Loading...
HomeMy WebLinkAboutPlan Review Comments PRE13-001547 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M   DATE: November 18, 2013     TO: Rocale Timmons, Planner     FROM: Jan Illian, Plan Review     SUBJECT: Bill Harrington Highlands Plat 2805 – NE 8th Street PRE13-001547      NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and may be subject to modification and/or concurrence by official city decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal. The following comments are based on the pre-application submittal made to the City of Renton by the applicant. Water 1. Water service is provided by the City of Renton. There is an existing 8-inch water main in NE 8th Street and an existing 8-inch water main in Harrington Ave NE. There is a ¾” water meter serving the existing residence. The site is located in the 565 water pressure zone. 2. System development fee for water is based on the size of the new domestic water meter(s) that will serve the new lot. Fee for ¾-inch or 1-inch water meter install is $2,523.00. Credit will be given to the existing residence. 3. Fee for a ¾-inch or 1-inch water meter installed by the City is $2,870.00. 4. All new construction must have a fire hydrant capable of delivering a minimum of 1,000 gpm and must be located within 300 feet of all structures. Sanitary Sewer Sewer service is provided by the City of Renton. There is a new 8-inch sewer main in NE 8th Street and an 8-inch main Harrington Ave NE. 2. The Sanitary Sewer System Development Charge (SDC) is based on the size of the domestic meter that will serve the new lot. Sewer fees for a ¾” meter or a 1” inch meter is $1,812.00 per new single-family lot. This is payable at the time the utility construction permit is issued. Credit will be given to the existing residence. 5. Short plats shall provide separate side sewer stubs to each building lot. Side sewers shall be a minimum 2% slope. Storm Drainage 1. There are storm drainage improvements in NE 8th Street. 2. A drainage plan and drainage report will be required with the application. The report shall comply with the 2009 King County Surface Water Manual and the 2009 City of Renton Amendments to the KCSWM, Chapter 1 and 2. All core and any special requirements shall be contained in the report. Based on the City’s flow control map, this site falls within the Peak Rate Flow Control Duration Standard, Existing Conditions. The drainage report will need to follow the area specific flow control requirements under Core Requirement #3. This project may be subject to Appendix C Small Site Drainage Review only. 3. A geotechnical report for the site is required. Information on the water table and soil permeability with recommendations of appropriate flow control BMP options with typical designs for the site from the geotechnical engineer shall be submitted with the application. 4. Surface Water System Development fees of $1,120 per new lot. This is payable prior to issuance of the construction permit. Credit will be given to the existing residence. Transportation/Street 1. Existing right of way width in NE 8th Street and Harrington Ave NE is 60 feet. Both streets are classified as residential access streets. To meet the City’s complete street standards for residential access roads, half street improvements including, but not limited to 13 feet of paving from centerline, curb and gutter, an 8 foot planter strip, a 5 foot sidewalk, and storm drainage improvements are required to be constructed in the right of way fronting the site per City code 4-6-060. City code requires street improvements along all frontages. Applicant may submit a letter requesting a modification to the street standards, allowing the existing improvements to remain. 2. Street lighting is not required for a two lot short plat. 3. Corner lots require a minimum radius of 15 feet of dedication. A curb ramp may be required. 4. The current transportation impact fee rate is $717.75 per single family house. The impact fee for this type of land use will increase on January 1, 2014, to $1,430.72 per new single family house. The transportation impact fee that is current at the time of building permit application will be levied. Payment of the transportation impact fee is due at the time of issuance of the building permit. Credit will be given to the existing home. General Comments 1. All construction utility permits for drainage and street improvements will require separate plan submittals. All utility plans shall conform to the Renton Drafting Standards. Plans shall be prepared by a licensed Civil Engineer. When the utility plans are complete, please submit two (2) copies of the drawings, two (2) copies of the drainage report, permit application and an itemized cost of construction estimate and application fee at the counter on the sixth floor. 3. A fee increase is expected January 2014.