- 1`;,I 1C' ', i i+ .T,11,.1-L. a,671.1'ai 141.:7. "' t1� 1 c? r-.4 ro°i Rd -; ••= -�. ""1 'rs.y- k -�tkiv-ppY `"• ���;»s. ,{ :7.�4 W .V n 5- : yl d 7. 5^k k x / O. I- ,.i vrf•"S ,.a u�'tyt �"-i.., tr, '' 1>�} .7'--„ '{S 4 1 i~ -il�.,i-_'•� y,, 1'4 I��.t.. ��' . 5::`.1-I .?., 120 .- IR• v :,.,..3�; 7:-;1,"., 1' i'-, ;?;' +''tti=�ra�..002 „;trgi_`3'.'`yra,,.,' bww,, •-,,Q=11 ^.dle,- • �'o i n,'' �S5i :.;+i,-'�S --'•P :,a keC�y;_�a'p��I $! .N _... , i ;,i..,...t,, ..tt 3,r,iii[�. -:} , s ,k .,..-u�f-�4,.. • .) 6x` II !I I' 'l",...:�,:,!*&+.. _'i'. ,y ,• ° ,L Yom: 1',.;. • y` .1 t' 1_-y bulRdb `,1,t !,.-I;�_t�l`r.L.�_4- jz 'r'1,!=,....: a • EXHIBIT B' City of Renton 2013 -2018 Transportation Improvement Program Map Index TIP No. • Project Title 1 Street Overlay Program 2 Arterial Rehabilitation Program 3 Rainier Avenue—Grady Way to S 2nd 4 SW 27th St/Strander Blvd Connection • • 5 NE 3`d/NE 4th Corridor 6 Duvall Ave NE—NE 7th to Sunset Blvd NE 7 Rainier Ave S Phase II-S 2nd Street to Airport Way 8 Park Ave North Extension 9 116th Ave SE/Edmonds Ave SE Improvements 10 Carr Road Improvements 11 NE Sunset Blvd(SR 900) Corridor Improvements 12 Sunset Area Green Connections 13 Oakesdale Ave SW--Monster Road to SR 900 14 South 7th Street—Rainier Ave S to Talbot Road S 15 S Grady Way-Main Ave to West City Limits 16 Highlands to Landing Pedestrian Connection Project 17 Lake Washington Loop Trail 18 Lake to Sound(L2S)Trail - 19 Walkway Program • 20 Sidewalk Rehabilitation and Replacement 21 NE 3151 St Culvert Repair 22 Bridge Inspection and Repair 23 . Roadway Safety and Guardrail Program 24 Intersection Safety and Mobility 25 Traffic Safety Program 26 Preservation of Traffic Operation Devices Program 27 Intelligent Transportation Systems (ITS)Program • 28 Transit Program 29 TDM Program • • 30 Bicycle Route Development Program 31 Barrier Free Transition Plan Implementation 32 City Center Community Plan 33 Project Development/Predesign 34 Arterial Circulation Program 35 Transportation Concurrency 36 Environmental Monitoring 37 WSDOT Coordination Program 38 GIS Needs Assessment 39 1%for the Arts Program 40 Lake Washington Boulevard—Park Avenue N to Coulon Park 41 Lind Avenue-SW 16th to SW 43rd 42 Logan Ave N Improvements 2-2 SECTION THREE DEVELOPMENT &:PRIORITIZATION OF THE SIX- YEAR TIP • General Programming Criteria 3-1 • Specific TIP Development Activities 3-3 • Summary Table of Projects and Programs: 3-5 • • DEVELOPMENT AND PRIORITIZATION OF THE SIX-YEAR TIP I. General Programming Criteria The yearly update of the Six-Year Transportation Improvement Program(TIP).is part of an ongoing process intrinsically linked with the development of the City's Capital Improvement Program. The Six-Year TIP is also linked with various state and federal funding programs,regional/inter-jurisdictional planning and coordination processes and the City's Growth Management Act Comprehensive Land Use Plan. Projects are developed and prioritized based on both specific goals to be achieved by the program and on general programming considerations. Those general programming considerations are: Planning. How,at a local and regional level,a project fits with, or addresses identified future transportation goals, demands and planning processes must be evaluated. This is stronglyinfluenced by ongoing land use decisions and by regional highway and transit system plans. _ Financing. Many projects are dependent on outside grants,formation of LID's or the receipt of mitigation funds. Prioritization has to take into account the peculiarities of each of the various fund sources and the probabilities of when, and how much, money will be available. Scheduling. If a project is interconnected with, or interdependent on, other projects taking place,this is reflected in their relative priorities. Past Commitment. The level of previous commitment made by the City in terms of resources,legislative actions or inter-local agreements also must be taken into • consideration in prioritizing TIP projects. In addition to the general considerations discussed above,.there are five specific project categories through which the TIP is evaluated and analyzed. They are: • Preservation of Existing Infrastructure • Multi-Modal and-Transportation Demand Management • Community Livability and Enhancement • Economic Development • Operations and Safety These categories provide a useful analysis tool and represent goals developed through an evaluation of the City's transportation program in response to input from citizens and local officials and to State and Federal legislation. 3-1 • Taken as a whole,the five categories provide a framework for evaluating projects both .individually and as part of a strategy that seeks to meet and balance the transportation needs of Renton during a time of increasing transportation demand, decreasing revenues, and growing environmental concerns. Although each project can be identified with an important concern that allows it to be classified into one of the five categories, most projects are intended to address, and are developed to be compatible with,multiple goals. Preservation of the Existing Infrastructure is a basic need that must be met by the program. The Mayor and City Council have addressed the importance of sustaining strong programs in this project category. The State Growth Management Act also requires jurisdictions to assess and address the funding required to maintain their existing transportation systems. The City of Renton owns and maintains 243 centerline miles of streets. Multi-modal and Transportation Demand Management (TDM)projects and programs are oriented toward"moving people"through a balanced transportation system that involves multiple modes of transportation and provides alternatives to the existing heavy reliance on the single occupant vehicle(SOV). Included are facilities that facilitate the movement of transit and carpools, and programs that promote the use of high occupancy vehicles (HOV's) and reduce the number of SOV's. The Federal Transportation Act(SAFETEA-LU), the State and Federal Clean Air legislation, and the State Commute Trip Reduction Act(CTR)have added momentum to regional efforts and placed requirements on local jurisdictions such as Renton to promote these transportation elements. Community Livability and Enhancement consists of projects that have been developed with major emphasis on addressing community quality of life issues by improving and/or • protecting residential livability while providing necessary transportation system improvements. Bicycle and pedestrian projects are included in this category. Economic Development projects and programs involve transportation improvements necessitated by new development that is taking place. Thus, a significant source of local funding for these projects is projected to come from mitigation payments and from specific access needs financed by new development. Operations and Safety projects and programs are developed through ongoing analyses of the transportation system and are directed mainly toward traffic engineering concerns such as safety and congestion. Projects are identified not only by analysis of traffic counts,accident records and geometric data,but also through review and investigation of citizen complaints and requests. Following this text are tables that display and summarize the six-year funding plan broken out in accordance with the five program categories. . Below is a more specific discussion of the activities involved in TIP development. 3-2 • IL Specific TIP Development Activities TIP project and financial development activities are intricately intertwined and involve interactions with many groups and agencies at the local,regional, state and federal levels. Within the Transportation Systems Division of the City of Renton,project development involves year-around coordination among the Maintenance and Operations Section,the Planning and Program Section and the Design Section. The Transportation Maintenance and Operations Section compiles accident and traffic count data,performs level-of-service calculations needed to identify operational/congestion problems and tracks all transportation-related complaints, suggestions and requests that come into the City. The Transportation Design Section, through the TIP's Overlay Program and Bridge Inspection and Repair Program,works closely with the Maintenance Services Division and with its Pavement Management Systems to establish structural ratings for the City's roads and bridges. These and other data are being used by the Planning and Programming Section to develop transportation improvement projects,prepare grant applications,interface with ongoing state and federal transportation programs,and develop a TIP that supports the goals of the City's long-rangeComprehensive Plan and short-range business plan. The Transportation Planning Section works with Metro Transit,the Puget Sound Regional Council, Sound Transit, and other groups and agencies to assure consistency between Renton's transportation policies and programs and those of the region. Such consistency is required by the Growth Management Act and related legislation and by federal and state grant programs. Ongoing transportation planning activities,such as updating the Transportation Element and traffic model,coordinating with the City's Comprehensive Plan and the development of sub-area plans, such as the City Center,Benson,Cedar River,East Plateau,Fairwood, Highlands,Kennydale,Talbot,Valley and West Hill Community Areas play an important part in identifying and prioritizing transportation improvement projects. State and regional transportation projects also play an important role such as those involving Sound Transit,the Metropolitan Transportation Plan and the State Systems Plan. Within the City of Renton,there are actions and interactions involving other departments and divisions, the private sector,the City Council and Administration,which strongly influence the direction of the transportation program. For example,the transportation system is significantly impacted by land use decisions, private development proposals and by public water and sewer extensions which increase transportation demand by making possible higher density and/or intensity of land uses. 3-3 Such proposals need to be monitored and analyzed in regard to how they individually and collectively create the need for transportation improvements. All departments and divisions in the City, the City Council, and the Administration are solicited each year to provide input,discuss,and comment on the Six-Year TIP. Additional input is also gathered through interactions with other public and private organizations and through public meetings held in the community concerning specific transportation projects and programs. At the City, State and Federal level there are new laws and regulations that create the • need for new or different kinds of transportation projects and programs. Examples include the Federal Transportation Act(SAFETEA-LU),the Growth Management Act, the Clean Air Act,the Commute Trip Reduction law,the Endangered Species Act and the Surface.Water Management Ordinance. All of these laws have tremendous impacts on the development and costs of transportation projects. Interconnection and/or interdependence among TIP projects and with projects by other City departments and by other jurisdictions is another element that affects the development,the prioritization and the timing of transportation projects. Equally - important is the likelihood,the time frame and the amount of outside funding that will be obtainable to finance transportation.projects. • In summary, with its heavy dependence on many different and unpredictable sources of outside funding and with the significant impacts created by ongoing local and regional land use decisions,transportation project development is a continuous activity comprised of a multitude of diverse elements. • 3-4 • 'CITY OF RENTON - PUBLIC WORKS - TRANSPORTATION'SYSTEMS DIVISION - 2013-2018 TIP • Six-Year Total Project • • Type TIP Project Title _ 2013 2014 2015 2016 2017 - 2018 'Period Total •. Funded:: Unfunded 1 Street Overlay . 776,000 833,000 876,000 920,000 •966,000 • 1,014,000 '5;385,000: • 4,804,000• ''581,000 0 c 2 Arterial Rehabilitation Program 366,000 1,085,000 404,000 •• 425,000 446,000 468,000 3,194,000 3,194,000 g a° 21 NE 31st St Culvert Repair 22 S zo Sidewalk Rehabilitation and Replacem Prog 170,000 250,000 250,000 250,000 250,000 • 250,000 1,420,000 491,000 929,000 22 Bridge Inspection&Repair Program 55,000 75,000 20,000 •20,000 . 20,000 25,000 215,000 165,000 50,000 g°' 23 Roadway Safety end Guardrail Program 10,000 40,000 15,000 15,000 15,000 25,000 120,000 95,000 25,000 26 Preservation of Traffic Oper Device Program 62,000 62,000 62,000 62,000 62,000 62,000 372,000 372,000 3 Rainier Ave-Grady Way to S 2nd St 9,844,223 9,844,223 . 9,844,223 4 SW 27th St/Strander Blvd Connection 8,222,575 286,646 1,535,000_ 7,665,000 6,765,000 •4,561,000 29,035,221 13,509,221 .15,526,000 4-A SW 27th St-Loan Repayment 150,000 150,000 150,000 150,000 600,000 600,000 6 NE3rd/NE4th Corridor 63,000 699,000 • 2,220,000 4;440,000 555,000 160,000 8,137,000 1,023,000 7,114,000 s Duvall Ave NE-NE 7th•St to Sunset Blvd NE 1,810,000 .1,650,000 2,240,000 6,350,000•: 12,050,000 12,050,000 7 Rainier Ave Phase II-S 3rd St to Airport Way 3,420,000 3,850,000 5,980,000 2,300,000 15,550,000 15,550,000 6' a Park Ave N Extension . - 2,400,000 2,600,000_ 5,000,000 5,000,000 22229 116th'Ave SE Improvements 3,574,000 3,76.0,000 1,600,000 5,351,000 14,285,000 14,285,000 io Carr Road Improvements 1,050,000 2,191,000 200,000 3,441,000 3,271,000 170,000 E11 NE Sunset Boulevard(SR 900)Corridor 1,000,000 2,700,000 4,430,000 8,870,000 9,000,000 26,000,000 26,000,000 • 0 12 Sunset Area Green Connections • 1,000,000 . 940,000 4,310,000 5,545,000 6,505,000 18,300,000 18,300,000 V 13 Oakesdate Ave SW-Monster Rd to SR 900 . 50,000 5,300,000 5,350,000 5,350,000 14 S 7th St-Rainier Ave S to Talbot Rd S 192,000 408,000 200,000 800,000 600,000 4,800,000 7,000,000 600,000 6,400,000 15 S Grady Way-Main Ave to West City Limits 450,000 1,275,000 1,275,000 3,000,000 _ 3,000,000 4o Lk Washington BlvdN-Park Ave N to Coulon 230,000 330,000 560,000 560,000 41 Lind Ave SW-SW 16th St to SW 43rd St • 250,000 1,350,000 1,900,000 3,500,000 3,500,000 • 42 Logan Ave N improvements 800,000 1,100,000 3,800,000 2,400,000 • 8,100,000 1,100,000 7,000,000 a , 24 Intersection Safety&Mobility Program 218,000 182,000 250,000 250,000 250,000 250,000 1,400,000 1,400,000 co 25 Traffic Safety Program 330,000 40,000 . 40,000 40,000 40,000 40,000 530,000 • • ' 526,000 4,000 v . is Highlands to Boeing/Landing Ped Connection •2,000,000 2,000,000 2,000,000 .g17 Lake Washington Loop Trail 50,000 • 300,000 1,200,000 1,725,000 1,725,000• '5,000,000 5,000,000_ • c 1a Lake to Sound(L2S)Trail 500,000 750,000 • 1,250,000 1,250,000 a 19 Walkway Program • 150,000 250,000 250,000 250,000 250,000 280,000 1,430,000 1,010,000 420,000 ', 30 Bicycle Route Development Program 30,000 70,000 70,000 • 70,000 70,000 80,000 390,000 '230,000 160,000 •Z 31 Barrier-Free Transition Plan Implementation 30,000 50,000 50,000 50,000 50,000 50,000 • 280,000 • 226,000 54,000 • H 28 Transit Program• 25,000 25,000 25,000 25,000 40,000 ' 40,000 180,000 180,000 1- 29. TDM Program 45,000 45,000 45,000 45,000 45,000 45,000 270,000 270,000 • 27 ITS Program . 30,000 30,000 30,000 30,000 • 30,000 30,000 180,000 • 180,000 32 City Center Community Plan 33 Project Development&Pre-Design Program 100,000 135,000 135,000 135,000 135,000 150,000 790,000 690,000 100,000 ..- 34 Arterial Circulation Program 120,000 235,000 235,000 235,000 235,000 250,000 1,310,000 995,000 315,000 osS 35 Transportation Concurrency/LOS Program 10,000 30,000 30,000 30,000 30,000 30,000 • 160,000 160,000 36 Environmental Monitoring Program 20,000 - 20,000 ' 20,000 • 37 WSDOT Coordination Program 10,000 30,000 30,000 30,000 30,000 40,000 170,000 170,000 . _36 GIS-Transportation Data Development 15,000 15,000 15,000 15,000 15,000 15,000 ' 90,000 90,000 39 1%for the Arts Program . 15,000 15,000 15,000 15,000. _ . 15,000 . 15,000 . 90,000 : 90,000 . . Total Sources • • .24,908,798 '13,281,646 •27,976,000 •40,522,000• 40,099,000 49,211,000 ••.19a,998,444 47,305,444. 148,693,000 .. e0)n. 3-5 1st Draft 204 PM SECTION.FOUR EXPENDITURES & REVENUES • Total Project Expenditure Summary 4-1 • City of Renton Funds 4-2 • Summary of Funding Sources 4-3 • Itemized Funding Sources: ■ Vehicle Fuel Tax 4-4 • Business License Fee 4-5 • Proposed Fund Balance 4-6 • Grants In-hand 4-7 ■ Mitigation In-Hand 4-8 • Other In-Hand 4-9 • Grants Proposed 4-1.0 • Undetermined 4-11 SIX-YEAR PROJECT COST SUMMARY* CITY OF RENTON-2013--2018 TRANSPORTATION IMPROVEMENT PROGRAM - Period - TIP Project Title 2013 2014 2015 2016 2017 2018 Total Community Planning Area 1 Street Overlay 776,000 833,000 , 876,000 920,000 966,000 1,014,000 5,385,000 Citywide 2 Arterial Rehabilitation Program 366,000 1,085,000 • 404,000 ' 425,000 '446,000 468,000 3,194,000 Citywide ' 3 Rainier Ave-Grady Way to S 2nd St 9,844,223 9,844,223 City Center 4 SW 27th St/Strander Blvd Connection 8,222,575 286,646 . 1,535,000 7,665,000 . 6,765,000 4,561,000 29,035,221 Valley 4-A•SW 27th St-Loan Repayment 150,000 150,000 150,000 150,000 600,000 - N/A - 5 NE 3rd/NE 4th Corridor 63,000 699,000 2,220,000 4,440,000 555,000 160,000 8,137,000 Highlands&East Plateau 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 1,810,000 1,650,000 • 2,240,000 6,350,000 12,050,000 Highlands&East Plateau 7 Rainier Ave Phase II-S 3rd St to Airport Way 3,420,000 3,850,000 •. 5,980,000 • 2,300,000 15,550,000 City Center 8 Park Ave N Extension • 2,400,000 2,600,000 . 5,000,000 City Center - .1 9 116th Ave SE Improvements • 3,574,000 3,760,000 • 1,600,000 5,351,000 14,285,000 Benson 10 Carr Road Improvements-. . 1,050,000 2,191,000 200,000 • 3,441,000 Talbot&Benson 11 NE Sunset Boulevard(SR 900)Corridor 1-,000,000 2,700,000 4,430,000 8,870,000_ 9,000,000 - 26,000,000 City Center,Highlands&East Plateau 12 Sunset Area Green Connections 1,000,000 940,000 4,310,000 5;545,000 6,505,000 18,300,000 Highlands • _ 13 Oakesdale Ave SW-'Monster Rd to SR 900 50,000 5,300,000 ' 5,350,000 '- West Hill 14 S 7th St-Rainier Ave S to Talbot Rd S 192,000 408,000 200,000 800;000 • 600,000 4,800,000 7,000,000 City Center _ 15 S Grady Way:Main Ave to West City Limits 450,000 ..1,275,000 1,275,000 3,000,000 City Center 16 Highlands to Boeing/Landing Ped Connection 2,000,000 2,000,000 - Highlands _ 17 Lake Washington Loop Trail - ' . 50,000 - 300,000 1,200,000 1,725,000 1,725,000 5,000,000 City Center 18 Lake to Sound(L2S)Trail 500,000 750,000 1;250,000 CIty.Center&Valley 19 Walkway Program 150,000 250,000. 250,000 250,000 250,000 280,000 1;430,000 Citywide 20 Sidewalk Rehabilitation and Replacem Prog 170,000 250,000 250,000 250,000 250,000 250,000 1,420,000 Citywide 21 NE 31st St Culvert Repair N/A 22 Bridge inspection&Repair Program 55,000 75,000 20,000 20,000 20,000 25,000 215,000 Citywide _ J 23 Roadway Safety and Guardrail Program - 10,000 40,000 15,000 15,000 15,000 25,000 120,000 Citywide 24 intersection Safety&Mobility Program .218,000 - 182,000 250,000 250,000 250,000 250,000 1,400,000 Citywide • 25 Traffic Safety Program 330,000 40,000 40,000 40,000 40,000 40,000 530,000 Citywide _ 26 Preservation of Traffic Oper Device Program 62,000 62,000 ' 62,000 . 62,000 62,000 62,000 372,000 Citywide 27 ITS Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Citywide 28 Transit Program 25,000 25,000 25,000 25,000 • 40,000 40,000 180,000 Citywide 29 TDM Program 45,000 45,000 45,000 45,000 45,000 45,000 270,000 Citywide 30 Bicycle Route Development Program - 30,000 _ 70,000 -70,000 . 70,000 70,000 80,000- 390,000 Citywide 31 Barrier-Free Transition Plan Implementation 30,000 50,000 50,000 50,000 - 50,000 50,000 280,000 . Citywide • - 32 City Center Community Plan City Center 33 Project Development&Pre-Design Program •100,000 135,000 135,000 135,000 135,000 150,000 790,000 N/A 34 Arterial Circulation Program • 120,000 235,000 235,000 235,000 235,000 250,000 1,310,000 • N/A 35 Transportation Concurrency/LOS Program 10,000 30,000 30,000 30,000 • 30,000 30,000 160,000 . N/A 36 Environmental Monitoring Program 20,000 20,000 N/A 37 WSDOT Coordination Program, 10,000 30,000 30,000 30,000 30,000 40,000 170,000 WA 38 GIS-Transportation Data Development 15,000 15,000 15,000 15,000 15,000 15,000 90,000 N/A 39 1%for the Arts Program • 15,000 . 15,000 15,000 15,000 15,000 15,000 90,000 N/A 40 Lk Washington Blvd N'-Park Ave N to Coulon 230,000 - 330,000 ;560,000 City Center 41 Lind Ave SW-SW 16th St to SW 43rd St 250,000 1,350,000 1,900,000 3,500,000 Valley - 42 Logan Ave N Improvements 800,000 1,100,000 ' 3,800,000 . 2,400,000 8,100,000 City Center- _ Total Expenditures 24,908j98 13,281,646 27,976,000 40,522,000 40,099,000 49,211,000 195,998,444 _ etr•re_ncLum 'Including unfunded amounts. - 07+022212 1121 4--1 1st Draft - a • • • • • CITY FUNDS(VEHICLE FUEL TAX+BUSINESS LICENSE FEE.+ FUND BALANCE+ MITIGATION) 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM • Period TIP Project Title 2013 2014 "2015 2016 2017 2018 . Total 1 Street Overlay • 776,000 747,000 758,000 " 773,000 856,000 894,000 4,804,000 • 2 Arterial Rehabilitation Program 366,000 385,000 404,000 425,000 446,000 468,000 2,494,000 3 Rainier Ave-Grady Way to S 2nd St 4 SW 27th St/Strander Blvd Connection • 4-A SW 27th St-Loan Repayment 150,000 150,000 150,000 150,000 600,000 5 NE3rd/NE 4th Corridor • 63,000 214,000 166,000 185,000 235,000 160,000 1,023,000 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 7 Rainier Ave Phase II-S 3rd St to Airport Way • • 8 Park Ave N Extension 9 116th Ave SE Improvements • 10 Carr Road Improvements • 30,000 30,000 • 11 NE Sunset B"oulevard(SR 900)Corridor . 12 Sunset Area Green Connections • 13 Oakesdale Ave SW.-Monster Rd to SR 900 " ' 14 S 7th St-Rainier Ave S to Talbot Rd S 32,000 " 68,000 100,000 15 S Grady Way-Main Ave to West City Limits. "• 16 Highlands to Boeing/Landing Ped Connection • 17 Lake Washington Loop Trail 18 Lake to Sound(US)Trail ' • • • 19 Walkway Program 150,000 170,000 .160,000 160,000 170,000 200,000 1,010,000 20 Sidewalk Rehabilitation and Replacem Prog 170,000 100,000 40,000 40,000 101,000 40,000 491,000 21 NE 31st St Culvert Repair . 22 Bridge'Inspection&Repair Program- 55,000 25,000 20,000 20,000 20,000 25,000 .165,000 23 Roadway Safety and Guardrail Program • 10,000 15,000 15,00D 15,000 15,000 . 25,000 95,000 24." Intersection Safety&Mobility Program 218,000 182,000 250,000 250,000 250,000 250,000 1,400,000 25 Traffic Safety Program • . 30,000 '36,000 40,000 40,000 40,000 40,000 226,000 26 Preservation of Traffic Oper Device Program' 62,000 62,000 62,000 62,000 62,000 62,000 372,000 27 ITS Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 28 Transit Program 25,000 25,000 25,000 25,000 40,000 40,000 180,000 • 29 TOM Program • 5,000 5,000 5,000 5,000 5,000 5,000 30,000 •30 Bicycle Route Development Program " 30,000 30,000 40,000 40,000 40,000 50,000 230,000 31 : Barrier-Free.Transition Plan Implementation 30,000 30,000 25,000 " •50,000 50,000 41,000 ' 226,000 32 City Center Community Plan • 33 Project Development&Pre-Design Program 100,000 115,000 115,000 115,000 115,000 130,000 690,000 34 Arterial Circulation Program 120,000 120,000 185,000 185,000 185,000 200,000 995,000 35 Transportation Concurrency/LOS Program 10,000 30,000 30,000 30,000 30,000 • 30,000 160,000 36 Environmental Monitoring Program 20,000 20,000 37 WSDOT Coordination Program 10,000 30,000 30,000 30,000 30,000 40,000 170,000 38 GIS-.Transportation Data Development 15,000 15,000 15,000 15,000 , 15,000 15,000 90,000 39 1%for theArts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 40 Lk Washington Blvd N-Park Ave N to Coulon 41 Lind Ave SW-SW 16th St to SW 43rd St • 42 Logan Ave N Improvements " • 108,00D 41,000 149,000 Total Sources 2,600,000 ,2,640,000 2,610,000 2,660,000 2,750,000 2,760,000 16,020,000 6716226I2 Ha 4-2 1st Draft • . SUMMARY OF FUNDING SOURCES 2013 -2018 TRANSPORTATION IMPROVEMENT PROGRAM . Period ,,, ITEM 2013 2014 2015 2016 2017 2018 Period Total SIX-YEAR PROJECT COSTS: ' Planning 510,000 698,000 958,000 648,000 563,000 553,000 3,930,000 Design 1,237,800 3,491,500 9,318,500 1,129,500 749,500 3,449,500 19,376,300 R'-O-W (includes Admin) 1,223,000 2,140,000 4,100,000 6,280,000 500,000 2,300,000 16,543,000 Construction Contract 18,551,729 6,464,757 12,304,500 29,134,500 34;221,500. 38,568,500 139,245,486 Construction Management , 3,366,268 452,389 1,285,000 3,320;000 • 4,055,000 4,325,000 16,803,657 Other/Post Const.Services 20,000 35,000 10;000 10,000 10,000 15,000 100,000 Sub-TOTAL SIX-YEAR COST 24,908,798 13,281,646 27,976,000 40,522,000 40,099,000 49,211,000 195,998,444 SOURCE OF FUNDS: Vehicle Fuel Tax 640,000 650,000 660,000 670,000 680,000 680,000: 3,980,000 Business License Fee • 1,700,000 1,740,000 1,780,000 1,820,000 1,860,000 1,900,000 10,800,000 Proposed Fund.Balance . Grants In-Hand 17,281,223 3,490,000 1;870,000 1,870,000 1,260,000 25,721,223 Mitigation In-Hand 260,000 250,000 . 170,000 ' 170,000 •210,000 180,000 1,240,000 Other In-Hand 5,027,575 326,646 40,000, '40,000 40,000 - 40,000 5,514,221 Sub-TOTAL SIX-YEAR FUNDED ' 24,908,798 6,456,646 ' 2,650,000 4,570,000 4,660,000 4,060,000 47,255,444_ Grants Proposed . Undetermined _ 6,825,000 25,326,000 35,952,000 35,439,000 45,151,000 148,693,000 Sub-TOTAL SIX-YEAR UNFUNDED - 6;825,000 25,326,000 35,952,000 35,439,000 45,151,000 - 148,693,000 TOTAL SOURCES-FUNDED&UNFUNDED ' 24,908,798 • 13,281,646 27,976,000 40,522,000 . 40,099,000 49,211,000 195,998,444 'Not Included in the programmed above - 07/02/2012 „ta 4-3 1st Draft _ ' ' s VEHICLE FUEL TAX 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Period TIP Project Title 2013 2014 2015 2016 2017 2018 Total 1 Street Overlay 640,000 650,000 660,000 • 670,000 680,000 680,000 3,980,000 2 Arterial Rehabilitation Program 3. Rainier Ave-Grady Way to S 2nd St 4 SW 27th St/Strander Blvd Connection 4-A SW 27th St-Loan Repayment 5 NE 3rd/NE 4th Corridor 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 7 Rainier Ave Phase II-S 3rd St to Airport Way 8 Park Ave N Extension 9 116th Ave SE Improvements 10 Carr Road Improvements 11 NE Sunset Boulevard(SR 900)Corridor 12 Sunset Area Green Connections 13 Oakesdale Ave SW-Monster Rd to SR 900 14 S 7th St-Rainier Ave S to Talbot Rd S 15 S Grady Way-Main Ave to West City Limits 16 Highlands to Boeing/Landing Ped Connection 17 Lake Washington Loop Trail 18 Lake to Sound(US)Trail 19 Walkway Program 20 Sidewalk Rehabilitation and Replacem Prog 21 NE 31st St Culvert Repair 22 Bridge Inspection&Repair Program 23. Roadway Safety and Guardrail Program 24 Intersection Safety&Mobility Program 25 Traffic Safety Program 26 Preservation of Traffic Oper Device Program 27 ITS Program 28 Transit Program 29 TDM Program 30 Bicycle Route Development Program 31 Barrier-Free Transition Plan Implementation 32 City Center Community Plan 33 Project Development&Pre-Design Program 34 Arterial Circulation Program 35 Transportation Concurrency/LOS Program 36 Environmental Monitoring Program 37 WSDOT Coordination Program 38 GIS-Transportation Data Development 39 1%for the Arts Program 40 Lk Washington Blvd N-Park Ave N to Coulon 41 Lind Ave SW-SW 16th St to SW 43rd St 42 Logan Ave N Improvements Total.Sources 640,000 650,000 660,000 670,000' 680,000 680,000 3,980,000. OUTu 0&262612 13 41 4-4 1st Draft • • BUSINESS LICENSE FEE 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Period TIP Project Title 2013 2014 2015 2016 2017 2018 Total 1 Street Overlay 136,000 97,000 98,000 103,000 176,000 214,000 824,000 2 Arterial Rehabilitation Program . 366,000 385,000 404,000 425,000 446,000 468,000 2,494,000 3 Rainier Ave-Grady Way to S 2nd St • 4 SW 27th St/Strander Blvd Connection 4-A SW 27th St-Loan Repayment 150,000 150,000 150,000 150,000 • 600,000 5 NE 3rd/NE 4th Corridor ' 61,000 35,000 16,000 35,000 45,000 192,000 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE ' 7 Rainier Ave Phase II-S 3rd St to Airport Way . 8 Park Ave N.Extension , • 9 116th Ave SE Improvements . 10 Carr Road Improvements'' 30,000 30,000 11 NE Sunset Boulevard(SR 900)Corridor - . 12. Sunset Area Green Connections' • 13 Oakesdale Ave SW-Monster Rd to SR 900 . •14 S 7th St-Rainier Ave S to Talbot Rd S 32,000 68,000 100,000 15 S Grady Way-Main Ave to West City Limits . . • 16 Highlands to Boeing/Landing Ped Connection ' 17 Lake Washington Loop Trail • 18 Lake to Sound(L2S)Trail. 19 Walkway Program 100,000 140,000 140,000 140,000 150,000 '180,000 850,000 20 Sidewalk Rehabilitation and Replacem Prog 170,000 100,000 40,000 40,000 101,000 40,000 491,000 21 NE 31st St Culvert Repair • 22 Bridge Inspection&Repair Program 55,000 25,000 20,000 20,000 20,000 25,000 165,000 23 Roadway Safety and Guardrail Program 10,000 15,000 15,000 15,000 15,000 25,000 95,000 24 Intersection Safety&Mobility Program 118,000 182,000 250,000 250,000 250,000 •250,000 1,300,000 25 Traffic Safety Program 30,000 36,000 40,000 40,000 40,000 40,000 226,000 26 Preservation of Traffic Oper Device Program 62,000 62,000 62,000 . 62,000 62,000 62,000 '372,000 27 ITS Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 28 Transit Program 25,000 25,000 25,000 25,000 40,000 40,000 180,000 29 TDM Program• • 5,000 5,000 5,000 5,000 • 5,000 5,000 30,000 30 Bicycle Route Development Program 30,000 ' 30,000 40,000 40,000 40,000 50,000 230,000 .31 Barrier-Free Transition Plan Implementation 30,000 '30,000 25,000 50,000 50,000 41,000 226,000 32 City Center Community Plan . 33 Project Development&Pre-Design Program 100,000 115,000 115,000 115,000 115,000 130,000 690,000 34 Arterial Circulation Program ' 120,000 120,000 185,000 185,000 185,000 200,000 . 995,000 35 Transportation Concurrency/LOS Program 10,000 30,000 30,000 30,000 30,000_ 30,000 160,000 36 Environmental Monitoring Program 20,000 - 20,000 37 WSDOT Coordination Program 10,000 30,000 30,000 30,000 30,000 40,000 170,000 38' GIS=Transportation Data Development 15,000 15,000 ' 15,000 15,000 15,006 15,000 90,000 39 1%for the Arts Program' .15,000 15,000 15,000 15,000 15,000 15,000 90,000 • 40 Lk Washington Blvd N-Park Ave N to Coulon 41 Lind Ave SW-SW 16th St to SW 43rd St '.'. 42 Logan Ave N Improvements • . . . Total Sources 1,700,000 1,740,000 1,780,000 1,820,000 1,860,000 1,900,000 10,800,000 4-5 1st Draft • USE OF FUND BALANCE 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Period TIP Project Title 2013 2014 . 2015 2016 2017 2018• Total 1 Street Overlay • 2 Arterial Rehabilitation Program 3 Rainier Aver Grady Way to S 2nd St 4 SW 27th St/Strander Blvd Connection 4-A SW 27th St'-Loan Repayment 5 NE 3rd/NE 4th Corridor 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 7: Rainier Ave Phase II-S 3rd St to Airport Way 8 Park Ave N Extension 9 116th Ave SE Improvements 10 Carr Road Improvements • 11 NE Sunset Boulevard(SR 900)Corridor 12 Sunset Area.Green Connections 13 Oakesdale Ave SW-Monster Rd to SR 900 14 S 7th St-Rainier Ave S to Talbot Rd S 15 S Grady Way-Main Ave to West City Limits. 16 Highlands to Boeing/Landing Ped Connection 17 Lake Washington Loop Trail 18 Lake to Sound(L2S)Trail 19 Walkway Program 20. Sidewalk Rehabilitation and Replacem Prog 21 NE 31st St Culvert Repair 22 Bridge Inspection&Repair Program 23 Roadway Safety and Guardrail Program 24 Intersection Safety&Mobility Program 25 Traffic Safety Program • 26" Preservation of Traffic Oper Device Program 27 ITS Program 28 Transit Program 29. TDM Program' ' 30 Bicycle Route Development Program 31 Barrier-Free Transition Plan Implementation 32 City Center Community Plan • 33 Project Development&Pre-Design Program 34 Arterial Circulation Program 35 Transportation Concurrency/LOS Program 36 Environmental Monitoring Program 37 WSDOT Coordination Program 38 GIS-Transportation Data Development 39 1%for the Arts Program •. 40 Lk Washington Blvd N-Park Ave N to Coulon 41 Lind Ave SW-SW 16th St to SW 43rd St 42 Logan Ave N Improvements Total Sources 4-6 1st Draft • • GRANTS IN-HAND • • • 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Period TIP Project Title 2013 2014 2015 • 2016 2017 2018 Total 1 Street Overlay ' 2. Arterial Rehabilitation Program • 700,000 700,000, 3 Rainier Ave-Grady Way to S 2nd St 6,104,223 6,104,223 _ 4 SW 27th St/Strander Blvd Connection • 7,275,000 1,870,000 1,870,000 1,260,000 12,275,000 • 4-A SW 27th St-Loan Repayment • •5 NE 3rd/NE 4th Corridor • V 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE • 7 . Rainier Ave Phase 11-S 3rd St to Airport Way • 8.. Park Ave N Extension • • •9 116th Ave SE Improvements 10 Carr Road Improvements. 1,050,000 2,191,000 3,241,000 • 11 NE Sunset Boulevard(SR 900)Corridor 12 Sunset Area Green Connections• - • 13 Oakesdale Ave SW-Monster Rd to SR 900 . • 14 S 7th St-Rainier Ave S to Talbot Rd S " 160,000 340,000 500,000 15: S Grady Way-Main Ave to West City.Limits 16 Highlands to Boeing/Landing Ped Connection 1,700,000 . '1,700,000 17 Lake Washington Loop Trail 18 Lake to Sound(L2S)Trail • 19 Walkway Program V 20 Sidewalk Rehabilitation and Replacem Prog 21 NE 31'st St Culvert Repair • 22 Bridge Inspection&Repair Program 23 Roadway Safety and Guardrail Program 24 Intersection Safety&Mobility Program • 25 Traffic Safety Program 300,000 300,000 26l Preservation of Traffic Oper Device Program 27. ITS Program _ 28. Transit Program • 29•TDM Program V V 30 Bicycle Route Development Program. . 31 Barrier-Free Transition Plan Implementation 32 City Center Community Plan . 33 Project Development&Pre-Design Program 34 Arterial Circulation Program 35 Transportation Concurrency/LOS Program 36 Environmental Monitoring Program. • 37 WSDOT Coordination Program • •38 GIS=Transportation Data Development 39 1%for the Arts Program • 40 Lk Washington Blvd N-Park Ave N to Coulon 41'Lind Ave SW-SW 16th St to SW 43rd St • ' 42 Logan Ave N Improvements • 692,000 259,000 • . 951,000 Total Sources 17,281,223 3,490,000 1,870,000 1,870,000 . 1,260,000 25,771,223 4-7 1st Draft • 1 MITIGATION IN-HAND 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Period TIP Project Title 2013 2014 2015 2016 2017 2018 Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave-Grady Way to S 2nd St 4 SW 27th St/Strander Blvd Connection 4-A SW 27th St-Loan Repayment • 5 NE 3rd/NE 4th Corridor 2,000 179,000 150,000 150,000 190,000 160,000 831,000 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 7 Rainier Ave Phase II-S 3rd St to Airport Way 8 Park Ave N Extension 9 116th Ave SE Improvements . 10 Carr Road Improvements 11 NE Sunset Boulevard(SR 900)Corridor 12 Sunset Area Green Connections .. 13 Oakesdale Ave SW-Monster Rd to SR 900 14 S 7th St-Rainier Ave S to Talbot Rd S 15 S Grady Way-Main Ave to West City Limits 16 Highlands to Boeing/Landing Ped Connection 17 Lake Washington Loop Trail 18 Lake to Sound(US)Trail 19 Walkway Program • 50,000 30,000 20,000 20,000' 20,000 20,000 160,000 20 Sidewalk Rehabilitation and Replacem Prog 21 NE 31st St Culvert Repair 22 Bridge Inspection&Repair Program 23 Roadway Safety and Guardrail Program 24 Intersection Safety&Mobility Program 100,000 100,000 25 Traffic Safety Program 26 Preservation of Traffic Oper Device Program 27 ITS Program 28 Transit Program 29 TDM Program 30 Bicycle Route Development Program 31 Barrier-Free Transition Plan Implementation 32 City Center Community Plan 33 Project Development&Pre-Design Program 34 Arterial Circulation Program 35 Transportation Concurrency/LOS Program • 36 Environmental Monitoring Program 37 WSDOT Coordination Program . 38.GIS=Transportation Data Development 39 1%for the Arts Program 40 Lk Washington Blvd N-Park Ave N to Coulon 41 Lind Ave SW-SW 16th St to SW 43rd St 42 Logan Ave.N Improvements 108,000 41,000, 149,000 Total Sources 260,000 250,000 170,000 170,000 210,000 180,000 1,240,000 Measnm.. d 05202012 124 4-8 1st Draft • OTHER IN-HAND(INCLUDES:CITY UTILITIES, SOUND TRANSIT&WS DOT AGREEMENTS) • 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM • Period TIP Project Title 2013 2014 2015 2016 2017 ' 2018 Total 1 Street Overlay 2 Arterial Rehabilitation Program • 3 Rainier Ave-Grady Way to S 2nd St 3,740,000 3,740,000 4 SW 27th St/Strander Blvd Connection 947,575 286,646 1,234,221 4-A SW 27th St-Loan Repayment 5 NE 3rd/NE 4th Corridor 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 7, Rainier Ave Phase!!-S 3rd St to Airport Way 8 Park Ave N Extension 9 116th Ave SE Improvements 10 Carr Road Improvements 11 NE Sunset Boulevard(SR 900)Corridor 12 .Sunset Area Green Connections 13 Oakesdale Ave SW-Monster Rd to SR 900 14 S 7th St-Rainier Ave S to Talbot Rd S' 15 S Grady Way-Main Ave to West City Limits 16 Highlands to Boeing/Landing Ped Connection 300,000 300,000 17 Lake Washington Loop Trail 18 Lake to Sound(L2S)Trail • 19 Walkway Program 20 Sidewalk Rehabilitation and Replacem Prog 21 NE 31st St Culvert Repair 22 Bridge Inspection&Repair Program • 23 Roadway Safety and Guardrail Program 24 Intersection Safety&Mobility Program 25 Traffic Safety Program 26 Preservation of Traffic Oper Device Program 27 ITS Program 28 Transit Program 29 TOM Program 40,000 40,000 40,000 40,000 40,000 40,000 240,000 30 Bicycle Route Development Program 31 Barrier-Free Transition Plan Implementation 32'City Center Community Plan • 33 Project Development&Pre-Design Program 34 Arterial Circulation Program 35 Transportation Concurrency/LOS Program 36 Environmental Monitoring Program 37 WSDOT.Coordination Program 38 GIS-Transportation Data Development 39 1%for the Arts Program • 40 Lk Washington Blvd N-Park Ave N to Coulon . 41 Und Ave SW-SW 16th St to SW 43rd St 42 Logan Ave N Improvements • Total Sources 5,027,575 326,646 40,000 . 40,000 40,000 40,000 5,514,221 celme,t a.e 4-9 1st Draft • GRANTS PROPOSED • • 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Period TIP Project Title 2013 2014 2015 2016 2017 2018 Total 1 Street Overlay 2 Arterial Rehabilitation Program 3 Rainier Ave-Grady Way to S 2nd St • 4 SW 27th St/Strander Blvd Connection 4-A SW 27th St-Loan Repayment • 5 NE 3rd/NE 4th Corridor • 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE 7 Rainier Ave Phase II-S 3rd St to Airport Way 8 Park Ave N Extension . 9 116th Ave SE Improvements 10 Carr Road Improvements 11 NE Sunset Boulevard(SR 900)Corridor 12 Sunset Area Green Connections : 13 Oakesdale Ave SW-Monster Rd to SR 900 14 S 7th St-Rainier Ave S to Talbot Rd S •15 S Grady Way-Main Ave to West City Limits 16 Highlands to Boeing/Landing Ped Connection 17 Lake Washington Loop Trail 18 Lake to Sound(L2S)Trail 19 Walkway Program 20 Sidewalk Rehabilitation and Replacem Prog 21 NE 31st St Culvert Repair 22 Bridge Inspection&Repair Program 23 Roadway Safety and Guardrail Program 24 Intersection Safety&Mobility Program 25 Traffic Safety Program 26 Preservation of Traffic Oper Device Program 27 ITS Program 28 Transit Program • 29 TDM Program 30 Bicycle Route Development Program 31 Barrier-Free Transition Plan Implementation 32 City Center Community Plan 33 Project Development&Pre-Design Program 34 Arterial Circulation Program - • 35 Transportation Concurrency/LOS Program 36. Environmental Monitoring Program 37 WSDOT Coordination Program 38 GIS-Transportation Data Development 39 1%for the Arts Program • 40-Lk Washington Blvd N-Park Ave N to Coulon • '41 Lind Ave SW-SW 16th St to SW 43rd St • 42 Logan Ave N Improvements Total Sources Geanerl 080202012 4-10 1st Draft • UNDETERMINED • 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM .:.. Period TIP . . Project Title .. 2013. 2014 2015:. . 2016 2017 .. 2018 : Total 1.' Street Overlay 86,000 118,000 . 147,000 ., ' .110,000 .. :120,000 . . ..581,000 2 Arterial Rehabilitation Programa 3 Rainier Ave-Grady Way to S 2nd St - 4 SW 27th St/Strander Blvd Connection 1,535,000 . 5,795,000 .4,895,000 3;301,000 '15,526,000 4-A SW 27th$t-Loan Repayment 5 NE 3rd/NE 4th Corridor 485,000 2,054,000 4,255,000 320,000 7,114,000 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE :. 1,810,000 1,650,000 2,240,000 .6,350,000 :12,050,000 7. Rainier Ave Phase II:-S 3rd St to Airport Way : 3,420,000 ' 3,850,000 5,980,000 2,300,000 15,550,000 8 Park Ave N Extension 2,400,000 :2,600,000 5,000.000 9 116th Ave SE Improvements 3,574,000 3,760,000 1,600,000 ' 5,351;000 .14,285,000 10 Carr Road Improvements 170,000 170,000 11 NE Sunset Boulevard(SR 900)Corridor 1,000,000 2,700,000 4,430,000 8,870,000 :.9,000,000 ' 26,000,000 12 Sunset Area Green Connections , 1,000,000 940,000 4,310,000 5,545,000'. :6,505,000 ' 18,300,000 13 Oakesdale Ave SW-Monster Rd to SR 900 50,000 5,300,000 '5,350,000 14 S 7th St-Rainier Ave S to Talbot Rd S 200;000 800,000 "' 600,000 4,800,000 6,400,000 15 S Grady Way-Main Ave to West City Limits : 450,000 1,275,000 1,275,000 ' 3,000,000 16 Highlands to Boeing/Landing Ped Connection 17 Lake Washington Loop Trail 50,000 300,000 1,200,000 . 1,725,000 . 1,725,000 5,000,000 18 Lake to Sound(L2S)Trail . 500,000 750,000 : 1,250,000 19 Walkway Program 80,000 90,000 .' 90,000 . 80,000 =80,000 ..420,000 20 Sidewalk Rehabilitation and Replacem Prog. ' 150,000 210,000 210,000 149,000 . 210,000 929,000 21 NE 31st St Culvert Repair 22 Bridge Inspection&Repair Program 50,000 50,000 23 Roadway Safety and Guardrail Program 25,000 " 25,000 24Intersection Safety&Mobility Program 25 Traffic Safety Program 4,000 4,000 26' Preservation of Traffic Oper Device Program _ 27 ITS Program 28 Transit Program 29.TDM Program 30 Bicycle Route Development Program 40,000 30,000 ' 30,000 . 30,000 ' :30,000 . 160,000 31 Barrier-Free Transition Plan Implementation . . ' 20,000 .' 25,000_ ' ' 9,000 '54,000 32 City Center Community Plan 33 Project Development&Pre-Design Program , 20,000 . 20,000 20,000 20,000 ' .20,000 100,000 34 Arterial Circulation Program' 115,000 50,000 50,000 50,000 50,000 315,000 35 Transportation Concurrency/LOS Program 36 Environmental Monitoring Program 37, WSDOT Coordination Program 38 GIS-Transportation Data Development 39 1%for the Arts Program 40 Lk Washington Blvd N-Park Ave N to Coulon .: .. 230,000 '330,000 . ' '. 560,000 41 Lind Ave SW-SW 16th St to SW 43rd St 250,000 1,350,000 1,900,000 ' . 3,500,000 42 Logan Ave N Improvements 800,000 3,800,000 ' .2,400,000 : 7,000,000 Total Undetermined 6,825,000. 25,326,000 35,952,000 35,439,000 45,151,000 148,693,000 UnIundatEken 0=2012 lab 4-11 1st Draft CITY OF RENTON-PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2012-2017 SIX-YEAR TIP Total Project Costs Six-Year Total Total TIP Project Title 2013 2014 2015 2016 2017 2018 Period Total Funded Unfunded 1 Street Overlay 776,000 833,000 876,000 920,000 966,000 1,014,000 5,385,000 4,804,000 581,000 2 Arterial Rehabilitation Program 366,000 1,085,000 404,000 425,000 446,000 468,000 3,194,000 3,194,000 3 Rainier Ave-Grady Way to S 2nd St 9,844,223 9,844,223 9,844,223 4 SW 27th St/Strander Blvd Connection 8,222,575 286,646 1,535,000 7,665,000 6,765,000 4,561,000 29,035,221 13,509,221 15,526,000 4-A SW 27th St-Loan Repayment 150,000 150,000 150,000 150,000 600,000 600,000 s NE 3rd/NE 4th Corridor 63,000 699,000 2,220,000 4,440,000 555,000 160,000 8,137,000 1,023,000 7,114,000 s Duvall Ave NE-NE 7th St to Sunset Blvd NE 1,810,000 1,650;000_ 2,240,000 6,350,000 12,050,000 12,050,000 7 Rainier Ave Phase II-S 3rd St to Airport Way 3,420,000 3,850,000 5,980,000 2,300,000 15,550,000 15,550,000 6 Park Ave N Extension 2,400,000 2,600,000 5,000,000 5,000,000 9 116th Ave SE improvements 3,574,000 3,760,000 -1,600,000 5,351,000 14,285,000 14,285,000 10 Carr Road Improvements 1,050,000 2,191,000 200,000 3,441,000 3,271,000 170,000 ii NE Sunset Boulevard(SR 900)Corridor . 1,000,000 2,700,000 4,430,000• 8,870,000 9,000,000 26,000,000 ' 26,000,000 • 12 Sunset Area Green Connections 1,000,000 940,000 4,310,000 5,545,000 6,505,000 18,300,000 18,300,000 13 Oakesdaie Ave SW-Monster Rd to SR 900 50,000 5,300,000 5,350,000 5,350,000 _ 14 S 7th St-Rainier Ave S to Talbot Rd S 192,000 408,000 200,000 800,000 600,000 4,800,000 7,000,000 600,000 6,400,000 15 S Grady Way-Main Ave to West City Limits 450,000 1,275,000 1,275,000 3,000,000 3,000,000 is Highlands to Boeing/Landing Ped Connection 2,000,000 ' 2,000,000 2,000,000 17 Lake Washington Loop Trail 50,000 300,000 1,200,000 1,725,000 1,725,000 5,000,000 5,000,000 16 Lake to Sound(L2S)Trail 500,000 750,000 1,250,000 1,250,000 19 Walkway Program 150,000 250,000 250,000 250,000 250,000 280,000 1,430,000 1,010,000 420,000 20 Sidewalk Rehabilitation and Replacem Prog 170,000 250,000 250,000 250,000 250,000 250,000 1,420,000 491,000 929,000 21 NE 31st St Culvert Repair , 22 Bridge Inspection&Repair Program 55,000 75,000 20,000 20;000 20,000 25,000 215,000 165,000 50,000 23 Roadway Safety and Guardrail Program 10,000 40,000 15,000 15,000 15,000 25,000 120,000 95,000 25,000 24 Intersection Safety&Mobility Program 218,000 182,000 250,000, 250,000 250,000 250,000 1,400,000 1,400,000 25 Traffic Safety Program 330,000 40,000 40,000 40,000 40,000 40,000 530,000 526,000 4,000 26 Preservation of Traffic Oper Device Program 62,000 62,000 62,000 62,000 62,000 62,000 372,000 372,000 • 27 ITS Program 30,000 30,000 30,000 30,000 30,000 • 30,000 180,000 180,000 25 Transit Program 25,000 25,000 25,000 25,000 40,000 40,000 180,000 180,000 29 TDM Program 45,000 45,000 45,000 45,000 45,000 45,000 270,000 270,000 30 Bicycle Route Development Program 30,000 70,000 70,000 70,000 70,000- 80,000 390,000 230,000 160,000 _ 31 Barrier-Free Transition Plan Implementation 30,000 50,000 50,000 50,000 50,000 50,000 280,000 226,000 54,000 32 City Center Community Plan ' 33 Project Development&Pre-Design Program 100,000 135,000 135,000 135,000 135,000 150,000 790,000 • 690,000 100,000 34 Arterial Circulation Program 120,000 235,000 235,000 235,000 235,000 250,000 . 1,310,000 995,000 315,000 35 Transportation Concurrency/LOS Program 10,000 30,000 30,000 30,000 . 30,000 30,000 160,000 160,000 _ 36 Environmental Monitoring Program 20,000 20,000 20,000 37 WSDOT Coordination Program 10,000 30,000 30,000 30,000 30,000 40,000 170,000 170,000 39 GIS-Transportation Data Development 15,000 15,000 15,000 15,000 . 15,000 15,000 90,000 90,000 39 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 90,000 4o Lk Washington Blvd N-Park Ave N to Coulon 230,000 . 330,000. 560,000 560,000 41 Lind Ave SW-SW 16th St to SW 43rd St 250,000 1,350,000 1,900,000 3,500,000 3,500,000 42 Logan Ave N Improvements 800,000 1,100,000 3,800,000_ 2,400,000 . 8,100,000 1,100,000 7,000;000 Total Sources 24,908,798 -13,281;646 27,976,000 40,522,000_. 40099,000 49,211,000 195;998,444 47,305,444 .148;693,000 Tow Plq-d ram 204 PM 5-la Draft • CITY OF RENTON PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM - Street Overlay Functional Classification: N/A • Proj.Length: N/A Proj: 122108 Community Planning Area: N/A TIP No. 1 CONTACT: 8111 Wressell 425.430.7400 • DESCRIPTION: . STATUS: Annual program for repairing and resurfacing existing roadways,operating the City's Pavement This program funds overlays on neighborhood streets and collector streets. The Arterial. Management System and providing data for deficiency ratings. Rehabilitation Program funds major and minor arterials.Installation of ADA compliant curb ramps has been incorporated into the annual Street Overlay Program in accordance with • federal requirements. A 5%annual cost increase has been incorporated into this program. . JUSTIFICATION: CHANGES: Asphalt concrete pavement(ACP)overlay and slurry sealof streets provide for improved driving surface The Transportation/Aviation Committee recommended$100,000 be allocated.in'2011'for and are highly cost-effective ways of avoiding expensive repairs and reconstruction. The computerized maintenance of existing alleyways.The budget is reflected in the Overlay Program' Pavement Management System and yearly survey of roadway conditions greatly Improve the efficiency of ($50,000)and in the Arterial Rehabilitation Program($50,000). Maintenance staff are the Overlay Program. The undetermined funding is based on a 5%cost escalation. purchasing a new pavement management system(street Saver)and future budget needs will be established in 2013 based on the reports from this software. • IFunded: 16,379,102 T lUnfunded: 1 581,000 Project Totals Programmed Pre-2013 - T Six-Year Program ITEM Programmed Spent In 2011 2012 Total 2013 2014 2015 . 2016 2017 2018 EXPENSES: • Planning 1,552 1,552 Preliminary Engineering 105,966 3,666 13,000 89,300. 14,300 15,000 15,000 15,000 15,000 15,000 R-O-W(Includes Admin) Construction 6,527,181 612,081 863,400 5,051,700 - 721,700 778,000 820,000 864,000 910,000 958,000 Construction Services' . 325;404 41,404 40,000 244,000 40,000 40,000 41,000 41,000 41,000 41,000 • Post Construction Services - • TOTAL EXPENSES ' 6,960,102 658,702 916,400 5,385,000 776,000 833,000 876,000 920,000 966,000 1,014,000 - SOURCE OF FUNDS: Vehicle Fuel Tax 5,200,000 620,000 600,000 3,980,000 640,000 650,000 660,000 - 670,000 • 680,000 . 680,000 - Business License Fee 988,702 38,702 126,000 824,000 136,000 97,000 98,000 103,000 176,000 214,000 Proposed Fund Balance • 190,400 190,400 Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand . Other In-Hand(1) . Other In-Hand(2) • Undetermined - 581,000 581,000_ 86,000 118,000 147,000 110,000 120,000 TOTAL PROG SOURCES 6,960,102 ' 658,702 916,400 5,385,000 776,000 833,000 876,000 ' 920,000 966,000 Dark, 06/202012 277 PM 5-1 1st Draft a CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM • Arterial Rehabilitation Program Functional Classification:various Proj.Length: N/A - Proj: 122186 • Community Planning Area: N/A - TIP No. 2 CONTACT: Bill Wressel 425.430.7400 DESCRIPTION: • - STATUS: This program provides for the rehabilitation of arterial streets where the restoration requirements are Proposed paving schedule:2012:156th Ave SE;2013:reserved for SW Grady Way; beyond that which can be accomplished through the annual Overlay Program. installation of ADA- 2014:SW Grady Way;2015:Benson Rd(SR 515 to S 26th St);2016:Benson Rd(S 26th compliant curb ramps has been incorporated into the annual Arterial Rehabilitation and Overlay St to 1-405);2017:Monster Road S.W.;2018:Airport Way(Rainier Ave to Logan Ave). programs according to new federal requirements. This order may change depending on future ratings. A 5%annual cost increase has been • • incorporated into this program.A preservation STP grant in the amount of$700,090 was awarded to Renton.for use in 2014. JUSTIFICATION: CHANGES: The,Overlay Program concentrates to a great degree on maintaining residential streets,where relatively The Transportation/Aviation Committee recommended$100,000 be allocated.lri 20111cr small traffic volumes and less truck and bus traffic make standard asphalt overlays a long term means of maintenance of existing alleyways.The budget is reflected in the Overlay Program maintenance. Arterial streets can often deteriorate rather quickly and often require more costly ($50,000)and in the Arterial Rehabilitation Program($50,000).Funds for 2013 reserved•to rehabilitation measures and/or costly temporary repairs to avoid more extensive deterioration. A number be used as match In 2014 for the STP preservation grant to overlay SW Grady Way. of arterials identified as needing major rehabilitation are being addressed in this program and the .. Overlay Program. • 'Funded: 13,884,000 (Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018-. EXPENSES: Planning Preliminary Engineering • R-O-W(Includes Admin) Construction . 3,884,000 342,000 348,000 3,194,000 366,000 1,085,000 404,000 425,000 446,000 • 468,000 Construction Services Post Construction Services TOTAL EXPENSES 3,884,000 342,000 348,000 3,194,000 366,000 1,085,000 404,000 425,000 446,000 468,000 SOURCE OF FUNDS: . Vehicle Fuel Tax • Business License Fee 3,184,000 342,000 - 348,000 2,494,000 . 366,000 385,000 404,000 425,000 446,000 468,000 ` - Proposed Fund Balance _ Grants In-Hand(STP-Preservation 700,000 700,000. - 700,000, Grants In-Hand(2) Mitigation In-Hand • Other In-Hand(1) _ Other In-Hand(2) • Undetermined TOTAL PROG SOURCES 3,884,000 • 342,000 348,000 3,194,000 366,000 1,085,000_ . 404,000 425,000 446,000 468,000 Aftw_Fwhe 01/204012 t32 PIA 5-2 1st Draft CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT.PROGRAM Rainier Ave Improvements-Grady Way to S 2nd Street Functional Classification: Principal&Minor Proj.Length:0.89 ml Proj: 122703 Community Planning Area: City Center TIP No. 3 CONTACT: Derek Akesson 425.430.7337 DESCRIPTION: STATUS: The ST agreement authorizes$14.9 million. Two State Ped and Bike Safety Grants have Improvements remove barriers,eliminate substandard conditions,and provide an enhanced pedestrian • been awarded:$200,000(2006)and$230,000(2007)..TIB awarded grant funds;of environment. Project elements include adding business access and transit(BAT)lanes north and $2,202,000(2003);$1,906,200(2006);and$2,831,500(2008). A$2.0 million(2009) southbound,removing the BNSF railroad bridge support pier,adding left-turn lanes at intersections, ARRA grant was awarded for Phase.1 (Shattuck Ave). A$4.8 million STP/CMAQ grant widening sidewalks with streetscaping, adding pedestrian-scale Illumination,transit facility Improvements awarded for construction(2009). Dept of Commerce awarded a$500,000 grant(2009).A (shelters,benches,information kiosks),planted buffer strips and landscaped medians. $1:5 million Mobility grant award for construction(2011). JUSTIFICATION: CHANGES: • Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of -City.water utility improvements will be funded by the water utility and are not included in infrastructure enhancements to provide greater ease of non-motorized and transit-based travel. Existing the TIP. high levels of traffic congestion and accidents. Improvements will enhance traffic flow and reduce accidents. BAT lanes will be provided from S 2nd St to Grady Way southbound and from Grady Way to S 3rd St northbound. ( Funded:1 44,423,1711 Unfunded:I Project Totals Programmed Pre-2013 Six Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: • Planning Preliminary Engineering 6,749,303 6,603,098 146,206 R-O-W(Includes Admin) 6,719,545 5,869,009 850;536 Construction 14,778,524 31,027 6,840,931 7,906,565 7,906,565 Construction Services 3,566,031 155,520 1,472,854 1,937,657 1,937,657 , Shattuck Stormwater Bypass 2,160,737 2,160,737 BNSF Bridge-work by others 10,449031 10,449,031 _ • TOTAL EXPENSES 44,423,171 25,268,422 9,310,526 9,844,223 9,844,223 SOURCES OF FUNDS: Vehicle Fuel Tax • Business License Fee 187,487 ' 187,487 Proposed Fund Balance 1,615,365 1,369,859 245,506 Grants In-Hand(TIB) 6,939,700 2,349,544 2,286,062 . 2,304,094 2,304,094 • Grenls(WSDOT+ARRA+STP+Mobilit) 8,662,829 2,001,829 2,910,870 3,750,130 3,750,130 Mitigation In-Hand 4,672,929 4,622,929- 50,000 Grants In-Hand.(Commerce) 500,000 450,000 50,000 50,000 Other in-Hand(Sound Tran.) 14,226,000 8,826,000 2,160,000 3,240,000 3,240,000 Other in-Hand(WSDOT bridge sa% . 4,750,000 4,750,000 Other(City Utilities) 710,774 710,774 V V Other-Franchise Reimbursement 1,658,088 1,658,088 _ Other WSDOT Overlay 500,000 500,000 • 500,000 Undetermined TOTAL SOURCES 44,423,171 25,268,422 9,310,526_ 9,844,223 9,844,223 na+ncl Ofl,A'Ali 232 PM 5-3 ist Draft Page 1 • 'CITY OF RENTON _ • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM , SW 27th Street/Strander Boulevard Connection Functional Classification: Minor Arterial Proj.Length: 1.27 miles .Proj: 122239,122240 Community Planning Area: Valley TIP No. 4 . CONTACT: Keith Woolley 425.430.7318 - - DESCRIPTION: STATUS: This project provides a critical four/five-lane arterial that will serve as a connector to West Valley $1,000,000 was received from the General Fund In 2003. Ph.1 Seg.1 is complete and Highway(SR 181)and East Valley Road,as well as an arterial connector to SR 167 from the south. The has been paid with approximately$3M in bonds. Grants include:TEA-21 funds of project will provide a grade-separated crossing at the Union Pacific Railroad(UPRR)and Burlington $745,563(2003)and$2,398(2005);federal discretionary(STP)of$737,946, STP-N of Northern Santa Fe(BNSF)railroad•tracks, Right-of-way Includes:City of Renton-$3.17 million,City of $94,420,federal discretionary(HPP)of$719,921,Section 129 of$122,500. The City was - Tukwila-$0.95 million. awarded$4.6 Min STP Regional funds.FMSIB awarded a$5M forconstruction of the next phase,pending Legislature authorization. ' . JUSTIFICATION: CHANGES: A new east-west arterial roadway will connect the cities of Renton and Tukwila and provide significant FMSIB Is contributing$7.75M and Sound Transit is contributing$4 M to Phase 1 -Seg 2a congestion relief to existing arterials. The new road will provide access to the new Tukwila Station,a (2 lane roadway from Naches Ave SW•to the Sounder Station,including a BNSF bridge). multi-modal center being developed immediately north of the new alignment,and to the Boeing The total project cost Is estimated as$65M and completion anticipated for 2020. An Longacres site. By undercrossing the UPRR and BNSF railroads,the new arterial will provide significant interfund loan in the amount of$700K was approved for the current phase.The loan benefits to both freight mobility and general motorists. • repayment is reflected in a separate TIP(SW 27th St/Strander Blvd-Loan Repayment- TIP No.4-A).City of Tukwila will take the lead for future phases. " Funded:1 33,400,3141 Unfunded:1 15,526,000 • Project Totals Programmed Pre-2013 - Six-Year Program ITEM. Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: _ Planning Preliminary Engineering • 6,61%490 5,005,490 70,000 1,535,000 1,535,000 • R-O-W(includes Admin) 4,636,830 3,509,830 L127,000 227,000 .900,000 Construction 30,467,494 33,053 7,182,220 23,252,221 6,952,964 249,257 6,000,000 6,000,000 4,050,000 Construction Services 4,202,056 1,056 . 1,080,000- 3,121,000 1,042,611 37,389765,000 765,000 511,000 Phase 1,Seg 1 design and cant 3,009,442 3,009,442 TOTAL EXPENSES 48,926;314 11,558,873 8,332,220 29,035,221 8,222,575 . 286,646 1,535,000 7,665,000 6,765,000 4,561,000 SOURCES OF FUNDS: _ , Vehicle Fuel Tax _ interfund Loan 700,000 445,205 254,795 ' Gen Fund&Prop.Fund Balance •2,084,591 2,084,591 _ • . Grants In-Hand-(State&Fed) 2,408,422 2,408,422 - Grants In-Hand(FMSIB) 12,750,000 700,000 2,900,000 9,150,000 4,150,000_ _ 1,870,000 1,870,000 1,260,000 Mitigation In-Hand 557,500 557,500 • • • Bonds 2,799,500 2,799,500 • • • Other.Sound Transit+FHB 4,563,655 1,563,655 2,052,425 947,575 947,575 . Grants In-Hand(STP Grant+TIB) 6,250,000 3,125,000 3,125,000 3,125,000 City of Tukwila Reimb. 1,000,000 1,000,000 • Interfund transfer 286,646 286,646 • 286,646 • Other Proposed • • Undetermined 15,526,000 15,526,000 1,535,000 5,795,000 4895,000 3,301,000 TOTAL SOURCES 48,926,314 11,558,873 8,332,220 29,035,221 •8,222,575 286,646 1,535,000 • 7,665,000 6,765,000 : 4,561;000 081207012 232 PM 5-4 1st Draft - CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM SW 27th Street/Strander Boulevard Connection-Loan Repayment Functional Classification: Proj.Length: Proj: Community Planning Area: Valley TIP No. 4-A CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: STATUS: This project will account for the SW 27th St/Strander Blvd Connection loan repayment.The loan was approved by Council In May 2011 and will be amortized over a 5-year period,at a 2.25%Interest rate. The interest amount to be paid over the life of the loan is$50,000. CHANGES: I Funded:1 750,0001 Unfunded:1 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 - 2017 2018 EXPENSES: Loan repayment 750,000 150,000 600,000 150,000, 150,000 150_,000 150,000 Preliminary Engineering R-O-W(Includes Admin) Construction • Construction Services Phase 1,Seg.1 design and con: TOTAL EXPENSES 750,000 150,000 600,000 150,000 150,000 150,000 150,000 SOURCES OF FUNDS: . Vehicle Fuel Tax . Business License Fee 750,000 150,000 600,000 150,000 150,000 150,000 150,000 Gen Fund&Prop.Fund Balance Grants In-Hand(State&Fed) Grants In-Hand(FMSIB) Mitigation In-Hand Bonds 011ier.Sound Transit+FRB Grants In-Hand(STP Grant) City of Tukwila.Reimb. Undetermined. TOTAL SOURCES 750,000 150,000 600,000 150,000 150,000 150,000 .150,000 OW262012 =PM 5-4A 2nd Draft • • • CITY OF RENTON PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM NE 3rd/NE 4th Corridor improvements Functional Classification: Principal Proj.Length: N/A Proj: 122176 Community Planning Area: Highlands&East Plateau TIP No. 5 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: STATUS: This project involves a series of improvements in this corridor to improve traffic operations such as The estimated cost for design and construction for the corridor(from Sunset Blvd N to the rechannelization and traffic signal modifications,possible transit priority signal treatments and queue east City limits)is$40M.The project corridor has been phased.The project received a jumps. This project will seek to meet pedestrian,transit and bicycle needs. $1,977,000 grant from TIB for Phase 1 improvements. Phase 1 consist in the design and • construction of improvements along NE 4th St from Union Ave NE to Whitman Ave NE. Programmed expenses(2013-2018)are placeholders for future phases. JUSTIFICATION: CHANGES: This corridor has a strong potential for transit usage and is experiencing rapid residential and retail • Funds shown in 2012 are to complete construction of Phase 1 improvements.The Phase growth.The NE 3rd/4th Corridor Study was adopted in May 2005. The study refined the corridor 1 Improvements are estimated at$3.4M. transportation needs and costs,Including pedestrian,transit,bicycle improvements,as well as streetscape enhancement. 1Funded: 14.667,393 [Unfunded: 17,114,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM _Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 218,420 218,420 Preliminary Engineering 1,057,973 459,801 136,172 462,000 63,000 399,000 R-O-W(includes Admin) 930,000 464 629,536 300,000 300,000 • Construction 8,570,000 • 1,930,000 6,840,000 2,000,006' 4,000,000 500,000 140,000 Construction Services 1,005,000 270,000 735,000 220,000 440,000 55,000 20,000 Post Construction Services • TOTAL EXPENSES ' 11,781,393 678,685 2,965,708 8,137,000 63,000 699,000 2,220,000 4,440,000 555,000 160,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 1,031,729 27,162 812,587 192,000 - 61,000 35,000 16,000 35,000 45,000 Proposed Fund Balance 83,964 83,964 . Grants In-Hand(TIB) 1,977,000 223,859 1,753,141 • . Grants In-Hand(2) . Mitigation In-Hand 1,574,700 343,700 400,000 831,000 2,000 179,000 150,000 150,000 190,000 160,000 Other In-Hand(1). Other In-Hand(1) • Grants Proposed - . Other Proposed . Undetermined 7,114,000" 7,114,000 485,000 2,054,000 4,255,000 320,000 . TOTAL SOURCES_ 11,781,393 678,685 2,965,708 8,137,000 63,000 699,000 2,220,000 4,440,000 555,000 • 160,000 NEn NEIth _ mra'2ot2 2:72 PM 5=5 1st Draft CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013 -2018 TRANSPORTATION IMPROVEMENT PROGRAM Duvall Ave NE-NE 7th St to Sunset Blvd NE Functional Classification: Minor Arterial Fund: 317 Proj.Length:0.67 mi Proj: 122702 Community Planning Area: Highlands&East Plateau TIP No. 6 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: Widening roadway to five lanes,including new pavement,curb,gutter,sidewalk,street lights,storm - Construction of the project pending outside funding.Project will enhance safety for drainage,channeilzation and bike lanes from NE 7th St to the Intersection with Sunset Blvd NE. pedestrians,bicyclists and vehicular along this corridor.The cost estimate has been revised to City's complete Street standards. JUSTIFICATION: CHANGES: Complete a missing link of 5-lane roadway,bicycle lanes and sidewalks on Duvall Ave NE,from NE 4th Project is unfunded. St to Sunset Blvd NE.Condition of the existing roadway pavement requires road reconstruction. I Funded:I I Unfunded:I 12,050,000 Project Totals r Programmed Pre-2013 Six Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 10,000 10,000 10,000 Preliminary Engineering 1,200,000 1,200,000 800,000 400,000 R-O-W(Includes Admin) 2,250,000 2,250,000 1,000,000 1,250,000 Construction 7,700,000 7,700,000 2,000,000 5,700,000 Construction Services 890,000 . 890,000 240,000 650,000 Post Construction Services TOTAL EXPENSES 12,050,000 12,050,000 1,810,000 1,650,000 2,240,000 6,350,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand Other In-Hand(1) ' Other in-Hand(2) • Undetermined 12,050,000 12,050,000 1,810,000 1,650,000 2,240,000 6,350,000 TOTAL SOURCES 12,050,000 12,050,000 1,810,000 1,650,000 2,240,000 6,350,000 1344•172141&num .. O84204012 0212012/4:32 5-6 1st Draft CiTY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Rainier Ave Phase iI-S.3rd Street to Airport Way Functional Classification: Principal _ . Proj.Length:0.89 mi Proj: Community Planning Area: City Center . " TIP No. • 7 .CONTACT: Jim Seitz . 425.430.7245 - DESCRIPTION:. • STATUS: Phase 2 of the Rainler,Ave Corridor Improvements will extend the improvements from where the current 'Planning to determine the roadway cross section and outreach will start in 2013,under the . phase ends to Airport Way.Project elements include widening sidewalks with streetscaping, adding . Project Development and Pre-Design Program. pedestrian-scale illumination,transit facility improvements(shelters,benches,Information kiosks), planted buffer strips and-landscaped medians. . ... . JUSTIFICATION: - CHANGES: Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of . Infrastructure enhancements to provide-greater ease of non-motorized and transit-based travel. • Improvements will enhance traffic flow and reduce accidents. Funded:1 I Unfunded:1 15,550,000 Project Totals Programmed Pre-2013 Six Year Program ITEM Programmed. Spent Pre-2012 2012- Total - 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 80,000 80,000 80,000 • Preliminary Engineering 1,840,000 1,840,000 •1,840,000 . R-O-W(Includes Admin) 3,050,000 3,050,000` 1,500_,000 1,550,000 . - • Construction 9,200,000 9,200,000 2,000,000 5,200,000 2,000,000 Construction,Services 1,380,000 1,380,000 300,000 780,000 300,000 Post Construction Services _ TOTAL EXPENSES 15,550,000 15,550,000 ' , 3,420,000 3,850,000 5,980,000 2,300,000 SOURCES OF FUNDS: Vehicle Fuel Tax J Business License Fee • - Proposed Fund Balance • - Grants In-Hand(1) ' Grants In-Hand(2) - Mitigation In-Hand Other In-Hand(1) • • Other In-Hand(2) • - • Undetermined . . 15,550,000 - 15,550,000 • 3,420,000 3,850,000 . 5,980,000 2,300,000 TOTAL SOURCES 15,550,000 - • 15,550,0001 - 3,420,000 3,850,000 5,980,000 2,300,000 tiaHr Pfi 2 662d2612 222 PM 5-7 '1st Draft • • Page 3 • • • CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Park Avenue North Extension Functional Classification: Fund: 317 Proj.Length: Proj: Community Planning Area: City Center TIP No. 8 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: The project will extend Park Ave N to provide access to Southport,PSE property and The Boeing Design and construction of Park Ave N extension and improvements on Houser Way N Company.Includes Improvements needed to convert Houser Way N to two-way operations(between N are anticipated in 2014 and 2015 and are unfunded. 8th St and Lake Washington Blvd). JUSTIFICATION: CHANGES: With the additional development growth in the North Renton area,which inciudes.The Landing and the• Southport residential/office development,this project will construct improvements to extend Park Ave N. I Funded:1 I Unfunded:I 5,000,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning Preliminary Engineering 630,000 630,000 580,000 50,000 R-O-W(includes Admin) 500,000 500,000 500,000 Construction 3,500,000 3,500,000 1,200,000 2,300,000 Construction Services 370,000 • 370,000 120,000 250,000 - Post Construction Services TOTAL EXPENSES 5,000,000 5,000,000 2,400,000 • 2,600,000 SOURCES OF FUNDS: ' Vehicle Fuel Tax • Business License Fee Proposed Fund Balance Grants In-Hand(1) . Grants In-Hand(2) Mitigation In-Hand Other In-Hand(1) Other In-Hand(2) Undetermined • 5,000,000 5,000,000 2,400,000 2,600,000 TOTAL SOURCES .. 5,000,000 . • • 5,000,000 2,400,000 • -2,600,000 . Pvk@q m202012 232 PM 5-8 1st Draft • • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM 116th Ave SE Improvements Functional Classification: Minor arterial Fund: 317 Proj.Length:2.5 mi Proj: Community Planning Area: Benson TIP No. 9 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Ave SE, New project in the Benson Hill annexation area.The priority,cost and schedule for including new pavement,curb,gutter,sidewalk,street lights,traffic signals,storm drainage, improvements will be determined through Arterial Circulation studies.Construction of channelization and landscaping from Puget Drive SE to south City limits. improvements between Puget Drive SE and SE 176th Street is anticipated as a first phase. • JUSTIFICATION: CHANGES: 116th Ave SE was annexed to the City of Renton in 2008 and Is classified as a minor arterial. It has To construct the project to the City's Complete Street standards will require right-of-way, generally two lanes of traffic with left-turn lanes at signalized Intersections and Intermittent two-way-left- estimated at$12M,in addition to the estimate shown below, turn-lane south of SE 168th. Non-continuous segments of sidewalk exist along the roadway. Improvements will enhance vehicular,bicycle and pedestrian safety along this important north-south. transportation corridor. ►Funded: I !Unfunded: 114,285,000 Project Totals Programmed Pre-2013 Six-Year Program _ ITEM Programmed Spent In 2011 2012 Total _ 2013 - 2014 2015 2016 2017 2018 EXPENSES: Planning 10,000 10,000 10,000 Preliminary Engineering. 1,904,000 1,904,000 1,104,000 500,000 300,000 R-O-W(includes Admin) 300,000 300,000 300,000 Construction 11,177,000 11,177,000 2,000,000 3,500,000 1,000,000 4,677,000 Construction Services 894,000 894,000 160,000 260,000 100,000 374,000 Post Construction Services TOTAL EXPENSES 14,285,000 14,285,000 3,574,000 3,760,000 1,600,000 5,351,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance . Grants In-Hand(1) Grants In-Hand(2) _ Mitigation In-Hand • Other In-Hand(1) Other In-Hand(2) • Undetermined 14,285,000 14,285,000 3,574,000 3,760,000 1,600,000 5,351,000 TOTAL SOURCES 14,285,000 14,285,000 -3,574,000 3,760,000 1,600,000 5,351,000 11dID 091204012 222 PM 5-9 i st Draft • • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM • Carr Road Improvements Functional Classification:Major Arterial Fund: 317 - Proj.Length: Proj: Community Planning Area: Talbot&Benson TIP No. 10 CONTACT: Jim Seitz 425A30.7245 DESCRIPTION:_ STATUS: Includes new pavement,curb,gutter,sidewalk,street lights,traffic signals from Benson Rd South(108th Roadway Improvement options including spot safety improvements,roadway'wldening and Ave SE)to Talbot Rd So.Potential Improvements vary from roadway realignment/widening at several roadway on new alignment have previously been Investigated by King County.Funding locations to address geometric deficiencies,widening to 5•lane roadway(2 lanes westbound,3 lanes proposed in 2015 is for finalization of improvements scope,cost and schedule.Corridor, eastbound),to a new 4-5 lane roadway on new alignment. This project includes intersection , improvements will be developed In phases.The total project cost is estimated as$72M. improvements at Carr Road and Benson Rd S(108th Ave SE). • JUSTIFICATION: CHANGES: Carr Road was recently annexed to the City of Renton and Is classified as a principal arterial. It has four The City was awarded a Safety grant for signal timing improvements along SW 43rd St/SE lanes of traffic with left-turn lanes at intersections. King County has identified the need for improvements Carr Rd/SE 176th St/SE Petrovitsky Rd Corridor.The grant also includes widening of the to enhance vehicle traffic capacity and safety for vehicles,bicycles,and pedestrians on this major east- • SE Carr Rd/Benson Dr S(SR 515)intersection.The grant amount is for$3,241,000 and west transportation corridor. no.match is required. 'Funded: 13,-271,000' 1Unfunded: 1170,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent In 2011 2012 Total .2013 2014 2015 2016 2017 2018 EXPENSES: - Planning 200,000 200,000 200,000 Preliminary Engineering 215,000 215,000 150,000 65,000 R-O-W(Includes Admin) 1,440,000 1,440,000 900,000 • 540,000 Construction 1,486,000 _ 1,486,000 1,486,000, Construction Services 100,000 100,000 100,000 • Post Construction Services - TOTAL EXPENSES 3,441,000 3,441,000 1,050,000 2,191,000 200,000 SOURCE OF FUNDS: Vehicle Fuel Tax , Business License-Fee 30,000 30,000 30,000 Proposed Fund Balance Grants In-Hand(Federal Safety) 3,241,000 3,241,000 1,050,000 2,191,000 Grants In-Hand(2) - Mitigation In-Hand Other In-Hand(1) Other In-Hand(2) Undetermined. . 170,000 170,000 - • 170,000 • TOTAL SOURCES 3,441;000 3,441,000 '1,050,000 2,191,000 200,000 Cur Rd C8'2021312 Z32 PM 5-10 1st Draft • • • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION • . 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM NE Sunset Boulevard (SR 900) Corridor Improvements , Functional Classification: Principal Fund: 317 Proj.Length:3.0 mi Proj: 122902 Community Planning Area: City Center,Highlands&East Plateau TIP No. 11 CONTACT: Jim Seitz,425.430.7245 DESCRIPTION: STATUS: . This project Involves a series of key improvements In this corridor to improve traffic operations such as The Sunset Area Planned Action EIS initiated in 2010 delineated transportation needs channelizatlon,traffic signal modifications,signal treatments,possible queue jumps,access along Sunset Blvd from N Park Dr to Monroe Ave NE(Phase 1).The cost of the first management through Installation of medians.This project will seek to meet pedestrian,transit and phase is estimated at$26M, bicycle needs.The project limits are from 1-405 on the west to the east City limits. `" • - JUSTIFICATION: CHANGES: - This corridor has strong potential for transit usage and is experiencing residential and retail growth. I Funded:1 210,0001 Unfunded:1 26,000,000 Project Totals Programmed Pre-2013 Six Veer Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: . Planning 210,000 200,000 10,000 Preliminary Engineering 2,700,000 2,700,000 1,000,000 1,700,000 R-O-W(Includes Admin) 2,100,000 2,100,000 _ 1,000,000 1,100,000 Construction 19,100,000 19,100,000 3,000,000 8,000,000 8,100,000 ' • Construction Services 2,100,000 2,100,000 330,000 870,000 900,000 Post Construction Services TOTAL EXPENSES 26,210,000 200,000 10,000 26,000,000 1,000,000 2;700,000 4,430,000 8;870,000. 9,000,000 SOURCES OF FUNDS: . Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(2) _ Mitigation In-Hand 10,000 10,000 Other In-Hand(CED) 200,000 200,000 _ , Other in-Hand _ Grants Proposed(STP) Undetermined 26,000,000 26,000,000 1,000,000 2,700,000 4,430,000 8,870,000 9,000,000 1'OTAL SOUiiCES. 26,210,000 200,000 10,000 26,000,000 1,000,000 2,700,000 4,430,000 8;870,000- .9,000,000 &reef are O&2MA12 ZOE PM • 5-11 1st Draft CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Sunset Area Green Connections Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: Community Planning Area: Highlands TIP No. 12 CONTACT: Jim Seitz,425.430.7245 DESCRIPTION: STATUS: This project will construct multi-modal Improvements identified in the Sunset Area Community Planned The total cost of project is estimated at$18.3M.Schedule,estimates and selection of Action Study.Roadways will be widened/extended/realigned to provide for future traffic flows.Several streets to be Improved to be determined.Significant const contribution will be required' residential streets will be developed as"green connections"improving pedestrian mobiiityand enhance from development Interests. the neighborhood.Roadways Included are NE 10th St,NE Sunset Lane,Harrington Ave NE,NE 12th St, Edmonds Ave NE,Jefferson Ave NE,Kirkland Ave NE and Glennwood Ave NE. JUSTIFICATION: CHANGES: This corridor is key to support the redevelopment of the Sunset Area Community in the Highlands area, bounded by NE 21st St on the north,Edmonds Ave NE on the west,NE 7th St on the south,and Monroe Ave NE on the east. The City in partnership with the Renton Housing Authority aspires to redevelop the Sunset Terrace public housing community and encourage private redelopment in the Planned Action Study area over a 20-year period. I Funded:1 1 Unfunded:1 18,300,000 Project Totals Programmed Pre-2013 Six Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning Preliminary Engineering 1,940,000 1,940,000 1,000,000 940,000 R-O-W(Includes Admin) 960,000 980,000 980,000 Construction 13,660,000 13,860,000 3,000,000 5,000,000 5,860,000 Construction Services 1,520,000 1,520,000 330,000 545,000 645,000 Post Construction Services TOTAL EXPENSES 18,300,000 18,300,000 1,000,000 940,000 4,310,000 5,545,000 6,505,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand Other In-Hand(CED) Other In-Hand - Undetermined 18,300,000 18,300,000 1,000,000 940,000 4,310,000 5,545,000 6,505,000 'TOTAL SOURCES 18,300,000_ 18,300,000 1,000,000 940,000 4,310,000 5,545,000 6,505,000 Sunni FM mown 292 PM 5-12 1st Draft • CiTY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Oakesdale Ave SW-Monster Road to SR 900 Functional Classification: Fund: - 317 Proj.Length: N/A Proj: Community Planning Area: West Hill TIP No. 13 CONTACT: Bob Mahn 425.430.7322 DESCRIPTION: STATUS: Widen existing roadway to four lanes plus two-way-left-turn-lane where needed and bike lanes. Realign A preliminary design study was completed In 1999. Phase 1 of improvements will address. Beacon Coal Mine Road approach to Intersection with the new Oakesdale Ave SW roadway. Includes roadway deficiencies and drainage problems between the Monster Rd Bridge and Beacon • new roadway,curbs,sidewalk,drainage,street lighting,traffic signals,channeilzation,retaining walls and Coal Mine Rd. Scope,cost and implementation schedule to be determined. The project widening the,existing bridge. cost is estimated to be$25 million(a portion of the cost is within unincorporated KC),and Is shown to be programmed for future years. JUSTIFICATION: CHANGES: Will serve growing north-south traffic demand. Cost beyond 2018 not shown. (Funded: I (Unfunded: 15,350,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent Pre-2012 4 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 50,000 50,000 50,000 Preliminary Engineering _ 3,000,-000 3,000,000 3,000,000 R-O-W(includes Admin) 2,300,000 2,300,000 2,300,000 Construction Construction Services Post Construction Services TOTAL EXPENSES 5,350,000 5,350,000 50,000 5,300,000 SOURCE OF FUNDS: .. Vehicle Fuel Tax Business License Fee - Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(1) Mitigation In-Hand Other In-Hand(1) Other In-Hand(1) Undetermined 5,350,000 5,350,000 50,000 5,300,000 TOTAL SOURCES 5,350,000 5,350,000 50;000 5,300,000 Mer Ad Mariam • 03/20'2012 2.32 PM 5-13 1st Draft • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM South 7th Street-Rainier Ave S to Talbot Road South Functional Classification: Fund: 317 . Proj.Length: N/A Proj: 122151 Community Planning Area: City Center • TIP No. 14 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: - STATUS: Widening the existing roadway to 3 lanes(2 lanes EB and 1 lane WB)and a separated multi-use trail. The S 7th St Improvements Project-Traffic Analysis Report provided alternatives for Included will be new curb,gutter,wider sidewalks,streetlighting,channelization and landscaping, - improvement options.The planning level cost estimate for the improvements are$7M. including street trees.Also Included is a new traffic signal at Shattuck Ave S and other signal Phase 1 of the project Is the installation of a traffic signal at the intersection of S 7th St and modifications. Shattuck Ave S.Funding for the signal will be provided through a$500,000 STP grant. JUSTIFICATION: CHANGES: This segment of the S/SW 7th St corridor connects Talbot Rd S(SR 515)with Rainier Ave S(SR.167). Costs beyond 2018 not shown. This project is mostly unfunded. Increasing traffic demands resulting from the WSDOT 1-405/Talbot Rd S interchange ramps will create the need for Increased capacity of S 7th St. This segment of S 7th St is part of a designated east-west • ped/bike route through the City's commercial core and an important link between regional trails. The , South Renton Neighborhood Study has Identified S 7th St as needing streetscape improvements. • IFunded: 1632,270 'Unfunded: 16,400,000 • Project Totals Programmed Pre-2013 • Six-Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 32,270 32,270 Preliminary Engineering 696,000 696,000 96,000 200,000 - 300,000 100,000 R-O-W(includes Admin) 1,096,000 1,096,000 96,000 • 500,000 500,000 Construction 4,558,000 4,558,000 358,000 4,200,000 Construction Services 650,000 650,000_ 50,000 600,000 Post Construction Services • , TOTAL EXPENSES 7,032,270 32,270 7,000,000 192,000 408,000 200,000 800,000 600,000' 4,800,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 100,000 100,000 32,000 68,000 Proposed Fund Balance 32,270 32,270 Grants In-Hand(STP) 500,000 500,000 160,000 340,000 Grants In-Hand(1) Mitigation In-Hand ' Other(proposed KC Metro) Other In-Hand(1) - _ _ Undetermined 6,400,000 • 6,400,000 200,000 800,000 600,000 4,800,000 TOTAL SOURCES 7,032,270 32,270 7,000,000 192,000 - . 408,000 200,000 800,000 600,000 4,800,000 87212i 07/02/2012 0.32 AM 5-14 1st Draft • • . i • CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM S Grady Way-Main Ave to West City Limits Functional Classification: Fund: 317 Proj.Length:NIA Proj: Community Planning Area: City Center TIP No. 15 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: This project will perform a comprehensive analysis of multi-modal transportation Improvements,Including The costs shown are for Phase 1 improvements only.New project. review of potential transit Improvements along Grady Way,such as BAT lanes and traffic signal priority (TSP).Phase 1 will remove the Islands at the intersections of S-Grady Way with Lake Ave S and Shattuck Ave S,to allow for a continuous eastbound lane from Rainier Ave S to Talbot Rd. Included are modifications to the traffic signal,new pedestrian crossings and channeiization. JUSTIFICATION: CHANGES: Removal of the obstructions and reconfiguration of the right turn lanes to eastbound through lanes will add much needed capacity to the S Grady Way corridor. [Funded: " 'Unfunded: 13,000,000 Project Totals Programmed Pre-2013 Six-Year Program ' ITEM Programmed_ Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning Preliminary Engineering 450,000 450,000 450,000 R-O-W(Includes Admin) 2,200,000 2,200,000 1,100,000 1,100,000 Construction 350,000 350,000_ • 175,000 175,000 Construction Services Post Construction Services TOTAL EXPENSES 3,000,000 3,000,000 450,000_ 1,275,000 1,275,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee - Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(1) Mitigation In-Hand Other(proposed KC Metro) Other In-Hand(1) Undetermined 3,000,000 3,000,000 - 450,000 1,275,000 1',275,000 TOTAL SOURCES 3,000,000 3,000,000 450,000 1,275,000 1,275,000 [lady WP/ 06120'1072 272 PM 5-15 1st Draft • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION • - 2013-2018•TRANSPORTATION IMPROVEMENT PROGRAM Highlands to Boeing/Landing Pedestrian Connection Project Functional Classification: Princiapi Arterial Fund: 317 Proj.Length:N/A Proj: 122901 Community Planning Area: Highlands TIP No. 16 CONTACT: Keith Woolley 425.430.7303 DESCRIPTION: STATUS: This project will provide a continuous barrier-free pedestrian connection between the Highlands and The City was awarded a federal grant In the amount of$240,000 for design. Final design Boeing 737 manufacturing plant,the Landing,Gene Coulon Park and nearby Lake Washington Trail and to be completed in 2012.A non-motorised STP grant In the amount of$1,700,000 was Cedar River Trail. The project was conceived by the Highlands Task Force Committee that Included awarded for construction of the pedestrian connection. residents,businesses and elected officials from the Renton Highlands. JUSTIFICATION: CHANGES: . Ever since the construction of 1-405 there has been a physical barrier preventing the.pedestrian connection along Park Ave North between the Highlands and Gene Coulon Park. This project will complete the pedestrian connection between the Highlands Urban:Center and the Downtown North Urban Center. - (Funded:. 12,379,418 •(Unfunded: l Project Totals Programmed Pre-2013 Six-Year Program ITEM • Programmed Spent in 2011 2012 • Total • 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 418 418 _ Preliminary Engineering 379,000 • 149,748 229,252 R-O-W(includes Admin) Construction 1,770,000 • 1,770,000 1,770,000 Construction Services 230,000 230,000 230,000 • Post Construction Services • TOTAL EXPENSES • 2,379,418 150,166 229,252 2,000,000 2,000,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 111,525 111,525 Proposed Fund Balance 27,893 27,893 • Grants In-Hand(CMAQ) 1,940,000 122,273 ' 117,727 1;700,000 1,700,000 Grants In-Hand(2) Mitigation In-Hand • Other In-Hand(CEO) 300,000 300,000 300,000 Other In-Hand(2) • Grants Proposed(CMAQ) Other Proposed . Undetermined • TOTAL SOURCES 2,379,418 150,166 229,252 2,000,000 •.2,000,000 • tipMard,btailiq O5/20f2012 2•.]2 PM 5-16 1st Draft 4 CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Lake Washington Loop Trail Functional Classification:varies - Fund: _ 317 Proj.Length: Prof: Community Planning Area: City Center TiP No. 17 CONTACT: Jim Seitz 425A30.7245 DESCRIPTION: STATUS: The project will provide a shared use regional trail from the Cedar River Trail and extending to the north Right-of-Way costs not Included In the planning level cost estimate. city limits along Rainier Ave N. Project elements include a 12-foot shared path separated from the travel lanes by an 8-foot landscaped strip. JUSTIFICATION: CHANGES: The project will separate pedestrians and bicyclists from the vehicular traffic,enhancing safety and encouraging residents to use active transportation modes. • • I Funded:j I Unfunded:1 5,000,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 50,000 50,000 50,000 Preliminary Engineering 350,000 350,000 300,000 50,000 F1-O-W(includes Admin) • • Construction 4,000,000 4,000,000 1,000,000 1,500,000 1,500,000 Construction Services 600,000 600,000 150,000 225,000 225,000 Developer Reimbursement TOTAL EXPENSES 5,000,000 5,000,000 50,000 300,000 1,200,000 1,725,000 . 1,725,000 SOURCES OF FUNDS: Vehicle Fuel Tax - Business License Fee Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand • Other - Other In-Hand(2) - Undetermined 5,000,000 • 5,000,000 50,000 300,000 1,200,000 1,725,000 1,725,000 TOTAL SOURCES 5,000,000_ 5,000,000_ 50,000 300,000 1,200,000 1,725,000 1,725,000 Ord., N 0820,2312 232 FM 5-17 1st Draft • • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Lake to Sound (L2S)Trail Functional Classification: N/A Fund: 317 • Proj.Length: N/A Proj: 122903 Community Planning Area: City Center&Valley TIP No. 18 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: The Lake to Sound(L2S)Trail is a joint partnership between the cities-of SeaTac,Renton,Tukwila, This project was awarded a federal grant in the amount of$800,125 for design and Burien and Des Moines,in coordination with King County. The 17-mile L2S Trail will provide an east- environmental documentation of Segments: A-Naches Ave SW(Renton)to Fort Dent west connection between the shoreline of Lake Washington(Renton)and the shoreline of Puget Sound Park(Tukwila),and B-Des Moines Memorial Drive S(SeaTac and Burien). Segment A (Des Moines). of the grant amount is estimated to be$300,000 and no City match is required.King County is leading the design. JUSTIFICATION: CHANGES: Segment A will connect Fort Dent(Tukwila)to the larger system of regional trails in South King County, Design of-the Fort Dent Park Connection is 50%complete.Design for segment A to be including the Green River Trail,the Interurban Trail and the Cedar River Trail.Segment A goes from completed in Spring 2013.Construction of Segment A(through Renton)estimated at Naches Ave SW in Renton to Fort Dent In Tukwila. , $1.25M,and anticipated to start in 2014,pending new grant funding. • • (Funded: I (Unfunded: 11,250,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 . 2018 EXPENSES: . Planning Preliminary Engineering R-O-W(Includes Admin) Construction 1,125,000 1,125,000 450,000 675,000 Construction Services . 125,000 125,000 50,000 75,000 Post Construction Services — TOTAL EXPENSES 1,250,000 1,250,000 500,000 750,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand • Other Other In-Hand Undetermined 1,250,000 1,250,000 500,000 750,000 TOTAL SOURCES . 1,250,000 1,250,000 500,000_ 750,000 its 06,972012 2'72 PM 5-18 1st Draft J. • • • CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION - 2013-2018 TRANSPORTATION IMPROVEMENT•PROGRAM ' Walkway Program Functional Classification:N/A Fund: 17 ' . Proj.Length: N/A Proj: 120009 • Community Planning Area: Citywide TIP No. 19 - CONTACT: James Wilhoit . 425.420.7319 DESCRIPTION: . STATUS: • • This program provides for the design and construction of high priority non-motorized transportation The Comprehensive Citywide Walkway Study was completed In 2009 and Is being used-to facilities for pedestrians. Projects are identified and prioritized using criteria from the Comprehensive - select projects that move Into the design and construction phases.The intersection.of . Citywide Walkway Study,Council direction,and through coordination with the City's Neighborhood Taylor Ave and SW 4th St is currently under design and is estimated to be completed irl Program. 2013. JUSTIFICATION: - CHANGES: Providing safe and convenient non-motorized facilities is an integral part of a complete transportation . network. Specific Improvements will respond to the needs of school children,the aged and persons with - disabilities,and support Increased use of transit. ' (Funded: 11,054,407 (Unfunded: 1420,000 Project Totals Programmed Pre-2013 - -. Six-Year Program • ITEM Programmed Spent in 2011 2012 Total 2013 2014 • 2015 2016- 2017 2018 EXPENSES: - • - Planning - 25,000 25,000- 5,000 5,000 5,000 5,000 5,000 Preliminary Engineering 184,329 4,329 40,000 140,000 15,000 25,000 25,000 25,000 25,000 25,000 F1-O-W(Includes Admin) • Construction 1,150,000 - .1,150,000 120,000_ 200,000 200,000 200,000 200,000 230,000 Construction Services. 115,079 79 115,000 15,000 20,000 - 20,000 : 20,000 20,000 . 20,000 Post Construction Services - TOTAL EXPENSES 1,474,407 4,407 40,000 1,430,000 150,000 250,000 • 250,000 250,000 250,000 280,000 SOURCE OF FUNDS: - Vehicle Fuel Tax _ Business License Fee 890,000 - 40,000 850,000 • 100,000 140,000 140,000 140,000 150,000 • 180,000 Proposed Fund Balance 4,407 4,407 - Grants In-Hand(1) - . - • Grants In-Hand(2) -' • • Mitigation In-Hand(sidewalk mit) 160,000 . 160,000 50,000' 30,000 20,000 20,000 20,000 - 20,000 Other In-Hand(1) Other In-Hand(2) . • • Undetermined. . 420,000 420,000 80,000 90,000 90,000 80,000 80,000 - TOTAL SOURCES ' 1,474;407_ 4,407_ . , 40,000 1,430,000 _ 150,000 • • •250,000 250,000 250,000_ 250,000 280,000 Wal • mrluga,a 2]2 PW 5-19 1st Draft • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM • Sidewalk Rehabilitation and Replacement Program - Functional Classification: N/A Fund: 317 • Proj.Length:NIA Proj: 122501 Community Planning Area: Citywide TIP No. 20 CONTACT: Bill Wressell 425.430.7400 DESCRIPTION: STATUS: This program provides for the removal and replacement of existing curb and gutter,sidewalks,and curb In 2011,this.program replaced sidewalks at S 4th PI(between Rainier Ave S and Shattuck ramps where such facilities have deteriorated or have been damaged. Ave S)and at the Maplewood Glenn area,including ADA ramps;The 2012 program will , continue work in the Maplewood Glen Neighborhood. Programmed for 2013 is to continue sidewalk replacement at the Maplewood Glen area,estimated at$170,000. JUSTIFICATION: CHANGES: This program will address deficiencies and provide safe and convenient non-motorized facilities for This ongoing program replaces deteriorated and damaged sidewalks as funds become pedestrians in neighborhoods with damaged or deteriorated curb and gutter,sidewalks,and curb ramps. available.The program Is scaleable funding availability. • There are some places where curb ramps do not exist or are not to current ADA Standards. - • 1 Funded:I 939,5031 Unfunded:1 929,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 10,338 10,338 Preliminary Engineering 49,142- 44,142 5,000 5,000 R-O-W(Includes Admin) Construction 1,766,938 166,938 200,000 1,400,000 150,000 250,000 250,000 250,000 250,000 250,000 Construction Services 42,085 17,085 • 10,000 15,000 15,000 Post Construction Services TOTAL EXPENSES 1,868,503 238,503 210,000 1,420,000 170,000 250,000 250,000 • 250,000 250,000 250;000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 741,000 200,000 50,000 491,000 170,000 100,000 40,000 40,000 101,000 40,000 Proposed Fund Balance • 198,503 38,503 160,000 Grants In-Hand(1) . Grants In-Hand(2) Mitigation In-Hand Other In-Hand(1) - .' Other In-Hand(2) Undetermined 929,000 929,000 150,000 210,000 210,000 149,000 210,000 TOTAL SOURCES 1,868,503 238,503 210,000 1,420,000 170,000 250,000 250,000 250,000 •250,000 f 250,000 Mow&Rehab ON20012 232 PM 5-20 1st Draft CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM NE 31st Street Culvert Repair Functional Classification:N/A Fund: 317 Proj.Length: N/A Proj: 120026 Community Planning Area: N/A - TIP No. 21 CONTACT: Derek Akesson 425.430.7337 DESCRIPTION: STATUS: The 2009 flooding on May Creek caused damage to NE 31st St. Settlement of the asphalt roadway This project was awarded a FEMA grant in the amount of$$101,961,State share of above an existing culvert occured after the high creek flows. Evidence of piping has occurred above the $16,993,and City share of$16,994 for repair to the existing culvert. culvert during the high flows that came close to the top of the culvert pipe. The gablon headwall Is • starting to-collapse,which may cause the culvert to completely fall. The existing gabion headwall and culvert pipe need to be replaced. JUSTIFICATION: CHANGES: NE 31st St is the only public access to six homes. Failure of the culvert will result in elimination of general and emergency access,thus the importance of the repair. • }Funded: 1140,997 (Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016. 2017 2018 EXPENSES: Planning • Preliminary Engineering 10,997 10,997 R-O-W(includes Admin) _ Construction 110,000 110,000 Construction Services 20,000 20,000 • Post Construction Services TOTAL EXPENSES 140,997 10,997 130,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee Proposed Fund Balance 22,043 10,997 11,046 Grants In-Hand(FEMA) 101,961 101,961 Grants In-Hand(State share). 16,993 16,993 Mitigation In-Hand Other In-Hand(1) Other in-Hand(2) Undetermined TOTAL SOURCES 1401997 10,997 130,000 • 31tlCulvert DEV202012 232 PM 5-21 1st Draft • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Bridge Inspection & Repair Program Functional Classification: N/A Fund: 317 • Proj.Length: N/A Proj: 120106 Community Planning Area: Citywide TIP No. 22 CONTACT: Derek Akesson. 425.430.7337. DESCRIPTION: STATUS: Inspect all roadway bridges owned by the City every two years to determine bridge sufficiency and load Biennial bridge inspections will occur in 2013.The Monster Road Bridge repairs require-an ratings,seismic retrofit needs. Undertake'minor repairs and preventative maintenance as needed. annual inspection frequency for the next three inspection cycles. JUSTIFICATION: CHANGES: Inspection program must be done for safety and funding purposes and as part of WSBIS Program to Funds shown under construction are for minor repairs to bridge structures. determine structural deficiencies,physical deterioration,or functional obsolescence and to qualify for • federal bridge replacement grant funding. Repair funding Is provided to accomplish improvements, identified through the inspection program,that will increase the safety and extend the longevity of the structures. • IFunded: 1421,956 (Unfunded: 150,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 • 2014 2015 2016 2017 2018 - EXPENSES: Planning 135 • 135 Preliminary Engineering 223,510 53,510 110,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000 R-O-W(Includes Admin) . Construction 118,311 3,311 65,000 50,000 20,000 • 30,000 ' Construction Services 10,000 5,000 5,000 5,000 Post Construction Services/Other 120,000 20,000 • 100,000 • 20,000 35,000 10,000 10,000 10,000 • 15,000 TOTAL EXPENSES 471,956 56,956 200,000 215,000. 55,000• 75,0061 20,000 20,000 '20,000 25,000 • SOURCE OF FUNDS: Vehicle Fuel Tax • Business License Fee 220,000 55,000 165,000 55,000 25,000 20,000 20,000 20,000 25,000 Proposed Fund Balance 201,956 56,956 145,000 Grants In-Hand(FEMA) Grants In-Hand(State Share) • Mitigation In-Hand - Other In-Hand - ---- Other In-Hand Undetermined 50,000 50,000 50,000. TOTAL SOURCES 471,956 56,956 200,000 215,000 55,000 75,000 20,000 20,000 20,000 25,006 Hrldw.1.9.1 OM/2012 532 PN 5-22 1st Draft • 1 • • CITY OF RENTON PUBLIC WORKS . TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Roadway Safety and Guardrail Program Functional Classification: N/A Fund: • 317 ' . • Proj.Length: N/A Proj: 120110 Community Planning Area: Citywide V TIP No. 23 CONTACT: James Wilhoit .425.430.7319 DESCRIPTION: V V STATUS: This program will make miscellaneous guardrail Improvements each year and Improve the safety of the Pre-design of the atenuator on the half-bridge along Maple Valley Road is undergoing: roadside environment. • • JUSTIFICATION: . CHANGES: .. . This program will Implement roadside safety Improvements including barrier systems and hazardous - object removal. • • (Funded: 1152,133 !Unfunded: 125,000 Project Totals . Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 - 2017. 2018 EXPENSES: - Planning _ Preliminary Engineering - 74,133 2,133 50,000 22,000 5,000 5,000 3,000 3,000 3,000 3,000 R-O-W(includes Admin) Construction 90,000 5,000 85,000 v 5,000 30,000 10,000 10,000 10,000 20,000 Construction Services 13,000 13,000 5,000 2,000 2,000 2,000 2,000 Post Construction Services/OtherV TOTAL EXPENSES 177,133 2,133 55,000 120,000 . 10,000 40,000 15,000 15,000 15,000 25,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 105,000 10,000 95,000 10,000 15,000 15,000 15,000 15,000 25,000 Proposed Fund Balance 47,133 2,133 45,000 _ Grants In-Hand(1) • V Grants In-Hand(2) V Mitigation In-Hand Other-In-Hand . - - - Other In-Hand • Grants Proposed ,. Other Proposed - - Undetermined 25,000 25,000 • 25,000 .. TOTAL SOURCES 177,133 2,133 55,000 120,000 _. 10,000 40,000 15,000 15,000 15,000 .25,000 ck."i° oaati20t2 2:32 PM 5-23 1st Draft • • • CITY OF RENTON • PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Intersection Safety& Mobility Program Functional Classification: N/A Fund: 317 • Proj.Length: N/A Proj: 122601 Community Planning Area: N/A TIP No. 24 CONTACT: Chris Barnes 425.430.7220 DESCRIPTION: STATUS: Thisprogram will design and construct traffic signals Identified by the Transportation Systems'Traffic The priorities and schedules for new traffic signals will be set by the Transportation Signal Priority List,including Intersection improvements. Intersections without signalized traffic control Systems'Traffic Signal Priority List. The list is determined by citizen concerns, will be evaluated. Intersection safety,mobility needs,and intersections that meet MUTCD traffic signal warrants. JUSTIFICATION: CHANGES: Historically,on the average,one traffic signal is designed and constructed every two years to meet safety Traffic signals high on the warrant priority list include NE 4th St&Whitman(installation In and mobility needs. This program budgets for projects needed to meet Increasing demand,and the need 2012),SW 41st St&Oakesdaie Ave SW,S Carr Road&Mill Ave S,and SW 34th St& for signalized traffic control. Elements used to prioritize project Intersections may include vehicular Lind Ave SW. approach volumes,accident analysis,signal-warrant analysis,and pedestrian volume. (Funded: 11,415,583 (Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 _ 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning • Preliminary Engineering 171,583 5,583 10,000 156,000 30,000 22,00Q 26,000 26,000 26,000 26,000 R-O-W(Includes Admin) _ Construction 1,123,000 1,123,000 170,000 145,000 202,000 202,000 202,000 202,000 Construction Services 121,000 121,000 18,000 15,000 22,000 22,000 22,000 22,000 Post Construction Services TOTAL EXPENSES 1,415,583 5,583 10,000 1,400,000 218,000 182,000 250,000 , 250,000 250,000 250,000 - SOURCE OF FUNDS: Vehicle Fuel Tax • • Business License Fee 1,310,000 10,000 1,300,000 118,000 182,000 250,000 250,000 250,000 250,00L1 Proposed Fund Balance 5,583 5,583 Grants In-Hand(1) • Grants In-Hand(2) Mitigation In-Hand 100,000 100,000 100,000 • Other In-Hand • Other In-Hand Grants Proposed Other Proposed Undetermined • TOTAL SOURCES 1,415,583 5,583 10,000_ 1,400,000 _ 218,000 182,000 250,000 250,000 . 250,000 250,000 Wen SAM', 07R21Al2 • 1113AM 5-24 1st Draft 5 •A • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Traffic Safety Program Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122115 Community Planning Area: Citywide TIP No. 25 CONTACT: Dave Whitmarsh 425.430.7423 DESCRIPTION: • STATUS: - This ongoing yearly program provides for special small-scale traffic safety Improvements that are Uninterruptable power supply/battery backup systems(UPS/BBS)project is approximatelly identified and require materials,labor or equipment beyond the normal scope of City operations and 20%completed. Program goal is to install UPS at three critical intersections per year(all maintenance crews.This program includes providing materials for railroad crossing upgrades and years),pending sufficient funding. LED Replacement Program is part of the Intelligent converting school zone signs to electronic operation. Transportation System(ITS)Program. JUSTIFICATION: CHANGES: Historically,this level of traffic safety Improvements are required on an annual basis. This program The City was awarded a Safety grant for a pedestrian hybrid beacon(HAWK signal)at the budgets for safety projects to address these needs. Projects are typically identified through citizen intersection of Duvall Ave NE and NE 12th St and pedestrian countdown signals at 20 concerns,analysis of accident records or observation by City Traffic Operations and Maintenance Intersections.The grant amount is for$300,000 and no match is required. • personnel. The Traffic Operations Section identifies and prioritizes locations. (Funded: 1821,029 (Unfunded: 14,000 Project Totals Programmed Pre-2013 Six-Year Program -- ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning Preliminary Engineering 95,758 18,758 10,000 67,000 44,500 4,500 4,500 4,500 4,500 4,500 R-O-W(includes Admin) Construction 666,272 176,272 80,000 410,000 .;247,500 32,500 32,500 32,500 32,500 32,500 Construction Services 63,000 10,000 53,000 38,000 3,000 3,000 3,000 3,000 3,000 Post Construction Services TOTAL EXPENSES 825,029 195,029 100,000 530,000 330,000 40,000 40,000 40,000 40,000 40,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 268,629 22,629 20,000 226,000 30,000 36,000 40,000 40,000 40,000 40,0001 Proposed Fund Balance 80,000 80,000 Grants In-Hand(WSDOT+Safety) 445,000 145,000 • 300,000 300,000 Grants In-Hand(WTSC) 27,400 27,400 Mitigation In-Hand Other In-Hand(1) Other In-Hand(2) Undetermined 4,000 4,000 4,000 TOTAL SOURCES 825,029 195,029 100,000 530,000 330,000 40,000 40,000 40,000 40,000 40,000 &dry OyN212012 a:11 AM 5-25 1st Draft • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Preservation of Traffic Operation Devices Program Functional Classification:N/A Fund: 317 Proj.Length:N/A Prbj: 122904 Community Planning Area: Citywide TIP No. 26 CONTACT: Dave Whitmarsh 425.430.7423 DESCRIPTION: STATUS: Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve Ongoing yearly program.Replacement of traffic signal detection loops,traffic signs,traffic proper installation and assure reliability. This program also provides for the replacement and/or signal,street lighting poles and pavement markings is dependent upon yearly Inspections. relocation of signs that are obsolete,faded,poorly located or no longer appropriate,and replacement of damaged luminaire and signal poles.These poles have been damaged in unknown Incidents where reimbursement through normal channels Is Impossible. JUSTIFICATION: CHANGES: Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed for the intersection controllers and ACTRA signal coordination system to operate effectively. The detection loops In the pavement must be properly maintained;their failure results In highly inefficient , operation. Pavement deterioriation due to heavy traffic volumes,trucks,and adverse weather has Increased the need for replacement. . • 'Funded: 1520,391 (Unfunded: Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent In 2011 2012 Total 20132014 .2015 2016 2017 2018 EXPENSES: - _ Planning Preliminary Engineering R-O-W(includes Admin) Construction - 520,391 86,391 62,000 372,000 62,000 62,000 62,000 62,000 62,000 62,000 Construction Services . - Post Construction Services TOTAL.EXPENSES 520,391 86,391 62,000 372,000 62,000 62,000 62,000 62,000 62,000 62,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 496,000 62,000 62,000 372,000 62,000 62,000 62,000 62,000 62,000 . 62,000 Proposed Fund Balance 24,391 24,391 Grants In-Hand(1) Grants In-Hand(2) - Mitigation In-Hand Other In-Hand(1) - Other In-Hand(2) Undetermined - TOTAL SOURCES 520,391 86,391 62,000 372,000 62,000 62,000 62,000 62,000 62,000 62,000 Donation 06/201¢017 sure 5-26 1st Draft 1 Y i CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Intelligent Transportation Systems (ITS)Program Functional Classification: N/A Fund: 317 ' Proj.Length: N/A Proj: 122162 Community Planning Area: NIA TIP No. 27 CONTACT: Chris Barnes 425.430.7220 DESCRIPTION: - STATUS: Provides for improvements to the operational efficiency of the roadway system,including development ' Upgrading of all signal controllers to be compatible with the new central system has been and implementation of signal coordination programs,signing and channelization improvements, completed. - surveillance control and driver Information system(SC&DI),transit signal priority,Intelligent Traffic _ Systems(ITS)Master Plan,signal improvements such as protective/permissive phasing and LED signal indications upgrade. JUSTIFICATION: CHANGES: improving the capacity and efficiency of the existing roadway system is a very cost effective element of the transportation program. (Funded: 1343,809 !Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning Preliminary Engineering 33,000 3,000 30,000 5,000 5,000 5,000 5,000 5,000 5,000 R-O-W(Includes Admin) - • Construction 276,809 43,809 113,000 120,000 20,000 20,000 20,000 20,000 20,000 20,000 Construction Services 34,000 4,000 30,000 5,000 5,000 5,000 5,000 5,000 5,000 Post Construction Services/Other , TOTAL EXPENSES 343,809 43,809 120,000 180,000 30,000 30,000 30,000 30,000 30,000 30,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 273,809 43,809 50,000 180,000 30,000 30,000 30,000 30,000 30,000 30,000 Proposed Fund Balance 70,000 70,000 Grants In-Hand(1) Grants in-Hand(2) Mitigation In-Hand Other In-Hand(1) _ Other In-Hand(2) _ _ Undetermined _ TOTAL SOURCES - 343,809 43,809 120,000 180,000 30,000 30,000 30,000 30,000 30,000 30,000 66 00/7112012 232 PN 5-27 1st Draft • CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Transit Program Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122706 Community Planning Area: N/A .. TIP No. 28 CONTACT: Dan Hasty 425.430.7217 DESCRIPTION: • STATUS: This program funds planning activities for short and long-range transit services and facilities,Including Staff continues to attend regional coordination meetings with transit agencies,monitor park-and-ride lots,bus shelters,and arterial high occupancy vehicle(HOV)lanes required to facilitate service and capital facility improvements'within Renton,pursue and advocate for better- transit speed and reliability. This program also supports staffing to coordinate with transit agencies, timed arrivals and departures at major Renton transit facilities.Coordinates with King serve as a liaison to the transit-using community,and advocate for service implementation to serve County Metro the implementation of the Rapid Transit Ride. business needs. f JUSTIFICATION: CHANGES: Transit Improvements are a vital component of the transportation system's ability to absorb future traffic demand and meet level-of-service standards. The City and private developers have invested millions of dollars In capital improvements in support of transit-oriented development and services. Transit will be one key In meeting the goals of the downtown area as well as development In other parts of the City. Coordination with Metro and Sound Transit projects and programs will.help leverage these funds and increase benefits to Renton. (Funded: 1207,417 'Unfunded: 1 Project Totals Programmed Pre-2013Six-Year Program • ITEM Programmed Spent in 2011 " 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: • Planning 207,417 • 17,417 10,000 180,000 25,000 25,000 25,000 25,000 40,000 40,000 Preliminary Engineering R-O-W(Includes Admin) Construction Construction Services • Post Construction Services TOTAL EXPENSES 207,417 17,417 10,000 180,000 25,000 25,000 25,000 25,000 • 40,000 40,000 SOURCE OF FUNDS: - Vehicle Fuel Tax • Business License Fee 207,417 17,417 10,000 180,000 • 25,000 25,000 25,000 25,000 '40,000 40,000 Proposed Fund Balance Grants In-Hand(1) Grants In Hand(1) Mitigation In-Hand Other In-Hand(1) Other In-Hand(2) --- Undetermined TOTAL SOURCES 207,417 17,417 10,000 180,000 25,000 • 25,000 •25,000 25,000 40,000 40,000 • 'WW1 08'20/2012 532 PM 5-28 1st Draft t g CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Transportation Demand Management(TDM) Program Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122135 Community Planning Area: N/A TIP No. 29 CONTACT: Dan Hasty 425.430.7217 DESCRIPTION: STATUS: Renton's TDM program Implements the State's Commute Trip Reduction(CTR)Act by encouraging a It is expected that technical assistance to employers for the Citywide program will continue reduction in the use of single occupancy vehicles(SOV). The City has two CTR programs:1)The at current levels in future years(provided State funds in support of this program continue). Citywide program,and 2)the City Hall CTR program(see note below). The TIP funds the Citywide CTR Renton receives a State allotment every two years to help fund the Citywide CTR program. _ Program and offers technical assistance to Renton businesses affected by the Act. The actual amount is determined by the number of CTR-affected worksites. The City is r also pursuing opportunities for additional funding via a Growth and Transportation • Efficiency Center(GTEC)program. JUSTIFICATION: CHANGES: The City is required by 1991 State Legislation to develop and implement a CTR program. This law applies to areas of the State with continuing air quality problems. TDM is an important element in achieving desired transportation,environmental,and land use goals. Note: Renton City Hall is an affected CTR site and must Implement Its own CTR program for City employees. It is funded outside of - the TIP program. (Funded: 1359,892 lUnfunded: I Project Totals Programmed Pre-2013, Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 359,892 46,892 43,000 270,000 45,000 45,000 45,000 45,000 45,000 45,000 Preliminary Engineering R-O-W(includes Admin) Construction - Construction Services - - Post Construction Services TOTAL.EXPENSES 359,892 - 46,892 43,000 270,000 45,000 45,000 45,000 45,000 45,000 45,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 32,364 2,364 30,000 5,000 5,000 5,000 5,000 5,000 5,005 Proposed -- Proposed Fund Balance Grants In-Hand(1) - Grants In-Hand(2) Mitigation In-Hand • Other In-Hand(CTR allot.) 327,528 46,892 40,636 240,000_ 40,000 40,000 40,000 40,000 40,000 40,000 Other In-Hand(2) Undetermined - - TOTAL SOURCES 359,892 46,892 43,000 270,000 45,000 45,000 45,000 45,000 45,000 45,000 TOM - OI3120'2012 222 PM 5-29 1st Draft CITY OF RENTON . PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Bicycle Route Development Program Functional Classification: N/A Fund: ' 317 Proj.Length: N/A Proj: 122173 Community Planning Area: Citywide TIP No. 30 CONTACT: Den Hasty 425.430.7217 _ DESCRIPTION: STATUS: Partner with other City departments to further develop the City's non-motorized facilities. Sign bicycle The City was awarded a$100,000 Federal Enhancement Grant to develop and produce a routes along preferred corridors. Construct missing links in the bicycle route system. Construct site- map that Identified a bicycle network with connections leading into and out of the City of specific improvements. Upgrade routes as needed to safely accommodate bicycle traffic. Publicize the Renton. The product of this project,the Trails and Bicycle Master Plan was adopted in ._ Renton bicycle network and educate citizens about safe bicycling. Provides funding to match grant May 2009,and distribution of the Bicycle Guide Map started in the summer of 2009. requests for bicycle planning and construction improvements. . JUSTIFICATION: CHANGES: This program will complete an integrated system of bicycle routes and trails and upgrade streets to better The Bicycle Route Program Is coordinating with the Street Overlay Program manager to accommodate bicycles. There is a strong demand for better developed non-motorized facilities in identify opportunities for developing,repairing,or enhancing bicycle facilities within.the: Renton. City as the overlay repairs are made. Additionally,an assessment of signage needs and upgraded pavement markings is ongoing. Planning cost estimates and a prioritization list • are underway. (Funded: 1242,590 (Unfunded: 1160,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011• 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 22,389 7,389 5,000 10,000_ 10,000 Preliminary Engineering 55,000 55,000 11,000 11,000 11,000 11,000 11,000 R-O-W(Includes Admin) _ Construction 300,201. 201 300,000 20,000 54,000 54,000 54,000 54,000 64,000 Construction Services 25,000 • 25,000 , 5,000 5,000 5,000 5,000 5,000 Post Construction Services TOTAL EXPENSES 402,590 7,590 5,000 390,000 30,000 70,000 70,000 . 70,000 70,000 60,000 SOURCE OF FUNDS: Vehicle Fuel Tax • Business License Fee 235,000 5,000 230,000 30,000 30,000 40,000 40,000 40,000 50,000 Proposed Fund Balance 7,590 7,590 Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand • Other In-Hand(1) • Other in-Hand(2) Undetermined 160,000 160,000 40,000 30,000 30,000 30,000 30,000 TOTAL SOURCES 402,590_ 7,590 5,000 390,000 30,000 70,000 70,000 70,000 70,000 80,000 Eke Paula 06/207012 2:32 PM 5-30 1st Draft • • F. o, CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Barrier-Free Transition Plan Implementation Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122705 Community Planning Area: Citywide • - TIP No. 31 CONTACT: James Wilholt 425.430.7319 DESCRIPTION: STATUS: This program implements projects that support the City's effort to transition pedestrian facilities within the An annual project list will be developed based upon sites identified in the Transition Plan right-of-way Into conformity with provisions contained in the Americans with Disabilities Act(ADA) section of the City of Renton Comprehensive Citywide Sidewalk Study. This"project"will Guidelines. This program provides funding for designing and building features on an"as needed"basis have a target budget of$25,000. The remaining will be set aside to respond to requests to in response to individual requests to improve access for individuals with special needs. address barriers to movement for individuals with special needs. • JUSTIFICATION: CHANGES: _ A programatic approach is required to ensure compliance with federal law. • I Funded:I 278.5601 Unfunded:1 54,000 Project Totals Programmed Pre-2013 • Six Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 81,856 1,856 5,000 75,000 10,000 13,000 13,000 13,000 13,000 13,000 Preliminary Engineering _ 704 704 R-O-W(includes Admin) Construction- 240,000 45,000 - 195,000 20,000 35,000 35,000 35,000 35,000 35,000 Construction Services 10,000 10,000 2,000 2,000 2,000 2,000 2,000 Post Construction Services ' TOTAL EXPENSES 332,560 2,560 50,000 280,000 30,000 50,000 50,000 50,000 50,000 50,000 SOURCES OF FUNDS: Vehicle Fuel Tax - Business License Fee 241,000 15,000 226,000 - . 30,000 30,000 25,000 50,000 50,000 - 41,000 Proposed Fund Balance 37,560 2,560 35,000 _ Grants In-Hand-(1) Grants In-Hand(1) - - Mitigation In-Hand • Other In-Hand(1) - Other In-Hand(2) Undetermined 54,000 54;000 20,000 25000 9,000 TOTAL SOURCES 332,560 2,560 50,000 - 280,000 30,000 - ' 50,000 50,000 50,000 50,000 .50,000 BUA.r Fre. - _ 06l20,2012 2:32 PM • 5-31 1st Draft - - CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 SIX YEAR TIP City Center Community Plan Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122906 Community Planning Area: City Center TIP No. • 32 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: The City Center Community Plan will provide traffic operation and circulation improvements and The scope and cost of the City Center Plan Improvements and strategies has yet to be strategies such as pedestrian enhancement(sidewalks,landscaping,wayfinding,public art)on major determined.Improvements on S 7th.St and Park Ave N extension identified in the City streets,connection improvements to provide multiple circulation routes,evaluation of benefits of one- Center Plan are included in the TIP as separate projects: Funding shown in 2012 is for way streets,"road-diet'and traffic awareness to reduce right-of-way to vehicular traffic and provide City staff to conduct a feasibility study on the conversion of the one way couplets to two- enhanced space for other modes of transportation. way streets. JUSTIFICATION: CHANGES: The City Center Plan Intends to provide better transportation connections for the full range of transportation modes to improve access to and from the City and overall safety within.The City Center Community Plan was adopted by the council on June 6,2011. • IFunded: 150,000 'Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 50,000 50,000 - Preliminary Engineering -- - R-O-W(includes Admin) Construction Construction Services Post Construction Services • TOTAL EXPENSES 50,000 50,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 50,000 50,000 Prop.Fund Bal. Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand Other In-Hand-Metro Mitig. Other in-Hand(2) - Undetermined TOTAL SOURCES 50,000 50,000 Minim P„lci CEMY2012 222 PM 5-32 1st Draft } Y i CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION • 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Project Development& Pre-Design Program Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122150 Community Planning Area: N/A TIP No.. . 33 . CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: Perform critical activities needed for the development of future CIP projects and for grant applications, Ongoing yearly program.This program Includes small studies funding and funds required including scoping,cost estimates,pre-design,interlocal agreements and deficiency analysis. Also to match new grants. provides for the monitoring of active grant projects for compliance with State and Federal laws, • regulations and specifications. • JUSTIFICATION: CHANGES: Analyses of existing and projected transportation operation problems,infrastructure maintenance needs, Funding to this planning program has been reduced to only cover Its internal staff•costs: . local and regional mobility goals and revenues/costs are vital to the development of transportation projects that will best serve the needs of Renton and compete well for grants. Also,to maintain eligibility for grant funding,the City must assure that project specifications and management comply with current State and Federal standards. • IFunded: 1849,244 'Unfunded: 1100,000 Project Totals • Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 699,244 59,244, 100.000 540,000 100,000 85,000 85,000 . 85,000 85,000 100,000 Preliminary Engineering 250,000 250,000 50,000 50,000 50,000 50,000 50,000 R-O-W(Includes Admin) Construction Construction Services Post Construction Services • TOTAL EXPENSES 949,244 59,244 100,000 790,000 •100,000 135,000 135,000 135,000 135,000 - 150,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 809,244 59,244 60,000 690,000 100,000 115,000 115,000 115,000 115,000 130,000 Proposed Fund Balance 40,000 40,000 - _ Grants In-Hand(1) • Grants in-Hand(2) . Mitigation in-Hand Other In-Hand _ Other In-Hand(2) Undetermined 100,000 100,000 20,000 20,000 20,000 20,000 20,000 TOTAL SOURCES 949,244 59,244 100,000 790,000 100,000 . 135,000 135,000 .. 135,000 135,000 150,000 n._D _ 0et21Y2012 2a2PM 5-33 1st Draft CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Arterial Circulation Program Functional Classification: N/A Fund: 317 Proj.Length:N/A Proj: 120029 Community Planning Area: N/A TIP No: 34 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: This program provides for the short and long-range planning and traffic analyses required to evaluate This project will fund the ongoing planning work which will lead to refinement and/or and update the Transportation Element in relation to the Comprehensive Land Use Plan to assess the adjustment of the of Improvement projects on the arterial network identified in the impacts of new development proposals,and to recommend local and regional transportation system Transportation Element.Renton's Street Development Guidelineswillbe developed under improvements for all modes of travel. Funding for hardware,software and employee hours required to this program. operate the computer model is also included under this program. JUSTIFICATION: CHANGES: Combined State and Federal Clean Air legislation,the Growth Management Act,and the increasing importance of making sure that local and regional transportation plans are coordinated to the benefit of Renton make ongoing multi-modal planning a high priority need. 'Funded: 11,188,684 'Unfunded: 1315,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent In 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: Planning 1,503,684 93,684 100,000 1,310,000 .120,000 235,000 235,000 235,000 235,000 250,000 Preliminary Engineering R-O-W(includes Admin) - - Construction - Construction Services Post Construction Services TOTAL EXPENSES 1,503,684 93,684 100,000 1,310,000 ' 120,000 235,000 235,000 235,000 235,000 250,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 1,178,684 93,684 90,000 995,000 120,000 120,000 185,000 185,000 185,000 200,000 Proposed Fund Balance 10,000 . 10,000 Grants In-Hand(1) - Grants In-Hand(2) Mitigation In-Hand - Other In-Hand(1) Other In-Hand(2) - Undetermined 315,000 315,000 115,000 50,000 50,000 50,000+ 50,000 TOTAL SOURCES 1,503,684 93,684 100,000 1,310,000 120,000 235,000 235,000 235,000 235,000 250,000• Alt vhl aO06126^2012 202 PM 5-34 1st Draft • • • CITY OF RENTON PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION , 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Transportation Concurrency/LOS Program Functional Classification: N/A Fund: 317 • Proj.Length: N/A Proj: 122107 Community Planning Area: N/A -. • TIP No. 35 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: The City created a Transportation Mitigation Fee as part of the Growth Management Act(GMA) Ongoing yearly program.The City is completed a rate analysis of the transportation Comprehensive Plan's Transportation Concurrency requirements to provide funds for transportation mitigation fees.Mitigation fees may be revised to increased gradually over a three-year improvements necessary to support new development. This program supports the planning effort to period,starting in 2015,and be compatible with the City's 20-year Transportation Plan. determine appropriate mitigation fees,to adjust the fee due to transportation plan changes,a funding - source and to monitor the funds collected. • • JUSTIFICATION: CHANGES: ' Management of the transportation concurrency and mitigation programs is an integral part of planning transportation improvements,ensuring that new development pays a fair share of the cost,and in maintaining a level of service required under GMA to allow new development to be approved and take place. (Funded: 1194,729 'Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program ITEM • Programmed Spent in 2011 2012 Total 2013 2014 20152016 2017 2018 EXPENSES: Planning 194,729 24,729 10,000 160,000 10,000 30,000 30,000 30,000 • 30,000 30,000 Preliminary Engineering _ R-O-W(includes Admin) Construction . Construction Services Post Construction Services TOTAL EXPENSES 194,729 24,729 10,000 160,000 10,000 30,000 30,000 30,000 30,000 30,000 SOURCE OF FUNDS: Vehicle Fuel Tax • - Business License.Fee 180,000 10,000 10,000 160,000 10,000 30,000 30,000 30,000 30,000 30,000 Proposed Fund Balance 14,729 14,729 Grants In-Hand-(1) Grants In-Hand(2) Mitigation In-Hand - Other In-Hand(1) Other In-Hand(2) Undetermined , . TOTAL SOURCES - 194,729 24,729 10,000 160,000 10,000 30,000 30,000 . 30,000 30,000 Cancunne7 oIz 232 PM 5-35 1st Draft • CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION'IMPROVEMENT PROGRAM Environmental Monitoring Program Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122187 Community Planning Area: N/A TIP No. 36 CONTACT: James Wilhoit 425.430.7319 DESCRIPTION: STATUS: Monitoring of wetland mitigation Installed as an environmental requirement for a project and to perform biological assessments as required by the Endangered Species Act. JUSTIFICATION: CHANGES: Monitoring ensures that the wetland vegetation installed is properly established. Creates an account to Attempts to get early acceptance for the Oakesdaie Ave SW Phase 1 site were successful. pay for unscheduled project environmental assessments. The Army Corps of Engineers has allowed the City to reduce the monitoring requirements to match the site's success. IFun ded: 142,722 (Unfunded: I Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent In 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: . Planning Preliminary Engineering 1,141 1,141 R-O-W(includes Admin) Construction - 21,580 21,580 Construction Services 20,000 20,000 20,000 Post Construction Services TOTAL EXPENSES 42,722 22,722 20,000 . 20,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 40,000 20,000 20,000 20,000 - Proposed Fund Balance 2,722 2,722 Grants In-Hand(1) Grants In-Hand(2) MItIg_ation In-Hand Other In-Hand(1) Other In-Hand(2) Undetermined TOTAL SOURCES 42,722 22,722 20,000_- . 20,000 ,06/21Y2012 2 32 PM 5-36 1st Draft • r CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM WSDOT Coordination Program Functional Classification: N/A Fund: 317 Proj.Length:N/A Proj: 122146 Community Planning Area: N/A TIP No. 37 CONTACT: Keith Woolley 425.430.7318 DESCRIPTION: - STATUS: Provide pre-design,design and construction coordination for WSDOT projects within or adjacent to Ongoing yearly program. Staff coordination on grant-funded projects. Staff coordination Renton to assure that those projects provide the maximum benefits and minimum problems for Renton's on the 1-405 Corridor Improvements is included in 1-405 Improvements in Renton." transportation system. WSDOT agreements contributed towards a portion of City's staff time.1-405 Stage 11 project has been completed In 2011. 3 JUSTIFICATION: CHANGES: WSDOT projects can have slgnflcant Impacts within the City. The 1-405/1-5 to SR 169 Widening Project is now broken into two stages.Coordination with the 1-405 project team will have minimal activity until future phases of 1-405 are funded. (Funded: 1202,703 lUnfunded: Project Totals Programmed Pre-2013 - Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: - Planning 202,703 22,703 10,000 170,000 10,000 30,000 30,000 30,000 30,000 40,000 Preliminary Engineering R-O-W(includes Admin) Construction Construction Services Post Construction Services TOTAL EXPENSES 202,703 22,703 10,000 170,000 10,000 30,000 30,000 30,000 30,000 40,000 ' SOURCE OF FUNDS: Vehicle Fuel Tax ' Business License Fee 200,000 20,000 10,000 170,000 10,000 30,000 30,000 30,000 30,000 40,000 - Proposed Fund Balance 2,703 2,703 - Grants In-Hand(1) Grants In-Hand(2) • _ - Mitigation In-Hand Other In-Hand(1) • Other In-Hand(2) Undetermined • TOTAL SOURCES 202,703 22,703 10,000 170,000 10,000 30,000 30,000 30,000 30,000 40,000 • WSDOT 01V202O12 2.32PM 5-37 1st Draft ' r CITY OF RENTON • PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION 2013-2018 SIX YEAR.TIP • Geographic Information System-Transportation Data Development Functional Classification: N/A Fund: 317 Proj.Length: N/A Proj: 122206 Community Planning Area: N/A TIP No. 38 CONTACT: Dam Hasty 425.430.7217 . DESCRIPTION: STATUS: Collect,analyze,and edit transportation geographic data. The Transportation Systems Division is coordinating with the GIS section of Information Technology to develop GIS data and participates in training opportunities and user's group meetings. • JUSTIFICATION: CHANGES: • The Transportation Systems Division GIS technology,data,and applications support the City's business needs. (Funded: 1146,482 (Unfunded: I • Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 • 2014 2015 2016 2017 2018 EXPENSES: • Planning 146,482 6,482 50,000 . 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Preliminary Engineering R-O-W(includes Admin) Construction Construction Services . Post Construction Services - TOTAL EXPENSES 146,482 6,482 50,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 SOURCE OF FUNDS: Vehicle Fuel Tax • Business License Fee 105,000 5,000 10,000 90,000 15,000 • 15,000 15,000 15,000 15,000 15,000 Proposed Fund Balance 41_,482 1,482 40,000 •Grants In-Hand(1) • • Grants In-Hand(2) Mitigation In-Hand Other In-Hand(1) Other In-Hand(2) Undetermined TOTAL SOURCES 146,482 6,482 50,000 90,000 15,000 15,000 • 15,000 15,000 15,000 15,000 aQ m=2012 232 PM 5-38 1st Draft • • • 4 4 CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013 -2018 TRANSPORTATION IMPROVEMENT PROGRAM 1%for the Arts Program Functional Classification:N/A Fund: 317 Proj.Length:N/A Proj: 122112 Community Planning Area: N/A TIP No. 39 CONTACT: dim Seitz 425.430.7245 DESCRIPTION: STATUS: Funding is tied to the calculated share of-eligible types of transportation projects and transportation - Program Is now based on actual design and construction costs.$60,000 was transferred In funding subject to the City's 1%for the Arts Program. All gateway project proposals under this program 2007 for 1%of 2006 expenditures(amount due:$22,483).Remaining credit($37,517) are subject to approval of the Arts Commission. used for 1%of 2007(amount due:$26,726). Remaining.credit($10,791)used for 1%of 2008(amount due:$32,190). A transfer of$21,399(credit deducted)was made In 2009 for 2008 Capital expenses.$13,261 was transferred in 2010 for 2009 expenditures.No transfer occur In 2011 (2010 capital expenses were offset by grant revenues not received JUSTIFICATION: in 2009). This program transfersfunds to Fund 125,which Is being managed by the Department of Community CHANGES: • and Economic Development. • 'Funded: 1120,000 'Unfunded: 1 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015• 2016 2017 2018 EXPENSES: Planning 120,000• 30,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Preliminary Engineering R-O-W(includes Admin) • Construction - Construction Services Post Construction Services LL TOTAL EXPENSES 120,00030,000 90,000 15,000 15,000 15,000 15,000 15,000 •15,000 SOURCE OF FUNDS: Vehicle Fuel Tax Business License Fee 105,000 15,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Proposed Fund Balance 15,000 15,000 • Grants In-Hand(1) - •• Grants In-Hand(2) • Mitigation In-Hand Other In-Hand(1) Other In-Hand(2) • Undetermined • - TOTAL SOURCES . . 120,000 30,000 90,000 _ 15,000 15,000 15,000 15,000 15,000 • 15,000 171 AM acezoom2 @32 PM 5-39 1st Draft CITY OF RENTON . PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT:PROGRAM Lake Washington Blvd N -Park Ave N to Gene Coulon Memorial Park Functional Classification:Collector Fund: 317 Pro).Length: N/A Proj: 122121 Community Planning Area: City Center TIP No. 40 CONTACT: James Wilhoit 425.430.7319 DESCRIPTION: STATUS: This project Includes road widening,traffic signals,railroad crossings,drainage,curb,gutter and Developer to design and construct,and get credit toward mitigation contribution.The sidewalks. Developer to design and construct,and get credit toward mitigation contribution. developeris completing the project in 3 phases. Project received a Railroad Crossing Safety grant in 2001 for the signal and gates on Lake Washington Blvd. Railroad grade crossing construction complete except for signal start-up requirements. Waiting for developer to continue their construction. JUSTIFICATION: CHANGES: This project will serve the development and access needs to Coulon Park and the Southport ' The costs shown below are for the estimated mitigation credit,per agreement with the Development.Agreement with developer to credit traffic mitigation towards the costs of certain developer.Project awaiting developer's schedule to continue construction.This project will. Improvements. be funded by the development of Southport. • IFunded: 1464,074 lUnfunded: 1560,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: . Planning 24,899 14,899 10,000 10,000 Preliminary Engineering . R-O-W(includes Admin) Construction 914,579 294,579 120,000 500,000 200,000 300,000 Construction Services 68,800 4,800 14,000_ 50,000 20,000 30,000 Post Construction Services 15,796 15,796 TOTAL EXPENSES 1,024,074 330,074 134,000 560,000 230,000 330,000 SOURCE OF FUNDS: _ Vehicle Fuel Tax 14,490 14,490 Business License Fee 2,362 2,362 . Proposed Fund Balance 8,294 8,294 _ Grants In-Hand(1) 180,575 106,575 74,000 Grants in-Hand(2) Mitigation In-Hand 258,353 198,353 60,000 ' Other In-Hand(1) Other In-Hand(2) . • Undetermined 560,000 560,000 230,000 330,000 TOTAL SOURCES 1,024,074 330,074 134,000 560,000 230,000 330,000 u,wA 06/202012 x32 PM 5-40 1st Draft , i p CITY OF RENTON PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT PROGRAM Lind Ave SW-SW 16th St to SW 43rd St Functional Classification:Minor Arterial Fund: 317 Proj.Length: 1.69 miles Proj: 120024 Community Planning Area: Valley TIP No. 41 CONTACT: Bob Mahn 425.430.7322 DESCRIPTION: - STATUS: Widen existing roadway to five lanes where required. Includes new roadway,curbs,sidewalks,drainage, The needs,priorities and schedules for improvements on Lind Ave SW will be determined signals,lighting,signing and channelization. through Arterial Circulation studies. • • • JUSTIFICATION: CHANGES: Increasing traffic demands In the Valley due in part to development will create the need for increasing the capacity of this major north/south arterial. A potential project is a signal installation at the Intersection at • Lind Ave SW.and SW 34th St(currently unsignalized). Additionally,improvements may result from future WSDOT 1-405 plans which include an interchange at Lind Ave SW(currently unfunded). • (Funded: I (Unfunded: 13,500,000 Project Totals Programmed Pre-2013 Six-Year Program • ITEM Programmed Spent Pre-2012 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: - Planning Preliminary Engineering 480,000 480,000 250,000 230,000 R-O-W(includes Admin) • Construction 2,700,000 2,70%000 1,000,000 1,700,000 Construction Services 320,000 320,000 120,000 200,000 Post Construction Services • TOTAL EXPENSES 3,500,000 3,500,000 250,000 1,350,000 . 1,900,000 SOURCE OF FUNDS: _ Vehicle Fuel Tax Business License Fee - Proposed Fund Balance _ Grants In-Hand(1) Grants In-Hand(2) Mitigation In-Hand • • Other in-Hand(1) Other In-Hand(2) Undetermined 3,50%000 3,500,000 250,000 1,350,000 1,900,000 TOTAL SOURCES 3,500,000 ' 3,500,000 _ 250,000 . 1,350,000 1,900,000 tlM .06/2070t2 292 PM • 5-41 1st Draft CITY OF RENTON • PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2013-2018 TRANSPORTATION IMPROVEMENT.PROGRAM Logan Ave N Improvements Functional Classification:Principal Arterial - Fund: 317 Proj.Length:N/A Proj: 122303 Community Planning Area: City Center • TIP No. 42 CONTACT: Jim Seitz 425.430.7245 DESCRIPTION: STATUS: Reconstruction of the roadway pavement,adding a northbound lane from N 6th St to N 8th St, Funding shown in 2012 is for a pavement assessment and evaluation of alternatives. realignment/reconfiguration of the Y intersection at N 3rd St,new curb,gutter and sidewalks,sidewalks Awarded a STP grant in the amount of$951,000 to start design in 2013.Right-of-Way separated from the travel lane by a landscaped buffer on the east side of Logan Ave N,streetlighting, acquisition pending funding. including pedestrian scale illumination,crosswalks,pedestrians ramps per current ADA standards, • channelization,traffic signal pre-emption,stormwater quality and conveyance system. JUSTIFICATION: CHANGES: The condition of the roadway pavement has deteriorated(due to increase in commuter and freight volume)to the extend that total replacement is needed.Included with the Improvements are urban • roadway amenities to Implement"Complete Streets"practice per City code. • [Funded: 11,150,000 (Unfunded: 17,000,000 Project Totals Programmed Pre-2013 Six-Year Program ITEM Programmed Spent in 2011 2012 Total 2013 2014 2015 2016 2017 2018 EXPENSES: - Planning 50,000 50,000 Preliminary Engineering 1,100,000 1,100,000 800,000 300,000 R-O-W(includes Admin) 1,100,000 1,100,000 .800,000 300,000 _ Construction • 5,120,000 5,120,000 3,040,000 2,080,000 Construction Services 780,000 780,000 - 460,000 320,000 - Post Construction Services _ TOTAL EXPENSES 8,150,000 50,000 8,100,000 800,000 1,100,000 3,800,000 2,400,000 SOURCES OF FUNDS: Vehicle Fuel Tax Business License Fee 20,000 20,000 Proposed Fund Balance 30,000 30,000 Grants In-Hand(1) 951,000 951,000 692,000 259,000 Grants In-Hand(1) • Mitigation In-Hand 149,000 149,000 108,000 41,000 Other In-Hand(general fund) Other In-Hand(2) -- Grants Proposed(TIB) - Undetermined 7,000,000 7,000,000 • 800,000 3,800,000 2,400,000 TOTAL TOTAL SOURCES 8,150,000 50,000 8,100,000 800,000 1,100,000 3,800,000 2,400,000 L.9.1 NMI OG/2012012 2:32 I'M 5-42 1st Draft • •r SECTION SIX APPENDIX • Abbreviations & Acronyms 6-1 • TIP Adopting Resolution 6-2 ABBREVIATIONS AND ACRONYMS The following list defines the abbreviated words or acronyms used in the City of Renton's Six-Year Transportation Improvement Plan. ACP Asphalt Concrete Pavement ADA American Disability Act BAT Business Access Transit BNSF Burlington NorthernSantaFe BRAC Bridge Replacement Advisory Committee CBD Central Business District CIP Capital Improvement Program CMAQ Congestion Mitigation and Air Quality CTED Community,Trade and Economic Development CTR . Commute Trip Reduction(State Act) DOE Department of Ecology EB Eastbound ECL East City Limits EDA Economic Development Administration EIS Environmental Impact Study ER Emergency Relief FAS Federal Aid Secondary Program FAUS Federal Aid Urban System FHWA Federal Highway Administration FMSIB Freight Mobility Strategic Investment Board GIS Geographic Information System GMA Growth Management Act HCT High Capacity Transit HES Federal Aid Hazard Elimination and Safety Program . HOV High Occupancy Vehicles I/C Interchange ISTEA Intermodal Surface Transportation Efficiency Act(Federal Highway Bill) TTS Intelligent Transportation System NHS Intelligent Vehicle Highway Systems LF Linear Feet LID Local Improvement District LOS Level of Service METRO Municipality of Metropolitan Seattle MOU Memorandum of Understanding MUTCD Manual on Uniform Traffic Control Devices , NCL North City Limits NB Northbound PMS Pavement Management System Precon Preconstruction Engineering/Administration(design phase of project) PS&E Plans,Specifications, and Estimates 6- 1 • • ROW Right-of-way RTA • Regional Transit Authority RTID Regional Transportation Investment District RUSH Renton Urban Shuttle SB Southbound SC&DI Surveillance Control and Driver Information SCATBd South County Area Transportation Board. SCL South City Limits- • SMA Structural Matrix Asphalt SOV Single Occupant Vehicle ST Sound Transit STP Surface Transportation Program TDM Transportation Demand Management Program • TEA-21 Transportation Efficiency Act T1B Transportation Improvement Board TIP Transportation Improvement Plan TOD Transit Oriented Development TPA Transportation Partnership Act UPRR Union Pacific Railroad •UPS Uninterruptible Power Supple VHS Vehicle Highway System VMS Vehicle Master System • WB Westbound • WCL West City Limits WSBIS Washington State Bridge Inventory System WSDOT Washington State Department of Transportation • • • • • H:\Divisions\TRANSPOR.TAT1PLANNINGVuliuna\TIPL20 f 3WublishlACRONYMS.DOC • • Cit of Renton • • - ',:1,;,,Lns , __ -v • .. h1 ?IIEArterial Streets :. -�: ▪ _ 2r I• 7-C i Designation :. r I �" ...:...,:, 4 • PRINC(PALARTERI,4L • ./ —11;1 9 ;�., h. : -9-,;!J. -:f,, j \ s. ._, MINOR ARTERIAL ,. '�+ COLLECTOR STREET --'f -_ - • 1I i_�.`.—_. i ..L.1 •;_r_`�S' �.,-,,� .,.si lit ,--:-.:•i,• ' tom.. -7J'-' _ ,.__ •rte 7 PROPOSED .f/f, =-=-L-:.:'' <'�.1:-.{I'.S a-'-�.1•,-+_�_ _L 4 '`'F ,' . ..-1'. `'��k- _ ''_ °�1 '� RENTON CRY LIMITS ,, /= 1 •-1 4,0,..... 7{ :;-^ i-_- . .�� _ 'I7.4 , MI p`i't ».i r a „,17Z:1,1-::.:1\'-,!:)1 <r 4 `,7 1:L Imo., _ __- --=n'T% -” 'f✓ .•., -„,,-,<, ''\ 'i. i'i'i! / N' j..--..-?. F"'_' •1 •iV J'!< -`j.,.Y•E tt•� I .',-.i . .4_ __ - P .EI' - r> \.^`�;- _ .'a ct,'�`). �' ',:.-.:!Al'' i r� 'r�' t'` _+ �_ .. •S moi. ,4,.-1.'-o-• �• ,' _ 1 : ��. ra —f`-`nsl;'{ ,1 ▪ T ,'`t. --,:-.;-.4___"7--- f•/: ----.,---._ Elk • �.._i. _ -Com' �S_Y'_. C '1'•t I -t'c.. ,- '`s"L 1: ---.L•••"7 t ,�.y`▪ - . `1 i•17 -i 'ii 1r{. I Y 1 - - . ty, - j�r"�'�om,-:-- it 4�;i _ =,: -:F 4 TT--,A.---- :- -- ?F:. • ..r�.1r_ _ `4_..`>`:_-- —_„_._ -r '1_ _ .�Y_. , •1 .��, 13 - �,-F.�"„... i I,'-^l•` f 1' . ' 1 Lc II•_ _ ..—.-_� Y pI,,,, Tr.-:'y i. y Ping{ �I„`'_ '. _ —� `tK i...H: 1Vi4�. I:,,'f'r•; .41 i ,� .r ._.._zl fr^ _ .' f. 1 -i �Lir� V{• SII_ f t� '�`; i� L `� „ ---;---,1” I_ 'c� ,..,-.,...::;;-::...-,), .:.,•-.... ▪ t• - I,' -moi: L _. • � {{ - '� „ . lr .• .. ••I`l _._ yr,...i'1 ,f <.{” ?,j t:..,W. 11 =� _ ,te F.. , I '..:_.3`P-,_+ , Y •'------- .i'F i{ _`7' ��' t ' r....�r `wi.. .- �' ' ; _ E ry, • i"- ,L I-• `�,1�','1_..'i._-. _t_- R. 1 Y��:.;-•+ r w�,T.'-.•%w..,.....?� ',i. • 1 % h _z �_ -,2•-•-,7•4-..---....-.4 i ', _. ( • L.1 @iii-- --� •ye,e::.:�4. �p'"..Ic:'5:.. o f _R. -�. r ••.ej. -.,...:---",r`,; 1J~ �` `4',, ' _ . _ R', - =�•-L. R=�, - '.afir.i. II _v'iw( +nj4:.zgrti, is - —11:--d :( ? _ .. ,•'y`, ----,--- s.:::'•:.:, - h ^-• '� .:u.».c..•a,'.' .c,ww is 1 ' _� .- _ �- D ;a.TS 0.5 ].Mees. I', I' II•/•.. 1 ' `f a i .r i=�'- ` _ I; '-',..“,.,:al, • - o.dc Proposed 2012ArterialStreets TMam....►•v4r�wr..,++1wmw•,..a Exhibit C `.'.;.....w '�r°4""..." Printed on:06120/2012 - a ^* p city of i , aj .I.. ea..:;ssr ......,.s 11' City of Renton - �F�-11 ,i - - ;-yl Arterial Streets .. "f' ,: ..,,,........,-_-_,,......4.„:„,,,,.., RE-..,.:-.-..„.,..,....-..-.-.. �� - Designation r' ..i 1 j' .. ` 'moi,i' ,(, i <....-Ti:1.,. �._t,,,`n.... a. •��`�":'' I PRINCIPALARTERIALt - - �` ' +M ,- • MINOR ARTERIAL 1 •":[-. 4'i , "-I: '1 j _-;,T'"�'tr :''t __\. 'tti` COLLECTOR STREET j L-I -t`,,-.ii �I.-' `:.. . ! - _ --- PROPOSED ''i„.k :!r hi' ,:-C.,:'��..-` .,7,,,....-k. ' --.Z?T RENTON CITY LIMITS -''<",( LII�g —1 ','1, -3i_, H`�:--, 'rV, - i i. t._.,. "5":',--.4"?` Y 'i t�\;''--, y:ii tt P_x -7-. d:=-----ill •t_'-IE._�-_ -� y- `'Cf. -.J,..r: CITY OF RENTON,WASHINGTON • RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2013-2018. WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been amended and modified from time to time as authorized by law;and WHEREAS, the City Council, after recommendation of the Public Works Department, held a public hearing on August 13, 2012, after notice to the public as provided by law for the purpose of considering adoption,modification,and amendments of the plan and program;and WHEREAS,at•the public hearing held on August 13, 2012,due consideration was given to the proposed changes and amendments for the purpose of updating the plan and program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF.RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above findings are true and correct in all respects. • SECTION II. The City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits"A","B"and "C" incorporated herein as if fully set forth. SECTION III. The plan and program, as evidenced by said Exhibits, shall be and constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan", and shall remain in full force and effect until further revised, amended, and modified as provided by law. -1 a _ RESOLUTION NO. SECTION IV. The Administrator of the Public Works Department and the City Clerk are hereby authorized and directed to file this Resolution, together with the Exhibits, with the Director of Highways for the State of Washington and as otherwise provided by law. PASSED BY THE CITY COUNCIL this day of ,2012. Bonnie I.Walton,City Clerk APPROVED BY THE MAYOR this day of ,2012. Denis Law, Mayor Approved as to form: Lawrence J.Warren,City Attorney RES.1563:6/21/11:scr