Loading...
HomeMy WebLinkAbout1997 TIP (CY. Pe • Six Year Transportation ANT Improvement Program planning/Building/public works Department Transportation systems Division 1997 through 2002 Hearing: 6/17/96 Adopted: 6/17/96 Resolution: 3206 CITY OF RENTON, WASHINGTON RESOLUTION NO. 3254 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY' S SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997-2002 . WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation Improvement Program" pursuant to Chapter 7, Extraordinary Session Laws of the State of Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of its Planning/Building/Public Works Department, caused to be held a public hearing thereon on March 10, 1997, and after notice to the public as provided by law for the purpose of considering amendments of said plan and program; and WHEREAS, at such public hearing held on March 10, 1997, due consideration was given to the proposed changes and amendments for the purpose of updating such plan and program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS : SECTION I. The City' s "Six-Year Transportation Improvement Program" is hereby further amended and modified, all as more particularly shown on the attached Exhibit "A, " incorporated herein as if fully set forth. 1 RESOLUTION NO. 3254 SECTION II . The aforestated plan and program, as evidenced by said Exhibit, shall be and constitute the City' s "Six-Year Transportation Improvement Program" and same to remain in full force and effect until further revised, amended, and modified as provided by law. SECTION III . The Director of the Department of Planning/Building/Public Works and the City Clerk are hereby authorized and directed to file this Resolution, together with the Exhibit, with the Director of Highways for the State of Washington and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 17th day of March , 1997 . fluvloi I ur Brenda A. Fri svold, Deputy City Clerk APPROVED BY THE MAYOR this 17th day of March , 1997 Jesse nner, Mayor Approved as to form: Lawrence J. War , City Attorney RES .574 :2/25/97 :as . 2 CITY OF RENTON • • PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION . 1997-2002 SIX YEAR TIP . I-405/NE 44th Street Multi-Modal Interchange Functional Classification: Fund: Proj.Length: Proj: Type: 1-INFRASTRUCTURE RANK: Al CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Improve the existing interchange to provide for and to facilitate the inclusion of full multi-modal and Elected and non-elected officials at regional,State and Federal levels have endorsed the Port Quendall intermodal improvements in capacity,access and connections. Improvements include new and development and are assisting Renton in its efforts to seek funding for the transportation improvements. To expanded ramps,improved arterial connections and signalization,and direct access ramps for date,applications for some$22 million in grants and direct allocations from State and Federal transportation carpools and transit to the 1-405 HOV lanes. The design will accommodate direct connections by programs have successfully made it through the first stages of consideration and therefore could be regional,subregional and local transit to an adjacent intermodal transit center. approved for funding over the next six-year period. The build-out of Port Quendall and the associated transportation improvements will consist of a number of phases over a period of up to 10 years. Design work on the transportation improvements is well underway. Total cost of the transportation improvements is JUSTIFICATION: estimated at$40 million to$60 million. $30 million is shown programmed over the next six years. The existing interchange will experience severe congestion and safety problems if the surrounding area develops as called for in existing local and regional land use plans. Paul Allen's proposed Port CHANGES: Quendall development provides a one-time opportunity to concentrate and design this development The project being proposed is a revision and significant expansion of a project that was previously in-the TIP, in conjunction with comprehensive and multi-modal transportation improvements of regional but pushed off into later years in the Comprehensive Plan. Revisions are also being made to regional plans significance. which identified a definite need for a direct access HOV interchange between Bellevue and Renton,but did not examine a specific location in detail. Evaluations to date indicate NE 44th Street is the specific location where these interchange improvements should be implemented. . f'7.4" -:Funded`:E'-: = 250;000.{:; 1J,nF..undedt:•ju:~;.;,:29;750;000. Project Totals Programmed Pre-1997 Six Year Program . ,..,.- ,, -, 1;....-;',;.;:-•..:19.9,7-. -, :: ',' is - - .5 e Pre-1998: .1996+Ca over- " ..-.Total:_..:>:�",-: -:.:::;- ',. '1.99,8^�' ..., ITEM. .-�. �.Programmed- P.nS . .. . ..-...rry. a ,: - r EXPENSES: Project Development 0 0 Precon Eng/Admin • 3,000,000 3,000,000 700,000 800,000 700,000 500,000 300,000 R-O-W(includes Admin) 1,000,000 1,000,000 50,000 950,000 Construction Contract Fee 25,000,000 25,000,000 1,000,000 3,000,000 7,000,000 14,000,000 Construction Eng/Admin 1,000,000 1,000,000 40,000 120,000 280,000 560,000 Other 0 0 =.. -, • ';-:50,000,000:::: :- :';,:.•--,',: ,700;000.y , .„:...._ 0 f7,7,:;,-,-L--,17;58%000 .,.,..:- : 00 ;.:_;.r�-.;.-,,>s:;'.-;a0�,`._:==�:;":.5' :;�, :,":0 ` :30 000000:: ;. ;:..-,....700 OOp is''<:'. .`_'_-r°800 000.;=�:�:1,790'000 ':•:::r`�4;570;00 .;4'-!-•-'::-14;490,00D TOTAL EXPENSES>.-. .". ,. - , 30,000, 0 _ . . ,_. ,. _. s.. , � ._. . , ., SOURCES OF FUNDS: 1/2 Cent Gas Tax 0 0 • Business License Fee 0 • 0 _ Vehicle License Fee 0 0 Grants In-Hand 0 0 Mitigation In-Hand 250,000 250,000 250,000 L.I.D.'s Formed 0 0 • Other In-Hand 0 0 0 0 Grants Proposed 10,000,000 10,000,000 800,000 2,000,000 2,009,000 5,191,000 Mitigation Proposed 7,500,000 7,500,000 200,000 550,000 179,000 1,000,000 2,571,000 3,000,000 L.I.D.'s Proposed 0 0 . Other Proposed 10,000,000 10,000,000 250,000 250,000 500,000 1,570,000 3,000,000 4,430,000 Undetermined 2,250,000 2,250,000 2,250,000 ' . TOTALSOURCES>..., -:..:;:.;:30,000,000'°'....::: :.,,;."'E''.,'.-'''':.7r-,0:-:"':.'.',•:•->,'•'`'.._.0.: '30,000;000 `-_..',7::.700;000- :::.::'..°....800,000.'*., ',`..:':1;479;000 :..'.;,''':4;570,000 .:;>'.:';:7,580;000:::,"::14;871;000 SECTION ONE - PURPOSE OF SIX YEAR TIP PROGRAM Mission Statement 1 - 1 Purpose of Six Year TIP 1 - 2 CITY OF RENTON MISSION STATEMENT 0 0 The City of Renton, in partnership with residents, business, and government, is dedicated to: * Providing a healthy atmosphere in which to live and raise families, * growth & economic * Encouraging responsible vitality, * Creating a positive work environment; Resulting in a quality community where people choose to live, work, and play. { SERVICE INTEGRITY 1-1 CI•TY OF RENTON SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM PURPOSE • Mandated by State Law. • Multi-year work/funding plan for development of the arterial street system. • Required for State and Federal funding programs. • Used to coordinate transportation programs with other jurisdictions and agencies. • Meets City of Renton Mission Statement. • Reflects involvement by citizens and elected officials. • Vital Part of Planning Under Growth Management Act. 1-2 SECTION TWO - SIX YEAR TIP MAP TIP Map 2 - 1 Index to TIP Map 2 - 2 h......., SE MN A 517MA f ff A CITY OF RENTON ..A=1,�; ; , dilliAid ,�. : � EXHIBIT A SIX YEAR T.I.P. �Ma" 1 A 1.997 — 2002 IAL. LSIN—n `,'_ C -.m. N l aM7 `_ `, WEEK14 5111)1 .510• Ir 510 * 1 G1�Y O� ++ "®M9e08T IL ' rn 44 A4.. AIR + � 9L 910 910A �sal ` _ o:4 K 9NY r � A 951010 .�jv rt,.../ 0j •> a a �.+�.- 41\ 11_1�c KW r—I icym NS 286 11 ' t;"*"./ * laW lqt ST I . 1 Cir) g'° cil LAKE WASHINGTON 39imisi. - o ,,, -111--4k7-- I Lail 1 th' P1 � \ ..•°- aim i 0 4 _.., 1 lin ,\ _ .,A. r----, rIo IZ am,® Q412 � li , I0. D (Nill x �,o 318V (29) dm. . am' .ii k .- 4101 sr 4 Io tt1It‘ 91 4 4 .g.:7 1,'"''".4)1 II t 3 0 1Z/1(-Sto 1 rilr.: {11R W p IF's ; . _____ . Ft .,..i. 4:4I' °V.' .n J IE SOA No,‘ \i/ 0.„,..r._' ,. „pi' ,,, . ,,, ... ' Et HE' a „,:e4Ef _.,... ) 7.11pfm 0 Nt IiiiEriNguwi/' _ - ''' ” ' IP IS'it) ft ---: ii.-- ,..., ,, /k_ - L ' ..,-,•„--...7.„„„- '„„,:„,,\\*4 C C E E I-e 9 . ? , ' f kf \ OE SrS • 174r,'-/- j „h,„.„.. .,', ,,,i'i;,,q.N.,,_ ''' d' 1\1 i/ :I gavarer, K 144 1r '�. l'7/ i TIP No Project Title * 1 Street Overlay Program 2 Houser Way Relocated -Sunset Connection to N 8th St (Houser Stage II) 3 SR 900 HOV & Houser Connection (Houser Stage III) 4 Downtown Transit Access Program * 5 Walkway Program * 6 Intra-City Intermodal Transportation Program * 7 Transit Program 8 CBD Transportation and Streetscape * 9 Transportation Demand Management Program * 10 Arterial HOV Program * 11 Bridge Inspection & Repair Program 12 Main Ave. S. -S. 5th St.to Bronson Way 13 Monster Road Bridge Replacement 14 SW 16th St- Oakesdale Ave SW to Lind Ave SW * 15 Transit Priority Signal System 16 SR 169 HOV -140th Way SE to SR-900 17 NE 3rd/NE 4th Corridor Transit Improvements 18 Park-Sunset Corridor HOV Improvements 19 Oakesdale Ave SW- SW 27th St to SW 16th St 20 SR 167/SW 27th St HOV * 21 Traffic Signal Loop Replacement Program * 22 Traffic Sign Replacement Program * 23 Light Pole Replacement Program 24 Inter-agency Signal Coordination * 25 Sidewalk Inspection and Replacement Program * 26 Arterial Circulation Program * 27 Project Development& Pre-Design Program * 28 WSDOT Coordination Program 29 Sunset Blvd NE/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways Program * 32 Miscellaneous Traffic Safety Program * 33 Traffic Systems Efficiency Improvements Program 34 N 4th Blvd - Logan Ave N to Sunset Blvd. NE Project Development * 35 TBZ Mitigation Program * 36 Missing Links Program 37 Sunset Blvd. NE Rockery Repair 38 North 8th Street Reconstruction 39 Railroad Crossing Safety Program * 40 Bicycle Route Development Program 41 Windsor Hills Street Rehabilitation Project Development 42 Oakesdale Ave SW- Extension to SR 900 43 SW Grady Way- SR 167 to SR 515 44 Lind Avenue -SW 16th St to SW 43rd St 45 Duvall Ave NE -NE 4th Street to North City Limits Project Development 46 SW 7th St/Li nd Ave SW 47 Benson Rd S/ S 31st St 48 Valley Connections to West EXHIBIT"B" Not shown on Map HEARING: 06/17/96 ADOPTED: 06/17/96 RESOLUTION: 3206 SECTION THREE - DEVELOPMENT AND PRIORITIZATION OF SIX YEAR TIP Development of Prioritization of Six Year TIP 3 - I Infrastructure Projects and Programs 3 - 5 Multi-Modal/TDM Projects and Programs 3 - 5 Neighborhood Protection/Livability Project & Programs 3 - 6 Economic Development Projects and Programs 3 - 6 Operations and Safety Projects and Programs 3 - 7 DEVELOPMENT AND PRIORITIZATION OF THE SIX-YEAR TIP I. General Programming Criteria The yearly update of the Six-Year Transportation Improvement Program (TIP) is part of an on-going process intrinsically linked with the development of the City's Capital Improvement Program. The Six-Year TIP is also linked with various state and federal funding programs, regional/inter-jurisdictional planning and coordination processes and the City's Growth Management Act Comprehensive Land Use Plan. Projects are developed and prioritized based on both specific goals to be achieved by the program and on general programming considerations. Those general programming considerations are: Planning. How, on both a local and regional level, a project fits with or addresses identified future transportation goals, demands and planning processes must be evaluated. This is strongly influenced by ongoing land use decisions and by regional highway and transit system plans. Financing. Many projects are dependent on acquisition of outside grants, formation of LID's or the receipt of mitigation funds. Prioritization has to take into account the peculiarities of each of the various fund sources and the probabilities of when, and how much, money will be available. Scheduling. If a project is interconnected with, or interdependent on, other projects taking place, this is reflected in their relative priorities. Past Commitment. The level of previous commitment made by the City in terms of resources, legislative actions or interlocal agreements also must be taken into consideration in prioritizing TIP projects. In addition to the general considerations discussed above, there are five specific project categories through which the TIP is evaluated and analyzed: They are: 0 Preservation of Existing Infrastructure 0 Multi-Modal and Transportation Demand Management 0 Community Livability and Enhancement 0 Economic Development 0 Operations and Safety These categories provide a useful analysis tool and represent goals developed through an evaluation of the City's transportation program in response to input from citizens and local officials and to State and Federal legislation. Taken as a whole, the five categories provide a framework for evaluating projects both individually and as part of a strategy that seeks to meet and balance the transportation needs of Renton during a time of increasing transportation demand, decreasing revenues and growing environmental concerns. Although each project can be identified with an important concern that allows it to be classified into one of the five categories, most projects are intended to address, and are developed to be compatible with, multiple goals. Preservation of the existing infrastructure is a basic need that must be met by the program. The Mayor, City Council and Citizens Transportation Advisory Committee have all addressed the importance of sustaining strong programs in this project category. The state Growth Management Act also requires jurisdictions to assess and address the funding required to maintain their existing transportation system. Multi-modal and transportation demand management (TDM) projects and programs are oriented toward "moving people" through a balanced transportation system that involves multiple modes of transportation and provides alternatives to the existing heavy reliance on the single occupant vehicle (SOV). Included are facilities that facilitate the movement of transit and carpools, and programs that promote the use of high occupancy vehicles (HOV's) and reduce the numbers of SOV's. The Federal Intermodal Surface Transportation Efficiency Act, the State and Federal Clear Air legislation and the State Commute Trip Reduction Act have added momentum to regional efforts and placed requirements on local jurisdictions such as Renton to promote these transportation elements. Community Livability and Enhancement consists of projects that have been developed with major emphasis on addressing community quality of life issues by improving and/or protecting residential livability while providing necessary transportation system improvements. Bicycle and pedestrian project are included in this category. Economic development projects and programs involve transportation improvements necessitated by new development that is taking place. Thus, a significant source of local funding for these projects is projected to come from mitigation payments and from site specific access needs financed by new development. Operations and safety projects and programs are developed through on-going analyses of the transportation system and are directed mainly toward traffic engineering concerns such as safety and congestion. Projects are identified not only by analysis of traffic counts, accident records and geometric data, but also through review and investigation of citizen complaints and requests. Following this text are tables that display and summarize the six-year funding plan broken out in accordance with the five program categories. 3-2 Below is a more specific discussion of the activities involved in TIP development. II. Specific TIP Development Activities TIP project and financial development activities are intricately intertwined and involve interactions with many groups and agencies at the local, regional, state and federal levels. Within the Transportation Systems Division of the City of Renton, project development involves year-round coordination among the Maintenance and Operations Section, the Planning Section and the Design Section. The Transportation Maintenance and Operations Section compiles accident and traffic count data, performs levels of service calculations needed to identify operational/congestion problems and tracks all transportation-related complaints, suggestions and requests that come into the City. The Transportation Design Section through the TIP's "Overlay Program" and "Bridge Inspection and Repair Program" works closely with the Maintenance Services Division and with its Pavement Management System to establish structural ratings for the City's roads and bridges. This and other data is used in developing transportation improvement projects, in preparing grant applications and in interfacing with ongoing state and federal transportation programs. Two important examples of how this data is used are: 1) to complete Transportation Improvement Board (TIB) Arterial Inventory Worksheet forms for each section of each arterial in the City and 2) to complete State of Washington Inventory of Bridges and Structures (SWIBS) forms for each bridge. These forms provide a ranking of overall deficiency both within the City and in comparison with similar facilities elsewhere in the state. These rankings, in turn, become important elements in securing funding from the TIB's Urban Arterial Trust Account and Transportation Improvement Account and from the federal bridge program. The data is also used in making other grant applications such as for hazard elimination and safety projects and for railroad crossing upgrades and other federal programs under the Intermodal Surface Transportation and Efficiency Act (ISTEA). The Transportation Planning Section works with Metro Transit, the Puget Sound Regional Council, the Regional Transit Authority and other groups and agencies to assure consistency between Renton's transportation policies and programs and those of 3-3 the region. Such consistency is required by the Growth Management Act and related legislation and by federal and state grant programs. On-going transportation planning activities, such as development of the Transportation Plan and the transportation computer model, coordination with the City's Comprehensive Plan processes, and the development of sub-area plans such as for the Central Business District, the Valley and the North Renton areas, play an important part in identifying and prioritizing transportation improvement projects. Within the City of Renton, there are actions and interactions involving other departments and divisions, the private sector, the City Council and the Administration which strongly influence the direction of the transportation program. For example, the transportation system is significantly impacted by land use decisions, private development proposals and by public water and sewer extensions which increase transportation demand by making possible higher density and/or intensity of land uses. Such proposals need to be monitored and analyzed in regard to how they individually and collectively create the need for transportation improvements. All departments and divisions in the City, the City Council, the Administration and the Mayor's Citizens Transportation Advisory Committee are solicited each year to provide input, discuss and comment on the Six-Year TIP. Additional input is also gathered through interactions with other public and private organizations and through public meetings held in the community concerning specific transportation projects and programs. At The City, State and Federal level there are new laws and regulations that create the need for new or different kinds of transportation projects and programs. Examples include the Intermodal Surface Transportation Efficiency Act, the Growth Management . Act, the Clean Air Act, the Commute Trip Reduction law and the Surface Water Management Ordinance. All of these laws have tremendous impacts on the development and costs of transportation projects. Interconnection and/or interdependence among TIP projects and with projects by other City departments and by other jurisdictions is another important element that affects the development, the prioritization and the timing of transportation projects. Equally important is the likelihood, the time frame and the amount of outside funding that will be obtainable to finance transportation projects. In summary, with its heavy dependence on many different and unpredictable sources of outside funding and with the significant impacts created by on-going local and regional land use decisions, transportation project development is a continuous activity comprised of a multitude of diverse elements. 3-4 INFRASTRUCTURE PROJECTS AND PROGRAMS TIP ::'TOTAL;. ::: TOTAL:. # Project Title .. • >>:COST;, . FUNDED, .. 1 Street Overlay Program 3,735,946 3,735,946 11 Bridge Inspection & Repair Program 911,945 911,945 13 Monster Road Bridge Replacement 1,775,000 1,775,000 21 Traffic Signal Loop Replacement Program 186,526 186,526 22 Traffic Sign Replacement Program 120,890 120,890 23 Light Pole Replacement Program 144,472 144,472 25 Sidewalk Inspection and Replacement Program 96,263 96,263 37 Sunset Blvd. NE Rockery Repair 115,000 115,000 38 North 8th Street Reconstruction 315,000 315,000 Total Sources . . . • • ;::::::..7;40:1.:;042;:; • 7,401.042:: MULTI-MODAL / TDM PROJECTS AND PROGRAMS •TIP • <':���:;TOTAV:� ".:€. TOTAL ..# • Project Title .: . • • :::<:'.. .C.OST;:::::'::::;:°::............... 3 SR 900 HOV & Houser Connection (Houser Stage III) 2,029,598 2,084,453 6 Intra-City Intermodal Transportation Program 1,380,000 620,000 7 Transit Program 3,372,999 1,292,999 9 Transportation Demand Management Program 533,640 331,400 10 Arterial HOV Program 3,215,500 1,678,000 16 SR 169 HOV - 140th Way SE to SR-900 2,100,000 1,059,500 17 NE 3rd/NE 4th Corridor Transit Improvements 2,502,000 753,000 18 Park-Sunset Corridor HOV Improvements 800,000 411,000 20 SR 167/SW 27th St HOV 10,120,000 464,000 26 Arterial Circulation Program 1,864,887 1,864,887 27 Project Development & Pre-Design Program 1,280,100 1,280,100 30 1-405 HOV Direct Access 41,368 41,368 Total Sources.. '`'���`�"�` <: .:` 0`.09 < ><:».`: :11 88.0g.07 3-5 COMMUNITY LIVABILITY / ENHANCEMENT PROJECTS AND PROGRAMS TIP • TOTAL. :: •••TOTAL • •Project Title • :.COS.T': •'< >: :. FUNDED 2 Houser Way Relocated - Sunset Connection to N 8th St (Houser Stage II) 6,510,000 6,510,000 5 Walkway Program 1,043,631 1,043,631 31 City Gateways Program 154,395 99,395 34 N 4th Blvd - Logan Ave N to Sunset Blvd. NE Project Development 80,000 80,000 40 Bicycle Route Development Program 670,000 230,000 41 Windsor Hills Street Rehabilitation Project Development 40,000 40,000 Total Sources :. . . :':>'<>: .8.;498026;:> 8,003,026.. ECONOMIC DEVELOPMENT PROJECTS AND PROGRAMS TIP TOTAL ': • TOTAL # Project Title .COST FUNDED 4 Downtown Transit Access Program 6,375,157 2,115,157 8 CBD Transportation and Streetscape 288,500 288,500 12 Main Ave. S. - S. 5th St. to Bronson Way 3,710,000 3,558,000 14 SW 16th St - Oakesdale Ave SW to Lind Ave SW 1,300,581 587,581 19 Oakesdale Ave SW - SW 27th St to SW 16th St 7,022,242 1,064,384 35 TBZ Mitigation Program 98,607 98,607 42 Oakesdale Ave. SW - Extension to SR 900 1,160,000 160,000 45 Duvall Ave NE - NE 4th Street to North City Limits Project Development 100,000 0 48 Valley Connections to West 50,000 50,000 Total Sources 3-6 OPERATIONS AND SAFETY PROJECTS AND PROGRAMS TIP ;;:;;::'TOTAL TOTAL . ...::..:.:..: :...:,Project.Title :`: ;::;;::COST: :.: :: : FUNDED.:.:..:... 15 Transit Priority Signal System 654,500 290,000 24 Inter-agency Signal Coordination 162,000 114,000 28 WSDOT Coordination Program 97,556 97,556 29 Sunset Blvd NE /Anacortes Ave NE 329,300 129,300 32 Miscellaneous Traffic Safety Program • 541,661 541,661 33 Traffic Systems Efficiency Improvements Program 284,984 284,984 36 Missing Links Program 278,654 278,654 39 Railroad Crossing Safety Program 363,432 183,432 43 SW Grady Way - SR 167 to SR 515 260,000 0 44 Lind Avenue - SW 16th St to SW 43rd St 3,000,000 0 46 SW 7th St/Lind Ave SW 150,000 0 47 Benson Rd S I S 31st St 130,000 0 Total Sources :::;:;::::;;6;252,087::: : : :':. :.1;919,587 3-7 L L L SECTION FOUR - SIX YEAR TIP FUNDING SOURCES ( Total Project Summary 4 - I Funding Sources I 1/2 Cent Gas Tax 4 - 2 L Business License Fee 4 - 3 Vehicle License Fee 4 - 4 Grants In-Hand 4 - 5 Mitigation In-Hand 4 - 6 ( L.I.D.'s Formed 4 - 7 Other In-Hand 4 - 8 ( Grants Proposed 4 - 9 Mitigation Proposed 4 - 10 L.I.D.'s Proposed 4 - 11 Other Proposed 4 - 12 Undetermined 4 - 13 1996 - 2001 Summary of Funding Sources 4 - 14 Total Project Costs 4 - 15 I CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Total Project Summary Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total _ 1 Street Overlay Program 380,000 380,000 380,000 380,000 380,000 380,000 2,280,000 2 Houser Way Relocation 300,000 300,000 3 SR 900 HOV&Houser i ' 4 Downtown Transit Access 132,027 692,000 400,000 2,640,000 2,160,000 6,024,027 5 Walkway Program 70,000 70,000 70,000 70,000 70,000 70,000 420,000 6 Intermodal Trans.Program 110,000 60,000 250,000 250,000 250,000 250,000 1,170,000 7 Transit Program 210,000 690,000 500,000 500,000 500,000 500,000 2,900,000 8 CBD Trans.&Streetscape 100,000 100,000 9 TDM Program 72,240 . 50,000 50,000 50,000 50,000 50,000 322,240 10 Arterial HOV Program 290,000 165,000 480,000 2,045,000 2,980,000 11 Bridge Inspection&Repair 100,000 100,000 100,000 100,000 100,000 100,000 600,000 12 Main Ave.S.-5th to Bronson 1,228,790 1,080,000 1,110,000 3,418,790 13 Monster Rd.Bridge 1,013,000 1,013,000 i 14 SW 16th St.-Oakes.to Lind 526,383 65,000 648,000 1,239,383 15 Transit Priority Signal System. 404,500 404,500 16 SR169 HOV-140th to SR900 100,000 630,000 1,360,000 2,090,000 17 NE3rd/NE 4th Transit 224,000 290,000 1,986,000 2,500,000 18 Park-Sunset HOV 22,000 176,000 72,000 528,000 798,000 19 Oakesdale-SW 16-SW 27th 2,800,258 2,440,000 640,000 5,880,258 20 SR167/SW 27th St HOV 439,000 380,000 300,000 1,200,000 2,184,000 5,592,000 10,095,000 21 Loop Replacement Program 20,000 20,000 20,000 20,000 20,000 20,000 120,000 22 Sign Replacement Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 23 Light Pole Prog. 15,000 15,000 15,000 15,000 15,000 15,000 90,000 24 Inter-agency Signal Coord. 60,000 60,000 25 Sidewalk Rplc.Program 10,000 10,000 10,000 10,000 10,000 10,000 60,000 26 Arterial Circulation Program 220,000 220,000 220,000 220,000 220,000 220,000 1,320,000 27 Project Development/Predesign 160,000 165,000 165,000 175,000 175,000 208,500 1,048,500 28 WSDOT Coordination Program 10,000 10,000 10,000 10,000 10,000 10,000 60,000 29 Sunset/Anacortes Ave NE 36,000 283,000 319,000 30 1-405 HOV Direct Access 31 City Gateways 44,395 55,000 99,395 32 Traffic Safety Program 40,000 40,000 40,000 40,000 40,000 40,000 240,000 33 Traffic Efficiency Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 10,000 10,000 10,000 10,000 10,000 10,000 60,000 36 Missing Links Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 37 Sunset Rockery Repair 65,000 65,000 38 North 8th Street 39 RR Crossing Safety Prog. 10,500 100,000 100,000 210,500 40 Bicycle Route Dev.Program 10,000 45,000 360,000 150,000 20,000 80,000 665,000 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 109,276 170,000 880,000 1,159,276 43 SW Grady Way-SR167/SR515 260,000 260,000 44 Lind Av-SW 16th-SW 43rd 120,000 418,000 1,836,000 626,000 3,000,000 45 Duvall Ave NE 100,000 100,000 . 46 SW 7th St./Lind Ave SW 18,000 132,000 150,000 1 47 Benson Rd S/S 31st St 20,000 110,000 130,000 48 Valley Connections to West • Total Sources 8,941,369 8,273,000 8,384,000 8,899,000 10,029,000 9,675,500 54,201,869 1 CMROJECTSREEITP@7-TIP-0.WB200/0906 0938 4-1 CITY OF RENTON • PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP 1/2 Cent Gas Tax Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 320,000 320,000 320,000 320,000 320,000 320,000 1,920,000 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program • 8 CBD Trans.&Streetscape 9 TDM Program • 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 17 NE3rd/NE 4th Transit 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 22 Si n Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project Development/Predesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SRI67/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson RdSlS31stSt 48 Valley Connections to West Total Sources 320,000 320,000 320,000 320,000 320,000 320,000 1,920,000 C WBOJECTBILEEOIPL974IP•O.WB2 0&0&96 0926 4-2 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Business License'Fee Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 60,000 60,000 60,000 60,000 60,000 60,000 360,000 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 66,327 117,700 80,000 480,000 380,000 1,124,027 5 Walkway Program 70,000 70,000• 70,000 70,000 70,000 70,000 420,000 6 Intermodal Trans.Program 60,000 60,000 60,000 60,000 60,000 60,000 360,000 7 Transit Program 210,000 . 210,000 100,000 100,000 100,000 100,000 820,000 8 CBD Trans.&Streetscape 9 TDM Program 20,000 20,000 20,000 20,000 20,000 20,000 120,000 10 Arterial HOV Program 90,000 90,000 240,000 672,500 1,092,500 11 Bridge Inspection&Repair 100,000 100,000 100,000 100,000 100,000 100,000 600,000 12 Main Ave.S.-5th to Bronson 94,800 94,800 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 15 Transit Priority Signal System µ 16 SR169 HOV-140th to SR900 100,000 257,500 340,000 697,500 17 NE3rd/NE 4th Transit 10,000 32,000 42,000 18 Park-Sunset HOV 40,000 30,000 70,000 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 20,000 20,000 20,000 20,000 20,000 20,000 120,000 1 22 Sign Replacement Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 23 Light Pole Prog. 15,000 15,000 15,000 15,000 15,000 15,000 90,000 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 10,000 10,000 10,000 10,000 10,000 10,000 60,000 26 Arterial Circulation Program 220,000 220,000 220,000 220,000 220,000 220,000 1,320,000 27 Project Development/Predesign 160,000 165,000 165,000 175,000 175,000 208,500 1,048,500 28 WSDOT Coordination Program 10,000 10,000 10,000 10,000 10,000 10,000 60,000 29 Sunset/Anacortes Ave NE 68,673 68,673 _I 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 40,000 40,000 40,000 40,000 40,000 40,000 240,000 33 Traffic Efficiency Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 10,000 10,000 10,000 10,000 10,000 10,000 60,000 36 Missing Links Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000 37 Sunset Rockery Repair 65,000 65,000 38 North 8th Street 39 RR Crossing Safety Prog. 10,000 10,000 20,000 ' 40 Bicycle Route Dev.Program 100,000 60,000 30,000 20,000 210,000 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 50,000 50,000 43 SW Grady Way-SR167/SR515 44 Lind Av-SW 16th-SW 43rd _ 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson Rd S I S 31st St 48 Valley Connections to West • Total Sources 1,530,000 1,565,000 1,595,000 1,625,000 1,657,000 1,691,000 9,663,000 C.17 ROJECTSLLEEITIM7.9I9-0.W32 0605,96 OB 20 4-3 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997 -2002 SIX YEAR TIP Vehicle Licence Fee Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program V 350,000 350,000 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 350,000 350,000 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 152,000 200,000 352,000 17 NE3rd/NE 4th Transit 114,000 245,000 350,000 709,000 18 Park-Sunset HOV 198,000 36,000 105,000 339,000 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project DevelopmentlPredesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SRI67/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson Rd S/S 31st St 48 Valley Connections to West Total Sources 350,000 350,000 350,000 350,000 350,000 350,000 2,100,000 C'WROJECTS.EEITIPI97-TIP-0 W02 0695/96 09.76 4-4 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997 -2002 SIX YEAR TIP Grants In-Hand Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 225,310 225,310_ 3 SR 900 HOV&Houser 4 Downtown Transit Access 86,400 553,600 640,000 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 597,200 958,000 1,555,200 13 Monster Rd.Bridge 84,000 84,000 14 SW 16th St.-Oakes.to Lind 446,671 446,671 15 Transit Priority Signal System 16 'SR169 HOV-140th to SR900 17 NE3rd/NE 4th Transit ' 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project Development/Predesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SR167/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson Rd S/S 31st St 48 Valley Connections to West Total Sources 842,381 1,150,800 958,000 2,951,181 C;wROJECTSLLEernps7•Tw.a 2 O8 96 0976 4- 5 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Mitigation In-Hand Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program -- 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 255,000 255,000 14 SW 16th St.-Oakes.to Lind 15 Transit Priority Signal System 40,000 40,000 16 SR169 HOV-140th to SR900 17 NE3rd/NE 4th Transit 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV - 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project DevelopmentlPredesign 28 WSDOT Coordination Program 29 SunsetlAnacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SR167/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson RdS/S31stSt 48 Valley Connections to West Total Sources 295,000 295,000 CWROJECTSLLEEITIP197-TIP-O.W52 08/0596 09 38 4-6 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP L.I.D.'s Formed Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 17, NE3rd/NE 4th Transit 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project Development/Predesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SR167/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson Rd S/S 31st St 48 Valley Connections to West Total Sources %PROJECTS O6165/96 09 36 4-7 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Other-in-Hand Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 74,690 74,690 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 14 SW 16th St:Oakes.to Lind 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 17 NE3rd/NE 4th Transit 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV • 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project Development/Predesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SRI67/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St/Lind Ave SW 47 Benson Rd S/S 31st St 48 Valley Connections to West Total Sources 74,690 74,690 C'19190JECTSLLEEMK97-1I9-0 W62 06i95l96 09.36 4-8 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Grants Proposed Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 320,000 2,010,000 1,630,000 3,960,000 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 480,000 400,000 400,000 400,000 400,000 2,080,000 8 CBD Trans.&Streetscape 9 TDM Program 52,240 52,240 10 Arterial HOV Program 90,000 75,000 240,000 1,022,500 1,427,500 .,. 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 152,000 152,000 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 15. Transit Priority Signal System 342,000 342,000 16 SR169 HOV-140th to SR900 115,000 680,000 795,000 17 NE3rd/NE 4th Transit 100,000 45,000 1,100,000 1,245,000 18 Park-Sunset HOV 36,000 264,000 300,000 19 Oakesdale-SW 16-SW 27th 1,133,900 1,000,000 272,000 2,405,900 20 SR1671SW 27th St HOV 100,000 100,000 300,000 956,000 2,200,000 3,656,000 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 48,000 48,000 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project Development/Predesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 15,000 185,000 200,000 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 90,000 90,000 180,000 40 Bicycle Route Dev.Program 40,000 240,000 80,000 80,000 440,000 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 85,000 440,000 525,000 43 SW Grady Way-SRI671SR515 44 Lind Av-SW 16th =SW 43rd 45 Duvall Ave NE 46 SW 7th StJLind Ave SW 15,000 110,000 125,000 47 Benson Rd S/S 31st St 15,000 91,000 106,000 48 Valley Connections to West Total Sources 1,621,140 2,296,000 2,830,000 3,264,000 4,326,000 3,702,500 18,039,640 C.WROJECTSS EE TIPl97.71P•0 WB2 O8N3198 09 36 4-9 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Mitigation Proposed Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access _ 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 110,000 110,000 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 65,000 162,000 227,000 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 105,500 140,000 245,500 17 NE3rd/NE 4th Transit 504,000 504,000 18 Park-Sunset HOV 89,000 89,000 19 Oakesdale-SW 16-SW 27th 1,666,358 1,440,000 368,000 3,474,358 20 SR167/SW 27th St HOV • 280,000 200,000 400,000 528,000 1,592,000 3,000,000 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project Development/Predesign -- 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 35,000 440,000 475,000 43 SW Grady Way-SR167/SR515 44 Lind Av-SW 16th-SW 43rd 60,000 209,000 918,000 313,000 1,500,000 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 3,000 22,000 25,000 47 Benson Rd S/S 31st St 48 Valley Connections to West Total Sources 1,669,358 1,942,500 1,467,000 1,472,000 1,507,000 1,592,000 9,649,858 C9PRCJECTSYEERIP,97-71PA W132 08/0196 09:3 4-10 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997 -2002 SIX YEAR TIP L.I.D.'s Proposed Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson If 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 162,000 162,000 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 17 NE3rd/NE 4th Transit 18 Park-Sunset HOV • 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project DevelopmentlPredesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access _ 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SRI67/SR515 44 Lind Av-SW 16th-SW 43rd 45 Duvall Ave NE 46 SW 7th St/Lind Ave SW 47 Benson Rd S/S 31st St • 48 Valley Connections to West Total Sources 162,000 162,000 CWROJECTSLLEETIP'97-TIP-O.WB2 C&05J96 0978 4-11 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Other Proposed Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 150,000 150,000 300,000 5 Walkway Program 6 Intermodal Trans.Program 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 15 Transit Priority Signal System 22,500 22,500 16 SR169 HOV-140th to SR900 • 17 NE3rd I NE 4th Transit 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 Arterial Circulation Program 27 Project DevelopmentlPredesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair 38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SR1671SR515 44 Lind Av-SW 16th -SW 43rd 45 Duvall Ave NE 46 SW 7th St./Lind Ave SW 47 Benson Rd S/S 31st St 48 Valley Connections to West Total Sources 22,500 150,000 150,000 322,500 C1PROJECTSLLEERIP191•T1P-0 W62 ONO6R6 0196 4-12 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Undetermined Period TIP Project Title 1997 1998 1999 2000 2001 2002 Total 1 Street Overlay Program 2 Houser Way Relocation 3 SR 900 HOV&Houser 4 Downtown Transit Access 5 Walkway Program 6 Intermodal Trans.Program 190,000 190,000 190,000 190,000 760,000 7 Transit Program 8 CBD Trans.&Streetscape 9 TDM Program 30,000 30,000 30,000 30,000 30,000 150,000 10 Arterial HOV Program 11 Bridge Inspection&Repair 12 Main Ave.S.-5th to Bronson 13 Monster Rd.Bridge 14 SW 16th St.-Oakes.to Lind 324,000 324,000 15 Transit Priority Signal System 16 SR169 HOV-140th to SR900 _17 NE3rd/NE 4th Transit 18 Park-Sunset HOV 19 Oakesdale-SW 16-SW 27th 20 SR167/SW 27th St HOV 500,000 700,000 1,800,000 3,000,000 21 Loop Replacement Program 22 Sign Replacement Program 23 Light Pole Prog. 24 Inter-agency Signal Coord. 25 Sidewalk Rplc.Program 26 __Arterial Circulation Program 27 Project Development/Predesign 28 WSDOT Coordination Program 29 Sunset/Anacortes Ave NE 30 1-405 HOV Direct Access 31 City Gateways 55,000 55,000 _32 Traffic Safety Program 33 Traffic Efficiency Program 34 N 4th Blvd.-Logan to Sunset 35 TBZ Program 36 Missing Links Program 37 Sunset Rockery Repair _38 North 8th Street 39 RR Crossing Safety Prog. 40 Bicycle Route Dev.Program 41 Windsor Hills Rehabilitation 42 Oakesdale Ave SW Extension 43 SW Grady Way-SRI67/SR515 260,000 260,000 44 Lind Av-SW 16th-SW 43rd 60,000 209,000 918,000 313,000 1,500,000 45 Duvall Ave NE 100,000 100,000 46 SW 7th St/Lind Ave SW 47 Benson Rd S/S 31st St 5,000 19,000 24,000 48 Valley Connections to West Total Sources 5,000 109,000 844,000 1,638,000 1,557,000 2,020,000 6,173,000 L IPBOJEOTStEETIPI9?-1IP•O WB2 06,06r88 09 36 4-13 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997 - 2002 SIX YEAR TIP SUMMARY OF FUNDING SOURCES Period ITEM Period Total 1997 1998 1999 2000 2001 2002 EXPENSES: Project Development 2,947,740 587,740 425,000 595,000 425,000 485,000 430,000 Precon Eng/Admin 5,261,224 1,323,224 1,001,900 1,657,900 862,900 191,900 223,400 R-O-W(includes Admin) 6,008,000 3,207,000 550,000 251,000 2,000,000 Construction Contract Fee 35,286,167 3,072,167 5,744,000 5,087,000 4,948,500 8,371,000 8,063,500 Construction EnglAdmin 3,214,238 311,738 505,100 506,100 425,600 744,100 721,600 Other 1,484,500 439,500 47,000 287,000 237,000 237,000 237,000 Sub-TOTAL EXPENSES 54,201,869 8,941,369 8,273,000 8,384,000 8,899,000 10,029,000 9,675,500 SOURCES OF FUNDS: _ 1/2 Cent Gas Tax 1,920,000 320,000 320,000 320,000 320,000 320,000 320,000 Business License Fee 9,663,000 1,530,000 1,565,000 1,595,000 1,625,000 1,657,000 1,691,000 Vehicle License Fee 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000 Grants In-Hand 2,951,181 842,381 1,150,800 958,000 Mitigation In-Hand 295,000 295,000 L.I.D.'s Formed Other In-Hand 74,690 74,690 Grants Proposed 18,039,640 1,621,140 2,296,000 2,830,000 3,264,000 4,326,000 3,702,500 Mitigation Proposed 9,649,858 1,669,358 1,942,500 1,467,000 1,472,000 1,507,000 1,592,000 L.I.D.'s Proposed 162,000 162,000 Other Proposed 322,500 22,500 150,000 150,000 Undetermined 6,173,000 5,000 109,000 844,000 1,638,000 1,557,000 2,020,000 TOTAL SOURCES 51,350,869 6,730,069 7,733,300 8,364,000 8,819,000 10,029,000 9,675,500 C:IPROJECTSLLEE1TIPl97-TIP-O.WS2 00105196 09:38 4-14 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION • 1997-2002 SIX YEAR TIP Total Project Costs Previous Period Total Total TIP Project Title Costs 1997 1998 1999 2000 2001 2002 Total Cost Funded 1 Street Overlay Program 1,455,946 380,000 380,000 380,000 380,000 380,000 380,000 2,280,000 3,735,946 3,735,946 2 Houser Way Relocation 6,210,000 300,000 0 0 0 0 0 300,000 6,510,000 6,510,000 3 SR 900 HOV&Houser 2,084.453 0 0 0 0 - 0 0 0 2,084,453 2,084,453 4 Downtown Transit Access 351,130 132,027 692,000 400,000 2,640,000 2,160,000 0 6,024,027 6,375,157 2,115,157 5 Walkway Program 623,631 70,000 70,000 70,000 70,000 70,000 70,000 420,000 1,043,631 1,043,631 6 Intermodal Trans.Program 210,000 110,000 60,000 250,000 250,000 250,000 250,000 1,170,000 1,380,000 620,000 7 Transit Program 472,999 210,000 690,000 500,000 500,000 500,000 500,000 2,900,000 3,372,999 1,292,999 8 CBD Trans.&Streetscape 188,500 100,000 0 0 0 0 0 100,000 288,500 288,500 9 TDM Program 211,400 72,240 50,000 50,000 50,000 50,000 50,000 322,240 533,640 331,400 to Arterial HOV Program 235,500 0 0 290,000 165,000 480,000 2,045,000 2,980,000 3,215,500 1,678,000 11 Bridge Inspection&Repair 311,945 100,000 100,000 100,000 100,000 100,000 100,000 600,000 911,945 911,945 12 Main Ave.S.-5th to Bronson 291,210 1,228,790 1,080,000 1,110,000 0 0 0 3,418,790 3,710,000 3,558,000 13 Monster Rd.Bridge 762,000 1,013,000 0 0 0 0 0 1,013,000 1,775,000 1,775,000 14 SW 16th St.-Oakes.to Lind 61,198 526,383 0 0 65,000 648,000 0 1,239,383 1,300,581 587,581 15 Transit Priority Signal System 250,000 404,500 0 0 0 0 0 404,500 654,500 290,000 16 SR169 HOV-140th to SR900 10,000 100,000 630,000 1,360,000 0 0 0 2,090,000 2,100,000 1,059,500 17 NE3rd/NE 4th Transit 2,000 0 0 224,000 290,000 1,986,000 0 2,500,000 2,502,000 753,000 18 Park-Sunset HOV 2,000 22,000 176,000 72,000 528,000 0 0 798,000 800,000 411,000 . 19 Oakesdale-SW 16-SW 27th 1,141,984 2,800,258 2,440,000 640,000 0 0 0 5,880,258 7,022,242 1,064,384 20 SR167/SW 27th St HOV 25,000 439,000 380,000 300,000 1,200,000 2,184,000 5,592,000 10,095,000 10,120,000 464,000 21 Loop Replacement Program 66,526 20,000 20,000 20,000 20,000 20,000 20,000 120,000 186,526 186,526 22 Sign Replacement Program 30,890 15,000 15,000 15,000 15,000 15,000 15,000 90,000 120,890 120,890 23 Light Pole Prog. - 54.472 15,000 15,000 15,000 15,000 • 15,000 15,000 90,000 144,472 144,472 24 Inter-agency Signal Coord. 102,000 60,000 0 0 0 0 0 60,000 162,000 114,000 25 Sidewalk Rplc.Program 36,263 10,000 10,000 10,000 10,000 10,000 10,000 60,000 96,263 96,263 26 Arterial Circulation Program 544.887 220,000 220,000 220,000 220,000 220,000 220,000 1,320,000 1,864,887 1,864,887 27 Project Development/Predesign 231.600 160,000 165,000 165,000 175,000 175,000 208,500 1,048,500 1,280,100 1,280,100 28 WSDOT Coordination Program 37,556 10,000 10,000 10,000 10,000 10,000 10,000 60,000 97,556 97,556 29 Sunset/Anacortes Ave NE 10,300 36,000 283,000 0 0 0 0 319,000 329,300 129,300 30 1-405 HOV Direct Access 41,368 0 0 0 0 0 0 0 41,368 41,368 31 City Gateways 55,000 44,395 0 55,000 0 0 0 99,395 154,395 99,395 32 Traffic Safety Program 301,661 40,000 40,000 40,000 40,000 40,000 40,000 240,000 541,661 541,661 33 Traffic Efficiency Program 104,984 30,000 30,000 30,000 30,000 30,000 30,000 180,000 284,984 284,984 34 N 4th Blvd.-Logan to Sunset 80,000 0 0 0 0 0 0 0 80,000 80,000- 35 TBZ Program 38,607 10,000 10,000 10,000 10,000 10,000 10,000 60,000 98,607 98,607 36 Missing Links Program 98,654 30,000 30,000 30,000 30,000 30,000 30,000 180,000 278,654 278,654 37 Sunset Rockery Repair 50,000 65,000 0 0 0 0 0 65,000 115,000 115,000 38 North 8th Street 315,000 0 0 0 0 0 0 0 315,000 315,000 39 RR Crossing Safety Prog. 152,932 10,500 100,000 0 100,000 0 0 210,500 363,432 183,432 40 Bicycle Route Dev.Program 5,000 10,000 45,000 360,000 150,000 20,000 80,000 665,000 670,000 230,000 41 Windsor Hills Rehabilitation 40,000 0 0 0 0 0 0 0 40,000 40,000 42 Oakesdale Ave SW Extension 724 109,276 170,000 880,000 0 0 0 1,159,276 1,160,000 160,000 43 SW Grady Way-SR1671SR515 0 0 0 260,000 0 0 0 260,000 260,000 0 44 Lind Av-SW 16th-SW 43rd 0 0 120,000 418,000 1,836,000 626,000 0 3,000,000 3,000,000 0 45 Duvall Ave NE 0 0 0 100,000 0 0 0 100,000 100,000 0 46 SW 7th St./Lind Ave SW 0 18,000 132,000 0 0 0 0 150,000 150,000 0 47 Benson Rd S/S 31st St 0 20,000 110,000 0 0 0 0 130,000 130,000 0 48 Valley Connections to West 50,000 0 0 0 0 0 0 0 50,000 50,000 Total Sources 17,349,320 8,941,369 8,273,000 8,384,000 8,899,000 10,029,000 9,675,500 54,201,869 71,551,189 37,126,591 C WiOhCTSUeTP,WLL-A.KB2 049191 4-15 SECTION FIVE - SIX YEAR TIP PROGRAMS Six Year TIP Project Listing 5-0 TIP Projects 5-1 through 5-48 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION ' 1997-2002 SIX YEAR TIP 317 Account Mld-Year Budget Adjustments • 112 CENT/BLF/VLF GRANTS:AND OTHER. OLD: • NEW Account • • •: ••: :.::J.;.:;:'• :::;•Budget::::': • `:New • , :'., •'•:Budget;.;: .... Now: :' Total.;New • TIP: : ::TIR # Project Title Adjustment Total .. Adjustment ;. Total:;:;:.. ::Account.: i 1 12108 Street Overlay Program 0 826,072 (4,708) 301,292 .s[:;:>7 127;384:.:`• 2 2 25 Houser Way Relocation 86543 1514,952 2,407,113 2,633552 .,.. 25 HouserNVSDOT 464,270 555,675 :4;703;979.; : 3 3 32 SR 900 HOV&Houser 0 359.113 427,298 1,005,303 .:•;7; 64;416::.• 9 4 12170 Downtown Transit Access (148,870) 240,000 0 ' o .'::z:240;000••:<;: . 5 5 9 Walkway Program o .304,485 155,000 155,000 :::459.465::: 8 6 12163 Intermodal Trans. Program 50,000 145,538 0 54,040 199,578 7 7 12109 Transit Program 0 275.033 0 0 '.::.::.27.5;033. 6 8 12111 CBD Trans. &Streetscape 0 158,892 0 10,000 ::':•':168;892:..::. 4 9 12135 TDM Program (100,000) 36,760 3,862 52,240 ..:.:::.89;000.:::::. 10 10 12160 Arterial HOV Program 0 87,702 0 86,500 : .;:174;202.:: . ' 11 11 106 Bridge Inspection&Repair 0 187,105 (1,176) 37,568 .'•..::.224;673 ::: 28 12 12158 Main Ave. S.-5th to Bronson 38,000 322,556 1,204,800 1,204,800 ...:.1;527;356. 13 13 12117 Monster Rd. Bridge o 61,078 0 1,128,825 • 1.189,903 35 14 12172 SW 16th St.-Oakes.to Lind 30,000 80,000 60,910 60,910 .•:.:140.9.10 new 15 New Transit Priority Signal System 250,000 250,000 0 0 . . 250,000 new 16 New SR169 HOV-140th to SR900 10,000 10,000 0 0 . .:::10,000 new 17 New NE3rd/NE 4th Transit 2,000 2,000 0 0 new 18 New Park-Sunset HOV• 2,000 2,000 0 o ..2,000: 15 19 22 Oakesdale-SW 16-SW 27th 0. 90,130 0 253,016 . :343,146 16 20 12138 SR167/SW 27th St HOV o 110,106 0 344,000 454,106 17 21 16 Loop Replacement Program 10,272 15,000 0 0 15;000 18 22 12113 Sign Replacement Program (10,272) 30,890 0 0 . 30,890 19 23 91 Light Pole Prog. 0 11,712 0 0 11;712 20 24 12140 Inter-agency Signal Coord. 0 54,728 48,000 48,000 102,728 21 25 56 Sidewalk Rplc. Program o 30,713 0 0 .. •30,713: 22 26 29 Arterial Circulation Program (200,000) 439,472 (362) 14,921 ::':::454;393 23 27 12150 Project Development/Predesig o 142,416 0 0 .14Z416 24 28 12146 WSDOT Coordination Progra o 12,046 0 0 . .12,046. . 48 29 12133 Sunset/Anacortes Ave NE 31,327 31,327 0 0 31527 ' 31 30 12171 1-405 HOV Direct Access 2,800 41,368 0 0 .41,368 32 31 12112 City Gateways 44,395 • 97,462 0 ' 0 97,462 , 33 32 12115 Traffic Safety Program 0 117,296 0 0 117,296 34 33 12162 Traffic Efficiency Program o 96,501 0 o 66;501 36 34 12083 N 4th Blvd.-Logan to Sunset o 74,502 0 0 74,502 37 35 12107 TBZ Program o 35,953 0 0 . 35;953 38 36 12106 Missing Links Program (50.000) 98,654 0 o • ...98.654 new 37. new Sunset Rockery Repair 50,000 50.000 0 0 ,..50;000 39 38 12165 North 8th Street 0 42,685 0 272,000 ' .314.685 40 39 12166 RR Crossing Safety Prog. 0 9.057 32.932 151.432 :. .160,489 41 40 12173 Bicycle Route Dev. Program o 20.000 0 0 .. :.20,000 29 41 12144 Windsor Hills Rehabilitation o. 36,656 0 0 ••. 36,656 30 42 12116 Oakesdale Ave SW Extension o 59,276 0 50,000 : ..109,276 43 43 12127 SW Grady Way-SR167/SR51 o . o o . o 44 44 24 Lind Av-SW 16th-SW 43rd o o o 0 o 45 45 12123 Duvall Ave NE o o o o o 46 46 12153 SW 7th St./Lind Ave SW o 0 0 . 0 0 47 47 12129 Benson Rd S/S 31st St o o o 0 o i 49 48 12149 Valley Connections to West o 50,000 0 0 50,000 • 12 401 12147 Lk.Wash. Blvd. Bridge 0 58,608 0 452,000 .:. .510,608. • 14 402 12121 Lk.Wash.Blvd. Bike/Ped 0 581,186 100,400 846,256 ;>::1,427442.. 25 403 12142 RR Crossing LID 0 (6,294) o o •::•::'(6;264) 26 404 12155 Bronson Way N. 0 3,371 0 145.889 : -::149,260: •. 27 405 12154 NE 3rd St/SR-900 0 (34,495) 0 413,678 379,183 42 406 75 S 192nd St/SR 167 0 14,486 0 0 • 14,486 50 407 28 SR167/E Valley Rd(WSDOT) 0 6,386 0 5.093 11,479 drop 501 8 Park Ave N-Bronson to 10th 0 (150,564) 0 1,410,143 1,259,579 drop 502 12164 Oakesdale Bike/Ped (44,395) 0 0 0 0 drop 503 0 Edens Testing o 0 0 0 0 drop 504 0 Arb Expense o 12,108 0 0 12.108 drop 505 11 South County TBD 0 35,721 0 0 . 35,721 drop 506 58 S 2nd/Logan Ave S. 133 0 0 0 .0.: . • drop 507 0 Ending Fund (51,133) 38526 0 0 ;:•:;38,826 • drop 508 12118 S Grady Way/SR167 0 0 0 0 .. .o . ... drop 509 54 NE 44th St/1405 0 0 0 0 .. :....0. . L drop 701 70 Mill Ave South o 320,786 0 0 ,::•::320,786..• drop 702 44 N 3rd Livable Street o 17,441 0 0 .`•17;441. . drop 703 12081 Park/Lk Wa BI 0 (688,508) 0 - _ 860,000 171,492 drop 764 12114 Brnsn SR169 to Grady o ' 0 0 0 0 drop 705 12126 Talbot 43rd to SCL 0 13,840 0 2.800 16,640 drop 706 12157 Rain/Air Resurf o 992 0 1,730 2.722 drop 707 74 Oakesdale Grady-16th 0 20,299 0 0 . 20,299 drop 708 15 SW 16th Bridge 0 12,820 0 0 .::.::12.820 drop 709 65 Repave Project 0 0 0 0 .. ::::::0::.,::.:.. drop 710 12125 Aberdeen Ave/NE 20th-27th (2,800) 0 0 0 .:::••:;0:<-•:. .: . . ( Total Sources of funds 0 6,916,245 4,898;339. 12,556,463: ::19,474,708 rirmonc1s tEE,nr,9l.rur-0 W82 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION 1997 -2002 SIX YEAR TIP 317 Account Mid-Year Budget Adjustments 112 CENT/BLF 1 VLF GRANTS AND OTHER... OLD NEW Account`': •:• .'..!:1410.00" `,..: New Budget...• New : Total:New> TIP TIP #. Project Title . •Adjustment. .•• total Adjustment :, Totaf.;:::>: .:<Accotirit; drop 503 0 Edens Testing o o o o : '•o`' ii5.::` drop 504 0 Arb Expense 0 12,108 0 0 ' ••'`12.O8 `_'<:; - drop 507 0 Ending Fund (51,133) 38,826 0 0 '':`: 38;826> ` drop _ 501 8 Park Ave N-Bronson to 10th o (150,564) 0 1,410,143 is:':'i:1>ti259;57M::: 5 5 9 Walkway Program 0 304,485 155,000 155,000 ;>:>:'.:459 485:> • drop 505 11 South County TBD 0 35,721 0 0 ".`6:35721' :'#r. drop 708 15 SW 16th Bridge 0 12,820 0 0 '''::1206M: 17 21 16 Loop Replacement Program 10,272 15,000 0 0 •::'15;000':::': 15 19 22 • Oakesdale-SW 16-SW 27th 0 90,130 0 253,016 .'`343;146: :' 44 44 24 Lind Av-SW 16th-SW 43rd o o 0 0 • : 'o", :::: 2 2 25 Houser Way Relocation 86.543 1.514.952 2,407,113 2,633,352 • : 25 Houser/WSDOT 464,270 555,675 '4,703;9 : 79::::: 50 407 28 SR167/E Valley Rd(WSDOT) 0 6,386 0 5,093 .`. .::11;479:::'':' - 22 26 29 Arterial Circulation Program (200.000) 439.472 (362) , 14.921 .•' :454:393:>::' 3 3 32 SR 900 HOV&Houser 0 • 359,113 427,298 1,005,303 :: ::';.1:::364A16% drop 702 44 N 3rd Livable Street o 17,441 0 0 :! ::'17;441 '' <: drop 509 54 NE 44th St/1405 0 0 0 0 : ''"o'`':: :;'i 21 25 56 Sidewalk Rplc. Program 0 30,713 0 0 •• 30;713 drop 506 58 S 2nd/Logan Ave S. 133 0 0 0 O. drop 709 65 Repave Project o o 0 0 0: drop 701 70 Mill Ave South 0 320,786 0 0 .';320;786 -- drop 707 74 Oakesdale Grady-16th 0 20,299 0 0 ...".20,299•.:... 42 406 75 S 192nd St/SR 167 0 14,486 0 0 .::6:'14486':':.::::. 19 23 91 Light Pole Prog. 0 11,712 4 0 0 . •':11;712.: ` 11 11 106 Bridge Inspection&Repair 0 187,105 (1.176) 37,568 '.224,673`.. drop 703 12081 Park/Lk Wa BI 0 (688,508) 0 860,000 . '171;492' 36 34 12083 N 4th Blvd.-Logan to Sunset o 74,502 0 074;502 .. 38 36 12106 Missing Links Program (50,000) 98,654 0 0 98,654 37 35 12107 TBZ Program 0 35,953 0 0 . •.35,953•.. 1 1 12108 Street Overlay Program 0 826,072 (4,708) 301,292 :1;127;364:::..:. 7 7 12109 Transit Program 0 275,033 0 0 <:275;033:•:. '' 6 6 12111 CBD Trans. &Streetscape o 158,892 0 10,000 ••:•188,89"2 • ' 32 31 12112 City Gateways 44.395 97,462 0 0 97462.. .;: 18 22 12113 Sign Replacement Program (10,272) 30,890 0 0 :• '30,890`'::.... drop 704 12114 Brnsn SR169 to Grady 0 0 0 0 0 ••' 33 32 12115 Traffic Safety Program 0 117,296 0 0 ' '117.296: 30 42 12116 Oakesdale Ave SW Extension 0 59,276 0 50.000 109.276 . 13 13 12117 Monster Rd. Bridge 0 61.078 0 1,128,825 1:189;903:•.7 drop 508 12118 S Grady Way/SR167 0 0 0 0 '":0:: ..`: ..... ' 14 402 12121 Lk.Wash. Blvd. Bike/Ped 0 581,186 100,400 846,256 ::.1;427.442::;: 45 45 12123 Duvall Ave NE o o 0 0 ..••:o >' drop, 710 12125 Aberdeen Ave/NE 20th-27th (2,800) 0 0 0 • .0 : drop 705 12126 Talbot 43rd to SCL o 13,840 0 2,800 16,640 43 43 12127 SW Grady Way-SR167/SR51 o o 0 o o 47 47 12129 Benson Rd S/S 31st St o 0 o o .0.. 48 29 12133 SunsetlAnacortes Ave NE 31,327 31,327 0 0 . ::502t:''...." 4 9 12135 TDM Program (100,000) 36,760 3,862 52,240 •'..86;000 16 20 12138 SR167/SW 27th St HOV o 110,106 0 344,000 :::::.454;106M 20 24 12140 Inter-agency Signal Coord. 0 54,728 48,000 48,000 :`..``:102;728". . - 25 403 12142 RR Crossing LID o (6,294) o o (6:294) ` '. 29 41 12144 Windsor Hills Rehabilitation 0 36,656 0 0 36;656 " '. 24 28 12146 WSDOT Coordination Progra o 12,046 0 0 ' 12,046 • 12 401 12147 Lk.Wash. Blvd. Bridge 0 58,608 0 452,000 510.608 ' - 49 48 12149 Valley Connections to West o 50,000 0 0 50000 23 27 • 12150 Project Development/Predesig 0 142,416 0 0 142,416 - 46 ' 46 12153 SW 7th St./Lind Ave SW o 0 0 0 0 ' 27 405 12154 NE 3rd St/SR-900 0 (34,495) . 0 413.678 379.183 26 404 12155 Bronson Way N. 0 3,371 0 145,889 .'149;260 drop• 706 12157 Rain/Air Resurf o 992 0 1,730 '4:722' 28 12 12158 Main Ave. S.-5th to Bronson 38,000 322.556 . 1,204.800 1,204,800 '1 527,356' 10 10 12160 Arterial HOV Program o 87,702 0 86,500 •.174,202 • . . • 34 33 12162 Traffic Efficiency Program 0 96,501 0 0 '96,501 . • 8 6 12163 Intermodal Trans. Program 50,000 145,538 0 54,040 199.578:: drop 502 12164 Oakesdale Bike/Ped (44,395) 0 0 0 . ...':o•••: `''..' 39 38 12165 North 8th Street 0 42,685 0 272,000 • :314:685'_ 40 39. 12166 RR Crossing Safety Prog. 0 9,057 32,932 151,432 :-.:::!'••160;489::33 9 4 12170 Downtown Transit Access (148,870) 240,000 0 0 _ • 240;000''• ••.; • 31 30 12171 1-405 HOV Direct Access 2,800 41,368 0 0 41;368 35 14 12172 SW 16th St.-Oakes.to Lind 30.000 80,000 60,910 60,910 140,910 41 40 12173 Bicycle Route Dev. Program 0 20,000 0 0 20,000 new 15 New Transit Priority Signal System 250,000 250,000 0 0 250,000• new 16 New SR169 HOV-140th to SR900 10,000 10,000 0 0 ;.10;000 •:.:: new 17 New NE3rd/NE 4th Transit 2,000 2,000 0 0 .;:::::2;000::>::`' ; new 18 New Park-Sunset HOV 2,000 2,000 _ 0 or:::.2 00ii> : new 37 new Sunset Rockery Repair 50,000 50,000• o o "'::50;000-:.`;'':`: • Total Sources of funds 0 6,918,245 4,898,339 14556;463' 19,474,700' C.,P ROl EC 1511 EE\rIPU 7•TIP•O wB 1 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Street Overlay Program Functional Classification: N/A Fund: 317;102 Proj.Length NIA Proj: 12108 RANK: 1 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: • STATUS: Annual program for repairing and resurfacing existing roadways,operating the City's Pavement Ongoing yearly program. Management System and providing data for deficiency ratings. JUSTIFICATION: CHANGES: ACP overlay, SMA,and slurry seal of streets provide for improved driving surface and are highly Budget Adjustment for grant of(-)$4,708. cost effective ways of avoiding expensive repairs and reconstruction. The computerized Pavement Management System and video inventory of existing roadway conditions greatly improve the efficiency of the Overlay Program. Project Totals Programmed Pre-1997 Six Year Program . <:. � ::<<=»:: .... ...: .:.: .:.....:.::.:::::.� .... .............. ....r ammed......5 ehtPre.1996.... 99&:.:. .;:.;:.;�.:::.;:.:<.::.;:. ;:.:;.;;;:.:;:.::•; ;. :<;::,:::.:::.,:::. .;:�;:;.::;..;;:.::.:;.. :::::.;::.:::::.::.. ........................... ......................�J►...... .. .. p ..............:... '#.....:*.Catrry�l[er:. ................................. ............. ......... ....: 1: ..::.::::::.::::::,200..Q.::•:::,:.::.:�,.200.i:.;:..:..::.:.:<:;:•::2002.::.:;.;:.; EXPENSES: Project Development Precon Eng/Admin 99,000 25,394 13,606 60,000 10,000 10,000 10,000 10,000 10,000 10,000 R-O-W(includes Admin) • Construction Contract.Fee 3,278,050 264,292 1,033,758 •1,980,000 330,000 330,000 330,000 330,000 330,000 330,000 Construction Eng/Admin 358,896 38,896 80,000 240,000 40,000 40,000 40,000 40,000 40,000 40,000 • Other TOTAL'EXPENSES:::;::;.;;:.::.;;;: ;;:.;:.>;:: ..; ::::>: »>::<:::>::>:: ;:::;:::;::::: ;. ;::::.:.;:;:.::>:.>. :.;•;.;:;.:.::.; :.: :.. :.>;;:::.::. ::....:.::::::,.. ..... 37.35$4.6....................328 5ti2::::>::;::;::;:<>:>::1..127�354..:.:.:...... •0 � <:::::»:;>:;:::. ,: ...... � ........,.......... ... ..................... , .......,......,........ 2,28(1, QO280,OOQ :::>.:«::: 380;�00.:::;:;:<:.:;<380 OOQ<.::::»:::<:;38.a{SOQ:..::::::.::38.0 SOURCES OF FUNDS: 1/2 Cent Gas Tax 2,561,405 262,157 379,248 1,920,000 320,000 320,000 320,000 320,000 320,000 320,000 Business License Fee 873,249 66,425 446,824 360,000 60,000 60,000 60,000 60,000 60,000 60,000 Vehicle License Fee Grants In-Hand 301,292 301,292 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed . Undetermined TOTAL>S:OURCE ` <:> : <>:<;:; ;. .....:;. ...::: <::':<.. ..... :.:.....:.. : > ,'127;' >:< :;'m ,.. : '::>r:»:�..:.• : ;" :::;:: °. . T,::<:<::::. 80,00 ..::::: :>:<:::::.:..:r.;.:::_:. <:m;.>.. .:.......:�.:'T ><:< ...::....::..,,; . . ............: :...: ....S.:..�. ......... .....3,735,�4�..... ......:328,5.82 ..........1,421;3.64.:.:;.;:>:<;2,1�80000..:�.:.:::::::::38Qt10Q ..�380�.OQ 380{10Q.:.::.;::;.;:.:.;38bt)0 3 0 0 0 00.•: CVRoiCT&YEE."4.7 02 .... gems 09*wa 5-1 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Houser Way Relocated -Sunset Connection to N 8th St (Houser Stage II) Functional Classification: Minor Arterial Fund: 317 Proj.Length 0.51 miles Proj: 25 RANK: 2 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Stage II of Houser Way will provide a new roadway from the connection with Sunset Blvd to N 8th Obtained a$3,000,000 ISTEA Demonstration Grant,a$727,000 ISTEA/STP Grant St.Includes curbs,sidewalks,street lighting,signing,landscaping and channelization. The Houser and a$750,000 WSDOT matching Grant Mitigation is from PACCAR Parts Plant Connection to Sunset Blvd is being constructed in conjunction with the SR 900 HOV&Houser New Demonstration funding grant total is$2,930,766; New State grant is$732,691. Connection Project JUSTIFICATION: CHANGES: This high priority project is a culmination of the North Renton Facilitation process directed by City Congress reduced all ISTEA appropriations for 1996 by 12.5%which results in a Council Resolution 2708 with the objectives of providing additional ingress/egress for Boeing and $69,234 reduction in in the ISTEA Demonstration grant The State,therefore has also Paccar employees and relieving traffic usage of North Renton residential streets. reduced its 20%matching grant Total loss in funds equals$86,543,Which was made up with existing BLF funding shifted from the Arterial Circulation Program. 1996 .budget adjustment was also made to budget$464,270 of additional state money. :undeil<;a< 55:1.ft000 ) :>UriFundeda< :'<>> »>< Project Totals Programmed Pre-1997 Six Year Program: :::.:::..... :;•; ;;;>;::....:.:::;:;:;:. :<:.;:::.. .:..::»:::::,, 8.::..:::.:.:::::.499..9::::•::.:::: : .200..0..:.::..:::::...... ........... ......... ... ......... EXPENSES: Project Development Precon Eng/Admin 1,078,593 1,078,593 R-O-W(includes Admin) 344,428 344,428 Construction Contract Fee 4,493,659 • 4,243,659 250,000 250,000 Construction Eng/Admin 593,320 543,320 50,000 50,000 Other >:TOTALSp(PENSWO:: :::«>;:;;.>:,4,5'fO;OO.Q;; :.:::.: :4OQ,00.. .:..:............to.0 i`..... ......................... ...... ........ SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,105,743 521,591 584,152 Vehicle License Fee 930,800 930,800 Grants In-Hand (ISTEA) 3,657,766 799,104 2,633,352 225,310 225,310 Mitigation In-Hand 83,000 83,000 L.I.D.'s Formed Other In-Hand (WSDOT) 732,691 102,326 555,675 74,690 74,690 - Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined TOTAL:S.OURCES::<:>:::<:>:::;::::>::::>:::>: :;::>;ji�51.0}�Ittck .........:.::�,/t2$,02�:.;;..;:,;;:.:;;4�7:.8�.J7.;�:.a .:;:.::::.�.QQ,O�DO.:�.::..:�::. l .... ........... ..................... .......... 09%4 AM cwrto�ecrs�r�r+u.arxez 5-2 - CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP SR 900 HOV& Houser Connection (Houser Stage III) Functional Classification: Principal Arterial Fund: 317 Proj.Length 0.44 miles Proj: 32 RANK: 3 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: High Occupancy Vehicle(HOV)improvements on SR 900 from the Houser Connection to SR169 Obtained a$130,560 ISTEA/STP grant, a$729,598 TIB/TIA grant and$200,000 from (Maple Valley Hwy). Project to include minor widening,re-channelization and signal modifications to Metro. Mitigation is$411,000 from PACCAR and$221,800 from Boeing. 1995 grants provide HOV lanes and will construct a portion of the Houser Way connection with SR 900. programmed=$130,560 ISTEA and$302,300 TIA. 1996 grants programmed= $75,505 ISTEA and$729,598 TIB/TIA JUSTIFICATION: CHANGES: The Houser connection with SR 900 makes possible the installation of HOV lanes and improved TIA grant increased by$29,598. signal operations on SR 900. This corridor is heavily congested by commuter traffic and has a high 1996 mid-year budget adjustment in 317 fund of(+)$427,298 in grant revenue. priority for HOV treatment. AundetliOgi:2 084 453 UnF.::unclest;;::>::>:>::>>»::: >:>M Project Totals Programmed Pre-1997 Six Year Program ::::<:::;;;......<:::;:::>:>:<:>:::::. ......:.:::::. ::...Rr. rammed......s eht:pre:'1.998?:�::?1996:+<C r. o e............ .:::::.:_::.::::.:... ::.::;;:;;:-;;:;.;:•;:. :.::::•::.:::::....: ........ ......... :.:�;::•;:•-:-::�:-;:•:: ......... .... ::::::::. ...................... 09. .. .. P... ..............:........:.::...a.ry.Y. [:.::::•:.�.'.T.ataE:.:::::::.:.. .:.::.:<:.;1997;:.;;;:;•:.:;:;;.;:::'1998..�:.�:•:.::::.;:::..:1J99:::.;:;•:;.:::•;:.;:;.;:2000.::.;:;.;:;.:;;:;:.;:.::200,:::::::::;-:::::.;;• :;::.;:.;:.: EXPENSES: :......: :.:•:::::..:::.::2002.::.::. Project Development Precon Eng/Admin 135,888 135,888 R-O-W(includes Admin) Construction Contract Fee 1,504,344 1,504,344 Construction Eng/Admin 219,652 219,652 • Other 169,714 169,714 ' S:.L.EXPENS>:S...............:.::::::.2 029 5 ...................... ............... ... ..:............................�.................:......... ........................... ........................... .....:...................................................:.:.:......:........: ............... ......::. 9.$....................3.3518. ............1 893 7.'f0. .::..::::::.:.�::................................:..�.::::::.::..:.........................................................:::.::.:::.::::.:... ........................... .......:.:.:::.:..::::::.: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 272,055 32,382 239,673 Vehicle License Fee 119,440 119,440 • Grants in Hand(ISTEA/TIA) 860,158 54,855 805,303 Mitigation In-Hand 632,800 48,651 584,149 L.I.D.'s Formed Other In-Hand (METRO) • 200,000 200,000 Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined TO.TA........................................................... < .......... 084 53 .................. ...............:..4....::.::.::...:....:...x.35 888...............1 9��565. ...............::.::::::::::::......................:...::.::..::::::.::...................................................................................:..:.:::.:.:... ........................... ... ........................... .pRozcTsuar6wFWLL•97.NR7 MOM 09:44 AM 6-3 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Downtown Transit Access Program Functional Classification: Collector Arterial . Fund: 317 Proj.Length 0.5 miles Proj: 12170 RANK: 4 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Construct transit lanes,improve turning radii,turnarounds,queue bypasses,pedestrian and bicycle Will seek grant funds through ISTEA and TIB to implement Stage 3. Total estimates improvements,signing,channelization and signal improvements(including transit signal priority equal:Stage 1 =$561,130, Stage 2=$800,000. Stage 3= $5,200,000. systems)to provide improved transit access to the Renton Urban Center. Construction to occur as a three-stage process. Stage 1 provides initial improvement to south portion from Grady Way to CBD. Stage 2 enhances and expands on south portion improvements in order to serve new downtown transit center.Stage 3 will improve access from transit center to the North Renton Industrial area. JUSTIFICATION: CHANGES: These improvements are needed to improve transit speed and reliability in Renton's Urban center, The original Talbot/Bumett Transit Way project has been expanded to address and to connect with a planned downtown Intermodal Center. The program will increase transit access area-wide long term needs. Budget adjustment of-$148,870 due to descision not to and ridership in Renton's Urban center by improving speed,reliability and accessability and improve Burnett Ave.Between N 7th.and N 4th. .ISTEA grant of$640,000 awarded enhancing intermodal transfers. for stage 2. • (:`::::>;E:tnded:t:N2:ISASIM)riFunded? : >4 260 000 Project Totals Programmed Pre-1997 Six Year Program ........................ . ................... . ... ........................... . ..... . ..... ... ............ .......::._.::::::::::. ::::.:;:.:�::.::::<:»: ......... ........ ::.;:<.;:>:::<::> :<::X001•:::..................... ........ ........................ :::::::::::•::::::::.::.... :::::. .. :.. . •... : ::.:::::.. :::::::..:_..:.:::::.�: ::::;:;:::.;:;.>::;;:1998.::::::.:•.......1999...:.: :.::::::.:2000.:::•.::. ... ... ............. ........ .;;;:::;:;.::.>;:•;;;:;;;•;;:.... . ;.. e,..S9g:.,:'.t9g6..•f:.Cglr:.oV.�[::. :.;:.;;:rtotat;.;:.;:.;:;.;;.;;:::.::::::'199.T.::::.::�•:::::::.•............... .................. .;:.; :<::«::<:::>:<::<:::»:;:j�'EM :<:::>:::>:<:: ::::s>;:::>:::a?!rogrammed>::�:<::5pentipt...'1. _::.. . � EXPENSES: Project Development Precon Eng/Admin 728,798 15,798 65,000 648,000 108,000 400,000 140,000 R-O-W(includes Admin) 1,095,332 95,332 1,000,000 - 1,000,000 Construction Contract Fee 4,224,027 160,000 4,064,027 24,027 640,000 1,400,000 2,000,000 Construction Eng/Admin 327,000 15,000 312,000 52,000 100,000 160,000 Other .... ............... ........ .. ...... .0-;.04:415.45:71i, ... . .. 1:.:::g.:i .. :. : » »:> < s>::<:>:>2°;16.0,0 .i < €:M.;,:!>i.;i.i .... •:::::::::::::::.•. :. :::.�::::.......:......:. • :•:::::::::.59x0.OQ.:.:.: .40.000tf::.:....2I;i409Ii00...: . ti � : :::.:.:�::::::::....::. � ::>::;::>::>::::�»>:>.2d0 0A0<::>:>:::�>:a;02a 02T:>.:::;.>:;:;<s:'132027.:::,.:::::..:.,.�..... . ..............�.... � .......... T�TALEXPENSES::::<::<.::::_>::::: : ::.::.::.:.:;.;:.;�.;:.;:;:1:11,70.:....: :::.:.:::.. ..:.f.... ...,.........�.. .�.... .. . t SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,475,157 111,130 240,000 1,124,027 66,327 . 117,700 80,000 480,000 380,000 Vehicle License Fee Grants In-Hand 640,000 640,000 86,400 553,600 Mitigation In-Hand L.I.D.'s Formed Other In-Hand . Grants Proposed 3,960,000 3,960,000 320,000 2,010,000 1,630,000 Mitigation Proposed . L.I.D.'s Proposed Other Proposed(Metro) 300,000 300,000 150,000 150,000 Undetermined .::::::.:.:........ :: :.::::. : ;;:.:::>:>:::::1;: 7 400 000.. .....2 .. .... ::::<,,;»:<:<;::<»::::>::::.;;: .:.:. . ::.:.;:.;;:;.;:.;;;:.;:..:::::::::. .. .. ; : . ::;:.>:;:.;;;::;.;:;:.:::.... .�:.�. ::::.:;;;; .;:;.;:. .::::. .....52'727...:.:::.::.:.5711 'J.OIi...:::.�:::..:.> . . ::•.:: :.;:. ;. . :;;:.:::.:.:;:.:.;;:�;:.;:.;:.;:.;. �3:5'157:`:.::;.;:.;;;;;;:.;:.:;;.::�'('k1 1�0.:..:;. : :.;:.:�da;0.00>;::>::>><�;0240�7: : '�....x � 9 .......�. T£1!1'AL:S.i�EI.Rt`►ES:.::::::::::::::::..::::::::.#�`r..x...r....................................► ................t.... .. 08/05/96 09:44 M CIPRO.ECTS'iE TP+FWlIL-97.WB3 5-4 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Walkway Program Functional Classification: N/A Fund: 317 Prof.Length N/A Prot: 9 RANK: 5 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: This program provides for the design and construction of high priority non-motorized transportation On-going yearly program.$120,000 MVET multi-modal grant will be passed through facilities for pedestrians as identified and prioritized in the 1991 Walkway Needs and Priority Report Metro for joint design and construction of sidewalk access and bus stop improvements for wheelchairs. JUSTIFICATION: CHANGES: Providing safe and convenient non-motorized facilities is an integral part of a complete transportation Budget Adjustment of+$155,000 of new grant money. network. Specific improvements will respond to the needs of school children,the elderly and the handicapped,and will support increased use of transit. {'? ;;F.unded `I<»<1040.31<;IUnFunded ;j:;;:> s>: ::: :» Protect Totals :.; :..:..:...:.. Programmed Pre-1997 .......>....... ....... S::><:ix Year Program m ._.::. : ::•::::::.;:,::: „. >..:.:: »:::.� >.<I:: < » >. .. .: P[ogranmed: .: SRetlt:Pre4996...:1 9 . .Car NDes.:::; : TotaF. - � : : 1997 . :. :t998::•;•::» iN»1999::iii::.. 2000;•:.:::. 7:M;200't::>c.:>.::;;:;»2002i:.:»:> : EXPENSES: Project Development Precon Eng/Admin 121,463 20,063 51,000 50,400 8,400 8,400 8,400 8,400 8,400 8,400 R-O-W(includes Admin) Construction Contract Fee 859,040 138,040 . 385,000 336,000 56,000 56,000 56,000 56,000 56,000 56,000 Construction Eng/Admin 63,128 6,043 23,485 33,600 5,600 5,600 5,600 5,600 5,600 5,600 Other TOTAL:EXP S 5:::>:<:>:<:;::;::<::::<:;>::::<. ........1 0.43.83:<:»::>::>>;::»::»:<:::. :... . .:::.::::.:::::. •>• ::::�:;::<:::>:<z:::>: � ., .. :..;;:;:;:.;:;:.: :.:•: . ...:::::::::.. . .: .. ::::;<;;::::>....., :. :::::>::>: ::>:: ..... . .. 11.64�d6::..�:::::.�::::::. :::_::::«.»>::;.:•::; � :>:::»<.:>::>:<:;>:.. �:.::::::.:�::.. � >: . ... .. .............459 485. .::.::.::.�:.A20:fl00.... .............7.0 00 .. ............. . ............ .. . ... ..... ...... . ............_.. ..........,.......� ......:.....: ::.......... .. ............... ............................. ........,.......,. ...........> .... ..............., ...::::.::...7.0�.00:>:»::>::>::;:<::7a�oo:::::.:::»:«<::7Q•oou:::::>::>::>:::<::7.0�0.00:; SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 783,631 59,146 304,485 420,000 70,000 70,000 70,000 70,000 70,000 70,000 Vehicle License Fee Grants In-Hand(MVET) 260,000 105,000 155,000 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed(MVET) Mitigation Proposed : L.I.D.'s Proposed Other Proposed Undetermined :O:TAi 's�S.Q.U .Og >(043;°63f�> :>: ?>:>'<<>1.fi4'(45;.;.1::igiii: :<4594815..1 Mi:g420 . .,: < :><`.:`«<: : : > ;.: ?>:::<:>: ::..r...0 <:>:'..`.`:: �: ::::::><`T iii;r7 :::::»:: :;. .. .... .......................................... ........ �... , ............. ........::. . .�... .::.::.:::.::::.�+t2�,000..-..::.�::._:::::7b,000. ...... .:70,fl00.:..:.;�.;:.;;;:7i�,000.: .,.....711jQ0lf.. :;.;;:.;;,:.;70,bOf1;.:.:..::.:::;;.;;7.Q,000.:. C:PRC.ECTRE PFNFir97.WBj OIV8'9i 094 Mi 5-5 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Intra-City Intermodal Transportation Program Functional Classification: N/A Fund: Fund: Proj.Length N/A Proj: 12163 RANK: 6 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: ' A comprehensive implementation program of intermodal mobility systems,improvements and A study of what type of shuttle service to operate in Renton is funded with$80,009 in facilities for the Renton area that link all modes of the local transportation systems to regional transit ISTEA funds and is near completion. It is hoped that demonstration service can be and high occupancy vehicle systems. A major first phase will be development of a circulator shuttle implemented by August 1996. bus system and/or dial-a-ride system interconnecting activity centers,park and ride lots and transit . routes. Auxiliary facilities such as bike racks and links to the non-motorized transportation system that promote intermodal mobility will also be evaluated,prioritized and constructed under this program. CHANGES: JUSTIFICATION: • Clean Air Act requirements,economic development,residential livability and relief of traffic ISTEA grant funds of$450,000 have been obtained for first two year's start-up of congestion are all dependent on achieving an increase in the usage of transit and other non-Single shuttle bus service. These funds will be administered by Metro Transit and do not . Occupant Vehicle(SOV)means of transportation. Renton can obtain much more benefit from appear in the City budget 1996 budget adjustment to shift$50,000 of ending fund . regional non-SOV systems such as HOV lanes,buses and commuter rail by providing local balance to this program to provide matching funds for shuttle bus grant . improvementsto non-SOV mobility and interconnections within the City. lriilded<;I €€><620;a00 4InFundeditiliM::; 60;000:: Project Totals Programmed Pre-1997 ' Six Year Program Pr �.. .... a...... ::..:.-at :en . re:19 ,.:::.199: +..:..:.::.:.:•._.:::.:. :.. 00.................2001..........::......2 02i........ ::.. ......:.:..:.:::::: ..:::::.�:::•:::::::::::.::.. ....................:...:•.:...: ....:. ...: :.. :::..::::.. ::>r;;>::»:::::>::<::>«. ;:r ::z:;::»>::»::<: 898..................1 ....... ; �;;;;:•;>;:•;::•;:.;:•:.�.;::: •. :�:•;:�;:�;;;:.;:;•;:;;;;;:•:::.:. . :•: :;•; :.. .. ?:::. 95.;*:•Car:. over>:«:: ;Tota(:.;:.:;;•::;,.;:.;>;;:..::::199.7.. ::•: 1:.............. ......................:.... ........ :;;:::ITEM::::<�>:«<::«:::::;<:<::>::»::::P.rogrammed:::.;::.Spent.Pre:i596:.,.:.'19 ry EXPENSES: Project Development 190,000 60,422 129,578 Precon Eng/Admin 200,000 20,000 180,000 30,000 30,000 30,000 30,000 30,000 30,000 R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other 990,000 990,000 80,000 30,000 220,000 220,000 220,000 220,000 ;. , ... :..::::::::::::.49, 0.. :. 250 000...........2 .0 00 . ;::. <•:;;;:;:;.:.;:•:>;:.;:•:.::;::.:;••: :•;, :;;;:.;:.:<:.:. . .: ... ::>:>;>::<><:«:»:<.: :: .. <:::.;::•:>:::.:;•.:. >z=::»:«�::;..: .. ..:......::.SO 000...........2 .;!� ............r. TOTAL...:... ;.;: . �.. : �<.::.>:.;:.;:.;;::;:.:.::.;:.>;:;.;.:;. ;:_.::;.;:;;>:�;:: ::;sa.2z.>:::.:::;.:.:;::::;:;:;a:!t9 57.i3:.:;.:.;<•:;;'(►1.7.0,000:_ :«. 41��do0...::::.::...... . . <EXPEN5ES:::.;:.>:::::.;:.:;<.::<:.;:.;;;:1.,360,QO.Q:,... ....:::...._.�!4.... ........ � ...... .....> SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 540,000 34,462 145,538 360,000 60,000 60,000 60,000 60,000 60,000 60,000 Vehicle License Fee Grants In-Hand(FAUS/ISTEA) 80,000 25,960 54,040 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined 760,000 7601000..... ... ............:.:.::•. :• ..::::..:..: :;.::.::.:190#000..............190,000>; :«>;:190,000:;«>::;:190,000 ...................................:::::-:�:::::•::::•.:.: • :;•::::.::........:..,.:;•.::•:::::::»:: ....;:_ :.;;:.;:•;:.;:•>:.:... . . .::::.:;:::.;::.;: .. ........ ...... 00 25.0.. ... .... .. ...... ::.:::.:::....................... ..:.....:::::..�:...... ... ::. :..::.:........... .:.:....... .. . .::.:::.::::::: ...:..::::::::. .......... :::.::::::.X50;X00..........25i1��..:.::. .:...... ......... T..::; <.:; > . :. : :.:.;<:>::<:><::::.:;:;.:::.:.:<.::.:aso aoa;:;<::::<::::>:.;::.:.:.sa a2�>::::>: .:..:�s�,s7�.:�.. .�..�20,000.:.�. ::: :.....,........{.......... ..., �I ::£�TAL:;S.�UR�ES;::;:::.::::::.::::.I::::::::'(�.......x........ ........................� j 011105116 UM M1 CiPROecrsxBt rw.arwet . 5-6 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Transit Program - Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12109 RANK: 7 CONTACT: Lee Haro (206)277-6217 . DESCRIPTION: STATUS: Determine and provide funding for short-range and long-range transit needs,routes and facilities, Staff is currently working closely with Metro Transit staff on near-term service including a transit center,park and ride lots,bus shelters and arterial system improvements such as improvements in Renton.Work on longer term transit planning has also been transit priority signal systems and roadway construction/modifications required to facilitate transit accomplished. Work is well along on the Six-Year Transit Plan which will identify, access,including a Transit center in the CBD. Joint projects with Metro will also be pursued to prioritize and provide cost estimates for the service changes and construction projects improve regional transit service to Renton.Work with Metro Transit, Downtown Renton Association, to be undertaken with this program. Process underway with Metro for planning and Boeing, etc.,for implementation. development of Transit Center/HUB in CBD. JUSTIFICATION: CHANGES: Transit improvements are a vital component of the transportation system's ability to absorb future Application has been made for an STP grant to support a Transit Priority Signal traffic demand and meet Level-of-Service standards.Transit will be one key to meeting the goals of System now defined as a separate project in the TIP. the downtown area as well as industrial and office park developments in other parts of the city. Federal ISTEA Legislation make this program an excellent candidate for generating Federal grants. Coordination with Metro and RTA projects and programs will also help leverage these funds and increase the benefits to Renton. l<<; funded ;il29z898:iUnund ed 'I <20.80000::: Project Totals Programmed Pre-1997 Six Year Program ;::;:::::> :»:<:::: ;;::IT ;•::::99 ...+..c. rryovef i*:»:<:>::;_ .::...iii _:. :.::, ......... ............................ ogramm�ci:... S ehtPre.1996.....189S:.t:Cat: over. ::::.:Tota ........:.. ::::::::: ;.;;:.;;;:.;.;;;:�:::.;., ;:::>•:.;:;::.;::<:.;:.. .......:.:.:::.�:. ::.�:::::.::::::::. .:..: .: p ry ................... .).:::: 199.7. :::::: .::. 1998::.;:.,.-... .:199.8:::>:<;>::::::::><::::<::;20b.tF:::>»>:;:::::::::200:.;:. .;::.: .. :2002::»;:;:.:: EXPENSES: Project Development 332,999 197,966 75,033 60,000 60,000 Precon Eng/Admin 580,000 200,000 380,000 60,000 80,000 60,000 60,000 60,000 60,000 R-O-W(includes Admin) , Construction Contract Fee 2,260,000 2,260,000 90,000 570,000 400,000 400,000 400,000 400,000 Construction Eng/Admin 200,000 200,000 40,000 40,000 40,000 40,000 40,000 •Other T..L.EXPENS ;• :.;:-:;:.;:.::•;% 75 :>:•>ii:ti:•:: > .............: . • :...� Z.., 9...::. .::.,...:.::a.97$.6fi..;:.:::::::::::::::275 0.33;..;:».:.;:.:.2 9.00.00 ;;.;:.::.;:;•;:;�;: � :<::::: :: >: •:.:::::::.� •. :..::::.�::: •. :: . .. � a. .....i.._., ..0..... .: :::.�'1Q,000... 690,1].00:<:<:»:: ;SO.aj)QQ;,:;:<.::.;SO.a,0.00;:::::>:�:;::<;50.O,U00<;:;;:>:::;�ar0.0,000;:: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,292,999 • 197,966 275,033 820,000 210,000 210,000 100,000 100,000 100,000 100,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand • L.I.D.'s Formed Other In-Hand Grants Proposed (FTA) 2,080,000 2,080,000 480,000 400,000 400,000 400,000 400,000 Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined - .TA L. ou - S. .. .RCE �:::. . . .. ..... ......................: ::.::.3, 7299:.:.:.::......:.:.::19T .61i.-.::::. .:.:::::27.:50.33.....:...... :. :::.:.:.� •. >:::»::»::»:: . .. >; ......... . .�.. . .. ................... �.... :. :,:::::�,9.00,000.;:..>::>:.»>::::::�4bti00.;:::«::<::<:,99ti,000.>::;:;::>::>::>:��.Oi?800<:::::::<:::::�i0b0.Ob::::::>>:«<:50.0�000::•::::::::.500000:.: CVROJECTSILEEITPIFWV417.W113 ClsAsow AM 5-7 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP CBD Transportation and Streetscape Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12111 RANK: 8 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Analyze,design and propose improvements to vehicular and pedestrian traffic facilities and The City's Comprehensive Plan,which proposes changes to land use in the CBD,has streetscape elements within the City's Central Business District compatible with CBD development been adopted.Transportation elements which are compatible with and enhance the proposal and Comprehensive Plan land use designations. proposed land use have been recommended as part of the Transportation Plan. JUSTIFICATION: CHANGES: Future development and economic vitality of the Central Business District depends upon the ability None of the transportation system to handle additional transportation and parking demand and pedestrian movement. The specific types of transportation improvements need to be coordinated with the type of land use proposed in the Comprehensive Plan. I:i:<:`grandediti aW6062:431tl undeid .1 «:` iiiMin: Project Totals Programmed Pre-1997 ::::. ... .Six Year Program :.;:.::::;....:..;>:.;:.;:»;;:.::::::: ..::.>:.;:.;;;: ;>;:.;::;.... ..: •:::>:: >;:. :<:>:»::>::::;. ::.::::.;:::::>:::<:; ;:;::>;::>:::>:::»::• 002:;:>::_>::::: EXPENSES: Project Development 152,843 83,951 68,892 Precon Eng/Admin 3,700 3,700 R-O-W(includes Admin) Construction Contract Fee 119,557 29,557 90,000 90,000 Construction Eng/Admin 12,400 2,400 10,000 10,000 Other ;:. ;:.>;::.;;:.::.:.::.:.. �•;:;:::«<:>«:::»::;:� 9 �:.::.::::.;•:;.;:::'I:0.0000><:;:«:`.»'::'[Da�00�' :;'.''':;: ' ><���;`<` ><<'�`:� ':�< `: > <`<>>? >»< «: <: <; >>€<<s;�''>':>> :`«» =`?> > SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 250,000 91,108 158,892 Vehicle License Fee Grants In-Hand (HCT) 28,500 28,500 Mitigation In-Hand L.I.D.'s Formed Other In-Hand (DRA) 10,000 10,000 Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined ::..... :<;>:<:<::»::><:�:> ::»::<>�>:<>: �� ;:<:<:::::>::::»::.. .......................................... TOTAL::S.OB.R!C.ES::::::::::::.::::::.:::::.<;;>;;2g8,5o.Q:.:.:::::._:::......................................................................... . a 6 09:44 c:wno.�crs��v++wa7.wai 5-8 - CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP • Transportation Demand Management Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12135 RANK: 9 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Develop and implement a Transportation Demand Management (TDM)program that will maximize The City is working with Metro,King County and other jurisdictions to develop the"people-carrying"capacity of the transportation system through operational and capital coordinated TDM strategies and CTR implementation.The unfunded portion in improvements and non-capital programs oriented to promote alternative travel modes rather than 1998-2002 reflects uncertainty as to whether the state will continue to provide grant SOV use. The program includes, but is not limited to,implementation of a Commute Trip Reduction funds to local jurisdictions to implement the CTR law. Additional grants for$52240 in (CTR)ordinance and working with major employers on TDM measures. Also includes development 1996 and$52240 in 1997 are to be executed. and implementation of City's own CTR program. JUSTIFICATION: CHANGES: The City is required by State Legislation passed in 1991 to develop and implement CTR.TDM/CTR $1549 of 1995 grant not received. is an important element in achieving desired transportation,environmental and land use goals. Therefore,grant 1996 budget adjustment= $50,691 ($52,240-$1,549). Budget adjustment of(-)$100,000. $50,000 moved to Sunset Rockery Project and $50,000 moved to Intracity Intermodal Program to match shuttle bus grant.. • Pro ect Totals Pro rammed Pre-1997 . . ;..... ......-,.............................:.............. .... Six Year Program ::::.::.. ::.:::........... :>::;.::::; 2000>:::::;;::::::::::::<:<:2001.:.;;:.:;:::::.:::.:::.::2002.::::::.:: EXPENSES: . .............. ........ .... ........ Project Development 533,640 • 122,400 89,000 322,240 72,240 50,000 50,000 50,000 50,000 50,000 Precon Eng/Admin R-O-W(includes Admin) • Construction Contract Fee Construction Eng/Admin Other • TOTL .: :,:•;;:.:.>;::..i.;.::•;:::.::. . 3: ;.::::::.;::.;::;:.:::.;1. ::-.;:.;:;.:::;.: .;;::> : ,...;:>:;>:<:»»::...,0..::::.::.::::::::....::.... .. ..:::.::::....::....:.<-;;;;;;;;;:;::...:.: :.: :...,::.::::.:: .::....:..:: AL.EXPENSES:;.:;..;::::.;:.:::..;.;:::.;.::::::5 3 .:.:.:::.:�:::::... � .;::;.;:.:>;:.::;.: . ..............:. ........::::.3 64.0:::::::.:::.::::::::1.22 400.,:;:;:;::::.;::.::..89 0 :.::;::;;>;;;>:.::: .. ,. _;�.::.:�::::::::. :: >::.:�;:<.;:.;;;: . . .............. .. � :.:.:..::. .... � OQ. .:. ;32�,29072,24t7..;:.::.;::::.:.5i�t1.00:::: SOURCES OF FUNDS: ......... � ..... ........�...�. . ..:...:. .::::::50,�.OQ:..,:;:;•;:.;::.>ry.Q,ab00.. ::::.;;.;<.;5.0,000::. 1/2 Cent Gas Tax Business License Fee 167,051 10,291 36,760 120,000 20,000 • 20,000 20,000 20,000 20,000 20,000 Vehicle License Fee- Grants In-Hand 164,349 112,109 52,240 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed(CTR) 52,240 52,240 52,240 - Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined 150,000 150,000 30000 30 000 30 000 30,000 30,000 TAL.S..OU.RCES.•.:.:::.::..:::.::.:::..:::.5 3 64 . ................. ;:.;;:.;:.>:::::; . :. _::•:>::»; >;::.. :.. ::>:;<»::>:;>:.; .: ...........,.......� �...:.t).::.::.::.:.:...:..:1224OQ.:.:::::;.::.::.:.:;::.;;.89 000............... 0................ . � •. .: ;; ............. ...................:.......: .. .......... ........ .......................� ► ...... ................ 511600500017 �::.::...r�.0,!b00. ::::.;:<.::.:.:.�a0,000::; c1PROJECTMLEEIiPffN447MIM MSS 0944 MI 5-9 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP • Arterial HOV Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12160 RANK: 10 CONTACT: Lee Hare (206)277-6217 DESCRIPTION: STATUS: Perform a comprehensive analysis of short and long term HOV needs for the Renton area and HOV Arterial Study to identify specific improvements along three corridors using develop a prioritized list with cost estimates of recommended arterial improvements,such as HOV $86,500 ISTEA grant,is nearing completion.Design of initial improvements can start lanes, HOV queue jumps,park and ride lots and other HOV facilities. Also provides funding in future in summer. King County has expressed interest in a joint project on the Carr Rd./SW years for construction of high priority projects as they are identified. 43rd St.corridor. JUSTIFICATION: CHANGES: Development of arterial HOV improvements will be necessary to promote the use and efficiency of Projects have been developed and are now separate items on the TIP in the SR900, transit and other HOV mobility options. SR169 and NE 3rd/NE 4th corridors. • (»« : .unded>r;{«:...:1:;67:8;0.0:1::>UnFund..*:1::::::::::1;587;500.... Pro ect Totals Pro•rammed Pre-1997 Six Year Pro.ram : >::>::::«::>:; ::.;;:.:;:.;;:.;;;:.; ::i ii:: ig4 02:;::::::»::: ::::::::.:•:::::::: ::.::::::.::�:::::::..:::: :..:... ::.. . :... .:::::.::.. ..: :::. .:::..... :1995. : .:::::;:.:;k999 .:.�. . 2............. ..... .. ............... .............. ......... ::•;:.;;;:;>;;:.;:•;;:.:::;.>:::: :::•::•:.;:;:.:.;;:.;;>;:�:•:;:.:;.:.. rammed:::;:<::S ent:3>[Q.::1996::;:199&:.t:C�rry�r�r.:.:.::.»:.: 7:otaE.:::.,•:::-:.::.:::: 199T..::::.�....:....... EXPENSES: Planning/Project Development, 145,500 61,298 .74,202 10,000 10,000 Precon Eng/Admin . 451,000 100,000 351,000 180,000 165,000 6,000 R-O-W(includes Admin) 100,000 100,000 100,000 Construction Contract Fee 2,290,000 2,290,000 426,500 1,863,500 Construction Eng/Admin 229,000 229,000 47,500 181,500 Other ............... .. . .. .; «. .. ........480 OOQ::i.:;i:::2 045000 TOTAL.... ... :<.: . . :.:::.:::::::::...::::::::::.:. .: •: :;.;>.:.:::>::::::::.::. .:. . :.:.;:::;:::::.�:::::...4202.•::::.;:;:.:.;79800..Q0::�..::::::::::: ::::::::::;::.>;;.::.:<. .....::: . . 29.0,.: :.::. ..............., .. ......� ;E�P:.:ENSES.. ;;;;:;.;;;;;:::<::>::::>::�,2?5,500..:-.:;.;;;::.;..::.;. �::.61.,298. :: '('�`.... ...•.:.:,......f ...�.......... ........................... .. .... SOURCES OF FUNDS: 1/2 Cent Gas Tax . Business License Fee 1,241,500 61,298 87,702 1,092,500 90,000 90,000 240,000 672,500 Vehicle License Fee 350,000 350,000 350,000 Grants In-hand(ISTEA) 86,500 86,500 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 1,427,500 1,427,500 90,000 75,000 240,000 1,022,500 Mitigation Proposed 110,000 110,000 110,000 L.I.D.'s Proposed Other Proposed Undetermined TOTAL. ... .;;: .:. . :.::.�:::::::.:.;:...:: .;.;�.:. . .. ... ..;:.:::::.::::::::... .:.:::;::.2 9.13Q 000..:.:..::::: :::::.:::: ::.�:.. . . . .: .:.:. :: ::7Q;,..... ...............:........ . . :.5.OURCES ;>;;:;�;:«::.:>;�,21.5,��.O.t1< :>:::<:>::::>;;;: 61:,'2+98...,::::::: ��'4,2Q� ... ...�..................................... 08/0619$ MN AM C:WROJECTS.EE1TPIFWLLr97.WBt 5-10 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Bridge Inspection & Repair Program Functional Classification: N/A Fund: 317 Prof.Length N/A ProJ: 106 • RANK: 11 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Inspect all roadway bridges owned by the City every two years to determine bridge load ratings, Ongoing yearly program. seismic retro-fit needs, undertake minor repairs,and preventative maintenance as needed. City has received grant funding from the Federal Highway Bridge Replacement and Rehabilitation Program for seismic retrofitting of Williams Ave Bridge and Houser Way Bridge,which were completed in 1995. Grant Applications have been made for seismic retrofit of the Logan Ave. Bridge,painting of the Williams ave.Bridge and replacement of the May Creek#1 Bridge. JUSTIFICATION: CHANGES: Inspection program must be done for safety and funding purposes and as part of S.W.I.B.S. Final grant changes were$1,176 less than estimate. Budget adjustment of(-)$1,176 Program to determine structural deficiencies,physical deterioration, or functional obsolescence and in grant funds. to qualify for Federal bridge replacement grant funding. Repair funding is provided to accomplish improvements,identified through the inspection program,that will increase the safety and extend the longevity of the structures. I:< >;lrunded<..<> ' 91;k°845:>isUnFunded<>:::>::<::><:»:>:::><: :<: Project-Totals Programmed Pre-1997 Six Year Program :>:<:>::;>» >::::>:«:;iTEM::<;:>:<<<€ >iii>> ,P....r......ammed:::=:�:<::S ent:P. e�1989:::::189&. .. :>::»:<:>::>•:;.:<;: ::.. �;>: :.:::.; ;:<.; .;::;;.;:.>:;:.;;;:.. :.;:.;:.;:;.;.;•;:;;.;. f.......... .......... . .....r...: .........t.C�r: Qver..:: r;;<>TotaE..................... :>;:;.:.;:..;;:.;;;:.;; :.:;.:;;:.;:;.::.;::;.;:. :::;:::.::::::::: • ..........................:a9 p ....... .ry........... ...................... .::::..:::199..7...:.:.::.. .: ::1998:::.::::: J99 .:.:.:;•::.;;200.0 <;;::.:.: ::200.1.;:;:.:.:.>;::;::.;:.;;;:200Z.:i::>:>::>:: EXPENSES: Project Development 150,000 150,000 50,000 50,000 50,000 Precon Eng/Admin 115,000 20,000 23,000 72,000 8,000 16,000 8,000 16,000 8,000 16,000 R-O-W(includes Admin) Construction Contract Fee 554,272 57,272 152,000 345,000 38,000 77,000 38,000 77,000 38,000 77,000 Construction Eng/Admin 92,673 10,000 49,673 33,000 4,000 7,000 4,000 7,000 4,000 7,000 • Other ' TOTA:<:'E: .L.EPES - X.. NES.:.�::::::::::...:::::::::.::� :,:. 91184'S..>:::»:::>;:: ::::;>:»:: 8 � : :>:::>::>:�::;<::<:::<: : .. .. �.. . .......... ............� ... .. ..............,224,673. ::: ,R,6:,...t..QO.,.:,;...;:<.::<,;100,000...:.:::.:::100,0.00::.::.:;::.<t0i:000::: :<:;;gi:::10.000.;::.;:.;:.::.;:.:1.0(40000.:::::::::.00000:i> SOURCES OF FUNDS: 1/2 Cent Gas Tax . Business License Fee 858,485 71,380 • 187,105 600,000 100,000 100,000 100,000 100,000 100,000 100,000 Vehicle License Fee Grants In-Hand(ISTEA) 53,460 15,892 37,568 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined TOTA.. . .....,;:.::,:;::x;:.;;>:�>:;.:::::.:;>.:;. ,m.:, 3i i:E;:iia: :::i:;::::?. ..,......�_:: :v,? ;;;:< . ::.". .�i; 8i<SE:i�?::? . ,::.:.:::;.;xs:.:::.;.:....: .. .:f::::•:;::;::.:.;..:. ;..,;.>;;r;::.:.:....;.:..:...;: ::.:;;:.;:.;:,,,.T.:;,.•:;::,:<.::;: .>,.n,,.,. ,�:: ::.:::...:. .. :.. .......................:..:::..91:1 94�..»>::<:<:::>::>:<:»::::>: 8727:2:.:.;:::::::.:..«:224. : <:::<::�>::::::>;:::: ......... ..................... ....................,............................. ..� ...... ...........:.... . . ,6.7:x:<�»::: <::::::<::000 000.:. ..�::.::::100 0.00.:.:::.:.::::.:.;1.00.000.;::.;:.;:.:::::100 0. ..;.;:.::.;:.;: ;;:.;.;�:.::. :.:.�::::::: .: .................., ..............., .:::....:..,0.0 .. ::.:.::::?00,�0(i:.::::. .10.0,b0rj:.;:;.;:.;;>;::1.A..Q,000:. CPPROJECTSYEEETPFFPU497.W133 M 09:44 NA 5-11 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Main Ave. S. -S. 5th St. to Bronson Way Functional Classification: Principal Arterial Fund: 317 Proj.Length 0.33 miles Proj: 12158 RANK: 12 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Widen to provide for two way traffic with turn lanes. Project to include curbs,sidewalks,street Preliminary engineering is scheduled for 1996. Final PS and E is scheduled for lighting,traffic signals,channelization,storm drainage,landscaping and right-of-way completion in 1997. JUSTIFICATION: CHANGES: Arterial Deficiency Ratings rank this roadway segment deficient in terms of accidents and Construction delayed to 1998. Adjustment to 1996 budget to include$1,204,800 in congestion in accordance with the TIB's state-wide evaluation process. This is a critical corridor in grant funds and also to include$38,000 of matching funds toward an addition of regard to traffic circulation to and around the CBD. $190,000 of costs for undergrounding utilities and railroad crossing improvements. I::'<:::iiEtstidediiini»3 1 00.0>:I:>:UnFundedi*.I<::>::<:452 000» project Totals L Programmed Pre-1997 Six Year Program :ii • if;;:.::..: ;::,:::,:.::::::::.�. ::._::..: »>;:<:<::;;;:•;: :.:.;::.;:;; :•::;•;»• 002::::< <s .. ::..:::.;::.;:::.::.:... .::::..�:::.:.�.:::::::::: :._;.:.:: .. »:.. 9&:+.Ca. nve.::...,....:.Tota').:.«:.;:.;�..: 4997.;•:. 1.998 : "(I� �...:.... ............... ........ ..... :........ :::>:;:>::.;:.; . iTErUI:.;;:.;:.:.;::.;::. ;:.::.;:.;:;.::.P...rogrammed:..,::.5per►t3�re:i998.:;.ti9 . ..:.... kr1+.... h................ EXPENSES: Project Development Precon Eng/Admin 320,000 30,644 250,566 38,790 38,790 R-O-W(includes Admin) 1,200,000 10,000 1,190,000 1,190,000 Construction Contract Fee 1,990,000 1,990,000 1,000,000 990,000 Construction Eng/Admin 150,000 150,000 80,000 70,000 Other 50,000 50,000 50,000 .:-•::::.::::..::.:::::: 4 ::<::>:::;:><>::0::.:: >:.;:;.>::;: : <:a::>:::II;2 .. .....1 ::<:lig; ::11: .0.;'?:€:><:' is<:;»::::::<:::::::::�:::::_>:: :i<::«::>:::i::<::?::ii iii.`:::.<s.>•»>:€�? T(?TA ::: .: :.. .. �;::<.;:.;:<.;;;:::;:;<•;:•;:: :.;: � :..;::::::::::.:.:.::::30 fi44.;:;;;::::::.;::::::260 561i;..::.,.<: :�418,7:.90::. . ;1,228;�!90.. .::::1,,.08Q,000..:::..�.F'�.::..x.....-. ........................... ..... ►I.;EX.P.:.ENSES.:.:::::::::::..:,,.::::::�,�1.OF00.4.:.:::::::.:::::.::::::..:.:. . ..................�.......... .t SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 448,000 30,644 322,556 94,800 _ 94,800 Vehicle License Fee 350,000 350,000 350,000 Grants In-Hand(UATA) 2,760,000 1,204,800 1,555,200 597,200 958,000 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 152,000 152,000 152,000 Mitigation Proposed . L.I.D.'s Proposed Other Proposed Undetermined 0:. 0 t:iiii:i'i':: :S ': :s:<:? ::'i:'':>::i:` .:EiMi::' �.., .: . .:<::::»:»::»>::•: ;: :>«::::::::::»: >� . ................. .. 0d2 0.00!:x;:;«::<��1I.. ;::::> < �:. ..>::::�30 5.44..:::::::::::.1527 3.5�i.::.:..:...2 152;000::..:::::::::::.::::::::::::::::.:.:::::1.�.:.. , TOT/�iL::S.O:EJRC.E:S::>:<.:: : : : >:;:> : ��71:OyQ00.: . . ::..:..r.......................i......►...................r . ....................... ......... ........ C9DROJECTSYEEITPFlU497.N97 08/014911 OM AM 5-12 • — CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP • Monster Road Bridge Replacement Functional Classification: Principal Arterial Fund: 317 Pro!.Length 025 miles Pro): 12117 RANK: 13 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Replace the existing structure with a new structure designed for earthquake loading and to a width City has received grant funding from the Federal Bridge Replacement Program to to accomodate motor vehicles, and pedestrians. replace the existing bridge. Design has been completed and right-of-way acquisition from King County is in progress. JUSTIFICATION: CHANGES: The bridge was evaluated in 1991 as part of the State of Washington Inventory of Bridges and Delayed one year. Structures(SWIBS)Program,which determines the structural integrity of bridges. The results of the inspection were that the bridge is structurally deficient and was not designed for earthquake loads. iftinged 1:f>:<1 7:7:5;000::1Mnl=oaded:>:1<> » r`':':,:_: Project Totals : .>.::. >...:.:. Programmed Pre...-199.:.7.....:..:..:::1:>3 :. :. < Six Year...Pr. ogram > ::::.:> : ITE.N'> <.':: . ..: ..> :.P.r«rammad> 1 ;pertPce18.8.6.; 18.9.Gt:.CaI'rybret1 ; : 7otal :; » ..,-,:;. ;19977.;.: »>:« 1998; ..::: ;;.:1999:;;:::: :i•'.::: ..;.2Q00:::N;.i1i.: :;::<:2 00.t.::..>:.:.> : :.�:.::.:..::20. 2:...:.3:;3::3 . EXPENSES: Project Development Precon Eng/Admin 254,000 246,097 7,903 R-O-W(includes Admin) 139,000 139,000 Construction Contract Fee 1,135,400 335,400 800,000 800,000 Construction Eng/Admin • 113,600 33,600 80,000 80,000 Other - 133,000 133,000 133,000' • TOTA:::<: : : <«>::>::::»::::<>::::<>>:>;>::, :. , 333. .. ...1............... ..... ...... 01 L E ;:.;:•;;;;;:,;,1;13;1. :. -.:: :;::::.;..;:.: .4;9.0 :: ii0.4:1 .� •::_..:::<:<:;.... .: .<>:>::>.isi>::>:>:;g•!.::<:.:::: . ::.R.':.::: .;::.:,:::::.g],:.m::.ii,iii: ... :W.::::::::]-M-:•:•::•' 3. 3333. XPENSES..:::.::.�::.�::::::::::.17..5 »::<:>::;»<:<..::.;;:: . .. ;::.;::.;:.;:.;:..; .:; .;:-;;:.:.:.::.:. : 313. . .. . �. ..............................� . 7..... ,::.:... ...515 9.03:::.::,:1.Q13 000::.:..:::::::1 .013 U00 .�.�:.�.:.:�::::::::::::.�.:.::::: : . ::: ...::::.::...:.:. .:.:::.::�:::•:::.:�::::::.::::.:::::: 133. .7 ............. L......Y.......... • .. i. 3331. .:: : _:::.::::: .Xa:;::•?r:;�:,;to::.;3;31;3:. ;: ;9y:i:?: :::yT`S'•:?:,11,1:%y:+ i SOURCES OF FUNDS: - 1/2 Cent Gas Tax Business License Fee - • 100,000 38,922 61,078 Vehicle License Fee Grants In-Hand(BRAC) 1,420,000 207,175 1,128,825 84,000 84,000 Mitigation In-Hand 255,000 255,000 255,000 L.I.D.'s Formed Other In-Hand _ Grants Proposed _ Mitigation Proposed • L.I.D.'s Proposed Other Proposed • • Undetermined . >:�;::::;.;:---:.:-.�1111.;: •. ...,,.. ..;:;:�:::::.>:».;.:;;;;;....,....�.....r.�:;:.n,;.::::::-::--.:.:......,,-..,.-..,,.:::.,..n:.r...:.:::..::.:.:::. ..::.....:... 333_3. 3333 :T. ::� �': � �� �'� ::>::;>::<>::»::>::»::>:�11:»::.::::. .. ..O ;:ii<.;:::;:::,;;:::.: •:..;:;.;;::;:::.;..: .;,:;•;:::;:.S: ;;_<.:;••;:;;li .;igit:<.:>: .iig »<::: .:::iiii::;:.;:;>;;:.;,iM., ::.:.: :;,:i:.:..0.:r• :: ::.::;i.,... :: .:.':Mi•:::.. ::. ..:TAL.SOU.ROES .......................... .. ._.....:...::.:.... .. ..... ...........................1T.Z50 3333.. ...........:,... ... .:.:::.........: . .......:....:: . 3 ���::.�.::::::........:..::.:::::::.:.:.:::..:......... :. .. .::::::.�:.:::::.:.:::::::.:............................. .. ;::. ..............................................{ .....�..RQ ..........24811.97...: �::::::::::.1 189 9 ....:.:.:::::: ::._:::::::::. ......:......:::.::::...::. .............::.:.�::::::..::.................:.......::..... ..:.::::.�:.�:::. ::::.:::::::.:,.:::. ...........333 +......... ...............► .....� ..0�. ::. ::::�.39000.._. ,.::.::�39t).00.:.:::: :.�.�..�:.:: .:.::,.:::::::::>::::::::::.:::::..:.: ....:::.:.:::::.:::.::::.:::::.::::::::.:�. :::.�:::::: :-::. . cwRocrsxPFqu».waa oroa� os*Mw 6-13 , CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP SW 16th St - Oakesdale Ave SW to Lind Ave SW Functional Classification: Minor Arterial Fund: 317 Proj.Length 0.40 miles ProJ: 12172 RANK: 14 CONTACT: Lee Hato (206)277-6217 DESCRIPTION: STATUS: Roadway improvements to include:Widening to 3 lanes,roadway reconstruction,curbs,sidewalks, Federal ISTEA grant has been obtained in the amount of$507,581 street lighting,channelization,storm drainage,traffic signals,bike lanes and landscaping. Project has two phases: Phase I will reconstruct the section from Raymond Ave.to Oakesdale Ave. with sidewalks and Class III bicycle facilities. Phase II will improve the section from Raymond Ave.to Lind Ave.with the same configuration. CHANGES: Budget adjustment of$30,000 to provide matching funds for grant Developer of JUSTIFICATION: Group Health site could defray costs of this project Traffic demands due to proposed development in this area,including the Boeing Longacres site,and deteriorating roadway pavement condition will accelerate the need for this project in the area from Raymond Ave to Oakesdale Ave. is>::<:F:..unded:s:IK:i';:::::587 581:::j::UnFunded::1><:<'>7i 0A0:> Project Tota.;.:..l;.s Programmed Pre-1997 : : .::..:..;:::::..;..:.......;...;;.:.....;..........:.,.::.:.:.:.::.::.::.:,.;::::;.>. Six:.Y:ear:Program ; :..: � :: . ::.; .: : ::::.: : :ogram.m.ed:=::.$pehl:PrE1996,799&3Cryover : :: Ota1: :: :....... 1997: : .,.:.....1998;:.: �.: : 1999.... T :.:.:.:.:..:.:.Z0...00...............:.�. ...:.:200.tz,:»,.>i..»�.»....>...200...2......« EXPENSES: . Project Development Precon Eng/Admin 136,198 61,198 75,000 10,000 65,000 R-O-W(includes Admin) 600,000 Construction Contract Fee 1,062,745 1,062,745 462,745 Construction Eng/Admin 101,638 101,638 53,638 48,000 :.:• .. . ...............:.::.::::..:.......... ......:..:::::::. .. :. . ..:. :.......... .::::::.:................ ........:.:.:::::::.:..... ...........X65 OOO...........648 0.0:.....:....:............. .>::.;:.;;:.:>:•:.:::.::::.::::::.:. :;;-:.;:.::.;:�;:.;:.;;:::.:::::.�;.::.::.>:.;:;.:;;:::.;;>;:.: :.::::6a.198;::.;:.:� 1,239,383:,.. :.:'$76,38 :.:.:.............. .. .. TOT'AL::EXP:.:ENSES.;::«.;;:;:<.;:<.::<.: ;;:t.,3�OF58;i:...::::::: ::.:::::. :.......................... . t. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 80,000 80,000 Vehicle License Fee Grants In-Hand 507,581 60,910 446,671 446,671 _ Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed 227,000227,000 • 65,000 162,000 L.I.D.'s Proposed 162,000 162,000 162,000 Other Proposed 324 000 324{000 Undetermined 324 000 .1..�. .,_,t....... determin , .�.. �. ...,.,,�r......,-,•:.:.••.:::.::...;:.;;;>::.:..:>:.:r::•^��;:;:T:�^z.;t.;Z:.•^:: :':::::'....;•.:.. :;: :ii>...;.,.. :....; :E:i:: ?+iE>;:•,'•.:i;i:?: :: ... .::. ..:. . .:.:::::;.:.;:. .: :: :.:. .. :.:.: :;.:...:.:: ::::::::::.�:.:.�:: .:..�140�JiO.:..iiiiiii:i. 1 .1.58;6T::t::>:::.::<:: »»::;44�r,X71. :::,........................�............ TfJTAL.:.S.QEIRCF:S: : 1y3i)0,581::.� • �............................. j .. . 0955196 08:5 MI C5PROZCTSYESTPF W 1L•97.W93 5-14 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Transit Priority Signal System Functional Classification: N/A Fund: 317 ProJ.Length NIA Pro): New RANK: 15 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Purchase and install hardware and software needed to implement Intelligent Transportation A grant application for$342,000 has been submitted under the Federal Surface Management System(ITMS)traffic signal programming capable of providing advanced signal Transportation Program Statewide Competitive Program. King County Metro Transit operations,including priority programming for transit vehicles. Includes a new central management has agreed to contribute$22,500 if the grant is successful. system,work stations,traffic signal controllers and real time detection and communications systems. JUSTIFICATION: CHANGES: Improved traffic signal operations and coordination are highly cost effective means of improving traffic New Project in TIP. This was formerly a sub-element of both the Transit Program and flow and safety, and expanding capacity compared to the costs of building and widening roadways. the Traffic Systems Efficiency Program; Funding was transferred from the Arterial Renton's current equipment is out of date and incapable of operating new systems management Circulation Program to fund this project programs. funded:::;ii 299;00.0;:;:>:Unfundettili 1.§3.6450.0: Project Totals Programmed Pre-1997 Six Year Program ,; `<>> '»>': >::>::;::;;....0 .... ................... mm .....S ehti're.1986::; . :. .:;.::•;::; p.. ......... ...::.:.1896....CB.. Aveh;:::;::»>::>:Total;:.;:;;.:;•:...:.:::::::::: ::.:;:::.:.;::.;;:.; ;::.<::..::::::. >:<:::>:::::2000:.::.:�::;::.:;;:.>;:Z00.1:;:::::::::.:::::: •:::>��>:«< EXPENSES: Project Development Precon Eng/Admin 92,000 2,000 90,000 90,000 R-O-W(includes Admin) Construction Contract Fee 100,000 100,000 100,000 Construction Eng/Admin 5,500 500 5,000 5,000 Other(Hardware/Software) 457,000 247,500 s 209,500 209,500 TO: ' ::. .: ; ;::;;;;::.;:.;>:;;:>.>::,>:»: :»::»><;::::>::::<:>:::;««::<::<:::<>:;.;;.;:.;::.:;:;;:.::.: .:.L.EXP..ENSES. .:.............65 ................................:.::::.:::..:�:.::.... .;:.;;;;:.;;:. . ............. ..4500................,............ .............. :. .:.::::.:::.:..:........:... :.:..::,::.�:::.� ............... ..................,....... ......... ... ...........:.:.:...:.:..:::.:.;;:::250 0.00;.:.::.:;:;;;:::.:404 500.............. ....................... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 250,000 250,000 - Vehicle License Fee Grants In-Hand Mitigation In-Hand 40,000 40,000 40,000 L.I.D.'s Formed Other In-Hand Grants Proposed 342,000 342,000 342,000 Mitigation Proposed L.I.D.'s Proposed Other Proposed 22,500 22,500 22,500- Undetermined ....... ......................::....::..:..0:..:..::.:,:.......................................:.:....250 0.00............... :..:::.::..:: ............................................. .... .. ............................. ......................►.......::.::..:........40.4 51)0........:...:404 5.00.:.:::::::.:..:.::::::::..,:..:...:..........:::.:.:::.:::.:.::.;:;:.;;:.;::::::.�::.:::..:::::.::::::,:::::::.;::.;;:.:::<:.::.:;.:;;:.;;:.::::;;;:.;::<.>: cApRoicm....wiNAL.97.win 09NSNi 097MIW 5-15 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP SR 169 HOV- 140th Way SE to SR-900 Functional Classification: Principal Fund: Proj.Length: Proj: New RANK: 16 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Construct queue jumps and bypass lanes and provide transit priority traffic signal improvements on Efforts are planned to coordinate and accomplish cost sharing with King County's the Maple Valley Highway(SR-169)at 140th Way SE,and at and between the 1-405 southbound and proposed project on 140th Way SE. northbound freeway ramps. Involves roadway widening at intersection approaches and modifications • to channelization and to traffic signals. • JUSTIFICATION: CHANGES: This is a high volume,high congestion corridor where providing travel time benefits for transit and New Project This Project was developed through the Arterial HOV Program study, car/van pools can be acheived with high cost effectiveness. funded with a Federal grant Budget adjustment was made to provide funding in this project to support development efforts toward preparing a grant application. 1> ftInded =1; 'f 059;500'>VdnFundeditirA0.40 500» .:.:...::.• P:..:r o ect Tot..::a.«...l.:.:s;.::..;:::::;..::..:,.::,.::::::•.:.. .....:.:.:............:..:.:� - :.. Programmed Pre-1997.:. S.:.i;.x:.:.:Y:.:.e.:.:a.:._.r..Program «>< «>!:>:?�::::::1XE <.;:.:>::.;;::;::•:<�:.;::.;:. .Rrogra..me:d >�:::>5pe:.ntPe:1.996; 199.6.: an.Yove : :: :: Yota) ;: .�.. : ::1997.: :. :•:.::: : 988;• . . 4J99 . :.: ..::.:.: o...00....::...:. .........200t: . .......:: :iiiiiiiiiiiii ........ EXPENSES: Project Development 10,000 10,000 0 Precon Eng/Admin 230,000 230,000 100,000 130,000 R-O-W(includes Admin) 500,000 500,000 500,000 Construction Contract Fee 1,200,000 1;200,000 1,200,000 .. Construction Eng/Admin 160,000 160,000 160,000 Other 0 0 :.:.::.:::..:. :....:..2,100,000..:::.. :::::::::.:......... .....:.::.�::::.�:::: . : ::.:::... ....:.::::::::::.::::.: :........:...:.::....::d.:.::: :....�::.�:::.....0.. ::: ....::::.:::::::.:.:::::::: : . :....::.:::::::.::::.�::::::::::::. .:.:...:.::::::::.::.:. :.::::....:: .. ::. :.:::::..:: >::: :<:;<>;: 0 0:::.::.:�.36.000.:.:::..:.:.::::.:: .:::::�:.:::::: ::.:........... .. .,............ . TO..:., .:.: .. . ;:<:.::::•::;:.;:�:;:::.;:•;. ;.. :• :.>;•.;•:::: •::•:;:.;:.;::•::;:�;:::;:• :;:.;:.:::::;::::;::�::.: 0 Q00.:�;;;:.;;:•::�0.�l0,000::�.:.>;:.;:.;;:10O,OOb:........630 ..0 ......:.....�......, :TALI::E�CPENSES<:::>:>;>:<:;:;:;;:.:«.::::;.;�.�',1.OO�UQ.O..::::.:;:<: . ::: ::.:. : :.� .. . :.............�.....................t SOURCES OF FUNDS: 1/2 Cent Gas Tax 0 0 Business License Fee 707,500 10,000 697,500 100,000 257,500 340,000 Vehicle License Fee 352,000 352,000 152,000 200,000 Grants In-Hand 0 0 Mitigation In-Hand 0 0 L.I.D.'s Formed 0 0 Other In-Hand 0 0 0 Grants Proposed 795,000 795,000 115,000 680,000 Mitigation Proposed 245,500 245,500 105,500 140,000 L.I.D.'s Proposed 0 0 Other Proposed 0 0 Undetermined 0 0 .. ••::. ... �. �:.•:::::::::..:::::::•:;;;::::::::. •::::::::::::;:.;;:•:::.; :::::::.:::. 090.Oi10.�.;_.:::::::::..25��i0Cf.:.;:.;::;.;:;.478,�01i5........1,3 ..t . ........................... ..... :.��:: :;;: QU.RIES:::::<>;<:::>::>:««:::�«:::<::>;�f1:00;00.0.:.;:«>.:::>::>::»:.».::;;«.;:;;.;:.;::.:.;�:.:::.;:.::.;;:.:::.�:::.�FOt000...........�, . � .................�........ . . MOWN 09M NA C.'WRO.ECTSNLEERPIFNRL•97.WEI 5-16 I CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP NE 3rd/NE 4th Corridor Transit Improvements Functional Classification: Principal Fund: Prof.Length: Proj: New RANK: 17 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: . This project involves a series of key improvements in this corridor to improve transit speed and This project is an excellent candidate for grant funding. reliability including:rechannelization and traffic signal modifications at NE 3rd/SR900 to provide an exclusive westbound to southbound turn lane;construction of an eastbound hill climbing lane from Monterey Ave to east of Edmonds Ave;and transit priority signal treatments throughout the corridor with special attention to the Jefferson intersection. JUSTIFICATION: CHANGES: This corridor has high transit usage demand. These improvements can provide signifigant travel New project in the TIP. time advantages for transit which,in turn,will promote more transit usage and less SOV usage, thereby reducing congestion and delay for all modes of travel. r:MEOnded......................................................................................... Project Totals Programmed Pre-1997 Six Year Program : ..:.: .::..Rro [ammed:..::.s entPre.t996.::..1996..t:Car: t7ven.......... .::: ::::�::::::::::: .:.:::::.:::::::.�. :..�:::::.::::.�:.. :::.: ::.:::::::.. .... ::: .................... .......: g P .............. ................ rY .::::Totak,.:. �:.-:::.:::::;199:7::;;:: »::;;:;::;199$::.;:,::::.:::::::::1999:<:>:::::>::: ::::.;:;: 0 :.:::::::::.::: :,:.. :.::..::: ..� EXPENSES: Project Development 12,000 2,000 10,000 10,000 Precon Eng/Admin 290,000' 290,000 214,000 76,000 R-O-W(includes Admin) Construction Contract Fee 2,000,000 2,000,000 192,500 1,807,500 Construction Eng/Admin 200,000 200,000 21,500 178,500 Other •' TOT' :< .: >::>::;>:<:::::;:::::::>:::.Y.. . ..L.EXPENSES.::..�:::..:.:::..... .2 502 000 � .:_...::.;::.;:.;::.:::.::.;:.:.::...::.:..:::::: ::::.:::.:�:::::::•::.. .: .:::::;:.>:.;; :..:.:: .. .........:..:.. :.....:. .�. .. ....::�:::::::::::::::•:::.:�::::::.�:.::::.:::::::::::..:.2 000.::::::::•.: .. �. .............................. ..............::...t.: . .........2 5.00 000:.::.:.:::::::::.::.::..;;:.:;>;»; ::.:.:;.;:.<.;.::::::::::::::::.:::.�: . .:::::::::: •. :>: ::>:<:;;:<:::»:: :::::>::::: ......... � . ...r................................. ........:. ::.:.�:: :::,:.. ,�24f�1.0f�..:.:::,<::;;190x0.0�:;<:::::<::::�:y))8.6�OOd:•..::..;<.>:�:.; :::..;.;:.;:. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 44,000 2,000 42,000 10,000 32,000 Vehicle License Fee 709,000 709,000 114,000 245,000 350,000 Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 1,245,000 1,245,000 100,000 45,000 1,100,000 • Mitigation Proposed ' 504,000 504,000 504,000 L:I.D.'s Proposed Other Proposed ' Undetermined m .. ....r....,.m. m :.. <::_r :: ::: :: :r;: r::s;8:z.:; sz: . <. ::: ;: .: .:;: .: . -.. .T..:.. .. ..s :.; :;:.;;:;.;;.;:.:.. AL.S.OU.RCES .:::.:::.:::. ..2 502 0 0 .:.......................:::.::::::............... .. _:::::::.::.::...:........ .......................:.: .:..:... :.....:..... ....... ............. ......................t.. ....:..:::..:...� . � :. .._ .:::.::.�:::. . ::. .»:.: .;::;:.;:.;:�24,000:.:.;:;.;;::�9t1,ty00.:. <: ,9$6,X00:. :>; :.<:::::;:»>:>::«:::>:: C:WROAECTSIEEITPTINALr17Ae2 COMM 09364 AM 5.17 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Park-Sunset Corridor HOV Improvements Functional Classification: Principal Fund: Proj.Length: Proj: New RANK: 18 CONTACT: Leo Hero (206)277-6217 DESCRIPTION: STATUS: Construct queue jumps and bypass lanes and provide transit priority traffic signal improvements on Stage I could be timed to be completed soon after the completion of WSDOTs the Park Ave/Sunset Blvd(SR900)Corridor from Garden Ave N.to Duvall Ave NE. Signal transit construction of an HOV by-pass lane on the northbound 1-405 on-ramp at Park Ave. priority improvements will be performed throughout the corridor;construction will involve two phases: The portion of the project at Duvall Ave to provide an eastbound to northbound lane Phase I will involve rechannelization to provide an exclusive eastbound HOV lane from Garden Ave to could be separated into a Stage IIA and accomplished earlier than the construction of the northbound 1-405 ramps. Phase II will rechannelize at NE Duvall to provide an additional lane for the southbound transit lane. eastbound to northbound left turns,and construct an exclusive transit lane for southbound to westbound right turns. JUSTIFICATION: • CHANGES: This important corridor is subject to high growth in travel demand which,if addressed by expanding New project. This project was developed through the Arterial HOV Program study, single occupant vehicle(SOV)capacity would be counter-productive by attracting even higher funded with a Federal grant • volumes of SOV traffic seeking to bypass congestion'on 1-405. These improvements will create signifigant travel time savings for transit and carpools. • inii Euiided<::I l 4 t;900.43).nFunded:::::1:::::;;:;:::::3.89;000:::: Project Totals Programmed Pre-1997 Six Year Program ......... ... ..2002.: ::. ...........:..... .. ......... ...... .:. :.:..::.::.. ::.:::.>;:.>:--:.:;.;:;::;:;::; :::>::»>::>::<:>::;;; ; ,::..:.. ...:.:.:.;f999 ::::::.::. :.2t100. . ::200..:::::._:. :::...:......... ......... ::�::::::::::::::•:: :: .. . ;�;;;;:�;:•;::•::•;:•::�:::::::.� :.:>:•;:: :. .. :::>f99.6+;Car: over:•:: ;;7otat;::;:;;:;•:�:::•;;:•:::::.1.99T.:•:.:::�:::::::1998:::::.�::•:.:•....................., :;::::::<:><�:;:;<:::>:::<:>a7EM;;;::•;:.;:::::<:;::::;<.;:.:F?ro�gfammed:.....5pent Pre:�t9s6:.:.. .................!'y ........ EXPENSES: Project Development 2,000 2,000 , Precon Eng/Admin 94,00094,000 22,000 72,000 R-O-W(includes Admin) Construction Contract Fee 640,000 640,000 160,000 480,000 Construction Eng/Admin 64,000 64,000 16,000 48,000 Other b ................:....... ..................... .................:::.;;;i;. :::.:. :•:::: :.:::::::.. : : iii.;::::.:>:.::: .i::::;>::>:::47 :::>::::>::. 72 0.00:: »:>€:€::;5i2 0.> M:•'!;;;:Ai i > ii ><`»>`>' ':>' ' TQT.. .::. .. . •:::::..:.........:..:..::.::. :::•:::::.::: ::::....:........:::::::: •::::::::::::::::::. ..........:::::.'Z98 000>:;: «:<::<:::s:>:::2,2.00fii.....:..:::::47fr 00�. :::,.::. :••.�..f........ ............. r �1L::AXP:::ENSES;.::;:::<::>:::;::::<;;::<;<>:::: ;:.:..8�0,00.0.;.::;.;::. . .;:.;;.:.; .:<:;:.:... . .,. ..::: ;�,O.QQ.. ....,......... . , ....... .............. .f...... ... f SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 72,000 2,000 70,000 40,000 30,000 Vehicle License Fee 339,000 339,000 198,000 36,000 105,000 Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 300,000 300,000 36,000 264,000 Mitigation Proposed 89,000 89,000 89,000 L.I.D.'s Proposed . Other Proposed Undetermined ::>.»:.>:;•::: 8;110 1.:»:> : :!::: >:«:> :>:<:gigi»:<:::?iiiiiiiit FQ.T .... .fp.n: .�+.::::::.::::::.�::...:.:.�.......eM .n n:.-::::::... .. ::::.:...:......::..•:::.::::::::.:::.::. OQO....... ::::::.'.7:98 000:: �.�::::::.:;198 000.:.....� : .::: :::::�:::: ;�. .f ..............f ........... ................... :l�A�::.7.OBJ.R4E.7:r:.::.;:.::.:>::;.;:.::.::::i::::2::i::qV�y.V,�.Y.:::::.:.>:.>:.::.>:. ::.>:.>:.>;:;.::..c:.:::.s.: :: :::::: :::.flf..:.. ::.i:.::.................f...........................f ... • 8408188 88:NAM C:W RO�ECTbYEE\TP'F W Nr87.W Bt 5-18 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Oakesdale Ave SW-SW 27th St to SW 16th St Functional Classification: Principal Arterial Fund: 317 Pro).Length: 0.68 miles Proj: 22 RANK: 19 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Construct new 5-lane roadway,with curbs,sidewalk,drainage,street lighting,traffic signals, TIB has approved$382,500 for predesign studies. Predesign is in progress.Previous channelization and landscaping. A portion of this facility at either end will be on structure. mitigation proposed includes Boeing and other Valley Developers. Mitigation Construction to occur in two phases. Phase 1 will determine layout and ROW needs for Phase 1 funding may be through site-specific mitigation or public/private partnership. Project to and 2, acquire ROW for Phase 1,and design&construct the new roadway from SW 16th St to SW be constructed in two phases. Total cost of Phase 1 &2=$13,750,000.Phase 1 is 27th St depending on the results of the layout studies. Phase 2 will design,construct and acquire programmed for current TIP. Phase 2 total cost of$6,750,000 is unfunded&planned ROW for the new roadway from SW 27th St to SW 31st St, to occur after 2010. JUSTIFICATION: CHANGES: High priority project in Renton's Valley Area Transportation Board(SCATBd)and in South County Project adjustment to move$432,500 of mitigation money into 317 account. Final TBD.Serves Valley industrial area,including proposed Boeing Longacres site. Completes missing design anticipated to begin in 1996 pending approval of funding by the TIB.$22,242 of section of important north-south corridor. mitigation was also previously expended. Added$104,000 of mitigation in hand for 1996 that was formerly shown as mitigation proposed. Irunded<t <::>?1:;064 384:::<:UnFunded:=: :::5;95:7.:;858:::: Pro ect Totals Pro.rammed Pre-1997 Six Year Pro.ram ii ii:.:>;:.:�:�::;;>:;;.:ITEM:.;;:.;:;::;.;;::.:;i;.:::;::.: : ... . : :;<:>:;...... . •:-.::::.:::.:.: .....:;::;;;::;>:::»>:<:: :sstu ;z::. :.:;;;.00 ::.::;:.;;:: :::.�::.::.:::. . 0: k:::::::: . . ......Pro rammed::::::>::>S ent:Pre�199 ��::::. :�: . ............................ ....... . ............ ......g.... ....... ...... p. ............................:.......:.:.over' .........Total..::::...:............ >:::<:>::>:::::>::> ::::: :.;:.;:.;:<:.,:.:::::.. .::::.:�:.:.:.::.::;.;: .......... :. :::::.:.. rS► :............... ...... • �.:.:. ::::'L9gy::.:.: :::: .::f 998 ..:,.:.:::.:.::t999.:.; .:<.::.;.;..;:;.;:20tlb::::::::::z»::<:>::<>::20Q'1: r::«:: :: ;�b02::>:<:>::::::: EXPENSES: Project Development • Precon Eng/Admin 1,302,242 616,338 525646 160,258 160,258 R-O-W(includes Admin) 2,000,000 2,000,000 2,000,000 'Construction Contract Fee 3,440,000 3,440,000 600,000 2,240,000 600,000 Construction Eng/Admin 280,000 280,000 40;000 200,000 40,000 Other TOTAL::EXR ��NSES:><>><<»':<<->:<_€':>< .,"' � .;::. >»U .,j6..,... . ..E.. 7 0 '� � <:::»»::<:; ,. ......... 22 242'. 616 338::.::.::.:::.:::.::.::.::.: �. �:::::::::;::»: ;:::,;;;:.:.::.::.�::.:.::.:.:.�...::::;:<:>:>.;:::>:..::::;.:..:...:::: .. ...... ...... 525:54&:...::::::::: �: .. ::: :::::>::. :> : .........5 88.0 258:>;�>::>:::>:>:�2�800�25 :..._:::: ...... . ....... .. .. .:::::::::..::: , . ...r....1 :.�:.�,.:........�,,: �..... ........ �..._ „ .. .. ., .. . .8.. .....2440 Q00:::<�>::>:;<::::640 //��/1���:.>;>;;:;;;:.;;:.::::.;;;::.:::.:::.:.::::.::::::.<:::..:.;. ;.:;»;:.;»;>:.:»>„:>;;; SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 100,000 9,870 90,130 Vehicle License Fee Grants In-Hand(TIA) 382,500 129,484 253,016 Mitigation In-Hand 581,884 476,984 104,900 L.I.D.'s Formed Other In-Hand Grants Proposed (TIA) 2,483,500 77,600 2,405,900 1,133,900 1,000,000 272,000 Mitigation Proposed 3,474,358 3,474,358 1,666,358 1,440,000 368,000 L.I.D.'s Proposed Other Proposed Undetermined • ... .::::..:.,.:.. ::::::::,. ::..: ... .:..:..:,:.>•:::.::::.:............ ::.::::::::::..„......:.......;:..::;:x;:;:•:>':.._.:. .. :..;..,.:.:;::::iii:+.:,;.:...::;:;'• :i:s;::•;•::;r.:.:..... ::...:.::::::::..::.::.:.:•..:.:......„........—.,...........,-,•••••.....,..,,••••; :.:�,-.,••:::......::„:„.,.:„.. T DTA... : .G is:::::;::;::>.:ii::i_ii>:::>:<..:: :; :;<>ai: � :i>::i::::::: :. <: . <:><:<:::::»>>.>.::>::: T. :.:t.IRGE.:.:.:.......................7 022 242.:.:::::.:...:..:.:.61.6 33.8:::.:.::.::::::::.525 S4 ........... ::;;:.::.>:. : <. :.:>:�;:� •: ............ ............1.... �................................1 ......:........... . ..&.. ,.5 88.0 258.:.:E :::..2 8.05 258: :..:2 4.4(150 �:. .>;:. .;::.;;::::::::::::;:.;;:.;:.::.;:. :<:;.:;.;;;:e:.;:.;;;:<.<..;:.;;:<.:;;;:::.,om:.;;:. CIPROJECTS LEMPIF W IL.97.V02 004115/9$ 09AM AM 5.19 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP SR 167/SW 27th St HOV Functional Classification: Minor Arterial Fund: 317 Proj.Length o.a miles Pro): 12138 RANK: 20 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Construct a new HOV exclusive interchange at SR 167 and SW 27th Street and construct arterial Project start delayed one year pending completion of WSDOT 1-405 HOV access HOV lanes on SW 27th Street to Oakesdale Avenue SW. Includes roadway,structures,curbs, study. sidewalks,drainage,traffic signals,lighting,signing and channelization. JUSTIFICATION: CHANGES: Serves the Valley,including the Boeing Longacres site,where TDM will be an important element in None. addressing increasing traffic volumes.Allows HOV's to bypass the other congested ramps,arterials and intersections in the Valley. - ::;ii4i rided:::)<:<:::>464;000::(: UnFanded:>::(:»»9 65fi 00(t Project Totals Programmed Pre-1997 Six Year Program:.>:>:.:...... :< <:::;::»:: . ::>:<:>:«<:::::>:«:._ ..: ::::>::::: _ ... tiff.iiii:. ...S...e t....re.1 9 : .:.. C.... ..:..:.::.::. .•........... ::::::: _..:.::.... :.::.:.::::::.. ..:.::: .:: •.:;.;:•:: :::»>::2ont•::::..............2002.:.:..:: ...:..1.. ................::::::::::: .:.�.�:::::................_..:.. ...::..... .:.... ... :.:. :.:.::::::.. .....:..:::..::.::::::: : :.:::.::.::.::: .; :::.:... ........X999.:.�::............�000.::::::. ......... .. .......... ......... .;;:•;;:.;:.;;::.;:::.:.�:: .;:::.;;:.;;;:.;:•;:�:::::.::.::: � :.f.:� ..:�.::.;:.:':ll`otat:.:;. ..�: : .:,199.T. ..;.:.;:,:.:.;:1998::::::._:•: ::.:.. >;;::�>::«>>.:�>:<��::::1I7EM•s:::>;>a:a:�>::<::::>:;>:<::<::>:P:.:rogfammed:<=:>:�:�>Speht:Pre:�.996<s::�fe9.&::::Garf'yaV.et::::•................................. ...... ........ .:.::::....................... EXPENSES: . Project Development Precon Eng/Admin 1,344,000 9,894 15,106 1,319,000 439,000 380,000 300,000 200,000 R-O-W(includes Admin) 1,000,000 1,000,000 1,000,000 Construction Contract Fee 7,180,000 7,180,000 2,020,000 5,160,000 Construction Eng/Admin 596,000 596,000 164,000 432,000 e Oth r :..;;;:;;;:;.. :.:.:.>.: 0:;.:::.:::218.4 OOQ::.:; ;:.:5.5 :2,0 0 :::::::.;.;:.;; ,-;:. . :-;:.;;.;•;:.;:.:.;:•: :.. • •::•;:.;;:;•;::.;;::•;:.: :.-.::::::.;A. :. ......... 0 000..: ....1 20.0 00 :. .:::..... ,... .. ....:,A,,. TOTAL.••..::.. : ;;;::::.:::::::::::::::. :. ; •:-;:. .�::::.:::.::::::;. : �.;.:.;;:::::::.�:::.,:;;: •. ;:• ; :;O'005000::_>.:::.;:;::::..435{IOQ.;:;:::::;>:;:380,f).00..::.:: :�0..:,......... .......i.......,. ::EXPENSES.::><:::::<:>::>:><:>: :>:<:::a�,'I�O�Q�.Q: >::;;::::>::>:<:>:>:><:9,89:.4...<.<:.;::.;::.;;::.;;:;::15t1n6. �..:� � ,........., , SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 120,000 9,894 110,106 Vehicle License Fee Grants In-Hand(ISTEA) 344,000 344,000 , Mitigation In-Hand . L.I.D.'s Formed Other In-Hand , Grants Proposed 3,656,000 3,656,000 100,000 100,000 300,000 956,000 2,200,000 Mitigation Proposed 3,000,000 3,000,000 280,000 200,000 , 400,000 528,000 1,592,000 L.I.D.'s Proposed - - Other Proposed - Undetermined 3,000,000 3 000 000 500y.000 700,000 1,800,000 • .......... ... 0MOO:.-:::::•. ..........•. : •::.:::i.:i..:... ::•:::! 20a000: ::....2 ia.4().00::.....5, �, CQT�►L::SDElRCES:«:> >:::>:<� >::::>:>:<::«i:9;�20,0.0.Q:>»>:: .>:: .>;»»>:9,9§.4..:.:..;:.;:.;::.;:.;::.;;: 5.4.,106:. , :.::::9.9'5.. ............................ .. OS/DS/Di 09:44 AM CAPROJECTSLLEa\TpFNAL-97.WB3 5-20 • CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Traffic Signal Loop Replacement Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 16 • RANK: 21 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to • On-going yearly program. achieve proper installation.and assure reliability. JUSTIFICATION: . • • CHANGES: Most of Renton's sigals require extensive vehicle detection systems to provide traffic count data Increased yearly funding by$5,000 by reducing sign replacement program by$5,000 needed for the intersection controllers and VMS signal coordination system to operate effectively. year. Budget adjustment in 1996 of+$10,272 transferred from sign replacement The detection loops in the pavement must be properly maintained; their failure results in highly program. inefficient operation.Pavement deterioration due to heavy traffic volumes,trucks, and adverse weather have increased the need for replacement. • Project Totals . Prog rammed Pre-1997 SIx Year Program . SpI I I.....'......." •:.> >::::;:.<:.::::>::>;:;::<::.. :»;:::::::::::;;:.>:.::.:�:;.:.;:.>: •::.;:.:.:::�;.;:::r:•.;: :;: � . .. .. ...: .:. . .................................. ..P... gr.mm. d.. . �ht:P:..re:1996::.:..1966:+::Car: .. . ..............ry EXPENSES: Project Development Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee 153,490 39,490 12,000 102,000 17,000 17,000 17,000 17,000 17,000 17,000 Construction Eng/Admin 6,000 2,500 500 3,000 500 500 500 500 . 500 500 Other(City Force) 27,036 9,536 2,500 15,000 2,500 2,500 P. 2,500 2,500 2,500 2,500 .ENSES:.::::::.�::.:::.:.�.�::::.::.186 526:::>:>;>:::.;:�:�:.:;:.::•;:•: .::• ...:.�:::::.......... ................a� ................. . ........... ::: ::::::51.626,..........::::::::::15 0.00.:::.::::.:.....1 4 000•::::::::::.:::: :.::.;:;.;:.;.::.;:. A�y p K;.::.:;.;:.;;::.:::. iiffp ff�� :.::.:;::.:;:::.;: ... .... .•......... ................. .r � f .. .. .............. ..f .... .....:..:•:::L f.:_ :..:.:.::::::.�::,.2ay0.0.0,;...:::::;;.;�;2V,vo�;_.;;•:;;;^::�:;20,L.Y.V.;ii[:<`Er:�i�::20 fQ�...V...:.:�.::.:.::.:::.:;.�..:�.i:�.i2. Q..t'�...��;:�:::: iQs Va :SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 186,526 51,526 15,000 120,000 20,000 20,000 20,000 20,000 20,000 20,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand . Grants Proposed • Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined . ... .ES.::.:::.:::::.:..::.�:::::..�:::.:166.626:-:::.:::::::.:::::::::. ..: •::::::.:;:.;:<::;:.;;:.;;; .;<.;:.;:.>:.;:.;;:;. : :::.::::::::::.�:::. .............. .. ........... .. ........... . ........... .. ....................................... �. .... 1�152615 000 't'20fl0021}0 >;»:<:: • }�/� ft•:.:::.::::::::�{}y �{;..•.�:::::::::. /� A.. }y:..::::::.�:::. ... .. .................s........................ � ._.:::::::.�.�::. ..f.:00:: Z :::::;:::>;#;:;:;:�V���V.:.: cwaaecTSUMPtwu a7.vre= OEp6Ni MOW 6-21 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Traffic Sign Replacement Program Functional Classification: N/A Fund: 317 Prof.Length N/A ProJ: 12113 RANK: 22 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: This program provides for the replacement and/or relocation of signs that are obsolete,faded, On-going yearly program.Contract fee amount is for purchase of materials that will poorly located or no longer appropriate. be assembled and installed by City. JUSTIFICATION: CHANGES: Poor signing can create safety problems and driver confusion. Purchase of these materials falls Budget Adjustment of by$$ 0 2 2,pyr oved tor and Loop added Replaceto the mLoent Program. merit nual beyond normal maintenance budgetexpenditure gram r<»:>.F.:.undedi:it ::>:>:I2C 890:1>:;:UnFunded>I>NN:•i>iiiiMi<: Project Totals Programmed Pre-1997 Six Year Program r ...... ........... .... .................. ...: ;:.;. •... ;.;:::::.::.. :>:::�::»:::_>>::ea:s:<.;>: �>:<:;:;•;:>:>s:t«�s:1998.:::;:::.:.:.;:::•;:•::1999.:::::::::•::::::•..4.............. ......... ..... .. .... z::;;:«;;:;z;;::<;;•::•;:;;::... :::_.>.>:::5 ent�Pre:.'I996;:::'1996;:�;COltrybller:.::;:.:.;:.;:.Tota€.::.:.:::::::.:::::::1S8.T....::,::... ............... ........ . :: <::;..tTEM:::<<::'::::«:: :<:;:»>;:;:::>I�ragrammed..:...:. p EXPENSES: Project Development Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee 65,000 20,000 45,000 7,500 7,500 7,500 7,500 7,500 7,500 Construction Eng/Admin Other Force) 55,890 10,890 45,000 • 7,500 7,500 7,500 7,500 7,500 7,500 :: :... .:.;::::.;:::..::.::.:.�:::::::::. ..:. ..:..;_:.>:::.::::::.::.::.::::.:�::.;:.;;;;::.:::.::::.._:.�::::::.. .. . ............ .. ..........:.15 006..........:.....x. :;.::.;:.;;;::.:>:.;.;.:.:.:;;:.;;:.;:;:.;:<;.;:::;;;;;,;;;;;;,>:.;;:.;:30,8.90:.::•;:.::;:.::..,:::90,000.:—.:..:::::.:::::..,........ ............. T(37'AL:'EXPENSES>:>;::>::<:<::<::>:<::s::.>.:<::>::»::;;1:20;89.0.:-.:.::::.. .. .... .............. .... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 120,890 30,890 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined TQTALSOI RG.. ES.::; : :.: ..... ,. : ..;;C00 ;::::::::::::::::::..:::1. .;::.<.;;:.:::'.(•.5:,1) ..;.....:::::::.:::::.:..::.:.:....�..0..0..:.x:. ................ C:WROJECTSYEa1T muww.We7 NMM MUM 5-22 i CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Light Pole Replacement Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 91 RANK: 23 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: This program is for the replacement of damaged luminaire and signal poles.These poles have been On-going yearly program.Contract fee amount is for purchase and repair of poles. damaged in unknown incidents where reimbursement through normal channels is impossible. JUSTIFICATION: . CHANGES: Pedestrian and vehicular safety is highly related to adequate signal displays and street lighting. None. Purchase of these poles falls beyond normal maintenance budget. ;:i:<;Funded :< 144 472>.:::UnFunded: :<» <:»>:<>:<:>> :< :> Project Totals Programmed Pre-1997 � Six Year ..':. ... ....:.::: - Progra.<;m <i.,m.i ..IT..E.M.. .:..:..;>;;;;:;:.;.:. . ogranm . . 5P�nt:Pre,•�996: 1996.+Ciffi�.vir .> � TotaF: : ..... :... �199 .::::::;::-:;::; :199).1> . . 1199M:i..:...;. :.M:200. : ..;i...; ::.200...f> : .:: .:».::0:1(*:;.::i:0 EXPENSES: Project Development Precon Eng/Admin 6,712 712 6,000 1,000 1,000 1,000 1,000 1,000 1,000 R-O-W(includes Admin) Construction Contract Fee 117,525 36,525 9,000 72,000 12,000 12,000 12,000 12,000 12,000 12,000 Construction Eng/Admin Other 20,235 6,235. 2,000 12,000 2,000 2,000 2,000 2,000 2,000 2,000 TO:: :: :;:>::::<::>:::;::»::<::::::>>::i114> .: :::_:»::>:»;::;»::>:> ::. ................:.:..::144 47�:.-::: : :.�:::::._:42 7.64....:................... :<:::>:::::.;.::»: :. .......... .. ..... ..... . ....... t.. .................r... ........:.......,:....., 0 .:,.::::..: .:15,0.0�...::::.::::15,000: .;:;:::•;;:>15,Q00:..:•;;:,;;;:.;::a5,1)QO : 1.5400;;:;;.;;;;:;.:;>18000.:.: SOURCES OF FUNDS: 1/2 Cent Gas Tax . • . Business License Fee 144,472 . 42,760 11,712 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined ..................: :R...:ES. ..�:.�......... ........:::..:'1.44472..:.:::::::::::::::::.d276Q.:.::.�::.::._::::::�.. .. ..::::::::::.:�::. � :............. .......:...:... :.::::::::::::..............:.........:. ::.:::::.�::::. ,:.:..:::.:�::. .............................� ...........................� . . .................: ;1,7;1 . :J(i,000.....,;:.;;::;.;:.;:.t5,t)00:..:;.;:.:<.:.:::.;:'15,100;:..;:.;:.;;;:.:;. ::.;:.;::.;:.:;:t51:OSi:.:�<::<.:::.:15 b0 : ;::::.:.;�::..i5 00:.: VPROJECTSLEENTP¢NAL•97.M2 MVO MOM 5-23 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Inter-agency Signal Coordination Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: • 12140. RANK: 24 CONTACT: Lee Hero (206)277-6217 • DESCRIPTION: STATUS: Provide means of signal coordination across jurisdictional boundaries of Renton,Kent,Tukwila, King Tukwila is lead agency for an inter-jurisdicitonal ISTEA grant approved for design of County&WSDOT. Implement signal sequences coordinated through broadcast world time with this project Grant funds are being managed by Tukwilla for the other agencies. necessary hardware to interface with Renton's master signal computer. Develop regional traffic Construction of inter jurisdictional signal communications systems expected to begin in flow parameters&signal timings. 1996 or 1997. JUSTIFICATION: CHANGES: Improve traffic flows,reduce congestion,reduce fuel consumption&air pollution.FHWA None. demonstration project. `>;<<;)=.unded as :>€ ....:a.::UnFtinded<: k:> <>><:':4%001 Project Totals Programmed Pre-1997 Six Year Program :<::;;:;:.> :;:;>;;: ::>;;>:.;:.;:;:<:;;:.. :;;.::;::.:;;:<.;;:.:: :;;:;.::: :.;:.:>::.:; :::.:...::::::<::.::.:::::: :•;:;::•;;;;;:.;:.;:.;:;;.;::.:;.;: :•:;:;; � :.. .:� nvele.:;<:<z:»»>'I'otat::::.:::::...:::.�::.199.7:. ;:..:::::: 19.9.8:: . �............... ............ ......... 9ss<>>:19ss:�Carry. ......................................:.. EXPENSES: Project Development 47,266 7,266 20,000 20,000 20,000 Precon Eng/Admin 14,006 4,006 5,000 5,000 5,000 R-O-W(includes Admin) Construction Contract Fee 75,000 45,000 30,000 30,000 Construction Eng/Admin 9,000 4,000 5,000 5,000 Other 16,728 16,728 TQTAL::EXPENSES::;;:«:>:<:::>:<::<::: ;::»:: :.'Is20�Q�:.:-:;.:<.:>:.>:;.::.>::.:.;:.t1.,27.2:..;:;.;:<.:.: >;;:. :90t't28:::::::,,.::.::::s...,...:.::-.:.:..............� ................ .... ..... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 66,000 11,272 54,728 Vehicle License Fee Grants In-Hand 48,000 48,000 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed (ISTEA) 48,000 48,000 48,000 Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined ............ ..... :>:»::>»::: :<::i• ::>;<::<::<:::::::: :::;•i::<:::: TSS:T�., ::: ...: .;;::;;:.;:.::::::::..:::::.;:.;:.;:;162 LtO.Q:.:;:.:;•;;:.::;:<::>:;;;:.11: ::d8,OOQ ::::::AB>..:...::..::..:............ A4:S.OEI.RCE�.:::::::::::::::::..:::::.::.............►...................................�........ ......... 0010690 09:44 NA VPROJECTSUEV PFN L-97.W87 5-24 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP • Sidewalk Inspection and Replacement Program Functional Classification: N/A Fund: 317 Proj. Length N/A Proj: 56 RANK: 25 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Inspect sidewalks to determine areas needing repair,notify property owners of those sidewalk On-going yearly program. areas that are their responsibility to repair and finance repair by City crews of areas that are City's responsibility. JUSTIFICATION: CHANGES: Dangerous sidewalk sections are a safety problem for pedestrians and a liability exposure for City. None :»:::::iurided::::::>`:«:�<::96•°263;::<:�lnFurided>:>`:»�> ><�`> Project Totals Programmed ..<..;.:..;...:.;..:.:..:.:.:..:.:.:.:..:.:......:.:..i7.E.M;.:.;.;.:.:..:.;.•;.:.;.•;.:.;..:.;..:.;.;.•:..:.:..•:::.....;.:.P...rograrrlmed.:..:.:.:SpPre-1997 ....>..:...:.:..>.:.<...:::>....:......:.-.>"..t.:o....t....a:.l....:.:.::...:...:...:...:.......:....:...-._:...:...:...:...:..::...::..:...:...:...:...:.1..9..9....7..:.:.::>.:..�.>..::;..=:.:....:�...:.:.:>.:::.>..:::.?:.:.:.1:...9.....9..8....:S.:.:.:.i:.x:....Y:..�.e.:.:a.:.:.:r.:.1.P9.r.9.o.g.g.....r...a......m eht.Pr »�99i3..;:799 ~:.0ary .........;..:...:....:..:..:..2.0...0..0..:.:.::.>:.:..;.;:.>:.:;...:..>:.:::.:::.:<...::::.;::>.2..0..0...:'.f..::::>.:;.;.:.:.:>.::>.:.::..:::'.::�.:>.:..>.:.:.:s.::2.•.0...:.0...�..:».:.:::.:.:.:>.::'.:>. .. .......... .... EXPENSES: Project Development 30,000 30,000 5,000 5,000 5,000 5,000 5,000 5,000 Precon Eng/Admin R-O-W(includes Admin) • Construction Contract Fee 50,713 20,713 30,000 5,000 5,000 5,000 5,000 5,000 5,000 Construction EnglAdmin Other 15,550 5,550 10,000 s:;.0``00��> .........:...:::::::::::. >::<:»:>::«::::�»:.»�:; .................. >::;:<>:::>::�»:::10 000::::::::;:>::>::»10 000.. ......:....: 0 ::>:::::>:><:::>�::10`0011: <' >....1. U................ ... :.O.. ES.......:..::..::::.::::::::.::�:9.6 26.3:.:.:::::..:.............5 350._..................30 7..'13. ........... �Q 000.._ .::.,.,.:::::::,:...:...::.::::.:;.::..,.. .,:..::,:..:::111x,:011! ,.: .............. ► ...... ...... .......�.. .... T: TAL.EXPENS. :.:::.. .:..;:.. ................._, ....t,......... .....................�.... ....... SOURCES OF FUNDS: 1/2 Cent Gas Tax •• Business License Fee • 96,263, 5,550 • 30,713 60,000 10,000 10,000 10,000 10,000 10,000 10,000 Vehicle License Fee • • • Grants In-Hand • Mitigation In-Hand • • • L.I.D.'s Formed Other In-Hand • • • • • Grants Proposed . Mitigation Proposed • L.I.D.'s Proposed • • • Other Proposed • • Undetermined ..::..:::.::: : :::.:...:.:..::•:.•::: : ::::..:. ::..� ...... .. ..... . ;:.: . .: :..::::::::::::. .: .. ;; TOTAL.. ..........:..................... ......................... . ................. ..:. ,..::.::.::::::.�..: ..�.::..:.......:1(0 .. ...........:10 0 0:::<:::::><::::::>::. 0 .. ...�...... 0 ..::..........1.0 0 0.....:.:..>:::..... .... ... ::.: .::::.::::.::.::..................9626..3:.-:::.�:::::::.::::::::::S3.bQ:.:::.::::::,::::::::3f1'X.3.:.:::::::.:::::,:SOOt10.._. ::::::::::....:..:tQO�::.::::::::::.:.., .0..... .< . .�i1,ti. t)i ::::::,,.::�ki1�..p::............... �... ... .... , :S.OU.ROES.::::.::::..�::::.:.::.:.:::::.:::.:.....�....................:.............►.. 3........................'1.........................,..... ... ► � cwnoJEcTsIEEITPFwL47.11/e; MAW NONA 5-25 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION. 1997-2002 SIX YEAR TIP Arterial Circulation Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 29 RANK: • 26 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: This program provides for the long-range and short range planning and traffic anaysis required to This project will fund the on-going planning work which will lead to refinement and/or evaluate and update the Transportation Plan in relation to the Comprehensive Land Use Plan,to adjustment of the of improvement projects on the arterial network identified in the assess the impacts of new development proposals and to recommend local and regional Transportation Plan. Remaining grants in 1996:Ramp Meter=$14,921. transportation system improvements for all modes of travel. Funding for hardware,software and employee hours required to operate the computer model is also included under this program. JUSTIFICATION: CHANGES: Combined State and Federal Clean Air legislation,the Growth Management Act and the increasing Budget adjustment of(-)$362 to zero out the HCT grant. Budget adjustment for 1996 importance of making sure that local and regional transportation plans are coordinated to the of(-)$200,000 which was moved to Houser Way and other Projects that require benefit,of Renton,make on-going, multi-modal planning a high.priority need. additional funding. • Project Totals Programmed Pre-1997 Six Year Pro ram i01.0..............e..;:,;:;;::: ..::....: re;.. ..:::.. 8.;* ..:....iiii..:. .:::::::: ......:::»>::; <::;»:<:::>;:>.:>: •:.:::: .. ::;<::. >.;:� .> »:>:> ":::::.�::-:::.:::.:::: <::;:;.;:..;;:.:.:<;.,:199..9>:::�<«:>:�:::»::>�>200Q>�>:<i?;:::##:<:s»20 .1:<z:s#:ii'>:g.:040020!-::: :::::::::::.::::•:::::..iI.tEM.:::::::::.::::::::.�.�::.�F'c rammed......5 ent:Pre.:1988....�i99.6.t.Gar over..........'1'otal............ ..........'[9 .>::>::::�::::::>::<: ;:1998...................:.............. ......................... ........................ ........ ..... ......... EXPENSES: Project Development . 1,864,887 90,494 454,393 1,320,000 220,000 220,000 220,000 220,000 220,000 220,000 Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other :.::»;•:<.;>:;;:;:>;:<::;:<:: :, 4 :.::.:::::::.. <: :>::>::»>::»:. :<::>::»:>;>:. ::>:::::»::>>:: 2 000>:: :::>>:<:: ,0 0:<> TECTAL:.EXP:.:ENSES.::.:;.�:::.;::.;:::.::;;.;:.;186id88.7:.;:.::::::.:::.::::::.:::::9d..9A..................!15. J3. .........1.X20 000.._. ..........220 000...........220 000......:.... 0... .:.:....,:.22 �....... ...............�........ SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,849,966 90,494 439,472 1,320,000 220,000 220,000 220,000 220,000 220,000 220,000 Vehicle License Fee Grants In-Hand(HCT, DOT) 14,921 14,921 Mitigation In-Hand Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D:s Proposed Other Proposed Undetermined TECTAL.SOt3.RE:.ES.:::.;.:.;::::;;:.; 00020:. 0...:......... f . .....:...:.......f........ awrtoJEcTRISEVIPFnu•97WEI2 01110599 PM MI 5-25 • • CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Project Development & Pre-Design Program Functional Classification: N/A Fund: 317 Proj.Length N/A ProJ: 12150 RANK: 27 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Perform critical activities needed for the development of future CIP projects and for grant This project has now been expanded to include oversight of construction specifications applications, including scoping,cost estimates,pre-design,interlocal agreements and deficiency quality control and documentation for CIP projects to assure compliance with current analysis. Also provides for the monitoring of active grant projects for compliance with State and State and Federal standards. Federal laws,regulations and specifications. JUSTIFICATION: CHANGES: Analysis of existing and projected transportation operation problems,infrastructure maintenance Annual Budget increased by$30,000 by reducing Arterial Circulation by$30,000 a needs,local and regional mobility goals and revenues/costs is vital to the development of year. This provides for more early design and project analysis work under this transportation projects thatwill be buildable,financable,best serve the needs of Renton and compete program.Also shifted projected future design funds designated for new projects to this well for grants. Also to maintain eligibility for grant funding,the City must assure that project program to provide for preliminary design work under this program. specifications and management comply with current State and Federal standards. ( '.: Funded> I«`:`n2,80 1.00:Is:a1nEtinded I s><>? <i> >»: Pro ect Totals Pro.rammed Pre-1997 Six Year Pro.ram e < :»5 a •:Pre 7996:»:1996: ::Ca : Duet >;:<•;:.;:.. <::»99 ::::::>::>:<:::<::<;:>:s:. 00 ;::><:>::»<�>::::»::; •<:<:::::.::::::;:. .......:.::.....:.:......:.:E .::::.:::::.:::::.::.:::.::Rrog.amm....:........p. ...... .... . ry....... ....................:....... . :...:.:::.�::::2....U:::.:.:�.:.:::.:.200:t:;:::>::>;;; ::<::::::;:;�002...:.•. ....:..::.......::.::,.... .........:............. EXPENSES: Project Development 1,016,600 89,184 142,416 785,000 130,000 130,000 130,000 130,000 130,000 135,000 Precon Eng/Admin 263,500 263,500 30,000 35,000 35,000 45,000 45,000 73,500 R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin • Other TOTAL:::EXPE SES::>;::>:;;:;::»::>:«:::>:«:::.;. go.: 0>.:«> :::::><::><:<:>:s91.84<: :<>::<>:<=:1:42�a4.is::>::>:<:::::<:::1 048,500::>::>::>:«:>::: <::60'OOO:::»:>::155 000:::01400.00i >`<ilip ,000>'<> .. ...... : ...::..N ::::.:.: . ,2....►1Q...::.. ..,..:...... ►....... . .......:..": ,.. � ....:: . �.::...t .. ..:_ . 1. . f . . ... � ... ::. .::.::.:45,000...:,:::::.:'175,000:::.:::.:.:20.. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,280,100 89,184 142,416 1,048,500 .160,000 165,000 165,000 175,000 175,000 208,500• Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand • Grants Proposed (UATA) Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined TO: ::::: :: ::»> 5484::>:::>:::>:>:;:»:<:>:: ... TA SOU � . ::<:>::>;::;:.::::.:�:_.:;,.;:;.;:.:.: .;. :. :.:�»;>::>;::>:«:> 8 .................. L. . .. .RC.ES...... .::.»:.;:.::;.;:;:.;;.;:.1 280'10.0.................:..... .:..... .............:....4. ..16. .........1.0..48 500..... ..........1. 1}0. 0............. : .. .,.. ........'[ ..0.00...........'175 0.00............175 00il...........�: .. C.1%toJECTSYEFTPIFµLLd7.We7 088594 00;1{MI 5-27 • CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP WSDOT Coordination Program Functional Classification: N/A Fund; .317 Proj.Length N/A Proj:.. 12146 RANK: 28 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Provide pre-design, design and construction coordination for WSDOT projects within or adjacent to Current WSDOT projects include the 1-405"S"Curves,SR 167 HOV, 1-405 Sunset to Renton to assure that those projects provide the maximum benefits and minimum problems for Coal Creek HOV,and miscellaneous maintenance and operations projects. Ongoing Renton's transportation system. yearly program. • JUSTIFICATION: CHANGES: WSDOT projects can have signficant impacts within the City. None. • 556:::.....nded:<:: : s :« <:>« : Project Totals Programmed Pre-1997 Six Year Program. >::>;::<:::::::»::<; . ::>:;>:<::<:::::::::;.;; ;:<::;::::2004::::::«:>::: ........................... ....:.. ; . .. ;;;.. :.�.:� .:.;;:.;:.;::.;:.. ..................... 99 ;>.<:;:<:,:<:::;::;::::::1998::.....,..........1.99.4..:.:.... .:. ::2............. ........ <.F�fogr2►mm�d<..::.:.5pentPre:�t99EC::. 199& :Car'rynvec::.:: :.:'.total..:.::::::::,::...::.;1. 7.'.:..:... ...,................. ....... ... ......... EXPENSES: Project Development 97,556 25,510 12,046 60,000 10,000 10,000 10,000 10,000 10,000 10,000 Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other ObO.:...:::.:::.:::.::1000C....:.::...,.:1�,000..:::.::.,::::1.�,00....:.:::::.:::.�...., ............... ..... ................, 0>:'• SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 97,556 25,510 12,046 60,000 10,000 10,000 10,000 10,000 10,000 10,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed • L.I.D.'s Proposed Other Proposed Undetermined TQTAL.. .. :::.::::::: : :.::::..::::.::<. ....... ..... :...................°i'� .(i.:.:.:.::.::.:....:50 OQ0:._..:::.::::::::::'id 000:>:>::_::::>::»::>:::10 0Ot):..............".Id 00Q:..:..::::::.::�..:0...:.: :............ r:.:..:: :...::.........,....... :S.OEI;R�ES.. :.::.. : . 07t556.. 25,310.. . ::.::.. *� :::...:::.......�.............:............... .. ........,....... ................,.... . 5-28 - CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Sunset Blvd NE/Anacortes Ave NE Functional Classification: Principal Arterial Fund: 317 Pro).Length 0.10 miles Pro): 12133 RANK: 29 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Realignment of intersection and construction of traffic signal. Grant application being prepared for$200,000 under the Federal Safety Program. JUSTIFICATION: CHANGES: Safety and operational characteristics can be improved by eliminating offset of intersection. Project has increased in priority due to increasing numbers of accidents at this location. 1:;M;,fun............................................................... unded:::(;»: ..:::200;00.0 Project Totals Programmed Pre-1997 Six Year Program ::>P....r. ramed:::::>::<:s nt:iP.re='7996`:>€::€�199fi::�.:C�r o ��: v t ........................................................ ogm R�................... ry..... ............-................... ............................. ......................:... ...:::.:1:. EXPENSES: Project Development Precon Eng/Admin 20,000 20,000 20,000 R-O-W(includes Admin) 26,300 10,300 16,000 16,000 Construction Contract Fee 258,000 258,000 258,000 Construction Eng/Admin 25,000_ 25,000 25,000 Other • . . • . TOT L::EXPENSES<:>:<::::<:»:::;:::>:.:<:>:<>::;>:<,::329,300< ... . A .. ...................................10 318 0 3 000:::.:::::::. 8ssyy ��{{:; ;:.;.:;:;.:::.;:::.;:.;:.;;;;:;;-;::�::;::.>:.::;:.;:.:..;:::;•.;;.;;:.<.:;�;:.;:.;;;:�::.;::.;::;:.;;>:.;:.;;;:-;:.;:.:;:•;;;::.>: SOURCES OF FUNDS:-' • • 1/2 Cent Gas Tax . Business License•Fee • • 100,000 31,327 68,673 68,673 • Vehicle License Fee • • • Grants In-Hand Mitigation In-Hand • 29,300 29,300 _ Formed • Other In-Hand • ' Grants Proposed • ' 200,000 200,000 15,000 185,000 • Mitigation Proposed . : �. • L.I.D.'s Proposed • • Other Proposed • ' Undetermined . R. 60`6 8`fi�:3•::-::� •>83$ 85` .:......:: ............................. ....................:::.. C.PROJECTSYE61TPff .47.WB2 IMO 09mmi 5-29 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS • TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP 1-405 HOV Direct Access Functional Classification: Freeway Fund: 317 Proj.Length N/A Proj: 12171 RANK: 30 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Expand on WSDOTs study for the construction of potential new 1-405 Transit/HOV interchanges with Coordination with and preliminary evaluations of WSDOT's 1-405,HOV access study Park Avenue,with SR515,with Benson Road,with Grady Way at Main Ave S,with Lind Ave or with will be done through the Arterial HOV program. This project provides funding for other locations along 1-405 within the City of Renton. associated impacts on City arterials • JUSTIFICATION: CHANGES: High traffic volumes now have to pass through,and contribute to,the most congested areas of the New project that includes the previous I-405/SR 515 HOV project development city to access 1-405. WSDOT is currently conducting an 1-405 HOV access study along the full Budget Adjustment(+)$2,800 from account#12125 which is a non-existing project length of the 1-405 corridor. This project will provide the necessary study to determine the • desirability,location,cost and priority of HOV access proposals resulting from the WSDOT study. Rentons study will be used to apply for State/Federal grants. 1=<>>� funded:.�.I:::::.:.::.::.......,..........I rt.........I.................::::.::...: Project Totals Programmed Pre-1997 Six Year Program :....::.:..2QOQ.:.:_.:: .:::.:::.200.4:::::,..::::...... ....... :::;:«<:::>:«<::.:�»>;•:::...: ;.;:.;;;:.::.:;.;;:.;:.:.;:.::.:.:;.:.. r ed:::.:.5 ent:Pr2:'I996.::.:f996..�.CaC: ovef:;::<:::::;.::;Total.:::::::::::.::::::>:::1997:.::::::,....::.:,4. ... .......................... .. EXPENSES: Project Development 41,368 '41,368 Precon EnglAdmin R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other ...................... . SOURCES OF FUNDS: 112 Cent Gas Tax Business License Fee 41,368 41,368 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined T4SAL.S. .E7... .ES.::::::::. :.::::. .::.:.....::.........w......................................................................r...................................................................... .............. C.wROJEcTSIEE\TPIFWk.I7.W82 0910599 119A4NA 5-30 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP City Gateways Program Functional Classification: NIA Fund: 317 Proj.Length N/A Proj: 12112 RANK: 31 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Beautify entrance locations to the City. Projects to include signing and landscaping. Previous Funding of$55,000 is budgeted to construct a project at Grady Way/Oakesdale'in conjunction with 1%for the Arts. This project is currently under design. Future projects will be pursued if new funds become available and the Arts Commission agrees to pursue a similar project JUSTIFICATION: CHANGES: Displays a sense of civic pride. Budget adjustment of+$44,395 of Business License Fee thet came in above budgeted revenue. Provides funding for additional locations. Project Totals Programmed Pre-1997 Six Year Program >::>:::; i; :+: :::r.... : : >::>::><;;:>:....<'.>::<:;: ::::»<:: ;:::.>:;;;;:.;;::.;:.; ;:;.::.;:.; 98 :><::>::::>'::>::::»::> >:::'>:>:::>::s>:'»> ::::>:>:'>:: '>::<ii• 00 >::»: - :>:::z:s:::>:: ::::::::::>::> : >:: . "1998 ............ y 9............ 2000. .200 .. .....2 2 Rc rammed:..:.:;; entPce,1886.....1896: Car: uv�r::.�:::.::'Tota.:: :::...:::::.:::.:198.7..:::::::..::::::.:: .. .:::.:.... ......:.... ........:.... :.:..::..........::.:.: .:.:::......:� .:...:.......... ......... EXPENSES: Project Development Precon Eng/Admin 22,527 1,933 5,594 15,000 7,000 8,000 R-O-W(includes Admin) 3,000 1,000 2,000 1,000 1,000 Construction Contract Fee 117,868 42,473 75,395 33,395 42,000 Construction Eng/Admin 11,000 4,000 7,000 3,000 4,000 Other . .:.::: .. TO:::•::: :::::: .: -: ::::;:;::::;::::>:::>::>::>::»;:«:::::;: 933 . ....5 0 ::.::::::..:::::::.91�>395:::::<:::>�::<::::�!44•�395:::; ::::>::>�:::<:>::>:::::<:::>::>::>::>:::>::»»::>::: . :T�IL.EXPENSES.::,.:. ..;::.....:.:::::::,.,.154,39.$,..,..�::::::.:::..::..:,:1, . .;:..::::..:::.:::..:...��..�'1'.�:..:::�::.::.:.:.....}......... .....:.:....... ,. .... ........................,..............>:..::::..:::.:,:.�..:::::..�::,.:..,.,.::.::::::::.:.::..;...;,..:::.:.::.::.:..:....... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 99,395 1,933 97,462 • Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed , Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined 55 000 55,000 55 000 .. :..; ............................... 395 ... .................1.9.33.....................97...6 :;<::>::,:::>:««;;55 000;:-•:.;::.::.;::.;;:::.::;;;;;:�:::::::.:::::.:::.:::.:.:::;.::::.;:.;.;:.;:.;:..........� T..OTAL:SaU:ROES..:::::::::::::::..::::::::.::::154,...:..:....:.::...................., .. .. .......................�.........................�..........f.............................:................... .......................... ........................... ........................... C:WRMECTSILEERPIFNN47.We2 OwiWi 119)44NA 5-31 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Miscellaneous Traffic Safety Program Functional Classification: N/A Fund: . 317 Proj.Length N/A . Proj: 12115 RANK: 32 CONTACT: Lee Hero (206)277-6217 . DESCRIPTION: STATUS: This program provides for special small-scale traffic safety improvements that are identified and Ongoing yearly program.Traffic Operations Section identifying and prioritizing require materials,labor or equipment beyond the normal scope of City operations and maintenance locations. Some funds may be used to match Hazard Elimination&Safety(HES) crews. Grant(s)if application(s)are successful. JUSTIFICATION: CHANGES: Historically,this level of traffic safety improvements are required on an annual basis. This program Grant application of$200,000 has been made for the Sunset/Anacortes project,which. budgets for safety projects to address these needs. Projects are typically identified through citizen is a separate project in the TIP. • concerns,analysis of accident records or observation by City Traffic Operations and Maintenance personnel. Project Totals Programmed Pre-1997:.:................. ...................:........::.... ........................ .Six Year Protgrram............. .......:......................... ........................ :. :;:<:. 00:>::>`>::> ::«:>< IT »>::>:><:»:":::•:•::•`:•::"•:'•:.. :..::.: .: »r:. 9 ::.;:� ... o l.:::r::::>:::;:: .::. .:.�:.:::::::::::: ::;:::::::>::::;:::>>::>:. 8:::<>:>s•«:::z:::>::>:z::199.9`:: :<<? :::>:?:�>200:0:'�:`:<:::':>:>::.... .1..................2 «:::>::::<>:<:»>::»::::»: .EM..........::::::::�:• :.:r ra mecj......5 ehtPre.1996...99 .8.*.Car. v h .........'Total.......................1S9T..................'l99 ........ .... EXPENSES: Project Development Precon Eng/Admin 48,176 10,176 11,000 27,000 4,500 4,500 4,500 4,500 4,500 4,500 R-O-W(includes Admin) Construction Contract Fee 431,645 136,349 100,296 195,000 32,500 32,500 32,500 32,500 32,500 32,500 Construction Eng/Admin 61,840 37,840 6,000 18,000 3,000 3,000 3,000 3,000 3,000 3,000 Other ..: �. <::;: .: P SES:::: ::::::>::>�::>:»>::::::>::::>::> : :::::�::>>::>::::;:. ..::.: : :>::::»:::�>:�:«:>:;::;�� t;: ::>::»::>::::;� �0 0:�:::>:>::�>::><::>:::: � ::::::::»::::::>::::: 0::>:;_:�>:>::<:::: •000:::::::;::<:>:::;:::::��00 ...........00 .... TQTi0.l_.EX...EN . ..............................54t SIi1...................1.8.4 365..................1.1 Z 2S ................240 0 ..................+�000..............40 00................+4.0 . ......:.............. .:..:..:,..,.::.. .:..:..::::........... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 541,661 184,365 117,296 240,000 40,000 40,000 40,000 40,000 40,000 40,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed LI.D.'s Proposed Other Proposed Undetermined FOTAI.S.QU.RCES.................. .. .1.8.43.65..................1: 729&. .............240000.._..............��011..............dOOOQ..............dOQO .................:..{l.�:..::::::.:.::...r....:::...:.:..:...:.....� O:PROJECTS1LEEMPMAL.7.WU2 MOWS 01A.AM 5-32 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Traffic Systems Efficiency Improvements Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12162 RANK: 33 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Provides for improvements to the operational efficiency of the existing roadway system, including Although the Transit Priority Signal System is now a separate project some of the such items as development and implementation of signal coordination programs,signing and hardware,software and programming to support improved signal operations will be channelization improvements,surveillance control and driver information system(SC&DI),transit purchased and performed under this program. signal priority, Intelligent Vehicle Highway Systems(IVHS),signal improvements such as protective/ permissive phasing,and match funds for possible grants to upgrade the Vehicle Monitoring System for traffic control. JUSTIFICATION: CHANGES: Improving the capacity and efficiency of the existing roadway system is a very cost effective None. element of the transportation program. :iZunded:;itipia284°984:>s:>UnFunded: :€?s >> :> >>< Project Totals Programmed Pre-1997 Six Year Program :::::.::b;:.: ....... ;ikii:;::::i.;i.;::::::»::>::i .:.. a...:......:.. :.�:.::: ;:::..:..::.: .;::: � �lTEM.:.:.::.::::.�:::::::::::.:Ar ramm :�>:::5 ent:Pre1S98<:<::M9g6>+::Ga . e ,.,,;,o... ::>:.99 «:.:::;;:;•::.>:;;. .:.;:i ::.:::..20(,12'*;.;.: .!.;< »:«:::>:::;;>::::::>: .... r. ver.:>«�::.T taf;> :>;:=:::<:«>:....y. 7...................1998::::>::>::::::::<:::::::<:::> :::::::»::::>::::;»::>:::> <::::::»<:��>::::;<<. 0 '.::::<�>::> : ?:: . ............. ....:.:..........:...................... «J. .. •.....p ... ............... .ry........ ...:.:.............................. ... ............ . ............:..::::. .::::::199.9.:.:: .:::.::.2000::..::.::.:: :2 O;E.::.:: .:.: . EXPENSES: . . Project Development Precon Eng/Admin 50,000 3,354 16,646 30,000 5,000 5,000 5,000 5,000 5,000 5,000 R-O-W(includes Admin) Construction Contract Fee 154,984 5,129 59,855 • 90,000 15,000 15,000 15,000 15,000 15,000 15,000 . Construction Eng/Admin 40,000 ' 10,000 • 30,000 5,000 5,000 5,000 5,000 5,000 5,000 Other(City Force) 40,000 10,000 30000 5,000 5,000 m 5,000 5,000` 5,000 5,000 ...;......... 0 . ......>`.:: 0 ':::<< €: >30`000> TOTAL:.EXP..:ENSES..::::.::.....::....:::::::::.28.495.4:.......::::.:.:�.�::::::13.. 3:.:::::.�.::::::.�::.96 5:01.. .............1$!}fl0.0.._..............30 .00..............3b0.00..............300.00...:::::::::.:30{1.00..:.:�.:..�.:.3.0 0 I1................ . . SOURCES OF FUNDS: • • 1/2 Cent Gas Tax Business License Fee 284,984 8,483 96,501 180,000 30,000 30,000 30,000 30,000 30,000 30,000 Vehicle License Fee Grants In-Hand ' Mitigation•In-Hand • - L.I.D.'s Formed - • Other In-Hand • •-• • Grants Proposed (TIA)-••- `f • • Mitigation Proposed • • L.I.D.'s Proposed • Other Proposed • Undetermined TD::. .: .:...::. :.... : ;m::... .. :;::�...; :��::�;:;:.i::;::;xY;:G>::::::•�:>. :�:. ..,...... ,, ... ... ..n:...;,<:.i:3»:. >:<:::.:•::>:.,.:s:-z ;;:., :E>:>:�;-• ..:. ::::::.:....�, .:,.�..,.T :.�. .;.•:,:.my:.:::. .. . :� ..:... O .. .. �.� � �::>:::<:::<:><: 84 98d:::_::::><:<::>:>>:.::;<:<::::>: : 3:: ::>:::;:::.::::::: ..::.:<;:.::.;;:::: 130 0 .. .....300. 0..............300.00 .......30 00 :<::::::::>::::»:<:: :::::::>`:::�:::>::>3.0 . 0....... ... .. ..::.TAL.:S.(.lU:RC...........................................::::. .:::.2 ..............:..,...:.::.:::.:::::)#,d8..::: :::.�::::::::9�,601.. :::::.:::::::1......,00. .._ ,::..:::....... f....... ............ ..>......:. .:..::::::. ., . Q...:::::,:.::3Qf�.0�::::,:.:: :::.. .,........ ...............f O.'WROJacisbusTPIFWLL.97.wB7 owns 90M141 6-33 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP N 4th Blvd - Logan Ave N to Sunset Blvd. NE Project Development Functional Classification: Arterial Fund: 317 Proj.Length 0.60 miles Proj: 12083 RANK: 34 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Prepare a preliminary design report for widening N 4th St to a two-way boulevard. Study is being done by city staff as time is available. JUSTIFICATION: CHANGES: Will address safety and traffic congestion concerns in this area and reduce impacts on residential None neighborhoods in accordance with the North Renton Facilitation process and as directed by City Council Resolution 2708. 0::::>LlnFunded ::<s:>:::>:'::>:>?:?':>:: Project Totals Pr rammed Pre-1997 Six Year Pro ram .:Programmed.:..: Spent.P...re49gg::1999.f.Cai'rybi[et':..::::::.T. taj::.::................................... ..................:.:....:.:..:..............,... ......... .............. ........ .............. ........�.... ......... EXPENSES: Project Development 80,000 5,498 •74,502 Precon Eng/Admin R-0-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other TOTAWEXPENSEWENg 0°OOQ>:::>:<:>::::>:::: >:. >:::5' 98 »':::<:>:::::>:«:::::<::T4°SQ <''>::> >«:>::: : :>:>>< :>': ::::::>:::>::::>:::>?:>`: :>: ::>»> >: >€>><<:<:: :><:>°:>:»> SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 80,000 5,498. 74,502 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined .. :: :..: i�E1RCES•;>;:.;:::.;:;.;:•:;.:<:::�:.;;;:.:�:.;;;: � 0 �;: .;;:::;::;..;;.::;::;:5 4 :.:::::;;;:.;:;;:.. T. Z C:'ROJECTSLEEITPFWIL•97W132 MOM 09%4MA 5-34 - CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997—2002 SIX YEAR TIP TBZ Mitigation Program Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12107 RANK: 35 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: The City has created a city-wide Transportation Benefit Zone to provide a source of funds for On-going yearly program. transportation improvements necessary to support new development This project supports the necessary planning effort to determine appropriate fees to charge as part of the mitigation process,to adjust the fee due to transportation plan changes and other factors affecting the fees as a funding source and to monitor the funds collected. JUSTIFICATION: CHANGES: Management of the Transportation Benefit Zone is an integral part of planning transportation None. improvements and ensuring that new development pays a fair share of the cost Project Totals Programmed Pre-1997 Six Year Program < :>P..crammed:::::>::..5: an t:Pre 1996;:::>:1996:f::Car:'ovpc:>::<::><::::::Total:::>::>:>:;: EXPENSES: Project Development 98,607 2,654 35,953 60,000 10,000 10,000 10,000 10,000 10,000 10,000 Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other • • TQTAL.,EXPENSE,5.::.::. ..:,......:..:.:::;:.:::98,6�7.`.....:::..::::.::::::,:::.2, .54..,.::.:::::::::::.:::35,J.5�..:::::;::.::�;::SO.,OtiO.:...:..:..:::::,.10,.. ....;:.,...:.::....►........ ........::.....:,.,.:.:. ::,.;::.:.:::....► . ...:.:::::.:...: . ,. :..:;.:::,:.:.:....:..►.....::. SOURCES OF FUNDS: 1/2 Cent Gas Tax - BusinessLicerise Fee , 98,607 2,654 35,953 60,000 10,000 • 10,000 10,000 10,000 10,000 10,000- • Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed Proposed Other Proposed Undetermined 70TAL:.<;> �:::::: ;• : ::::«<:«<::>:::<::::::::::::<:>:: ::>;><::: �� ::.::s:::>::>{>::::>::<:�<::>: �8 ` :>:»<::>:>>«:>:::�::>� 5� :»<:::�:<:»::�:>< : ::::� >::>:;E];!4.010 !;;;: �{ ::<::: : . I .S.O . OES............:...........:.........98 807.........................2 ..5.4.:..,...::.::.....:::.3:J.53.. ...............SO 00..... .... . .: D . ::.:.:::..:..,. O:VROJEC7$YEElTPFNILL47.WB2 MOM 0SM Ni 5-35 • CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Missing Links Program Functional Classification: N/A Fund: 317 Proj.Length N/A Pro): . - 12106 : . RANK: 36 CONTACT: .Lee Haro . (206)277,6217 .. DESCRIPTION: STATUS: . This funding provides for the completion of transportation links that do not qualify for other sources On going yearly program of funding. An example would be a section of roadway between two LID's or between two developer mitigation improvement projects. JUSTIFICATION: CHANGES: Making the necessary,and often small-scale,improvements needed to connect other projects can Budget adjustment of(-)$50,000,which was moved to Sunset/Anacortes project,TIP achieve significant benefits. #41 to match grant application. • [:<::ME::united:=:l:<:>gi:218 654 thiFunded G> E:>>EN: ProjectTotals................. ......................:.:. Programmed Pre-1997.............:........ .... ............................:.......... ...... ..........Slx Year Pro9ram.........:...:::.........:............ ............ .................:::::::. ..:;: W C ttilidifi.<::::.::.:.. ......:<::<::,:;:::::;:::;::<>:<:>::<<::>:>::;»:«:;::<:>:>:::::>:>::::.»>: ::>:>::»>:<::::>. >;<>:>;<:::::>::>«<:>::::. »:<:>:::» >:->:<::;;» :>::>::>::»>:>:: :«>.>:><:::>::5:>::;:.;:•:;<.:;: eht•Pre.:1988....1986::3::Ca.: aver ..........'totaE..........__..........................................1........:..:.:...::::.::2::.::,::.:::.::::::::::::. .,.:.:,:.:.. ......... ........... ........................... EXPENSES: Project Development Precon Eng/Admin 34,000 10,000 24,000 4,000 4,000 4,000 4,000 4,000 4,000 R-O-W(includes Admin) Construction Contract Fee 229,654 85,654 144,000 24,000 24,000 24,000 24,000 24,000 24,000 Construction Eng/Admin 15,000 3,000 12,000 2,000 2,000 2,000 2,000 2,000 2,000 Other 0' 00' <><>><>:>30"000< .T..OTAL:EXPENSES.:.�:::::::.::::::::::::::::.27..8 654::.::::::::::...:.....::::::::::::::::.::::...............9.6 64...............1.80 000.._..:....:......3.a�oa....:.:...:..:3a,000:;....:...:,,.3iiF, .o....:.::::.::..,.s.......... .............. ,.:.:.:. .:.�.�::::.:....�....: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 278,654 98,654 180,000 30,000 30,000 30,000 30,000 30,000 30,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed • • • Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined T.. .. .. ;.:;:.::.::.;;:::.:. ::..::::::::.�:::.:.:;:.::::.�:.�:::..:. 8 4............... t;tl 000...........:.:..3 OOff:..::........3x 000..............30 OOf/..............3i3.. ........:..... : .......:....:.....,........ .OTALS.O.UR�CES:.:::::::::.::.::::.;::.;:.;:.;:.;;;:27:.8,65.4. . .:.::.::.::::::::.�:::::._.::::::.:::::::::::9...,�5..::::.��:::::::::1......�..:....::-.:::.:::..:.::..4� . .. :...:........ , ...............�....�T...............x........ ..............� ..... C.�PRCJECTSLEEITPVINAL-97.WB1 =MI VIA4AM 5-36 • CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Sunset Blvd. NE Rockery Repair Functional Classification: Minor Fund: 317 Proj.Length: Proj: new • RANK: 37 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Reconstruct failing sections of rockery wall on the east side of Sunset Blvd NE between Bronson Way New project. and NE 7th St. Monroe Ave NE between NE 7th and NE 12th will also be evaluated and corrected as needed. ' JUSTIFICATION: CHANGES: Weathering has caused rocks in some sections of rockery walls to crumble,with the risk of local colla Budget adjustment made to provide funding. Repairs will be programmed on a priority basis,to address the potential hazard for pedestrians and vehicles. " :>l=unded<=:I<:<:>: :4�.vD00»l:sUnFunded:a><`:>: <>::>i <:::>; _ Project Totals Programmed Pre-1997 Six Year Program :::::.:.�:::::.:�::::::..: . :::::::.::;:.:;;::<.:>::<.;:; .. �::::: ... ..9 ... .99 .... . over ....fiotaE.........._ ..........199.7...................1998..................1993..................2000..................2 . .1.. :;.;::.;:;.;:.;:::.:;.:-;:.;:.:;.ITEM:::.:.::::.:.:::::.:::.:.:...P.rogrammed..::.:Sp�ntPre:�(..86:::.1...G::f:Carry ..... .:.::....................................... . ........... ........................... .......... ............... ........ ................ .......... ............. ....... ... ........ EXPENSES: Project Development Precon Eng/Admin 10,000 5,000 5,000 5,000 R-O-W(includes Admin) Construction Contract Fee 100,000 45,000 55,000 55,000 Construction Eng/Admin 5,000 5,000 • 5,000 - Other TO:TA.. 5.......:..:.::::::::::.:::....1.1.5 OO.Q.........................................................SOO.Ol3. ....:....:.:::,; ......... .:_............... ..� . .....::::::.�::::::::._:::::::::.:.::.:::::..:::.::,:...;:,.:::..:,.:::.::�:.:::::,.:. .::...:........... ...... ........ . ........... L:EXPENS)=..::.:::..:....... ...................� ... :. ................................... .... _......... ..� .. ..... S, . .. • 'SOURCES OF FUNDS: • • • 1/2 Cent Gas Tax • • • Business.License Fee - - . • 115,000 50,000 65,000 65,000 • Vehicle License Fee • • Grants In-Hand. • Mitigation In-Hand •• • • L.I.D.'s Formed • • . Other In-Hand • • • Grants Proposed- ..• • • .• • • Mitigation Proposed • • . . • L.I.D.'s.Proposed ' Other Proposed Undetermined • - • •. . TD:TAi_.S.O:U.RC...................................... .::..::_:..:..............� .......................... ........................... .......................... .......... CW{o.ECTa%EE\Twrw..,7we2 WOWS 09)44 AM 5-37 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP North 8th Street Reconstruction Functional Classification: Minor Arterial Fund: 317 Proj.Length 0.21 miles Proj: 12165 RANK: 38 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Reconstruct the roadway of North 8th Street from Garden Avenue North to Houser Way North. Federal Intermodal Surface Transportation Efficiency Act(ISTEA)preservation grant funds have been obtained for this project. JUSTIFICATION: CHANGES: This Street has deteriorated beyond the point where it can be addressed through normal Delayed one year. resurfacing and,therefore,requires complete reconstruction of the roadway. »::><��:�urided:>�:�<::»>315000>:'•��»UnFunded::>�(<> ':% �>�'�:< Project Totals Programmed Pre-1997....... .......... ................................ ........-........... .. Six Year Program:..::,::.:.. ....:.:_::::.:..:.>:.;:<; ::.:::.:.�:::::..:::::.: .. ............................ ...... a .�r2•:1996�::.7996:#:CSI.: over ..........Total.........._...........1997::«<::�« :>:<::>?:1998..:::::::.:::::::...............:.. ....... ............ ........ ............... ...:.......... ......... :::.::::.:::.::.::::::::j.T...E.M::.:.:::::::.::::.:.::..:P...royramm�d.:::::sp.nt. .....,.ny.................... .. ....................................... ....... . EXPENSES: Project Development Precon EnglAdmin 19,000 315 18,685 R-O-W(includes Admin) Construction Contract Fee 280,000 280,000 Construction Eng/Admin 16,000 16,000 Other TOTAL.EXPEf�.:E....�::::::::,:::..:.::::::.::,....::..., A.D..,::.::.:.:......::....:.............. .....................t. ........... ............................. ... ... ..... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 43,000 315 42,685 Vehicle License Fee Grants In-Hand (ISTEA) 272,000 272,000 Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined 1'OTAL::.S.OEIRCES...................:::.::::.�:::31.5,OOQ.:.:::.:::..:::.:.:..:.::::::..:i..... :...........:..........►..............::......................:.......:......................... ..........................�.......................... ..... CIPROJEC1S% TPFWR.97.WB2 040519$ 09%{MI 5-38 • • CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Railroad Crossing Safety Program Functional Classification: N/A Fund: 317 Pro).Length N/A Prof: 12166 RANK: 39 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Install railroad crossing upgrade improvements at locations determined to warrant.safety Grant funds will be sought through the Federal railroad crossing program improvements. Depending on the needs of the location,work could include rubber crossing pads, administered by WSDOT. Received$137,932 grant for N 8th St crossing lighted or unlighted signing, motion detectors,gates and connections to traffic signals to provide improvements which will be constructed in 1996. signal pre-emption. JUSTIFICATION: CHANGES: Railroad roadway crossings can present a serious safety concern that needs to be addressed Grant increased by$32,932. when conditions warrant improvements. ;Funded::a»::>>1.83;432::I^a)nFunded a> >':180;000 s ;.. Protect Totals Programmed Pre-1997 Six Year Program '::>�?:'::#:•>:> :::>:>::>>< .; ..::::: :.. :.99 .:..996::.;:Ca . ove.>:�::.;;>:�:;:..o :;::::»::>:.>::.;.:.::. ........................ ;::;:.;::.;:;:;;;:.;:.;:::::.:<: . med......5 entPce.:1 6.....9 .t.. C..........'.Y` .telt..........-:..�:::;....1. 8.7.::::::: >�:..... .::::..::::::.:::::::.:ITEM:.::::::::.::..:::.::::...Program. .......... p..................... . try....... ................................,........................... ......... ............... .......................:... :..:.:.... ....::::....:.......:........::::::,.. :..:........... ......... EXPENSES: Project Development 10,500 10,500 10,500 Precon Eng/Admin 41,000 2,943 12,057 26,000 13,000 13,000 R-O-W(includes Admin) Construction Contract Fee 294,432 134,432 160,000 80,000 80,000 Construction Eng/Admin 17,500 3,500 14,000 7,000 7,000 Other :: 9 3::.::::::::::::::::.49 J89::::<:::»OM .:0°500>:=:.>::»::>::>::>::>:10.50 ;`: :::.� : �•�:: .: :::::::...:..:...::::::::::.�363'432>:. ::>::::«:><:::><:>:<:>::::..2 .4 ...................1.. ...29 7QTAL:EXPENSES;:::::::;;::;.:.:;. ..:.:.:.., ..... ...................... � .,..................:� . .. ..::::::,:.... ..,..:..._.:.:::::::::..::► . . : :..:........_.>. ..................... ....................,... :..:...:..:..:............. :................... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 32,000 2,943 9,057 20,00010,000 10,000 Vehicle License Fee Grants In-Hand(ISTEA) ' • 151,432 151,432 Mitigation In-Hand L.I.D.'s Formed Other In-Hand • • Grants Proposed (ISTEA) 180,000 180,000 90,000 90,000 Mitigation Proposed • L.I.D.'s Proposed • Other Proposed Undetermined .::.;;>:;:.:�:. . :; .;;.;::.::.;;:::;::.;:.:.;:.;;.; :. 43::�:::::::::::::::.:60� 9:::>:�»>:<:::;>:«:� 00000>.::;�:»::>:;»;>:�»::>:;»::�<>:»: ::;::�. t .. ........................... ......................... 9. .. ...............9. ..+18 2 ......................................1.0..' TUTAL.:SOU.RCE..S :: :::::.::363,432:...:::::.::.:::::::::::::�r.:......:..........:....:.......� . ..,::.:::::::::. ....� _ .. ::,:.::.:::::.:::...::..:... ......:::......� ........................... ................� ........................... ............. .. C.PROJEC7$%EEWWYI .47.82 !!A!A! 09M4 AN 5-39 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Bicycle Route Development Program Functional Classification: N/A Fund: Fund: Proj.Length N/A Proj: 12173 RANK: 40 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Further develop the City's non-moterized facilities. Sign Bicycle Routes along preferred corridors. Projects will be developed,prioritized and evaluated for potential grant funding. Construct missing links in the bicycle route system. Construct site-specific improvements. Upgrade Some potential projects include the Garden Ave. North Bikeway and Houser Way routes as needed to safely accommodate bicycle traffic. Publicize Renton bicycle route network. Bikeway;and other identified high priority bicycle links including connection of Provides funding to match grant requests for bicycle construction improvements. Springbrook Trail with the Interurban Trail at Fort Dent Park(in Tukwila)and/or at SW 16th St,Sunset Blvd.Bypass(NE 12th),and the Lake Washington Loop. JUSTIFICATION: CHANGES: The City does not currently have a well-developed bicycle route system; this program will complete None. an integrated system of bicycle routes and trails. Many locations along existing and potential routes have site-specific safety problems,which would be addressed in this program. Additionally,there is a strong demand for better-developed non-motorized facilities in Renton. • >:>::Fandedlij `>: >23Q 00.......................................................... • Project Totals Programmed Pre-1997 Six Year Program •.. .......... ............. ....:. :.. �. :::::. .... .;:.;.;.;.:,:_. <:>s:<<;>: -:::::�::»>:«:> :;;::;;;:.;.;::::.;:.: 8;.;;.:;.;;;:;;:•:;199. ..... . .P.r. rammed:._:.;5 entPre:�[996:: .199.6.t.C$rryover:::::.:::TotaE.:.:::::.::.::::.::::::t�97:::.:::..::::::::199 ::..::.:::.::.,.::........:........ . EXPENSES: ........ .............. ... . .... ............. Project Development 15,000 5,000 10,000 10,000 Precon Eng/Admin 106,000 106,000 10,000 45,000 10,000 20,000 10,000 11,000 R-O-W(includes Admin) Construction Contract Fee 502,000 502,000 318,000 120,000 64,000 Construction Eng/Admin 47,000 47,000 32,000 10,000 5,000 Other T.,T :<:>EX :>:>:: »:::>;:>:::<:::>::>::::»::>::: 0 0 :.;.;::.>:.;:.;::.::.:.::.;:.::::.;:;::::;>•.:::;;:»>:•<.::�:<:>:::::;»: :::::>:;::>:;:::;:>::. . ......... 000 56000f)...........'[ .. . ...... ::. TOTAL:.EXPENSES.:::::.�::::.�::::::.�::::::.:B7.:o-00.0::.::.�.::.:::...:.:.:::::::::::.�...:....:::......,.::..::"��Q00. . .. .. .1;.65,OOQ.. : . �0,1t0� .:::.::...+45, . ....:::::.:,:. ..�.... .... ................,.... .. ....... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 230,000 20,000 210,000 100,000 60,000 30,000 20,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 440,000 440,000 40,000 240,000 80,000 80,000 Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined '1100::::::::?:::';:;:;:;;2 ':Q ;:::g:0`.. ik:>; :.. ...... ....................... .o ............ ............... .................. o 000.. .... 50 000 toy Ool�....:......40 000:> <> >:�oa .o ........:..�.. :.::� ;<;...:.::.... ,...... TE?TAL.S.OU.ROES.::::. .:.:.:::67 :OO.Q.::::::::.:::: :.:.::::. :: : 2...:...::. .6. r..:.::. .::..:......: . ....:........ �. . .............: ................. ..... , C.'1PROJECTS.EE TPIFNILL-97.WB3 00/05/91 09:44051 5-40 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Windsor Hills Street Rehabilitation Project Development Functional Classification: Residential Streets Fund: 317 - Proj.Length 1.00 miles Proj: 12144 RANK: 41 • CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Perform preliminary analysis/design/cost estimates for reconstruction of failing roadway areas Study is being done by city staff as time is available. which can be rehabilitated in conjunction with street overlay program and in conjuntion with improvements proposed by the storm,water and waste water utilities. Investigate establishment of a Local Improvement District. JUSTIFICATION: CHANGES: This is an older residential area with failing infrastructure in need of major repair and/or upgrading. None f <<< .unded :l:r.....>::40 fi0.0>:I::UnF'undeii:: 1>:><s .... ;;:.>:::i:>: • Project Totals Pr rammed Pre-1997 Six Year Pro ram <»:: :::::::<:::><:: >:::<:<:::. :..::.::.;<.>:.;::.;:: ;.;:.::.;;;.::.:r::;>• :::»;:�:»:::>:�:::::<> 002::;;;:::::: ........................: ............:.: ........ ... ..Programmed.:.::..5pentPce..'[996...:1996..::Carrryo.Vert..:,:,:..:Totat.:::::::..�.:.:........... ...,... .......... .............. ............... ..... ........ ............. ........ ............. ........ EXPENSES:- . Project Development 40,000 3,344 36,656 Precon Eng/Admin • R-O-W(includes Admin) Construction Contract Fee • Construction Eng/Admin • Other TO.TALEXPENSES::< :s»::»::::>:: ::>:>::»:........ SOURCES OF FUNDS: - 1/2 Cent Gas Tax Business License Fee 40,000 3,344 36,656 Vehicle License Fee Grants In-Hand . Mitigation In-Hand L.I.D.'s Formed • Other in-Hand Grants Proposed • Mitigation Proposed • L.I.D.'s Proposed • • Other Proposed - Undetermined <'< >'><'>':»><: :<z<:s:>::>:>'?:`:<: TOTAL:S�.U.RCES»::>::�>;::::>:<::::::>:::::::::>......... .............. .. . ... ........... ...... . ............................. ......................... .. . .......... ............... ........................ ................ CP*O CTs „PVwwa.x68 0e/05/111 OM w 5-41 CITY OF RENTON • PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Oakesdale Ave SW- Extension to SR 900 Functional Classification: Principal Arterial Fund: 317 . Proj.Length 0.80 miles Pro): 12116 RANK: 42 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Perform a design study for an ultimate(Stage II)4-5 lane improvement and construct an interim King County agreed to provide$50,000 toward design study. Alignment for Stage I (Stage I)3 lane improvement Includes curbs,sidewalk,drainage,street lighting,traffic signals, from Monster Road Bridge to Coal Mine Road established and shown for 1999 channelization,retaining walls and bridge structure. This study will determine the costs for Stage II construction. Phase II final alignment will be determined jointly with King County. which are not now shown in the six-year funding below. JUSTIFICATION: CHANGES: Will serve growing north-south traffic demand and reduce congestion on Rainier Avenue and Grady Construction now shown for Stage I. Way.This project will be mostly financed through off-site improvements and mitigation payments by adjacent development I<> = 1=.t itlegl ga:4603)00:>I::>UnFunded:>:I:`::::z1 0.00;00CP Project Totals Programmed Pre-1997 Six Year Program ::::::::::::•:::::......f..E :>;;::>::>:<::<:>>:::>.>::»:>>:t?.ro rammed::::>>>S a :Pre:�I986:::>::'199.&....Car. over.:::>::>::::>:#'otal:<:<:::::»:>:=;s<<»><:>:1997:.:.:.><:<.::MR:1998::.:>•;::;; MOOZ::`:<::>< EXPENSES: Project Development 724 724 Precon Eng/Admin 229,276 229,276 109,276 120,000 R-O-W(includes Admin) 50,000 50,000 50,000 Construction Contract Fee 800,000 800,000 800,000 Construction Eng/Admin 80,000 80,000 80,000 Other TOTAUEXPE SES:>;<: :::>::::>:::<::>::>::«::::1";6 " '»::>:'4�159 276<:> ... T.. N . . .......................... 1..0 00.0�:>�:>:'.<'>::>::»:'>:::«:>�:::»»>::24::�::::<:::<�:< ::>:<:>:>:�> >::><:....... .. Z .._...........'[ ..2.l�...........'L.. .. ... :.... . SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 110,000 724 59,276 50,000 50,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand(King Co.) 50,000 50,000 Grants Proposed 525,000 525,000 85,000 440,000 Mitigation Proposed 475,000 475,000 35,000 440,000 L.I.D.'s Proposed Other Proposed Undetermined �.. L.SOURCE&........... .::...:......1...60 T. TA .. . .. . ........... C.PRCJECTSLEEITPFM.M.WE"J 081125196 0944 MI 5-42 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP SW Grady Way -SR 167 to SR 515 Functional Classification: Principal Arterial Fund: 317 Proj.Length 0.44 miles Proj: 12127 RANK: 43 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Rechannelize and modify signals to provide a continuous eastbound lane from SR 167 to SR 515. Project cannot proceed until funding is obtained. Develop capacity,safety.and property access improvements. JUSTIFICATION: CHANGES: Will improve traffic flow and reduce congestion on SW Grady Way. Delayed one year. Frinded:< ::> :..:::260.1)0:::: Protect Totals Programmed Pre-1997 Slx Year Program • :>::::::9 ::»1999:::::=: <'s:`::::::'>20 0:::::>::::::::::;>:»:::::<:• 00:.::::>:<:::>:>::#;s>::»#::2002::::.>::>:<'.: :.. �::::»:; a e:.99&:::>:1996.:�:.C$t: Dues :<:<.;:.;;;;:.:;.;;:.;•.;:;.;:.f.T..:EMProgramm�d.:.,:::�p nt.Pr. i ........ ............. .rY.......:::..:..:,:..... .::.:.::..:.:..:.:..,.................... ........................ ......... .:..:.:.:.::. ......................... ....... .... .........,......... .... ........ EXPENSES: Project Development Precon Eng/Admin 40,000 40,000 40,000 R-O-W(includes Admin) Construction Contract Fee 200,000 200,000 200,000 Construction Eng/Admin 20,000 20,000 • 20,000 Other .:....:::::::.�.:..�::::::::::. O::A E PE SES.:.::::::.�::._:...:�::::::::::2 0 ......................... ... . . .. .............. ............. .._.....................::�;;;;:::::.;;:�;::::�>:.;;:.;::.;;:.;;:;:.;;:;:.::...... .... ............................................................ ............ SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined 260,000 260J)00 260 000 TAL SO RCESi:» <a>::::m><:: 0 0 ....... ...................................................... 2 000 ............ . . ... CIPROACTSYEE\TPFILLLA7.WB7 OMNI 09A4M1 5-43 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Lind Avenue -SW 16th St to SW 43rd St Functional Classification: Minor Arterial Fund:. 317 . . Proj.Length 1.69 miles Proj: . 24 . . RANK: 44 CONTACT:. Lee Haro . (206)277-6217 . DESCRIPTION: STATUS: . . Widen existing roadway to 5 lanes where required. Includes new roadway,curbs,sidewalks, The needs,priorities and schedules for improvements on Lind Avenue will be.. drainage,signals,lighting,signing and channelization. determined through Arterial Circulation studies and the TBZ Monitoring Program. JUSTIFICATION: CHANGES: .. . . . Increasing traffic demands in the Valley including the proposed development at the Boeing Delayed one year. . Longacres site,will create the need for increasing the capacity of this major north/south arterial. . . . .. • • <i?::3..0.00;00.0.. Project Totals Programmed Pre-1997 Six Year Program ......................). .E ... . . ed:..:.::5 eh .Pre.:1896....'t996.:t:Gar; aver ..........'T.'otal::::>::> ::>:>::>:::»>:::"t99.T::<::::<::r;::»::;::;.;1988................:.1. . ...�.......:...... .. ...�.., ....... .,:....... ... ......... EXPENSES: • Project Development Precon Eng/Admin 388,000 388,000 120,000 268,000 R-O-W(includes Admin) 150,000 150,000 150,000 Construction Contract Fee 2,280,000 2,280,000 1,700,000 580,000 Construction Eng/Admin 182,000 182,000 136,000 46,000 Other ..................... TOTAL;;:: .� • �:::::::::::::::.�:::::::::: :::: .FSP:.:ENSES.;;:.;:<.;:.;:.;:.;:.:.:;::.::.::.;:�000 00.0..........................................................::......:....:.:......::.3 .0 ._..,,..:.:......:.......:.::.::.::.:..:..1. . ..:.:.::.::........�..:....::.<..:...w ;...... . . . . �.. .. ....................:...: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand • • • • . • . • Mitigation In-Hand . . . L.I.D.'s Formed . • • • • • • • . • • Other In-Hand Grants Proposed(UATA) Mitigation Proposed 1,500,000 1,500,000 60,000 209,000 918,000 313,000 L.I.D.'s Proposed Other Proposed Undetermined 1500,000 1,500,000 60,000 209{000 918,900 313,000 TOTAL. ... �;... ::»»::>::::>;::>::<::> :SQ.URGES:::::::::::.::...::::::::::.�oOaQoo::.::::.�.�:.:.:.:.:...............................................................�000 oQo.._..................:....................12a 000...::::::.:Vii..x� ......... � f .............. ,.. .....:::::::::::::.::::::::::::: C:WROEC7SLE5TFFV L-97.WB2 08/0590 004W 5-44 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Duvall Ave NE - NE 4th Street to North City Limits Project Development Functional Classification: Minor Arterial Fund: 317 Pro).Length 1.67 miles Pro): 12123 RANK: 45 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Preliminary Engineering study for widening roadway to 3 or 5 lanes,includes:curbs,sidewalks, Project cannot proceed until funding is obtained. Actions by King County and the City storm drainage,street lighting,channelization,and bikeway. of Newcastle regarding the widening of Coal Creek Parkway will influence whether this project proceeds. JUSTIFICATION: CHANGES: Growing residential areas use this route which is also becoming a major through route between Delay one year Renton and Bellevue. Furided s::::>:?> :1.00'000: Project Totals Programmed Pre-1997 Six Year Program >:»>:<:::> :::;<>:»::>:1'f'EM:>::�»::':s»�?-<::»'.P.�... rarririrea:>«<::S ' nt:Pre'(898:<::>y999:°t'Car:�oireC «<:<::::::>TctaE':::«::�:::c::�::>:>::>�::::1987::°':>::<: :><>:>:11998:'::<<::::>::«:::::><>::> ::.:.;:.;;;;;.;:;�:•;;� ::.;:.;:.::.:.::.:.:.:::.: :::<:»: ......................................................... ......og. ............. Pe ..... ......... ................ ..:..:::199 ::;:::>::>::><:::>::::>::200.a.::.:.�:.:::.�::.200.x::::::.:::.:::::::2002...::::: EXPENSES: Project Development 100,000 100,000 100,000 Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin • ' Other • • TOTA .: :S>::::>««:>::>:::«<»>::><>z:<100 0 ::.. . ..L.EXPEIVSE .... . 00 ;:.:<>::;:>:::>:.;::;»>:>.:::;::;;::;:.;;:::;.;:.:..::;;::;:>.;;:.;::.;:::::;:<::.;:.;:::::>::::;::::.>;;>>;:;::. 000<:;::.:.;>::»»::>::::>::;:::::::.;;.>:;:.::..:<.:.:<:>:::>::>::;::>::;>::>:.»::>::;»::«.: ::.::::>::><:::>:::<:::>::::»::>::::>:::::>:::: .. ........ . .. .......... .. ................................ ................................. ...........1Q4 . ........................ .............................................100 000.:.::.::..::::........::.:.::..:::::.::::::.::.::.::.::: SOURCES OF FUNDS: 1/2 Cent Gas Tax • •• • Business License Fee Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand • • Grants Proposed - • Mitigation.Proposed L.I.D.'s Proposed • • Other Proposed • Undetermined 100,000 100,000 100 000 .. . L.. . E1.RCEs =`.gni::> <:>:::.......... 0......................................................... ......... ..........t00 000.._................................................ . .. .............:........ .... ... . . . C*ROJECTSr.ESTPIT494,17119e2 90,0599 09x4 Nu 5-45 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP SW 7th St/Lind Ave SW Functional Classification: Minor Arterial Fund: 317 Pro).Length Intersection Proj: 12153 RANK: 46 CONTACT: Lee Hero (206)277-6217 DESCRIPTION: STATUS: Install new fully actuated traffic signal,including poles,signal and pedestrian displays,detection Project cannot proceed until funding is obtained. loops,emergency pre-emption,an 820-type signal controller,interconnect to master computer and associated channelization. JUSTIFICATION: • CHANGES: Increasing vehicular and pedestrian traffic in this area is warranting a traffic signal based on safety Delayed one year. and delays. • Project Totals Programmed Pre-1997 Six Year Pro ram •............................ ._... ... ..996.::..'..1996..*:Galt. �bver ..:.......TotaE.........._...........199.7....:........:.....1198::.:.::,.:..::.:.:199$..::.•::::.�:::�......::....... ......................... ......................... .tarogrammed......sp6nt.�re:'1......:... . rY. .................................................. ............. ............... EXPENSES: Project Development Precon Eng/Admin 18,000 18,000 18,000 R-O-W(includes Admin) Construction Contract Fee 120,000 120,000 120,000 Construction Eng/Admin 12,000 12,000 12,000 Other TOTAL:EXPENSESE>;::»<:;::;::>:»»::;::>::;�150Q0.Q::;.�:.:. :;.:•;..:.:..::.::,:.,:.,... .::::.:.:::�::.:::.:::::.:::::::..:.:.::::::::::.:...., :. .._::.:.:.:..:........> ............. r ............... ...................... . . . SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 125,000 125,000 15,000 110,000 Mitigation Proposed 25,000 25,000 3,000 22,000 L.I.D.'s Proposed Other Proposed Undetermined ...: ...::. .. :... :::;r:::;:;;:;>:«:::>;: ;::>:<:�>._>:�:�.. ..•;...:..;: ::»»:��:''��>.;.;>'ism>: ::>::;:::^;:>:<:;;":::_}:>::::>:>:�::�:.::: >:::k»: :... :-:..: :;:--•:.:.: ,: ::..:�: .:.. ..,:.:.,:.:.>.���::.;;:;:..:::.:;:.;:.;;:;:.;�..::.:;:.:::.;;;::;:.:�.;:�;:::::.>::;�:.:;;:.;;•..::.;::::.;:;.:::.;.:;:;:::<.;.::.:;;:.;::•.:.:;: TOT/1.. E112CES;;.;:.;::::.:�:<:::<::::>::::>:::<:.:>::::1:Sa00.Q..::...:.:........:::.�::::.�:.�::...:.:.:............................. .............'i'50000.._ ......:.....:#1�1) 0..:.:::::::.'�.. r. ........................... ........................... ........................... .. . . G..S.D. ... . . :::::..::..:.:.............:...........r .. . ...................... ................................. ................... ................ ..a CAPRO.ECTSILEEVPFNK•97 W07 MAN 09A4 NA 5-46 - CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Benson Rd S/S 31st St Functional Classification: Minor Arterial Fund: 317 Proj.Length Intersection Proj: 12129 RANK: 47 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Install a complete actuated traffic signal at Benson Rd S and S 31st St designed to provide for Project cannot proceed until funding is obtained. King County is lead agency for possible future Benson Rd widening. determining when this project will proceed. JUSTIFICATION: CHANGES: Location is approaching signal warrants and traffic volume is increasing. Signal will reduce side None. street delays and improve safety. Project Totals Programmed Pre-1997 Six Year Program ................:..ITfM::::::_:;:>:<:::>::»::»::::;:::;:>:::P...[o Camme :::?::S...eht:P.te•".1996>:'>::7996::+::Cat: over:.::.::.::.:.::.: ota :::�:::::<::>::-::::<;>::<>::1997;:.:.;;;:::::::»<:::>:::998........ .........199.9............. EXPENSES: Project Development Precon Eng/Admin 20,000 20,000 20,000 R-O-W(includes Admin) Construction Contract Fee 100,000 100,000 100,000 Construction Eng/Admin 10,000 . 10,000 10,000 Other TOTALEKPENSES[ ''<<< :« <€��`.> i><130 000;::':: � « » � »<;>>�:»« ><<�< >�>�>>:>«:`»< << €»:>[> > 1:3�0°000:'>�i�»> »2d`O.Qd< '> ....�. . ............................................................................................................... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D.'s Formed Other In-Hand Grants Proposed 106,000 106,000 15,000 91,000 Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined 24,000. ......<...............:.:.: :................ ................... 24,000........ ...........5.000.......... 19,00...0 TOTAS.O.U.RC. 5�.....:.>.<......>..>_.<:<..<...:......1: 000Q.. : .< < » <`< > ...:: : , sge.i. ingi .$i..;ia <.'r.m......<..».......:.......'.......>.. ..>. C.VROJECTSREEITF 4LL•97.Wa7 96/0/0/ 09A4 AM 5-47 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 1997-2002 SIX YEAR TIP Valley Connections to West Functional Classification: N/A Fund: 317 Proj.Length N/A Proj: 12149 RANK: 48 CONTACT: Lee Haro (206)277-6217 DESCRIPTION: STATUS: Provides for improvements connecting the Renton Valley area to the west. Possible improvements City of Tukwila is lead agency for project development, design,construction and include: 1)Extension of SW 16th Street to West Valley Highway,2)Extension of Strander Blvd securing grants and other funding. Funding from the City of Renton will consist of from West Valley Highway to the Boeing Longacres site and possibly to Oakesdale Avenue SW;3) Boeing mitigation funds. Total cost of all improvements,if implemented,is Grade separation of SW 43rd St and UPRR/BNRR tracks. approximately$50,000,000. Priority and scheduling of improvement projects has yet to be determined. $50,000 is being budgeted to finalize the list of projects and priority. Improvements are unfunded and planned to occur after 2010. JUSTIFICATION: CHANGES: Provides westerly access to and from Renton Valley area.Project(s)respond to existing None Rentonlfukwila interlocal Agreement entered into when City boundaries were adjusted. • Funded::..::.:>..>:..?::SC°'00.0:::::::....Funded:::;:: ..><........ ..`: Pro ect Totals Pro.rammed Pre-1997 Six Year Pro.ram :::_:.. ..... .:. ...:. :<�. ::+•: a.:<.;:<.:.;::.;:•:ota::::.;•;:.:::.:...�.;�:.;�.195::>;>::;:::::::>s:::>:.:1.99.8.>::»::::»:>:;<>:...1. 9&:;:.;:;;;:;::.. . :.;:•;:.:�:.: :...:.. ............. TE .:<::.::: .::<;.:>..:«: <n.::>Pr rammed..:... ehtlDfe.'I39B....'1996....Car. av t .......:.:T E::..:..:_ ::..::..,._. T........ ...:... . ....._. .._........ .... .............. ........................... .........._....::;.>:<.;:.; EXPENSES: Project Development 50,000 •50,000 Precon Eng/Admin R-O-W(includes Admin) Construction Contract Fee Construction Eng/Admin Other >:>:;>:•50000>>:»:.: >.:.:>:>»>:.:>.:>..>:>::=:<':><:::»:>::»:>:>: <::`::':::>>:`<:>>..<:>:::> ::«<€: ;`::.>:;'>..::::»:>:>>:>::>.::>::.:>`::»> <>«< < <« .>«> <.> <: `:>:<::<`:`:<?> >:>«> >. ..TA:;;. . . ESES:>::>.<::<'>:<::<::<:::.<:::::::>:>::::>:50"00.0�::_:<:::::<;>:>:::<:>:>;>:<:::»::»::>:«««: ::>; >::>:........ .. . SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 50,000 50,000 Vehicle License Fee Grants In-Hand Mitigation In-Hand L.I.D:s Formed Other In-Hand Grants Proposed Mitigation Proposed L.I.D.'s Proposed Other Proposed Undetermined TOTAL.. .. <::: ; : :> :<:>»: :»:::>::»:::�::>: .S.O E!R C E S...................::..::::.:::::.:.:...,....:..::..:::.:::::::::.:::::.::.:.:.......... .......................,..........a.............................................................. ........................... ........................... ............ .... CSPROJECTStEEIT mAI.-97WB2 98005196 09:44AM 5-48 SECTION SIX- APPENDIX Six Year TIP Abbreviations & Acronyms 6 - 1 ABBREVIATIONS AND ACRONYMS The following list defines the abbreviated words or acronyms used in the City of Renton's Six Year Transportation Improvement Plan BRAC Bridge Replacement Advisory Committee CBD Central Business District • CIP Capital Improvement Program CMAQ Congestion Mitigation and Air Quality CTR Commute Trip Reduction (State Act) EB East Bound ER Emergency Relief FAS • Federal Aid Secondary Program FAUS Federal Aid Urban System FHWA Federal Highway Administration FTA Federal Transit Administration HCT High Capacity Transit HES Federal Aid Hazard Elimination & Safety Program HOV High Occupancy Vehicles I/C Interchange • IVHS Intelligent Vehicle Highway Systems ISTEA Intermodal Surface Transportation Efficiency Act (Federal Highway Bill) LID Local Improvement District METRO Municipality of Metropolitan Seattle MUTCD Manual on Uniform Traffic Control Devices NCL North City Limits NB North Bound PMS Pavement Management System Precon Preconstruction Engineering/Administration (design phase of project) PRT Personal Rapid Transit PS&E Plans, Specification, and Estimates ROW Right-of-Way SB South Bound SC&DI Surveillance Control and Driven Information SCATBd South County Area Transportation Board • SCL South City Limits • SOV Single Occupant Vehicle STP Surface Transportation Program • SWIGS State of Washington Inventory of Bridges and Structures TBD Transportation Benefit District TBZ Transportation Benefit Zone TDM Transportation Demand Management Program TIA Transportation Improvement Account (Administered by TIE) TIB Transportation Improvement Board TIP Transportation Improvement Plan UATA Urban Arterial Trust Account (Administered by TIB) VMS Vehicle Master System WB West Bound WCL West City Limits WSDOT Washington State Department of Transportation 6-1 .