HomeMy WebLinkAbout1992 TIP df
3IX YEAR TRAN3PORTATION
IMPROVEMENT PROGRAM
1882 THRU 1887
A-"\ Y
C.K\
egb
'4°P -hjLHEARING: JUNE 17, 1991
ADOPTED: JULY 1, 1991
RESOLUTION: 2852
Table of Contents
SECTION ONE SIX YEAR TRANSPORTATION IMPROVEMENT MAP
TIP Map 1
Index to TIP Map 2
SECTION TWO PURPOSE OF SIX YEAR TIP
Mission Statement 3
Purpose of Six Year TIP 4
SECTION THREE DEVELOPMENT AND PRIORITIZATION OF SIX YEAR TIP
Development of Prioritization of Six Year TIP 5
Infrastructure Projects and Programs 7
Multi-Modal /Transportation Demand
Management Projects&Programs 7
Neighborhood Protection/Livability Projects&Programs 7
Economic Development Projects&Programs 8
Operations/Safety Projects&Programs 8
SECTION FOUR SIX YEAR TIP FUNDING SOURCES
Total Project Funding 9
Funding Sources _
Business License Fee - 10
Vehicle License Fee 11
Grants In-Hand 12
Grants Proposed 13
L.I.D.'s Formed 14
L.I.D.'s Proposed 15
Mitigation In-Hand 16
Mitigation Proposed 17
Other 18
Unfunded 19
1992- 1997 Summary of Funding Sources 20
SECTION FIVE SIX YEAR TIP PROGRAMS
• Six Year TIP Project Listing 21
TIP Projects 22-75
APPENDIX
Six Year TIP Abbreviations&Acronyms 76
., n -, l• i , -,
i • ,-,, 1
. .
• .
WEMEjl CV.:,;;Z-L,:4 C.1,:<•.^.-::-..2 uzaaj EL,,,,,,,i, bz.,,,,,i4t
• • '
•
..."
•
:••••••••••
•••••••••••.: •:4: 4.4:
•••••• •
:Xi:: ' . :::::•1:Xi:
, .,...••••••••••• ••••••e.I.7::
• ••••••• i...-t,.... 1,•••.•
... A
•
:14 • I
"04000
0000000
L !
.....„:::: .., ,
004.0690 '
•
,
CITY OF RENTON
.........: . •
1..., - .N ...4,
•
A
SIX YEAR T.I.P.
_ /*motif/ ir,
ik k -
_ / .„„7i_„,_;,••-•••••
,,,, .L01
- .07,11 ::/172.,iii k,7.-......-'•-.... '_ .
4 .. 17-_"1.-4....M.1.-1-..lie.. i
• 11.r.....1 lir.TY-_,,11 I k •
•
4. k.--."•:..:::,-,_*117.1 -- -
. .•
k ril II.0. '1
. --. •
...„,
\ ' 1 •N\011Z•
7.1h...•-.7.7.,-.. . , .v..\,,:
_ ..
1 i r
.. -11 -4, • 1 I . 15 ._. /.
LUCE WASHINGTON :1 i. .---- IT-it, F..
-1-1 ..,,..:.
r----.--'k-e
• I-7J- i ip s
s. ..OOOOO 00 % • 1.2•A -"41411E Pi IIIII i f*r401. ANN. "141
.....
••••••
.........................•.,
.... ••.....W. . ° , :-/plift 'tr-;:e : '24.t.iii.-"• ' ‘`. • ',,i-• ''
1 •.•.•••••..7.. ••le.•,•7...7.1(Iltii. . ., .
• 06,0900.00061•40 Se
afilli• I ; y P • C4 • • *fan ,
III
1.1 '\......?......?:•....................;.......... .... , V::.,
•,4'....... • .., ` •••
• ,,
\•••• 7••••••••••:::::••••••••• ••••••••• 7::::14
'''. :.. •••• 00•000
;•••••••••••• ••••,•••••••
, 964,00Oe0 000.0 00.400 .11• iii-1•mr,--xima --a NM Nil
...
•••••• ••••, ••• •• .._.,....4...
, c................. ....•'.:.:.:.' .,.i.-'i• 1• ••.‘. '1._.'..vil.t:111.4:,,1 II.41F iriltriOd '''.1 11' IN lal.
, MI
A.,::::::::.•••••:.. . IF/ill..74'v. , 1:1•• , FillP - '34.4111'. -
• \••••••• •••••• j•••••••••••
ogee." • , ,t_ii_i_
.48041.00 . 04909040
064.906 46.006000 1 •••••
I 1••••••••••,e.v.*:•••.„•4. j F.••••••••• 0
___I
1 j.ri -.' 617.4°11L-V4 74-1•611111 !I.. jiri.II • MIR .
1461 ;:ell I I •••••
1 •••..
6600006
060• -70*:::::::::41 OOOOOO*••••• • 0
V1151;4911'•• . 9.‘HI g, ••••••••••••
r •••••••••
•
•••••••••••••••••• •,.--,•••••••••••••:• I efee,...ege
, . ••r, LIE --1 41•6:4K;S:Fir/ ' .••-'. •t.r.,,,
s...,
,, •••••••••••••••••• •••••••••••••.I ,je...:.•••••••••••••
•f..7 itjl•.1 El•••••••••.•. l .„....., !IF; ,...,,, L..::::::::::::::::::. ::::::•••...••, •.. r•••••*••••'
.4 4iirii II•••••••;;:•••••••••,"' m"---- 4-------**, st
••••• •• •• ••••••• •••••••••••00:1 ..,..._i 6.0.4::::::::,
I •••••••••••
-R1, El 1 im ,? .p:r) "lir 4( r.....;....„..___ .........:.,............ ,•...,,•••.... ... .... .• ,•••
%, i I-.. IIREI it, i c;IiE liek I.; ..,,,e,/••••••• •••••••••I•••••• •••-1••••••••••I ••••••••••••••••••'...."•""
I - -__ p, .1 , ‘ •••••••••••••••••I
1 0 '
‘\,;••110.. ."--"-'4,
1 •,•10\ta . ..0.0... •• ••••• •••••••• i••••••••• •••••••• ••••••••
606.0000660060006 .60906060 .000060.00 40.66046 "0069
, C]••••••;. _......... .ei aj NI r
7 7•7•747::•7•7. .n.'!'!**_1::47•7•7. .747.7.: .7.7%
Otiopip. 1110:11!"_,.--iii •:•1&:.,'":"%il n" M._il'itt.• v • , , ...........,.....••• •• .••••••-•.•. •••••••••j••••••
(••••
. •
• ..,....t......% "..,r_., _,-4-, ,..N/d .A ri-- - ....,M...... ....•..•....•....::::::•.•.•. .•:::::.:.•..•::.•.•.•.:::::::.•4•, •,.ILL•'.f'::::::....
'•••••• ••••......„ ,
hiV• .
porii,.......................::::.
.„. •..•• -....,__
, .,,.:::::• . . '...*::.::::::..............:...,,,,,„ i ---.-.14440*%111111111(1• 1;),./ill ..
Ai. 1.,...-il.• A /tails.• ..-...-7•••••••••••••••••••••••••••••••••_•••• ••••••••••••••••••••••. ,-1.-.... 1. ••••••••••
• •••••:g••r••. •111.•••••••••••••••••••••••••••••••••••••••••• I '.IZgr*••••••••••••••••••••
•
•1 •
\••••••••••••••••••• •••••••••••• •••
10 . 0)•••••••••0••••••••••••••••••• ' . I -4-. •aglirpri, ..„1" ii
lig215111611-Pit‘s. ..••••••••••••••••••••••••••••• .9.0.9.0.6.9.0.4.0.9.4.6.6.0.. ••••••00006 tr,‘•16-i• 0.4000."
r.......... ......................••••••••••••
161•Iimi I ••••••••••••••••••••••••••••••0• • •••••••••••••••••••• latIOUL.; •••:•••••••••
466.000640" •••660666044.90.0.
0 00006...01r0060.04606400.0. ' ' •:•••••••••••••••••f .----.0.*:•••••••••••••••••••••••••••••0••••••
\.f.;...:...•:•:•.•;• ":.:;:;:;:..:i•:•>'...r.4.•-•.6-------:••:•.:.:.:.:.•.••;.•-•.0-•.4>.,4111Piptfisc....0 slit jt.,CD. \\Wr Tri_flif 'go ro,ri::.' ES .,., „...0.40......9.0..... ....0:::::::::::::::.... •••••••••• 1 ..,...., ..•„••••••••••••••••••••••
•
•••••••••••• •••-•r•ft---- ...lip) ••••••••••••••••••••••
••••••••7---'4,"• •• "•••••••••!••••••••::::::•••0.
0004000090064.604000.6.0.0040.6006 l•rert."'„......t.
Vt.-, ••••••••••••••••••••••
i_•••••••••••••••••/•••• 0000.0660000060V"
Ili . ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ,,.„..,"•••••••••••••••••••.•••••
••• • •••• ••••••••••••••••••••••••••'--'-•••:••••••••••••••••••••••••••:••••:••••••••••••:•••.•
000.0.66.9066.6400
. . .s.i :•••••• •• 4::, ••••••••••••••••••• .........2.;\111i • /•••70., ',44'11%IF .
... ,, :• .,,,p4•14,,,,,,... _.,.._,___!...,06.41.0.0.0.6.6.6.4.6.4.6.....0.0.0.4.....•OOOOOOO••••••••••••••••••••••••••• . . .
"••••'••••
.'••••." ...00.6.000.604.0.40041
00.069•000.40600.060.040 ....-
0.6.6..00.06.06000000040 1411461r "‘,..00•WIII4•4 'VI 1 •I 1 J V- !
-'46‘...;. ....7.11rfilklqi714,1 I .. '---•"N.‘‘411,11CINS• 0446000.6.0000$000
7,60.0000.4.06601.666
d•'• •••-• •••••••••• •••••••4•••6•0 4• ••••••...••
'r...... .••••••••••••••••••••••••• ••••••••••• iiii.y611 •••••••••••••••••••••••••••••
• . .•••46:0.6.6.0.•:::::::::::: :::::...04:4:• •••••••0‘.,••8•6•; -..1-.,,,,-i-- - • "I. ,-- - \ ,
N1/4...fH.r. ,..,...•‘•••••••••••••••••••••• •11111%
•.......4•••• • ••• •••••• ••••••••••••••••••••••%V*'••••••••' 1 FM IR 7 1,, 1' 1 •
‘.••••••••••••••••• ••"... -•••
I •••••••••• 1 .• iv) r 1•.._
.. •.•••••••.•• i; , ........e.:)mute::• ,) ...,•i c c
. . ,,,,,,,,.• •••••••••• gn,
. „.............. ciii,
,_. 664641000.4
0064006.404 •
••
'...•.7...!•,0'. •*OW:67• .0;0•••••••••4•• •• •
11••••••••••••••••••••••••
II ••••••
• '''• . S‘. .**
6 Plitt.
111S,„' ":::::::::::::::::": • ...,
. ...•. ..
.V.7.7.7......:47A\ :1 ..1 , ., , 4 ?Ow.ii/ _E r
....._ ,..,... •••••••••••••• o• -..... ••,.
• 600640.6606
ve0600O•60006004.060
In..? . 4r ......../.
ir.....----___„•11140114r0r.,.cit..y..11 \ . \ ' , jypor.W.., ••••••
40.••••••••••••••• c..,..,•.,Th.-6'•••-• Ist.-4,,---. Appi,,-- 414 r f...i.t.....- ' 0 .
--.......,,,,,, •••
. ...........................:" .... 7 _,- ;Fry'.............-...-A
• •....•.•..• • - 'A..,.-.;wird .: .•4 0.--2".46."-:'Ai vol 11,
N•alk'..\,...N ''''.,'c '''''''t, '
• •••••••••• 1j...a _ - --dd. ..-...•
. 7::::'" '".---s.•• •••-•;----L---------...i.,._1_7_
Aill'bri 114: . ClID
.••• ,•-:":-'.. 1F1311;grNa;RR g h -
. • kz\l'ik,---,.. ., _• . .. .. .
, 40101kr" ••••••••••••••••••••••• •••••••
' I ••••••••••• ••• ' .
'tik•'.....A1 ecait' ' ' ,
\,-
.-... _.i
' 7::::::::: •
Wit
li....::::2:•;••••11:?;::::::::::::::::::' ......**61....4.::•...:::•::::int*iglil.
AI
. .
.:••••••••••••••••I•••••••••••••••••••••••• •••••••••••••••••••••••••••••••.'---n---'OOOO\ .' •• ' . . , .4*1 1:-.Ali . ., .
'<• 1.L 1._.T-::.'-j .
6.046660066.00606606. 0000.040•064•6460
4646•00000000.0000064 00,66 060066 ; 1....i ., NI f. -.
0600.666.46006000.06. 00.0 6000
6666010.0460006600.0 6000 .600
0.00069.0.06604.0011.0 ed.. ••••••••• .1. .-11. -',N\ • .
0006 .0600900.
In
••••••••••••••••••••••••••••••••••••••••• 6604 606. 000.0,006 ;
•
4111' 74:0.0:01111:)4:::*17:::::::
, ••••••••••••••••••• ••••••• •••••• ••••••••
AM\••••••••••••••••••••• •••••••••••••••• II••••••••• 1 '
.................,„.............,
.........:...........................................:. -::.....„ _ ir.
0.0040400046006.0410000000
::::04::::::=
••••••••••••••••••••••••••••••••••••••• ••••••••••••••••••••••••••••••4 t....•••••••••
' •••••••••••••••••• •••••••••••••••• r----... ••• \ '. ... \ • • ''' ‘-----'---{'''--.411 i
.4560.00044.06940400. .0660604000.06004 606660000
66600060.0•4000.60 0.0.0000606e •••••••• • . ) '
••••••••••• •••••• •••••••••••• . .:_. ••••••••• , • A.----1 .
.••••••••••••••••••••••?••••••••••• .- , •••••:•••• .----'''••• •••••••••••" • i • : 1
' ••••••••••• • • •-.---•.•••••••••••• ••••••••••••I I
P0.06064066 -• •••••••••••••••• I••••••••, , •;„
•••••••••••••••••••• •••••••••• •••••••••••••••••••••••••••••••-I•••••••••'••••••••I .:. : I ' .
•••••••••• ••••• ' •. ee. , ••• ••• ••• •••••1
LI
•••••••••• ••••• ,-, • :O.O.,••• ,
••••••••14.•••••••••-• ••••••••••.1 •••••••••••••••• ••e••.;;;
........„.„.„„._._.1
. . .
••••••••••i ••••• . ••••••••••••••••• ••••••••• It
• •••••••••••••••••••. •••••••••• 1 ••••••••••:::•••••••••••••••• •••••74.••••••
/0/ 7.74,•••••• ise • 004000.806.0.00411 000404'00S
••9::::::::‘• -• - ::::::::::::::::0 :::::::::
•
, . ••••••••••,•,•••••••••••••••••••••••• ••••••••••••••••••••••e.••o •••••••••••••••••.-.
•
1 4, ::••••:••••:••••••:•h r••••:e••I•••••••••1---- ••••e••••••••••••• --'lit__ .,
i •••••••••••••••••••••li•••••••• I ...•••••••••••
....•••••••••••••••••••••••••••••• .•••••••••, .....• .6....II . . .•
t'i •••••••••••••••••-• - ... " •• •
I ••••••••••••••••• , • • •
••••••••••••••••• •; •••••••••••••••• ••••••••• , •
.6600006•660066006 0.66449464.00.0 .00004600 • .
. .
•
t:. ••••••••••••••••••• •••••••••••••••• •••••••••
••••••••••••••••••• ••••••••••••••••• •••••••••; • • • .
••••••••••• ••• •0 •••••••••••••••• ••••••••/ ,
•FE ' ti
P1
49 • or MI Project
or 1
T ,
ID III 11111111111
Makaggill Project Development
• Transportation Benefit/Planning Areas
. i .
• 0 akf- or Irtievido Project cc Program
I , I •
• CD •
.4.•
Cr)
. .,
•
CS
en
14:•
o•
...
••
Cli
. .
. d
.....•
fn•
4.1•
.....
•
• .
1.0
• •
•
0•
•
• • • .
. .
. •
. • •. .v..,, . •
. ,
.• ., .
.... ..'
•
•
•
' ' •
' .
• . . • .
•
•
• .
•
•
' .
. .
• . .
. . .
•
Section One
Map Index to Six Year TIP
TIP
O 1 Street Overlay Program
2 Oakesdale SW-SW 31st to SW 16th
O 3 North Renton Uvable Streets
4 Park Ave N/Lake Washington Blvd
5 S 43rd St(LID 329)
6 Park Ave N-Bronson Way N to N 10th St
7 Mill Ave S Rebuild W/I-405(WSDOT Project)
8 Main Ave S/S 4th St
9 Houser Way Relocated-Sunset Interchange to N 8th St Phase I
0 10 Transportation Demand Management Program .
0 11 Walkway Program
0 12 CBD Transportation and Streetscape
0 13 Transit Program
0 14 Houser Way Relocated-Sunset Interchange to N 8th St Phase II •
O 15 Bridge Inspection Program
O 16 Traffic Signal Loop Replacement Program
O 17 Traffic Sign Replacement Program
O 18 Light Pole Replacement Program
0 19 Sidewalk Inspection and Replacement Program
O 20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th St/I-405
23 SW 16th St-West City Umits to Und Ave SW
24 Sunset Blvd N Project Development
25 S 2nd St/Logan Ave S,Williams Ave S&Wells Ave S
26 SW 43rd St/SR 167 Loop Ramp
0 27 Lake Washington Blvd-N Park Dr to N 44th St Bike/Ped Trail Project Development
0 28 Neighborhood Improvement/Beautification Program
O 29 City Gateways Program
30 S 2nd St/Main Ave S
31 Maple Valley Highway-Maplewood Ave SE to East City Umits(WSDOT Project)
32 N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development
33 Talbot Rd S-S 43rd St to South City Umits
0 34 TBZ Project Development
O 35 Missing Links Program
36 Oakesdale Ave SW-Monster Rd to SR 900
37 Bronson-Houser Corridor Project Development
38 S Grady Way/Rainier Ave S Project Development
O 39 Miscellaneous Traffic Safety Program
O 40 Guardrail Program
41 S 192nd St/S 200th St-SR 167 to SR 515 Project Development
42 S 3rd St/Smithers Ave S/Logan Ave S
43 Monroe Ave NE-SR 169 to Sunset Blvd NE Project Development
44 Duvall Ave NE-Sunset Blvd NE to North City Umits Project Development
45 SW Grady Way-SR 167 to SR 515
46 1405/SR 515 Project Development
47 SE Puget Dr-Jones PI SW to Edmonds Ave SE
48 N Park Dr-Lake Washington Blvd to 1405 Project Development
49 Aberdeen Ave NE-NE 20th St to NE 27th St Project Development
50 Benson Rd S/S 31st St
51 S 3rd St/Rainier Ave S
52 S 2nd St/Rainier Ave S
53 Sunset Blvd NE/Anacortes Ave NE '
0 54 Other Valley Improvements
2
SECTION TWO
CITY OF RENTON MISSION STATEMENT
O 0
The City of Renton, in partnership with
residents, business, and government,
is dedicated to:
* Providing a healthy atmosphere in which
to live and raise families,
* Encouraging. responsible growth &
economic vitality,
* Creating a positive work environment;
Resulting in a quality community where
people choose to live, work, and play.
t.
,i, _ ,
.sc %-_, ,,
,,,47 o's,' Y 0, %
"R
0
tel
V SERVICE
INTEGRITY
3
Section Two
CITY OF RENTON
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PURPOSE
o Mandated by State law
o Multi-year work/funding plan for development of the
arterial street system
o Required for State and Federal funding programs
o Used to coordinate transportation programs with
other jurisdications and agencies
o Meets City of Renton Mission Statement
o Reflects involvement by citizens and elected officials
o Vital Part of Planning Under Growth Management Act
4
•
Section Three
DEVELOPMENT AND PRIORITIZATION OF THE SIX-YEAR TIP
The yearly update of the Six-Year Transportation Improvement Program is part of an
on-going process intrinsically linked with the development of the City's Capital
Improvement Program,with various state and federal funding programs and with
regional/interjurisdictional planning and coordination processes.
Projects are developed and prioritized based on both specific goals to be achieved by the
program and on general programming considerations.Those general programming
considerations are:
Planning.How,on both-a local and regional level, a project fits with or addresses
identified future transportation goals, demands and planning processes must be
evaluated. This is strongly influenced by ongoing land use decisions.
Financing. Many projects are dependent on acquisition of outside grants,
formation of LTD's or the receipt of mitigation funds.Prioritization has to take into
account the peculiarities of each of the various fund sources and the probabilities of
when and how much money will be made available.
Scheduling.If a project is interconnected with, or interdependent on, other
projects taking place this is reflected in their relative priorities.
Past Commitments.The level of previous commitment made by the City in terms
of such things as resources, legislative actions or interlocal agreements also must be
taken into consideration in prioritizing TIP projects.
In addition to the general considerations discussed above, there are five specific project
categories through which the TIP is evaluated and analysed. They are:
o Preservation of Existing Infrastructure
o Multi-Modal and Transportation Demand Management
o Neighborhood Protection and Livability •
o Economic Development
o Operations and Safety
These categories not only provide a useful analysis tool,but also represent goals to be
achieved by the transportation program.These goals have been distilled over a two-year
period in an effort to reevaluate the City's transportation program and to respond to
local input from citizens and elected officials and to new state and federal legislation.
5
Taken as a whole, the five categories provide a framework through which projects can be
evaluated both individually and as part of a strategy that seeks to meet and balance the
transportation needs of Renton during a time of heavy growth, funding limitations and
increasing environmental concerns.
Although each project can be identified with an important concern that allows it to be
classified into one of the five categories,most projects are intended to address and are
developed to be compatible with multiple goals.
PRESERVATION OF THE EXISTING INFRASTRUCTURE is a basic need that must
be met by the program.The Mayor, City Council and Citizens Transportation Advisory
Committee have all addressed the importance of sustaining strong programs in this
project category.The state Growth Management Act also requires jurisdictions to assess
and address the funding required to maintain their existing transportation system.
MULTI-MODAL AND TRANSPORTATION DEMAND MANAGEMENT(TDM)
involves projects and programs oriented toward "moving people"through a balanced
transportation program that involves multiple modes of transportation and provides
alternatives to the existing heavy reliance on the single occupancy vehicle (SOV).
Included are facilities that serve pedestrians,bicycles and transit services and programs •
that promote the use of high occupancy vehicles (HOV's) and reduce the numbers of
SOV's. The State's new Clear Air and TDM legislation have added momentum to
regional efforts to promote these transportation elements.
NEIGHBORHOOD PROTECTION AND LIVABILITY consists of projects that have
been developed with major emphasis on addressing community quality_of life issues by
improving and/or protecting residential livability while providing necessary
transportation system improvements.
ECONOMIC DEVELOPMENT projects and programsinvolve areas where
transportation improvements are necessitated by new development that is taking place.
Thus, a major source of local funding for these projects is projected to come from
mitigation payments and LID's financed by developers building in these areas.
OPERATIONS AND SAFETY projects and programs are developed through on-going
analyses of the transportation system and are directed mainly toward traffic engineering
concerns such as safety and congestion.Projects are identified not only by analysis of
traffic counts, accident records and geometric data,but also through review and
investigation of citizen complaints and requests.
•
On the following two pages are tables that display and summarize the six-year funding
plan broken out in accordance with the five categories.
6
INFRASTRUCTURE PROJECTS AND PROGRAMS
TIP agiiiMMERMINOMEnni iiMigrASW.ii OPISNEVER850 RIMERigin gaiiiiimigige Singlits solosmo giatiliffen Total
'Iiiii?:.*:igiii:::::iiiiiii.g:i ..:, gMMiiiiiliMe iigNiliiiiNgg i:..i. .§L.., .1_.. iiiiaNkL::•••:•sliiii:..5 4.::iii:5•.::giiiiiii:i...kEiiii.
Pr.blealtiltiOliMEMEN.,agtoding 0114902mi!MOcAMIgiOnft40:Mal.99.5::01R1 92.0iiii] l'i-;14.99.:70::i Total deliVideillE
1 Street Overlay Prgrn. 440,000 440,000 440,000 440,000 440,000 440,000 2,640,000 2,640,000
15 Bridge Inspection Program 50,000 40,000 40,000 40,000 170,000 170,000
16 Traffic Sig Loop Replace Prgm 25,000 25,000 25,000 25,000 25,000 • 25,000 150,000 150,000
17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000 120,000 120,000
18 Light Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000
19 Sdwlk Insp&Replace Prgm 15,000 10,000 10,000 10,000 . 10,000 10,000 65,000 65,000
21 Monster Road Bridge 100,000 200,000 1,100,000 1,400,000 100,000
33 Talbot S-S 43rd to SCL 30,000 300,000 330,000 330,000
40 Guardrail Program 31,500 50,000 50,000 50,000 50,000 50,000 50,000 331,500 331,500
1136101::MEMMignailiiiiiaiiiggingigil iiffitifittitg nifil646.(Y MOW&Witititti NM ijlidOW:Weitittite il*Ittitdiii iRgattekg gittatijitt
MULTI-MODAL/TRANSPORTATION DEMAND MANAGEMENT PROJECTS AND PROGRAMS
TIP 7iiiIiiiiieliniNEMBEEMEIMENiiiniiiii.:ig401640 g"iiiiiilginINI:i ININEWEi iii.iignaigE ligNI]iiiiii!ligin EMENiiiiiiiii ONAMS Miiinalata liertaigii
::. ilii]i :i.;::!1 : .i ...i' .t. i:, .i. : :il] .i:M:
.iift initttlltIOSIERNAM Funding 1992 adataim 1g94 1995 nAlSME tifit9ORE::; t1997:M V.0Total ME iii.Fundedk
10 Transp Demand Mg mt Prgm 60,000 25,000 25,000 25,000 25,000 25,000 185,000 185,000
-.I 11 Walkway Program 150,000 50,000 50,000 50,000 50,000 . 50,000 50,000 450,000 450,000
13 Transit Program 378,000 50,000 200,000 200,000 828,000 828,000
20 Arterial Circulation 120,000 160,000 500,000 1,300,000 1,600,000 1,600,000 1,600,000 6,880,000 4,559,000
27 LWB-N Park to N 44th Bk/Pd 75,000 50,000 125,000 125,000
48 N Park-LWB to 1-405 60,000 60,000
NEIGHBORHOOD PROTECTION(IJVABILITY PROJECTS AND PROGRAMS
TIP MENEMEILININIMMIN!ROOK ineendi iiilkomp moson;iiii:pi•miggq-; imitimio mii.,Iiiiiiiiiiimii gRIPRiatg, Tota
Eit.Mgelaii::PRO:iiellitilliigiiiiiiiinnlii giir.iitiatottilidOWN BOOM ff0.60411 1•1095 1.966:"gi-iii.4997SiI!i times iii;i:Fundedei
0 •
3 North Renton Livable Streets 160,000 635,000 795,000 443,200 o
•
4 Park N/Lk Wa•Blvd 191,000 570,000 761,000 761,000 o
m
6 Park N-Bronson to N 10th 340,000 1,459,000 3,419,800 2,064,200 7,283,000 2,280,800 -I
7 Mill S Rebuild-W/1405 47,000 283,000 330,000 330,000
al
. 9 Houser Rel-Sunset to N8th I 220,000 390,000 1,063,000 661,000 2,334,000 762,000 es
14 Houser Rel-Sunset to N8th II 128,000 508,000 1,625,000 . 2,261,000 30,000 '
28 Neigh Improve/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 70,000 420,000 420,000
29 City Gateways Prgm • 55,000 55,000 55,000 55,000 220,000 220,000
32 N 4th-Logan to Monterey 50,000 30,000 80,000 80,000
TOORMINNENOWINEWM ginal.tgi 000400:4001000i1$1.01:20M OraaROM ai6.9%000ii 102000MIA4KOnatieiftem
ECONOMIC DEVELOPMENT PROJECTS AND PROGRAMS .
.v:......n ...:..n�........... r �...... vn.: ...v.................n.n..n....n. ...v....... .,X......f.............-.}.......:....:.o........ 0.:..v...:.�r...n:v..:.:.t tr. ..::..:..v..:.. v Mx
wv„r:
wvxl. }�
rn•x
h. , .vhtry;n;y$: f�. : i
;f `
�.x
.
•
..... r..................;.h.. ....:...:.:.......:..: ..n::.:.. ..:....v.........r..r.v................. :i.;.4a miWimi]iiNPfajdOvrittondoiNE :r....::... .............,...•...0;!;!;',:!;!;!;:;];!..t.;:;!::
.....,r............ ....v.. n......x.n....vr . ...... Tnn..:}:•...r.......v;!:!::;:;::::==.:::!:::!;!;./ t{....}.. }tv }•:t:4:n,:$:•t+.�.ti${Immo,
;...;..... 'fl::h \
: : , : : r, .� .. f :: . Tn. . : } . t . �
ia
otig
2 Oakesdale SW-31st to 16th 300,000 615,000 3,115,000 6,480,000 3,240,000 13,750,000 900,000
12 CBD Transp&Streetscape 100,000 40,000 210,000 350,000 350,000
23 SW16th-WCL to Lind 60,000 219,000 479,000 3,544,000 4,302,000 120,000 ' •-
34 TBZ Project Development 115,000 115,000 115,000
41 S192/S200-SR167 to SR515 95,000 155,000 250,000 - 250,000 •
43 Monroe NE-SR 169 to Sunset 50,000 50,000 50,000 -
47 Puget-Jones to Edmonds 100,000 910;000 1,010,000
49 Aberdeen NE-20th to 27th 40,000 • 40,000 •
54 Other Valley Improvements 2,451,000. 8,637,000 6,912,000 18,000,000
...otas: < v
: : : : n: MINE: :P.MOr980Q0: kageoix.... : .> xp : ::....-..._mum . OSS57fln.: X556.6.
,
OPERATIONS/SAFETY PROJECTS AND PROGRAMS •
..... ,.r..... ...... n.}....{. .....:....v: .v:l• . .:.:...........n.... .r ....r...:......:.....:.. ..:.......t........... r.h... .r::. n .r.:.:::.::::: w...::•.:} :::..}::..::: .v. wn :,.n,i.:. .::.:.x::.:.:n.:.::::.::.v:+ /:}.::'n....i..}�}F
ntv}h4•'•ov :•}i:}n::i...:v� r
.n:t.otj4 4ini...
....:.'N..
�... N} }4
a'•i•} '}.:.
}.�
/
.-:..ii}.:{i:.} v$:..::.:{:{• {{•}':.•:-;.:;•.:.....,•........v....;..;......•..:........ .r...v....nn :.n.........,... .....n .. .. : :.:::..n.. ..n :.x :..... ........ .• :::.: J .r.};.,.� . :.:}•.}:.}}•..4: } :• .;x:::: .:.. :: • :...:.i. : :.-,.•$ {•;j: •v.:
.. .....: : .:p : PagctTtie : h .. n :::Flan: fin gnaws n.:...x093v.: ^v44v :.:..:m .: v • i :fvv .\i . . v : $:ti : .w{ , . $ ,. . , ,
;:
5 S 43rd (LID 329) 2,182,000 1,145,700 3,327,700 3,327,700
co 8 Main S/S 4th ' 158,000- 22,000 440,000 620,000 530,000 _-
22 NE 44th/1405 Interchange 44,000 216,000 260,000 260,000
24 Sunset N Project Develop 100,000 100,000 100,000
25 S2nd /Logan,Williams&Well 138,889 ' 138,889 138,889
26 SW 43rd/SR 167 Loop Ramp 80,000 20,000 950,000 1,050,000. 80,000
30 S 2nd/Main S 75,000 • 75,000 75,000
31 Maple Vly Hwy-Mplwd to ECL 5,000 5,000 5,000
35 Missing Links Prgm 446,000 200,000 200,000 200,000 200,000 200,000 1,446,000 1,446,000
37 _ Bronson-Houser Corridor 50,000 • ' . 50,000 50,000 r
38 S Grady/Rainier S 30,000 60,000 90,000 90,000 N
39 Misc Traffic Safety Prgm 50,000 50,000 50,000 50,000 50,000 50,000 300,000 300,000 0
a
42 S 3rd/Smithers S/Logan S 130,000 - 130,000 30,000 C
44 Duvall NE-Sunset to NCL 50,000 50,000 50,000
45 SW Grady-SR167 to SR515 260,000 • 260,000 60,000 3
46 1405/SR 515 Prj Dv 60,000 60,000 W
50 Benson Rd S/S 31st 20,000 110,000 130,000
51 S 3rd/Rainier S 54,000 54;000
•
52 S 2nd/Rainier S - • 36,000 198,000 234,000
53 Sunset NE/Anacortes NE 86,000 192,000 278,000
:.. . ..:{..,:.:r::.::..:::.:,.�.,.:.'.}:.}}:.::.:t..............,..t.:::.,. �.. . .. .. .. :::;;::<.: ;::{'�50'�#I.tf�� :1���'t58' :jrr
:.,...:.{..,.......r....:::>.:::::::nt.:::h:::::::::.:..,....... :. . ..:. .: . .::: . :.:..,t' . . f3OQ:::::.}#386'OOt3{.:$:::.} I#;f100:> n..:....::..........................:::•.:::::..: ...:.... ....
Section Four
TOTAL PROJECT FUNDING
n.n...•, v ::: .� }.•. ::::: w..•. : : : :.::..•........... • .......? i:
:�}:;::}. :}?}?:•:}+
}: i iii �
�
: >.ft
MP ..rvv : :: : Y . mv .. . izi : n: : v :. ..�n.:.: w:n . v: }•. ...} ..r...: : ? .r : in.:? ::.:..r $C :'.t:>,.: Jtd...(.
...:
r:...
::.:•.>..} v::•}: :� t :: :: yn �,•. w:v ..g.: n ....: v.:.: :f9n ?...nf . r:rxr1895w : }.+0. » i. :n991.: ='MUM iikec:»
1 Street Overlay Prgm 440,000 . 440,000 440,000 440,000 440,000 440,000 2,640,000 2,640,000 _
2 Oakesdale SW-31st to 16th 300,000 615,000 3,115,000 6,480,000 3,240,000 •13,750,000 900,000
3 North Renton Livable Sts 160,000 635,000 795,000 443,200
4 Park N/Lk Wa Blvd 191,000 .570,000 761,000 761,000
5 S 43rd(LID 329) 2,182,000 1,145,700 • 3,327,700 3,327,700 '
' 6 Park N-Bronson to N 10th 340,000 1,459,000 3,419,800 2,064,200 7,283,000 2,280,800
7 Mill S Rebuild-W/1405 47,000 283,000 .330,000 330,000
8 Main S/S 4th 158,000 22,000 440,000 620,000 530,000
9 Houser-Sunset to N8th I 220,000 390,000 1,063,000 661,000 2,334,000 762,000
10 Transp Demand Mgmt . 60,000 25,000 25,000 .25,000 25,000 25,000 185,000 185,000 ,
11 Walkway Program 150,000 50,000 50,000 50,000 50,000. 50,000 50,000 450,000 450,000
12 CBD Transp&Streetscape 100,000 40,000 210,000 350,000 350,000 '
13 Transit Program 378,000 50,000 200,000 200,000 828,000 828,000
14 Houser-Sunset to N8th II 128,000 508,000 1,625,000 2,261,000 30,000 •
15 Bridge Inspection Program 50,000 40,000 40,000 40,000 170,000 170,000 r'
16 Traffic Sig Loop Replace • - 25,000 • 25,000 . 25,000 25,000 25,000 25,000 150,000 150,000
17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000. 120,000 120,000
18 Ught Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000
19 Sdwlk lnsp&Replace Prgm 15,000 10,000 10,000 10,000 10,000 10,000 65,000 65,000 '
20 Arterial Circulation 120,000 160,000 500,000 1,300,000 1,600,000 1,600,000 1,600,000 6,880,000 4,559,000
21 Monster Road Bridge 100,000 200,000 1,100,000 1,400,000 100,000
22 NE 44th/1405 Interchange 44,000 216,000 260,000 260,000
23 SW16th-WCL to Und 60,000 219,000 479,000 3,544,000 4,302,000 120,000
24 Sunset N Project Devel 100,000 100,000 100,000 _
25 S2nd/Logan,Willms&Wells 138,889 138,889 138,889 '
26 SW 43rd/SR 167 Ramp 80,000 20,000 950,000 1,050,000 80,000
27 LWB-N Park to N 44th 75,000 50,000 125,000 125,000
28 Neigh Improve/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 70,000 420,000 420,000
29 City Gateways Prgm 55,000 55,000 55,000 55,000 220,000 220,000 .,
30 S 2nd/Main S 75,000 - . 75,000 75,000
31 Maple VIy Hw-Mplwd to ECL 5,000 - 5,000 5,000
32 N 4th-Logan to Monterey 50,000 30,000 80,000 80,000
33 Talbot S-S 43rd to SCL 30,000 300,000 330,000 330,000 '
34 TBZ Project Development 115,000 115,000 115,000
35 Missing Unks Prgm 446,000 200,000 200,000 200,000 200,000. 200,000 1,446,000 1,446,000
36 Oakesdale-Monster to SR 900 50,000 ' 50,000 500,000 1,117,000 3,866,000 3,867,000 9,450,000 325,000
37 Bronson-Houser Corridor 50,000 50,000 50,000
38 S Grady/Rainier S 30,000 - 60,000 90,000 90,000
39 Misc Traffic Safety Prgm 50,000 •50,000 50,000 50,000 50,000 50,000 300,000 300,000 ,
40 Guardrail Program 31,500 50,000 50,000 50,000 50,000 50,000 50,000 331,500 331,500 l:
41 S192/S200-SR167 to SR515 95,000 155,000 250,000 250,000
42 S 3rd/Smithers S/Logan S 130,000 130,000 30,000
43 Monroe NE-SR 169 to Sunset 50,000 50,000 50,000
44 Duvall NE-Sunset to NCL . 50,000 50,000 50,000
45 SW Grady-SR167 to SR515 260,000 260,000 60,000
46 1405/SR 515 Prj Dv 60,000 60,000
47 Puget-Jones to Edmonds 100,000 910,000 1,010,000 : •
48 N Park-LWB to 1405 60,000 60,000
49 Aberdeen NE-20th to 27th 40,000 40,000 -
50 Benson Rd S/S 31st 20,000 110,000 130,000
51 S 3rd/Rainier S 54,000 54,000
52 S 2nd/Rainier S 36,000 198,000 234,000
53 Sunset NE/Anacortes NE 86,000 192,000 278,000
54 Other Valley Improvements 2,451,000 8,637,000 6,912,000 18,000,000
.......................:.::. •:::.: :::::::: :::•:,....5,886, 89:;::$;tiA8;7DQ: :::1.052;8D0::::•>1$r8+i5j21Xm>:1:'152?t,ODO...1$)193jOD0..;1:315&4OD0:::>84. A089.:::24383;089
9
Section Four
BUSINESS LICENSE FEE SUMMARY
•x•}}}}•::
}i:•xi}}vi;•}Y•}}}•::v:::{{.}:}wi•.........}:}...}.}:•ri:}:}:}:i:i}n •xw::nwi.v..;.v.}....•:ti.:}:..v:•.};.t:v:r.:vn:tv}:Lti.vx}}:v :n.:.: .. ::::::::{.::..•.v:::}:}\}{.:t : .}::
::::.::.{
4 } .:{ r
:iy�}:i
ih'}:;:;
i '?>i ^ } i}: '� �•. ^twn4: x.\{v?�•:.::::{:iiv:4::•Y ::}i:s . tn .A• \ ii .. G:�f Y {{ Lip
�il
'4ti :ti :ii : ihii?{ y } : •}.:}{:+?:v.hYv . :+\ ?? t : {•: J"ii; w::iii� '}ti} : } : ^ :JJ:� .:. •v. : :v: '•: fi<ti:
. .. iv: isp :etiii : 'ttndi . wy� :x ... ;..,4 ..: n.: . . .;v•��.�' . k: :}�}: ^ 1'Ot:a1/:i:}.:
••
1 Street Overlay Prgm 150,000 150,000 150,000 150,000 - 150,000 150,000 900,000
. 2. Oakesdale SW 31 to SW 16 100,000
3 North Renton Livable Streets •45,000 ,
4 Park N/Lk Wa Blvd Inter. . 70,000 70,000 70,000
• 5 S 43rd Widening(LID 329) 100,000
6 Park N-Bronson N to N 10th" 640,000 510,800 150,000 1,300,800
7 Mill S Rebuild-W/1405 47,000 283,000 283,000
' 8 Main S/S 4th 158,000 22,000 22,000
9' Houser Rel-Sunset to N8th I 61,000 60,000 19,200 81,000 160,200
10 .Transp Demand Mgmt Prgm 60,000 25,000 25,000 25,000 25,000 25,000 185,000
• 11 Walkway Program 150,000 50,000 50,000 50,000 511,000 50,000 50,000 300,000
12 CBD Transp&Streetscape 100,000 • 40,000 210,000 250,000
13 Transit Program . . 378,000 50,000 200,000 200,000 '450,000
14 'Houser Rel-Sunset to NBtfi II 30,000 30,000
15 Bridge Inspection Program 50,000 40,000 40,000 40,000 120,000
16 Traffic Sig Loop Replace Prgm 25,000 25,000' 25,000 25,000 25,000 25,000 150,000
17 Traffic Sign Replace Prgm 20,000 •20,000 20,000 20,000 20,000. 20,000 120,000
18 Light Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000
19 Sdwlk lnsp&Replace Prgm 15,000 10,000 10,000 10,000 10,000 10,000 65,000
20 Arterial Circulation 120,000 160,000 290,000 449,000 1,030,000 925,000 885,000 3,739,000
21 Monster Road Bridge 50,000 50,000
22 NE 44th/1405 Interchange
23 SW16th-WCL to Und SW 60,000
24 Sunset N Prj Dev 100,000 '
25 S2nd/Logan,Williams&Wells 13,889
26 SW 43rd/SR 167 Loop Ramp 13,300
27L LWB-N Park to N44th Bk/Pd 75,000 50,000 50,000
28 Neigh Improve/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 70,000 350,000
29 City Gateways Prgm 55,000 55,000 55,000 55,000 165,000
30 S 2nd/Main S 75,000
31 Mpl Vly Hwy-Mplwd SE to ECL • 5,000
32 N 4th-Log.N to Mont.NE 50,000 30,000 30,000
33 Talbot Rd S-S 43rd to SCL 30,000 30,000
34 TBZ Planning Prj Dev ' 115,000
35 Missing Links Prgm 446,000 200,000 200,000 200,000 200,000 200,000' 1,000,000
36 Oakesdale-Monster to SR 900 10,000 10,000
37 Bronson-Houser Corridor 50,000
38 S Grady Wy/Rainier S Prj.Dv. 30,000 30,000
39 Misc Traffic Safety Prgm -50,000 50,000 50,000 50,000 50,000 50,000 300,000
40 Guardrail Program 33,150 50,000 50,000 50,000 50,000 50,000 50,000 300,000
' 41. S192/S200-SR167 to SR515 15,000
42 S 3rd/Smithers S/Logan S 30,000 30,000
' 43 Monroe NE-SR 169 to Sunset I 50,000 50,000
. 44 Duvall NE-Sunset to NCL 50,000 50,000
45 SW Grady Wy-SR167 to SR515 60,000 60,000
46 1405/SR 515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S
52' S 2nd/Rainier S
--- 53 Sunset NE/Anacortes NE
54 Other Valley Improvements
0 x'000 <:148001000 #`1'800'0 i:: ::: s>1D 800000
} ::;iQ''0Q(#>»1?800 ODO:�If':<ti:::>:<�{0tf0:
{sits•% >'£ ` i*` fi'• ' <`? r`: ; :
yy a♦ �y�iii:�i:}:i:.>i::ii>:»ii'<}:;<.;:;}:<.<:i::i:::
:F•..i..:.::::::::r:•:::.::::::.::......:.:::..:::{:!:�:.}::.:}:::::::•.f!t!.+.Wah7A7•. ���'A!�!i :...i.......k........ ...,.......,........ ...�.......,..........:...t.......r........... i.......: ......,.......,....::�:
Previous Funding + 6-Year Total = 13,355,339
10
Section Four
VEHICLE LICENSE FEE SUMMARY
TvimEM.... axt :.•.:.:.•:..r:..r:..:::•::::}•}•:::::::r••r::<::::::::.:::••::::::::::.:.,,:::• .:..:•...mo.i::}?/•.+•.:.k:.r::.r....}.. :»
r::•::,t.:::.:r,..•}
.};.:::mr:xni
x•<.a}�t
:.>.•':•.:.:...:.....:r<r::..
Year`
u:; , .O # 0 ecNtMv: : rWia ,: : M • $ 040M .:ffisusi ;tOrf ,vom ;
--
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Uvable Streets
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening(UD 329) •
6 Park N-Bronson N to N 10th 240,000 350,000 50,000 640,000
7 Mill S Rebuild-W/I405 •
8 Main S/S 4th 350,000 350,000
9 Houser Rel-Sunset to N8th I •
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Ught Pole Replace Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation 350,000 350,000 700,000
21 Monster Road Bridge 50,000 50,000
22 NE 44th/1405 Interchange
23 SW16th-WCL to Und SW 60,000 60,000
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to'N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL 300,000 _ 300,000
34 TBZ Planning Prj Dev
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/5200-SR167 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL „ -
45 SW Grady Wy-SR167 to SR515
46 1405/SR 515 Prj Dv
47 Puget-Jones to Edmonds • •
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
' ai-V•'.':<'•<:•'•.''•<:'•><':*i:MK t•}}}.}}:•:;•}:•}:•}:.::•}:•}:•:i}}:t.} ;000:i> 50 Q05t1' 0 > <35t3'::i::rti:;'
•
11
•
Section Four
GRANTS IN-HAND SUMMARY
�• ..}}hv:•}Xi}}:•i::•}}}:{:'•vtf:::.�::}f'::r:n•:.•:x:::rr:}:}.r.. x::::.: ::f.•.{4}}:4i.........}}i}}:�'.Y}}i::S:•}:•}Y}Yf} �I ey
.;... t....'tt.•{........ ..... � ........�:;::•r.•:'•;5:�:2t�::rrt{?i};;}.;:{frtor?:>}}:?;.}:ti?{{{?�}:?;•::?:.... :...... }ryr.{r{.}:Gr} :::::l.�Y!z};<_
v;}.x:• }}:}}}}}}:•i}:P}}:;:vn; •vx :::::0.•. ..;.... .. �..:::
.................: 4 v{v.......... ::•vx:•::•:.. .......nv?ii:?;.}•:.i.:....•.':'{•; ::::......n.:•:{{?^::.}}:::iii!ti^:f::r}:•}:•:'ii:}ii'r::}i} 'r:?{::ii?::`i;iY......... ?i%:{:i:}i f:}:}:.}!{:r, ...{t.
kt{ xA..n: n....t}.p..y{{nQ fim.#..n �.m. ;.:•.••:.:xf:tR. G:...�...%:.:.{...{•:{rtiv.Oiv 6•.} }: :: }: :n:%NORMA
fr1
4f }Y'..}
:::}::•if�}G•}•}:?{T'•).
•:n
ti•;}v:?4:
}:•Yi::•:
::...
1 Street Overlay Prgm •
2 Oakesdale SW 31 to SW 16
3 North Renton Uvable Streets
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening(UD 329)
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/I405 .
8 Main S/S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetsoape
13 Transit Program
14 Houser Rel-Sunset to N8th 11
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Ught Pole Replied Prgm • '
19 Sdwlk lnsp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th/1405 Interchange 28,336 182,886 182,886
23 SW16th-WCL to Und SW •
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells 125,000
26 SW 43rd/SR 167 Loop Ramp 66,700
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl VIy Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515 80,000 120,000 120,000
42 S 3rd/Smithers S/Logan S
43 Monroe NE-SR 169 to Sunset
44 Duvall NE-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405/SR 515 Prj Dv
47 Puget-Jones to Edmonds • '
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S •
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
•
54 Other Valley Improvements
ia#8## •.`:3:':##:sEs >%E>'> ``z» <#'ti:'•. '>'s`.#: 36`•,M120;000!: a?a`182885'.i<z . ??: i% <`?•.':`.i: % o E>`'r:`s3>?.. >'? E :3:0•..`
. ... ......
'flt .,Sf3Qi�..:.:.•::1201........::. .............. ...'�.io
Previous Funding +6-Year Total = 602,922
12
Section Four
GRANTS PROPOSED SUMMARY
T p �}e. nviii r: . }•...}iixMOttS :• wi4 }}x �v::}:•?}? • \ } .\ \ m % q
{ iviV::i
ti::
} n
: } : ,........ : :.:iar ....... : . }}f.. ••,• } : r : .:.vn£ ? ?}• : r. :w:ec,:• hi: iwo. YJ :} gi.gii }..• .:: �v:
i
oi3n: rv :iFtje�m ` ok :}i .}� :{tdfhevY7ak ::• v7�i .. r �7T• •.rn . ^ •v ( D'? . :�� g rii' ■� `
1 Street Overlay Prgm .
2 Oakesdale SW 31 to SW 16 • 177,400 1,239,900 1,926,200 963,100 . 4,306,600
3 North Renton Livable Streets
4 Park N/Uc Wa Blvd Inter.
5 S 43rd Widening(LID 329)
6 Park N-Bronson N to N 10th 579,000 2,559,000 1,504,000 4,642,000
7 Mill S Rebuild-W/I405
8 Main S/S 4th
9 Houser Rei-Sunset to Nath I 992,000 580,000 1,572,000 ---.
10 Transp Demand Mgmt Prgm
11 'Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II 64,000 254,000 813,000 1,131,000 __-
15' Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Ught Pole Replace Prgm - •
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge 1,050,000 1,050,000
22 NE 44th/1405 Interchange
23 SW16th-WCL to Und SW 1,772,000 1,772,000
24 Sunset N Prj Dev '
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp 20,000 619,300 639,300
27 LWB-N Park to N 44th Bk/Pd ,
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE •
33 Talbot Rd S-S 43rd to SCL _
34 TBZ Planning Prj Dev ,
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900 275,000 650,000 1,900,000 1,900,000 4,725,000
37 .Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
• 40 Guardrail Program _
41 S192/S200-SR167 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe NE-SR 169 to Sunset
44 Duvall NE-Sunset to NCL •
4§ SW Grady Wy-SR167 to SR515
46 1405/SR 515 Prj Dv 30,000 30,000
47 Puget-Jones to Edmonds •
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th .
50 Benson-Road S/S 31st 15,000 91,000 106,000
51 S 3rd/Rainier S 44,000 44,000
52 S 2nd/Rainier S 26,000 150,000 176,000 ,
53 Sunset NE/Anacortes NE •
•
54 Other Valley Improvements 1,471,000 5,182,000. 4,147;000 10,800,000
7: 0. 988. 7895'*f#0#. ,:;:: #,....x.
`�1�aTS:•::::."'•::�.' ?:�:3#:3:?-:: :3`:�::3E�:3:3:3::r'••:.: ::.::;:+': :•}:,••i::• ..i........ •:. ;.............t......ar,:.�.,.,.,<.•...�.......y:..••:::::.......................................... .....,i�,.,.;�"�,f.......;
Previous Funding +6-Year Total = 30,993,900
13
•
Section Four .
• L.I.D.'S FORMED SUMMARY .
glICEEMMEMMEMNiiin
.:...�.�:::........ ••v.�:•.... ......:::::v.. n. w;:}:P:•:nv:::::.�:n?p}.}}�:.�ti???>.'6:4:•.+•}::�:.}:•.{•n......:.�:.•...........................P.J:??}.,:.
K^:;n}n}}x}:h::•::':is}}v?•}}}:•::•.•::::::::::}:::.%w:.+.v......::: :•r}:•::::•}:::::::::::::::::.�•::v:w}}:•}:w:::::::::::.�:•:..............•m:::}::.�?.?::::}:n•:::?v. :::.
..;...v.\•••}:::::?.;.:.:}: :v: w:•: •?:: ••:::::::v•:\•:::: •$:}:: •::::::::xw; .}:r\•:w:.�: ..::::.::^;\.; .;:•}}:•}:•:?'•ii;. .
i:i$if.•
.:�:::}.r....::.�:?.::<.:.�'€v�.'fiif�t.}::::<.::::<:::::::..�u . <.:.<:.}:.}:.}i.�.'�•::;<:.>..:?.:<.:.:.i.99�;:::.:.:........#9; .:::.........���'x::....MA :E......�IT.:..:.::.::..�:�'cta�fs<>
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Uvable Streets
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening(UD 329) 2,044,300 1,145,700 1,145,700
• 6 Park N-Bronson N to N 10th •
• 7 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Rel-Sunset to Nath I
10 Transp Demand Mgmt Prgm
11 Walkway Program •
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Ught Pole Replaoe'Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge •
22 NE 44th/1405 •
- 23 SW16th-WCL to Und SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28 Neigh lmprove/Beaut Prgm
29 City Gateways Prgm •
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE -
33 •Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev •
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900 •
37 Bronson-Houser Corridor •
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program •
• 41 S192/S200-SR167t0SR515
•
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL •
45 SW Grady Wy-SR167 to SR515
46 1405/SR515 Prj Dv
47 Puget-Jones to Edmonds
• 48 N Park Dr-LWB to 1405 •
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st •
51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
...................... ................................... .................... .................... ................... ................::::.Previous Fundin +
Funding:::: �::::•..................._.:.�::.::::.:.......
6-Year Total ,190,000$
14
Section Four
L.I.D.'S PROPOSED SUMMARY
.. '.:;.:rrr:•.. ........,. .. .. .:.:::::.:......cr:•r:•r rr::?•r:.......:.:::::::.,.:::.:.r:'•:•rrrrr:;•r:•:vr:;:?.::;•rr:•rr:•r::•r:•r:;•rr:•r:r;:?.>;:�>'.::;;•r:?:?.;?o•:::::.;;rrt?•rr•.r:.:.:::
•
?,•..:::.,,,.o::•:::•:ter:":..�.::???:.:•:•:.:?•::.:::...
....�..:::.:...........r............:.......:.......r.•.
•::.c•::•:rr:;;.:�..;;...:..,.;,,,.::•::::: : : :: :
: .. iN•# c a0< e: » :< u :4090:» .;•::::.:•9. MOWN
#W» . :::••:*95
:<..:<:::::•:;«S`;:: •r/::•:..... y 1t49 . :;s
?•:......
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Livable Streets
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening(LID 329)
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program ,
14 Houser Rel-Sunset to N8th II •
15 Bridge Inspection Program
.16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace Prgm '
19 Sdwlk Insp&Replace Prgm •
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th/1405
23 SW16th-WCL to Und SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp 330,700 330,700
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL •
45 SW Grady Wy-SR167 to SR515
46 1405/SR515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
•
49 Aberdeen-NE 20th to NE 27th •
50 Benson Road S/S 31st
51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements 980,000 3,455,000 2,765,000 7,200,000
i*:*::
Previous Funding +6-Year Total = 7,530,700
15
Section Four
MITIGATION IN-HAND SUMMARY •
,:{•ii:{:.}:•}'•}}}:�X'•}.5}5:•>:.}•::::..
:.vx{,?�{('::.�:{....v.x::?}:.,v•fm..}::{::..::..:.:.::..:,.�.:..:...:;...\...•.:;..r...;.r.{..�...•/k:..:0.:..Jttw9..4..�.f./•.::i...�.:l.l..{.Q:.:.:u::'5}::i.::}.::}.:.r.::.:^:.:::.:•{i::.5:::.:^:.:vv::{.:^:::v.Y::::i.::.:..:.ry..:y•":11::,,;,...a+;.�•�M.{�t[,.Rv.,�;.(..'.�..:.:,}.n.::.n : .;....{ ;}
• a . : .:;::wg::.}a:.•:.•:;.{:n:..:.•:i:#:.:::.MOWN
myi lr.•:.:.r.:7x...{...:}.'•:.5.5::•::{.i
.�.{:x . }.,i>:i:
{:i•:i:::::;:pp;:i.��..yy;yy•;�.�;i,s?..•r.•r.;;•:.:.
1 Street Overlay Prgm •
2 Oakesdale SW 31 to SW 16 100,000 437,600 262,400 700,000
3 North Renton Livable Streets 115,000 283,200 283,200
4 Park N/Lk Wa Blvd Inter. 121,000 500,000 500,000
5 S 43rd Widening(LID 329) 159,000
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Rel-Sunset to Nath I 330,000 51,800 ' 381,800
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to Nath II
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
• 17 Traffic Sign Replace Prgm • •
18 Ught Pole Replace Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th/1405 15,664 33,114 33,114
23 SW16th-WCL to Und SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/$R 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
'28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
- 33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900 40,000 50,000 225,000 315,000
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv. 60,000 60,000
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405/SR515 Prj Dv
47 Puget-Jones to Edmonds '
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S •
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
i�5ttt£i84 i�f.'•l •..• zz'�#57'�'1 .
�ttlsiis `:`•:'•.;><«s; > '? zl<':;•`•<::; ><::=>::'::»::>::> .. 90':800::;. .. .,�..r... :::.�:{:::::::.
Previous Funding +6-Year Total = 2,783,778
16
Section Four
MITIGATION PROPOSED SUMMARY
.,:.::#.:n....•::..:::i:'.:.....�..:.....:....:...:...n......:....n......:...........4.....n.:,.'..•:i...:..i:.j:?.r..v...:.v...:....::....::......i..ri..:.•..:t..:.•..C:..i...:::.L:.::.v•..:..:..n:.:...t�:.........::...............t.....,...:.:............:...r............:........f:.t.'..r:...e......v......?..ct....u..r:...s......i:.:.:..:;.ingani . .: :
.::;.;.<.:<.>.•.:i..�.:9:::6:: iNtilikaggi
::Nu•
.1Yar
MOWN .:. 43951f
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16 1,612,700 4,553,800 2,276,900 8,443,400
3 North Renton Livable Streets , 351,800 351,800
4 Park N/Lk Wa Blvd Inter. •
5 S 43rd Widening(UD 329)
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405 •
8 Main S/S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II •
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm •
18 Ught Pole Replace Pgrm - •
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation 210,000 400,000 400,000 325,000 365,000 1,700,000
21 Monster Road Bridge 50,000 150,000 50,000 250,000
22 NE 44th/1405 Interchange
23 SW,16th-WCL to Lind SW 159,000 479,000 1,772,000 2,410,000
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900 467,000 1,966,000 1,967,000 4,400,000
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Pgrm
40 Guardrail Program
41 S192/S200-SR167 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405/SR 515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th 40,000 40,000
50 Benson Road S/S 31st
51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE 86,000 192,000 278,000
. 54 Other Valley Improvements
::<;� >s< �>` ><�'��� `� > < �•.`:�<': ?>���'? •.'•• ' �'•`: '.<:>': € •;:: »:7T'7{KI:�'->6`98. 3`''3#3:z::<�::>:; ;: <::>>�:;.>::; . ;
'#'�ai .....5617�8i33a<>>. 900' 1000
•::::�:••:::::::.:•.•�r� f::::..� s: .::::•:::::::s::::.::: •°�.•.•�`�.....::•::....:.:.e'�..33e-.`�.i100: 1�:!38�'�e.......:
............................. ..................
Previous Funding +6-Year Total = 17,873,200
17
Section Four
•
OTHER SUMMARY .
-.}r.:.?}?:.?}'r:�::::
--- r .:.•:tivi::,n:.4R:•:vv::. v.,.......r.t:•,v. , •4.{L:.. v�:v...:? ...��:::.... �
...L... ..... r.. f............. .,. .......k.... .... ..,...........t,:., t:L.,Lr }ytyt••h<..:. t.... .:•:� .t:�..r
.... ..,•:nom:. :::.ii`v'ii'{•%L:: ....x•�:f'•{{{•Jij•'vi•{,{iii{:+•:{�?'�iii::ilii?:�:4i
f+•v.•fi?::::•i}::'i}:.......... :........v. � �:-:fw::..:r:+:t::kv::•:r•::i.::::::F.•:•::i:::...:. .............. ...t .v.v.... .:?•}}}?}i}::•:rJ.. :...r..
... 4v::::nvvy}:Fi.i::iir.�{•
\x};{:•}Nk : v::..• et•:ee•:. e rlitAn.:. .}.t4ga?• ::::4t::•}:\4•}:.w:i.ig?•.. l.•:.y..;:v, N....A.•:.:;a};\£.::n:}.r:{:.}vvv.wv•..:���.,��.4:i.r;:4:.i:t:}:{:i.'?.::::.,}�•.}..:.0.M1f.i4..::L..•{.•}:}.v?....
r .?.}:+:1!.^.{:.?:•i;irJ.,{+i.?i.'?..{n?.}.}.i.}.;.:i.}.. :..i{rf•}::; :; :Shrry::r:}.'
•iii:,+*i77.Yi:}:.....ta.`7..7'LLL?<L;•:r•:A.I :�ix{is{:{.`�1�9�rick::::•'::�Ot�f:.:{<•i
1 • Street Overlay Prgm
2 Oakesdale SW 31 to SW 16 •
3 North Renton Livable Streets
4 Park N/Lk Wa Blvd Inter. •
• 5 S 43rd Widening(LID 329)
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Rel-Sunset to N8th I
•
. 10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program '
14 Houser Rel-Sunset to Nath II
• . 15 Bridge Inspection Program
•
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replacer Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
, 22 NE 44th/1405
23 SW16th-WCL to Und SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells -
26 SW 43rd/SR 167 Loop Ramp _
27 LWB-N Park to N 44th Bk/Pd ---
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl VIy Hwy-Mpiwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Unks Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515 35,000 • 35,000
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405/SR515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405 30,000 30,000
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S •
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
................................................................ ..................... .................... ...............•..,. ..................,: Previous:�•::Funding +6-Year Total = • 65,000
18
Section Four
•
UNFUNDED SUMMARY
u•,{r{. �.(�� �M
;iii ir5�9}7GF:;:::::'t:{iY:1�17.Jf:::::::T:{: {jii:
{
.....:.:.:::.:.::>.::>::�?co act<'litfet:;::>::>:>�:::::»::>:;<:::::>:turidEn :::::>::>:::1. :>::::;:::;::;::}1:993:>;<::::::>::;..::....:........ •
tin
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Uvable Streets
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening(LID 329)
6 Park N-Bronson N to N 10th 360,200 360,200
7 Mill S Rebuild-W/1405
8 Main S/S 4th • 90,000 90,000
9 Houser Rel-Sunset to Nath I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 .CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II 34,000 254,000 812,000 1,100,000
•
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm _
17 Traffic Sign Replace Prgm
18 Ught Pole Replace Prgm •
19 Sdwlk Insp&Replace Prgm
20 'Arterial Circulation 451,000 170,000 621,000
21 Monster Road Bridge
22 NE 44th/1405
23 SW16th-WCL to Und SW
24 Sunset N Prj Dev
25 52nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
31 Mpl Vly Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL -
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515
42 S 3rd/Smithers S/Logan S 100,000 100,000
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL
45 SW Grady Wy-SR167 to SR515 200,000 200,000
46 I405/SR515 Prj Dv 60,000 60,000
47 Puget-Jones to Edmonds 100,000 910,000 • 1,010,000
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st 5,000 19,000 24,000
51 S 3rd/Rainier S 10,000 • 10,000
52 S 2nd/Rainier S 10,000 48,000 58,000
53 Sunset NE/Anacortes NE •
54 Other Valley Improvements
'?�20? >'1''r''i�I��imD ': >$3�'000::.:»�:zz:<:::::?::>::::>::::>::s .
...........:..:...... :.......
'x75 1300 >�'>s3'J!f
Previous Funding +6-Year Total = 3,633,200
19
•
•
•
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
_ SUMMARY OF FUNDING SOURCES
Period
ITEM PerIodmWg:?M 992ie M190.4EN: iigia1997:EN
EXPENSES:
Plaming/Project Development 1,050,000 410,000 290,000 180,000 70,000 30,000 70,000
- Precon Eng/Admin 7,800,000 1,429,000 1,592,000 1,028,000 2,486,000 995,000 270,000
R-0-W (includes Admin) 9,403,000 1,390,000 4,361,000 191,000 2,081,000 1,190,000 190,000
Construction Contract Fee 55,838,400 3,077,900 4,374,300 16,129,700 6,438,500 13,661,500 12,156,500
Construction Eng/Admin 4,203,600 249,100 331,500 1,302,500 434,500 1,002,500 883,500
Other 162 700. 92,700 14c.000 14,000 14,990 14j100 14,000
INSOONgi iNAOARBOgi MINA%!iintIMAR:EIDIMPANCEIngAgi-;.9.9k
SOURCES OF FUNDS:
1/2 Cent Gas Tax 1,740,000 290,000 290,000 290,000 290,000 290,000 290,000
Business License Fee 10,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000
Vehicle License Fee 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000
Grants In-Hand - 302,886 120,000 182,886
Grants Proposed 30,993,900 756,400 4,899,900 7,907,500 3,488,100 7,895,000 6,047,000
L.I.D.'s Formed 1,145,700 1,145,700
L.I.D.'s Proposed 7,530,700 330,700 980,000 3,455,000 2,765,000
Mitigation In-Hand . 2,273,114 1,590,800 457,314 225,000
Mitigation Proposed 17,873,200 560,800 2,577,700 6,967,800 3,143,900 2,291,000 2,332,000
Other 65,000 35,000 30,000
Unfunded 3,633,200 375,000 974 200 1,472,000 812,000
- ,
EXOTALSOURCESKOMEgiiiili Mi7e4574700.iLMBA48i70.1X M1lX9.6203.0i iggl.60393;Cf00:
- •
C- File::TIPCIP A.XLS 20 Printed 7/3/91 at 11:40 AM.
Section Five
Six Year TIP Project Listing
TIP
Page •
1 Street Overlay Program 22
2 Oakesdale SW-SW 31st to SW 16th 23
3 North Renton Uvable Streets 24
4 Park Ave N/Lake Washington Blvd 25
5 S 43rd St(UD 329) 26
6 Park Ave N-Bronson Way N to N 10th St 27
7 Mill Ave S Rebuild W/1-405(WSDOT Project) 28
8 Main Ave S/S 4th St 29
9 Houser Way Relocated-Sunset Interchange to N 8th St Phase I 30
10 Transportation Demand Management Program 31 -
11 Walkway Program 32
12 CBD Transportation and Streetscape 33
13 Transit Program 34
14 Houser Way Relocated-Sunset Interchange to N 8th St Phase II 35
15 Bridge Inspection Program 36
16 Traffic Signal Loop Replacement Program 37
17 Traffic Sign Replacement Program 38 •
18 Ught Pole Replacement Program 39
19 Sidewalk Inspection and Replacement Program 40
20 Arterial Circulation 41
21 Monster Road Bridge 42
22 NE 44th St/I-405 43
23 SW 16th St-West City Limits to Und Ave SW 44
24 Sunset Blvd N Project Development 45
25 S 2nd St/Logan Ave S,Williams Ave S&Wells Ave S 46
26 SW 43rd St/SR 167 Loop Ramp 47
27 Lake Washington Blvd-N Park Dr to N 44th St Bike/Ped Trail Project Development 48
28 Neighborhood Improvement/Beautification Program 49
29 City Gateways Program 50 •
30 S 2nd St/Main Ave S 51
31 Maple Valley Highway-Maplewood Ave SE to East City Umits(WSDOT Project) 52
32 N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development 53
33 Talbot Rd S-S 43rd St to South City Umits 54
34 TBZ Project Development 55
35 Missing Unks Program 56
36 Oakesdale Ave SW-Monster Rd to SR 900 57
37 Bronson-Houser Corridor Project Development 58
38 S Grady Way/Rainier Ave S Project Development 59
39 Miscellaneous Traffic Safety Program 60
40 Guardrail Program 61
41 S 192nd St/S 200th St-SR 167 to SR 515 Project Development 62
42 S 3rd St/Smithers Ave S/Logan Ave S 63
43 Monroe Ave NE-SR 169 to Sunset Blvd NE Project Development 64
44 Duvall Ave NE-Sunset Blvd NE to North City Umits Project Development • 65
45 SW Grady Way-SR 167 to SR 515 66
46 1405/SR 515 Project Development 67
47 SE Puget Dr-Jones PI SW to Edmonds Ave SE 68
48 N Park Dr-Lake Washington Blvd to 1405 Project Development 69
49 Aberdeen Ave NE-NE 20th St to NE 27th St Project Development 70
50 Benson Rd S/S 31st St 71
51 S 3rd St/Rainier Ave S 72
52 S 2nd St/Rainier Ave S 73
53 Sunset Blvd NE/Anacortes Ave NE 74
54 Other Valley Improvements 75
21
CITY OF RENTON
- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
( - . Fund: 317;102
Proj: 12108
Rank: 1
PROJECT TITLE:
Street Overlay Program
DESCRIPTION:
Annual program for repairing and resurfacing existing roadways, operating the City's Pavement Management System and
providing data for Arterial Deficiency Ratings.
JUSTIFICATION:
Overlay and slurry seal of streets provide for improved driving surface and are highly cost effective ways
of avoiding expensive-repairs and reconstruction. The computerized Pavement Management System and video inventory
of existing roadway conditions greatly improve the efficiency of the Overlay Program.
STATUS:
Yearly program.
CHANGES:
--- None
' FINANCIAL DATA
?%:iS::iiiiti i:%}i:ir is%:ti ••4:4:::y 6•r::i::'•i:::?i::i
:%r.:::::%:::i:%:......................�` ?E:::?":::��'�j:�''t�@flC�:�iIE�iiL+�CEi�'@�'._:;`:Sy: :`:3 ?�:%:�,:•»:::k±.u•:,::::::,...
Total Project Cost: 2,640,000r k::::>:::::Fpindeci '
a::..•:::.:::::.:;•::•:•;:•;:•;:;•:;•:N;..: .;:2.:?,640400:.:0 1,74
0,000
900,000
Spent Through 1990: wix } :
f :nYq :; wvswkXcx
Zi
1991 Budget + Carry74O,u•
Remaining Cost: s B..;.Dtttx
Period
EXPENSES:
Project Development
- Precon Eng/Admin 270,000 45,000 45,000 45000 45000 45,000 45,000
R-O-W (includes Admin)
Construction Contract Fee 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000
Construction Eng/Admin 270,000 45,000 45,000 45,000 45,000 45,000 45,000
Other
...........................:.....rniggiggign ..........440000..:::::.::::+1!i0 ;:;«;:::A40Op0;:.:;.;;»:.:;:M10iI :::<ss<s:::::::#ADtIDO.M:::.:ROQtf.00>
SOURCES OF FUNDS:
1/2 Cent Gas Tax 1,740,000 290,000 290,000. 290,000 290,000 290,000 290,000
(- Business License Fee 900,000 150,000 150,000 150,000 150,000 • 150,000 150,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
'�tiY'�3..SQU...CSS::.....r................:............:... i)D�R ......... . ;:.:.:.::::?.::?�#t!!1 ;;;;:.;;;;::::�tl..t)p.;:.::.:.::.:::.. . : . �::?:::>:>::: �..:.:. ...:
.......................................� � .......... il,04ti............. :�1.. . ..........?id0.t :::a:::»::>::::d�t3,pfail:............?�40:Oi�Q::
File::TIPCIP_A.XLS 22 Printed 7/10/91 at 11:33 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 022
Rank: 2
PROJECT TITLE:
Oakesdale Ave SW- SW 31st St to SW 16th St
DESCRIPTION:
Construct new 5 lane roadway, with curbs, sidewalk, drainage, street lighting, traffic signals,
channelization and landscaping. A portion of this facility at either end may be on structure. •
JUSTIFICATION:
High priority project in Renton's Valley TBD and in South County TBD. Serves Valley industrial area, including
proposed Boeing Longacres site. Completes missing section of important North-South corridor.
STATUS:
On TIB fund list. Prospectus to TIB in June 1991. Design will start in 1991.
Previous Funding: Preconstruction E/A = $300,000; Business License Fee = $100,000;
Mitigation In•Hand = $100,000; Grants Proposed = $100,000.
CHANGES:
Southern terminus extended from SW 27th to SW 31st. Estimate increased from former $6,800,000 to $13,750,000.
FINANCIAL DATA
w+;hftx:.:••''::••:?:ry.::.�:v'�1.};:{1•,{1, iij ::�TeF: !;: }i:7� iy;:�v� .}}riv i{;,:••: rr.rY ^
ii) ti?.l +i :•' ..::::ti' .A�4. ••' 1::n }riii''�::...:x?vk:J.i�•? :�{vti:ti:<G::n}:i�:.ii..:.x:{v.•:in:. -
Total Project Cost: 13,750,000>;M'?`:Pundedx 900,000 100000 800,000
Spent Through 1990: {} ? i: p"?Fxa SA
: : { x: ,• : s ; : wA
a;Et: v
-
1991 Budget + Carry Over: 300,000; t taed 12,850,000 4,406,600 8,44 ,400
Remaining Cost:
Period
:Y N
:::3::>..}:•}'iii'.i:.
:::•.•:::rn4}}'.};.}•}+{.f.}'�ij.:�.� �y .: •} �..:::...A/. .... ......•..�f.. •.ry}:•}:•}}::'t::'::}Y•. � �iijii i�: rr
::.:.........{.....n...:. : :�R GSI.: .n..........:?:N:.... ... ::^:iS i'... ::::?:�:•:•:civ:::: moi.n. •.�:::.�:+ { .v::v.:�:::n�.}.{::
.w........:.......:: ...:I`Wk �`!Dttll�...........11892.::::••.......:....'.l993..:•:}::?•.•.�?....:#99?l•:•:::::•:.}:?:•}}.:ISS5:<.}:{•}:>..}�r}:<>;:?}'E?99I�:;:::iz<.:>:�;::::»>:<<1997:>#:M
EXPENSES:
Project Development
Precon Eng/Admin 1,230,000 615,000 615,000
R-O-W (includes Admin) 2,500,000 2,500,000
Construction Contract Fee 9,000,000 6,000,000 3,000,000
Construction Eng/Admin 720,000 480,000 240,000 •
Other
MIMEO
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
•
Vehicle License Fee
Grants In-Hand
Grants Proposed 4,306,600 177,400 1,239,900 1,926,200 963,100
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In•Hand 700,000 437,600 262,400
Mitigation Proposed 8,443,400 1,612,700 4,553,800 2,276,900
Other
Unfunded
9.3�i50'OOl):::::»»:::.'::: :::>::><:::;' `I:i:5•�::>:::.}•.::: 0 ...::.::.::::
...................................::::::::�:{::. : :::::.:....�.. .......,..,�::::...8t;S,00il.:•::}::.� � :..:{� ,.,,000; >:;:3;�.4,�i,�{'f.0::::::���s:<::<isi;;•>:•}:•}:.::•::{•:•}:•>:.>:M<.:{?•»::•}>:?•>:.:.:.}I
File::TIPCIP A.XLS 23 Printed 7/10/91 at 11:34 AM.
_ CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 044
Rank: 3
PROJECT TITLE:
North Renton Livable Streets '
DESCRIPTION:
Neighborhood protection/traffic management improvements in the North Renton residential areas to reduce thru
commuter traffic volumes on residential streets. General boundaries are Sunset Blvd, Bronson Way, Logan Ave, and
N 6th St. Work will be conducted to conform to direction provided by the North Renton Arterial Facilitaties
Plan process.
-- JUSTIFICATION:
This project is directed by the North Renton Plan, which resulted from City Council Resolution 2708 to preserve.
the integrity of the,North Renton single family neighborhood.
STATUS:
Project is currently under design.
Previous Funding: Preconstruction E/A = $115,000.
, Mitigation In-Hand: Boeing = $398,200.
CHANGES:
None.
FINANCIAL DATA
� v{r}{.::{:'r..n.t.Y;•tix{;fr•.ny:.f:x:{{vf.{n••'f. v{:J.:nY•:{4}•::r,.::.v,{s;.:t:i.'•:x{rf.•}:i?{tt.:Y!%l.•:r{4Y:•Y:x.Y}:x{:f.:
'.v::h:.....+� ,?}':,{:{•'.:t{.;{:3.?x.;h .:}.i ,y�y�y :r•' � .•:x:ri:v.:YTi.y{:
.:.i„'����•"'.•.��RA:{'^ : :...{•:.::•.c•:ryy((��-':.z:;G.:•YY:.{?C.,R?4z,�r'r:',•'-'::•,'•.t< %�::u.°:,}M
Total Project Cost: 795,000Mrundedr< 443,200 398200
rSpent Through 1990: 10,000{: : ? � ` ifWs.wi «} nc4wnv3{{ / ff
1991 Budget + Carry Over: 150,000M(0000#0% 351,800 351,800
Remaining Cost: ••••••• n; a4i ''.
Period
.......:.................
.:llGiirl..:Y........:..:::r•......}.T.iF4{tib.��f�:.v.....1:A.7R::i:?�:::vY:k}}::•%1992::::g..::.,.{::.:M1 •:}`i::'':{::::}'::i{Ci{:; ..{:.:iii'?:'•,':x:: .....;.;.;;tiii:
...X98?1.r..o,:..........iI1�99vx4s:•>Y:}}w.Y}}}'E.99b`iris::'.;%.':.':.:•:::•:1E9B7:z;<:;:.::.
EXPENSES:
Project Development
Precon Eng/Admin •
R-O-W (includes Admin)
Construction Contract Fee 577,000 577,000
Construction Eng/Adnin 58,000 58,000 •
Other'
::}::f}Y:i'�:::':....... xr.4... v.:.L.::..vr w::.w.v::::;:. .
:}r'•:•Y:•..........n...... .x\4}:?x{ttt.}:.x}}}}:•i};:t•Yyn}}}:4:4};.Cf}:
}Y..�./.�:G/# ^:^}:4}:4}v'..4i}•x:n:vrx:.v:::.::::.v.v:.!!/,yy���,�,yyAA.:.::.:::::.�i���{{��yyy�,y/��:...n:::.:...::::.. ....................:..........:...x:::4•v.v w:::::.....:::::::::n:......:...:...:..............:.........::..
'R:ii!fV.Y,.4t..::::::::::V�1,.7„FV.MV.:::::•::::::•;:;.•}:..•.:. .... .:...... ........::..............................:::..�:.:�:
•.w.w:N:::::::::• v{{'.v:.{4"::w'v4};4};{•:}:?4;{:::?w::'v..:. ?n....n...;r•: r. ....x:.v;•::...w::;:...:....v...:..:::,:v,..
iw:::::::::::::::::::::::. n•••'.' ... ...... ..................:..w:..... ....v.::Y .rr.f.r.:{...n.....:...:v.......v nv:.�.v.:.:v..{.:nv.::::::::.}Y:::{•}:•}YY}i}}'f.4}:i•::::w::::::n...n......
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee •
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 283,200 283,200 •
Mitigation Proposed 351,800 351,800
Other
-- Unfunded
T
�.AL:S.Oijft �
C 5:i;:;;;.;;.;Y:•:.YY:.:<;::;:;:;Y:.Y:.::.:.:.:t:}:{•Y:Y:::.�i35000::�
............. ............ ...... 835`000:::::.�:::::.:::.:.:::::.�::p;g1.MiEigAgii.
File::TIPCIP_A.XLS 24 Printed 7/10/91 at 3:34 PM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12081
Rank: 4
PROJECT TITLE:
Park Ave N/Lake Washington Blvd
DESCRIPTION:
Reconstruct intersection of Park and Lake Washington Blvd to discourage through movements from utilizing Lake
Washington Blvd and improve traffic flow from Park Avenue N. to Boeing and Paccar. Intersection•will be designed to
conform to direction provided by the North Renton Arterial Facilities Plan process; to include roadway
reconstruction, signal modifications, drainage, channelization and signing.
JUSTIFICATION:
High priority project; culminates North Renton Facilitation process directed by City Council Resolution 2708 to
assure that arterials providing access to North Renton and Kennydale neighborhoods are designed and
operated in a manner responsive to citizen needs.
STATUS:
Project is currently under design.
Previous Funding: Preconstruction E/A = $131,000; ROW = $60,000.
Mitigation Sources: Boeing = $421,800; E&H = $199,200. •
CHANGES:
None
FINANCIAL DATA
� :.:;+•4�,:4:?r{,:{{4:4:{{{4:4}•4:•:{???4::??4:4:{:.
:?:;:.r y{.};?:4'J}}:??•':ti{i'}vti:::�::::v:v::::nw:::n,+::�i i?wii:. ..40Mg. :
fx
{r{amw{::4rrff{:4..
{:+v•;::4,:{{??4}:}:?v:.:?
4'
Total Project Cost: 761,0004rFuv{n«y . —"—
Spent
S nt Throu h 1990: v4 }:%"w•}44 { : w� wfk :: r
1991 Budget + Carry Over: 191,000Ui ' ri .
Remaining Cost: nommggi
Period
:n,4,.•}::w??iMaY{??•:. +y nxlv.: � .�:}.: ?4\: \•::•}:•}}:+{::
n.}...:..n... Y W i:i{:-}D.7G:`.i.}}n-}:?<:}:•:::�,77a7::iti>.�iiii:S�i:�f::i���17M::is}iv.n •:{+�
EXPENSES:
Project Development
• Precon Eng/Admin
R-O-W (includes Admin) '
Construction Contract Fee 520,000 520,000
Construction Eng/Admin 50,000 50,000
Other
i,Q,E .
...Ali!!ISi*5::>::>::€'s:'.rz'.>:::?< ::n:'<:ro
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 70,000 70,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 500,000 500,000
Mitigation Proposed
Other
Unfunded
r..}...r
........... .. OOI)..?.}:........s�'7•(f OIlO>'�• .................�':.,.........r::::::r:::•}}:.:....•:..:...........x......r......./.4...........:.:.......:.
File::TIPCIP A.XLS 25 Printed 7/11/91 at 7:27 AM.
•
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317;320
Proj: 108;329
Rank: 5
PROJECT TITLE:
S 43rd St (LID 329)
DESCRIPTION:
Widens S 43rd St from SR-167 to Talbot Rd by 2 lanes, SR-167 NB ramps and Talbot Rd by 1 lane and includes
curbs, sidewalks, lighting, signals and channelization. Also includes a tunnel under S 43rd with retaining walls
and connecting roads; realignment of sewer, water and drainage lines; new VMC power and water service; PVR Station
and landscaping.
JUSTIFICATION:
This project is designed to increase capacity and safety in this congested corridor and to mitigate traffic
impacts due to expansion of Valley Medical Center, which is funding the LID.
STATUS:
Construction will start in 1991.
Total project costs: Preconstruction E/A = $417,000; Contract Fee = $2,490,700; Construction E/A = $220,000;
Financing = $200,000.
CHANGES:
Scope and cost have increased
FINANCIAL DATA
Total Project Cost: ...:::.:.00 .rN:..N:.1•N::.,,•..•r.:.:•:• ,•:::•..25µ•k00:
3,327,700::�s`: ���q�«>�'. 3,327,700 •-3;190000,::::,,..,•100000 ... ......12!700 25 000
Spent Through 1990: »f::>:::::>::>::;:::.:z#:?::•:>:;:;:>;;;:.;:.;::.::.:::.;.;;::::.•:.•:::•:...:•>::.:<.;>^;:::::<::::::::
..:v:.l.r
1991 ..: .. .:: �:: r........:.. ....:::•i:::::::::::ti:in:t:i:
Budget + Carry Over: 2,182,000' � FLItli�lP+dN .':.,:...:.`•::^:.:•.
Remaining Cost: :; `:`s'•''' ` `.
Period
EXPENSES:
Project Development
Precon Eng/Admin
R-0-W (includes Admin)
Construction Contract Fee 980,400 980,400
Construction Eng/Admin- 86,600 -86,600
Other (Financial) • 78,700 78,700
. .:................
aiiffiEfffi.
QRS :::::::::::::::.;»w;:.:;...::<:. ..:.............:................
.......... 1i �7.04. .:.:.... .4 � .....:....::................. ............................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
'Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed •
L.I.D.'s Formed 1,145,700 1,145,700
• L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
File::TIPCIP_A.XLS 26 Printed 7/11/91 at 7:28 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works j
Div: Transportation Systems
Fund: 317
Proj: 008
Rank: 6
PROJECT TITLE:
Park Ave N-Bronson Way N to N 10th St '
DESCRIPTION:
Reconstruct roadway between Bronson Way N and N 4th St, widen to 5 lanes between N 4th St and
N 10th St, signal modifications at N 6th St, N 8th St and N 10th St. Provide new curbs, sidewalks, street
lighting, channelization and storm drainage.
JUSTIFICATION:
This high priority project will ease traffic congestion by improving capacity, thus reducing traffic usage of
adjacent residential streets. This project ranks as a high priority project with the TIB based on regional
significance of Boeing traffic, access to I-405 and SR-900, and the need for Park Ave to serve as a major
transit route.
STATUS:
Design will start in 1991.
Previous Funding: Preconstruction E/A = $340,000; UATA funding of $2.4 million previously
requested, additional $2.242 million UATA funding to be requested.
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 7,283,000'f<.'.': g .F0000..:. 2,280,800 133,578 1,432,222 715000
Spent Through 1990: j� :.::k..�.: ;:.;,::{:.::.::;.:.;:.>:.;:-s:;.ii:.i:.:
{ii.:::•:::: •`i %::•'''`•":''ii �...... :.;... ,.{:::
v ... :....\h..v.i:::i>:$:ti•:�: ::.v::::::...........v:.::::::.v::•i:.v.:v.:v::::.,., ....: ..:v::$:1.4::.v...,.:iiiii4•:'.Gii1i :<ii:::
1991 Budget + Carry Over: 340,000>;?'>.Lhl10600,{ 5,002,200 4,642,000 360,200
Remaining Cost: »:::;#$9
Period
:....... .::::.....f.c:{•::::r•::::::.:.... .: {.:.::n::: , ::.; 3.98:3:;:;iiti::;;:::;:1499.1ME MOIMONO:z;o-::i.:r:; :....::...
EXPENSES:
Project Development
Precon Eng/Admin 379,000 279,000 100,000
R-O-W (includes, Admin) 2,000,000 1,000,000 1,000,000
Construction Contract Fee 4,226,000 180,000 2,159,800 1,886,200
Construction Eng/Admin 338,000 160,000 178,000
Other
. ..: kkENPii:.iin. ; :: 1: i? .M VV .::• A:
: :mJ :wv44
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 1,300,800 640,000 510,800 150,000
Vehicle License Fee 640,000 240,000 350,000 50,000
Grants In-Hand '
Grants Proposed (UATA) 4,642,000 579,000 2,559,000 1,504,000
L.1.D.'s Formed
L.I.D.'s Proposed -
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded . 360‘200 360 200
.:::::N::.:::::.:.:........:.::::::::$943OOi9:::::::,.5g 000.. .2;00.00M
File::TIPCIP A.XLS 27 Printed 7/11/91 at 8:02 AM.
• CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 070
Rank: 7
PROJECT TITLE:
Mill Ave S Rebuild W/I405 (WSDOT Project)
DESCRIPTION:
Reconstruction of existing roadway to include: Raising the Southbound roadway to the same level as
the.Northbound roadway to provide a 35' residential street. The existing NB roadway and sidewalk will
remain. Project will be done jointly with WSDOT I-405 Project. Approximately 50X of the project will be funded
by WSDOT.
JUSTIFICATION:
Reconstruction of Mill Ave is required to meet commitments made to the Renton Hill Community.
STATUS:
WSDOT will assume lead for design work in 1991 and will administer the construction contract.
Previous Funding: Preconstruction. E/A = $47,000
Funding shown below represents City's share of construction and will be matched by an approximately equal
share by WSDOT.
CHANGES:
None
' FINANCIAL DATA
:.v::.v::.v..v::::•:,{.:i:{}}}}}}}:4i...............:i::::::.'.w;:}:::::::............ :y:{:. mienziai
, ry:::%•:....:;'':i;}}::v:::}h v:yv:v{v::'•}}}:?:v}j}^}
Total Project Cost: 330,000p`': _Fue ded 330,000 ?•: 330,000 f?•;r;;;nv}i{`??}:}+ :;:p:';r+.•}}};lv:.4v}}}}}}'4:-\S}'•}:•Y.•}.. v}} : ::.};.y-n},wn}}}x
_ {ti:::::.}:^'C:{ti{ti4Y::4i}:4}}:4}:{{p}•:.}}:({•: ... ::..v{..:.;....r... r.}:{.u}.ii'i::..:.
i:}:}:•.::}:•::::::::::::::; {iii:::; #::iii;:}:{>.}.}-{r;•{.{::;-.i •..+
Spent Through1990• .,{....:..............::;<i•}>:?>.}.}••::•i::i:>•... :::f•;:f.{>,.;�:<;;»>::< :}
n..... ..::r:.:.::{...v. •••••:::{r'' {{i:{•:{•nti•:\f}:•ii>ritvi:Y{�•}:i'iv$ri�:if'{ti•.i:ii4ri2`vw�i:
; ........v...r.. ....k..v.v..v:•.{vi{n\i{i}.:i-.vv.::v:.::.{}:n+:::C•Y
1991 Budget + Carry Over: 47,000::>:%:ltif itdetl <
Remaining Cost: ..:...... :2t
Period
::.v . . .... ::i Li}.,;..{, .r....��.� : •:{w.w:.:•:w::; : : ':vrk: :•itiJ'li:y
..:::}..{v.r..�['EIi�^::•.v:::v::::::�i+.:n. �...}..�}:���.;{.:.:..:..n ::{.}:.::::.} i:•.y:{>
I ...�I��iiitii•::.::v::::��:::'riiiii:?}$,:ii:i�7�::':::::3i::;iL{:.Y:. ri•}}:•:v}}}f.i} .}i{yk.:•}`f.^::rf.•
.�::•::•:::}}:}}}...................... ::.:.: ......... ..........:. ...:f.�II'9'.�.::iii::_..:::._,.:'I?ff9�::is:r•::.:_:.:::,�997 `>_`•>
EXPENSES:
Project Development •
Precon Eng/Admin
R-O-W (includes Admin) _
Construction Contract Fee 283,000 283,000
Construction Eng/Admin
' Other
....................
](� �''{/�j�. I��(�y�/�J� :cl-.v.::x::.v.v::::.:v::•::i:.:?{.v.{.{{{r.;;.{.::::.vw:nv.w:?•:-:.:::::.v:::::::: ...Kw:::::::
��I.'►}I.�S1•/1r4f���?{�}}}:1}:i}:4:is{•}:•}:::}:}}:•}:v::i}}}:L:•}�V.11 V.Y. : }}i}}}}}.vS•.{�17.V.4{V.•;•gip}}}}i}}i}}}:}}}}:-..... : ...:..................J.n.: .:::.:.:::::?...............
..... ....... v..........:..... v:.v:x:::-u:w:my•w:::•::•:::•:vw:?.:x:n:v:v:•.v:^v•.
wnav::.:•.v:::.w:r:.v:nw:: : :v::.w.w.w::.v:v:.vw:.v:.v::.w.v::w:r.v..v....:::u :::::::::::.v............:::::::::.....:nv:::::::•:'r:xvw,ry••}}:•}:L:{�:•}::::::::::::::::.�:{.}...........v..n.......vv..n..n....v.....n...........v......v.:.v
' SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 283,000 283,000
- Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TAL>$
•
OU�iIrES::::::::::i::is�>s:ii::::>i::i::is�>::>::>?;:::::?:::<:i><:�:<:�i�83•QOOz
F1le::TIPCIP A.XLS 28 Printed 7/11/91 at 8:03 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 024
Rank: 8
PROJECT TITLE:
Main Ave S/ S 4th St
DESCRIPTION:
Improvements to Main Ave S including widening and signal reconstruction at the intersection of S 4th St.
in conjunction with the work done by WSDOT on the I-405 Project. Includes curbs, sidewalks, signal, channelization,
signing and street lighting.
JUSTIFICATION:
Modifications required to fit with WSDOT I-405 Project and also needed to reduce accidents and
congestion in this heavily travelled corridor.
STATUS:
UATA funding requested.
Previous Funding: Preconstruction E/A = $58,000; ROW = $100,000.
CHANGES:
None
FINANCIAL DATA
M:<.<:>.�:.} :,,,. #P::LA> ::> ..tts`Lie: <> �v•?::::::,:}:<.><:•.�}... .,.??.:r..::.,,.. ..:}.h,,..
•}. :':.•:.;.•::.,,ry r:., 2?•:.,x, vrr..,4,}r::.•:..r9:
Total Project Cost: 620,000x;`:>1" Unded 530,000 180,000 350,000
Spent Through 1990: ....:.::..:::.:.::::::::.:::::::::. . .........::.
,M1.:::::::::••:f•.S<:c'.:;•}:::::::}}};3:??•}};;>;:::';Yr't;y� :::,..,..,. •.. •.:?:::iS:>.::;+<::;::}:#}}:-•}.;}}:Si:::r.?•:3.,?•:,:}}}x•S}Sr}:: �:<:;:}:::::ti}�;x•
1991 Budget + Carry Over: 158,OOO •`::ltifi:1E dila. 90,000 90,000
Remaining Cost: #?# ;
�r�w�* ................
Period
...r....r.n..n................ :........................ :l.1i93:$i..........,...r��?i}}:^ii;:;};::i'}??- :::n:::::;...,.. :r{.i!i•.?•}:?:i}ilii}.
.. ..:.:..... :.}:�} .:..::.....::::....................................:;:�:•:_:?.;.:}:;X99.�►....:>:::::a;:;a•^:•:2�•?•::<f99�€;4;:.}<:•:•}:•}•.•:}:}�99T}s:.:;:.
EXPENSES:
Project Development
Precon Eng/Admin 22,000 22,000
R-O-W (includes Admin)
Construction Contract Fee 400,000 400,000
Construction Eng/Admin 40,000 40,000
Other
...4�.mss....... :::.::...::. .. 04. : :::;:?::�:••}::>:?;:::.,•:.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 22,000 22,000
Vehicle License Fee 350,000 350,000
Grants In-Hand
Grants Proposed (UATA)
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 90 000 90t000
.50kIF1xx
• ::.::::•}}:.},..:..�:0 •:;•}}>}}}>::•}?•>:.. ............ ... :::��is :.;. ... :o�::: o�::::%:`::>:::
File::TIPCIP_A.XLS 29 Printed 7/11/91 at 8:05 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 025
Rank: 9
PROJECT TITLE:
Houser Way Relocated - Sunset Interchange to N 8th St Phase I
DESCRIPTION:
Houser Way Phase I and II will provide a new interchange connection with Sunset Blvd and a new roadway to
N 8th St. Phase I will determine the layout for Phase I and II and design and construct the Southbound
lane(s) from N 8th to Sunset Blvd. Includes curbs, sidewalks, street lighting, signing, landscaping
and channelization. •
JUSTIFICATION:
This high priority project is a culmination of the North Renton Facilitation process directed by City Council
Resolution 2708 with the objectives of providing additional ingress/egress for Boeing and Paccar
employees and relieving traffic usage of North Renton residential streets.
STATUS:
TIA Grant denied, will reapply. Design will start in 1991.
Previous Funding: Preconstruction E/A = $210,00, ROW = $10,000
Mitigation Sources: ESA = $540,800
CHANGES:
Because of funding short fall, this project has been divided into two phases. The funding need has
increased mainly due to Right of Way cost.
FINANCIAL DATA
Total Project Cost: 2,334,000M.0000010$ 762,000 221,200 540800
::4\:;I..:>•::<>;r:..,.:,;v<.., f.$-::<,:,:K^ :{n:{rr•:4Y.Si4;v::.<:,;,..,:<r.«.;::,<:ff.+rSY,,:,.:.,:;.
Spent Through 1990: gicrMagi
.:.
1991 Budget + Carry Over: 220,000?7igald. 1,572,000 1,572,000
Remaining Cost: .,....#s r1: 4x...... 1w..,
.:::::.::::::::::::.:......
Period -
.:.:•:... ....::::::.�. .:.::.::;;.4994ENS. 'E.S98<.;:.;:.,:,.:;»::::;:f1E99'7::s::»: ::
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin) 790,000 390,000 400,000
Construction Contract Fee 1,227,000 614,000 613,000
Construction Eng/Admin ' 97,000 49,000 48,000
Other
SOURCES OF FUNDS:
1/2 Cent Gas Tax •
Business License Fee 160,200 60,000 19,200 81,000
Vehicle License Fee
Grants In-Hand
Grants Proposed (TIA) 1,572,000 992,000 580,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 381,800 330,000 51,800
Mitigation Proposed
Other
Unfunded
T :;;: .... z---M;::•::;::.;::•;:.:;.;�.;-.;::...�::::::-.....
File::TIPCIP_A.XLS 30 Printed 7/11/91 at 8:07 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12135
Rank: 10
•
PROJECT TITLE:
Transportation Demand Management Program
DESCRIPTION:
Develop and implement a program that will maximize the "people-carrying" capacity of the Transportation System
by promoting use of high occupancy vehicles. The program will include, but not be limited to, development
of a transportation demand management ordinance, working with major employers on TDM measures, and recommending
facility improvements such as HOV lanes, signal modifications, and park and pool lots.
JUSTIFICATION:
The City is required by State Legislation passed in 1991 to develop and implement TDM.
•
•
STATUS:
The City is working with King County and other jurisdictions to develop coordinated TDM strategies.
CHANGES:
New program.
FINANCIAL DATA
?:2:n14i ti•}.;.::u;y,;t NEMENE:• •:.•!.•:::nvxrYv:�vv::.•:::r:
i:;::}•r.':•}::.}}}}}};::?w?•}:: r.. ...........,.v.....,.r •�•.''•r:;civ:}>}:C?:Sa:}>}}}}}::.:k}}r.•}}}}:•}}:•}}:•xw:h; -
NiPaiii
Total Project Cost: 185,0006 s%: Fuvded w 185.000 185000 •
:}}\??:?????::.}??::;vi;?{•%,.•}}}}:?�}}:J:??•}}:•}:::•}:J}y}:1:1:11'{:?1111:,�;}yjijt:•;}:•:
Spent through 1990:
+f.^:•}'•}}:??w:•:::.:::•.:v:w:�v:}i:?�:3:•i:?i:•ii'r'r':i:i'ji:Si}::>:4:i'i}i:'{:ii:•'r::•t
1991 Budget + Carry Over: v:?::UijOoodeti«:;
Remaining Cost: »sg
Period -
..... ...•.<.argllil.::.::}•.:::>::.}>:.::.,:::::..:E4Ktu43:tI!taI.}: RM992EN:>^;;;::<1885:.:<.}:.>}::?.::::»:::>:t9'9.A:{:::::;:;::<:::.::,?:M5::>;::;z:<::: .::.}:?,:?. 997,}:-}<}::Y.:
EXPENSES:
Project Development 185,000 60,000 . 25,000_ 25 O00 , 25,000 25,000 25,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
A�
:.V:!" ..i,y,�•:i: :::`::}::ii:?}:isTf!��5fi/.Vi>iiri::%:•.%}�F!i.Q�i':;i:::;:}',v,•.. 1jN.{/�::;::::'+.•Y.'::i:ti::•�, '
..f'4tr:1MM�Mlf.�Miiiii'�`;::;::`vtiiii:;i};ititi??}tititi:i}i:•}:;:}:.....]V.V
..............:}:::}:::::::............. .::::... v... ..•...}}h:}:..r......rr.:::
SOURCES OF FUNDS:
1/2 Cent.Gas Tax
Business License Fee 185,000 60,000 25,000 25,000 25,000 25,000 25,000
Vehicle License Pee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
::«<;<><:>:<>::>::}:;:::11::r::»::>:::»-:»•�»>:. '. :>::11:;:>:;::<>�: 5000::<:>::>:: ...........25 :::>::«:»::::>:} .., <::::>::::::<::<s>::;25'L#Ob:
�:�T��:SQA!#iC�S:.:::::::::.:::::::::.�::•::.:::..�,,.:}::::385,t1OA �>`»>::::::»::;:36Q,0.00.:.::::.:�.::� �..................._�.�........ .... .....:....�ODt1...:::::::::::��D00.. :.r•.:.............�.. ....
File::TIPCIP A.XLS 31 Printed 7/11/91 at 8:14 AM.
•
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 009
Rank: 11
PROJECT TITLE:
Walkway Program
DESCRIPTION:
This program provides for the development of City-wide non-motorized transportation walkways for pedestrians,
and for undertaking improvements identified and prioritized by this program.
JUSTIFICATION:
Providing safe and convenient non-motorized facilities is an integral part of a complete transportation
network. Specific improvements will respond to the needs of school children, the elderly arid the handicapped,
and will support increased use of transit.
STATUS:
On-going yearly program.
$33,000 spent on improvements in 1990. Needs and Priority Report will be completed in 1991.
Previous Funding: Project Development = $25,000; Preconstruction E/A = $11,000; Contract Fee = $73,000;
Construction E/A = $8,000.
CHANGES:
None
FINANCIAL DATA
�y k��,, r .}}},{:vx::.::F:::::::v::?•}vii:r:i'+iii}:`i{i:•v4iyn;w•,{},:;:^:{iv>:{:»•iii:is{;:;:
..< •„n •i\{Y iiyi:•ii y::iiii:�:i:v:••:•xnn,n•..x.x...:1.i{•:4i{C•i�i:{•i:{8:•i:•::L{'.i
”' m::::::i,{{•:i : .........:...M1..... .. .......
Total Project Cost: 450,000M0060ed : ': 450,000 450000 r.
iiifi<{{.vy,.v?i%{?i:•i'??•i:hii:•iYvii
r.?��:jCti::i vitt»f•:..
1990: 33 000:>:>:<::'•»::>:«:`::i2::r::s`::> ���»�'><:>:<`:: �:s:; :€:>:>€:>::::: '>'::>#:<^<..•{:{
S nt Through :.f,... ...:.
1991 Budget + Carry Over: 117,000;: _ii'if;ff3tlEd •`.
Remaining Cost:
Period
::....:....,.,....... ......i'EM•;>..{{•;:::.i:•::;{.::.;:.;r<.::>:OriOWtMi:>:.N:{.:y:992{.:::::::{•.::M
..................................................:::<:>3090:a::?:::>:::.....
EXPENSES:
Project Development
Precon Eng/Admin 36,000 6,000 6,000 6,000 6,000 6,000 6,000
R-O-W (includes Admin)
Construction Contract Fee 240,000 40,000 40,000 40,000 40,000 40,000 40,000
Construction Eng/Admin 24,000 4,000 4,000 4,000 4,000 4,000 4,000
Other
.:{ :;:,>:;:>:.>:?.::.:;.;iii:::;:::<:'::�:r�>xi:;:<....,. ..:.{{.:{:;.;;: :. .: :»>r::::>;:;.,..;...:.>:>::»::::::::;s:
d :•iii Q <.:::>i#Q� :::::>��:s:':>::»: .
•: �Ai1Q<
.r�....](�•:. .{►�j,�.�*gQ�•:::.�:::::::::::.::•:.:.:...a.:.:......... Ai1.Q:: :«::?:z»:?::;.+il.A •(�OaO:QO{:::z.{.::><:....:.
�1•�I:�II.•.�eA.�4'1{..{Y.ti7•i:•i:•i:oii:4:4i:{.i;iii::;.�??:n:•i:i}i::•i::{. ................4......................./...............v.......:1........................ ............... ... ...... ......f........
•:::::.•::::::::.vw:::rw:::: :: :::::::::::...:::::::::::�: +w •r••::�v,w:::•:...............................n........n.......r................,....r...........:.............�..........ni.n.,.vn..........r.......v......r.......:........
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand _ •
Mitigation Proposed
Other
Unfunded
>::>::::::;:>:«:»>:: i<:>: .......... :.;:.:�:;;:.::.;: 0 ;:<::<:>::::::<::::>: �dBQ:.:.:.i:.i:.:{.�::'
�OTAI..SQIJRG�S.::::::::.:::.:::::.::::.::.:::::.::..........30Qlt1.11�:.............�,,t), 04..............34�.. ............. ! f .........:.......... f .. .�... AO
File::TIPCIP A.XLS 32 Printed 7/11/91 at 8:13 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12111
Rank: 12
PROJECT TITLE:
CBD Transportation and Streetscape
DESCRIPTION:
Analyze, design and construct improvements to vehicular and pedestrian traffic patterns and streetscape elements
within the City's Central Business District, compatible with CBD development proposals and Comprehensive Plan
land use designations.
JUSTIFICATION:
Future development and economic vitality of the central business district depends upon the ability
of the transportation system to handle additional traffic, parking demand and pedestrian movement. The specific - -
types of transportation improvements need to be coordinated with the type of land use proposed in
the Comprehensive Plan.
STATUS:
The City's Comprehensive Plan, which may propose changes to land use in the CBD, is currently being reviewed.
Transportation elements which are compatible with and enhance the proposed land use will be recommended
as part of the Transportation Plan initiated in the Spring of 1991.
Previous funding: Project Development = $100,000. Remaining $250,000 for streetscape improvements.
CHANGES:
Combined with CBD Transportation and CBD Streetscape Projects.
FINANCIAL DATA
:..�C.�'.%'p': :•.4x:}: ..4...../.tr iii::':i itv::f}'::i 2:}'r,:::ii��}:'
:<:iF.•'l.E+.. n4\,+ri:;r.i r........ ti:.S.Y:}f:v}:?{tix::.�:ti:::.}v.}:::. _
i�i:}:•:•}::: :};}}i:;:J}i.':i.Y.�i��:v'::iii��.MiM4Ti :iti:iv..::::},�.}::{:..;.....:: :k.:}..n.r
{•¢;i.}}$i: �iL::.•.C�iv.•.:::x4•.^in�v:nw.:v�.vv •}.4x:.•.vnw:w}:•.4+}:•}}:y,4v�]hV:4:•iih}ri�vii�r'ivNiii?\\ti�.`ti ti?•i\r{{�ii,+{<iw•
Total Project Cost: 350,000p10644.0 350,000 350000
Spent Through 1990: • ..C..:z:?::}::::;}:}: 4i4ii ; : } } ;
: ar > fiE:
r .,•:;.�.
1991 Budget + Carry Over: 100,000ilinkifiltidicag
Remaining Cost: <: : SQa Q •
Period
M......................<:<.:1'I'EiVi.:,,.}}}................<•::wF?e..........................................................� is:,:;i<
EXPENSES:
Project Development
Precon Eng/Admin 40,000 40,000
R-O-W (includes Admin)
Construction Contract Fee 190,000 190,000
Construction Eng/Admin 20,000 - 20,000 20,000 '
Other
i•: ^:}}}y,;.}}i}}r^}}:}}}}}}}}:}}}}}}}}:•}ii iii:: .: .{}}:•}}}}}}}:•:4;•}}}}:i•;i•}:i•}}i:4}:::{{?i?4:.�} .::: .:
:•:n}}}}:4}}fl.4vu.�'::4}:::::J:i:}::i:::::v':}:}:::::}::•:•::v}::::::.:::.4.v.4:.}is:v:•::ti?•}:'•}::.::v:•nvi:1:?•:
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 250,000 40,000 210,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other '
Unfunded
.�.. .OUACES:.;:;•;;•;;.ii:.}:-:.i>:..::•ii;.i;•:;•i;:;;.;.;:;•}:•}}:2 •pOO::.::::z::<.:::;:;:>::i•:i::i:;::::z:::i•:>:<::<::>:<::... mEgignix
File::TIPCIP A.XLS 33 Printed 7/11/91 at 8:09 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT:. Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12109
Rank: 13
PROJECT TITLE:
Transit Program
DESCRIPTION:
Determine short-range and long-range transit needs, routes and facilities, including a transit center, intra-Renton
shuttle, rail system and park and ride lots. Work with Metro Transit, Downtown Renton Association, Boeing, etc.,
for implementation of short-range needs. Include transit improvements in proposed transportation demand
management programs, impact fee program and capital facilities needs assessment.
JUSTIFICATION:
Transit improvements are a vital component of the transportation system's ability to absorb future traffic demand.
Transit will be one key to meeting the goals of the downtown area as well as industrial and'office park development
in other parts of the city.
STATUS:
Staff is currently working closely with Metro Transit staff on near-term service improvements in Renton.
Work is beginning on the Transportation Plan, which will examine the need for future transit improvements.
Previous Funding: Project Development. = $50,000; Design and Construction = $328,000.
CHANGES:
$168,000 ending balance of 317 Fund put into Transit Program-plus $160,000 that was replaced by grant for
NE 44th signals.
FINANCIAL DATA
f• \; rr:r}:x:rivi4ii ii':jiii�i:}iY:w}:i vti h:'r':}r:4}}:•}ii}};};.}ii}}}i::i>r:{4iY.:f4i}}Ti}:�
:r \ '{r v.: '•ir r:n yr:}:•{:
Total Project Cost: 828,000 ':`: ::-0004 < 828,000 828,000
SpentThrough1
990: }:.}:-;}::<.}:;}}:.}:.}:.}::�:.}:<;«.>:.}}>}}:::.}}:.}:.:�:.::.>}:.>:.;:.;:.:.:->::.}::}:.;:.}:;:.}:•r;:;.,..:::;::.:.�..:�.
::::: .......:.n.n.r..:.�.�:::.:::.....:..:.,}•.w::.�:.viv:v.rw:.w:�v:.}:ry.}},r,.:•}}:i^'+^•
`{<{•`:}:i::i::i:':i::•>.;:;:y:;:; .......vn•::•:•}:2:r:vti:•:•:'':{:•:•:::•:•:•::::iii��i>:i}:ii::•is:i::•:•:ti��:�iii:�:ti�:i::::•:�:::::.v::::::::v�x:::n•.IX•::
1991 Budget + Carry Over: 378,000;::::€:€iiii;ttta:.:. :%'
Remaining Cost: maggot
y�,�,,},�.{ Period
'v:+w:.....;n..:............ .........n:..v... .:�.w:•.��.::::.:::::r{•::::'fil�w:w::.w:}::::��4.!�•.:�.:Wnv::::.�.:��.�:.::h:.:�}:.�.��:��::vi.'•::$:i�ii$iiii:•'i':���'}$:•}}:•i:•i
EXPENSES:
Project Development 50,000 50,000
Precon Eng/Admin 48,000 24,000 24,000
R-O-W (includes Admin)
Construction Contract Fee 320,000 160,000 160,000
Construction Eng/Admin 32,000 16,000 16,000
Other
TAXIMMINFAMSNEME
.G>
SOURCES.OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 450,000 50,000 200,000 200,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.1.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
••::�---:�-.:;m:}}:.�}}:.}}}:.:<.ii:::;::::}:.}::i}}::<:i;:-:�:.}i>:;•: iii::::>i:.:<::...:..:..:...... ::.:...•:::::::.,...:::.......:
. ............:::::.�::::::::.�:•::::::::.�::.�:.............!{50;000>.::� ':�:��:�:•:.'+�.�.:.:..:.::.�:::::::::::.�:-::::::::::.:::::::::::::::.�:....:•.,:....�.�:::::......................2.. #100:::::>g•:i::<:::: g00<
File::TIPCIP A.XLS 34 Printed 7/11/91 at 8:12 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund:
Proj:
Rank: 14
PROJECT TITLE:
Houser Way Relocated- Sunset Interchange to N 8th St Phase II
DESCRIPTION:
Houser Way Phase II will design and construct the new undercrossing of Sunset Blvd and the new Northbound
lane(s) from Sunset Blvd to N 8th St. Includes curbs, sidewalks, street lighting, signing, landscaping
and channelization.
JUSTIFICATION:
This high priority project is a culmination of the North Renton Facilitation process directed by City Council
resolution 2708 with the objectives of providing additional ingress/egress for Boeing and Paccar
employees and relieving traffic usage of North Renton residential streets.
STATUS:
Funding to be determined.
CHANGES:
Because of funding short fall this project has been divided into two phases. The funding need has
increased mainly due to Right of Way cost.
FINANCIAL DATA
}:•}:•:{•}:::{::::v;:{:.\...r.:x:};i•,,,�}. ..t:?i
:�li:; ./..::??}:v..}-.{{;{:+}:i::ii,::::{::{:+• •,:;i :i ii'iryry.}!j:•....
4}i:;::sisiiv::'•{-,vw}:.{:m:::..-.:V.►Si�4ti:%�{i i��S�!( fi/:;�: } i :}:.4:i\n:.:i:� :n\{.::\{:::.},:•:...::.:.: {,
,:•:itS:::::•::..^C{:v.:{•}nw:x::.:xn::x::....}}:n:.v.: - .. .::r.:....n...:r.\.�:. .{'.•�'fi$ntiv:r..nn.:::...�}:..r}.r1.rh�v}}}}:C•r.?:ii ri}
l{vi
..nv
Total Project Cost: 2,261,000s:{^�<• 30,000 30000
�:::::.:..:.. ,.......:::: : :.x':{.}}::i}} :r .{ :. :.'••c'}YS}.'m�:{•}:•4:'ti?"t`�t
Spent Through 1990: {::z<;:;v::::�}.:<.>•::.}:.?:,::�}..,.::.}•.<:{::...:::.:::.,,.
Pe �s ti::�':: : i:;::;::::....:.. ' . :a:,•:r::::r::.,-:::>}:;� n.:<.:{.ss}rx.}�c;.>:{:}:.......:::i;z::<::R;,•;>:'•::`w<
1991 Budget + Carry Over: 2,231,000 1,100,000 1,131,000
Remaining Cost: maigglag
Period -
.�:::::.�:::::::::..�:::.:::::::�'E'EHi.::.}>}}:.}::.:.}:.}:•:{.}:;.:.:�:{.:,.:E�er .�`ota�:>::;::}}}}:-:7.992:•}}}:•}:{. ::.:�::7.9HA..?.}:.>:n.M1595:::::::.::::.:Kw::t99S:>::>:r•:;:<:::>{::::<>1<6197.::: ,,..
EXPENSES:
Project Development
Precon Eng/Admin 256,000 128,000 128,000
R-O-W (includes' Admin) 380,000 380,000
Construction Contract Fee 1,505,000 1,505,000
Construction Eng/Admin 120,000 - 120,000
Other
•::ry:x.�.:vv.:::�::::?c:P:?}�::r:.�..s..l."..s...::.;.«.:.:.><.:.:::.:.::.>.:.:::::<.v>:::.<v<:::n:>:v::«::::::::::::,:v>::::>:�:<:n::�...�.2..�...r..•.o.w�n�v::;:.:.:>N<; >> : x «wr >. § anQt<> ::l< xg. . MAMA* xx
: : : :n
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 30,000 30,000 - •
Vehicle License .Fee
Grants In-Hand •
Grants Proposed (TIA) 1,131,000 64,000 254,000 813,000
•
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 1000,000 34,000 254,000 812,.000
1 C
...... ..........:.....:.. ............:............. X28{000:: `::.t� :z;,�yB° ;:�::»::#:$2 •A00>::::<:{:>:�s>>•>:::s:<>.::::;:;::;s;}.
•
File::TIPCIP A.XLS 35 Printed 7/11/91 at 8:08 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
CONTACT: Lee Haro
' DEPT: Planning/Building/Public Works
I v: Transportation on Systems
Fund: 317
Proj: 106
Rank: 15
- PROJECT TITLE:
Bridge Inspection Program
DESCRIPTION:
Inspect all, roadway bridges owned by the City every two years.
JUSTIFICATION:
Must be done for safety and funding purposes and as part of S.W.I.B.S. Program to determine structural
deficiencies, physic91 deterioration, or functional obsolescence and to qualify for federal•bridge replacement
grant funding.
STATUS:
- On-going bi-yearly program. $50,000 budgeted for 1991 program.
CHANGES:
Changed to bi-annual program and "Emergency Repair" taken out of title. Repairs as required will, be funded
on case-by-case basis.
FINANCIAL DATA
BRIERESSIMEN 101:94M1 ENEEN SEEPOIRISSEM
Total Project Cost: 170,00000000W 170,000. .171999: — • — ' —
Spent Through 1990: ORIMEMESIBEn sposna Emenonsramm
1991 Budget + Carry Over: 50,000MUbfaid6d0 • • .w
Remaining Costlampg
Period -
ilE11:904S ig.01:#00E
EXPENSES:
Project Development 120,000 40,000 40,000 40,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
- igNERA:040.]
SOURCES OF FUNDS:
' 1/2 Cent Gas Tax
Business License Fee 120,000 40,000 40,000 40,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
RMI:01.8M Mii:MSES ligigga0;00M.
File::TIPCIP A.XLS 36 Printed 7/11/91 at 8:17 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 016
Rank: 16
•
PROJECT TITLE:
Traffic Signal Loop Replacement Program
DESCRIPTION:
Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve proper
installation and assure reliability.
JUSTIFICATION:
Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed
for the intersection controllers and VMS signal coordination system to operate effectively. ..The detection
loops in the pavement-trust be properly maintained; their failure results in highly inefficient operation.
Pavement deterioration due to heavy traffic volumes, trucks, and adverse weather have increased the need
for replacement.
STATUS:
On-going yearly program.
•
CHANGES:
None.
FINANCIAL DATA
x:4.v:::•::•.?•:•iY?4:?:i:}:::ii::Qi>:::isii:;t:%i':isi:i::i::i:i::iiii:v:::iii::::i:
:::::::::::::::.�::::::::::::::::.i-�-�,-::•:::::::>;:.:;:.:>::::::::::::.4:r:::::::: .:.....irr:i::?;rr<.?�::::;v•:'i�r� �:.: ......................
Total Project Cost: 150,000 :: : :`:Fuv edt> 150,000 150,000
•:!i•i::/:i•)::4:4Y••i:•:i}}Y•i::/„Fr:..v.'iii:-i:4i:-i:-i:.i:::ii:-i:i:.
Spent Throughh 1990:
::w:r:::... .:::.:is?i}i};i.};4.x..:.;.•i.ii.y:4.i.:•.•�;:j!':i4:iiii:.:.'r':.i•:.:i.:...�:...�r.•??? :r:i::s:•?:1 :Yiyr .i.iil.4h�s{�:4C�k�iii}::i.'.ii.,ies ii?i•;:•:i•ii:i?:•?>•ii'f:•i.•i:i:i:w:•i:ii:ir:::x.>:i•ii:F:f•i•ii::
1991 Budget + Carry Over: gi<•tfl UElde N
Remaining Cost: somppigmm
Period -
•.�:1• .:.:#9 ?>� ::;:: '•:: �'�:z ::: 995:>?a'::>:�::::r<:»:�>:::�99?'::`•::::'{>.
...1TEM.............................PeCjod•1'trt�I.i.:. ,.::1992.::.,.:::::.:?.::•i....99S.i:.;:.i:.:?...:.,..::.... �:::>� ::s:<::...
EXPENSES:
Project Development
Precon Eng/Admin
R-0,W (includes Admin)
Construction Contract Fee 126,000 21,000 21,000 21,000 21,000 21,000 21,000
Construction Eng/Admin 9,000 - 1,500 1,500 1,500 1,500 1,500 1,500
Other (City Force) 15,000 2,500 2,500 2,500 2,500 2,500 2,500
r:::? � , : s.: ,» ; E\ v>:i O „ >xMOM :> ? 2A0NORMS
'.•..?,,
SOURCES OF FUNDS:
1/2:Cent Gas Tax
Business License Fee 150,000 25,000 25,000 25,000 25,000 25,000 25,000 '
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
.....::.. ...... . .:.:::::::::.:::::::::,:::.::.:::::-:.::::.::,::..:.. ,i ....::• :.....iii::??.i•.:..;....:...:1:::::.:.:::.....;.:...:..::::::.::?,.i......i....•::•::•i:•i:.:.i>i.??:...•:...•:• ::...::..m::.......,... .::.::::::,.:. ..
.... . .. ::.�:::::.�::::.:�:,:::::.�:.�::.i•:.�:::•::.,.? 5tT L#00::::�:'.•:::•:::•::25:.0 :.:.;:.:.i:.,i:.ii:.; :.:::• <::::�•O �
T�1 R �•:::1. OO:.:.i:.i:::::::::.25 000:.: ...2x'1)00:;MOR;20706, 'i:?:25OOII<'
File::TIPCIP A.XLS 37 Printed 7/11/91 at 8:18 AM.
CITY OF RENTON
- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997 .
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
, Fund: 317
Proj: 12113
Rank: 17
PROJECT TITLE:
Traffic Sign Replacement Program
DESCRIPTION:
This program provides for the replacement and/or relocation of signs that are obsolete, faded, poorly
located or no longer appropriate.
' JUSTIFICATION:
' - Poor signing can be one of the highest liability exposures for a city by creating safety problems and driver
confusion.
' STATUS:
On-going yearly program.
Contract fee amount is for purchase of materials that will be assembled and installed by City.
CHANGES:
-- None
- FINANCIAL DATA
••f•}:•}:•}:» .x:::.f. :.x;?:>�}:::?:;iii>:<
........:..::.:.::.:.:...:..:..
.:::::.v:?::::>:}},}>}>:•.;?: :.�:,.... ....,.::}::.�::.:`:::..•.?•:.:�}:•}:•}}}:y,:i>iii:?:,;::::ts::;?;:.:...}s:..,..}:}:?•:�,v,}:;•:w:k?�wti•}:u`az}�e.;,,.;f>
Total Project Cost: 120,OOOr;,•,.�;:;<;:;:I<_i7't:Kiecl:t ;: 120,.000
1 ,000
Spent Through 1990: . wvmvtv : ;:]?} ? � • w:.....
:%
4Yvw4vv: % v
if » : ri
•
i }
1991 Budget + Carry Over:
Remaining Cost: mgmlam9A
� Period
:::STEM:r>.<:<;:;}::<}:•;}};::;}:<:}}:•%•:>:�. i�'�:•: :•}}d. .
:v��i:�:2nri<%.
:>:'>::»::<>:1.99A::::....... v: ::•::
- .:,•.�.::�:?•::::::.�:::::::::...................:..::.:.:.:::.::.�}�• .?•:.::�.::: .........'I1IKl5:::'•:> :�<:;,;:::s'E:999:s:•;::�:<
- EXPENSES:
Project Development
Precon Eng/Admin
R-0-W (includes Admin)
Construction Contract Fee 51,000 8,500 8,500 8,500 8,500 8,500 8,500
Construction Eng/Admin .
Other (City Force) 69,000 11,500 11,500 11,500 11,500 11,500 11,500
M'iR; i~NSAS€:`: ::s:RIERGE SZEISOMIX
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 120,000 20,000 20,000 20,000 20,000 20,000 20,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
- L.I.D.'s Formed
• L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
- Other
Unfunded
TALI50URL`fS•: :::::::::::::::::.::::E EMOMONOY:.::.._::::::•::.2fQ0I1::
File::TIPCIP A.XLS 38 Printed 7/11/91 at 8:19 AM.
•
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 091
Rank: 18
PROJECT TITLE:
Light Pole Replacement Program
DESCRIPTION:
This program is for the replacement of damaged luminaire poles.
These poles have been damaged in unknown incidents where reimbursement through normal channels is
impossible.
JUSTIFICATION:
Pedestrian and vehicular safety is highly related to adequate street lighting. Purchase of these poles falls
beyond normal maintenance budget.
STATUS:
On-going yearly program.
Contract fee amount is for purchase of poles.
CHANGES:
None.
FINANCIAL DATA
.............
j.•:{.v: :v.}}. .. •}?:::x:4!i i:•i::.`i.'•:•}if......$.n....+•rr..:.4rh...nA i:.r./.....::...{v+:xS':L:'ii4.
Total Project Cost: 150,000 v�:'•.:Fuvdecl:«:;;:;: 150,000 150000.;:. 4
:???r:M:^hv{.}:ii'i�rix{.i;;.}�;.};•}}};•%.:4ii:}}:i}}:^.:•}}:.y.4i}:?4}yY.4}Y.••:.i.
.{:...n....
SpentThrough Throu h 1990:
:4:;•}};};{•i}}}}}iii}ii}:?{{{{•}}}}}}:}y,{{?4}}y}}i:4:{•}}:•}}}};r.;:.},4}}:4}:}:4}:i};4:w::::v..:.........r. :?•.:-:m:x:::i.{w::::::::•::::::::::4:::::::::............
.................•...:. ............:..:...v.. ...:.......�:iti'riiijjjii::ni:::�4:�iitii?ii:?CSJ$+iitT}iiri:iif:n4::wiii t�4'.:::i:;
1991 Budget + Carry Over: <:ttn1U d itt
Remaining Cost: • ....: 1 fl:OO
Period
EM?{.:..i:.ii:?•::................PgCkRd•�'�7t6[{•.::: :::>::1.992>..>:{<.;:}.••i:>.•i:{.i:.'3988«:;>:�;�::<:<;:::{<;:::k99�1{{.i}i:.i:.:<.i:•ii:•i:.:11I�5::<: ::::::> `:?s:E:991ii:s<%:�>:.:::•:::.�:�9BY`::<:':
EXPENSES:
Project Development
Precon Eng/Admin 12,000 2,000 2,000 ' 2,000 2,000 2,000 2,000
R-O-W (includes Admin)
Construction Contract Fee 138,000 23,000 23,000 23,000 23,000 23,000 23,000 --
Construction Eng/Amin
Other
Tyr {.: ;•;iii:•i-.iii:.;iiiii::;•;ii:-ii:{•i:;.::-i:-i:.;i:{:.i., :. ::4;i:{•iiiii..: : . <.:.ii:.iii:.ii:::: ,: : .:.i:.;iii:.i:;;.;. :}. ...:.iiiiiii:4:;:: . .: •� .:..:::::::.: . ;... :�•i:•iii:;.:{:.}:.}. ..::. ...:
.�.�.: �s��.i:.:;.::.i:.::.:}:.i:}:::}:.::.::::.i:.}>:.i}::i:.:}:».:...�oo�Q. ...::.ii:.i}:.:���o::>;:::«:>:.:.:?.:.�s�oo:,r:}:::::.:.:��Qvo:.;:.i::.>:.i•:{.:: oo�,: f.....r.... >::<::>.:...::... . o�la:
SOURCES OF FUNDS: ,
1/2 Cent Gas Tax
Business License Fee 150,000 25,000 25,000 25,000 25,000 25,000 25,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed _
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOT�1i::50t1R ':> ><::::3 5Q 0C 0:::::.::<sz:•:s:25 000::=::::>:::: :<>::'.25 000<::::::<:»:<:»» 001!::::: :::::;:.:::2 .
>:::::r;:> ... a flDQ>>:::::;.i:.;:.i:•2 ' -i:•i:>25 Q00>
. . _............... � ...::.:........�......�,.:.:.::,�:.;.... �..... ..�......,,,� � ..,..:::..... ,.............:::.�::...S,fl00>::�i;__?iii•:::... ........; i
File::TIPCIP_A.XLS 39 Printed 7/11/91 at 8:21 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 056
Rank: 19
PROJECT TITLE:
Sidewalk Inspection and Replacement Program
DESCRIPTION:
Inspect sidewalks to determine areas needing repair, notify property owners of those sidewalk areas that are
their responsibility to repair and finance repair by City crews of areas that are City's Responsibility.
JUSTIFICATION:
Dangerous sidewalk sections are safety problem for pedestrians and a liability exposure for City.
STATUS:
On-going yearly program.
Program began in 1990 and will complete backlog of repair locations in 1992.
CHANGES
Inspection began in 1990 and will complete backlog of repair locations in 1992. Budget increased from
$5,000 to $10,000 per year.
$5,000 for inspection & notification, $5,000 for City repairs.
FINANCIAL DATA
.::$::$$::$.4::•}4i:::?:y 4:::•.::..i.}ti}}.*$:•:.v:.. :. .. :. ........... .. ............
+$ " JiiiIMASEENSEN
Total Project Cost: 65,0000M4004§0M
65,000 65}000
r}:.:$;rJ..n,.:.>.NNf:O:,:.:{.;{va;•: {y{{q:•'tr..i0:..:i.
:.•....:...::::..:..:.:.:::::....:
SpentThrough 1990:
z:::;::::::: '::'<:;:.:::::$#:':: }:4}:?•}}}}}:•}:•}}:.x•>:?•}:•}:.}:::.:.:.;:{:.::::,:.!:.::..:.:.;.:!�{::::<{.x:. .:........i.:#;'•,Y:•::`xi4>:•}}:i•}:?•}>}:4:•:?•:4!}>:•}:•}r:4:
1991 Budget + Carry Over: ::...:.........:...........
Remaining Cost: .hv....r>?> fl: '.
,. --Period
MMEMERREWEEMEMELmitualmwmPOIMMERmgmma9.941MMEIRIMEwmogRomMmoommg
EXPENSES:
Project Development 30,000 5,000 5,000 5,000 5,000 5,000 5,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 35,000 10,000 5,000 - 5,000 5,000 5,000 5,000
Construction Eng/Admin
Other
..�
Tt3'i'A,�:.: .i .S .:::.�:::.:::•::::::.:•:.:..:..:::• :�:�:�::�:�•::•:�-: '�1!OQ>::::<:>.>:<:�:::;><t� .(XO..:::::::.:.:.:.l:G QC.G::
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 65,000 15,000 10,000 10,000 10,000 10,000 10,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
: :..........:f !}011::
-- File::TIPCIP A.XLS 40 Printed 7/11/91 at 8:22 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 029
Rank: 20
PROJECT TITLE:
Arterial Circulation
DESCRIPTION:
Completion of a computer model of the City's arterial system is scheduled for 1991. This model will be used to
develop an arterial plan as part of the City's Transportation Plan. Transportation projects will be recommended
to improve traffic flow on a multi-model basis and will be coordinated with Transportation Demand Management and
Clean Air requirements. This fund will provide for planning, design and construction of projects.
JUSTIFICATION:
Recommendations for arterial system improvements will be a key product of the Transportation Plan.
These projects are essential to support further development and to reduce negative traffic impacts in the City.
This fund is necessary to allow for completion of relatively low-cost projects which will improve traffic operations,
promote increased use of high-occupancy vehicles and comply with clean air legislation.
STATUS:
Work is just beginning on development of the Transportation Plan. Initially, this project will fund the
planning work which will lead to recommendations of improvement projects.
CHANGES:
None.
FINANCIAL DATA
NORINNEAMM 10:01$1002 I141114100 ligiNEBESSEENS
Total Project Cost: 6,880,000"`::s<'`Iunedt 4,559,000
Spent Through 1990: REMERMERMEM. 3M.l599,•`0
00.0: :...:7.:0...0..
: . c . yili.:
1991 Budget + Carry Over: 120,000g0-004000_ 2,321,000 1,700,000 621,000
Remaining Cost: .....?6 ;
Period
.:.. ........::::::::::::.;;;:.::>..;:. . •� ::;.:........ .�:::::.;:::::�«<.. �:.:;:;•;:•:�•::;.:;;;: .:;::�#195;:<:.>::�>=::'•>::�.., .
::.:.:::::::.;;;:.;:<•;:«•;:.::.::•;•.:#'t'EM.;:;;::<.::::::.,.:::::.....:...!?erluc€:�`.i`tttail..........:'1992.:::::...::::.....Ate.:.:......::......�59�.�..:.>:.::�;:.:::.:::>:<. ,
EXPENSES:
Project Development 80,000 80,000
Precon Eng/Admin 830,000 80,000 150,000 150,000 150,000 150,000 150,000
R-O-W (includes Admin) 650,000 50,000 150,000 150,000 150,000 150,000
Construction Contract Fee 5,200,000 300,000 1,000,000 1,300,000 1,300,000 1,300,000
Construction Eng/Admin •
Other
:.�:::::.>. ,�y/�:::>::>: .. .(��y,�;;;,;: :.::;.:. �a:::::;:::i:�s . ....:.....
r�+.�x�. 'rSa�........::•::•:•::::::::::::::::.•::::::..�i.V.S!W..�. .........f{n!i.V.14V............i!�M�jSlV.Y,...•::•:,:� f.KVM•.�:>.�5:�f.��:•.::.::.:•..:...}.. .............J...:..:f..:::::::
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 3,739,000 160,000 290,000 449,000 1,030,000 925,000 885,000
Vehicle License Fee 700,000 350,000 350,000
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 1,700,000 210,000 400,000 400,000 325,000 365,000
Other
Unfunded :..:...:::::::. . .:..:::::::::.- 621,000 ;::.::.;:>::.:...:...... :;::.::;:.:;.:..:...: .....<::>:>.:::::>.451 000::<>::;:,170 000 ..::.
;:;•;:«
............ ..... •. >::<>.:::>::;;>::: : ::-:;:;:•<:::<;:;;50.0�(IOQ:::>:«<:::>f 300 OOi1::::z:::>::;:T••600 000>:::::<:«9:'6.: O:OO:s
�i1�:50x1£i��S>:`�>#:�:�>#:�:�>s»s:�:;<>�:;:::><::•:�:::�,�'6�D,.QOD...:::...:::'I1iQ,00t#..:.,..�:::::.....� .,.,.. ........: �... . ........►.,..�.�.... ..........� �,..................�. ....,. ....�
•
File::TIPCIP A.XLS 41 Printed 7/11/91 at 7:57 AM.
' CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12117
Rank: 21
PROJECT TITLE:
Monster Road Bridge
DESCRIPTION:
Replace Monster Road bridge. May be combined into Oakesdale Ave SW/Monster Rd to North City Limits project.
JUSTIFICATION:
Bridge requires interim repairs based on evaluation by an independent bridge engineer. Due to increasing
truck traffic, age and condition of structure, partial or full replacement of the structure may soon be required.
STATUS:
Bridge will be fully evaluated in 1991 as part of S.W.I.B.S. Program, which determines the structural integrity of
the bridge and whether it qualifies for Federal Bridge Replacement Funding.
-- CHANGES:
Former scope of work was only for interim repairs.
FINANCIAL DATA
•:?•:{:.}•{rw:?^'!.?: : r•y:A•:wi}}:•}ii%4:? Y..}:{{i?}:::?•
::{•:{:}ti:??;:r.:n}}}:?:>:�i:•.'•ii moi{:�:n;;:j
Y•:iti};:?{}{{{i}�ii:'':::.::j'v:ti:?;:i, t:>:x�:y;:???::•ini'{:}i::Ct;
}::.}•{::::;:.-rY •:.^,.:;:::;:;:•$:•}}:t• :: ::,:•:::•.:•:: ..........r.;.....:r,�.r::.....:...:.i.`.2:>rkG:: :•:.........i..
Total Project Cost: 1,400,000:' %; undedt 100,000 50,000• 50,000
x:f'{%{:j F.t{:{?rJ}:•r.{.;.}}:t}:i ii?j•{rrj
•}}tirC:•}:4:{.}};{Si}:{v}}}}{v•}}}}}4};K{•}:•}}::.}}}}:?•}ti?T:ti '''Ki: x:,{•J.v:i::
1990. .....:.............. ....:,:.:.;...)•411#1.00.411
Spent Through .....G�111$�>s>»;:.: :•`::>�:'•::...• •:.::::::.....
I� 9 hyi:i�:jii:}}:iii?.}:•}i}}i:?•r;},.::< :.r\:n�r:bi}.v::.: /i�f':L:iiiiii:Ci�i:
::}::::;..:::?{•• :;..:.::...........................:::::vw:n :::x :nw:::: .r.:r........... :::::}:v'.
1991 Budget + Carry Over: `::iil ut'ided ::}: 1,300,000 1,050,000 250,000
Remaining Cost: '.... .< 1,4i0,
Period
EXPENSES:
Project Development
Precon Eng/Admin - 200,000 100,000 100,000
R-O-W (includes Admin) 100,000 100,000
Construction Contract Fee 1,000,000 1,000,000
Construction Eng/Admin 100,000 100,000
Other
SOURCES OF FUNDS: •
1/2 Cent Gas Tax
Business License Fee 50,000 50,000
Vehicle License Fee 50,000 50,000
Grants In-Hand
Grants Proposed 1,050,000 1,050,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 250,000 50,000 150,000 50,000
Other
Unfunded
:.... ........... ..... ..
000: ::::::;?: ::it200`1D00::>:i:`•:1:10D`'OOIff-MENIM
3?':'•i 3? ``•'•i ':'• ii '?
::..,; •}: " .........................................:.1'400 ............#00'000> '•»:.....
�TAL:SOURCE$:'>'r??:`�`� '�� �''°`:`:>s'`:.i......�.....,._...............� ..,....... i.......,......,.a.....,� . ..............................,......................�............................
- File::TIPCIP A.XLS 42 Printed 7/11/91 at 8:46 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 054
Rank: 22 •
PROJECT TITLE:
NE 44th St/I405
DESCRIPTION:
This project is signalization of freeway ramps and widening of signal approaches where warranted.
JUSTIFICATION:
Growing traffic volumes are warrenting signals at this location.
STATUS:
FAUS funds of $211,222 have been approved. Mitigation funds of $48,778 in hand.
Previous Funding: Preconstruction E/A = $44,000.00, including $28,336 FAUS grant.
WSDOT money is also available to refurbish bridge deck. •
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 260,00tvggsgolgoit 260,000 $211,222 48778
;${\{$x$ : :ry. ::{f.4:Y;,v Y..:{.kw,{y;{r{{??rf.0'{{N.{C{•ri•:{{{{:ni'f.{+f:{{Y.:x??.n:
}}:\'{{{n,:$$:+• {r{•:L:{{}:i•i.....v.?.....{{::::r:.i4•:rrr
Spent Through 1990: {.;�•<.:.,.:,,. :$:�... ..,:::+::::::::.:,
1991 Budget + Carry Over: 44,000#s ,fiilfujk6da
Remaining Cost:
Period -
::i`t'FAVI.::::::::,.;:.;::.;:{•;;:;.;:;:.::::P4. .:.w::::..:::::::::. ..�:{;.,:.':::.>•::$$:::: ,r.{...
.::r.:::{:.: :::::. .........3998.::•:............:k9�::.;;:•::•:.{.:.:;•::�595:•>:;•:;;:.:::•;:•r::::�E.99(i:>::>:$::$:::�;$•:$::$$'199T:::<s$:;•;>
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 200,000 200,000
Construction Eng/Admin 16,000 - 16,000
Other
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand (FAUS) 182,886 182,886
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 33,114 33,114
Mitigation Proposed
Other
Unfunded
.....,.......:...
File::TIPCIP_A.XLS 43 Printed 7/11/91 at 8:27 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 023
Rank: 23
•
PROJECT TITLE:
SW 16th St- West City Limits to Lind Ave SW
DESCRIPTION:
Roadway improvements to include: Widening to 3 lanes, roadway reconstruction, curbs, sidewalks, street
• lighting, channelization and storm drainage and bikeway.
•
JUSTIFICATION:
Traffic demands due to proposed development in this area, including the Boeing Longacres site, will accelerate
the need for this project and a re-evaluation of the project scope," including number of lanes.
STATUS:
Begin P.S. & E. in 1992 pending funding
Previous Funding: Pre-construction E/A =S60,000
CHANGES:
West Limit extended from Oaakesdale to West City Limits, combining with the former "SW 16th - Oakesdale
to Monster Rd" project.
FINANCIAL DATA
.r.4. :'%?;•$:+�iijY?�i���M��i'...}...i�...�?'�V.;7i.Tt�i}1VY.17iEW:6i ,£ ::?i}�:::.'•::iii
.a :::.?•:::: ,.. .;•'<?{::;?:.�.'•n;rSiS'n}xa:•:S}}}k?•}:•}jix:�.'•°x•:}::.:::u::
Total Project Cost: 4,302,000 :'^c.�.0,1)t1tlecl <;'......'.....120,000 :• 60000 :. �.f: :.}}}:? ,;?t:?. ••},,:. .;x . :}:,.• ;?.
Spent Through 99 .
Pe 9 :,•:�:•.w.. ,:<� :`. �::'..>•'��::>�:�`. #::::%?;::} :.NI 11031«::?::�::<:' •.:::: . :::•.f?•f:�:::
*:•::::::::•:::}'-.?••::.� .:.............r.........,:........r...:......x:...}..rr.�..}.......: vr.,:.r.....%s ;�:??sazs�> s?..:.?:}..:.� :
1991 Budget + Carry Over: 60,000:}:: i�iftriideiti : % 4,182,000 1,772,000 2,410,000
Remaining Cost: `# ¢ `:
Period
................lt0e•}:;•%:•::.v..rr:........aFAWM �•}: '•""'•}}r:??:?.??:
...�i�z......:..........'l.�J93::::•:::-::•...:•:19i�'ra::::<::::}:.}: �:::\:?'E:998:r:....
EXPENSES: -
Project Development
Precon Eng/Admin 498,000 219,000 279,000
R-O-W (includes Admin) 200,000 200,000
Construction Contract Fee 3,282,000 3,282,000
Construction Eng/Admin 262,000 262,000
Other
{ }1 �j EM
>i.f...:..:.r... rte.?•.v: �..}r:....v ::.:frxxf.•.
�y+��(� y�►� �+ .:;v.v::.�, .. ��i� r.r��1:l��Vlf1�:;ESSAM:::.}}:}i�}�� �• �i'::?'-}}i:::t:;.i}}
�i'/.�).�A}r.•�i/�F��Q���}S.`•S:c:fi:'•k..�'.:•):}::r:•::::: JNA.r� ..4 .1 .Tii..�.!�/1 ::i}}}.}}};. v?::::•:::r}:::%•:}Y•}:•
:•.:.:::.::•::::::,v::::.•::::..•:::rrr::%v:L::><.....•..:.-..•.�..::::x.::...�"!•....,.:.:••£t"r£?w}::::.r..x.,,v..,.}x.ti•:.,-:rr:::.:....r::::::::..,�..rn....:,vJ.x.•.:.•:.•::::}rr::a:>:.:yrv„r:"r`�<:::;'i:;:viw.�:iv:So}r..w.v.v.:a.:::::f.:,.,•r..:.3.vr
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee 60,000 60,000
Grants In-Hand
Grants Proposed 1,772,000 1,772,000
L.I.D.'s Formed
L.I.D.As Proposed
Mitigation In-Hand
Mitigation Proposed 2,410,000 159,000 479,000 1,772,000 •
Other
Unfunded
'r:i�y;:?ii;:'r$ji??:}ii?ii4:4.ti'r,::}:;:j?;:,}}. .�. �V{IY.:;:ri:4. rr.}:{:^'•Y...:}..r.n..,}.....:..:YA}}Y i}
� : H;E ?%: .....:�F'2?I2'i101f :???;?•}s:>2:I?2'•ODO::;>:;>:.....�X9'OOQ:: •'.���>. �1
.:.. ... .mow•::::::.-:.:-},.::+•::::::::• ...:..:....1.... ) :::::.:. ..1..... .. ...A. ............ ... ..... .......... �
F1le::TIPCIP A.XLS44 Printed 7/11/91 at 8:33 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works !
Div: Transportation Systems
Fund: 317
Proj: 032 . I
Rank: 24
PROJECT TITLE:
Sunset Blvd N Project Development
DESCRIPTION:
Conduct preliminary engineering studies for improvements to Sunset Corridor between Maple Valley Wye ,
• (SR-169) and Houser Way relocated.
JUSTIFICATION:
This congested corridor lies between two interchanges to I-405 and is at the confluence of two state routes
and three heavily traveled principal arterials. This area contains the two most heavily congested intersections
in the City. Long-range and short-range improvements are required.
STATUS:
Previous Funding: Project Development = $100,000
CHANGES:
This project was formerly called "I-405 Studies," but has been narrowed down to this key location.
FINANCIAL DATA
BENEEME .. .:. ...t.,v.r..vt>� t €��.vw:.:i. rt rrrtr.rry w, ��;:vr
Total Project Cost: 100 000•.`:•? �r':•• lzuv led Y100,000 . 1.100000.
J
Spent Through
1990:
:::•v:.v::,.........w:•{{......r:...r:n4\.v......,.......t........:}}}i:•}}:•}:4:.`.v:.v?:•.v.•}i}}?it}:....a:.. ::::::....
1991 Budget + Carry Over: 100,000 `<0001 :ti..
Remaining Cost: ...............t...:?;` `:•':
Period - -
r.f...n..... ..n.... :i }il.:i.•}}}:::::rr:{,�.:.f :::: •' {-:.i}i'i}}: :.:asi.;i.:.. .. i'rij:-' tii%i:... ::tial
...............
{•?Y.w.w:n.:, ::}.:•}'•}:•}:•:: ::^:•?:•?:4}}},}:�iiiii iii}:•:•:^} }} ... .?:•::.• � .r}:. .::..... •• ... A..Avv �I'"?:l':::'. ,}
..\{ti.........l1P.ilY.i.............................�Fl{�{��7VWl..:: .::.:��?:2?n`'':.... "•i$:�.a7.a•:...}}:•}:{:,tttyl��ii.•`.:ii:ti{�i'ritii:{{�•V.ar::,:::4......�.�xl{•}:::::}:?{,v v.{.�..................
...........................
EXPENSES: _
Project Development
Precon Eng/Admin
R-0-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin 1
Other '
::::'t•:::?:<><: :s:;:ss:> ; ;:::s:: :; ;::;•i:::;::•::i;:Yi:'•.:::;;::r>;:;,; }}:;;.}:{;•:{:;•::t+':'t;'t:>•.is::;•+i..v
!•.3I•RF.#h'•.+Mlf1F.•MI'V#w�•}:4:•}}::.:•:::::v::v::•}:•}}:::n•. .. .>....... i:::152,24
ti..... �t,ttyy
......m:::. r...•;.:•:.::..::::•::.::....:.•t:'r4 ?}i :....... m::•.r•}} ....t..u....t... ..v.:...... i�.........:.{,...
.... .tw:::nt•:::::::...................r......}:w::::::;;..............,..r:0}i}:{•:::v;t. ,}}.:v::w:.v}Y.•.v.•}::{ vv:. .:... �,.:; .i.......::.:.h-•v.....n}::} ...
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I..D.'s Proposed ,
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
1`1�•}: ::::::-:r;•i:.ii:;•i:<{.}:.}.;:::.....•::•.,•::::::::::r:..t•:.t•:.tti•:::::•:�:•::.}:�.}:.::.::...::.�.,:.,:.. .......... ....::. ..}::::::;::.}'.::.:•,>:
.�.�Ct1_i##��5<{.>:.}:} • >•}:•::.:::.::.}}i:.}:.:•:>;.:;<:i .:: �::::: :•}:•};::.;:•::.}}}:•ii}:{;{.;:.}:::::.,,:r:r: ................ .:..tt..,. .,..t,...............::..�::.:v.,..:....•� r•�::<,.....t:.tr......
I
File::TIPCIP_A.XLS 45 Printed 7/11/91 at 8:29 AM.
1
I
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 058
Rank: 25
PROJECT TITLE:
S 2nd St/Logan Ave S,Williams Ave S &Wells Ave S
DESCRIPTION:
Bring signal indications up to MUTCD standards. Provide overhead signal displays free from roadside
obstructions. Increase intersection visibility and awareness. Major work is signal foundations, wiring and
new poles.
JUSTIFICATION:
Qualified for Federal Safety Funding due to accidents caused by poor signal head visibility.
STATUS:
Final design and construction are on hold awaiting input from CBD Transportation and Streetscape projects.
Previous Funding: Preconstruction E/A = $23,000; Contract Fee $107,000; Construction E/A = $8,889
CHANGES:
None.
FINANCIAL DATA
Total Project Cost: 138,889€ °` Fun ?:' 138,889
•
Spent Through 1990: Ingnagaigigaggigin
< : ; : . : } ,. rr ;: :
� M<
1990 Budget + Carry Over: 138,8891016:W040
Remaining Cost: ............... :i#<'>.:ir>
Period
.::::.::::.:.}:.}:;<.:1:983.:•>:•}>}:•}::•}}>::::>:<19',94.:.:•:;•.;.::•:;«:.}.}::: 995>:>:>::>:<:>'>•':�>::::
EXPENSES: .
Project Development
Precon Eng/Admin
• R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
roW: .s
. ray..�s...:.....:..:.::.v:....,........... ............... ... :.}::;<.}:.::.}:.}:.}:.}}.:.;}}}}}:.:.>}:.}:::.}}:.}:::}}}}}:.:•.ry.}<:.::.}:.}}:.}:.}:..
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand (HES)
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
-- • Other
Unfunded
•
.:::::::::::..:...............
File::TIPCIP A.XLS 46 Printed 7/11/91 at 8:34 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 028
Rank: 26
PROJECT TITLE:
SW 43rd St/ SR 167 Loop Ramp
DESCRIPTION:
Construction of new Southbound to Eastbound off ramp at SW 43rd St and SR-167. WSDOT is lead for design and `
Construction management. City will hire consultant and manage the funding.
JUSTIFICATION:
Identified in Valley TBD Study as an improvement needed to reduce congestion at the intersection of ,
SW 43rd St/East Valley Road.
STATUS:
Previous Funding: Preconstruction E/A = $80,000
CHANGES:
None
FINANCIAL DATA
••:::>'}:::2::;;;:;:i::i::i•:t}\}}.iin;:::i:.•':::ii,::ii•.:x:.'.:}.• ;.::}}• ::;:.d::i.,::,.i}:::}}:::::<>::}::::>:>•:::;:}•::;::::
. ;#:ok:�E:::: ::>::::::FAi�&:G:r.'�ii#s z:: sof 'a::>:.}N<:.:zi:>.:�,.}:,;>.::}>::,>rf>.>:<>:>::»::>.:;.;:<.:;<:N::>::
::>::,..::::::;:::::>:<::}}.::r::::::::r::::::..:::::::::�::.�::.�::::. .. .r .....r:r.....r.... ..:..r.rx:.....:..r..:...r.....
Total Project Cost: 1,050,000'�1<:' Folded _ 80,000 66 700 ..13x300
Spent Through 1990: }:.}•:.iii}:;;}:•;:.:•}::a.:ii
1991 Budget + Carry Over: 80,000:Mgifi.:IN'eda 970,000 639,300 330,700
Remaining Cost: momlepag
Period
•}}I'Q is W4f�:: I�'ii viii ii:r}�}:ti>.�:.
:::.}�::::.,s:<:#>:,.;::z<z::::i::i::::it'EIIN:::::::>.>•:::z>.::::;;::>::r;:>:<::;:<.::..... rT. I.::::.....:.:1992::: :::;::i:<;::;::>•::1:983:>........:......39 .. TB95E':::::<:M:>::::199fiaig`•'•:# 'M9Inz :
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin) 20,000 20,000
Construction Contract Fee 860,000 860,000
Construction Eng/Admin 90,000 90,000
Other
i'c�c�,,. r�s�s.::.:<.}:::.::.:::.::<.:..:::.:�:.:;:.}:.::.::.::}:. a.�aQ::�:::.::.::::::::.<}•::>:::::i::i::.is.:.>:.i:.:���oo:.::::<::�: ::��: �a>:::i.:ii•::.rr.......:::::....:.......
w:::ii:vrw:r::r::r};w:::r::.•:x: w:r::r:r::::.v}iv}S::rr::•x::.vm:Yr:::............: Y:ii}:S}:4r}r}}kr$::x:.v:.v:}:.v:xx:r.x.......r..::}:x:::nvvrrr.....r...r...wk•:}:.v}:::.w:n•::xv:•:.:v}::v}:•i::i:•EUSi}}}}}::•iii�}i:i}S?.':•S:•}M
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed (TIA) 639,300 20,000 619,300
L.I.D.'s Formed
L.I.D.'s Proposed 330,700 330,700 `
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
:
:; }}:• :
'i:::s ii ... .. .... .:9OO: ss :.:??: s >»:> > :>E:.: 20'000:: > :' 5pOOD � £ Y : :iv ::}} ar :.};.: •} } • } : :
File::TIPCIP A.XLS 47 Printed 7/11/91 at 8:35 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12121
Rank: 27
PROJECT TITLE:
Lake Washington Blvd -N Park Dr to N 44th Project Development
DESCRIPTION:
Preliminary engineering studies on Lake Washington Blvd to rehabilitate the roadway and to conduct safety
improvements such as a pedestrian/bike path and traffic metering.to N Park Dr.
' JUSTIFICATION:
This is an important route in the City's trail network and the City has made a commitment to limit
through traffic in this area. The existing roadway is in poor condition, resulting in high maintenance costs, and
is in need of rehabilitation.
STATUS: -
Construction funding to be sought, including grant money.
Existing carryover funds will be used to develop proposals.for the rehabilitation and trail improvements which will
be undertaken as funding is available and in conjunction with the Overlay Program.
CHANGES:
None
FINANCIAL DATA
tai ..*kora ♦...:.....ry+myv.viii•:•ti{:ij:iiSi:ii:•?\ii:?i�j::�$iji:�:i�iii$:•:ii�i��i}i:}:•}'?}v:•.
r'4:•l{r,4$:::}CC�:;.;iiiiii:w.w:::::::::nv:}.. •••••••
Total Project Cost: 125,000?;::;:::? ' uild'e1 ':: 125 000 125,000
Spent Through 1990:
..n....... ..... ................r..... :�rl:iiY:i: :iii:::>:{i`v ?ti4i:�ii:}:iii}Y:...n........i:•:•fi:•5<}�i }i}:•i::�:
1991 Budget + Carry Over: 75000) '?Ujlfundtd +
Remaining Cost: ............''Sfl;
Period
EXPENSES: -
Project Development 50,000 50;000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
...ati• ..0>:::
SOURCES OF FUNDS:
' 1/2 Cent Gas Tax
Business License Fee 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I:D.'s Proposed
Mitigation In-Hand -
Mitigation Proposed
.Other
Unfunded
File::TIPCIP A.XLS 48 Printed 7/11/91 at 8:55 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12110
Rank: 28
PROJECT TITLE:
Neighborhood Improvement /Beautification Program
DESCRIPTION:
Provide traffic flow management, and residential street beautification.
' will include such items as signing, benches and trees.
JUSTIFICATION:
This program is intended to enhance "livability" qualities on residential streets.
STATUS:
Previously funded $70,000 will finance 1992.
Previous Funding: Preconstruction E/A = $10,000; Construction Fee = $56,000; Construction E/A = $4,000
CHANGES:
None
FINANCIAL DATA
gginpiaMMEMPtIAMTAIMMOARMWM...... ::.::
;>::•>;>:>::
•
Total Project Cost: 420,000 # F....ittied .......
420,000 420000
. , •
Spent Through 1990: • :
: : . : .
1991 Budget + Carry Over: 70,000:: f. ftd .«k
Remaining Cost: 3OOOt
Period
•:.::•;:::::.::s•:....:•..:.,,::::.::�`I`F..M•;:•:,::;;;;•;:.;:.:..............�1'i..'I'�it8l..............1....•:::::::::•>;;::;:a:1;.�.::.:;.::•:.::�>:.....�99?l•.h.........;:,.;.�..• ...........
EXPENSES: - .
Project Development
Precon Eng/Admin 50,000 10,000 10,000 10,000 10,000 10,000
R-O-W (includes Admin)
Construction Contract Fee 280,000 56,000 56,000 56,000 56,000 56,000
Construction Eng/Admin 20,000 4,000 4,000_ 4,000 4,000 4,000
Other
�t�?FA�;:;i*XXF+�NSiRSs : :.<::::<.::;•::•,:.:,.,.,,,::;.:::,:.::•�... >:.;:;.:;:»� A:...............: t�.......0s� . 90iy ? '�> .......,.......
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 350,000 70,000 70,000 70,000 70,000 70,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
• Unfunded
..350:'000:¢•:::.:;.;:•::,•::.::.>:<;:;•::•::•::.:::::::;;:::•.:, ::
File::TIPCIP A.XLS 49 Printed 7/11/91 at 8:38 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12112
Rank: 29
PROJECT TITLE:
City Gateways Program
DESCRIPTION:
Beautify four entrance locations to the City. Project to include signing and landscaping.
JUSTIFICATION:
Displays a sense of civic pride.
STATUS:
Previously Funding $55,000 will finance 1992.
Previous Funding: Preconstruction E/A = $8,000; ROW = $1,000; Contract Fees= $42,000:
Construction E/A = $4,000.
CHANGES:
None.
FINANCIAL DATA
Total Project Cost: 220,000':;x:> FUAded ' 220,000 220 000
1 ..�:•}}:{{:}:Y.:' :.}}}:!}:.%r•}}:.:?i::l+:•}}i}v,}••v,J:{?r:r.,4 v\... {{?+f:.
Spent Through 1990: � nn,:x..,,.., •kv:i::i::%:'i'r::i:>::iv:i}iii{{{{i}::::}C<i::::?iiii i::j:4:}<•>:::<.}{:+?f{.•::: / YJ < < > n {'.}
};
1991 Budget + Carry Over: 55,000Wid a
Remaining Cost: mgmoom
Period
::>>�:s:r::::.�::.�::.::::::•:::�'.EM:>:::<:s<:>::>`•:`:<::z::z<: >:::Pa�1'tt�:'E`s�titta�:: :> :::::x:892:•}:,.}<}••:•}:•}:.:.}•;.}
.,..3.993::•':::>'::::ss:'<:��f99?i:::?<::::�z::?�<>:I.B95:::r?::>;:: <:a::: :E:998€:::>s:::::';•.{,rrr<.rf99�v'.�..,.}.
........... ....................................................................................................................... .............................:......................
EXPENSES: .• -
Project Development
Precon Eng/Admin 24,000 8,000 8,000 8,000
R-O-W (includes Admin) 3,000 1,000 1,000 1,000
Construction Contract Fee 126,000 42,000 42,000 42,000
Construction Eng/Admin 12,000 4,000 4,000 4,000
Other ♦ y1�.�
��y� �+�c ti.:::::::::::::::}:::::::1��1MF•; ... ?nO...v�.�7.'4/.V.K•},:.,:w.:.•:?::?�.�7.//�1.V.SF:::i{:::}`•.,•:••.��t.7`.V.ItSI.::•}:•}.}}}..:i{.,.ry}:2i.....
.,,,•.;;•}::::.:.:::::::•}:.,,,r.-::::::::...r.........,....::...,•}:•:}:::.v:.v::.o-::r:.,:............ .i:,.i}}}::i•.v}:_}:�:?i•}S.v.•:'t•:okv:rnv,:...r........:::x::.•}::::::..,........:.�.v..2•.vtiv:.:..:..�:.v:.•..rx:ntn,{•.2C•:r.:rn•.,{{•::}x?vi:•:w:.,:,•:.vx.,..:x
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 165,000 55,000 55,000 55,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.Is Formed
L.I.D.Is Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
:i\v:•vii y�{}
li �. ?.,:•:?.::.,.::::.}.}::..:}}:????::.} ... 000.:<::::�>::>::>:::i:::z:»;:: ::;:>:: C}�.(�:::}:??•.:;:.}. ......�IJe•.
{is�Y.�iR����v.�iNi::}:}:6}i::::}}::::::.�:::iiiiiiYi:v ......................::::::::::::::::::`TJ .rv..:. V7/.Yi j:>.�:'r:•iiY�:iii?i�:?ii'i:?...........................
File::TIPCIP A.XLS 50 Printed 7/11/91 at 8:39 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 095
Rank: 30
PROJECT TITLE:
S 2nd St/Main Ave S
DESCRIPTION:
Signalization and channelization improvements at intersection.
JUSTIFICATION:
Existing signal does not meet current standards.
STATUS:
On hold waiting input from CBD Transportation and Streetscape Project.
Previous Funding: Preconstruction E/A = $10,000; Contract Fee = $60,000; Construction E/A = $5,000
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 75,000s'< :F fiath75000 75,000
?..;\:r•.}:},:;:n}•x v}Nh}?�::;n+i F•?}:;}\\'•?:•?:•}?ti;}:i+:i'i'tijiii}4:::;;27hiS::;:},-'r:+.;::
•.:}•.f...:... �fn• :::..L....
iii'�iSi::i+;'iii is ii i:ti�:i:•:{�i::;:ii.'i is t�iiii�i::•ii is i�l�ii:;i}:ti::•:•.:;,{•:v:...n..... ..A}}}n,..........:::w:.:�:}:•:
•}:fv�i ii iiii+iti Q•:::rr:v::::.�.vr
Spent 9
n Through 1990: ..;.
1991 Budget + Carry Over: 75,0000m404040
Remaining Cost:
Period
1't'F.�iVI.;:.}}:}:::........:.K;.�.::.Perfa�.Tx�tatr.:z:>::>:<::<f.992:.>•:<z:>;:::::::>.::}::::A:993:::»::}�::<>:::.::: ::'I99?I:s:>:: ;:::>:<z: ;::�1I�5:;� :>:::?r::.;:::E991i€:>•:::.:.•:::::::::.:1997::<�.....
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
c :::>:z:>:::::::<z:>•:<:::zi::z:>::>::::>•:>:}:>::>ss•<:z<}::}:::<}.:s: >:;:is:>;::::::c•;z::;:>::i:�ii:�ii
>.>•:k:::>:: ,>.»?::? ;:<::<:::»s::> ::>::>::;:;>:•:;;;;>::?:<:
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee _
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
., .............;;;:::_iii:�>•}}vr;:•}::::.::.................................................................:�;;::.:•:.}':::. ;:::::::;:;:.,•::::;:::.,.r::.:::::.:r:
.......:...............,...r..,v::::.�?}:•}}:�:�:;�:^:v:::w::}::::kw::::w...�::::::::ti4.;w}}:•:i.v•}'•::........}.�:i�}:;�}:;�:v:.}:•?:4?:•?:ti•::•:v.
.r........ ... .n.................................n...r......n..:.n.x....n.......:.......}.'•}:•ii'r:�i:•:•::::.r•:�>:C�iiy':....r..... .. ...r.. .....•:?$$:• ii is�:i:•:ii i:•.*$$ii::Y viii.`i:O}}:o}}}}�•.x...:iT}}}:}'6:•:•i:•iii.`.':• :'•:•'i'r:• 'r:
File::TIPCIP A.XLS 51 Printed 7/11/91 at 8:40 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 033
Rank: 31
PROJECT TITLE:
Maple Valley Highway-Maplewood Ave SE to East City Limits (WSDOT Project)
DESCRIPTION:
Widen existing roadway to 5 lanes, provide new curbs, sidewalks, storm drainage, street lighting and
channelization.
• JUSTIFICATION:
Will address highly needed congestion and accident concerns.
• STATUS:
Project will be funded entirely by WSDOT.
City Funds of $5,000 budgeted for plan review and construction coordination'by City.
Scheduled for construction bid ad in February of 1992.
CHANGES:
None.
FINANCIAL DATA
Total Project Cost: 5,000i0's €F 0.00 >:. 5,000 5,000.:..x:.
Spent Through 1990: { ?E\ \ ^ fv:...v.....r..r...;v......:::..?.}:::ii;t;'r::iy::j::i:}:;:ii;:i: :?{'+,r::::i;{:`iii;{i::::.....4:...}}:•}'•iY�v�!:}<4:•}:•}}v?vv?:.:}.:,
>^:?h:•iY.{::y}•:
................:..... ...............:...r.. .rr.:. .rrr :.r r. : :: • >»
1991 Budget + Carry Over: 5,000:`?a %f3k5Citl'#'
Remaining Cost: ........'::,i ,.•......
Period
.............
..............
...?..............:.::.:::.....:h'EM.};:::::::::::::::::::•};:.Y:..W .:trtsi..::.: :>::aiM:n:z:,;::>::>:z3.�::>::::`:.'•<:;<::.<.:::::s>:::::X99?ls:::>:::<:>:;.:�:::::'I!99*��.s';:.'::::::::::: ::::`;::: 9913E:.:::::::.:?.}.:•:.,.:'1;99?:•,��'{: .n
EXPENSES: •
Project Development
Precon Eng/Admin
R-0-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
TOTME7tP3»N.o,1!S::}::w:::::::::nv:rvw.v:::.:::?w::w:::::?w:::::.� .:.v.:v....u.............m::..::::::::::::w::.v.,.::n..........::::::.:..::::.v::}Y:::.. ......:.
.................n.......r...n.nr...... u...............:...............:::}::rv::.vr{.....:.r.v.....rr....r.............:..r...:..x...e........r...:..r....r..v.. :SiYir}}}: :rii}.r..rs.:..r..xr..v.�i>iii}}ii}iWii}i}}}ii'r
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
File::TIPCIP A.XLS 52 Printed 7/11/91 at 8:41 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12083
Rank: 32
PROJECT TITLE:
N 4th Blvd -Logan Ave N to Monterey Dr NE Project Development
DESCRIPTION:
Prepare a design report for widening N 4th St to a two-way boulevard.
JUSTIFICATION:
Will address serious safety and traffic congestion concerns in this area and reduce impacts on residential
neighborhoods in accordance with the North Renton Facilitation process and as directed by City Council
Resolution 2708.
STATUS: _
Previously funded $50,000 to begin project development in 1991.
CHANGES:
None.
FINANCIAL DATA
ENNEMEN ..Y3.115.......... •}:{.i:: ;:'' .:}}}:{.:}Y::::}}:Y}}}}:}:::i is i.'
Total Project Cost: 80,000 :`: v;'•.F nd c1 80,000 80000
Spent
Through Thro h1990:
..........
1991 Budget + Carry Over: 50,000 U fiEld
Remaining Cost: ?:.,......:`.:>:>3O; k
Period
:::991i::::>::<: :»::<:::>�1�95::>:•::>:>>:.YY::;.:'$998<::?:z:<.`:'.�<:>....
:::::.}:::..:..,::::,;:::>s::>RO:1'€?F_111N.::;•}>::•}:.}:.}}:.}:;< ;::;•:.}}:PeC :'j'siW0::<.::}s<::>.'1 :........... . ..........................._............................................................
EXPENSES: ••
Project Development 30,000 30,000
9 �
•
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin , •
Other
��/.:;IAh!• �t4..i�.{X417.YY'•:i•:�}yr.};:r.}:::•}:•Yii'ri�i}ii::i::i{:::>.:::iii::.... ::ii:•iY.j:i::i::: � ............:........ r.......:r.r......r..r.
:.:..:..............n................,..........v.! .........................1.:.:..is.}iY'.:}::::::::Y::�}:Y::' r....r:}::::::::::::::.w:::::::....::::::::::nv:rFi;:::}}:4;:�;•Y:ry:.}:.f..:i•Y}}}YYYY:•Y}Y}Y.'i }::'.•w::r.;..
SOUReES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 30,000 30,000 •
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
• Unfunded •
File::TIPCIP A.XLS 53 Printed 7/11/91 at 8:42 AM. , •
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12126
Rank: 33
PROJECT TITLE:
Talbot Rd S - S 43rd St to South City Limits.
DESCRIPTION:
Reconstruct roadway prism in areas with failing pavement .and sub-grade conditions and sub-standard cross
slopes. Overlay the reconstructed roadway as part of annual overlay program.
JUSTIFICATION:
Poor existing roadway conditions are a safety and maintenance concern.
STATUS: -
Evaluation of existing conditions will be done in conjunction with
Pavement Management System inspections and analysis.
CHANGES:
Changed from a study to an improvement.
FINANCIAL DATA
Total Project Cost: 330,0000MWWWg 330 000 30,0, 30,000 •
Pent Through 1990:
4w:.:�:::::::::r :•.rri :Ynrri.•.ii{;2vir•ri:i}:i:i: ti }v
..:•• 3R ny : YShY}
1991 Budget + Carry Over: :::: idii»ifed ;
Remaining Cost: ulimmimg'':.
Period
::;::!;:ii:i::i':i?::::;:.::;Ei : �ir� �{,.� ?:}eii:•::{':::::b ` itit',••:•'.:i{:5:'i:.:r'::•. ;;t
r\..}...:...�......r.r....n :il:'i'r<i:: <�� ...�. ±ii:i ...}..n. :ri}....
................................�TT�T.:::::::i:::':'t::::::::::•'.:}.....:.,..��f,.FW4.�.. :i:I:::�::{::`.�:+'�.,7.�':.n:.:::.:::::........77.T`::::::::::::y:::::::::::::::::FY+'-�T2?:::�::::::::i::.....�.........................T'7:7�::::.::.::.........�..i14'....,.}..:
EXPENSES: •
Project Development
Precon Eng/Admin 40,000 30,000 10,000
R-O-W (includes Admin)
Construction Contract Fee 265,000 265,000
Construction Eng/Admin 25,000 25,000
Other
:.:OTAi:iF.X
.......,.:330 . 0:,;};}};;:;}}}}:.}}:....,:..:...:...E':'30000::: ::::s:3000iD0 >::<:EE:::'.:'.:>>:>:E:::#:::::<.::::><:<:::?:::«>:::'.'<.<: : "':<:in:::}»>:<•{:::s:»
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 30,000 30,000
Vehicle License Fee 300,000 300,000
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I:D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
7 �:.:.:.:. ............................... ...0!64;':>:<::<::::>: :<:#«>:'::s>:>�:<->:�:�::: :: :�>ii€ :�9C!Q.............. ..........:. ..
..t7TA1.�.Qi1...i~ �............... ........................................30,40.0. ... ,
File::TIPCIP_A.XLS 54 Printed 7/11/91 at 9:05 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12107
Rank: 34
PROJECT TITLE:
TBZ Project Development
DESCRIPTION:
Transportation Benefit Zones are areas of rapid growth within the City. To determine and fund transportation
improvements necessary to support new development, traffic studies are performed which recommend
projects and determine appropriate fees to charge as part of the mitigation process. This project supports the
necessary planning effort to develop and revise TBZ studies and manage the funds collected.
JUSTIFICATION:
Creation and management of Transportation Benefit Zones are an integral part of planning transportation
improvements and ensuring that new development pays a fair share of the cost.
STATUS: -
TBZs have been finalized in the Valley and Grady Way areas. Interim TBZs have been established in the
NE 3rd/4th and NE 44th areas. Ultimately, a city-wide impact fee system will be developed as part of
the Transportation Plan process.
Previous Funding: Project Development = $115,000.
CHANGES:
None
FINANCIAL DATA
•':{hti':iiiii:::i?�ii::ii:?i::}ii}:•:,.,.Y.k.1M4`<}:':>":i::h�......1.!!Y.:'�i�4:C:
...... r?}S:•$$:•$:•$:{ti::;::}i}:r:�:`...............r....r....n......:ti!S:•:i}::;}:%L.`•Yr':'fr:•
rw: .v:::}}•.v;.,;....•:v::;:::,•:::•}::v::n•:::::::::::::v:::::v;•}' :}'}:nv:::nv::;:•::::•::::•:::::}.
Total Project Cost: 115,000:::{:i^;::Funed 115,000 115,000
Spent Through 1990:
1991 Budget + Carry Over: 115,000M100404M
Remaining Cost: ••.r•..:••.:. ""> :y
Period
':{<: <:>:::':s:`z�<?.'::::>::::�?E'E:M:>::<.<.:::>:<::::>>:�:::>:«�:::POr :'�`sitaiE::::::: :::>�:992:>'::>:»>::�::::>.3995:>?<::`::<::: ::<>195� :>>:' <r�:<:11�95<<::�:: •::::::::t596f` < �::< `> �99'�<s�>:�:
EXPENSES:
Project Development
Precon Eng/Admin
R-0-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
�:tiTirM
ERlMMv::. m:n . n. :: } iiin .nx}: vttw vrx { n •: ; x
i < :::: ivvwfv:::?:iiii>:;:i};;n1:};:%}:j:x,?•.
iif:iii�$.'•iii:x.n r.:.:..n.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
lI`
File::TIPCIP_A.XLS 55 Printed 7/11/91 at 8:44 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12106
Rank: 35
PROJECT TITLE:
Missing Links Program
DESCRIPTION:
This funding provides for the completion of transportation links that do not qualify for other sources of
• funding. An example would be a section of roadway between two LID's or between two developer
mitigation improvement projects.
JUSTIFICATION:
Making the necessary, and often small-scale, improvements needed to connect other projects can achieve
significant benefits.
STATUS:
Program has functioned well for its intended purpose, providing for timely and cost effective facilities
to be installed.
Previous Funding of $320,000 will be used in 1992: Preconstruction E/A = $35,000; ROW = $64,000;
Contract Fee $205,000; Construction E/A = $16,000
CHANGES:
Level of funding adjusted to reflect only solid sources of funding.
FINANCIAL DATA
..w.;:::::�;.'•ki:::::::.'{:::;{x•{:<::>s:::Via:<:
Total Project Cost: 1,446,000 :< :?<:FUrtded«::: 1,446,000 1446000
> w:u....
Spent Through 1990:
1991 Budget Carry Over: 446,000`':::':'Uflftif1cietl ::%
Remaining Cost: o1000,
Period
c:� ,,},�,} .,141
::.�.�::;::::{::{:,:{•::::::: . .. �' ..........'7992::::::•,••;;:::::::;:::::z»1.993::.::.::•:�::.:.;;;.;•:•.:.99�i;::;:•;z:::;:>::;:>:::::. •::.:�:::.•:::._.:••:. :::::::r::•::::::•:.
:;<{{;{�::•;:{�::.:::,va::::..:............:............::::.:::.:.......................................... ..............................::.::::.�:.�::>:..1•,.....:.�:.{..:..-:<,:��1�.i1,:;<:;rR:;'t}.::•::{��6`.iii:.i:.ii:.•.`.<.::.::.t:;1SB�:::y.,:,:.
EXPENSES: •
Project Development
Precon Eng/Admin 110,000 22,000 22,000 22,000 22,000 22,000
R-O-W (includes Admin) 200,000 40,000 40,000 40,000 40,000 40,000
Construction Contract Fee 640,000 128,000 128,000 128,000 128,000 128,000
Construction Eng/Admin 50,000 10,000 10,000 10,000 10,000 10,000
Other
�i :.:.C.:::::::::::::::}:::::::{.:.•::ii:::.�:}( //�,�ip y,,�y{y,./A�/I/h� /��/��yy y,� .r m:h::{' '�,yy/,����.iii:{ry.Y,.:{•:y 'ma�,yyy..
7�!:t`. :. . i. l�S�S.,.{....................................# Vi�Sf.:.i%{.iia:^:•:{•::{•;{{N>::.i:{•isb::•:iMV'S!!/Y::�i:::::::::FY.Y."
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 1,000,000 . 200,000 200,000 , 200,000 200,000 200,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
• Unfunded.
.......... 000:::;
E T
R � :.....r....... ......>:r;:::��:<#:>:::z <:>:'200'OOO:::s:«:s>'s200::00D:�>s:::::::�00:.:.:::::::::...::.::{{,»•{•;:.:>::::::::>..�: •:<:;:>; {'"•... �.. . .. ,Opgi:€::> ::2.. ()00:::'<::ss>�::»� 000::
File::TIPCIP_A.XLS 56 Printed 7/11/91 at 8:45 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12116
Rank: 36
PROJECT TITLE:
Oakesdale Ave SW-Monster Rd to SR 900
DESCRIPTION:
Construct new 4 to 5 lane arterial with curbs, sidewalk, drainage, street lighting, traffic signals,
• channelization, retaining walls and bridge structure. Monster Road Bridge project may be combined with
this project.
JUSTIFICATION:
Will serve growing north-south traffic demand and reduce congestion on Rainier Avenue and Grady Way.
This project is included in the Grady TBZ and will serve and be partially financed by development in
those areas.
STATUS:
Initiate project pre-design in 1992.
Grady TBZ: River Tech - $70,236; Blume Distributers - $254,791 •
CHANGES:
New project in TIP.
FINANCIAL DATA
Total Project Cost: 9,450,000:` '>':<>` FttidedW 325,000 10p000 315000
Spent Through 1990• � }) } i : iii , n ::: antgatiggiiinnag
1991 Budget + Carry Over: :'::?tii3fSfarJett `< 9,125,000 4,725,000 4,400,000
Remaining Cost: ..: '945G
Period
-:..:;., ...ITEM:z:::>:<•'•:::;::r :}:;<s:<.:?}}::•.fie :•r:.�::: ::::::.r ..,...:......... .....,... ,,.:}r:.. a:.r..:..
.......:...:... ... ..k •`•ll`titBfl•;:f•:::.::.�.992.:.::.<:,•:•}:•}:;>.:•}:1:993;:•>::::•::•::•}:•:;.;:•:1919A•:.}•:.}:•}:.:.>•.::.�:::. .::.;.•:a::.>::<.:
.. ...... .......... :......:.:::::::1,�5*.t..<:>s:}.;:....�.:::t!J9.�`i;.}:,......,.......:1919'x::>I
EXPENSES: -
Project Development
Precon Eng/Admin 1,217,000 50,000 50,000 500,000 617,000
R-O-W (includes Admin) 500,000 500,000
Construction Contract Fee 7,160,000 3,580,000 3,580,000
Construction Eng/Admin 573,000 286,000 287,000
Other
•
IR RA .Q » a : ?E ? MEMO: Y :RV ? : VV :linf \
:NM!R:: .ZAV
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 10,000 10,000
Vehicle License Fee
Grants In-Hand
Grants Proposed 4,725,000 275,000 650,000 1,900,000 1,900,000
L.I.D.'s Formed
•
L.I.D.'s Proposed
Mitigation In-Hand 315,000 40,000 50,000 225,000
Mitigation Proposed 4,400,000 467,000 1,966,000 1,967,000
Other
Unfunded
e.:
o '
RG :: : ; . ; 000 :> �fF 00 a50 OQ,.. :W..> '000 > . M
OODM3
A6dsN' 3iTt01,
•
File::TIPCIP_A.XLS 57 Printed 7/11/91 at 8:25 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works -
_ Div: Transportation Systems
Fund: 317
Proj: 12114
Rank: 37
PROJECT TITLE:
Bronson -Houser Corridor Project Development
- DESCRIPTION:
This program provides for an operational analysis and evaluation of neighborhood impacts of alternatives to
' the Bronson - Houser couplet. A design report will be prepared.
JUSTIFICATION:
This is a critical corridor for the movement of traffic into and through the City. The goal is to provide reduced
congestion at the intersection of Sunset Blvd and Bronson, to reduce the need for traffic to bypass the signal
by cutting through the neighborhoods.
STATUS:
Approved by the Council in 1991 budget for $288,000 to design and construct. Decision has been made to only
fund Project Development at this time. Previous Funding: Project Development = $50,000
CHANGES:
New project in TIP.
FINANCIAL DATA }.
."..
Total Project Cost: 50,000•`•.1 ?# Fut�tf2d:.:;; 50,000 50,000•r.r.v
Spent Through 1990:
1991 Budget + Carry Over: 50,000•.`::::}#1dL'1Ii4eda>»::
Remaining Cost: `........:.........r..........
Period
•::992 ::::<.<.::399q:::>,:•;:.:>:•>::•;fB.95:::>::s:>:
EXPENSES: -
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
geiMMIM
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded •
VIAVS.CORCES.EMMEME:�'::::>�<:::::::.<::.`• <->`>'>>>:» >':�`<'> �:>»`k' # 2}��>:<:<>.>«<::><:: <`'�< '�>; :; :':s>`::: ';%'i >>::?> :>:.
r.rr:r::.>....:.....
File::TIPCIP A.XLS 58 Printed 7/11/91 at 8:48 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12118
Rank: 38
PROJECT TITLE:
S Grady Way/Rainier Ave S Project Development
DESCRIPTION:
This project will grade separate Grady Way and Rainier Ave and provide ramps to connect them. Included
• will be new roadways, curbs, sidewalks, structures, drainage, signals, lighting, signing and channelization.
JUSTIFICATION:
Increasing traffic demands in the area, including proposed development of the Boeing Longacres site, will
create the need for increasing the capacity at this critical intersection.
STATUS:
Will be evaluated as part of Arterial Circulation Study.
CHANGES:
New project in TIP.
FINANCIAL DATA
gOSENEMEMOUMANOW5gCha.--
Total Project Cost. 90,000 ::: >:.Futtded«::: 90,000 30,000
: is
6000
Spent Through 1990: inetagnignIMENSMininggil L:•vv:,
+: {
„„ >...>.
1991 Budget + Carry Over: '^?• i#i'iiLIE1t1
Remaining Cost:
Period
....�'€'EIVx::::<:<:::>:::::<::: ::::::<:::::>:Put�ad Tvt�1:: ::'::::::::1:992�h :::>::�:»:'.:>:a.•.3:993:::�>:':>:::>':»:`:F95A:z':`:�::>:�:'..:>:>i 9�:<::�:<:'•::»:?��� :'t:991I::>�:`::�:�•:;•::......X997`.:::;:..:.,•:.
EXPENSES:
Project Development 90,000 30,000 60,000
' Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
:'gTaN.c.�.S:::'::#:>:<.:::s:n>#nn::: ::i:::%:::::>'::9g9OQ ;:aggiGi:: ::... . ...;:
KQO..Ct:•�:::v::::::::> .>. :>::::;::r::: :::::<:<:��:;::>:::;•:::;<::s<::::��•::::::::::��::><:::;::::::?::<.>.:::•<.<:;>;:�:::<:...:..,...
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee ' 30,000 30,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.1.D.'s Proposed
Mitigation In-Hand 60,000 60,000
Mitigation Proposed
Other
Unfunded
T#3T
.#i::��
bt1. 00:::... O OOQ: :z:<:::::>::;;;:<>:::;>;:;<»::>:::::<r:»>::>:::>.�::.>.>::::::r:>::::>::::::>::::::::�:;::::>::>::':{::<::>::>::::::>:::>:::•z�<{::>::;sz:;:::>s::z<:::
File::TIPCIP A.XLS 59 • Printed 7/11/91 at 8:49 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12115
Rank: 39
PROJECT TITLE:
Miscellaneous Traffic Safety Program
DESCRIPTION:
This program provides for special small-scale traffic safety improvements that are identified and require materials
labor or equipment beyond the normal scope of City maintenance crews.
JUSTIFICATION:
Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for
safety projects to address these needs. Projects are typically identified through citizen concerns, analysis of
accident records or observation by City Traffic Operations and Maintenance personnel.
STATUS:
On-going yearly program.
Traffic operations section identifying and prioritizing locations.
CHANGES:
New program initiated in 1991.
FINANCIAL DATA
R1li/RtV•:7:•.Stee i >.�i4iii:}iir ''�:0:�:viii•i'.ii>'i'n�ii:i�$Q::�i'ri::::;::i::i:;i;i:iii:•i'tii
w.4.:?i•}}S`;isii:4:::j:}'t'vi}:i:i�::::::::::::::::::::ii:::::::::::::::::::nv:::::::•i.....v:...:..........v .vv...vv x::f::.•:::::nv:::w::A::w::is i::.vi::.:v+:•:
Total Project Cost: iiiiiiiiiii 300,000 300,000++::•
:.:«•::tiff«•;:titi.:•:x:
Spent nt Throu h 1990: : . :.::y:ryv:::•+tititi;.:.:.�.i...{.ti r+.•:.ti.i.ii.i.v.i.:.•:.i.4.i.:.•:.i.i.:..:vti..i.}.i:.•i...v.r.v......:...:.:.:r.•::.y:•::•'r
i}:ti�i�••:;n•: "n:>
.:: : :: .. . . .
1991 Budget + Carry Over: tr t det�
Remaining Cost:
Period
MaganiiingITEMONagnin992:>:<:::::::::::::;:::z:;::::>'i:993::::;. ::>:::<:::;:<•1.99?k:: >�`•?:?€:.<:;��<:`�1I!95:::::::>:s:;#:»:v;::m..
.:..1.998:::::.�:�•:.•::::::::::1993:'•?`;`:;::::::;'
EXPENSES:
Project Development
Precon Eng/Admin 30,000 5,000 5,000 5,000 5,000 5,000 5,000
R-O-W (includes Admin)
Construction Contract Fee 270,000 45,000 45,000 45,000 45,000 45,000 45,000
Construction Eng/Admin
Other
:> �<>:>:`:<v' !•'i1Qtf >�> :>�:�::'' 0�`QOt :,fit'/Y.
:: ....:.. ............................................:.........::......................:.....:..:......:::..:...............:..............:.:..
- SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed •
Other
. • Unfunded
{�ii:•:•hY:ii+•iiiiii.'i:•i'riiiiiii iii •: ..
x::::.:340 4<:::�:::::::::::::::•:::::50'OW::.s>::::>:::<:::%::i •::
File::TIPCIP_A.XLS 60 Printed 7/11/91 at 8:23 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 073
Rank: 40
•
PROJECT TITLE:
Guardrail Program
DESCRIPTION:
Replace existing deteriorating guardrail and install new guardrail sections where needed.
JUSTIFICATION:
Properly designed, located and maintained guardrails perform an important safety function in areas where needed.
STATUS:
On-going yearly program.
CHANGES: '
None
FINANCIAL DATA
:.,i r.:nvv:v.::::.::::::..:...: .. ..,;;....vv..:^v:n••v{::•:.::•.:.i'.::::•:::.::::•i 3'i::iiii$.:.::.:...::...:.....:$r. r
ri'}:}i:iii?:n^}i}}:{:i:.i:.ii:.i'r$i::.
'L:.i.... :::�. V {ry:n:{}}:':i•+::•:i:•}}:i}ii}iir::{:;.•:r/,.{•:iiiiii}r;:y%;{;>j'r;::•i
Total Project Cost: 331,500'#_ E{Funded ��•.'••` 331,500
SpentThrough Th h 1990:
r ti>n:}�::i$n:}:::k i::ii:}:::::i....r { : i{::\::::::}^:::::;'.{iti::::'� :Jtii::::%::$}::::{:ti}v:
1991 Budget + Carry Over: 31,500>:` iifif i l tls`':`}• :..:....::.:...:..r.,r.r..::........
Remaining Cost: inIglAmm
Period
?•:t`f •;,:{•:{•;::•;:•::•::.>:•:.:•:•;::•;:;:�::�K {'�`Sita�::�:;. .::.:1.992•:::::: � .. �t.
.�' ........:.:::.::.:{.,............... ... �:::. ...........3. ...:::>:..........�99A:::>:•;:::.::�:;:.;:>:i.895:::>:: .: :�>:::21999::<<.::^.:.:v•::.;;>:;f.9BT�:<
EXPENSES: •
Project Development
Precon Eng/Admin 36,000 6,000 6,000 6,000 6,000 6,000 6,000 •
R-O-W (includes Admin)
Construction Contract Fee 240,000 40,000 40,000 40,000 40,000 40,000 40,000
Construction Ehg/Admin 24,000 4,000 4,000 4,000 4,000 4,000 4,000
Other
. . ..............
.O1QQ...: <:{:�Q OQi1:s:::.>.::•:<:.}::<:<:;50�Q44:::?::::::::::::>::>::>��Q
vm�r.:,....:::•:::,vv...r,s•:.::..,•:::.:•.:::rr::•::;:•x:,�:•,::n:..,,,•i;::{:{::.::....:...:: ..::::::v:......... ..{.r..:........:......... .:•...::.. ......:MEMOS ..f.:.:�:;
........................... : :nv:::iiv:.:{...r........h.......:.::............. :w.w:.v.v+}:.w.::n.......
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
8:.
aYI
.. T
E :::::;::<::.::..:>:.:::::::.::::: :::::.,:.;::.::300 ............50 OOOr::.....::::::50,001).:a;:>:>.:::s:>:•:80'OOD:::::>:�:::>:•<.:::>s:80,000:.:{;{;;•>:;.;:};. .
File::TIPCIP A.XLS 61 .Printed 7/11/91 at 8:37 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 075
Rank: 41
PROJECT TITLE:
S 192nd St / S 200th St - SR 167 to SR 515 Project Development
DESCRIPTION:
Prepare a feasibility, route and environmental analysis for the City of Renton's portion of a new East-West
principal arterial.
JUSTIFICATION:
This is part of a four-agency (Kent, Renton, King County, SeaTac) study for development of a new
East-West principal arterial from I-405 to 140th Ave SE.
STATUS:
TIA grant of $200,000 approved. King County to provide $35,000 and City $15,000. Total = $250,000 for
project development.
$95,000 carryover to be spent in 1991.
CHANGES:
TIA grant has been approved.
FINANCIAL DATA
.....................
x}}:Qf:}:•}:4}}{ilv:++??•{.}}'.�.v:.4nv:::,x:::i}}:•}}:..................x::x::: ::. ! •}}:•}}:+{•}:•}:{4;L}}ii:;•}}}:•}
Total Project Cost: 250,000 ::`€? ;FU ded 2§:11666 15,000 200,000 35,000::
S nt Through 1990• : : :: :.:: . ��: � r : : � MMOWN
;; ,: : , r
:: : .
1991 Budget + Carry Over: 95,000 €€I;ttlftijid0(;
Remaining Cost: : ' 5}
Period
................... .
EXPENSES:
Project Development 155,000 155,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
701AL.£).(E+EN'`E'$l:%}::>::;::::szg:>:::>:.::r{ .r..........
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand 120,000 120,000
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other - King County 35,000 35,000
Unfunded
..tom ::.s.: ::.:.:::::{{:::.,:.}:.::{;:::;::>;:;: »::>::>: .... ..........g. M ::::<r:::�:: <:«:>:::>>>:::��:�::::: :::>>;>:<:>:::�r<::�>::<:>:�:>::>;::>:.»:.:.:.:».>:.>:.:<:.>:{.;:>.}:.:.}}»>:.;..>.:::::::.:
File::TIPCIP A.XLS 62 Printed 7/11/91 at 8:52 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12128
Rank: 42
PROJECT TITLE:
S 3rd St/ Smithers Ave S /Logan Ave S
DESCRIPTION:
Remove signal control from Smithers 8 rechannelize intersection.
JUSTIFICATION:
Will improve corridor signal coordination.
STATUS:
Will be influenced by CBD arterial Circulation Study.
CHANGES:
None
FINANCIAL DATA
a ::E#i< tie€? INEENCI
Total Project Cost: 130,000>>`« ft0000': 30,000 30,000
Spent Through 1990:
1991 Budget + Carry OverRAMffiAtkil > 100,000 100,000
Remaining Cost: r'1 OOO:
Period
a0399.2!0:0:: -
EXPENSES: •
Project Development
Precon Eng/Admin 20,000 20,000
R-0-W (includes Admin)
Construction Contract Fee 100,000 100,000
Construction Eng/Admin 10,000 10,000
Other
Tom' Pf30''OIt4s''
f.1i: .EN�E$::>':<::::::::;:>:>;:>:::s>><:>::;:;>: : :s:>i 3:0•i100>
i•:?:•?:::::::.�:::?::::::::::.......::........::..... .Si:?•?:•?•..: ..:.. ........�::::: {•?. :.v:•??:•???;... ....... •::: :tiff:;+::?::iii?�•?...........r.............:...................... ...rrr.........
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 30,000 30,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I:D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 100,000 100,000
1'�7`AL:SQt1RG�&:<.:::;.:.:..<.:.::::::.::.:.�::.::.:::..::::.�::.�::.. ,0!C1.. ..........................._...........'X30,Gda............................ ..:.:.::.�::::::.::::::::..;r.?:.?:.::>f:;.>:.?::::::::.:::::::::::..:::::::::::::::.:::•.
•
•
File::TIPCIP A.XLS 63 Printed 7/11/91 at 9:07 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12122
Rank: 43
•
PROJECT TITLE:
Monroe Ave NE- SR169 to Sunset Blvd NE Project Development
DESCRIPTION:
Prepare a design report for a new roadway, including curbs, sidewalks, street lighting, roadway
• resurfacing, channelization and storm drainage from SR-169 to NE 2nd and evaluate connecting Monroe to SR-900
(Sunset Blvd) as a through route.
JUSTIFICATION:
Additional North-South route required to meet growing traffic demands.
STATUS:
Will depend on whether development occurs in the area between NE 4th St and SR-169.
CHANGES:
This route changed from Edmonds to Monroe.
FINANCIAL DATA
Total Project Cost: 50,000€>':.s IREunded 50 000 50,000
Spent h
n Through h 1990:
1991 Budget + Carry Over:
Remaining Cost: e5GO0O
Period
..•::::::.:::.:>::{.>::.>::•>:<.>:.:.:.. .............................. :::.:�,,•: .... ......:...........'E..�.,:,:::::.........'#9 ;:.::.:<.:.:;;>.?:{;<.;:...X19!�:: »::>::::::>:::r<.':'���...�...
EXPENSES: •
Project Development 50,000 50,000
Precon Eng/Admin
R-O-W (includes Admin)
. Construction Contract Fee
Construction Eng/Admin
Other
000:• 000..:::::::,..
........... .... ..............:::.:::.::::::::.::..::.>:>:;;:{.:.:::.;;:.,:.:;. . .......................... .....r.?;•>{:.::.; .:...:::;..::.moi •::��:�::::::•:::.,
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other .
Unfunded
TOTIAUSOURCESirii.;WgiiiiiMii.:igii.,ii., '00
........:::::::::::::::::::...............
•
File::TIPCIP A.XLS 64 Printed 7/11/91 at 8:58 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12123
Rank: 44
PROJECT TITLE:
Duvall Ave NE- Sunset Blvd NE to North City Limits Project Development
DESCRIPTION:
Preliminary Engineering study for widening roadway to 5 lanes, includes: curbs, sidewalks, storm drainage,
street lighting, channelization, and bikeway..
JUSTIFICATION:
Growing residential areas use this route which is also becoming a major through route between Renton and Bellevue.
STATUS:
Will be evaluated as part of Arterial Circulation Study.
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 50,000;::;;:::::x:4;#Fuflded >
50,000 50,000
Spent Through 1990: % tri}} f444nh{ vhvv
; : } ? Anwfi : %:knviqw:: vn :
1991 Budget + Carry Over: BWAddd '
Remaining Cost: 8111118104##t
Period
pseilowrotop .:.::.:.: :.... $n : ......... } E � ....3z..
EXPENSES: • -
Project Development 50,000 50,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
v: •r
.:..::::::: : :: : :::::::::::::::.v: :::r:::::.v::::::........:: r...,..:::.•:::::::.::::::::::,�v:.r:::.€rv::::::rr.::.:N.}....:......:::::::..:::::::::..: .�,::...,.::}r::.::..::.,•,�•:f•:::f„�::::::::}:}�}:;}NN:>;;}.,:...}::}:.:
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 50,000 50,000
.Vehicle License Fee
Grants In-Hand
Grants Proposed -
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
t3rAi,.:S..�iJACES::;<>:::::::<::::;;::::.:?:::>:::. .>,:{:;::.R:.,.r.{.r.}}:.}}:.:....................r. .::.::::::{.. ..........................................:...........
File::TIPCIP A.XLS 65 Printed 7/11/91 at 9:01 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12127
Rank: 45
PROJECT TITLE:
SW Grady Way- SR 167 to SR 515
DESCRIPTION:
Rechannelize and modify signals to provide a continuous eastbound lane from SR 167 to SR 515.
. Develop capacity, safety, HOV and property access improvements.
•
JUSTIFICATION:
Will improve traffic flow and reduce congestion on SW Grady Way.
STATUS:
Projected for 1993 start.
•
CHANGES:
None
FINANCIAL DATA
ini..r .. ., ......v.n....v.,n... v.:.,.....v.vn..n........:: t •>iv`:::�::?:ti�}.
E.
:••:::}}:?•}}i:G:^:}:O:•:.::::::......:nv::::::.vr.v::::•w::::::::::::::::{•:v}•ii:•}}+'.:•}}}}+;•4'4i}::•i:iii.....................
Total Project Cost: 260,000:n��`:`` i tided # ' 60 000 60,000
Spent Through 1990: :•:a3rituritl��:":>:��
1991 Budget + Carry Over __,:WIROOA004i 200,000 200,000
Remaining Cost: • ..... :2lE ,D0,¢
Period
:::-»>-;>.}•.>}::.}:.}:{.}}>:-:.}:•::.>:.::.. :s:::::::::.>ii$4:::`:::si::::<::`•:;#'.'#:995':: ::`::`:>:.....1...6...................'.E..V...N
EXPENSES:
Project Development
Precon Eng/Admin 40,000 40,000
R-O-W (includes Admin)
Construction Contract Fee 200,000 200,000
Construction Eng/Admin 20,000 20,000
Other
TOTA1::i�(P�N�ES:«:;>:::::�z�:�;::<>:.:<'?`:.:<: :.`:`•:'::>>::�:::26:Q.
:.::..............................:
..l....n.:.-.?:v:::;C:...:.v.: r.?}}};•};}yr.},y'+:•}:•}i}::::}:•}Y.•f....:.r .
-.:w:.v::nvnvvxn?vv::n,w::::::::�.:{vv?{.},v,..vv.,vvwr}.,•}.??•:J::::.v: vv. :ii�:iFJ}:•k�:ry}:ni}:•i:4:?iit:?:?{•:nv.: ........xxw:::ix(•}:{vnv{w.w.:vvl9h:-.vi i:...........v.n.Av.. •••• 'fir v:::
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License'Fee '60,000 60,000
Vehicle License Fee •
Grants In-Hand
Grants Proposed
L.I.D.'s Formed •
L.I.D.'s Proposed
Mitigation In-Hand.
Mitigation Proposed '
Other
Unfunded 200,000 200,000
A�1���y{�::ii:�i �� {j{I.'.�}X'i4:ti i:(*iijii};i4'}?i is?+i�i:�fi�:itiif�?Y:i: )ii:};:�i�iiiii:ti:ii}iiiiii:?�ii:•ii:�ii::ii riiiti:i<}<SSiiS{i::
:T.(.��:j���:ti; ., �J�j'}irS•`'}::SS'iS:i:;:{}::{;�;:jj::iii:�'i:-jT:i}:�:}j::$:iKfOV{/V
File::TIPCIP A.XLS 66 Printed 7/11/91 at 9:06 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 010
Rank: 46
•
PROJECT TITLE:
I405 / SR 515 Project Development .
DESCRIPTION:
Prepare a design report for the construction of new I-405 ramps to and from the north at SR-515. Scope
. project in 1992. Request grant funds in 1993.
•
JUSTIFICATION:
High traffic volumes on SR-515 now have to pass through, and contribute to, the most congested areas of
the City to access 1-405.
STATUS:
Will be evaluated as part of the Arterial Circulation Study.
•
CHANGES:
None
FINANCIAL DATA
:rr...............v..v,:v:::::::::.................:v....................v:..vv::?i::?•iii:•iii'•i:•T:}:.i>:??i:{.v... .v•:}?}}}}:$}'•:}.r•}:{::4:�'�:'�
Total Project Cost: 60,000E ?'u64e
.pF
Spent Throughh 1990: } hF1E„ , > ; xx { ;? :
1991 Budget + Carry Over: :><::?:aJnfuitled 60,000 60,000
Remaining Cost: %"``'::"::::'{> '::
»:>:>: •:
Period
:
.. . ... ............ :::::>: >':>......... .................... <<>>< >;< '#:$95 :: : `16.:::> ::<: �:<<:>��9...
EXPENSES: • •
Project Development 60,000 60,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
I Tili':EXi EN 8S'%:::::::::igni»:$$$:.<:;s,::'::>:<>:::<:::<:::;gp'.".p, >•':: :^>:#< < <:<z::>:s;;r< 0.00.:;<:>:::: ::::::::>:?<::>:: :<a ' >:>
v.::v::v::::::.,:,v: }:nv::: ::.....,.n............�:f.:.:v.v.........v\............. ........v.,.f.:.....,.,.v..................................:..........\.....,., .,::::.v..v.{•:v}}}}i:v:}.,:.:::.,:{,^�:i`.'�.:"f.,:,i'„:v^}}:'•.•::.v:::.v:.�:...
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 60,000 60,000
File::TIPCIP A.XLS 67 Printed 7/11/91 at 8:51 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
- Div: Transportation Systems
Fund: 317
Proj: 12120
Rank: 47
- PROJECT TITLE:
SE Puget Dr-Jones P1 SW to Edmonds Ave SE
DESCRIPTION:
. Roadway reconstruction and resurfacing to include: curbs, sidewalks, street lighting, channelization and
storm drainage.
- JUSTIFICATION:
This project would extend the improvements of SE Puget Drive further east into the growing residential area.
STATUS:
Depends on growth rate and availability of funding.
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 1,010,000ti`: 's Funded.:.; ,
Spent Throughh 1990: '. 04d •
: : . . .. .. .
;i ? t } rY
1991 Budget + Carry Over: 1,010,000 1,010,000
Remaining Cost: Miegggia
..::.............
Period
•�:.;:•:.>:{.�:..:,:,....:�.::.{,::.�:.��iVl::.:::.>::::::..::.::.::::,:.•,:Pei.[btl.:.��i ::;.:::.�::::t.S9�::::::z:..;:.::•,::.:99',3..:::,.,.:,:,::nti9!X.::::::,,.�,:{.::{{.1?.9�:•;:<::<::::ss::;;;s::..�6:•;:{.;»:{.:•;:{;{.r:•:.��............
EXPENSES:
Project Development •
Precon Eng/Admin 136,000 100,000 36,000
R-O-W (includes Admin) 10,000 10,000
Construction Contract Fee 800,000 800,000
Construction Eng/Admin 64,000 64,000
Other
IM"AL:.£APgNSE3::.::.,::,:{.;:,:{:.:;:r.N:•ar;:;:: :::.;>::.;:;•91.
SOURCES OF FUNDS: -
1/2 Cent Gas Tax
Business License Fee •
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.1.D.'s Formed
L.1.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 1,010,000 100,000 910,000
TQ'.l'A3::St)i1R.CES:<::::::::: ::::::::.<.<::::::::::>::::::<:::::::::::::>::::?:::'#:;Q'tO,OG.. ..........................._........................................ . : ..:�::..........91Q�!tl�d0 .....................>.................................:
File::TIPCIP A.XLS 68 Printed 7/11/91 at 8:53 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12124
Rank: 48
PROJECT TITLE:
N Park Dr- Lake Washington Blvd to I405 Project Development
DESCRIPTION:
. Conduct preliminary engineering study to facilitate traffic flow on N Park Dr to and from I-405, including
analysis of high occupancy vehicle facilities.
JUSTIFICATION:
Extremely high traffic volume area impacted by Boeing/Paccar industrial traffic and by I-405 overflow traffic.
Providing HOV access on Park to and from I-405 is much desired by Metro.
STATUS: -
TIA grant to be sought with Metro and/or WSDOT to be requested to provide the "other" funding.
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 60,000%>< ';,,. flded= :•........................
SpentThrough ThrOU h 1990:
'� {�j!�l'(� :i ? '�� � <•.'•.>< <`>��<?�� >'•>�?"�^"k <:��<�''i
1991 Budget + Carry Over: ':•`.'•. tided: 60,000 30,000 30,000
Remaining Cost: MINETWO
Period
x..:.m..:.,:•...:v.::.. 'f...n..................:..... ... .. ...5..... .....4� .........:.... 555:•}?::.....
{:.:tr{LC:::�:Yt7.v!::..:{<.SS.:::{rtg1n7.Y.6::::t:<::::.Y:::ri.::M7IVEN
EXPENSES:
Project Development 60,000 60,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
5:..\.
. :{ ....... .::: ............. x:h:�in5:5i5i:::•55v is{i::v i}.>.:v w:•1.•v:.........r..
17`0.AL� 51 .. ��:..5•:::.5:.:;•5:•;:•:iiil�QO::.5:{•5:•:{•:.>55:.55::.;:.5:..{�5:{.:-5:::.<:.::S:.:BO oD05::.5:.:55:.;:.5;55>::>::;:;:>::>:<:>::>::::>::;:{{:;:::5:::{::.;'<:::::::<:....::..�.:..�:.:.::.... ..,.,.
..>.�`:. . � � 3:::::::..:::::.::>::::.:5::.5:.5:.:. ............ ::. �.........:....... ....:........ .....5.5.....5...
..:.::.,:..r<.:..::::.::s::::::::::::::,:5:.55555.iris::.::s:.�::::..:...:..:::.::::.�::::::::,:a::::::::.::::::::..:..:.,::::..:::::..:.,.:.,:..:.,:.:::::...........:........:.::.�:::::::.:.::: :f.::.. :.:::.:,.:f:....:..::.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee -
Vehicle License Fee
Grants In-Hand
Grants Proposed (TIA) 30,000 30,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other (Metro/WSDOT) 30,000 30,000
Unfunded
.........:... :...... ..::
File::TIPCIP A.XLS 69 Printed 7/11/91 at 9:02 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992.- 1997
--- CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12125
Rank: 49
PROJECT TITLE:
Aberdeen Ave NE-NE 20th St to NE 27th St Project Development
DESCRIPTION:
Prepare a design report for reconstructing existing roadway, provide curbs, sidewalks, street lighting, water
and sewer mains, channelization and new traffic signal at NE 27th' St and Aberdeen Ave NE.
JUSTIFICATION:
Project will be needed when water and sewer are extended into this area and development increases.
STATUS: -
Will depend on land use actions that occur in this area.
CHANGES:
None
FINANCIAL DATA
?nti}:i?•:{?8}}:4 :???{r{•}:?4:?:{x:?,;::{n};:i.}:+i^}:?.}}:4::::,}.i•:.y,:•.
:iii:>:i::;•:ii i^r•:+:.'? i<'i}iiiiiiiiii ii<}}}::•..}}}}}
•>i}:::..v......v::::::.......:::....?fi+�.r *.:.iy}w:. ::.v?•}F.4:a ........,,..n.: x.,
:.::.k.��.:.�4r}:�:4•i}:�:�::is}%:;r}:;}:;..}•.: i:if;}%uiii}:rf ..}.,.:...::...:.:....::}::•:
::::::::::::::::::::::::::::...::\?w:::n:w::nv.4::::.v:::::.vR::.v.,•A:w:.4.4 ........... }'•'{:'v......'.:}:?:::::.,{??i:??+:Citi+.fviif.?iv:?4:}::f.?•:nv:v:•
Total Project Cost: - 40,000;`:': MFu 4e l•<':
Spent Through 1990: ? % ii � iwiii :ip::::11111811018:
n
xrxvv :! : vxw
_ 1.991 Budget + Carry Over: WANOWded0 40,000 40,000
Remaining Cost: gloginow
Period
:..,...;. �..Ili:::::i>::>:;:::::::::::�::;:r::::.......I.10.st..1....... :•}:•}}::•. �:.`::;,:.:'•.•:::::r::•'•�'9 '.•::�:•:.,•...,•::::::..:.....
EXPENSES:
Project Development 40,000 40,000
Precon Eng/Admin
R-0-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
:'il:i::j:i}}:•:}::^w:::. ti i::Gi}'v:gii�i:i}::;:;:;:;tiryi::; } Si::?; :i:•:}�i�i:i::Sriir::i%::y g
T ..y �.v�. +�`$S:•:::::::::.�•: ...:..::...c........40 . 0:�}:.,..?;>:;;::<::.}}}:.;•.}}::.:::.:.;;•:.. ...!i0 OD.(I::�:?�%�?�:�::::::::�::�... ..,i
..Q!'}lL,.�Ai'�1!1 ...:r}.::.:.:::.,?..}:,...,:.,......... ...:..:.....:...> ...r:.:} /........... :}.. .�.:......::::..::: ::. ?..�:: •}::::.}:�:.}}�.}•..:;';<.}:..+•:.»};•:i?•.+•:?:;:•:i'?.:?ct•:.'•;.:x.}}•,:.<i'>.;/six
.:n.....r......::}::n�:::::::r:..................r.....}.,r.,.......•::•:::i::•rrrri:0:. �::: ...:...,..:.:.r.......{4%...r:....i:i•:.v:::. ../.i..xi:n..r.n..l.... }�....
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 40,000 40,000
Other
Unfunded -
�� :iii>iii::>:psi::i::;;i:.;•:::::.•:::r:•r.:::.
:.:. .;:. �::5.0.1113'CE$:::::::::':#::<.::<:>:::<:::::::;: ;: :<:= :::<:>:::::::<:::<:+�1 Ot1Gii :•::::•::•:•:.�.�:::::•:.,.;::........:... _ ...... .......................
File::TIPCIP A.XLS 70 Printed 7/11/91 at 9:03 AM.
. CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12129
Rank: 50
PROJECT TITLE:
Benson Rd S/ S 31st St
DESCRIPTION:
. Install a complete actuated traffic signal at Benson Rd S and S 31st St designed to provide for possible future
Benson Rd widening.
JUSTIFICATION:
Location is approaching signal warrants and traffic volume is.increasing. Signal will reduce side street delays _
and improve safety.
STATUS:
Projected for 1993 design start.
CHANGES:
None
FINANCIAL DATA .,�,�,t
ii:?•{:j:�i:j::�:::�}:}ii'rit::$•}p1}i•::::::::::n:g:::ri'<ii{{:}ii:n.:::n n..n•.: r........rijf:�:iirii•:Si: ��:vti�iii:'v�:'vii.'•i::� i::....:.......r.:........
Total Project Cost: 130,000;::;::::x::;:;Eun ed�::::
Spent Through 1990:
1991 Budget + Carry Over: :'•. €sjiridd 130,000 106,000 24,000
Remaining Cost: ,•:•-Ute:
Period
EXPENSES:
Project Development
Precon Eng/Admin 20,000 20,000
R-O-W (includes Admin)
Construction Contract Fee 100,000 100,000
Construction Eng/Admin 10,000 10,000
Other
: : v: � i•}•::::::::::p•.�:::}rr.�:::{•v.�w;;r.r... }n„��y .:................... ... '.,.v:•:•:::. ��J�j ::•.G::�,�.�::}v.:•...
• t:.t:•::.�::n::••:,:;•::::•:}::•}x. •:•}}}};{ry.�::{:::........:• p/{�;::<:}}{:r:: 4A ..........:..... .:r}.;...r......n......n... r...}.,n.::•
AL.IrXXPEN :i.•}}:•.iv}ii..............:r..... ...4. O... :•:}:E.1. .r:}:4::•}:•}%:•}}:6:•i}:3:4:Ox:::m::::::...........:.
................. �� `�.��.!l.Y..... ..........•::.. ...,•::::.,••2q!!.Y.Y:Si:�::>iti.......Y`..T.T.':':':•:?2•'.i':;r5:4;:}:::�:}:�:::;::•:...
•Yr}}.i•:.}:xn:p:::.:::.:::v:::�4:.•rr:•}};y}:o,•3:••::}}::{:y}}:•:... .:...}:r:}•Lt.':..:.....:.nvt�:.i}Yii..?ii:n}}:•}}:.}}:}:.i'r:>:::j:}:::::i}::{::::r:::n.:::.: t•w,v:w:•:•:L :iir:{:.Y:<:::.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed 106,000 15,000 91,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 24,000 5,000 19,000
.. •.
OPAL}S 0�0...... MUR:MC(1).(XY
OQO:z:�::�:�:�:�:'•':'•11:0'000: ;::z::'•::>�>::�:<:s;:'•>::#>::;::::::z::i::.<.::::::::>:`::�s=:':::::»`::'. >::>:z�::»'s:«:::>::::::
.......................................................................:.............
File::TIPCIP A.XLS 71 Printed 7/11/91 at 9:08 AN.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
-- Fund: 317
Proj: 12130
Rank: 51
PROJECT TITLE:
S 3rd St /Rainier Ave S
DESCRIPTION:
Design and construct a signal modification to provide for exclusive double left turn southbound lanes.
JUSTIFICATION:
Will improve traffic capacity and reduce delays.
STATUS:
Projected for 1993 design start.
CHANGES:
None
FINANCIAL DATA
'^•::•+•• :•iii:•ii:•::�:Y:i:iBiiiT:i!}iiiii:•i}ii}i::.iiii:
?ilii:iii;iiii ilii iso:?viii:�ijiiii:•i:................... :i•;:•ii:•iiiiiiYti•;:�ii:<'{:i`vii:is;;::i:•;::•ii' :.::..
Total Project Cost: 54,000 ': :`. gded
Spent Through 1990:
1991 Budget + Carry Over: > itifaunded;**'% 54,000 44,000 10,000
Remaining Cost: mitnnim
Period
:::::<:::.::::.:::.:::.:::.::::::.1T..M::.;:.;::.:.<::.:;.::..;..;;:.i:.>::;• it'gal`f0C:::T0�::.........:�.; ::::>:<:::�::.............. ................... .. ... ... ...... .. ......, ..:
EXPENSES:
Project Development
Precon Eng/Admin 8,000 8,000
R-0-W (includes Admin)
Construction Contract Fee 42,000 42,000
Construction Eng/Admin 4,000 4,000
Other
:::i ii::;rN:
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed 44,000 44,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 10,000 . 10,000
-
File::TIPCIP_A.XLS 72 Printed 7/11/91 at 9:12 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12131
Rank: 52
PROJECT TITLE:
S 2nd St /Rainier Ave S
DESCRIPTION:
•
. Relocate existing east-west crosswalk to eliminate ped-vehicle conflicts. Construct pedestrian island in
middle of S 2nd St from which pedestrians can cross Rainier Ave. -
JUSTIFICATION: '
Enhances pedestrian circulation and safety and provides for enhanced signal operation and coordination.
STATUS: -
Projected for 1994 design start.
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 234,000 :` w;?s<Fiinded1::
•
Spent Through 1990: WIIIIIMISIIWIWOONONANOW18.018.11111111II
1991 Budget + Carry Overtlig nded ; 234,000 176,000 58,000
°..... _ >'23
Remaining Cost: 4O0O'
Period
.fi
............ :::ITS ':€:>�:�:>::«: :>� ':`::�:�'�:;::.:::>ri::` :.:s.......
EXPENSES:
Project Development
Precon Eng/Admin 36,000_ 36,000
R-O-W (includes Admin)
Construction Contract Fee ' 180,000 180,000
Construction Eng/Admin • 18,000 18,000
Other
�:bTA�.IXP..EN�ES:::�.::::.�.:}:}};}}}:;:r•>}}}::<.:..}:�:�-�:.}}::
23+I�OQO>�:::> :>::$$$:z:>$;.:.}:::::::..:.�::.:::::::::::}::::.:.::::::::::.::::.380 ;.:;.},;..::.:{.}. ...... ,.....:.,,.,,..,,..,.:..:.}:
.:. ................................::::::...., �,:�...... .............,:............................................. : ........... ..::.:...:E'�8 600:::•}:::;:>.>:.}•.}}:.}}:{.}.�:•}}}:•}:•:::::._:::...�:.::•::::•:..
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee • •
Vehicle License Fee
Grants In-Hand
Grants Proposed 176,000 26,000 150,000
L.I.D.'s Formed .
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 58,000 10,000 48,000
....................................
File::TIPCIP A.XLS 73 Printed 7/11/91 at 9:12 AM.
•
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12133
Rank: 53
PROJECT TITLE:
Sunset Blvd NE/Anacortes Ave NE
DESCRIPTION:
. Realignment of intersection and construction of traffic signal.
• JUSTIFICATION:
•
Safety and operational characteristics can be improved by eliminating off-set of intersection.
STATUS:
Funding will be generated through development mitigation.
CHANGES:
None
FINANCIAL DATA
:::::::::::.�:::::.�:::.::�::::•::: ,•:.;;....;•;:.•;:.::iii.;:.:•:•;;:•:^�•... .<.........
............. :::.:..:.:.::.:... ........................
.................. .....................
Total Project Cost: 278,000 `. >.? urytted ::
Spent rough 1990: �titi atlan;:i.::::
• 1991 Budget + CarryOver: '>:'>` : *:
............................'•`:•::•:1y;Munded_i:' 278,000 278,000
Remaining Cost: '....... '>27:8DQ0
Period I
MSE.I.:EiaggfIVIMIEMME _
EXPENSES: •
Project Development •
Precon Eng/Admin 36,000 36,000
R-O-W (includes Admin) 50,000 50,000
Construction Contract Fee 175,000 175,000
Construction Eng/Admin 17,000 17,000
•
Other
...�?' r..8I3 OD.tI>::::>::>:<:>:�i92 000:::::x::°:>�:>:�::;r:>::.,....... :.,.�.•.
.......r : 4: ::::::w:^:::•i:•}::9:::•:::•i:•:i:is-0:Liii ::: :: ......... n..................................n..........................:.r..r.k..,v.n•.x.n....r.::r.•iii::::::}::::::i ii:ii:•::•::•i
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee •
Vehicle License Fee
- Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand '
Mitigation Proposed 278,000 86,000 192,000 ._
Other
Unfunded
TOTAUSOURCEWiffliMiNiMME:i;
File::TIPCIP_A.XLS 74 Printed 7/11/91 at 9:14 AM.
• CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Hero
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12132
Rank: 54
PROJECT TITLE:
Other Valley Improvements
DESCRIPTION: •
Design and construction of transportation improvement projects identified to meet future traffic demands
within the Valley Transportation area.
JUSTIFICATION:
This program will construct the projects identified by the Valley Transportation Plan.
STATUS: -
Plan is being re-evaluated.
CHANGES:
None
FINANCIAL DATA
magnitio .:;: ::
Total Project Cost: 18,000,000.genii0dil
Spent Through 1990•
.::.C'� Ali1&'•»'•» > s:>�t#�`:::;`:#�:> ::•.`:::`"::::::#:•'::::::�:::::>::>#:'•>�:::::::::::::.>:::::'•>::>;:•::•;:•>:•;<:•:
1991 Budget + Carry Over: #:':.'.'>.a� CYited ':. 18,000,000 10,1300,000 7,200,000
Remaining Cost: 13800000Ds
Period
EXPENSES:
Project Development .
Precon Eng/Admin 2,176,000 1,451,000 725,000
R-O-W (includes Admin) 2,000,000 1,000,000 1,000,000
Construction Contract Fee 12,800,000 6,400,000 6,400,000
Construction Eng/Admin 1,024,000 512,000 512,000
Other
�0':[}lig:Fa(P1N�£3• �`:::'s:�`:<z<'•>:::>:>::>:"`::<:`•-::�#::�:: '000'>'•••.`•>':s>??'•>'.>?>': <><'•'.::>•i `•a''•z:<:>::>'<#>M:#'•>:`%s :• `#::#>s>' 37' �'•li 1 : Q>
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee •
Vehicle License Fee
Grants In-Hand
Grants Proposed 10,800,000 1,471,000 5,182,000 4,147,000
L.I.D.'s Formed
L.I.D.'s Proposed 7,200,000 980,000 3,455,000 2,765,000
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded •
�..S9. ...G S..............:..............,...........
0;00.(400.0i.MiM.::.:;::.:;:.:>:.;:.;:.:::.:;;.;:.;:.:.;:.:.:.;:.;:.:;.;:.;:.:.>.•.::<:.:::::.:.:::<:.;::::«.;;:.;:;.::•;;I,4....cOttQ.......:8,8S..,Q00•. .::::::..sol20i14.
File::TIPCIP A.XLS 75 : Printed 7/11/91 at 9:14 AM.
ABBREVIATIONS AND ACRONYMS
- The following list defines the abbreviated words or acroynms used in the City of Renton's
Six Year Transportation Improvement Plan 1991 -1997.
BRAC - Bridge Replacement Advisory Committee
CBD - Central Business District
CIP - Capital Improvement Program
EB - East Bound
ER - Emergency Relief
FAS - Federal Aid Secondary Program
FAUS - Federal Aid Urban System
HES - Federal Aid Hazard Elimination Program
HOV - High Occupancy Vehicles
UD - Local Improvement District
METRO - Municipality of Metropolitan Seattle
MUTCD - Manual on Uniform Traffic Control Devices
NB - - North Bound
Precon - Preconstruction Engineering/Administration before project is started
PS&E - Plans, Specifications,and Estimates
ROW - Right of Way
SB - South Bound
SCATBD - South County Area Transportation Benefit District
SOV - Single Occupancy Vehicle
SWIBS - State of Washington Inventory of Bridges and Structures
TBD - Transportation Benefit District
TBZ - Transportation Benefit Zone
TDM - Transportation Demand Management Program
TIA - Transportation Improvement Account (Administered by TIB)
TIB - Transportation Improvement Board
TIP - Transportation Improvement Plan
UATA - Urban Arterial Trust Account (Administered by TIB)
VMS - Vehicle Master System
WB - West Bound
WSDOT - Washington State Department of Transportation
76
PA lfs* '? SE 64th Pt
SE 86th
SE 68th ST PL SE 68th
SE 5;th
7�4
SE 72nd ST
SE 72r?d ST
&
ai �5 SE 73rd ST
5* ST
00
SE 78
SE 76th P1 75 Pt
-17th PL
Z
SE SE 81 st
SE Ud
N Cth ST
SE 84th ST
38th ST b
SE Both
37th
N .36 STFME 38th ST SE 8ft ST
a,
N 35th ST 49 SE 89th SE
N 34th ST < N J4th 571z
S
N 33,d PL PL
NE 3 Rd ST SE gist ST sL
5 N 33rd ST
N 32rd ST N
ME 31ST L*/ 0
st SE
N 31st ST YAY LREEK gist
❑ N 30th
N 29th S 44
2 E:N :29th R� 14 2ft ST NE 29th ST 0
4 ST
5 N 26th SE 96th 38th ST
tg NEh PL 25t
1�41
NE
#h ST W 24th ST j), SE loft ST
C� 2.'(d PL
SE IGI�t 6
SE 1021d F-jF-� YE 23rd
NE 2Yd "E 2,Vd ST
21.t. ST Pv`SE 10ad S7 22id V 22nd
NE 2ft ST ;1� NE Nth SE ic4th 3T
L A'K E "N A S H 1 C041 G T 0 INE > "ah
lQth ST
>
4 NE 19th
16� ST
17b� 47
NE 16th ST Nt 17th SE 107th PL
14th
12
>
NE l2th ST o ❑ ❑ � � � <
JUK] 5
E - lAth,p 11<
p
F EKT� �qTl W 11th
Nt ?It) I t. Z'
F-D ah U� HE 1-th
I
F❑I I�- PL Ki!W irth CT < ❑ �_❑�
[--�-
❑4 E I Cthi' NE
>JFS-IF117th 14E I oth Oth ST SE 118h
F-] FEE-, 7�17bih] PL NE ?-h PL Q I Si S'T---]
38 ST
loth P r. NE 9th ST F NE
FD ftpt Lj
SE ll&h
❑
39 48
126d, I ❑L��
A41 bi
N th ST
EQ F WftsT
112 3;1 NW 7th 38 54 ME -1th ST xI M 7t > SE 12Dth
A <
10 58"NE em 6th PL
N ft ST >
F124 sit,
Hw 37 -4;, ❑NE 3T ❑ 47
❑NE 5th ST Nw sth ST >
> W 5'�h ST
:;j < SE 125th
h S1 60
4th 126th
-9 4 4
3
3 8
< El
1� Lj 62 J NE 3-d
5% >
A
ti
,tea S7
S7
M4 'Ind ST
Ali S 16
*Y
s 2nd 14
63 'z: M PL
'If 6
66
4� Soo 4 5
IL
SE 5th 9
'ot
24 75 77 s 6th ❑
SW j -?bh ST 7th ST
32
Pal k Rld4i
69 < ❑ <_
S1 MAP
S RE4 TCN 4ita PL
AV
ih ST S 15th a 3P
SE 16th K
2
24 7 SW 30
157th
ST 29
aUU 3i
SE i3t ST��Q \J
SW 23rd ST S 2jrd ST
26 SE 180th
SE 16:nd 5,,r
S 25th ST
S'N 27th S7
sw SE isft 5T ZZ
46 27th ST S Z7th ST
72 - 't -- In
SW lima SE 1 ON §t, 29th
30th
SW 313t S 31st ST SE 15ft ST
SW 33rd t8
N
>- sw 34th ST sw
74
S 172nd ST SE Principal Arterials Collector Arterials
sw S 36b� 2I. Airport Way from Rainier Ave. S to Logan Ave. S 48, Shattuck Ave. S from S 4th St. to S Grady Way
24 j7t� S7 . Bronson Way S/Bronson Way N from Main Ave. S to Sunset Blvd. N 49. Park Ave. NIN 40th St. from N 30th St. to Lake Wash Blvd. N
3. Logan Ave. S/Logan Ave. N from Airport Way to N 8th St. 60. Burnett Ave, N from Lake Wash Blvd. N(S. Term.) to Lake Wash Blvd. N(N. Term.)
SW 3ft 3T 4. Logan Ave. S/Smithers Ave. S from Airport Way to S 7th St. 51. Aberdeen Ave. NE from Sunset Blvd. NE to NE 27th St.
RR 6. Main Ave. S from S Grady Way to Bronson Way S 62. NE 16th St. from Jones Ave. NE to Edmonds Ave. NE
6. Maple Valley Highway from Sunset Blvd. N to East city limits 53. NE 12th St- from Edmonds Ave. NE to Union Ave. NE
73 sw 41st 7. N 3rd St. from Logan Ave. N to Sunset Blvd. N 64. Monroe Ave. NE from NE End St. to NE 12th St.
8. N 3rd PLIN 4th St. from Houser Way N to Logan Ave. N 55. NE 2nd St_ from 'Monroe Ave. NE to City Shops entry
M 9. NE 3rd St./NE 4th St. from Sunset Blvd. N to East city limits 66. NE 10th St. from NE Sunset Blvd. to Monroe Ave. NE
A SE 17ft ST 10. Park Ave. N from Bronson Way N to N Park Dr. 57. NE 7th St. from NE Sunset Blvd. to Monroe Ave. NE
11. N Park Dr./NE Park Dr. from Park Ave. N to Edmonds Ave. NE 58. Edmonds Ave. NE from NE Sunset Blvd. to NE 3rd St.
teat 12. NE Sunset Blvd. from Edmonds Ave. NE to East city limits
21 59. Bronson Way NE/NE 4th St. from NE 3rd St. to Jefferson Ave. NE
13. Rainier Ave. N/R&inier Ave. S from North city limits to S Grady Way 60. Taylor Ave. NE/Taylor Pl. NW from Renton Ave. Ext. to West city limits
14. S 2nd St. froin Main Ave. S to Rainier Ave. 9 61. Meadow Ave. N from Bronson Way N to N 4th St.
15. S 3rd St. frorx Rainier Ave. S to Main Ave. S 62. Factory Ave. N from Bronson 'fay N to N -1-th St.
4ft PL 16. Renton Ave. Extension from Rainier Ave. S to West city limits 63. SW Langston Road from SW Sunset Blvd. to West city limits
17. SW Sunset Blvd. from West city limits to Rainier Ave. S 64. S 3rd Pl. from Rainier Ave. S to Shattuck Ave. S
bs 18. Sunset Blvd. N from Bronson Way N to FAI 405 65. Shattuck Ave. S from S 2nd St. to S 4th St
72 19. Houser Way S/Houser Way N from Main Ave. S to Bronson Way N 66. Whitworth Ave. S from S 2nd St. to S 4th St.
20. S Grady Way from Rainier Ave S to Main Ave. S 67. Morris Ave. S from S 2nd St. to S 4th St.
21. SW 43rd St-/S 43rd St, from West Valley Road to Talbot Road S 68. Burnett Ave. S from S 2nd St. to S 7th St.
22. Talbot Road S from S 7th St. to S Puget Dr. 69. Monster Road SW from S 140th St. to SW 16th St,
23. Benson Dr. S from S Puget Dr. to South city limits 70. SW 16th St. from East Valley Road to Monster Road SW
24. Oakesdale Ave. SW from SW 43rd St to Sunset Hwy. 71. East Valley Road from SW 16th St. to SW 43rd St.
25. N 8th St. from Logan Ave. N to Park Ave. N 72. Talbot Road S from S 16th St. to South city limits
73. SW 41st St. from East Valley Road to Oakesdale Ave. SW
74. SW 34th St. from East Valley Road to Oakesdale Ave. SW
75, Hardie Ave. SW from SW Sunset Blvd. to Rainier Ave. S
SE 19ft ST 76. Jones Ave. NE from NE 16th St. to NE 28th St.
LJ Minor Arterials
26. Benson Road 3 from S Grady to South city limits
EF 27. Lind Ave. Sw from SW 7th St. to SW 43rd St.
28. SW Grady Way from Rainier Ave. S to West city limits
29. S Puget Dr./Puget Dr. SE from Talbot Road S to Edmonds Ave. SE
30. Edmonds Ave. SE from Puget Dr. SE to South city limits
31. 9 4th Pl./S 441a St- from 'Rainier Ave. S to Main Ave. S
SE 199th 32.
S 7th St./SW 7th St- from Burnett Ave. S to Oakesdale Ave. SW
S 260y, H
ST ❑ 33 Mill Ave. S from Houser Way S to Bronson Way S
34* S 2nd St. from Mill Ave. S to Main Ave. S
35. Wells Ave. S/Wells Ave. N from S Grady Way to S 6th St.
36. Williams Ave. N/Williams Ave. S from N Sth St to S Grady Way
37. N 8th St. from Park Ave. N to Garden Ave. N
38. Garden Ave. N from Bronson Way N to N Park Dr.
39. N 8th St. from Park Ave. N to Garden Ave. N (North Leg)
40. Sunset Blvd. NE from FAI 405 to NE Park Dr.
41. Union Ave. NE from South city limits to North city limits
42. Edmonds Ave. NE from NE Sunset Blvd. to NE 27th St.
43. NE 30th St./Kennewick Pl. NE/NE 27th St. from FAI 406 to Edmonds Ave. NE
44. N 30th St. from Burnett Ave. N to FAI 405
45. Lake Wash. Blvd. N/NE from N Park Dr. to North city limits
48. SW 27th St. from West Valley Road to East Valley Road
47. Duvall Ave. NE from North city limits to South city limits
EXHIBIT F
HEARING . ......... .
ADOPTED
RESOLUTION
rn
0