Loading...
HomeMy WebLinkAbout1992 Correspondence March 23. 1992 Renton City Council Minutes. Page 145 of all consultant contracts used in the City be-provided to Council for review. MOVED BY STREDICKE, SECONDED BY TANNER, COUNCIL ADOPT THE COMMITTEE REPORT. CARRIED. Public Works: Referred 3/16/92 - Transportation (Aviation) Committee Chairman Park/Lk. Washington Stredicke presented a report stating that the Committee recommended Bl. Intersection concurrence with the Transportation Systems Division staff Improvement recommendation to approve the design for the Park Avenue North/Lake Washington Boulevard intersection improvement project. MOVED BY STREDICKE, SECONDED BY TANNER, COUNCIL ADOPT THE COMMITTEE REPORT. CARRIED. Councilwoman Mathews requested that the Administration coordinate plans with the Parks Department before proceeding due to potential problem with traffic circulation. • WSDOT: Traffic-Flow Referred 3/2/92 - Transportation (Aviation) Committee Chairman Study, 1-405 & State Stredicke presented a report stating the Committee recommended • Routes, Kline (CAG- concurrence with the Transportation Systems Division staff 004-91) recommendation to amend the Transportation Committee report, dated 3/9/92, to include the approval and execution of Task Order #6 of the consultant agreement with David Kline and Associates (CAG-004-91). The Committee further recommended that the Mayor and City Clerk be authorized to execute Task Order #6. MOVED BY STREDICKE,' SECONDED BY TANNER, COUNCIL ADOPT THE COMMITTEE REPORT. CARRIED. Councilman Tanner stated his opinion that it was inappropriate for Council to oppose ramp metering while endorsing implementation of a traffic flow study that includes ramp metering. Public Works: Referred 3/16/92 - Transportation (Aviation) Committee Chairman Pedestrian Signal, Stredicke presented a report stating that the Committee recommended Houser Way, concurrence with the Transportation Systems Division staff Liberty/Cedar River recommendation to approve the installation of a signalized pedestrian Parks crossing on Houser Way North between Liberty Park and the Cedar River Park. This signal will be interconnected into the signal computer system. to allow coordinated traffic movement on Houser Way, as well as provide pedestrian access crossing Houser. This installation is to be funded from the Six-Year Transportation Plan (TIP) walkway program and the TIP miscellaneous traffic safety program. MOVED BY STREDICKE SECONDED BY TANNER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Police: Property Use Councilmembers Stredicke and Tanner requested that the Administration & Parking, Second.& and City Attorney investigate the Bryant Motors property at Second and Garden, Bryant Garden to determine whether it is in violation of City regulations, and Motors that the Police Department investigate the Second and Garden intersection. to determine whether illegally parked vehicles are blocking the stop sign. AppRovE D 3-a5. 9�- � 1 TRANSPORTATION COMMITTEE COMMITTEE REPORT MARCH 23, 1992 PROJECT: PEDESTRIAN SIGNAL ON HOUSER WAY TO CONNECT LIBERTY PARK WITH THE CEDAR RIVER PARK. (Referred 3/16/92) The Transportation Committee recommends concurrence with the Transportation Systems Division's staff recommendation to approve the installation of a Signalized Pedestrian Crossing on Houser Way N. between Liberty Park and the Cedar River Park. This signal will be interconnected into the signal computer system, and it will allow for coordinated traffic movement on Houser Way, as well as provide pedestrian access. crossing Houser. This installation is to be funded from the 6-Year TIP Walkway Program and the TIPMiscellaneous Traffic Safety Program. Z—,---741-64z0 /AO' chard Stredicke, Chair • !V . Jesse Tanner, Vice-Chair rTh.,a_11.4 Tim Sc 'tzer, Acting M: ser cc: Mel Wilson Karl Hamilton KJH:mr ww\committe\podsig March 16, 1992 Renton City Council Minutes Page 134 8) CAG-091-90 - Alpha Engineers for bridge inspection 9) CAG-092-90 - H. W. Lochner, Inc. for bridge inspection Refer to Transportation (Aviation) Committee, CAG: 91-066, Airport Transportation Division submitted consultant contract Task Orders 9 & 10 Improvement Project,, with.TRA (CAG-066-91) for Airport runway pavement overlay design TRA and construction supervision; required expenditure $117,260. Refer to Transportation (Aviation) Committee. Public Works: Transportation Division submitted Park/Lake Washington Boulevard Park/Lk. Washington intersection improvement 70 percent final design for consideration; Bl. Intersection required expenditure undetermined at this time. Refer to Transportation Improvement (Aviation) Committee. Public Works: Transportation Division requested authorization for installation of a new Pedestrian Signal, pedestrian traffic signal on Houser Way to connect Liberty Park with the Houser Way, Cedar River Park; required expenditure $60,000. Refer to Transportation Liberty/Cedar River (Aviation) Committee. Parks MOVED BY KEOLKER-WHEELER, SECONDED BY TANNER, COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED._ CARRIED. CORRESPONDENCE Correspondence was read from Leslie D. Allen, broker, North Pacific Utility: Sewer Rim Realty, Inc., 94151. 35th Avenue SW, Seattle, 98126, requesting Connection, Sunset approval to connect to City sewer for lots 1 & 2, Block 5, on Sunset Hwy., Lots 1&2, Highway. MOVED BY.KEOLKER-WHEELER, SECONDED BY Block 5 , SCHLITZER, COUNCIL REFER THIS MATTER TO THE UTILITIES COMMITTEE. CARRIED. OLD BUSINESS Referred 3/9/92 - Planning and Development Committee Vice-Chairman Planning & Stredicke reported that the Committee received notice from the executive Development board of the Puget Sound Regional Council (PSRC) regarding two Committee amendments to the bylaws of that assembly. The bylaws are being. Planning: Puget Sound amended in two ways: Regional Council Bylaws Amendments 1) The previous language provided "that if the President or Executive Board determined that an emergency exists, they may make a written finding to that effect." The new language will clarify that either the president or the executive board may make that determination. 2) The second proposed amendment relates to the first. In the event either the president or the executive board determinesthat an emergency exists, a special meeting may be held on telephonic or written notice delivered to each representative at least three days in advance. This has been changed from five days notice. The Committee recommended that the City's representative to the assembly vote to approve these amendments. MOVED .BY STREDICKE, SECONDED BY MATHEWS, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. CITY OF RENTON COUNCIL AGENDA BILL AI #: J, h Submitting Data: Planning/Building/Public Works For Agenda of: Dept/Div/Board.. Transportation March 16, 1992 Staff Contact Karl Hamilton Agenda Status: Consent X Subject: Public Hearing Pedestrian Signal on Houser Way to connect Correspondence Liberty Park with the Cedar River Park. Ordinance Resolution Old Business Exhibits: New Business Issue Paper Study Sessions • Information Other • Recommended Action: Approvals: Refer to Transportation Committee Legal Dept (March 19, 1992) Finance Dept Other Fire Department.... X Police Department. X Community Serv... X Fiscal Impact: Expenditure Required $60,000. Transfer/Amendment Amount Budgeted $60,000. Revenue Generated Summary of Action: The Transportation Division is pursuing the installation of the new Pedestrian Traffic Signal.on Houser Way. This signal will serve as a walkway connector between Liberty Park and the Cedar River Park, as requested by the Community Services Department. This signal will be interconnected into the signal computer-system, and it will allow for coordinated traffic movement on Houser Way, as well as provide pedestrian access crossing Houser. Staff Recommendations: The Transportation Division recommends Council concurrence in the installation of this signal. We request funding authorization for this work from the 6-YR TIP Walkway Program and the TIP Miscellaneous Traffic Safety Program. ww \pcd\nu CITY OF RENTON MEMORANDUM DATE: February 24, 1992 TO: Kathy Keolker-Wheeler, Council President Council Members VIA: Earl Clymer, Mayor r'ROM: n ttmann, Administrator lan* /Building/Public Works Department STAFF CONTACT: Karl Hamilton SUBJECT: PEDESTRIAN TRAFFIC SIGNAL, HOUSER WAY, CEDAR RIVER PARK ISSUE: • The need for a pedestrian traffic signal connecting Liberty Park with the Cedar River Park on Houser Way has been identified. BACKGROUND: The Community Services Department has requested that the Transportation Systems Division pursue installation of a signal at the above location to serve pedestrian crossing needs on Houser Way. This signal would serve as a "walkway" tying together the two major Parks facilities. Such a traffic signal would be pedestrian actuated, whereupon, traffic lights would display red to Houser Way, giving pedestrians a walk signal. This signal would be interconnected with the City's computerized signal system and would, therefore, be able to coordinate traffic flow on Houser, as well as provide the signalized walkway for pedestrians. Houser Way Pedestrian Signal February 20, 1992 Page 2 In order to minimize costs, City resources would provide a substantial amount of the signal hardware required from existing salvaged stock, and City staff would assist in the installation work. The remaining costs, e.g., foundations, controller, cabinet, conduit and trenching would be borne by the Six-Year TIP Walkway Program. RECOMMENDATIONS: The Transportation Systems Division recommends that the City Council endorse this project for completion in 1992. It is further recommended that the Council authorize such expenditures as may be necessary to install this signal, as outlined above, to be funded from the Walkway Program. KJH:mr w,egnbiu�upea CITY OF RENTON, WASHINGTON RESOLUTION NO. 2852 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 . WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation Improvement Program" pursuant to Chapter 7 , Extraordinary Session Laws of the State of Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of its Planning/Building/Public Works Department, caused to be held a public hearing thereon on June 17 , 1991, and after notice to the public as provided by law for the purpose of considering adoption, modification, and amendments of said plan and program; and WHEREAS, at such public hearing held on June 17, 1991, due consideration was given to the proposed changes and amendments for the purpose of updating such plan and program. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The City's "Six-Year Transportation Improvement Program" and the City' s "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits "A, " "B, " "C, " and "D" incorporated herein as if fully set forth. 1 RESOLUTION NO. 2852 SECTION II. The aforestated plan and program, as evidenced by said Exhibits, shall be and constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan, " and same to remain in full force and effect until further revised, amended, and modified as provided by law. SECTION III. The Director of the Department of Planning/Building/Public Works and the City Clerk are hereby authorized and directed to file this Resolution, together with the Exhibits, with the Director of Highways for the State of Washington - and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 1st day of July, 1991 . AIIP ..).--), i ,f Marily►! . Petersen, City Clerk APPROVED BY THE MAYOR this 1st day of July, 1991 . Q ,& \, NIN&:\ Earl Clymer, ! ayor Approved as to form: Ot"ilA#W Lawrence J. Warr , City Attorney RES. 148 : 6-26-91 :as . 2 RESOLUTION NO. 2852 O 1. Street Overlay Program 2. Oakesdale Ave SW - W 31st to SW 16th St O 3. North Renton Liveable Streets 4. Park Ave N Lake Washington Blvd 5. S. 43rd St (UD 329) 6. Park Ave N - Bronson Way N to N 10th St 7. Mill Ave S Rebuild - W/I-405 (WSDOT Project) 8. Main Ave S / S 4th St 9. Houser Way Relocated - Sunset Interchange to N 8th St Phase I O 10. Transportation Demand Management Program 0 11. Walkway Program O 12. CBD Transportation and Streetscope 0. 13. Transit Program O 14. Houser Way Relocated - Sunset Interchange to N 8th St Phase II O 15. Bridge Inspection Program O 16. Traffic Signal Loop Replacement Program O 17. Traffic Sign Replacement Program O 18. Light Pole Replacement Program 819. Sidewalk Inspection and Replacement Program 20. Arterial Circulation 21. Monster Road Bridge 22. NE 44th St/I-405 23. SW 16th St - West City Limits to Lind Ave SW 24. Sunset Blvd N Project Development 25. S 2nd St/Logan Ave S, Williams Ave S & Wells Ave S 26. SW 43rd St/SR-167 Loop Ramp 8 27. Lake Washington Blvd - N Park Dr to N 44th Prject Development 28. Neighborhood Improvement/Beautification Program O 29. City Gateways Program 30. S 2nd St / Main Ave S 31. Maple Valley Highway - Maplewood Ave SE to East City Limits (WSDOT Widening) 32. N 4th Blvd - Logan Ave N to Monterey Dr NE Project Development 33. Talbot Rd S - S 43rd St to South City Limits O 34. TBZ Project Development O 35. Missing Links Program 36. Oakesdale Ave SW - Monster Rd to SR-900 37. Bronson-Houser Corridor Project Development 38. S Grady Way / Rainier Ave S Project Development O 39. Miscellaneous Traffic Safety Program O 40. Guardrail Program 41. S 192nd St / 200th St - SR-167 to SR-515 Project Development 42. S 3rd St / Smithers Ave S /'Logan Ave S 43. Monroe Ave NE - SR-169 to Sunset Blvd NE Project Development 44. Duvall Ave NE - Sunset Blvd NE to NCL Project Development 45. SW Grady Way - SR-167 to SR-515 46. 1-405 / SR-515 Project Development 47. SE Puget Dr - Jones PI SW to Edmonds Ave SE 48. N Park Dr - Lake Washington Blvd to 1-405 Project Development 49. Aberdeen Ave NE - NE 20th St to NE 27th St Project Development 50. Benson Rd S / S 31st St 51. S 3rd St / Rainier Ave S 52. S 2nd St / Rainier Ave S 53. Sunset Blvd NE / Anacortes Ave NE 0 54. Other Valley Improvements Exhibit A (See booklet on file) YNO a R )LUTION NO. 2852 • T 414M Akil --1, CITY. OF. RENTON "let _ 1 SIX YEAR T.I.P. .'''1 Ice ti PL 1992-1997 _/,'' ,il , 1,74 '� alert—ra: - ' �`. "Vall.rATIII IL__ c) \4 ,:il tin left_.;A, :tr..i.._, : -- _ '-)_ , . ,GAN ` MEI i ' -- , S11! i I' Ill:1 : r Y 70,11 -I:•, 1 F�rrrn Aiii \S"...,- 'i- IJ TCr 1 I r—i # „ tylat w.„,,tsi r :hwia \teffic-4,'„i EFE,-.*Aormir::::: :.5ra:.::::::::.,:::.::,. ;.:::::::.:::::::.:.::::.:.:: I Lioa wl IT ['-'6 '''r'' ,” 4• ''':: F-3-'-', .:•:•:•:•:•:•:::, ,••••••• -' ..:•::::•::: - •:•� �� l �?��s��9�,:i�F s� ]� :•mato. . .......... moi• O ..... .:::::. .:.�:. . sl ?.ii ,4o.IFLPIP til N, -\._ ...... E iitir,Imp.....,. ,,,,. \ - ,,,,,_;,,, ,,,,,,,,,,,, _, \ 7,. ,t,„,,,,, .., „ . ,,,,,o,.„,„:„...F.,..„ ,,, , ‘..,, __. .„7,,, ...,„_ „..„,_. _,4„...,,,„, .i , s AN‘_:'_\;-------"T. _.,( im to Imo' iAEI �+I \ . F.:- , _:,,_, ,, „,,t:::::: ,,::::::::::::::::::::: „....;),____Nsti Er, Im..,..-_-„4„_772,,r 7:::.::::::::::::::::::::::::::::::::::: ,_ ._,,, , - , ___, Vii, ' -, API , N......- - ---- 1 A ...::::::::::::::::::::::::::::::::::: es in.i Amiti \ lorri.IIIII "Lid 4.\:::::::::::::::::::::::::::::::::::::: %;.7 ; 1\ ,lk. ----i 7 i-_,,-111 l'....:.::.:i.:..:::.:.:::::.:::.:.::::::•.:.:::.:i.:i:j.:::.::::. — i ' : \ A '7: A*.,_,Ivilini :::::::::::::::::::.::::::::::.::_::::: _r__ 1 k 1 -N ,t ; : 71, t 1 _, IB gr ::::,:,..:::,:,::::::::: •._.„„„„.___ n �r"i • AN! I iv . <�1 I/� •or EMI Project e • u• Project Development Transportation Benefit/Planning Areae t 0a4►-itITs.-Ikk*tfPN, • Exhibit B kFCITY OR AREA-WIDE PROJECTS NOT SHOWN ON MAP RESOLUTION NO. 2852 . 44TFL/G-4L5 DI - RENTON STREETS 01C SIGNALS - -TRANSPORTATION D MANAGEMENT PROGRAM [ CITY OF RENTON s'"" —WALKWAY PROGR;w 199i TRANSPORTATION - CBD TRANSPORTATION AND sTREELSCAPE • —TRANSITPROGRAM PROJECTS IN PROGRESS ,1 II — BRIDGE INSPECTION > ROGIIAN -TRAFFIC SIGNAL LOOP REPLACEMENT PROGRAM -RAMC SIGN REPLACEMENT PROGRAM / (. . 1. - LIGHT POLE REPLACEMENT PROGRAM _ - SIDEWALK INSPECTION AND REPLACE PROGRAM �'I I ! . -ARTERIAL GRCULATION ,� �»� \9 ■ VT - CITY GATEWAYS PROGRAM �i t I -TBZ PROJECT DEVELOPMENT ka29 - MISSING LINKS PROGRAM wry= -VE}tiGLE MANAGEMENT SYSTEM UPGRADE in LEGION: .... .. gimgmogsm 1991 OVERLAY AND SLURRY SEAL • ■ .• . l', •6 o oo o OORR co 19911PROJC UNDER DEVELOPMENT DR DE51dl ®f.gi-r—__ ■m p /•can i _ . PARK AVE N/L J< 1 n '` e p + - WJSHINGTON BLVD • 1 '• PARK AVE N i1 ! 'I�1 �I �I� r-i r..F L BRONSON TO N 101H �', :Tragi� ❑ :MI n g PISI ..--q gzilei 9E- _,,w=i__::EFor.1 I 0 ,,,, u wet,_.161cclo a���—oa goo a RPR/�uuulJ • � ji jC5_D JILL] n°o�" lel.'' 61 l ���� ©O d =6 , 0 MINOR AVE AIRPORT WAY/ i A �© "1'Cu i yie,,,, SAFETY IMPROYi<7LLNT5 i ' u a���'�,.n %1'V. �� illir . FIFE 'I',,. ilaTN.)kii,N., :WM', ck 001ANCIDE*41110 Mir" - I ' H — Le2 j 4001 1 :7--- rfAIIMZ lv" rmn .6 qqicrEE2 it OCA r HOUSER WAY RELOCATED :gt- ! ; • 10111 a '� e 1-�' 1, SUNSET TO N 8TH PHASE I g ��DDooQaoi Io% '"" I . IN oO�i 1.1311_100:I f _ ,..e\ MAPLE VALLEY WYEJ • . 1 .� .1 +"QMILL AVE S REBUiLU.- r+ I II ,.,1 a[6[10!_-1 el (M'fTH WSDOT) ~\t�C f'-j- L SW 18TH ST. __ _ iiili! / ©� , WCL TO UND AVE "" (��� • c� ,..aA1 C'II A Ina �Nib. 4!11,14 w, e �/f.�J :"^�tiu,, i-A \b., i44- '''. 1■ ;� Lw,a 40,,s . MAPLE /ALLEY HIGi1110 . - ?' 000 TO ECL( SGOT) g 2.9...-E- lifilli '-' • .11V..,. k..y7 _ , 1 m I T ♦ r ..v,. _ ;Ip f 'Es s' .;DAL AVE SE t ... l »nTT] ®ei eITH7D3r) •-ifitc-. �. ' TrrT L 16TH TO SW 31ST �A . .1r 7:'"'II X ... . . ` �v all _• 9 AI; C= 1■ ■r_ it .Tew w �e� ). ice. , .r,nlI " ..., il....1 . ip _ 4 S 43RD WIDENING • UD 329 HEARING - �LLOOPRAMP .1� ADOPTED • S*�5I' �.',0 - RESOLUTION S 192ND/S 200711Pie' j ISR-I'o7 TO SR-51'" a EXHIBIT 'C' RESOT.UTION Nl 7 R 5 7 . .A ^-i— -`- =-,-)e ARTERIAL STREETS 1991 — r„-,'_'-r.• LEGEND. MIR;+ V y Q N1 PRINCIPAL ARTERIAL 'i _ C, ( 1 . MINOR ARTERIAL ' COLLECTOR ARTERIAL :41 ' ; IF ? n `�. iiki V‘..rrn"-9-1.-1 :-:-.,-, --i\-• :—. 1 -, . ,,,,,,. „,__},,,„,,,,,,,,,,,7. .„,„...„, ,..„,ii.,. .,,,,_. „„ f .- LAKE WASHINGTON '� =''T� "3J (�, •L '-�-�' j � ' • _,T.SII L.. Flea m ,,'^ �.{ .,�,� ' _ . 1 I jp:"111111d)11 : . :14-1-h‘-'.-.1..'''Eit 1��' 1� c� ip,1.1 ti, : 4) (1)',riAg't7-1-11, t—T911. ,:',—, ! -tti \\-----kili,r: . 4"),!/74k-)1.44 -1' 111111H_ ..: .m,,,,,, , t A I ,_,4.- 16, _ .A41,„ _ ,III x CliT J m X3 1[11 is,j, li i 6 ,, --Iirrigiti)air,..0,.. iiiii , 1E' op . mixtutr,.--,1 .,.. ) rtiole,A7vr, .,, , ,,, - (1) --loit--- ifFre,..,,,yiii m ..,••:v„---,.„,-,•_,,4,--,-,, lUG�' 1 111 Jrit -49 `/ 6 f' IYY.w.l u.......... U &t!Ecr” ' L W .w. W T�I�W�t.d FIL w.8 Ym�w.l Mm.br..l /Y 1 fla IL q Y}I r1Y KwY.q Ubr 3 Y�.'�.o wfa-y..ue..Yww.Yn.x Yge aw.w u.lY upyr..w.y���'� 1S �6IYYF Q�'4wr�M Y W . a Yrw�in q A .,! muwlYFlY orb YN. an..R L Kr.M.P.P.fav Way II M.Il u M..Y Ink A M r.�•4mI.11!no in Bo • a ® / \ la Realm Atm te.wl I W w1.M.ABY My WI mY tld;PMI rq �'' w.ATPw rl A us yaws.w Y..n Cq Ylu �I a a.YN. Mu..111..11.10.•Pm,YWb Q ME Y..Y from•••••••Vey X UY.Y R F 1"- IIt is2L,liw.I., =1.11:1:71.:.T.wow. 14"'"^.W.. L7:! . nom a wt...Ymlu . AI..wlbw.tit.Yn WWY..e..M.• i. 1MR hem Wale. 1Y 1 �a Y.v..bC.w�.a/Yafr..e�br.lv x r ru q la N 1:•....'"' w.1 M1'1 r K Y'AV ry M Y.4 Vq!nm 4tY.V iw YmY WUL�w��P_��q Y Y. NIawN M.I Iwm u . Iia Y _ RYNR/1aa.1 hm Igl.W�gi YTYY.4a R I�4.:.i..1pam1.4-U1.l11. Y hM 41 �mB.1l U IWL nM1.YR�a11.01R YY IW6 n SNF M tant1 Miwlu - Y •.am 1./S IW.R a.m -IIWIIOW an.O)Y hIn it p Nlu BL Y.�4w Zit,'YJ Iri OWMY.M O eb lrMN AIL ,.. ..........—...h...............I......I .wmMYa . .. 1 • • �J Ali ru.ee I IJ nas um—,..4.41quw.Y r,,Ymw sn Por /gglw— ..........4•.•11.1.10.B } � . �� H U RI.E lie s rm.1111.1.41.1"...1.••.• l 21.11:—.. pp11... 11. /1.Y R W...W .1 Yueiwom it I F J O. t II!SLAW Inv)wwi 1.!Y P.NY.Am A YYYY'"' Y. YIO.n.!fM 4u.v 71:4.'"°•.7 rq1 riY • mA Arg. .w pm .w.1 �1�.X.w i nm°lr.0 u�i.t.,Iq W re-II VI lww.i M n X'M P. M. lFLEA....IrY.M U IQ Mt Pa(Yuaw 4 ••••••• .117 RYIMY rOT��g•Int I.ItYalN)Y Yr Y M.Ya M. WGI�•L"10:1=47.3 e a -Yora'"" Y P.. .w.Tree esr.olp Ym1Y to AW as.. EXHIBIT Y��L. NEARIMO ADOPTED.____ ems . s' -hiLy 1. 1991 Renton City Council Minutes Page 233 OLD BUSINESS Councilwoman Keolker-Wheeler referenced a request from Peggy Robinson, Streets: I-405 On/Off 801 Sunset Boulevard, Renton, for an investigation of the intersection of Ramp Issues Sunset Boulevard NE and northbound I-405 for possible traffic light installation, and Mayor Clymer's Administrative Report of 6/24/91 which stated that traffic in that area was not heavy enough to warrant a signal. Ms. Keolker-Wheeler commented that the intersection is poorly designed, and suggested that the City take a proactive stance on freeway access issues. MOVED BY KEOLKER-WHEELER, SECONDED BY EDWARDS, COUNCIL REFER THIS MATTER TO THE ADMINISTRATION TO DEVELOP A STRATEGY FOR RESOLVING I-405 ON/OFF-RAMPS ISSUES. CARRIED. ORDINANCES AND RESOLUTIONS Ways & Means Ways and Means Committee Chairman Stredicke presented the following Committee ordinances for second and final reading: Ordinance #4319 An ordinance was read amending Section 2-9-5 of Chapter 9, Park Parks: Amendment to Commission, of Title II (Commissions and Boards), of the City Code by Rules & Regulations, adding a subsection relating to penalties which states that Park Board Rules Criminal & Civil and Regulations be identified as: Violations 1) Criminal violations are subject to a fine not to exceed $500 and incarceration in the City jail for a period not to exceed 90 days, or both fine and incarceration; 2) Civil violations may be punishable by a fine not to exceed $250. MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. Ordinance #4320 An ordinance was read vacating a portion of the alley located between North Vacation: VAC-90-003, 30th and North 31st Streets and between Park and Burnett Avenues North Burnett & Park Avenue (Cannon - VAC-003-90). MOVED BY STREDICKE, SECONDED BY North (Cannon) KEOLKER-WHEELER, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. Ways and Means Committee Chairman Stredicke presented a Committee report recommending the following ordinance for first reading: Utility: Special Utility An ordinance and summary ordinance were read amending Section 8-4- Connection Charge 41.B.3, of Chapter 4, Water, and Section 8-5-17-B.3 of Chapter 5, Sewers, of Revision Title VIII (Health and Sanitation), of the City Code relating to special utility connection charge. The special utility connection charge shall be assessed against any property that has not participated in the development of the water system including wells, pump stations, reservoirs, and transmission mains at the rate of: a) Nine hundred forty dollars ($940.00) per single-family residence and mobile home dwelling. b) Five hundred forty five dollars ($545.00) per living unit of an apartment, condominium, cooperative rental, time-share, motel, hotel, or similar multi-family occupancy residential structure. c) For all other properties except City properties, twelve point six cents ($0.126) per square foot of property connected but not less than nine hundred forty dollars ($940.00). MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER ORDINANCE BACK TO WAYS AND MEANS COMMITTEE FOR ONE WEEK. CARRIED. Resolution #2852 A resolution was read updating the City's Six-Year Transportation Streets: Sim r Improvement Program, 1992-1997. MOVED BY STREDICKE, SECONDED Transportation_, BY KEOLKER-WHEELER, COUNCIL ADOPT THE RESOLUTION AS Improvement Program, PRESENTED. CARRIED. 1992-1-9c7 WAYS AND MEANS COMMITTEE APPh # �r;... 7-/— fl 9// COMMITTEE REPORT r„kM'rttt'� IV .4 JULY 1, 1991 ORDINANCES AND RESOLUTIONS The Ways and Means Committee recommends the following ordinances for second and final reading reading: Amendment to Park Rules and Regulations Cannon Alley Vacation, VAC-0"03-90 The Ways and Means Committee recommends the following ordinances for first reading: Special Utility Connection Charge Revision Ordinance and Summary Ordinance The Ways and Means Committee recommends the following resolution for reading and adoption: 1992-1997 Six-Year Transportation Improvement Program LOCAL OPTION TRANSPORTATION REVENUES (Referred 6/3/91) The Ways and Means Committee recommends this resolution be referred to the Transportation Committee for review. Due to timing constraints, the resolution may be taken to the full Council for approval without return to Ways and Means Committee. APPROVAL OF CONTRACTS The Ways and Means Committee recommends approval of the following contracts and further recommends the Mayor and City Clerk be authorized to sign the contract documents: East Side Green River Watershed Plan (Black River Water Quality Management Plan) with R. W. Beck (CAG-033-90, Task Order No. 3) Watermain replacement at N. 34th St., N. 35th St. between Burnett Ave N and Park Ave N with James M. Montgomery (CAG-073-90, Task order #3) Copies: John Webley Dick Anderson Ron Olson Sam Chastain Mel Wilson Rick Moreno Bill Huts inpi1lar Lee Haro Jim Hanson Ron Nelson Ways and Means Committee r Committee Report AtTed July 1, 1991 Page Two LEAD CONSTRUCTION INSPECTOR POSITION (Referred 6/17/91) The Ways and Means Committee recommends approval of this proposal to designate one already authorized and filled construction inspector position as a lead position with a 5% pay increase; then ultimately promote an existing construction inspector into this "lead"position. • - 4714.)(Y$ S:77/491/0e-L---------___ Richard Stredicke, Chair / (C) athy Ke ker-Wheeler, Vice-Chair rcIA,4. ma--Putb._ Nancy Matl�ws, Member June 17. 1991 Renton City Council Minutes Page 211 Councilwoman Zimmerman expressed concern that the sewer plan would drive the City's land use issues. Administrator Guttmann advised that the sewer system plan is a generalized document regarding hydraulics and the physical system based on sensitivity to land uses, but those uses would not govern the Comprehensive Plan. Ms. Zimmerman also urged that the City focus on sewer concerns within its boundaries, and allow the County to solve its sewer problems without pressure by the City. Administrator Guttmann cautioned that the East Renton Plateau drains into the City's aquifer, and could seriously contaminate the City's water supply. - - - She reported that staff has presented the proposed Comprehensive Sewer System Plan information to County officials and County Council members, and is investigating ways that the County and City can resolve sewer issues jointly. In response to Councilman Stredicke's inquiry, Mr. Harbert said that the area south of Valley Medical Center is served by a line constructed jointly by the City and the Cascade Sewer District. He further stated that the line falls in east/west alignment to 192nd, and has been sized in accordance with existing land use development in the area. Mr. Harbert anticipated that the City will serve that area to the City limits, and Soos Creek Sewer District (formerly Cascade Sewer District) will serve the County property beyond. Everett Wilcock, 11830 164th Avenue SE, Renton, said that County residents are sensitive to Renton's aquifer needs, and have initiated efforts to educate citizens on the proper use of septic tanks. He stated further that County residents are concerned about the liveability of the community and how funds are used. Mr. Wilcock urged that planning be slow, thorough and for the good of the whole community. MOVED BY STREDICKE, SECONDED BY EDWARDS, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER THIS MATTER TO THE UTILITIES COMMITTEE. CARRIED. Mr. Anderson advised that additional copies of the Comprehensive Sewer System Plan will be made available for sale and public review at the libraries and in the Public Works and City Clerk offices at Renton City Hall. Recess MOVED BY KEOLKER-WHEELER, SECONDED BY EDWARDS, COUNCIL RECESS FOR TEN MINUTES. CARRIED. Time 9:07 p.m. The Council meeting reconvened at 9:18 p.m.; roll was called; all members were present. Streets: Six-Year This being the date set and proper notices having been posted and published Transporta'att�on— in accordance with local and State laws, Mayor Clymer opened the public Improvement Program, hearing to consider the 1992-1997 Six-Year Transportation Improvement I992-1997 1 Program (TIP). Transportation Systems Manager Melvin Wilson gave a brief overview of the Plan, and noted that the 1992-1997 TIP emphasizes multi- modal and Transportation Demand Management (TDM) activities. l' Mr. Wilson reported that the proposed direction of the Plan reflects input 1 from several sources, such as the Council Transportation Committee, Citizens' Advisory Transportation Committee, Planning Commission, and regional transportation legislation (Clean Air Act, Transportation Demand Management Law). Mr. Wilson introduced Traffic Specialist Lee Haro who explained that the adoption of the annual Six-Year TIP is mandated by the State Legislature, and is submitted to the State Department of Transportation and adjacent municipalities following annual approval by the Council. The purpose of the TIP is to involve citizens and elected officials in the process of identifying the City's priorities for transportation improvement funding; and when those priorities are identified and the plan has been approved, funding authorities and adjacent jurisdictions are notified to ensure coordinated planning throughout the region. In his presentation, Mr. Haro identified 54 projects which were listed and prioritized for completion during 1992-1997. The first ten priorities of the TIP are listed as follows: 1) Street Overlay Program 2) Oakesdale SW - SW 31st to SW 16th 3) North Renton Liveable Streets 4) Park Avenue North/Lake Washington Boulevard 5) South 43rd Street (LID 329) 6) Park Avenue North - Bronson Way North to North 10th Street June 17. 1991 Renton City Council Minutes Page 212 7) Mill Avenue South Rebuild, W/I-405 (WSDOT Project) 8) Main Avenue South/South 4th Street 9) Houser Way Relocated - Sunset Interchange to North 8th Street, Phase 10) Transportation Demand Management Program The following revisions have been made in the Plan: 1) Benson Road improvements, Phase II study, was dropped because improvements are being undertaken by private developers. 2) SW 16th - Oakesdale Avenue SW to Monster Road project was combined with the SW 16th - West City limits to Lind Avenue SW project. 3) Oakesdale - SW 31st to SW 27th project was combined with priority #2 above; Oakesdale - SW 16th to SW 31st. 4) South Grady Way HOV project was dropped due to Metro route changes. 5) Garden Avenue North - North 6th Street to North 8th Street project was dropped due to Council action. Mr. Haro reported that the Citizens' Transportation Advisory Committee recommended the following: 1) No reduction in transportation financing. 2) Extension of the business license fee scheduled to expire this year until other local sources of funding have been identified. 3) Investigation of other sources of transportation financing. Council members made the following inquiries: 1) What is Transportation Demand Management (TDM)? 2) What will be done on Monroe Avenue? 3) What are the plans for the area around the Longacres property purchased by The Boeing Company? 4) What has been spent on overlay program? 5) Is the overlay program funded from one-half cent gas tax revenues? 6) How is the business license fee shown in this document? Mr. Wilson responded as follows: 1) The object of TDM is to reduce the number of single-occupancy vehicles by working with businesses to promote transit, ride sharing, etc. 2) Previous studies indicated the need for a connector from Maple Valley Highway to Monroe, and staff currently is studying the impact that connection would have on Monroe and the Highlands. 3) To serve the Boeing/longacres development, Oakesdale will connect from SR-900 on the north, continue through the Boeing/Longacres development, and connect to East Valley Road in Kent, and East Valley Road and off-ramps from I-405 will connect with 16th. I 4) $500,000 was spent on the overlay program in 1990 and $150,000 will be spent in 1991. 5) The one-half cent gas tax and a portion of the business license fee revenues are used to fund the overlay program. 6) The funding levels shown on the TIP include the assumption that the business license fee will be continued. The business license fee will be extended or dropped at the time the Council considers the City budget. The Citizen's Advisory Transportation Committee and City staff will meet on a quarterly basis to consider other sources of revenue to replace the business license fee. Everett Wilcock, 11830 164th Avenue SE, Renton, representing Cascade Bicycle Club, urged that the TIP consider non-motorized transportation, specifically bicycles, when considering long-range planning for the Renton ! . area. MOVED BY EDWARDS, SECONDED BY MATHEWS, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. MOVED BY EDWARDS, SECONDED BY MATHEWS, COUNCIL REFER THE SIX-YEAR TRANSPORTATION PLAN (TIP) TO.THE WAYS AND MEANS COMMITTEE. CARRIED. AFFIDAVIT OF PUBLICATION Dolores E. Ashbaugh ,being first duly sworn on oath states that he/she is the Chief Clerk of the VALLEY DAILY NEWS • • Kent Edition • Renton Edition • Auburn Edition - - Daily newspapers published six (6) times a week. That said newspapers i CITY OF RENTON are legal newspapers and are now and have been for more than six I NOTICE OF PUBLIC HEARING BY months prior to the date of publication referred to, printed and published RENTON CITY COUNCIL in the English language continually as daily newspapers in Kent, King NOTICE IS HEREBY GIVEN that the County, Washington. The Valley Daily News has been approved as a legal I Renton City Council has fixed the 17th day onewspaper by order of the Superior Court of the State of Washington for Chambersf June, 1991,fh at Renton7o p u i i the Council g of the Municipal Building, King County. 200 Mill Avenue South, Renton, Washing- ton, as the time and place for a public hearing to consider the following: ll The notice in the exact form attached, was published in the Kent Edition 1992-1997 Six-Year Transportation XX , Renton Edition XX , Auburn Edition xx , (and not in Improvement Program supplement form) which was regularly distributed to its subscribers Any and all interested persons are invited pp g Y to be present to voice approval,disapproval, during the below stated period. The annexed notice a n„h i 1 '2 n n+-a c e or opinions on this matter. CITY OF RENTON I Marilyn J. Petersen, CMC #5880 City Clerk Published in the Valley Daily News June June 7 , 1991 7, 1991. 5880 was published on i-_ - - - The full amount.of,the fee charged for said foregoing publication is the ad sum of$ 21st , ' JY Subscribed and sworn before me this day of June 19 91 #41111Ir Notary Public for the State of Washington residing at Auburn, King County, Washington VON 487 Revised 4/89 June 17. 1991 Renton Cily Council Minutes Page 211 Councilwoman Zimmerman expressed concern that the sewer plan would drive the City's land use issues. Administrator Guttmann advised that the sewer system plan is a generalized document regarding hydraulics and the physical system based on sensitivity to land uses, but those uses would not govern the Comprehensive Plan. Ms. Zimmerman also urged that the City focus on sewer concerns within its boundaries, and allow the County to solve its sewer problems without pressure by the City. Administrator Guttmann cautioned that the East Renton Plateau drains into the City's aquifer, and could seriously contaminate the City's water supply. She reported that staff has presented the proposed Comprehensive Sewer System Plan information to County officials and County Council members, and is investigating ways that the County and City can resolve sewer issues jointly. In response to Councilman Stredicke's inquiry, Mr. Harbert said that the area south of Valley Medical Center is served by a line constructed jointly by the City and the Cascade Sewer District. He further stated that the line falls in east/west alignment to 192nd, and has been sized inaccordance with existing land use development in the area. Mr. Harbert anticipated that the City will serve that area to the City limits, and Soos Creek Sewer District (formerly Cascade Sewer District) will serve the County property beyond. Everett Wilcock, 11830 164th Avenue SE, Renton, said that County residents are sensitive to Renton's aquifer needs, and have initiated efforts to educate citizens on the proper use of septic tanks. He stated further that County residents are concerned about the liveability of the community and how funds are used. Mr. Wilcock urged that planning be slow, thorough and for the good of the whole community. MOVED BY STREDICKE, SECONDED BY EDWARDS, COUNCIL CLOSE THE PUBLIC HEARING. .CARRIED. MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER THIS MATTER TO THE UTILITIES COMMITTEE. CARRIED. Mr. Anderson advised that additional copies of the Comprehensive Sewer System Plan will be made available for sale and public review at the libraries and in the Public Works and City Clerk offices at Renton City Hall. Recess MOVED BY KEOLKER-WHEELER, SECONDED BY EDWARDS, COUNCIL RECESS FOR TEN MINUTES. CARRIED. Time 9:07 p.m. The Council meeting reconvened at 9:18 p.m.; roll was called; all members were present. Streets: Six-Year This being the date set and proper notices having been posted and published Transportation in accordance with local and State laws, Mayor Clymer opened the public Impro`-nt P ram, hearing to consider the 1992-1997 Six-Year Transportation Improvement 92-1997 Program (TIP). Transportation Systems Manager Melvin Wilson gave a brief overview of the Plan, and noted that the 1992-1997 TIP emphasizes multi- modal and Transportation Demand Management (TDM) activities. Mr. Wilson reported that the proposed direction of the Plan reflects input from several sources, such as the Council Transportation Committee, Citizens' Advisory Transportation Committee, Planning Commission, and regional transportation legislation (Clean Air Act, Transportation Demand Management Law). Mr. Wilson introduced Traffic Specialist Lee Haro who explained that the adoption of the annual Six-Year TIP is mandated by the State Legislature, and is submitted to the State Department of Transportation and adjacent municipalities following annual approval by the Council. The purpose of the TIP is to involve citizens and elected officials in the process of identifying the City's priorities for transportation improvement funding; and when those priorities are identified and the plan has been approved, funding authorities and adjacent jurisdictions are notified to ensure coordinated planning throughout the region. In his presentation, Mr. Haro identified 54 projects which were listed and prioritized for completion during 1992-1997. The first ten priorities of the TIP are listed as follows: 1) Street Overlay Program 2) Oakesdale SW - SW 31st to SW 16th 3) North Renton Liveable Streets 4) Park Avenue North/Lake Washington Boulevard 5) South 43rd Street (LID 329) 6) Park Avenue North - Bronson Way North to North 10th Street June 17, 1991 Renton City Council Minutes Pane 212 7) Mill Avenue South Rebuild, W/I-405 (WSDOT Project) 8) .Main Avenue South/South 4th Street 9) Houser Way Relocated - Sunset Interchange to North 8th Street, Phase 10) Transportation Demand Management Program The following revisions have been made in the Plan: 1) Benson Road improvements, Phase II study, was dropped because improvements are being undertaken by private developers. 2) SW 16th - Oakesdale Avenue SW to Monster Road project was combined with the SW 16th - West City limits to Lind Avenue SW project. 3) Oakesdale - SW 31st to SW 27th project was combined with priority #2 above; Oakesdale - SW 16th to SW 31st. 4) South Grady Way HOV project was dropped due to Metro route changes. 5) Garden Avenue North - North 6th Street to North 8th Street project was dropped due to Council action. Mr. Haro reported that the Citizens' Transportation Advisory Committee recommended the following: 1) No reduction in transportation financing. 2) Extension of the business license fee scheduled to expire this year until other local sources of funding have been identified. 3) Investigation of other sources of transportation financing. Council members made the following inquiries: 1) What is Transportation Demand Management (TDM)? 2) What will be done on Monroe Avenue? 3) What are the plans for the area around the Longacres property purchased by The Boeing Company? 4) What has been spent on overlay program? 5) Is the overlay program funded from one-half cent gas tax revenues? 6) How is the business license fee shown in this document? Mr. Wilson responded as follows: 1) The object of TDM is to reduce the number of single-occupancy vehicles by working with businesses to promote transit, ride sharing, etc. 2) Previous studies indicated the need for a connector from Maple Valley Highway to Monroe, and staff currently is studying the impact that connection would have on Monroe and the Highlands. 3) To serve the Boeing/longacres development, Oakesdale will connect from SR-900 on the north, continue through the Boeing/Longacres development, and connect to East Valley Road in Kent, and East Valley Road and off-ramps from I-405 will connect with 16th. 4) $500,000 was spent on the overlay program in 1990 and $150,000 will be spent in 1991. 5) The one-half cent gas tax and a portion of the business license fee revenues are used to fund the overlay program. 6) The funding levels shown on the TIP include the assumption that the business license fee will be continued. The business license fee will be extended or dropped at the time the Council considers the City budget. The Citizen's Advisory Transportation Committee and City staff will meet on a quarterly basis to consider other sources of revenue to replace the business license fee. Everett Wilcock, 11830 164th Avenue SE, Renton, representing Cascade Bicycle Club, urged that the TIP consider non-motorized transportation, specifically bicycles, when considering long-range planning for the Renton area. MOVED BY EDWARDS, SECONDED BY MATHEWS, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. MOVED BY EDWARDS, SECONDED BY MATHEWS, COUNCIL REFER THE SIX-YEAR TRANSPORTATION PLAN (TIP) TO THE WAYS AND MEANS COMMITTEE. CARRIED. i cl 4.11,1 ., • . , Ei iril - j _ 4iI ____. --- CITY OF RENTON vI �—� SIX YEAR T.I.P. Alai 1 i----- �� / 1992-1997 i ,� Al.® I'M lirrinim ii. �.� V, R_R11.151' . wag i an NOM=_ • I1" lk �• w .-\ I E 1 111 . ��� _� J�p S ♦ v N+,zr it _ -- ;....r. Inc (:,3=1‘._,I T ail 1 1 (ri) il 4, LAKE WASHINGTONar�� rl 'j[ J t. � J 7 r_ a Ell4PV 1'4� .1c:: :!''\ : � p0 iIll ads � *4 ill_ 119111 '--.,, \..• 0 iii ..... lutTETICY A161 ; ; 4-,* pi'� ▪ � ; • = t/ ® . W iiin..▪ � �: \'.Q . 1(J F Erik lysg Slip rar El.....Y:4,...4,-.:•:•:•:,9 _ r.N4. ii i...*:::::::::::::•::::::::::::::...f:if.......f....................... r...:...:...-.....7.:E.::::::::•:i.......1 ...... -Wit' ..-7,- - -,...-----1 .-...-... ••••A•7.-..-....,,•••::, •••-• •,• , .••."••... Dv 4161,114'tk"-glE-\-- 11/ ki d io.tk is) . rip!? 4,...„,. ., .... .......„....................................................:......:..., ••• ...▪. .... ,:.......„....... ....::::..:. ... 11.46 .1.,....., cliti.,,,"0w,.��WI 1.I i 1,1 '-'' (:�`��;'Q�Q G°� ° �1�(..:: �„�:::...,..__.. ,. ` ▪.::•:. .� til . .............. ...............▪...▪.„ 4 r..▪........ ,, a •••• fir•: .... ••••••••••••. . •••••▪••''%"1"-----......................-.....q..",ivimp i(.. - ;_maimitc.,1 olaci!riol-- . • Y • .. ............ r -3 ' ••••rif reiii,„ E- .• `.f a O _....., ,....7, -"S„N'•:147:Cc*,„................▪......▪....▪........ ,.......... . MAI- y 1i..:..................:.x:...: Ilipre-....cimw......-\voT • �� . ..............▪........▪......▪.., „, .1 ,,..., „,..... , —i--- .7„,...c.b, ,...„...Fritr .. . c<111. , ..••:::::::::::•. • :fiz-._;,..06.4 -iporms.,.;.,• ...-------...h Tii.1 Al.° • ... .:. (11) . i .1 -II \ ....,..meip$H4 r..:..:......:.:.1„....:▪.:.:▪.:▪....:....: :efin 1.:::::: ;.:::::::::: ...K., 1 .. 4. :.i , I"-' ow 6 !IliN/ /2-- ) ." g 1 r,.. ,..... ,,, .6.::v........:......1........:...z.z.......; ..........:.e.;::::......▪..▪.........:lim ,1 4 ... i e �� \ aMa+m� it r ••••••••••••••••••••••••••••••••••••••• ••••••••• ...V:. ,, .. Mil I , 1 ... , ts. la p ,:',..-:•\....'........................•:................!...•................:..............•.:•:.......!........•.........1!........•:...••••!.."...•••••••••••:•••::..!...........:•... w w r E CCC + FFF■ 1', li........... I.r,•••• 1 I I ....A. u.... Cr'' Q "0;41 .▪....,...............▪...1.........:........--.. , f 0 M =gyp era -- r or NIEN Project AI "��■ ProjectDevelopmentED w ................It Transportation Benefit/Planning Areae .................O — Ot1lEt- EPi i OtPi vsm 1 • O 1. Street Overlay Program 2. Oakesdale Ave SW - W 31st to SW 16th St O 3. North Renton liveable Streets 4. Park Ave N Lake Washington Blvd 5. S. 43rd St (UD 329) 6. Parc Ave N - Bronson Way N to N 10th St 7. Mill Ave S Rebuild- W/I-405 (WSDOT Project) 8. Main Ave S / S 4th St 9. Houser Way Relocated - Sunset Interchange to N 8th St Phase I O 10. Transportation Demand Management Program 0 11. Walkway Program O 12. CBD Transportation and Streetscape O 13. Transit Program O 14. Houser Way Relocated - Sunset Interchange to N 8th St Phase II O 15. Bridge Inspection Program O 16. Traffic Signal Loop Replacement Program O 17. Traffic Sign Replacement Program O 18. Light Pole Replacement Program Q 19. Sidewalk Inspection and Replacement Program Q 20. Arterial Circulation 21. Monster Road Bridge 22. NE 44th St/I-405 23. SW 16th St - West City Limits to Lind Ave SW 24. Sunset Blvd N Project Development 25. S 2nd St/Logan Ave S, Williams Ave S & Wells Ave S 26. SW 43rd St/SR-167 Loop Ramp O 27. Lake Washington Blvd - N Park Dr to N 44th Prject Development. O 28. Neighborhood Improvement/Beautification Program O 29. City Gateways Program 30. S 2nd St / Main Ave S 31. Maple Valley Highway - Maplewood Ave SE to East City Limits (WSDOT Widening) 32. N 4th Blvd - Logan Ave N to Monterey Dr NE Project Development 33. Talbot Rd S - S 43rd St to South City Limits 0 34. TBZ Project Development O 35. Missing Links Program 36. Oakesdale Ave SW - Monster Rd to SR-900 37. Bronson-Houser Corridor Project Development 38. S Grady Way / Rainier Ave S Project Development O 39. Miscellaneous Traffic Safety Program O 40. Guardrail Program 41. S 192nd St / 200th St - SR-167 to SR-515 Project Development 42. S 3rd St / Smithers Ave S / Logan Ave S 43. Monroe Ave NE - SR-169 to Sunset Blvd NE Project Development 44. Duvall Ave NE - Sunset Blvd NE to NCL Project Development 45. SW Grady Way - SR-167 to SR-515 46. 1-405 / SR-515 Project Development • 47. SE Puget Dr - Jones PI SW to Edmonds Ave SE 48. N Park Dr - Lake Washington Blvd to 1-405 Project Development 49. Aberdeen Ave NE - NE 20th St to NE 27th St Project Development 50. Benson Rd S / S 31st St 51. S 3rd St / Rainier Ave S 52. S 2nd St / Rainier Ave S 53. Sunset Blvd NE / Anacartes Ave NE O 54. Other Valley Improvements ^ ` . • v:\tprfundo.xls TOTALPROJECT.FUN0X :IR ����� �� 1 Street Overlay Prgm 440,000 *40,000 440,000 4*0,000 440.000 440.000 2,640,000 2,640,000 2Oaknodu|oSW-31st to 16th 300.000 615.000 3.11e.000 6.*80.000 3.240.000 13.750.000 900,000 3 North Renton Livable Sts 1e0.000 635,000 • 795,000 443.200 * PamN/Lkwa Blvd 1e1.000 570,000 7e1.000 7e1.000 5 S 43rd(LID 32e 2.182,000' 1.145700 3,327.700 3.327.700 6 Park N-Bronson to N 10th 3400001.*59.000 3,419,800 2,064,200 7,283,000 2,280,800 7 N0||GRwhm47,000�|*Oa 4r.� __ o83.0O0 � 330,000 330.000 8 Main S/S 4th 1e8.000 22,000 • 440,000 620.000 e30.000 9 Houser-Sunset toNomh | • 220.000 390.000 1.063,000 661.000 2.334.000 762.000 10 Transp Demand Mgmt 60,000 25.000 us.OVV, 2e,000 25.000 25,000 , 185.000 185.000 11 Walkway Program 150.000 e0.000 50.000 50,000 50,000 50.000 50,000 *50.000450,000 10CBD TmStreetscape 100.000 _ 40,000 210.000 oeo.ouo` 350,000 13 Transit Program 378,000 50,000 200,000 200,000 828,000 828,000 14 Houser-Sunset to N8th II 128.000 508,000 1.625.0002.261.000 30,000 15Bridge|"vpw�ionPmgmm 50,000 *0.000 40,000 ' 40,000 170.000 170.000 16 Traffic ,GigLnnpRep|uno 25,000 25,000 25,000 25,000 um.noV os.noo 25,000 1e0.000 , 150.000 • 17 Traffic Sign Replace Prgm 20,000 20,00 20.000 20,000 20.000 20.000 120.000 120.000 18 Light Pole Replace Prgm 25,000 25,000 2e.000 25.000 25,000 25,000 150.000 150.000 - 19 Sdwlk lnsp&Replace Prgm 15.000 10.000 10.000 10.000 10.000 10.000 65,000 • 65.000 20 Arterial Circulation 120.000 160.000 500.000 1.300.000 1.600.000 1.600.000 1.e00.000 e.880.000 4.55e.000 21 Monster Road Bridge 100.000 200,000, 1.100,000 1.400.000 100.000 uuwE44m/NVo��mhongo • 44.000 216,000 260.000 260.000 23GW16th-WCL to Lind 60,000 21e.000 479,000 3,544.000 4.302.000 120.000 • � • 24 GunooNPnuDevo| 100,000 100.000 100.000 . uaGond/Logon.Wilms&Wells 138.889 138.889 138.889 26 SW 43rd/SR 167 Ramp 80,000 20,000 950,000 • 1,050,000 80,000 27 LWB-N Park to N 44th 75,000 e0,000125,000125,000 28 Neigh|mpmvo/oouvtP'gm 70,000 ro.00n 70,000 70.000 70,000 70,000 420.000 420,000 29 City Gateways Prgm 55.000 55.000 55.000 55.mmo�.n� 220,00030G2nd/Ma|nG 7e.000 ' 75,000 75,000 31 Maple Ny*w'Mp|wuooECL 5,000 � 5,000 5,000 32 N 4th-Logan to Monterey • 50,000 30.000 80,000 80.000 33 Talbot S-S*3rd to SCL 30,000300,000330,000 330.000 34 TBZ Project Development 11e.000 115.000 115.000 35 Missing Links Prgm 446,000 _ 200,000 200,000 -200,000 200,000 200,000 1,446,000 1,446,000 36 Oakesdale-Monster to SR 900 50.000 50,000 500,000 1.117,000 3,8ee000 3,8e7.000 e.450.000 325.000 . 37 Bronson-Houser Corridor 50,000 50,000 50,000 :�� ` ' � 38 S Grady/Rainier S 30.000 60,000 90,000 90,000 39 Misc Traffic Safety Prgm 50.000 50.000 50.000 50.000 50.000 50.000 300.000 300.000 . 40 Guardrail Program 31.500 50,000 50,000 50.000 50,000 50,000 50,000 331.500 , 331.500 41 S192y8200-Gn167moGR515 95.000 155.000 • 250.000 250,000 42 S 3rd/Smithers S/Logan S 130.000130,000 30,000 4oMonroe NE-SR 1Os»oGuno^� ' 50,000 50,000 50,000 44 DuvalI NE-Sunset to NCL 50,000 50,000 50,000 45 SW Grady-SR167 to SR515 260,000 260,000 60.000 *6w05/Gne15prjov 60,000 60,000 4rpugeoJonoou`Edmonds 100.000 e10.000 1.010.000 *8mpud�uwau,|ons 60.000 60,000 «e*m�nu=nnw�m�h�oono 40,000 40,000 50 Benson RdG/So/st 20,000 110,000 130,000 51 G�nd/Ruinier8 54,000 54,000 52 S 2nd/Rainier S 36,000 1e8.000 234,000 ' 53 Sunset NE/Anacortes NE 86.000 192.000 278.000 Valleye^Other m \mp ,vman� 2.451.000 8.637.000 e.912.000 18.000.000 1.400000.8.a.:i AMIAgOw4COPUM 3015.4.P.4!*40.40.8%-4:40?”00.0 • • INFRASTRUCTURE PROJECTS AND PROGRAMS .......................................................................... .. .. ..............r................,.....................:.,..:..:.:::::::::.:r::::::::::.�:::.:.:::.::.................................................................4?�� ::::::::..::.:::.:..Ota..:..:..... ... .................................. !. .. ............:...::..�.:::::::::.::......:.. .......:ur1c€....1�....r.....:..:....33.......................�9�.................'i.��........:...:::..:.::�.���.�..:::::::.::::::,.:°1..���.�.:...............1. . .7....................T . t................l+t�n ...... 1 Street Overlay Prgm 440,000 440,000 440,000 440,000 440,000 440,000 2,640,000 2,640,000 15 Bridge Inspection Program 50,000 40,000 40,000 40,000 170,000 170,000 16 Traffic Sig Loop Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000 17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000 120,000 120,000 18 Light Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000 19 Sdwlk Insp & Replace Prgm 15,000 10,000 10,000 10,000 10,000 10,000 65,000 65,000 21 Monster Road Bridge 100,000 200,000 1,100,000 1,400,000 100,000 33 Talbot S-S 43rd to SCL 30,000 300,000 330,000 330,C 40 Guardrail Program 31,500 50,000 50,000 50,000 50,000 50,000 50,000 331,500 331,!' ..... ...... :.. . .::.........::::.::::.:::::.;:.::.>;::.::.;.::::::::...::.�: :.::::.:�:..... .��40.........6...5 Oc�Q:;:.:;.:::.:.s.:..t�00(}.......,.9...fl{1�4:::...:.6.1�0 . ......... :� ......... 1. . ....... .:4. ..::..:.:::......: .......................,.., ...f.. OQ.:�::::::R�•:::{�r.{���.:�:.::.f]..;:�,:Q�Q:;.:::,..�3'�r�,{*?.���...,yr1,.��:,-::::::r�56c40 MULTI-MODAL/TRANSPORTATION DEMAND MANAGEMENT PROJECTS AND PROGRAMS ..........:.......,.:... ....:...........................................................................te....Aub.... ......:::::::.�.�::.::::::::..:::.....................................,......................................................,......................... .....,........................... . .................. . ......... ..... . ..................................................................................... .. ........................................................................�ems........ ...........Ota.......... :::.:::::.::::• ...Pro ect.Title........................... F itl .. ................................ . ... .....................•.... ...............................,9.,... .................. .............................:::::::::.::it$:. .:4::::::::. .::::10nd0140 10 Transp Demand Mgmt Prgm 60,000 25,000 25,000 25,000 25,000 25,000 185,000 185,000 11 Walkway Program 150,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000 450,000 13 Transit Program 378,000 50,000 200,000 200,000 828,000 828,000 20 Arterial Circulation 120,000 160,000 500,000 1,300,000 1,600,000 1,600,000 1,600,000 6,880,000 4,559,000 27 LWB-N Park to N 44th 75,000 50,000 125,000 125,000 - 48 N Park-LWB to I-405 60,000 60,000 .................... .................::.::.:.�.::.:..:..:::.:::::.:_:::::>.�:.:. :......:..�� 0�0(}........3�Qf{?:�0.........6�� O��J...:1...��� .°t.�QQ�:7 ...,1.. . . . . .::::::::4..�•ey�r. . . ::::::. ..�..: .............f......:..._..,.... ..............._......,. ....s............ .,....,..,,,..f............ ...,!..........f.......:.:.:•.:�r.�,.W..:::..y�...f���:.: •v.f�� p��0. V�.�J'a�4r���:., ..�3..r..::;�;�fifi00 NEIGHBORHOOD PROTECTION/LIVABILITY PROJECTS AND PROGRAMS TER . ::: ;»:<:»:::;::< :>> >! .. ........................................................[.jrr Ali .. ......................................... .......w..rr........ I ii'•'f.^i:?ilii}:�:= ..:t.MN:€::>:> < > ;< <:>......+��.rt.... :.:'�.09:�::::::;<:<:»:::>: >�:�3�� � ! >�< '�����< > >�`'> " `?'�<�`< '' `>`�• :<::<1::.. �::;<„: ::<�::: .... ..... .......................... ....................................................... .............. ......... ...� :::<::<::::>::::....;......��:7<�!> !<'.....:.....Ota............ .....fil....dec1> >' 3 North Renton Livable Streets 160,000 635,000 795,000 443,200 4 Park N/Lk Wa Blvd 191,000 570,000 761,000 761,000 6 Park N-Bronson to N 10th • 340,000 1,459,000 3,419,800 2,064,200 7,283,000 2,280,800 7 Mill S Rebuild-W/I405 47,000 283,000 330,000 330,000 9 Houser Rel-Sunset to N8th I 220,000 390,000 1,063,000 661,000 2,334,000 762,000 14 Houser Rel-Sunset to N8th II 128,000 508,000 1,625,000 2,261,000 30,000 28 Neigh Improve/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 70,000 420,000 420,000 29 City Gateways Prgm 55,000 55,000 55,000 55,000 220,000 220,000 32 N 4th-Logan to Monterey 50,000 30,000 80,000 80,000 . :..: : .�y�v .:. 0{•0� 1..A .��++.j:?..:Qp(� ::..:2:.(]:7.::x:. >:ig::::.64%;(/ (.: ..::.:/��+(]5.... . ::..,•:::gii7....: p :..: ](:y::.0.%30,4i2.9 .i .. f. 00'....�r.�!l�f�!JQ...:..i.W.O...,V00......i.�7...Rf�O�.........W3.�f V}I.y..:.:�.i.W�rliJtf���.::.:::.....��,�0�.:..:.��.�Cl?�.I�V\ .:. f . .. , ECONOMIC DEVELOPMENT PROJECTS AND PROGRAMS TIP. <>> >` <> < i> `:`: >z>><i<> » >`'< < > <> � > :; ::><>'?:oii »`>> <F >< ` >`.><`.> >> > > >'.<:>»>':><>:ya>><`>`>><<><»<r> > ><:>::>< <:5: 41.4.c ' ..... e� tis... ...:.:: ................................................ .. .. . ........................... i. . ..... .�.. .. .... j..........�., w...,..,w............... ..................:.a:.:. .. 10:2.::.:: .........39.93..........,.......t99............. ..::: :.42.9.5::::::::..:::::::::#. 96:.:.:............1.9 .7....:::::,.::.�:::.:::. .. . t::::::::::....�:.F . 2 Oakesdale SW-31st to 16th 300,000. 615,000 3,115,000 6,480,000 3,240,000 13,750,000 900,000 12 CBD Transp & Streetscape 100,000 40,000 210,000 350,000 350,000 23 SW16th-WCL to Lind 60,000 219,000 479,000 3,544,000 4,302,000 120,000 34 TBZ Project Development 115,000 115,000 115,000 41 S1'92/5200-SR167 to SR515 95,000 155,000 250,000 250,000 43 Monroe NE-SR 169 to Sunset 50,000 50,000 50,000 47 Puget-Jones to Edmonds 100,000 910,000 1,010,000 49 Aberdeen NE-20th to 27th 40,000 40,000 ' 54 Other Valley Improvements 2,451,000 8,637,000 6,912,000 18,000,000 ,. .... ...................................................................................:L•R!:.:Q8::::::);J.:..%VO.•D...:.i..,....:AV..Q.:_.9 ZPANPPQMV0000:...:00.7i.000:::0.`?;7.:2WOC(::. .t. .1.. :. .:..V. OPERATIONS/SAFETY PROJECTS AND PROGRAMS ec *i:]:::K:i:.::17.-.0talf - MOO ....... .. .....Project:,Titl. :: : .:....................Fundirt .,... .....:::1.992..,:::::::.;:;;;;:'1:993•: :::.:........1.9 4.....::::...:.:::::1. . :.:::::::.,.: .:. ::::•;;::..........:. ..::::::::.::::.�::::.. :;.:I::::.::::.. ..::: ....................... ..1�....,,�............... .......,......... ......: ...x:...�:::..`•�..:.:�:..:. ::::.::995.::� ::::::�:�.T.99..��r;:;::.;:. :.;:::,1:;3.x.7.:::..;:.::�.::.:::.:�at�l:>::::>�::;>:;��sr�c�eci�:::. 5 S 43rd (LID 329) 2,182,000 1,145,700 3,327,700 3,327,700 8 Main S/S 4th 158,000 22,000 440,000 620,000 530,000 22 NE 44th/1405 Interchange 44,000 216,000 . .260,000 260,000 24 Sunset N Project Develop 100,000 100,000 100,000 25 S2nd /Logan, Williams &-Wells 138,889 • 138,889 ' 138,889 26 SW 43rd/SR 167 Loop Ramp 80,000 20,000 950,000 1,050,000 80,000 30 S 2nd/Main S 75,000 75,000 • 75,, 1 '31 Maple Vly Hwy-Mplwd to ECL 5,000 5,000 5,uuu 35 Missing Links Prgm , 446,000 .200,000 200,000 200,000 200,000 200,000 1,446,000 1,446,000 37 • Bronson-Houser Corridor 50,000 50,000 50,000 38 S Grady/ Rainier S 30,000 60,000 90,000 90,000 39 Misc Traffic Safety Prgm 50,000 50,000 . 50,000 ' 50,000 50,000 50,000 300,000 300,000 42 S 3rd/Smithers S/Logan,S 130,000 130,000 30,000 44 Duvall NE-Sunset to NCL 50,000 ' 50,000 50,000 45 SW Grady - SR167 to SR515 260,000 260,000 60,000 46 1405/SR 515 Prj Dv 60,000 60,000 50 Benson Rd S/S 31st 20,000 110,000 '130,000 0 51 S 3rd/Rainier S 54,000 , 54,000 0 52 S 2nd/Rainier S 36,000 198,000 234,000 0 53 Sunset NE/Anacortes NE 86,000 192,000 278,000 ..... .......................................... .. .......................... ...:. ..7.Q(0..f.. .56,U0Q.s:.>:�:::.588i:)t34.:..,:.::::8$S:.00Q.;:..;;.,,20..00.0:.:<::_:IS.O,.OUB:;;:.;;::8.:68.:589i:M542.v83 • , CITY OF RENTON _ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY Period ................... . .. :'s.:>:::<::::i'i': ::>::>::;:i�etled::':E'. ' E::>:�>:?: «i ....«:::> '::::::>::::>: . >#::»>:::: ::»#:<:#:: +ti:::>: <z:>:s»:i:»:ii: � ::::»>::>'1 :::»:?:>i :::':>:<:><: :»:?::<><>< .<'<...........��............. >:�:':'........... ........�..............J9�.................1;993..................1.�$ ....................99�:<:>':>::: >.........99�:a>»:>: >.........�9.T........... EXPENSES: Planning/Project Development -1,050,000 410,000 290,000 180,000 70,000 30,000 70,000 Precon Eng/Admin 7,800,000 1,429,000 1,592,000 1,028,000 2,486,000 995,000 270,000 R-O-W (includes Admin) 9,403,000 1,390,000 4,361,000 191,000 2,081,000 1,190,000 190,000 Construction Contract Fee 55,838,400 3,077,900 4,374,300 16,129,700 6,438,500 13,661,500 12,156,500 Construction Eng/Admin 4,203,600 249,100 331,500 1,302,500 434,500 1,002,500 883,500 Other 162,700 92,700 14,000 14,00014,000 14,000 14,000 ...'.I' . . P E :::><::<'::>:<::<>:::::::»::>:7 ". T.� 7 ;:: 2 :. <:.:3 >::E<::::z1:::' 4 b :<• `;>:>':1`:. .: :.;;:.;•: ......ox��..�.c..�s..�.......................�a.�.. ..�a�.>::::::>:.. �..oa.:<::::::�.o.�s.. .......:���•�Qr� SOURCES OF FUNDS: 1/2 Cent Gas Tax 1,740,000 290,000 290,000 290,000 290,000 290,000 • 290,000 Business License Fee 10,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 Vehicle License Fee 2,100,000 350,000 • 350,000 350,000 350,000 350,000 350,000 Grants In-Hand 302,886 120,000 182,886 Grants Proposed 30,993,900 756,400 4,899,900 7,907,500 3,488,100 7,895,000 6,047,000 L.I.D.'s Formed 1,145,700 1,145,700 L.I.D.'s Proposed 7,530,700 330,700 980,000 3,455,000 2,765,000 Mitigation In-Hand 2,273,114 1,590,800 457,314 225,000 Mitigation Proposed 17,873,200 560,800 2,577,700 6,967,800 3,143,900 2,291,000 2,332,000 Other 65,000 35,000 30,000 Unfunded 3,633,200 375,000 974,200 1,472,000 812,000 .......4..�..SOU..C..S 0]0$457:700 C • • C. File::TIPCIP A.XLS Printed 5/31/91 at 11:28 AM. June 10. 1991 Renton City Council Minutes Page 201 Parks: Junior Golf Referred 6/3/91 - Community Services Committee Chairman Tanner Program, Maplewood presented a report stating that the Committee recommended approval of the Golf Course proposed junior golfing rates, which will be the same as the rate for seniors, Monday through Friday only. MOVED BY STREDICKE, SECONDED BY EDWARDS TO CONCUR IN THE COMMITTEE REPORT. CARRIED. Transportation: Six-Year Referred 6/3/91 - Transportation (Aviation) Committee Chairman Edwards Transportation presented a report stating the Committee recommended that the scope of the improvement Program, Lake Washington Boulevard - North Park Drive to NE 44th Street Bike/Trail 1992-1997 Project be expanded to include roadway rehabilitation, and concurred in the staff recommendation that $75,000 of carryover funds be allocated for preliminary design of the rehabilitation and bike/pedestrian trail. The scope of the project shall not include expansion of the number of automobile traffic lanes beyond the one existing lane in each direction. The Committee further recommended that the $75,000 for the Lake Washington Boulevard project be transferred from the Park Avenue North - Bronson to North 10th project account and that the Park Avenue North project be allocated $75,000 of vehicle registration fee funds which would come to the City in.1991. The Committee further recommended referral to the Ways and Means Committee for the proper budget adjustments. MOVED BY EDWARDS, SECONDED BY STREDICKE, TO CONCUR IN THE COMMITTEE REPORT. CARRIED. Planning: Truck Route MOVED BY EDWARDS, SECONDED BY STREDICKE, COUNCIL SET A Ordinance PUBLIC HEARING ON A PROPOSED TRUCK ROUTE ORDINANCE FOR 7/15/91. CARRIED. Appeal: Renton Village Councilwoman Mathews reported that the Planning and Development Center (Renton Village Committee has concluded the appeal hearing on Renton Village Associates, Associates), South Grady and a report on this matter will be presented to Council on 6/17/91. Way, (SA, CU-078-90) ORDINANCES AND RESOLUTIONS, Ways & Means Ways and Means Committee Chairman Stredicke presented a Committee Committee report recommending the following ordinances for second and final reading: Ordinance #4313 An ordinance was read amending Ordinance No. 3856 adopted by the City LID: 329, South 43rd Council October 22, 1984, as amended by Ordinance No. 4074 adopted by the Street Improvements, R. City Council on June 15, 1987, as amended by ordinance No. 4180 adopted W. Scott by the City Council on October 10, 1988, by expanding the improvements authorized in those ordinances and including those improvements within those permitted under LID No. 329. Improvements to include: 1) Widening of South 43rd Street between SR-167 northbound ramps and Talbot Road South on both sides. 2) Construction of a tunnel between SR-167 northbound ramps and Davis Avenue South under South 43rd Street to connect the Valley Medical Center properties, including construction of an approach road on the South side connecting to Davis Avenue South and reconstructing portions of existing roads on the north side. 3) Installation of new curbs, gutters, sidewalks, curb ramps, and driveways. 4) Provision of asphalt overlay of existing streets; 5) Adjustment and restoration of existing abutting property features. 6) Adjustment of existing manholes, utility castings, monuments, etc., to new pavement grade; 7) Abandonment of existing and construct new drainage facilities. 8) Relocation of existing hydrants and water meters where roadway widening occurs. 9) Relocation of affected private utilities. 10) Structural design for tunnel and retaining walls; 11) Installation of new traffic signal hardware on South 43rd Street at intersections with SR-167 northbound ramps and Talbot Road South. 12) Relocation of existing metal street light poles and lights on new foundations; add new foundations, poles, and lights; and install new underground conduit. 13) Installation of new pavement markings, channelization, and signing throughout the project. 14) Provision of telemetry conduit through the project area. 15) Provision of new sanitary sewer line to bypass the tunnel and its south approach road. 16) Provision of tunnel lighting, new electrical service to Valley Medical Center, and relocate parking area lighting as necessary. 17) Rerouting and reconnection of the Valley Medical Center drainage line caused by the lowering of the north approach roads to the tunnel. 18) Provision of new water service connection to Valley Medical Center. APE ©VLD 6,, p ,9 / TRANSPORTATION COMMITTEE COMMITTEE REPORT JUNE 10, 1991 LAKE WASHINGTON BOULEVARD - N. PARK DRIVE TO NE 44th STREET BIKE/TRAIL PROJECT DEVELOPMENT (Referred 6/3/91) The Transportation Committee recommends that the Scope of the above-referenced project be expanded to include roadway rehabilitation and concur with the staff recommendation .that $75, 000 of carryover funds be allocated for preliminary design of the rehabilitation and Bike/Pedestrian Trail. The Scope of the project shall not include expansion of the number of automobile traffic lanes beyond the one existing lane in each direction. The Committee recommends that the $75, 000 for the Lake Washington Boulevard project be transferred from the Park Avenue N. - Bronson to N. 10th project account and that the Park Avenue N. project be allocated $75, 000 of Vehicle Registration Fee funds, which come due to the city in 1991. The Committee further recommends referral to the Ways and Means Committee for the proper budget adjustments. /A;404,40/t Bob Edwards, Chair -)11(ft -Ful/L- Nancyews, Vice-Chair -N"\...4MIAAvN2) TYferesa Zimmerm n, Member Copies : Mel Wilson Harold Adams PUBLIC HEARING June 17, 1991 Consideration of 1992-1997 Six-Year Transportation Improvement Program. Locations of postings done on -_5-- I/ , 1991. 1. A/� 0/-21'4' 11/;4440-70,0:- 2. 3. ?1 /1P ÷ 2eao 7�i 4. ` ©y c3d 6.(.,r GtJaaGf 441"i'1" 367t7: 7. jc oo a7 Y1 �- lar i 8. d -nc, n� 9. L14471 4i7 , l o. 3060 -.0, 5-,fit', 11. -mare4' " 12. f ol /1)V 13. � ). at, yt ao 77 . 14. 7;;4i 2OIJ¢� Amyl 2i‘,,e/ 15.014-4d all I lA.) q-ovt.otc(. 4A) ,2)(.0 16. )M a "l(1 Q yll • 17. j ind 4j ,� + ,d . . 18. ,o a.L 7/i ,A L3.- ' 19. oh- 62/4 20. -'edip a J., 'n * 177 21. /00(e „„23./S,4- 22. b�P/j' n M .p .0 62 lP 17'- 23. 24. avj fovt 25. 3/1 4v&I, av D posting NOTIcE RENTON CITY COUNCIL • PuBLIC HEARING ON JUNE 17, 1991 AT 7:30 P.M. RENTON MUNICIPAL BUILDING COUNCIL CHAMBERS 200 MILL AVENUE SOUTH TO CONSIDER THE 1992-1997 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, ANY AND ALL INTERESTED PERSONS ARE INVITED TO BE PRESENT TO VOICE APPROVAL, DISAPPROVAL, OR OPINIONS ON THIS MATTER, Complete legal description &further information available in the City Clerk's Office - 235-2501 • • ' The removal, mutilation, destruction or concealment of this notice is a mis- a r.n. 1 n g • .. demeanor___.punishable by fine and imprisonment. CERTIFICATION STATE OF WASHINGTON) ss. COUNTY OF KING hr I (/ HEREBY CERTIFY THAT COPIES OF THE ABOVE NOTICE WERE POSTED ( ME IN THREE OR MORE CONSPICUOUS PLACES ON THE PROPERTY DESCRIBED AND TWO COPIES WERE POSTED AT THE.RENTON MUNICIPAL BUILDING, 200 MILL AVENUE S. RENTON, WA ON DATE OF (p SUBSC•I.ED AND SWO•N TO BE ME �G thi' of ... - 19 SIGNED' ),„„4 .4' . ' . & 4._11 otary atlisip and fo the S of Washington, residin ��ll Nl NOTICE RENTON CITY COUNCIL puBLIc HEARING ON JUNE 17, 1991 AT 7:30 P.M. RENTON MUNICIPAL BUILDING COUNCIL CHAMBERS 200 MILL AVENUE SOUTH • TO CONSIDER THE 1992-1997 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, ANY AND ALL INTERESTED PERSONS ARE INVITED TO BE PRESENT TO VOICE APPROVAL, DISAPPROVAL, OR OPINIONS ON THIS MATTER. Complete legal description &further information available in the City Clerk's Office - 235-2501 • The cmmamoufttlasiontidsia cmiosn- Wa r n I n • demeanor punishable by fine and imprisonment. CITY OF RENTON NOTICE OF PUBLIC HEARING BY RENTON CITY COUNCIL NOTICE IS HEREBY GIVEN that the Renton City Council has fixed the 17th day of June, 1991, at 7:30 p.m. in the Council Chambers of the Renton Municipal Building, 200 Mill Avenue South, Renton, Washington, as the time and place for a public hearing to consider the following: 1992-1997 Six-Year Transportation Improvement Program Any and all interested persons are invited to be present to voice approval, disapproval, or opinions on this matter. CITY OF RENTON Marilyn J.`e ten, CMC City Clerk DATE OF PUBLICATION: June 7, 1991 Valley Daily News Account #50640 • June 3. 1991 Renton City Council Minutes Page 187 Parks: Junior Golf Parks Department submitted proposal for junior golf program to be instituted Program, Maplewood at the Maplewood Golf Course under the following fee schedule: $10 for 18 Golf Course holes, Monday through Friday, for youth 17 years of age or younger or 18 years of age if still in school. Refer to Community Services Committee. Plat: Requirements Development Services Division requested a waiver of plat requirements when Waiver warranted. Refer to Planning and Development Committee. Building: 1991 Energy & Development Services Division submitted the 1991 Washington State Energy Indoor Air Ventilation Code and the Washington State Ventilation and Indoor Air Quality Code. Codes Refer to Planning and Development Committee. Personnel: Senior Long- Planning/Technical Services Division requested authorization to hire Senior Range Planner Long-Range Planner at Step D, Grade 11. Council concur. Utility: Department of Solid Waste Utility Division requested that the Mayor be authorized to submit Ecology Coordinated a letter of intent to apply for Department of Ecology Coordinated Prevention Prevention Grant grant funding. Refer to Utilities Committee. Funding Transportation: Planning Transportation Systems Division requested public hearing be set for 6/17/91 Local Option to consider resolution adopting transportation planning, programming and Transportation Revenues coordination requirements for using local option transportation revenues. Council concur in the public hearing date and refer the draft resolution to Ways and Means Committee. Transportation: Cedar Transportation Systems Division requested authorization for City Attorney to River Water Supply proceed with resolution authorizing interlocal agreement between City of Protection Interlocal Seattle and City of Renton to protect water supply Cedar River pipeline Agreement with Seattle during Benson Road improvement project. Refer to Ways and Means Committee. Airport: Field Use Fee Transportation Systems Division requested authorization of a field use fee in the amount of $3.50 for the commercial use of the Renton Airport which would be charged to all commercial air taxi, charter, courier, and banner towing operators who utilize the airport. Refer to Transportation (Aviation) Committee. Streets: Six-Year Transportation Systems Division requested public hearing be set for 6/17/91 Transportation to consider the 1992-1997 Six-Year Transportation Improvement Program. Improvement Program, Council concur in the public hearing date, and refer the draft resolution to 1992-1997 Ways and Means Committee. Transportation: Field Transportation Systems Division requested approval of task order for H. W. Study City Bridges, H.W. Lochner, Inc. to conduct field study, fracture-critical, and Under Bridge Lochner, Inc. Inspection Truck (UBIT) inspections; load-rating and earthquake analysis, field-scour evaluations, scour-analysis calculations; State of Washington Inventory of Bridge and Structures (SWIBS) reporting; recommendations for maintenance, repairs, or improvements; and a final report and updated project files for City bridges (expenditure required $32,992.80). Refer to Ways and Means Committee. Utility: Sierra Heights Utility Division requested authorization for annual contract for Brown and Sanitary Sewer Study, Caldwell with task order authorization for engineering evaluation and design Brown & Caldwell for Sierra Heights sanitary sewer; expenditure required $57,682.45. Refer to Ways and Means Committee. Utility: State Department Utility Systems Division requested resolution authorizing the Mayor and City of Ecology Centennial Clerk to execute a Washington State Department of Ecology Centennial Clean Clean Water Fund Grant, Water Fund Grant agreement for the City of Renton Black River Water Black River Water Quality Management Plan; City's 25 percent grant share ($60,112.50) and Quality Management Plan associated staff time ($9,887.50); total $70,000. Refer to Ways and Means Committee. Latecomer Agreement: Utility Systems Division requested authorization to file action for Declaratory Tomlan Sewer Extension, Judgment to obtain a court review due to failure to pay latecomer fee on the #S-380 (Cantellay), LA- Tomlan sewer extension #S-380 (Cantellay), LA-002-89. Refer to Utilities 002-89 Committee. CITY OF RENTON COUNCIL AGENDA BILL AI#: (n.�, Submitting Data: Planning/Building/Public Works For Agenda of: Dept/Div/Board.. Transportation Systems Division June 3, 1991 Staff Contact Lee Haro Agenda Status Consent X Subject: Public Hearing... X Correspondence.. Public Hearing for a resolution updating !149-1--1997 Ordinance 00 six-year Transportation Improvement Program Resolution X Old Business Exhibits: New Business Study Sessions Draft Resolution Other (additional exhibits will be forthcoming) Recommended Action: Approvals: Legal Dept X 1. Set Public Hearing for June 17 Finance Dept 2. Refer Resolution to Ways and Means Committee Other Fiscal Impact: Expenditure Required... None Transfer/Amendment Amount Budgeted Revenue Generated Summary of Action: Staff is requesting the Council to hold a public hearing June 17, 1991 on a resolution adopting the annual update of the Six Year Transportation Improvement Program(TIP). Prior to the public hearing, staff will submit to Council all TIP documents and exhibits. pubhearing/LH/bh CITY OF RENTON, WASHINGTON RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S SIX YEAR TRANSPORTATION IM!'ROVEMENT PROGRAM 49-911- /q97 WHEREAS, the City of Renton ha: heretofore . adopted a "Six-Year Transportation Improvement Pro. am" pursuant to Chapter 7, Extraordinary Session Laws of th- State of Washington, and Chapter 195 of the 1961 Session Laws of th- State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law; and WHEREAS, the City ' ouncil, after recommendation of its Public Works Department, caus-• to be held a public hearing thereon on July 16, 1990, andafter •tice to the public as provided by law for the purpose of consideri g adoption, modification, and amendments of said plan and program; - d WHEREAS, at such , public ' hearing 'held on , due condideration was given to the proposed chang-s and amendments for the purpose of updating such plan and program. NOW, ' ?HEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON DO RESOLVE AS FOLLOWS: SECT ON I. The City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan" are hereby further RESOLUTION NO. amended and modified, all as more particul-rly shown on the attached Exhibits "A, " "B, " "C" , and "D" incorpo ated herein as if fully set forth. SECTION II. The aforestated p .n and program, as evidenced by said Exhibits, shall be and constitute the City's "six-Year Transportation Improvement Program" and the City's "Arterial Street Plan, " and same to remain in full force and effect until further revised, amended, and modifies as provided by law. SECTION III. The Plann'ng/Building/Public Works Administrator and the City Clerk are her- .y authorized and directed to file this Resolution, together wit the Exhibits, with the Director of Highways for the State of Washin;ton and as otherwise provided by law. PASSED BY THE C Y COUNCIL this day of , 1991. Marilyn Peterson, City Clerk APPROVED B THE MAYOR this day of , 1991. Earl Clymer, Mayor Approved as to form: Lawrence J. Warren, City Attorney 4-0 {g-f`� Washington State Duane Berentson ii WO Department of Transportation Secretary of Transportation Transportation Building KF-01 Olympia,Washington 98504-5201 (206)753-6005 CITY OF RENTON May 13, 1991 MAY 2 0 1991 4•4aA.► iVED _AN CLERK'S OFFICE Mayors and City Council Chairmen Boards of County Commissioners Six-Year Transportation Improvement Program. (TIP) 1992-1997 RCW 35.77.010 and. RCW 36.81.121 requires that each city and county update its TIP annually and file a copy of the adopted program with the Secretary of Transportation, DOT Local programs office through the District Local Programs Engineer. The document is intended as a planning, tool for local, state and federally funded projects and is utilized by the state, MPO's the Transportation Improvement Board (TIB) and County Road Administration Board (CRAB). The complete TIP is due by July 31, each year. The CRAB utilizes this document to establish eligibility for the Rural Arterial Program (RAP) projects and any County Arterial Preservation Program (CAPP) projects classified as construction. Likewise the TIB utilizes the information submitted on the TIP to budget and develop their program during the year and to select,projects for funding from the Urban Arterial Trust Account (UATA) and Transportation Improvement Account (TIA). It is therefore important that all construction projects being considered for local, state or federal funding sources be included on this program. The Annual Element (AE), required by the Federal Highway Administration, is also developed by the MPO's from this document, (see Chapter 1, Division 4, of the Local Agency Guidelines). The form is designed to identify the planning of projects to be performed during the six year period from 1992 through 1997. It has been made as simple as possible and has combined data required by the using agencies so that most requirements can be satisfied with one submittal. We have included for your use a projection of anticipated state gas tax revenues. An important point to remember in your planning process is that the law stipulates that any project, (including those using local funding), which has not been included in the adopted TIP, cannot be approved for funding until it has officially been added to the TIP. As you know, this requires that you complete the hearing process which could undoubtedly delay the project. Agency requests for project funding utilizing CAPP, RAP, UATA, TIA and federal funds must be compared against the adopted TIP. t • May 13, 1991 Page 2 :As an aid to local agencies and to be able to respond to legislators' request, the program .is available on a microcomputer database. .It is available on Smart, Advance Revelationand 'Lotus for your convenience. The data can .be utilized by the agencies for use in planning and updating as well,as by the WSDOT, TIB, CRAB and the MPO's. For those agencies who have not received the data base or- spreadsheet programs in the past, there are two ways to obtain it. The program is called 6YRDATA.ARC and is located on the Local Programs/Technology Transfer bulletin board (206)586-1942, SCAN'321-1942, and can be downloaded using microcomputer communications equipment. A'copy will be sent by mail to'any. requesting agency and the project data can be put onto the diskette and returned. Request for the six-year data manager or spreadsheet program should be made to Stan Sanders, at (206) 753-1065 or SCAN 2341065. Counties may continue to use the AREV Sixyear program module contained on the CRAB provided CRIS System. Distribution of the completed forms are to 'be made..in accordance with-the instructions indicated on the forms. Two copies are to be sent to the District , Local Programs Engineer and one copy to the TIB. . Counties are to send, an additional copy to the CRAB. Agencies which are within a Metropolitan Planning Organization (MPO) are to submit a copy to their MPO: Those agencies who generate the TIP data on a PC are requested to send a diskette containing the data directly to TIB. This will enable themto generate reports requested by utility companies and Legislators. Your District Local Programs Engineer is available for any assistance you may need. The names and phone numbers for the District Local Programs Engineers are shown on the attached map. Sincerely, jj/411(2'k--- S. A. MOON Assistant Secretary Local Programs SAM:kmp Attachments cc: . City Engineers, w/attach: Craig Olson AWC Vern Wagar,CRAB , Don Hoffman, Dist. 1, MS:NB82/121 Ron Selstead, Dist. 2 Bob Holcomb, Dist. 3 Bob Elderkin,'Dist. 4,'MS:S-15 Bill'.Linse, Dist..5 Dick Albertson, Dist. 6 DISTRIBUTION FOR CITIES IS BASED ON PER CAPITA 1992 Regular 43.0 million. 17.70 per..capita 1/2 Cent 2.0.1 million 8.30 per capita TOTAL 1992 63.1 million 26.00 per capita To compute the amount of Gas Tax available, multiply the agency's population by the amount of funds available per capita. EXAMPLE: City of. Aberdeen, population 17,050. Regular: 17,050 X 17.7.0 = 301,785 . . Compute the 1/2 cent similarly, EXAMPLE: City of Aberdeen, population 17,050 1/2 cent: 17,050 X 8.30 = 141,515 r ' PROJECTED ANNUAL ESTIMATE OF FUNDS PER YEAR 1992 1997 IN, THOUSANDS TOTAL CITY GAS TAX HALF CENT 'FAUS*. PER YEAR ABERDEEN 302 142 56 499" ANACORTES 195 92 37 324 AUBURN 604 283 102 . ' 990 . BELLEVUE 1,573 738 266. 2,577 BELLINGHAM 861 ' 404 162 . :1,426 BONNEY LAKE 124 ' 58 23 .205 ' BOTHELL ' 210 99 36 . , 345 ' BREMERTON 668 . 313 120 ,1, 101. . CAMAS 114 54 . 21 ' 189 CENTRALIA 214 100 - 40 354 CHEHALIS 113 53 22 189 CHENEY 135 63 25 223 CLARKSTON 119 ' .56 22 . 196 ' . COLLEGE PLACE 108 50 20. . : 178 ' DES MOINES ' 274 12.9 .46 449 ' EDMONDS 529 248 ' 88, . 864 ELLENSBURG 215 " ' . 101 41 357 ENUMCLAW 113 ' 53 . 21 187 EPHRATA 97 ' 45 1,8 : 16.0 ' EVERETT • 1, 181 ' 554 187, 1,922 FEDERAL WAY 1, 132 531 ' , 180 1,843 ; . FIRCREST .96 45 19 161 . GRANDVIEW . 116 54 '22 192 HOQUTAM 160 75 30 265 ISSAQUAH 131 61 22 214 ' . KELSO 200 94 38 331 KENNEWICK 671 3,15 126 1, 112 KENT 663 311 116 1, 089 KIRKLAND 667 313 113 1, 093 LACEY 313 ' 147 59 519 LONGVIEW ' 541 ' 254 102 . ' 897 LYNNWOOD 477 224 76 .776 MARYSVILLE . 168 79 26 ' 272 MERCER ISLAND ' 365 171 . . 62 598 MILL CREEK 122 57 . 19 . ' .198 MOSES LAKE 193 91 ' . 37 321 MTLAKE TERRACE 316 148 50 . 514 MOUNT VERNON 269 126 . 51 447 MUKILTEO 118 55 18 191 OAK HARBOR ' ' 275' 129 ' 50 454 OLYMPIA 574 ' 269 . ' 108 951 PASCO 315 , ' 148 '60 523 PORT ANGELES 320 150 61 531 PORT ORCHARD 87 41 18 145. PORT TOWNSEND 124 58 23 205 * = Assuming program continues at present funding level TOTAL CITY GAS TAX HALF CENT FAUS PER YEAR PULLMAN 409 192 77 678 PUYALLUP 391 184 .72 647 REDMOND 627 294 103 1,024 RENTON 696 327 118 1, 141 RICHLAND 535 251 .101 888 SEA TAC 425 199 72 696 SEATTLE 8,882 4, 165 2,097 15,144 . SEDRO WOOLEY 114 53 22 . 189 SHELTON 135 63 26 224 SNOHOMISH 110 52 17 .179 SPOKANE 3, 074 . 1,442 666 . 5, 182 STEILACOOM 103 48 18 169 , SUMNER 107 50 20 177 SUNNYSIDE 173 81 33 288 TACOMA 2,929 1,374 .598 . _ 4,901 TOPPENISH 117 55 22 194 TUKWILLA 192 90 ' '32313. TUMWATER 152 71 . 28 252 VANCOUVER . 789 370 ' 150 1,309 WALLA WALLA 450 211 85 747 WENATCHEE 359 168 67 595 YAKIMA 899. 422 169 1,490 * = Assuming program continues at present funding level COUNTY .GAS TAX REVENUE ESTIMATES • PER YEAR 1992 - 1997 IN THOUSANDS • CO. TOTAL NO. COUNTY GAS TAX FAS*, FAUS* - PER YEAR 1 ADAMS 2,813 323 • ' 3,136 2 ASOTIN 962 132 1,094 3 BENTON 2,256 158 61 2,475 . • 4 CHELAN 1,608 140 23 . 1,771 . 5 CLALLAM 1,494 110 18 . 1,622 6 CLARK 4,522 153 : 1 398 . 5,073 7 COLUMBIA 993 . 103 1,096 8 COWLITZ 1,717 150 ' 44 1,911 9 DOUGLAS 2,680 288 49 1, 017 ' . - 10 FERRY 1,263 145 . 1,.408 11 FRANKLIN 2, 061 215 30 2, 306 12 GARFIELD 920 . 130 1, 050 . 13 GRANT 4,425 452 30 4,907: 14 GRAYS HARBOR . 1,758 179 1,937 15 ISLAND 1,616 98 1,714 16 JEFFERSON 1,026 74 1, 1.00 17 KING 14,803 182 1,500 16,485 18 KITSAP 3,932 ' '212 230 4,374 19 KITTITAS 1,402 93 . 1,495 20 KLICKITAT 2, 007 259 2,266 21 LEWIS 2,422 151 • - 2,573 22 LINCOLN 3, 340 421. 3,761 23 MASON 1,625 83 1,708 24 OKANOGAN 2,522 374 ' 2,896 25 PACIFIC 1,059 . 88 - 1, 147 26 PEND OREILLE 1, 093 • 141 1,234 27 PIERCE 9,022 160 , 960 10, 142 28 SAN JUAN 760 53 . ' . 813. 29 SKAGIT 2, 179 190 2, 369 30 SKAMANIA ' 605 56 661 31 SNOHOMISH 7,425 262 . 490 ' 8,177 . 32 SPOKANE . . 8,035 480 460 8,975 . 33 STEVENS 2,654 . 284 2,938 34 THURSTON 3,278 155 ' 141 3,574 35 WAHKIAKUM 558 50 608. 36 WALLA WALLA 2, 130 . 274 28 2,432 37 WHATCOM 2,763 -230 46 - 3,.039 38 WHITMAN . 3,215 . 391 3, 606 39 YAKIMA 4,601 439 114 5, 154 * = assuming program continues at present funding level t l! /TEVENI "NO wNATCOM OREILLE. •AN JU \ f, , AKAOIT MALUM iti ENONOMISN` 1 roKANE • JEfiEItApN 4/'�� LINCOLN 6 RING I iv k. h RmrtAA MANY TIERCE ..m ....M -4 1\1 - yL., TNURSTON rAxnu LEWIS FRANKLINIng . i MU) - MENTON wAI" WALLA COLUEERIA AWTIN COWLIT2 �KAMANIA - WAMKIAK,I 4 5 CLARK KUCKITAT - v N STATE OF WASHINGTON :r W - DISTRICT BOUNDARY D District State Aid .Engineers District 1, Don Hoffman - (206)562-4146 ; 15325. SE 30th Place, Bellevue, WA 98007-6597 District 2 , Ron Selstead - (509)663-1657 ; P. 0. Box 98 , Wenatchee, WA 98801-1156 District 3 , Bob Holcomb - (206)753-7266 , P. 0. Box 9327 , Olympia, WA 98507-9327 District 4, Bob Elder.kin - (206)696-6437 ; P. 0.. Box 1709 , Vancouver, WA 9.8.668-1709 District 5 , Bill Linse - (509)575-2580 ; P . 0. Box 12560 , Yakima , WA 98909-2560 District 6 , Dick Albertson - (509)456-3058 ; P. 0. Box 5299 , Spokane , WA 99205-0299 June 3, 1991 Renton City Council Minutes Page 191 Resolution #2849 A resolution was read declaring an emergency for purposes of contracting to CAG: 91-006, Declaration repair damaged sewer lines in the vicinity of Devil's Elbow Road. MOVED of Emergency, Devil's BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL Elbow Lift Station ADOPT THE RESOLUTION AS PRESENTED. CARRIED. Rehabilitation Ways and Means Committee Chairman Stredicke presented a Committee report recommending the following ordinances for first reading: Rezone: Sunset Park An ordinance was read changing the zoning classification of certain Apartments/Phase II, properties within the City from B-1 (Business District) to R-3 (Medium Figgins rezone, R-100-89 Density Multi-Family) (Sunset Park apartments/Phase II - Figgins rezone: File No. R-100-89); .93 acre located at 4444 NE Sunset Boulevard. MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER ORDINANCE BACK TO WAYS AND MEANS COMMITTEE FOR ONE WEEK. CARRIED. LID: 329, South 43rd An ordinance was read amending ordinance No. 3586 adopted 10/22/84, as Street Improvements amended by Ordinance No. 4074 adopted on 6/15/87, as amended by Ordinance No. 4180 adopted on 10/10/88, by expanding the improvements authorized in those ordinances and including those improvements within those permitted under LID No. 329. Included within the improvement to be installed under this local improvement district are the installation of a pedestrian and vehicle undercrossing at South 43rd from the property on the south side of South 43rd, previously known as the Lomas property, to the Valley Medical Center properties on the north side of South 43rd, together with all necessary drainage, water/sewer relocations, soldier pile walls, curbs and gutters, sidewalks, lighting, utility adjustments, landscaping, primary power, and other necessary appurtenances thereto; estimated cost to be approximately $3.2 million. MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER ORDINANCE BACK TO WAYS AND MEANS COMMITTEE FOR ONE WEEK. CARRIED. Legal: City Code of An ordinance was read amending Sections 1-6-3.A and B of Chapter 6, Code Ethics Revision, of Ethics, of Title I (Administrative), of City Code relating to the filing of Statement of Expense for public disclosure forms. MOVED BY STREDICKE, SECONDED BY Candidates KEOLKER-WHEELER, COUNCIL REFER ORDINANCE BACK TO WAYS AND MEANS COMMITTEE FOR ONE WEEK. CARRIED. Planning: PACCAR Ways and Means Committee Chairman Stredicke presented a report stating Supplemental EIS, NBBJ that the Committee recommended concurrence in the contract with NBBJ Consultant Services Group, architects and planners, for consultant services for the PACCAR supplemental Environmental Impact Statement (EIS) with Mayor and City Clerk authorized to sign the contract documents. MOVED BY STREDICKE, SECONDED BY KEOLKER-WHEELER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. NEW BUSINESS Councilwoman Keolker-Wheeler reported that the traffic from the Valley Streets: Traffic Control, Freeway to 43rd Street appears to be consistently heavy, and requested that Valley Freeway to 43rd the Administration investigate traffic control in this area. Street King County: Seattle Councilwoman Keolker-Wheeler referenced the Valley Daily News editorials Center Bond Issue regarding the proposed County-wide levy for the Seattle Center which was defeated on 5/28/91, primarily because of the voters in the South King County area, and commended the newspaper for defending the interests of South King County. Council: Committee Councilwoman Keolker-Wheeler advised receipt of inquiries regarding Attendance attendance of a fourth Councilmember at a recent Council committee meeting who was not a member of the committee. She requested that committee members be cognizant of the potential violation of appearance of fairness when four Councilmembers sit as members of a Council committee. For the record, Councilman Tanner advised that at the referenced Committee meeting, he announced the names of the Committee members, and introduced the fourth Councilwoman as a Councilmember but not a member of the Committee. He felt there was no misunderstanding by the press or the audience. Transportation: Six-Year MOVED BY EDWARDS, SECONDED BY ZIMMERMAN, COUNCIL Transportation REFER THE SIX-YEAR TRANSPORTATION PROGRAM BIKE TRAIL Tmprovement Pro PROJECT (LAKE WASHINGTON BLVD., BETWEEN NORTH PARK 997 DRIVE AND NE 44TH STREET) TO THE TRANSPORTATION (AVIATION) COMMITTEE. CARRIED. March 4. 1991 - Renton City Council Minutes Page 80 Streets: Six-Year Transportation Systems Division submitted proposed schedule for review and Transportation adoption of the 1992-1997 Six-year Transportation Improvement Plan. Refer Improvement Plan (TIP), to Transportation (Aviation) Committee. 1992-1997 Utility: Mount Olivet Utility Systems Division submitted request for task order authorization for Closure Evaluation, Parametrix Inc. to review and evaluate the Mount Olivet closure plan relative Parametrix Inc. to aquifer protection. Refer to Ways and Means Committee. Councilwoman Keolker-Wheeler questioned the Parametrix contract in view of a Seattle Times newspaper article regarding a Federal government raid on Parametrix software, and asked the Administration to investigate this matter. MOVED BY NELSON, SECONDED BY STREDICKE, COUNCIL ADOPT THE CONSENT AGENDA AS AMENDED. CARRIED. INFORMATION ONLY Executive Department submitted information regarding prioritization of South SCATBD: Project County Transportation Benefit District (SCATBD) projects. The projects are: Prioritization Oakesdale (SW 31st to Sunset) SR-167/SW 43rd (South 180th) Interchange SW 27th (West Valley to SR-167) SW 43rd/East Valley Monroe Avenue NE (SR-169 to NE 3rd) SE Puget Drive (Jones to Edmonds) Rainier/Grady Grade Separation South 192nd/196th (SR-167 to SR-515) Park Avenue North (Bronson to I-405) Carr Road (Talbot - 108th) Joint with King County Main Avenue South (Grady to Bronson) Houser Way Relocated (Park to Sunset) Fourth Boulevard (Logan to East City Limits) OLD BUSINESS Councilman Stredicke noted that the East Renton interceptor moratorium will Utility: Sewer end in two years, and asked the following questions: Moratorium, East Renton Interceptor 1) Who will perform the Environmental Impact Statement (EIS) tasks; and 2) Is it be possible to accelerate this process. Councilwoman Keolker-Wheeler stated that she will relay these questions when the Utilities Committee hears the East Renton interceptor status report on 3/6/91. WSDOT: Floating Bridge In response to Councilman Stredicke's inquiry about the floating bridge Sections in Lake sections in Lake Washington, Mayor Clymer said he received a letter from Washington Ron Anderson of the Washington State Department of Transportation (WSDOT) which stated that the bridge sections would be removed this summer. City Attorney Warren advised that he had spoken to the State Department of Natural Resources, and was told that Washington State Department of Transportation (WSDOT) would be informed that it must establish a lease for lake use with the Department of Natural Resources, and that shoreline permits must be obtained from the City of Renton. Mr. Warren stated further that the Department of Natural Resources will contact the owner of the bridge section that sunk into the lake to request the section be refloated, and inform him that a City shorelines permit will be required. Claim: Fiorillo Northwest In response to Councilman Stredicke's inquiry, City Attorney Warren Inc., CL-91-014 explained that the City was sued some years ago by James Colt, president of Memorial Services, Inc. and Mount Olivet Cemetery, and the case resulted in a stipulated settlement. Since this matter is being revived, Fiorillo Northwest Inc., the landfill operator for Mount Olivet, was permitted by the court to intervene in the case as long as they did not expand causative action. What • appeared on the consent agenda for 2/25/91, was a claim for $5 million from Fiorillo based upon alleged violations of due process and Federal rights laws. Claim: Shegrud, CL-91- In response to Councilman Stredicke's inquiry regarding the nature of a 019 $22,000 claim against the City involving Park Department equipment, Mr. Warren explained that the claimant, Kristopher Shegrud, alleged that a table improperly secured at a grade school caused him injury when it struck him. The claim amount of $22,000 includes doctor bills, pain and loss, and future medical bills. CITY OF RENTON COUNCIL AGENDA BILL AI N: 6k SUBMITTING DATA: FOR AGENDA OF: March 4, 1991 Dept/Div/Board..Plan/Bldg/Public Works-Transp. Systems Staff Contact..Mel Wilson AGENDA STATUS: Consent... XX SUBJECT: Six-year Transportation Improvement Plan Public Hearing.. 199 2-199 7 Correspondence.. Ordinance Resolution Old Business.... EXHIBITS: 1. Schedule for review and adoption of New Business.... six year TIP Study Session... 2.Preliminary list of projects. Other REC0194ENDEDACTION: Refer to Transportation Committee APPROVALS: Legal Dept Finance Dept.... Other FISCAL IMPACT: Expenditure Required... Transfer/Amendment.. Amount Budgeted Revenue Generated... SUMMARY OF ACTION: This action is being taken to inform the Council of the proposed schedule for review and adoption of the 1992-1997 six year Transportation Improvement Plan. SCHEDUL FOR 1992-1997 SIX—YEAR TIP DEADLINE 1— Prepare list of projects 2/1/91 2— Review and determine requirements r.e. ESSB 6358 and Growth Management 2/18/91 3— Meet with Administration and Finance to review process, presentation and schedule 2/26/91 4— Submit to Division and Department heads requesting input 2/28/91 5— Meet with Transportation Committee 3/7/91 6— Meet with Divisions and Departments 3/8/91 7— Re—work TIP. Work up costs, financing for new projects 3/22/91 8— Meet with Citizens Advisory Committee 3/28/91 9— Submit to other jurisdictions for review 4/8/91 10— Circulate to Department and Division heads for review 4/8/91 11— Rehearse slide show 4/12/91 12— Meet with Citizens Advisory Committee (slide show) 4/14/91 13— Hold meeting with Department and Division heads 4/15/91 14— Finalize 5/1/91 15— Submit any significant changes to Department heads and to Transportation Committee 5/1/91 16— Prepare final documents and presentation 5/15/91 17— Rehearse presentation 5/31/91 18— Hold public hearing inearly June 6/1/90 to • • 6/20/91 19— Adopt resolution r.e. ESSB 6358 and Growth Management if required 6/20/91 20— Prepare TIP format for TIB, MPO, etc. 7/1/91 21— Submit to TIB, MPO, other agencies 7/31/91 .nj .- City of Renton Year Transportation Improvement Prog 1992-1997 1. Street Overlay Program 2. Oakesdale Ave SW-SW W 31st to SW 16th St 3. North Renton Liveable Streets 4. Park/Lake Washington Blvd Intersection Improvements 5. S 43rd St Widening (LID 329) 6. Park Ave N -Bronson Way N to N 10th St 7. Mill Ave S Rebuild-Joint w/I-405 HOV 8. Main Ave S 9. Houser Way Relocated-Sunset Interchange to N 8th St 10. CBD Transportation Study 11. Transit Study 12. Walkway Program 13. CBD Streetscape Improvements 14. Bridge Inspection and Emergency Repair Program 15. Traffic Signal Loop &Pavement Repair Program 16. Traffic Sign Replacement Program 17. Light Pole Replacement Program 18. Sidewalk Repair Program 19. Miscellaneous Traffic Safety Improvements 20. Arterial Circulation Improvements 21. Oakesdale-Monster Road to SR-900 22. NE 44th St Signals and Interchange 23. SW 16th St-West City Limits to Lind Ave SW 24: Sunset Blvd N Study 25. S 2nd St Signal Visibility Safety Project 26. SW 43rd St/SR-167 Loop Ramp Improvements 27. Guardrail Improvement Program 28. Neighborhood Improvements/Beautification Program 29. City Gateways Program 30. S 2nd St&Main Ave S 31. Maple Valley Highway -Maplewood Ave SE to East City Limits (WSDOT Widening) 32. 4th Blvd -Logan to Monterey Drive Study 33. S Grady Way HOV • 34. TBZ Planning Studies 35. Missing Links Program 36. Monster Road Bridge Replacement 37. Benson Road Improvements Phase II Study 38. Bronson-Houser Corridor Study 39. Grady/Rainier Grade Separation 40. SW 16th St-Lind to SR-515 Study 41. I-405/SR-515 Interchange Study 42. S 192nd St/200th St-SR-167 to SR-515 Study 43. SE Puget Dr-Jones PI SW to Edmonds Ave SE 44. Lake Washington Blvd-N Park Dr to N 44th Bike/Pedestrian Trail Study 45. Monroe Ave NE-Sunset Blvd NE to SR-169 Study 46. Duvall Ave NE-Sunset Blvd NE to North City Limits Study 47. N Park Dr-Lake Washington Blvd to 1-405 Study 48. Aberdeen Ave NE-NE 20th St to NE 27th St Study 49. Talbot Rd S-S 43rd St to South City Limits 50. SW Grady/Shattuck Signal Improvements 51. S 3rd/Smithers/Logan Signal Improvements 52. Benson Rd S &S 31st St Signalization 53. S 3rd St&Rainier Pedestrian Improvements 54. S 2nd St&Rainier Pedestrian Improvements 55. Other Valley Transportation Projects 56. Sunset Blvd NE/Anacortes Ave NE 57. Garden Ave N-N 6th to N 8th St Attached are the following materials for the City Council's Monday, June 17, 1991 public hearing on the Six-Year Transportation Improvement Program update: 1-A map and list showing the TIP projects 2-A map showing 1991 projects in progress 3-A map showing the arterial street system 4- Summary sheets and worksheets for the TIP projects 5-Transportation Citizen's Advisory Committee report on transportation funding. 0 err ® I 4.10: 41.1 :I %pit CITY OF RENTON ,Alp" __ SIX YEAR T.I.P. je ' ® ' 1992-199' i a ,,� : Amp. kMI_li AM ST Y my, r©� ••••.. ..--v..--.• ANN, _ „It lOnk rrl 11111=111 S. fi NI + ..W + O , 7 t im2._ r r ME I 7CG.7,se v0111...17.71:R�R11tl M2kd=i � ��I•,�• ,It x NI 1911,ST _ =f a N[Mtn King ����````''''�������W�WJfJfJJJJJJ''''/'/''/'/'''777777 T mil to 11 TX 1 057 ' i®� LAKE WASHINGTON `` _ - 721.1zSt �w 4 Y ro� I CID s . c. 13 i '• \ ` x[ tm sT I Q A I ®w D ...--...... • ,4"-�� qVd4r/1 'XIV a_ D.,. I illi-"Aup_____,,____,....,1 IE 1 SI 1 ,\,,,, • w 40 ,_ ,30,.._i_T [it mull nw 1 A A, ".... . . • • _ -.1.- n „,,j2 TJEJ I iff.,.3 % illiii ----.11\70..-5 , vato ....... 991-1........... ... .. .. \ qi4-31R3t1 ""c121"-'1:U'' 1�'dU \. r ;i . . c\. I 1 4 *411/[411E C Ai if ,, XM Aa T tn' 4 ' : 5 well 1 Itir_. ...... .................................. 0,0, (FA BED 4 k I i 0 .................. L � .0,.. .rd 1 _Mb I � .:.:.. \N, .........• 4T:1f"/ - por 1 Di, tri/o(r) ; 1,27.44.4, / _ _. .. _,, .... \ SE1• A., ,.‘ � .. ...•1• .. . - Ipyo ,`• ' � . , t ili ll Sk.1 4 ur 1.,„.4- 4-44- 'P' . , 4.4 ._. mt i r Q ,TI-1,0 Vlu Fillx.. ,4 0 \ ,,,,,,,,,T DI SE , n =I I "•....• it\ -40,7.1„„, I , n1 e SE lin Si( .ii.... .. . .Nil ..... ... 0 r I • or mom Project Substantially Funded ISinSi • or 'MB Project Partially Funded II t - " • or Imo Project Substantially Unfunded if • ili MI NV Project Development Substantially Funded 1Z I =' its*lit Project Development Partially Funded ' . ,, CID u •Ni■si Project Development Substantially Unfunded '�/ al. $ �" :::::::j Transportation Benefit/Planning Areas fill I1 City - or Area-aide Project or Program Substantially r'unded / ; $ City - or Area-wide Project or Program Substantially Unfunded — b i T Al v n Cr) D CO O 1. Street Overlay Program 2. Oakesdale Ave SW - W 31st to SW 16th St O 3. North Renton Liveable Streets 4. Park Ave N Lake Washington Blvd 5. S. 43rd St LID 329) 6. Park Ave N - Bronson Way N to N 10th St 7. Mill Ave S Rebuild - W/I-405 (WSDOT Project) 8. Main Ave S / S 4th St 9. Houser Way Relocated - Sunset Interchange to N 8th St Phase I 08 10. Transportation Demand Management Program 11. Walkway Program 12. CBD Transportation and Streetscape 13. Transit Program 14. Houser Way Relocated - Sunset Interchange to N 8th St Phase II 15. Bridge Inspection Program 16. Traffic Signal Loop Replacement Program O 17. Traffic Sign Replacement Program 18. Light Pole Replacement Program 19. Sidewalk Inspection and Replacement Program 20. Arterial Circulation 21. Monster Road Bridge 22. NE 44th St/1-405 23. SW 1 fith St - West City Limits to Lind Ave SW 24. Sunset Blvd N Project Development 25. S 2nd St/Logan Ave S, Williams Ave S & Wells Ave S 26. SW 43rd St/SR-167 Loop Ramp 27. Lake Washington Blvd - N Park Dr to N 44th Prject Development 28. Neighborhood Improvement/Beautification Program 29. City Gateways Program 30. S 2nd St Main Ave S 31. Maple Valley Highway - Maplewood Ave SE to East City Limits (WSDOT Widening) 32. N 4th Blvd - Logan Ave N to Monterey Dr NE Project Development 33. Talbot Rd S - S 43rd St to South City Limits 0 34. TBZ Project Development O 35. Missing Links Program 36. Oakesdale Ave SW - Monster Rd to SR-900 37. Bronson-Houser Corridor Project Development 38. S Grady Way / Rainier Ave S Project Development O 39. Miscellaneous Traffic Safety Program O 40. Guardrail Program 41. S 192nd St / 200th St - SR-167 to SR-515 Project Development 42. S 3rd St / Smithers Ave S / Logan Ave S 43. Monroe Ave NE - SR-169 to Sunset Blvd NE Project Development 44. Duvall Ave NE - Sunset Blvd NE to NCL Project Development 45. SW Grady Way - SR-167 to SR-515 46. 1-405 SR-515 Project Development 47. SE Puget Dr - Jones PI SW to Edmonds Ave SE 48. N Park Dr - Lake Washington Blvd to 1-405 Project Development 49. Aberdeen Ave NE - NE 20th St to NE 27th St Project Development 50. Benson Rd S / S 31st St 51. S 3rd St / Rainier Ave S 52. S 2nd St / Rainier Ave S 53. Sunset Blvd NE / Anacortes Ave NE O 54. Other Valley Improvements / --- 1 NE 44TH/I-405 CV OR AREA—WIDE PROJECTS NOT SHOWN ON MAP — NORTH RENTON ENABLE STREETS TRAM TRASDKS E — TRANSPORTATION DEMAND MANAGEMENT PROGRAM CITY OF RENTON 140, / s SE77NPi — WALKWAY PROGRAM — CBD TRANSPORTATION AND STREETSCAPE ili 1991 TRANSPORTATION g 7YNTT - PROGRAM „, — BRIDGE INSPECTION PROGRAM PROJECTS IN PROGRESS ` — TRAFFIC SIGNAL LOOP REPLACEMENT PROGRAM (_,_:., — TRAFFIC SIGN REPLACEMENT PROGRAM 41 IF -- UGHT POLE REPLACEMENT PROGRAM ,SEdYq — SIDEWALK INSPECTION AND REPLACE PROGRAM" "ntkil ' \ ` j — ARTERIAL CIRCULATION N.>qN TT d I — CITYGATEWAYSPROGRAM jaiN00ThsTI °i N 4 a I N>,q §-I i — TBZ PROJECT DEVELOPMENT A. Ai N 33,d TT I I — MISSING UNKS PROGRAM i SII N TT ` — VEHICLE MANAGEMENT SYSTEM UPGRADE IN MO II ASIA ST I� «E J1d ST , [N70gll Ned.ST I ` ' ®I XzamTT IME v a F 3 SE RI 9dN SI 2YN - � -----/S------- ss:: � A NE 15t PE g,p. [3.. NC 3 INA ST i Y LEGION: —,0 c�uul' ,: 5E,01d ,...: SE,dp2a mmilmil 1991 OVERLAY AND SLURRY SEAL � J' SE,�.1 I TT I pit . lE 2kd NC MI ST � I P 1` NE 11d ST t- i« w SE 107r TT ' ••••••• OR • 1991 CONSTRUCTION ® ` 1E 20q ST�_ t O Dig WO ST I - ig _ Y ` Imo■■■■■Ni OR ■ PROJECT UNDER DEVELOPMENT OR DESIGN �I NE 12111 :R PARK AVE N/LAKE - _ ,d 0. O �q „"If�"� =Ele>„ WASHINGTON BLVD �r S`wdE g 020 �b � PARK AVE N TT a /4111M,__---‹r 06 �I C]n c � ®°, — BRONSON TO 10TH ®/rAillifitd ❑ SE„1q R /, ��I «n1�_ .7-1 5r ��� uq ,I _ _ TTX5JN 11„Erzlpit----f--E3 ��L—�, 5 Iidq S7 � NMN �! � ® _ �. , IE IOM ��I,OM ST I° ff„eq Sr r) 3/4,, 'R ❑-®� NSI i la %EDI MO I/LI ��—�—�— Q —�Ileth-p—cd—i--,. I� 1 s 'E I NE I� - lr H Ildq s ,L YIN Si • - `'■'+ "(JILL* 57 yJs, �! $1.----s--.1_7s: II 111d , 5� IZ♦d _ $ ;� a IE TT D -1:: Q<t�°"'�/a�(� N 5 Ixi na sr� lxma ltaa ` �j U/ j-i _�I:Q IYtYd Pl ED 1 aJ, 1 *iiiiiii[ jE,=,\it /� < r� IE6q0.V T 5 Iq1 yi �fCT�1Ytl..� $ _—N 6N Si 6 Ek ©®I�-PL III TTgnI s [] RAINIER AVE AIRPORT WAY► b sr �D _ LLuJJ1/Ll3 'ted' SAFETY IMPROVEMENTS ) ` —-- x Sq s, ji�i Q x[m sT „5; Y.,i14,;', f ■ - 1, ®®IC . N Iq TT /pow- AWL' NE . TT SE . SI IL i014,29.1 R �5 i1gN 57 -- —_Nw Q, ... iltillimw4"0 - / YTYtTdy FIFFF �� $, .V`y' N„2.1 I6 Q� \, s13:4Sr I , ,�a 41-5E-1L,I® •_ 1NE 1M SrM ',� �� /®� 1==J �;�P..-- ROUSER WAY RELACATED �' '-'45\-4,111 'q � C fid TT _ P SUNSET TON 8TH PHASE 1 i``' . 1 i_ ©4 - - *, MAPLE VALLEY wYEI :1 I '` a / do`^ r e SE sa 51 ilmil4 Si -- - SE IJOIh M1 M R =�'aai�ll +� 4* CI( LL =- ;�1- MILL AVE S REBUILD. g� �, „"` �t 11 I C eN sr �� ,� WITH WSDOtlir w � i I ., II 7.ST> SY, TT <, •, _ , . Vj7 ; I t I D oma.Ydd Q ® I 1 ane • • • ,s, -11P SW 16TH ST. T°—_- E' �►: • = 000 WCL TOUNDAVE aill_�0Inc �Y ' .•. �,.tIII7) _ \. 111I t � I sw nth sr tee, "� i TO ECL (WSDOT} 5" �� 4.4iii . p 5/ Rldn .,4 cz, ■ 'J !Eli® YId ST^ :� / // I] 1 S:::: E 15400 R ■ A 1Jrd ST 5 rad LJLJ gldaN M�,�— � SC MIA TT aIdON' fe. - SE 162.1 ST E ti > `t��lSE 161nd1 M ■ 51St ST s \SE``t((e''Na��� gre .` AVE ■ Q - II I CI 1e5r1 TT s® JLfU 3��'Yq g leer a �` VE SE s. 'SrSO zq SI (� V . ... Jig iNN TT I F ®�C_ 1 SW 16TH TO SW 31ST �v , 57 — Se Mdq SE M«Y 51 C vy artYn M 11: : : ` °" �l�(�1�-((�1�r�_11f�JJll 13 . OF 5( iset 5f s< ieeti i - w s .4111,f�^ 5x Sad ST M NI d J 5•Sfr Y 1SE IMIN STI 'FV� `SE,dYN 5T1 8 ] _ � Q € W M CSE 16600 P,I,,I� YI \\ \( Cf�\ 3 - 5- 1r $g `ATM"I_ NE 1,0%5T �KM 2� S' SN ma TT S• S,M SE 6 J !Y - 4 \ S� ... S 172.1 sr �L�J 1N e c 35F sE 172r 51 ' (0 141NTT a p �a ,, "`JJJ M — 5E 170 Sr - Y R1ROM7 Y / yy_ ... l( SIA'I,d 1 TT �� -� r A NMN Sf I�n SC 17TT PVW SE1Th 57ar d)1 ST Sr WJt:l SC Say` iii _ S 43RD WIDENING LID 329 HEARING 5 TTi 11 43RD 1 _ 11JJ ADOPTED LOOP RAMP 1 •••i' `.* i "I's n MI , • 1 1 I RESOLUTION S 192ND/S 200TH10110..m. ifl► .d EXHIBIT 'C' SR-167 TO SR-51 1 d a -a 4,71 iIII I. A'• Ybns FE sEEO� 14--- ARTERIAL STREETS 1990 N L 5 r - e N N fC R7Aa= LEGENDS _�;�' F A a W:XB Y PRINCIPAL ARTERIAL � C x Q ®®®®®®m MINOR ARTERIAL e s inn a ' e W Dn COLLECTOR ARTERIAL �� © ®IDS ` P. >(a + i- x. inn sr -q 4ed Mk pi e� � 'II,�r� i I! 4aepj S SO ANT �N _ ;� Ale c a]en 1111 1 al,. xaa, n �inn , J l i X torr B s-...)11 r�Q ; \tilltnrill rl / 9:din �`� SI 011=Wr sr [X i •'3.11-1.. _y'!' I,\ s eau it , Yil•• Y I '�''� III q��-r1 - ' 2-�i-5-Ur•0. - - - 21a SI Irl ]In D '� 'DM 1 ] M]la 41W4 •• \LP O a,.�:se. s me.,LAKE WASHINGTON t 0 I-1 I (21i ,I� II - O MI% it r (ffjjll���ss L ��,,,�/ A �__ ' I I- tear Y � E Pri :fl ,_ 1 II: RMeR.0 fr' iL -11 I I4I RI 7 ill IonO arm a m II I r , W0 I_%' IR La Io®�� )Ii Pt.',/,` I ��7� I'', '1 sums ,z.,,: ;; In8 � 9 omam �Io r>oa ��m mom= NEVA" m ®® = ��I IDS.~ i 1� MI as 39 ---�' ®� - _ I I ell dim Km ir 5 -' ,= .� ��• � 'll® II ,®. � *1 I�©1,i _ III ..ass \�IYyyE! I „,=_.),;:!,:m - ., r - ,ma Ri.1_ Q �I ,qtr- 1//µyyy :I�/ I r' . - -�/ s< = S I_ 7P ©'i ii 2"rFyhr El ` Ntl? 1. _V' IEX � r tlS �; �■ 1p '�''-��RR �/ ads I -- i';11ti �,�~ I� it PlII VIII II •1 M \ ' 111 .II l n il_ _-":.11�g�la'll�,�®;JIF'41w1�'iflr Ili. 1' -6i g NI�� �I r_ ]r 1 �/C/k� _�/}los a� ®-• 9l 111 • ->...4161. Rr �' 13<3 :0YVA sr y,� --t :• •ill. .I 1j B ed - -CD - - -.* �Ii, l" 3x1 -� I ❑rvr mr Sr rant !II 1 -IC -- _ % � 2".. . li II ill 41 0. ,; /- i I I ,, -lealifil �NI!9!):::411% �./■ rI,l l.. -',...., ri' ..f® to O I III S.I1 ;il/' / :, %, 1441,: I n I 'l' µ ,` e . s as 1 g > Mii 111 // li. E ,' ® \4 moa B NI 1/ EIIr, 11 . �� SHa st '11I'I - s_ ., .„... yy�� s into, 3IIIHnDan ." . ® � ILII '`,Ia:]avi ......,- 'III vQ " ° a el Ili. I s lean s SIP MO I s nn Sr Ilii. Ix N u-�2 now .I-• y; g4. 4. • ne I _I B W _ .®.'__ _ _ _ il„ - - h' I store sr # Principal Arteriole Collector Arterials ,ctII 1 I '5ola 11 I, Airport Way from Relnier Ave.5 to Logan Ave.S 49. Shattuck Ave.S from S 4th St.to 5 Grady We, 4 0 I' 4R�' 2. eramon Way 6/Bronson Way N from Main Ave.9 to SuneeL Blvd.N 50. Perk Ave.N/N 40th St.from N 90th St.to Lek Wash.Blvd.N 1 L 3. Logen Ave.S/Logen Ave.N from Airport Wey to N 8th St. Si. Burnett Ave.N from lake Wash.Blvd.N(S.Term.)to Lake Wash.Blvd.N(21.Term.) 81 j • - 'j a > 4. Logen Ave.5/Smlthere Ave.S from Airport Wey to 5 7th St. 52. Aberdeen Ave.NE from Sunset Blvd.NS to NE 27th St. II I I i 5. Main Ave.S from 3 Grady Wey to Brozman Wey 5 53. NE 16 h St.from lanae Ave.NE to Edmonds Ave.NE I 0. Maple Valley Highway from Sunset Blvd.N to East city limits 54. NE 12th St.from Edmond.Ave.NE to Union Ave.NE Itl If IlbI I -I 6 7. N 3rd St.from Logen Ave.N to Sunset Blvd.N 55. Monroe Ave.NE from NE 2nd St.to NE 12th St. ail �- .R 1 _8. N 3rd PI./N 4th St.from Houser Way N to Logan Ave.N 50. NE 2nd St.from Monroe Ave.NE to City Shope entry - I I NE S. 4th St.fromSnook Blvd. toEast city limit. 57. NE 10th St.from NE Sunset Blvd.to Monroe Ave.N$ �_-^_:II 'l f_ w s torn Sr 10. Park Ave. from Bronsonf Ws N to N Park Dr. 58. NE 7th St.from NE Sanest Blvd.to Monroe Ave.NB $ _ 1 r _ II. N Perk Dr./NE Perk Dr.from Park Ave-N to Edmond.Ave.NE 59. Edmond.Ave.NE from NE Sunset Blvd.to NE 9rd St. -_w'..,,._ ��,w..i fill - -- ___ ,_. __ 12._.NE SunsetBlvd-from-Edmonde_A•e.NE_M Seatcitylimits_ __80. Bronson Ave.NW//NE 4th St.from NE 8rd_,Ave. o t,tfenon_A•e-NE _ - • . t /i g 1ed -r' i -= aI> 13. Reinter Ave.N/Rainier Ave-9 from North city limits to S Grady Wey Si. Taylor e-NW/Taylor PI NW from Renton Ave-Ext-to west city limits 14. S god St.from Main Ave.S to Rainier Ave.9 02. Meadow Ave.N from Bronson Way N to N 4th St. \� 1 �� I s I5. S 3rd St.from Rainier Ave.S to Melo Ave.S 83. Factory Ave.N from Brennen Way N to N 4th St. 18. Renton Ave.Extension from Rainier Ave.9 to Weet city limits 84. SW Langston Rood from SW SuneeL Blvd.to eet city limits MI 17. SW Sunset Blvd.from Weet city limit.to Rainier Ave.S 55. S 3rd Pl.from Rainier Ave.S to Shattuck Ave.S 18. Suoeet Blvd.N from Broneoo Wey N to FA1 405 68. Shattuck Ave.S from S End St.to S Grady Way • 19. Houser Way S/Houeer Way N from Mein Ave.9 to Bronson Way N 87. Whitworth Ave.9 from 9 god St.to S 4th St. 20. S Grady Way from Rainier Ave S to Main Ave.S 88. Morrie Ave.6 from 5 End St.to 9 4th St. 21. SW 49rd St./S 43rd St.from Weet Valley Road to Talbot Road 98B. Burnett Ave,8 from 9 2nd 9t.to 8 7t 3L. Fd22. Talbot Reed S from S 7th St.to S Paget Dr. 70. Honeter Road SW from S 140th St.to SW 161h St. 23. Hensen Dr.9 from S Puget Dr.to South city limits 71. SW 18th St.from Eeet Valley Roed to Monster Road SW 6 II 24. Oekeedele Ave.SW from SW 43rd St.to Suoeet Hwy. 72. East Valley Roed from SW 18th 6t.to sW 43rd 6l25. N Blh 9t.from Login Ave.N In Pnrk Ave.N 73. Talbot Roed S from 9 16th St.to south ity limits ; 20. S 55th St./SE l92od St.from SR-515(108th Ave.SE)to 1-187 74. SW 4let St.from East Valley Reed to Ookeedele Ave.SW 75. SW 34th St.from Eaet Valley Road to Onkeedale Ave.SW s naa 11 - 77. Join78. .Ave.NE from NE 16thAve.SW from SW eSt.to NE 26th St.. Ave.et Med.to Rainier 9 I - I bel a Minor Arterials 1 t' 27. Beneoo Road S from S Gredy Wey to eouth elty limits 26. Lind Ave.SW from SW 7th St.to SW 49rd St. B u 29. SW Grady R from Rainier Ave.9 to west city limits > 30. S Puget Dr./Puget Dr.SE from Talbot Road S to Edmonds Ave.SE a 31. Edmond.Ave.S5 from Puget Dr.SE to a nth city limit. sore > �_ 32. S 4th P1./9 411,St.from Rainier Ave.S to Main Ave.9 g s 1110 33. S 7th St./SW 7th St.from Burnett Ave.S to Ookeedale Ave.6W I :inn '"s I! I 34. Mill Ave.S from Houser Wey S to Bronson Way 6 95. 9 god Sl.from Mill Ave.9 to Mein Ave.9 38. Wells Ave.6/Welle Ave.N from S Grady Wey to N 4th St. 37. Williams Ave.N/1HIllame Ave.S from N 4th St.to 8 Grady Way 38. N 8th St.from Pork Ave.N to Garden Ave.N 39. Garden Ave.51 from Brannan Way N to N Perk Dr. 40. N 8th St.from Park Ave.N to Garden Ave.N(North Leg) 41. Sunset Blvd.NE from FAI 405 to NE Park Dr. 42. Uolon Ave.NE from south city limits to north city limlta 43. Edmonde Ave.NE from NE Sunset Blvd.to NE 27th St. 44. NE 30th St./Eemeewlek Pl.NE/NE 27th St.from FAI 405 to Edmond.Ave.NE 45. N 30th St.from Burnett Ave.N to FAl 405 40. Lake Week.Blvd.N/NE from North Perk DR.to north city limits 47. SW 27th St.from Weet Valley Road to Eeot Valley Road 48. Duvall Ave.NE from north city limits to south city limit. EXHIBIT 'D' HEARING ------_-___- ADOPTED __-_--___ RESOLUTION ______ CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992- 1997 1 Street Overlay Program 2 Oakesdale SW-SW 31st to SW 16th 3 North Renton Uvable Streets 4 Park Ave N/Lake Washington Blvd 5 S 43rd St(LID 329) 6 Park Ave N-Bronson Way N to N 10th St 7 Mill Ave S Rebuild W/I-405(WSDOT Project) 8 Main Ave S/S 4th St 9 Houser Way Relocated-Sunset Interchange to N 8th St Phase I 10 Transportation Demand Management Program 11 Walkway Program 12 CBD Transportation and Streetscape 13 Transit Program 14 Houser Way Relocated-Sunset Interchange to N 8th St Phase II 15 Bridge Inspection Program 16 Traffic Signal Loop Replacement Program ' 17 Traffic Sign Replacement Program 18 Ught Pole Replacement Program 19 Sidewalk Inspection and Replacement Program 20 Arterial Circulation 21 Monster Road Bridge 22 NE 44th St/I-405 23 SW 16th St-West City Umits to Lind Ave SW 24 Sunset Blvd N Project Development 25 S 2nd St/Logan Ave S,Williams Ave S&Wells Ave S 26 SW 43rd St/SR 167 Loop Ramp 27 Lake Washington Blvd-N Park Dr to N 44th St Project Development 28 Neighborhood Improvement/Beautification Program 29 City Gateways Program 30 S 2nd St/Main Ave S 31 Maple Valley Highway-Maplewood Ave SE to East City Limits(WSDOT Project) 32 N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development 33 Talbot Rd S-S 43rd St to South City Umits 34 TBZ Project Development 35 Missing Unks Program 36 Oakesdale Ave SW-Monster Rd to SR 900 37 Bronson-Houser Corridor Project Development 38 S Grady Way/Rainier Ave S Project Development 39 Miscellaneous Traffic Safety Program 40 Guardrail Program 41 S 192nd St/S 200th St-SR 167 to SR 515 Project Development 42 S 3rd St/Smithers Ave S/Logan Ave S '43 Monroe Ave NE-SR 169 to Sunset Blvd NE Project Development 44 Duvall Ave NE-Sunset Blvd NE to North City Umits Project Development 45 SW Grady Way-SR 167 to SR 515 46 1405/SR 515 Project Development 47 SE Puget Dr-Jones PI SW to Edmonds Ave SE 48 N Park Dr-Lake Washington Blvd to 1405 Project Development 49 Aberdeen Ave NE-NE 20th St to NE 27th St Project Development 50 Benson Rd S/S 31st St 51 S 3rd St/Rainier Ave S 52 S 2nd St/Rainier Ave S 53 Sunset Blvd NE/Anacortes Ave NE 54 Other Valley Improvements Page 1 c:\cipindx.xls .BUSS IIVut.k& SUIVIIVIiu- y Ut I:HNIVtitS SIX YEAR TRANSP;' ATION IMPROVEMENT PROGRAM ^' 1 \• Prelim CIP _ j 92-97 91 Proj. 91-96 PROJECT COMMENTS TIP Budget # TIP 12108 1 Street Overlay Program Funding lowered by$60,000 due to reduced gas tax revenue forecast. 2 14 022 2 Oakesdale SW-SW 31st to SW 16th South terminus changed from SW 28th to SW 31st, construction estimate increased significantly. 3 15 044 3 North Renton Livable Streets 4 16 12081 4 Park Ave N/Lake Washington Blvd 5 18 329 6 S 43rd St(LID 329) 6 19 008 7 Park Ave N- Bronson Way N to N 10th St 7 20 070 8 Mill Ave S Rebuild W/I-405 WSDOT Project 8 21 024 9 Main Ave S/S 4th St 9 22 025 10 Houser Relocated-Sunset to N 8th Phase I Due to increased construction estimate and funding constraints; Houser split into two phases. 10 n/a 12135 n/a Transportation Demand Management New program in TIP. New state legislation requires implementation of TDM. 11 25 009 13 Walkway Program 12 23 12111 14 CBD Transportation and Streetscape "CBD Transportation" and "CBD Streetscape" combined into one program. 13 24 12109 12 Transit Program Changed from"Study"to"Program." Funding provided to pursue capital improvements. 14 n/a n/a Houser Relocated-Sunset to N 8th Phase II Due to funding constraints, Houser has been split into two phases. 15 26 106 15 Bridge Inspection Program Changed to inspection only.Repairs will be performed on a case-by-case basis. 16 27 016 16 Traffic Signal Loop Replacement Program 17 44 12113 n/a Traffic Sign Replacement Program Approved by Council in'91 CIP. 18 28 091 17 Light Pole Replacement Program 19 29 056 18 Sidewalk Inspection and Replacement Inspection element added to program and funding increased to complete backlog. • 20 30 029 19 Arterial Circulation Description expanded to include TDM,Clean Air and multi-modal elements. 21 n/a 12117 35 Monster Road Bridge Fomerly"repair;" now grant will be pursued for replacement of bridge. , 22 n/a 054 21 NE 44th St/1405 23 31 023 20 SW 16th St-West City Limits to Lind Ave SW Due to proposed Boeing development of Longacres site, west terminus changed to west city limits. 24 33 032 23 Sunset Blvd N Project Development Formerly called "1-405 Studies;"focds now narrowed to this critical corridor. 25 n/a 058 24 S 2nd St/Logan,Williams&Wells Ayes S Formerly called "S 2nd St Visibility Safety Project." 26 34 028 25 SW 43rd St/SR 167 Loop Ramp 27 n/a 12121 33 Lake Wash Blvd-Park to N 44th Bike/Ped Re 11411,re,b',,0 ®f it.RDL,,.fy ADD£o. Deil6,A, ,'rpo u/bep <02 /qef . 28 36 12110 27 Neighborhood Improvement/Beautification 29 37 12112 28 City Gateways Program 30 n/a 095 29 S 2nd St/Main Ave S 31 38 033 30 Maple Valley Hwy-Maplewood to ECL 32 39 12083 31 N 4th Blvd-Logan Ave N to Monterey Dr NE 33 n/a 12126 44 Talbot Rd S-S 43rd St to South City Limits Formerly a study. Funding has been provided for reconstructing existing roadway.. 34 42 12107 39 TBZ Project Development 35 n/a 12106 34 Missing Links Program 36 n/a 12116 n/a Oakesdale Ave SW- Monster Rd to SR 900 New TIP project. Part of Grady TBZ. Need to improve this arterial is increasing. 37 45 12114 n/a Bronson-Houser Corridor Project Development Approved by Council in'91 CIP.Changed from project to project development. 38 n/a 12118 n/a S Grady Way/Rainier Ave S Project Devel. New TIP project. Part of Grady TBZ.Traffic volumes and congestion require evaluation of this project. 39 n/a 12115 n/a Miscellaneous Traffic Safety Program New TIP project. Funds small scale safety projects identified by traffic operations section. 40 35 073 26 Guardrail Program . 41 41 075 37 S 192nd St/S 200th St- SR 167 to SR 515 42 n/a 12128 46 S 3rd St/Smithers Ave S/Logan Ave S ' 43 n/a 12122 40 Monroe Ave NE-SR 169 to Sunset Blvd NE Arterial changed from Edmonds Ave NE to Monroe. 44 n/a 12123 41 Duvall Ave NE-Sunset Blvd NE to NCL 45 n/a 12127 45 SW Grady Way-SR 167 to SR 515 Formerly called "Grady/Shattuck Signal Improvements." Scope expanded. 46 43 010 51 I 405/SR 515 Project Development 47 n/a 12120 38 SE Puget Dr-Jones PI SW to Edmonds Av SE 48 n/a 12124 42 N Park Dr-Lake Washington Blvd to 1405 49 n/a 12125 43 Aberdeen Ave NE-NE 20th St to NE 27th St 50 n/a 12129 47 Benson Rd S/S 31st St 51 n/a 12130 48 S 3rd St/Rainier Ave S 52 n/a 12131 49 S 2nd St/Rainier Ave S 53 n/a 12133 53 Sunset Blvd NE/Anacortes Ave NE 54 n/a 12132 50 Other Valley Improvements REVISED, COMBINED OR DROPPED PROJECTS n/a 17 057 5 Benson Road Improvements- Phase II Study Dropped. Improvements being undertaken by private developers n/a 32 030 22 SW 16th- Oakesdale Ave SW to Monster Rd Combined with #23 "SW 16th-West City Limits to Lind Ave SW" n/a n/a n/a 36 Oakesdale-SW 31st to SW 27th Combined with #2 "Oakesdale-SW 16th to SW 31st" n/a 40 12086 32 S Grady Way HOV Dropped due to Metro's route changes. n/a n/a n/a 52 Garden Ave N-N 6th St to N 8th St Dropped by action of City Council CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY • c:\tprfund2.xls TOTAL PROJECT FUNDING 1' Previous >'Project Total Project Title Funding 1992 1993 19941 _ 1995 1996 19971 Total Funded 1 Street Overlay Prgm 440,000 440,000 440,000 440,000 440,000 440,000 2,640,000 2,640,000 2 Oakesdalo SW-3lstto 16th 300,000 615,000 3,115,000 6,480,000 3,240,000 13,750,000 900,000 3 North Renton Livable Sts 160,000 635,000 795,000 443,200 4 Park N/Lk Wa Blvd 191,000 570,000 761,000 761,000 5 S 43rd (LID 329) 2,182,000 1,145,700 3,327,700 3,327,700 6 Park N-Bronson to N 10th 340,000 1,459,000 3,419,800 2,064,200 7,283,000 2,280,800 7 Mill S Rebuild-W/I405 47,000 283,000 330,000 330,000 8 Main S/S 4th 158,000 22,000 440,000 620,000 530,000 9 Houser-Sunset to Nath I 220,000 390,000 1,063,000 661,000 2,334,000 762,000 10 Transp Demand Mgmt 60,000 25,000 25,000 25,000 25,000 25,000 185,000 185,000 11 Walkway Program 150,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000 450,000 12 CBD Transp&Streetscape 100,000 40,000 210,000 350,000 350,000 13 Transit Program 378,000 50,000 200,000 200,000 828,000 828,000 14 Houser-Sunset to N8th II 128,000 508,000 1,625,000 2,261,000 30,000 15 Bridge Inspection Program 50,000 40,000 40,000 40,000 170,000 170,000 16 Traffic Sig Loop Replace 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000 17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000 120,000 120,000 18 Light Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000 19 Sdwlk Insp&Replace Prgm 15,000 10,000 10,000 10,000 10,000 10,000 65,000 65,000 20 Arterial Circulation 120,000 160,000 500,000 1,300,000 1,600,000 1,600,000 1,600,000 6,880,000 4,559,000 21 Monster Road Bridge 100,000 200,000 1,100,000 1,400,000 100,000 22 NE 44th/1405 Interchange 44,000 216,000 260,000 260,000 23 SW16th-WCL to Lind 60,000 219,000 479,000 3,544,000 4,302,000 120,000 24 Sunset N Project Devel 100,000 100,000 100,000 25 S2nd/Logan,Willms&Well 138,889 138,889 138,889 26 SW 43rd/SR 167 Ramp 80,000 20,000 950,000 1,050,000 80,000 27 LWB-N Park to N 44th 75,000 50,000 125,000 125,000 28 Neigh Improve/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 70,000 420,000 420,000 29 City Gateways Prgm 55,000 55,000 55,000 55,000 220,000 220,000 30 S 2nd/Main S 75,000 75,000 75,000 31 Maple Vly Hw-Mplwd to ECL 5,000 5,000 5,000 32 N 4th-Logan to Monterey 50,000 30,000 80,000 80,000 33 Talbot S-S 43rd to SCL 30,000 300,000 330,000 330,000 34 TBZ Project Development 115,000 115,000 115,000 35 Missing Links Prgm 446,000 200,000 200,000 200,000 200,000 200,000 1,446,000 1,446,000 36 Oakesdale-Monster to SR 900 50,000 50,000 500,000 1,117,000 3,866,000 3,867,000 9,450,000 325,000 37 Bronson-Houser Corridor 50,000 50,000 50,000 38 S Grady/Rainier S 30,000 60,000 90,000 90,000 39 Misc Traffic Safety Prgm 50,000 50,000 50,000 50,000 50,000 50,000 300,000 300,000 40 Guardrail Program 31,500 50,000 50,000 50,000 50,000 50,000 50,000 331,500 331,500 41 S192/5200-SR167 to SR515 95,000 155,000 250,000 250,000 42 S 3rd/Smithers S/Logan S 130,000 130,000 30,000 43 Monroe NE-SR 169 to Sunset 50,000 50,000 50,000 44 Duvall NE-Sunset to NCL 50,000 50,000 50,000 45 SW Grady-SR167 to SR515 260,000 260,000 60,000 46 1405/SR 515 Prj Dv 60,000 60,000 47 Puget-Jones to Edmonds 100,000 910,000 1,010,000 48 N Park-LWB to 1405 60,000 60,000 49 Aberdeen NE-20th to 27th 40,000 40,000 50 Benson Rd S/S 31st 20,000 110,000 130,000 51 S 3rd/Rainier S 54,000 54,000 52 S 2nd/Rainier S 36,000 198,000 234,000 53 Sunset NE/Anacortes NE 86,000 192,000 278,000 54 Other Valley Improvements 2,451,000 8,637,000 6,912,000 18,000,000 Totals 5,886,389 6,648,700 10,962,800 .18,845,200 11,524,000 16,893,000 13,584,000 '84,344,089 24,183,089 INFRASTRUCTURE OPERATIONS/SAFETY MULTIMODAL/TDM ECONOMIC DEVELOPMENT NEIGHBORHOOD PROTECTION/LIVEABILITY INFRASTRUCTURE PROJECTS AND PROGRAMS 1 Street Overlay Prgm 440,000 440,000 440,000 440,000 440,000 440,000 2,640,000 '2,640,000 15 Bridge Inspection Program 50,000 40,000 40,000 40,000 170,000 170,000 16 Traffic Sig Loop Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000 17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000 120,000 120,000 18 Light Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 150,000 19 Sdwlk Insp & Replace Prgm _15,000 . 10,000 10,000 10,000 10,000 10,000 65,000 65,000 21 Monster Road Bridge 100,000 200,000 1,100,000 1,400,000 100,000 33 Talbot S-S 43rd to SCL .30,000 300,000 330,000 330,000 40 Guardrail Program 31,500 50,000 50,000 50,000 50,000 50,000 50,000 331,500 331,500 �Q1(.'f��.��.:<::;;::::;:;:i;:;:;:::::::r:::::;•:::i::::?::;:::::�:i<::::::i;:;:;::i:;i::::%#:::::::;:::�;:;::;:::::'.::::':5:;:::::::;;:::::::;;�:k��':�?ifiV::::......W....OMM...:.....W...iSZOOMMan........Wnan........#/....COM........e...ain.....iF Or.000....,.......06 a00. MULTI-MODAL/TRANSPORTATION DEMAND MANAGEMENT PROJECTS AND PROGRAMS ...::.ll.A9:'.:€< > M...:::.........ii ............................._.......................... 10 Transp Demand Mgmt Prgm 60,000 25,000 25,000 25,000 25,000 25,000 185,000 185,000 11 Walkway Program, 150,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000 450,000 13 Transit Program 378,000 50,000 200,000 200,000 828,000 828,000 20 Arterial Circulation 120,000 160,000 500,000 1,300,000 1,600,000 1,600,000 1,600,000 6,880,000 4,559,000 27 'LWB-N Park to N 44th 75,000 50,000 125,000 125,000 48 N Park-LWB to 1-405 60,000 60,000 :.:Qta s........:....:...:.........................................................................nfil ......... Q Q10.:......0 ' fi10 1. {1 ,> MI..3...' # ...... 5+ r .......:R )€3Q..:.:#: :..7 #IICf NEIGHBORHOOD PROTECTION/LIVABILITY PROJECTS AND PROGRAMS _ .::. ::::::::::::::::::.::.:::.�::::::.:.P.���..TIt.�.........:.......,......................t�r�c�.... :.....::....:..°k.��.��.........:.:::::::1.���.................'�.�1��:...............,.�..�9 .................'is���.........,......�,��.?.,.,.....,.......:�'�o��...:....:..........�+�Rr���l....... 3 North Renton Livable Streets • 160,000 635,000 795,000 443,200 4 Park N/Lk Wa Blvd 191,000 570,000 761,000 761,000 6 Park N-Bronson to N 10th 340,000 1,459,000 3,4.19,800 2,064,200' 7,283,000 2,280,800 7 Mill S Rebuild-W/1405 47,000 283,000 330,000 330,000 9 Houser Rel-Sunset to N8th I 220,000 390,000 1,063,000 661,000 2,334,000 762,000 14 Houser Rel-Sunset to N8th II 128,000 "508,000 1,625,000 . 2,261,000 . 30,000 28 Neigh Improve/Beaut Prgm . 70,000 70,000 70,000 70,000 70,000 70,000 420,000 420,000 29 City Gateways Prgm 55,000 55,000 55,000 55,000 220,000 220,000 32 N 4th-Logan to Monterey 50,000 30,000 _ 80,000 80,000 ::.Q1.6'�,}5.............................::..:,..........::....:...................:...:..:........:.�:r.�.��Q�?�:..:0401100*:.:.:�.��..:.+V4��....�t.RJ:.:4?+::: t ECONOMIC DEVELOPMENT PROJECTS AND PROGRAMS TIP >`<' :iEiE::s:'::i<>;iEEEEi3EE`EiE`<EEiE<Eii:€E>E >Ei E>E`Ei`<`E aEii< ii>E >'<'.E:>E i 'r::>..:::<;>i;::<i'< <iiMii} <`>>>>» > <«`�< << ? >><>> `> <>`<€ ``` ilii >>I> > iii;;i I <>'?>iiign ` > gilli> »> »<'::roje<_ilia >':<: > .... . . ... . ......... .. .... ?��..5.... .........:: ::::................................................................;;:;.........................=:;:;... ......... ::::.......... :.: Vii.:::::.:. t t:. :. .::::: :.....:.... . :::.:::.:::: ::::. : . ':iilki:> :>:!::MM«:»<: 'Pr:,::.i.tiiTI .F., t E......:;::>. 41.:::>:94i> c<; ;1>.. :;:;:;:;!;:::::::::::=::::]:;:;:;:;:;:;::,E19EEE>I. 7>EE i = > >' ' o_;.:4 > < >�E 44c.1.: �Pct>:T �............ • °......... .................................. . .....t. ...................::::::.,.:.:.:......u��i.r� :::: .;::::.�:�:� €iiiiE`::E:............�J: `<:>: E............:i'�.......... .........:.:.��.95::>:::::«:.:::>:::. .... :9�::>::<:::::�:::::�::::......��3..................:...:...��...... ......:....t�... 0i `: 2 Oakesdale SW-31st to 16th 300,000 615,000 3,115,000 6,480,000 3,240,000 13,750,000 900,000 12 -CBD Transp & Streetscape 100,000 40,000 210,000 350,000 350,000 23 SW16th-WCL to Lind 60,000 219,000 479,000 3,544,000 4,302,000 120,000 34 TBZ Project Development 115,000 115,000 115,000 41 S192/S200-SR167 to SR515 95,000 155,000 250,000 250,000 43 Monroe NE-SR 169 to Sunset 50,000 50,000 50,000 47 Puget-Jones to Edmonds 100,000 910,000 1,010,000 49 Aberdeen NE-20th to 27th 40,000 40,000 54 Other.Valley Improvements 2,451,000 8,637,000 6,912,000 18,000,000 <;:>'.>:: ::>:EEEEEisEEEE`EiEE`iiiiin'EE}rE:c'iiiEigiiii < 't'i:iii'?t:iiiiiEiiiii:i:E:iiE E'YE: `:'•:`':' diii;P n� ':''05.:1:': :..>.. :.>":.'.':yEE;E,E`..:.>`:.y"_" `:,:::.:,.Pii!::.:,;:,.;';.;'•E:',r::.:.....:y:: -:.:: .:.:"0.0.kNO; '.::.,,,.::.:..;:..0.1i,:••.:::..'.::.,.,:.:,:.,:.;;•,.;. „.;;:.,:,..,:.,.,:,,..;il:Y, :...�ta.#s.................... ...... .............:........................................ . . ... :. . . :7:4. . :... : .: :A' :.��++ QQ{{��1; ..:. 7 . . ....QQ•. .1. . . : . ... . .7. . . : .1. :(� .. .. ..................:..................:.................il�I�i��O. ......L!Vk?���...�i.�...... ���...�.���...r.��Q... W 4?:V...i��Q: .•� � ...���. .4! �....2��Q. ��.�V..:���.:..:.. �!V�.�Q�• OPERATIONS/SAFETY PROJECTS AND PROGRAMS <T1;. :<:j�r ; ;: i;i :>::r ::»:E: » <E:;<<:E:�ri < i> > i' <i:»i < ::<':<::::>:>> ::>E:>^<4G>:>E:r: <:» ii«-:i.' i :s s S. iii:>4 : ; iii•:;v•i::•:;:•i:i eo:: : : :........:. ......:.:::.:::.:; . :: • ' '': � . : ' b : ' ' . : :'.i:i:i:i:::.:i;:i:}:}i::.::::::i:}:i:+: moo 0 : i .. ... : : 4vec1T.. .<':::::>i:<:::<::: 4•»:.:»•::::::•>::::: u r• . ii:.::. 4tr , n } no 000E0 :;_::»i•; : iv : ^ f :iiLv { : ili4 } Y7» ::>:: v•g: »> : >> : ; : . i]i iiii 5 S 43rd (LID 329) 2,182,000 1,145,700. 3,327,700 3,327,700 8 Main S/S 4th 158,000 22,000 440,000 - 620,000 530,000 22 NE 44th/I405 Interchange 44,000 216,000 260,000- 260,000 24 Sunset N Project Develop 100,000100,000 100,000 25 S2nd /Logan, Williams & Wells 138,889 ' 138,889 138,889 26 SW 43rd/SR 167 Loop Ramp 80,000 20,000 950,000 1,050,000 80,000 30 S 2nd/Main S 75,000 75,000 75,000 31 Maple Vly Hwy-Mplwd to ECL 5,000 5,000 5,000 35 Missing Links Prgm 446,000 200,000 200,000 200,000 200,000 200,000 1,446,000 1,446,000 37 Bronson-Houser Corridor 50,000 50,000 50,000 38 S Grady/ Rainier S 30,000 60,000 90,000 90,000 39 Misc Traffic Safety Prgm 50,000 50,000 50,000 ` 50,000 50,000 50,000 300,000 300,000 42 S 3rd/Smithers S/Logan S 130,000 130,000 30,000 44 Duvall NE-Sunset to NCL 50,000 50,000 50,000 45 SW Grady - SR167 to SR515 260,000 ' . 260,000 60,000 46 1405/SR 515 Prj Dv60,000 60,000 50 Benson Rd S/S 31st 20,000 110,000 130,000 0 51 S 3rd/Rainier S 54,000 54,000 0 52 S 2nd/Rainier S 36,000 198,000 234,000 - 0 53 Sunset NE/Anacortes NE 86,000 192,000 278,000 T<;:;>- :1°:E:iiEEiE:EiE::E:i>:E:E<:>E€:EiiE'>><i>�>E<:iE:E:E:EE:E`E:i::iE:EE>>E:E:iE:<:iEr:E:iE><E:<'EiiE<>EE' ::.::: :.,::,..,.,.::,.:.:::.: is�:E>`E:::"<,:`: .::.::.,iEEE:;_E :'E,.'..`..".-'`E E<' , :,,,:..::_:,.:.'.. .:;; `:,:,.::.<',.:' ":`-:: :>::»�.:,:,.:::;:':.:::..,.<'' : �:�': :�::�'�''i:•��':> ::,.,,:.:.:,::,.,,<.::<:,.::::: ;. :,.;...:`:::_'::._ .: 3 gt8.689. ....24 ..7 .°l 1. •1:. . . :::....::. .... ..... .::.eta..s..:.::::::::::::.::.. . .......::..::::::r:.::::::;::::::::::::.:.;:.:::.:::::.: . .'#.........� ..�Q.......�....�6 tl£�Q......... 5�8:0. . ,.:.......4?8 0 Of3Q ... . . .... . 8 .. ... 42. . .... ............. ................................... ........................................3......,.........l.........._................F....._..�......f......, .;�.:.:�0.;.,.::.�i?...:�i��Q. �47::.:�. ,r�:::::���{.O�Q._.::,,;W p!a!�41�t�.:.:Ur:. .�t� Fv?.V�` CITY OF RENTON S" ( S SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY 3 • ®� c:\granprop.xls GRANTS PROPOSED mama :ii:4•i:>:iyi>}iii:>::::::::..:.v.,:�.::::•: %:;':;':}?:iii{:?t?;ii:;?: :;i:{i{{:;i:;:r::niii'iiii:>:;m.}•.,i iiii:::v::Y::tii:;{:;:i;::.:;::i:?i:':vi{:jii iiiii}iiY•ii:•i'•'{i:':jv:;: ............n � •:::• { y�� ::: ::.:•.vy.; �y .:::.:..:...:.•::..... .........q�{ .�. ... ......i.,iy+,{y,ti::::::'tii::i:�..7..R.-.F^:i+.::::S::i:`'t::�.7ifJ.:::Siii'•iiiii;� :ii::i.'•:mAggt':::ii:'t::{:.....�. 1 ••'ic::ii i:::`.<;:iii::;S•::;;:{{:i:.iT.'M...'•'•t'1ii:•i}iii:3ii::;iiii::::ii i£:iiii::•:[� .. viiii;.a77....J�M7 1 Street Overlay Prgm ' 2 Oakesdale SW 31 to SW 16 177,400 1,239,900 1,926,200 963,100 4,306,600 3 North Renton Livable Streets 4 Park N/Lk Wa Blvd Inter. 5 S 43rd Widening(LID 329) 6 Park N-Bronson N to N 10th 579,000 2,559,000 1,504,000 4,642,000 7 Mill S Rebuild-W/1405 8 Main S/S 4th 9 Houser Rel-Sunset to N8th I 992,000 580,000 1,572,000 10 Transp Demand Mgmt Prgm 11 Walkway Program 12 CBD Transp&Streetscape 13 Transit Program 14 Houser Rel-Sunset to N8th II 64,000 254,000 813,000 1,131,000 ' 15 Bridge Inspection Program 16 Traffic Sig Loop Replace Prgm 17 Traffic Sign Replace Prgm 18 Light Pole Replace Prgm 19 Sdwlk Insp&Replace Prgm 20 Arterial Circulation 21 Monster Road Bridge 1,050,000 1,050,000 _ 22 NE 44th/1405 Interchange 23 SW16th-WCL to Und SW 1,772,000 1,772,000 24 Sunset N Prj Dev 25 S2nd/Logan,Williams&Wells 26 SW 43rd/SR 167 Loop Ramp 20,000 619,300 639,300 27 LWB-N Park to N 44th Bk/Pd 28 Neigh Improve/Beaut Prgm 29 City Gateways Prgm 30 S 2nd/Main S 31 Mpl Vly Hwy-Mplwd SE to ECL 32 N 4th-Log.N to Mont.NE 33 Talbot Rd S-S 43rd to SCL 34 TBZ Planning Prj Dev 35 Missing Unks Prgm 36 Oakesdale-Monster to SR 900 275,000 650,000 1,900,000 1,900,000 ,4,725,000 37 Bronson-Houser Corridor 38 S Grady Wy/Rainier S Prj.Dv. 39 Misc Traffic Safety Prgm 40 Guardrail Program 41 S192/S200-SR167t0SR515 42 S 3rd/Smithers S/Logan S 43 Monroe NE-SR 169 to Sunset 44 Duvall NE-Sunset to NCL 45 SW Grady Wy-SR167 to SR515 46 1405/SR 515 Prj Dv 30,000 30,000 47 Puget-Jones to Edmonds 48 N Park Dr-LWB to 1405 49 Aberdeen-NE 20th to NE 27th 50 Benson Road S/S 31st 15,000 91,000 106,000 51 S 3rd/Rainier S 44,000 • 44,000 52 S 2nd/Rainier S , 26,000 150,000 176,000 53 Sunset NE/Anacortes NE 54 Other Valley Improvements 436,000 1,035,000 5,182,000 4,147,000 10,800,000 i::i::i::n.:::::::::::: ..;..::::::::..i:.;.::::.-::::::..�.::::::.:.:::.::,:::.:::: ::'.$' >: :052':311 4i!ti itidd:i470 :::>30`983' •�'4.ts�:::i:;«<::;::: :;:i>:::>::::>:>::>::>:::>::::>:::<•<.:::>::::>::>::::>::::>:<:>::::>::>::»::»>::»::>::s::»::: <:>:7a��4#�II:':,S?F;1 ��130•... 3�3�5� • • CITY OF RENTON Sir SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY J? : 01 c:\mitprop.xls • MITIGATION PROPOSED ::x:v:{vim:::::::::::fv:....r.:::::::::.�::::.::::.:::::::::::::::::•v:•{{{{{{{6}:..w::•:::•.v ......................... ........... :::::v:n:•:::::•:::•.:: •i'r'�iiii:{4i: ................. ............................................x..n...... ...,...vr nv.w:::•:x::_•.�:.:�.�.:::v...::::::4ii:4iiii'^'^i:{•i:•i;{{n;{}:;}i::ii':i:::::::.v.::::�::S4:{{•ii:4i::::::::::�:•:::x:.�::•i: . :::�u.. .;:::::1�rf>:<:-::::>::�1 ::<:::><:'.>:>'� #::::::;::'.�'�s���° ::::::::>:'.::>:::::z:l ::>:>:><::<:»;1:99:..... ..o. ::»:�::>>;::>::;:.:<::::::: j�cC>°:1:'lie:::::>::>:>:::::::>r::<::: .. t�:::::�> ........ ................................. 1 Street Overlay Prgm 2 Oakesdale SW 31 to SW 16 1,612,700 4,553,800 2,276,900 8,443,400 3 North Renton Livable Streets 351,800 351,800 4 Park N/Lk Wa Blvd Inter. 5 S 43rd Widening(LID 329) 6 Park N-Bronson N to N 10th 7 Mill S Rebuild-W/I405 • 8 Main S/S 4th 9 Houser Rel-Sunset to N8th I 10 Transp Demand Mgmt Prgm 11 Walkway Program 12 CBD Transp&Streetscape 13 Transit Program 14 Houser Rel-Sunset to N8th II '15 Bridge Inspection Program 16 Traffic Sig Loop Replace Prgm 17 Traffic Sign Replace Prgm 18 Light Pole Replace Pgrm 19 Sdwlk Insp&Replace Prgm 20 Arterial Circulation 260,000 400,000 400,000 300,000 340,000 1,700,000 21 Monster Road Bridge 50,000 150,000 50,000 250,000 22 NE 44th/1405 Interchange 23 SW16th-WCL to Und SW 159,000 479,000 1,772,000 . 2,410,000 24 Sunset N Prj Dev 25 S2nd/Logan,Williams&Wells 26 SW 43rd/SR 167 Loop Ramp `- 27 LWB-N Park to N 44th Bk/Pd 28 Neigh Improve/Beaut Prgm 29 City Gateways Prgm 30 S 2nd/Main S 31 Mpl Vly Hwy-Mplwd SE to ECL 32 N 4th-Log.N to Mont.NE 33 Talbot Rd S-S 43rd to SCL • 34 TBZ Planning Prj Dev 35 Missing Unks Prgm 36 Oakesdale-Monster to SR 900 467,000 1,966,000 1,967,000 4,400,000 37 Bronson-Houser Corridor 38 S Grady Wy/Rainier S Prj.Dv. 39 Misc Traffic Safety Pgrm 40 Guardrail Program 41 S192/S200-SR167 to SR515 42 S 3rd/Smithers S/Logan S 43 Monroe-SR169 to Sunset 44 Duvall-Sunset to NCL 45 SW Grady Wy-SR167 to SR515 46 1405/SR 515 Prj Dv 47 Puget-Jones to Edmonds 48 N Park Dr-LWB to 1405 49 Aberdeen-NE 20th to NE 27th 40,000 40,000 50 Benson Road S/S 31st 51 S 3rd/Rainier S 52 S 2nd/Rainier S 53 Sunset NE/Anacortes NE 86,000 192,000 278,000 54 Other Valley Improvements :::::a5(};80).: Mf0.4):Q=ss6;9f7;10.Q::.. CITY OF RENTON SDC YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY 3" .,O c:\buslic.xls BUSINESS UCENSE FEE Th Jmdnggignignall 'ANAOM M40.91Vg 194 15 NOTOSM 1 Street Overlay Prgm 150,000 150,000 150,000 150,000 150,000 150,000 900,000 2 Oakesdale SW 31 to SW 16 3 North Renton Uvable Streets 4 Park N/Lk Wa Blvd Inter. 70,000 70,000 5 S 43rd Widening(UD 329) • 6 Park N-Bronson N to N 10th 640,000 510,800 150,000 1,300,800 7 Mill S Rebuild-W/I405 283,000 283,000 8 Maln S/S 4th 22,000 22,000 9 Houser Rel-Sunset to N8th I 60,000 19,200 81,000 160,200 10 Transp Demand Mgmt Prgm 60,000 25,000 25,000 25,000 25,000 25,000 185,000 11 Walkway Program 50,000 50,000 50,000 50,000 50,000 50,000 300,000 12 CBD Transp&Streetscape 40,000 210,000 250,000 13 Transit Program 50,000 200,000 200,000 450,000 14 Houser Rel-Sunset to N8th II - 30,000 30,000 15 Bridge Inspection Prograin 40,000 40,000 40,000 120,000 16 Traffic Sig Loop Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000 120,000, 18 Ught Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000 19 Sdwlk Insp&Replace Prgm 15,000 10,000 10,000 10,000 10,000 10,000 65,000 20 Arterial Circulation 160,000 290,000 449,000 1,030,000 925,000 885,000 3,739,000 21 Monster Road Bridge 50,000 50,000 22 NE 44th/1405 Interchange 23 SW16th-WCL to Und SW • • 24 Sunset N Prj Dev 25 S2nd/Logan,Williams&Wells 26 SW 43rd/SR 167 Loop Ramp 27 LWB-N Park to N 44th Bk/Pd 50,000 50,000 28 Neigh lmprove/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 350,000 29 City Gateways Prgm 55,000 55,000 55,000 165,000 30 S 2nd/Main S 31 Mpl Vly Hwy-Mplwd SE to ECL 32 N 4th-Log.N to Mont NE 30,000 30,000 33 Talbot Rd S-S 43rd to SCL 30,000 30,000 34 TBZ Planning Prj Dev 35 Missing Unks Prgm 200,000 200,000 200,000 • 200,000 200,000 1,000,000 36 Oakesdale-Monster to SR 900 10,000 10,000 37 Bronson-Houser Corridor 38 S Grady Wy/Rainier S Prj.Dv. 30,000 30,000 39 Misc Traffic Safety Prgm 50,000 50,000 50,000 50,000 50,000 50,000 300,000 40 Guardrail Program 50,000 50,000 50,000 50,000 50,000 50,000 300,000 41 S192/S200-SR167 to SR515 42 S 3rd/Smithers S/Logan S 30,000 30,000 43 Monroe NE-SR 169 to Sunset 50,000 50,000 44 Duvall NE-Sunset to NCL 50,000 50,000 45 SW Grady VVy-SR167 to SR515 60,000 60,000 . 46 1405/SR 515 Prj Dv 47 Puget-Jones to Edmonds 48 N Park Dr-LWB to 1405 49 Aberdeen-NE 20th to NE 27th 50 Benson Road S/S 31st 51 S 3rd/Rainier S 52 S 2nd/Rainier S 53 Sunset NE/Anacortes NE • 54 Other Valley Improvements M(343000::amoxim maitiogi Amoom goi.oroto wormtv amouto. CITY OF RENTON 5-P SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY 3: 0 1 c:\vehlic.xls VEHICLE LICENSE FEE AIM MiNEE_::.::::.:::::::::::::::.:.::::::::::::::::46.4 ::::::.:::.:::::::::::::::::.:..:.....::t:;:;::'t:::;::R:::::i:::%i:;;;:;::;:::iini::::::::::::Sf:::;:::r:%':.::::rS::::R:::::::::::•::::::::5:::::%::S;s:>:::R:::S:::;:....;;.... imipKom m' z< ' #?1:s1getI#tjis < �mo::.f=friidlrita• >><:><:> 01:94s::»:gOOOe.'':<:;:<;:>::::001:>:>«MUM= 1 Street Overlay Prgm 2 Oakesdale SW 31 to SW 16 3 North Renton Livable Streets 4 Park N/Lk Wa Blvd Inter. • 5 S 43rd Widening(LID 329) 6 Park N-Bronson N to N 10th 240,000 350,000 50,000 640,000 7 Mill S Rebuild-W/l405 • 8 Main S/S 4th 350,000 350,000 9 Houser Rel-Sunset to N8th I 10 Transp Demand Mgmt Prgm 11 Walkway Program 12 CBD Transp&Streetscape 13 Transit Program 14 Houser Rel-Sunset to Nath II 15 Bridge Inspection Program 16 Traffic Sig Loop Replace Prgm 17 Traffic Sign Replace Prgm 18 Light Pole Replace Prgm 19 Sdwlk Insp&Replace Prgm 20 Arterial Circulation • 350,000 350,000 700,000 21 Monster Road Bridge 50,000 50,000 22 NE 44th/1405 Interchange 23 SW16th-WCL to Und SW 60,000 60,000 24 Sunset N Prj Dev • 25 S2nd/Logan,Williams&Wells 26 SW 43rd/SR 167 Loop Ramp ( - 27 LWB-N Park to N 44th Bk/Pd 28 Neigh Improve/Beaut Prgm 29 City Gateways Prgm 30 S 2nd/Main S 31 Mpl Vly Hwy-Mplwd SE to ECL 32 N 4th-Log.N to Mont.NE 33 Talbot Rd S-S 43rd to SCL 300,000 300,000 34 TBZ Planning Prj Dev 35 Missing Unks Prgm 36 Oakesdale-Monster to SR 900 37 Bronson-Houser Corridor 38 S Grady Wy/Rainier S Prj.Dv. 39 Misc Traffic Safety Prgm 40 Guardrail Program • 41 S192/S200-SR167 to SR515 42 S 3rd/Smithers S/Logan S 43 Monroe-SR169 to Sunset 44 Duvall-Sunset to NCL 45 SW Grady Wy-SR167 to SR515 46 1405/SR 515 Prj Dv 47 Puget-Jones to Edmonds 48 N Park Dr-LWB to 1405 49 Aberdeen-NE 20th to NE 27th 50 Benson Road S/S 31st 51 S 3rd/Rainier S 52 S 2nd/Rainier S 53 Sunset NE/Anacortes NE 54 Other Valley Improvements MOWN HMO.* :<<::> 5F3°(I :::>:<: SExitti]:3ak31700::>;:e cf > CITY OF RENTON / ' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY 3 : c:\ginhand.xls GRANTS IN-HAND Previous Funding :»423.t:»:<.:�>'.::>�:9 `.:>:�: '::>:>� #�'.><::::>;�:>�9�,':>�:>'.:: >:>s�>tz:>:» r�»:::198 :> ':::::':`::>•.':CI::':::< 1 Street Overlay Prgm 2 Oakesdale SW 31 to SW 16 3 North Renton Livable Streets 4 Park N/Lk Wa Blvd Inter. 5 S 43rd Widening(LID 329) . 6 Park N-Bronson N to N 10th 7 Mill S Rebuild-W/1405 8 Main S/S 4th 9 Houser Rel-Sunset to Nath I 10 Transp Demand Mgmt Prgm 11 Walkway Program _12 _CBD Transp&Streetscape 13 Transit Program _ 14 Houser Rel-Sunset to Nath II 15 Bridge Inspection Program 16 Traffic Sig Loop Replace Prgm 17 Traffic Sign Replace Prgm 18 Light Pole Replace Prgm 19 Sdwlk lnsp&Replace Prgm 20 Arterial Circulation 21 Monster Road Bridge 22 NE 44th/1405 Interchange 28,336 182,886 182,886- 23 SW16th-WCL to Und SW 24 Sunset N Prj Dev 25 S2nd/Logan,Williams&Wells 125,000 26 SW 43rd/SR 167 Loop Ramp 66,700 \, 27 LWB-N Park to N 44th Bk/Pd • 28 Neigh Improve/Beaut Prgm 29 City Gateways Prgm 30 S 2nd/Main S 31 Mpl Vly Hwy-Mplwd SE to ECL 32 N 4th-Log.N to Mont.NE 33 Talbot Rd S-S 43rd to SCL . 34 TBZ Planning Prj Dev 35 Missing Unks Prgm 36 Oakesdale-Monster to SR 900 37 Bronson-Houser Corridor 38 S Grady Wy/Rainier S Prj.Dv. 39 Misc Traffic Safety Prgm 40 Guardrail Program 41 S192/S200-SR167 to SR515 80,000 120,000 120,000 42 S 3rd/Smithers S/Logan S 43 Monroe NE-SR 169 to Sunset 44 Duvall NE-Sunset to NCL 45 SW Grady Wy-SR167 to SR515 46 1405/SR 515 Prj Dv 47 Puget-Jones to Edmonds 48 N Park Dr-LWB to 1405 49 Aberdeen-NE 20th to NE 27th 50 Benson Road S/S 31st 51 S 3rd/Rainier S 52 S 2nd/Rainier S 53 Sunset NE/Anacortes NE 54 Other Valley Improvements 300 036 €lit_:.:.0O..# #> ::::::..::;.,._' #>�':?z?�� ��<><»>:« :>:` » >''s>€ «< ><««>««<>< > < '•"'::. .,:.: : �#`vise`s`> >»> > > #'•.:>'.>< »:`�`>�z>s'. .....:!2Li OOU......'�8 86'................................................................ .........................:302 8$6. Previous Funding + 6-Year Total = 602,922 00 s/rs, CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY 3:, 0 c:\mithand.xls MITIGATION IN-HAND PreviousiggwRiggi .................. ..,:1'1#ia<> f' <' Funding MAME>>><':1; `'>:'::>::::>:::f9��..::;::s:::;:::'>::3J$5:<:>:«:::::::1.1 :§M9V:n 1 Street Overlay Prgm 2 Oakesdale SW 31 to SW 16 100,000 437,600 262,400 700,000 3 North Renton Livable Streets 115,000 283,200 283,200 4 Park N/Lk Wa Blvd Inter. 121,000 500,000 500,000 5 S 43rd Widening(UD 329) 159,000 6 Park N-Bronson N to N 10th 7 Mill S Rebuild-W/1405 8 Main S/S 4th 9 Houser Rel-Sunset to N8th I 330,000 51,800 381,800 10 Transp Demand Mgmt Prgm 11 Walkway Program 12 CBD Transp&Streetscape 13 Transit Program 14 Houser Rel-Sunset to N8th II 15 Bridge Inspection Program 16 Traffic Sig Loop Replace Prgm 17 Traffic Sign Replace Prgm 18 Ught Pole Replace Prgm • 19 Sdwlk Insp&Replace Prgm 20 Arterial Circulation 21 Monster Road Bridge 22 NE 44th/1405 15,664 33,114 33,114 23 SW16th-WCL to Und SW 24 Sunset N Prj Dev 25 S2nd/Logan,Williams&Wells 26 SW 43rd/SR 167 Loop Ramp • 27 LWB-N Park to N 44th Bk/Pd 28 Neigh Improve/Beaut Prgm 29 City Gateways Prgm 30 S 2nd/Main S • 31 Mpl Vly Hwy-Mplwd SE to ECL 32 N 4th-Log.N to Mont.NE 33 Talbot Rd S-S 43rd to SCL 34 TBZ Planning Prj Dev 35 Missing Unks Prgm 36 Oakesdale-Monster to SR 900 40,000 50,000 225,000 315,000 37 Bronson-Houser Corridor 38 S Grady Wy/Rainier S Prj.Dv. 60,000 60,000 39 Misc Traffic Safety Prgm 40 Guardrail Program 41 S192/6200-SR167 to SR515 42 S 3rd/Smithers S/Logan S 43 Monroe-SR169 to Sunset 44 Duvall-Sunset to NCL 45 SW Grady Wy-SR167 to SR515 46 1405/SR515 Prj Dv 47 Puget-Jones to Edmonds 48 N Park Dr-LWB to 1405 49 Aberdeen-NE 20th to NE 27th 50 Benson Road S/S 31st 51 S 3rd/Rainier S 52 S 2nd/Rainier S • 53 Sunset NE/Anacortes NE 54 Other Valley Improvements 5 0664 :::.:::...: .:....:........:.. ......................................... ...:::.. ................................ .... . ..... ;...;590�Q......� 1..........' �#Ji7f#: :>>: > >%>'.'. `:'.>s>` ��> >'s� <�>><>'.?`:<'. �'273..'(4. Previous Funding +6-Year Total = 2,783,778 1/2 Cent Business Vehicle Grants Grants LID's LID's Mitigation Mitigation Totals I. Projects Gas Tax Lic.Fee Lic.Fee In-hand Proposed Formed Proposed In-hand Proposed Other Unfunded 92-97 • S. . 1 Street Overlay Program 1,740,000 900,000 2,640,000 j 2 Oakesdale SW-SW 31st to SW 16th 4,306,600 700,000 8,443,400 13,450,000 3 North Renton Livable Streets 283,200 351,800 635,000 4 Park Ave N/Lake Washington Blvd 70,000 - 500,000 570,000 - - 5 S 43rd St(LID 329) 1,145,700 1,145,700 6 Park Ave N-Bronson Way N to N 10th St 1,300,800 640,000 4,642,000 360,200 6,943,000 _ - 7 Mill Ave S Rebuild W/I-405(WSDOT Project) 283,000 283,000 - 8 Main Ave S/S 4th St 22,000 350,000 90,000 462,000 . 9 Houser Way Relocated-Sunset Interchange to N 8th St Phase I 160,200 1,572,000 381,800 2,114,000 - . • 10-Transportation Demand Management Program 185,000 185,000 - - • 1 11 Walkway Program 300,000 300,000 ' . . 12 CBD Transportation and Streetscape 250,000 250,000 • . - 13 Transit Program 450,000 450,000 -- ,_ 14 Houser Way Relocated-Sunset Interchange to N 8th St Phase II 30,000 1,131,000 1,100,000 2,261,000 15 Bridge Inspection Program 120,000 120,000 - 16 Traffic Signal Loop Replacement Program 150,000 150,000 . . 17 Traffic Sign Replacement Program 120,000 120,000 '_ 18 Light Pole Replacement Program 150,000 . 150,000 - . .. 19 Sidewalk Inspection and Replacement Program 65,000 65,000 .. , 20 Arterial Circulation 3,739,000 700,000 1,700,000 621,000 6,760,000 - 21 Monster Road Bridge 50,000 50,000 1,050,000 250,000 1,400,000 - .. 22 NE 44th St/1-405 182,886 33,114 216,000 23 SW 16th St-West City Limits to Und Ave SW 60,000 1,772,000 2,410,000 4,242,000 - - 24 Sunset Blvd N Project Development 0 . 25 S 2nd St/Logan Ave S,Williams Ave S&Wells Ave S . 0 : 26 SW 43rd St/SR 167 Loop Ramp 639,300 330,700 970,000 ; .z .. 27 Lake Washington Blvd-N Park Dr to N 44th St Project Development 50,000 • 50,000 V. -. 28 Neighborhood Improvement/Beautification Program 350,000 350,000 .- . •29 City Gateways Program 165,000 165,000 30 S 2nd St/Main Ave S 0 31 Maple Valley Highway-Maplewood Ave SE to East City Limits(WSDOT Project) 0 32 N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development 30,000 - 30,000 33 Talbot Rd S-S 43rd St to South City Limits 30,000 300,000 330,000 34 TBZ Project Development 0 35 Missing Links Program 1,000,000 1,000,000 36 Oakesdale Ave SW-Monster Rd to SR 900 10,000 4,725,000 315,000 4,400,000 9,450,000 37 Bronson-Houser Corridor Project Development 0 38 S Grady Way/Rainier Ave S Project Development 30,000 60,000 90,000 39 Miscellaneous Traffic Safety Program 300,000 300,000 . _• 40 Guardrail Program 300,000 300,000 _ 41 S 192nd St/S 200th St-SR 167 to SR 515 Project Development 120,000 • 35,000 155,000 42 S 3rd St/Smithers Ave S/Logan Ave S 30,000 100,000 130,000 43 Monroe Ave NE-SR 169 to Sunset Blvd NE Project Development 50,000 50,000 V 44 Duvall Ave NE-Sunset Blvd NE to North City Limits Project Development 50,000 50,000 V • 45 SW Grady Way-SR 167 to SR 515 60,000 200,000 260,000 46 I 405/SR 515 Project Development 60,000 60,000 •- 47 SE Puget Dr-Jones PI SW to Edmonds Ave SE V 1,010,000 1,010,000 48 N Park Dr-Lake Washington Blvd to 1405 Project Development 30,000 30,000 60,000 .. • 49 Aberdeen Ave NE-NE 20th St to NE 27th St Project Development . 40,000 40,000 I 50 Benson Rd S/S 31st St 106,000 24,000 1.30,000 51 S 3rd St/Rainier Ave S 44,000 10,000 54,000 • 52 S 2nd St/Rainier Ave S 176,000 58,000 234,000 - 53 Sunset Blvd NE/Anacortes Ave NE 278,000 278,000 V . 54 Other Valley Improvements _.................... ...:10,800,000 ............-....... ......7,200,000 ::::::::::::::::::::::::::::::. ::::•:_ :::•::::::. ::. ::.:::::: ::::::•::..;18,000,000 :•.;•:. � •::•;:•:; •. � :�:::i<:: � •:•:•::3b � ::•::•;:•t� •5•�. .:•>::•:::7•�v34.7�:���:=` "til �`i:t#:�:�:�:x�`•'�X3` ':' :::�..... :.....�tl�f ...._..... ........... Grand Total :::;>;1 ry4OtAOA-.: : 9, } (10:•::::•: ►y � :3b8 .::•:: : 3390-:::::: . . ::::•...�.. . ,..: :.• :: ?• ?:::: : ::: "-:::::::: ::::. :::::::�•:::: .... .................. Page 1 - _ e:tpsource.xls - _ - 12- CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992-1997 SUMMARY • • Period EXPENSES: Planning/Project Development 1,050,000 410,000 290,000. 180,000 70,000 30,000 70,000 Precon Eng/Admin 7,800,000 1,429,000 1,592,000 1,028,000 2,486,000 995,000 270,000 R-0-W (includes Admin) 9,403,000 1,390,000 4,361,000 191,000 2,081,000 1,190,000 190,000 Construction Contract Fee 55,838,400 3,077,900 4,374,300 16,129,700 6,438,500 13,661,500 12,156,500 Construction Eng/Admin 4,203,600 249,100 331,500 1,302,500 434,500 1,002,500 883,500 Other 162,700 92,700 14,000 14,000 14,000 14,000 14,000 .::.;:.:1 2: ::>:%:::>E::: 24>t! ;::: 11114i.004.00.0 :.::: ......�..�4.........E�1���»�:::��>::>::..........�.4..�..7.Q�7........ � .......t�9G..$(�Q.::;::»�. $;a.���4�........�5.......X00.:» 1:5�$���t10�::: :: .............................................:.......................................................................................................................................................................................................................... SOURCES OF FUNDS: 1/2 Cent Gas Tax 1,740,000 290,000 290,000 ' 290,000 290,000 290,000 290,000 Business License Fee 10,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 Vehicle License Fee 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000 Grants In-Hand 302,886 120,000 182,886 Grants Proposed 30,993,900 756,400 4,899,900 7,907,500 3,488,100 7,895,000 6,047,000 L.I.D.'s Formed 1,145,700 1,145,700 L.I.D.'s Proposed 7,530,700 330,700 980,000 3,455,000 2,765,000 Mitigation In-Hand 2,273,114 1,590,800 457,314 225,000 Mitigation Proposed 17,873,200 560,800 2,577,700 6,967,800 3,143,900 2,291,000 2,332,000 Other 65,000 35,000 30,000 Unfunded 3,633,200 375,000 974,200 1,472,000 812,000 >::: T' ft>E ::::::::::<::<:::>»<::><:::>::' ::>:>;. _. ::70"'•:::'•?3.00600 >:>:>:# .:..::. :«:::s€:1:.................€ii!.!i::1 '' 9 iJ........0,96�,$9Q. ......$,$45,29O. ........6,8.3,bn.Q.......... • File::TIPCIP A.XLS Printed 5/31/91 at 11:28 AM. 13 CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317;102 Proj: 12108 Rank: 1 PROJECT TITLE: Street Overlay Program DESCRIPTION: Annual program for repairing and resurfacing existing roadways, operating the City's Pavement Management System and providing data for Arterial Deficiency Ratings. JUSTIFICATION: Overlay and slurry seal of streets provide for improved driving surface and are highly cost effective ways of avoiding expensive repairs and reconstruction. The computerized Pavement Management System and video inventory of existing roadway conditions greatly improve the efficiency of the Overlay Program. STATUS: Yearly program. CHANGES: None r FINANCIAL DATA Total Project Cost: 2,640,000€•igig15.4.600.4r4 2 640 000 1,740,000 900,000 SpentThrough Throu h 1990: 1991 Budget Carry Over: Remaining Cost: $i{ ; ............................. Period EXPENSES: Project Development Precon Eng/Admin ' 270,000 45,000 45,000 45000 45000 45,000 45,000 R-O-W (includes Admin) Construction Contract Fee 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000 Construction Eng/Admin 270,000 . 45,000 45,000 45,000 45,000 45,000 45,000 Other : #::0;04Lf . 0.1i«::<>:::::4O.O.::::'>::::::s:::<; 4Aapfk>::s:>•`::•`:: .11* SOURCES OF FUNDS: 1/2 Cent Gas Tax 1,740,000 290,000 290,000 290,000 290,000 290,000 290,000 Business License Fee 900,000 150,000 150,000 150,000 150,000 150,000 150,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded . • .01MS.OU...CE$..:.:.::..::.:..:.:.....:..:.:::. ...... ..:440!A!!!!!::.::::::..44Q, ...:::::.::::�?�hDQO..,:..::::.:?►4.f3,.00Q.. File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM T CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 022 Rank: 2 PROJECT TITLE: Oakesdale Ave SW- SW 31st St to SW 16th St DESCRIPTION: Construct new 5 lane roadway, with curbs, sidewalk, drainage, street lighting, traffic signals, channelization and landscaping. A portion of this facility at either end may be on structure. JUSTIFICATION: High priority project in Renton's Valley TBD and in South County TBD. Serves Valley industrial area, including proposed Boeing Longacres site. Completes missing section of important North-South corridor. STATUS: On TIB fund list. Prospectus to TIB in June 1991. Design will start in 1991. Previous Funding: Preconstruction E/A = $300,000; Business License Fee = $100,000; Mitigation In-Hand = $100,000; Grants Proposed = $100,000. CHANGES: Southern terminus extended from SW 27th to SW 31st. Estimate increased from former $6,800,000 to $13,750,000. FINANCIAL DATA ...:.....:::::.:;::::::::::......... - :»..> •:•::::. _::::. ...... :;:;;.::; ;; Total Project Cost. 13,750,000 » >Md0d. 900,000 100,.000 .... ............ 800,.000. ..... SpentThrough 1990• :...::.:::::..::.....::::::::•:•;:.::•:::::::;:.. ....................:.:.:.::.:::.::.:;::::::.;::::.;..::..•.::::..:...;.,:::::::::. 1991 Budget + Carry Over: 300,000`:::# aim.. 12,850,000 4,406,600 8,443,400 • Remaining Cost: sigaimpg Period . .................. .... I'Itls€T. t..........:1892;:.:;>-;<::-::.:.::....:�f993::.:::.::. g ..;:.: �•::.;:.::.;: ;:.::.;;:.: ::«:z:<:#:::::�;;:>:::::<'........:.:::::.:. :•:::.,:::>:<;:.:::.::;::.;::>:.;:.;:.. .... ...........iG Bbl...................'11395:>.;;;.:;;.::.;:•::;::.:f:9915.::::::::...::::::::1.987::>::>::>::::>: EXPENSES: Project Development Precon Eng/Admin 1,230,000 615,000 615,000 R-O-W (includes Admin) 2,500,000 2,500,000 Construction Contract Fee 9,000,000 6,000,000 3,000,000 Construction Eng/Admin 720,000 480,000 240,000 Other .:................:....:...:........IA..�'v13Q14 ..........O5:M.0........1414gIC:.::-::. -..... 0D.:MAMMA • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed 4,306,600 177,400 1,239,900 1,926,200 963,100 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand 700,000 437,600 262,400 f.._ Mitigation Proposed 8,443,400 1,612,700 4,553,800 2,276,900 Other Unfunded l' S010.10E$ s 1€ <1?>` > ::z ':>M40. :SEK►OW:gi '::»Sl 0 ,:.iiM PAOMW z ><:::::>«•'•.::>:> :"s> ::::.:.<;:::::>:> File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 044 Rank: 3 PROJECT TITLE: North Renton Livable Streets DESCRIPTION: Neighborhood protection/traffic management improvements in the North Renton residential areas to reduce thru commuter traffic volumes on residential streets. General boundaries are Sunset Blvd, Bronson Way, Logan Ave, and N 6th St. Work will be conducted to conform to direction provided by the North Renton Arterial Facilitaties Plan process. JUSTIFICATION: This project is directed by the North Renton Plan, which resulted from City Council Resolution 2708 to preserve the integrity of the North Renton single family neighborhood. STATUS: Project is currently under design. Previous Funding: Preconstruction E/A = $115,000. Mitigation In-Hand: Boeing = $398,200. CHANGES: None. • FINANCIAL DATA r.. lits.. a< .': .... . Total Project Cost: 795,000 €Pittlit ill ': 443,200 398,200 •......45000 Spent Through 1990: 10,000 MingiiiiligigliiiMEMEN 1991 Budget + Carry Over: 150,000€<:<::: #Gritistl:>{ 351,800 351,800 Remaining Cost: ': Period :::::•i'n::x:::::•Y:{>:::::::::: iiiii'v'r:...::..v.......... •:.v}:::{:. w::rry:•:rr.}:: .......:.....:r... )'E'•l�M.:::::::r::,:::::::::::,:::::.l�Kl�:�'xiEa�::::::::,::;:.<:�:892:::>::>::>::: •;:>::>7995: ::»>::>:<:>::»:<:�9&�:: :::: :>::>::::�f1�95::>:::<::::: <>::::::>:E!3 15::>:<::s ::•'::::::<.::'::::.1 EXPENSES: Project Development Precon Eng/Admin R-0-W (includes Admin) Construction Contract Fee ' 577,000. 577,000 Construction Eng/Admin 58,000 58,000 Other > s< `: g< ; SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed _ _ Mitigation In-Hand 283,200 283,200 Mitigation Proposed 351,800 351,800 Other Unfunded ::';.><:;?:€<>:>:><::>:>:>: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM `�--' CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12081 Rank: 4 PROJECT TITLE: Park Ave N/Lake Washington Blvd DESCRIPTION: Reconstruct intersection of Park 'and Lake Washington Blvd to discourage through movements from utilizing Lake Washington Blvd and improve traffic flow from Park-Avenue N. to Boeing and Paccar. Intersection will be designed to conform to direction provided by.the North Renton Arterial Facilities Plan process; to include roadway reconstruction, signal modifications, drainage, channelization and signing. JUSTIFICATION: High priority project; culminates North Renton Facilitation process directed by City Council Resolution 2708 to assure that arterials providing access to North Renton and Kennydale neighborhoods are designed and operated in a manner responsive to citizen needs. STATUS: Project is currently under design. Previous Funding: Preconstruction E/A = $131,000; ROW = $60,000. Mitigation Sources: Boeing =$421,800; E&H = $199,200. CHANGES: None • FINANCIAL DATA ::F Total Project Cost: 761,000 `• ;Ftf{tied ' 761,000 SpentThrough Throu h 1990• 1991 Budget + Carry Over: • 191,000_ :M:11 ,000,0 Remaining Cost: :.....: >`: 7a ►(' Period ::•;w:•;::::•::•::•;: ••::;.::.:.>;:::.::.. .•: -.�::.::.�:::::::::.:... . ..:::.�:.::::::::::.......:.::...::.. .:�::.....:...............:. ..........1992;:.::.>:::..::;:.::r:::'I• ..>:.>::.::<»;::;.;>::: •.>::.:::;>..:•.::.;:.::.::: :;::::>::::::::::>.>•::::<::>. ::>:::<:ii:s::;:::�::.>::::a::: .>::>::>::>;> .............................. ........:........................ .............:.................:............::......:.:,:<;<. 99A�.:,::::: EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee 520,000 520,000 Construction Eng/Admin • 50,000 50,000 Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 70,000 70,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand 500,000 500,000 Mitigation Proposed Other Unfunded TOTONSOURCEMOMMUMMEMOWOOEWAMSVPOUSEMMEMMEMEMSOMftWWWWVEMEM File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR-TRANSPORTATION IMPROVEMENT PROGRAM • • CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317;320 Proj: 108;329 Rank: 5 PROJECT TITLE: S 43rd St (LID 329) DESCRIPTION: Widens S 43rd St from SR-167 to Talbot Rd by 2 lanes, SR-167 NB ramps and Talbot Rd by 1 lane and includes curbs, sidewalks, lighting, signals and channelization. Also includes a tunnel under S 43rd with retaining walls and connecting roads; realignment of sewer, water and drainage lines; new VMC power and water service; PVR Station and landscaping. JUSTIFICATION: This project is designed to increase capacity and safety in this congested corridor and to mitigate traffic impacts due to expansion of Valley Medical Center, which is funding the LID. STATUS: - Construction will start in 1991. Total project costs: Preconstruction E/A ='$417,000; Contract Fee = $2,490,700; Construction E/A = $220,000; Financing = $200,000. CHANGES: Scope and cost have increased `—= FINANCIAL DATA Total Project Cost: 3,327,700< 0000ded»:;<: 3,327,700 3,190,000 1:00,000 1.2,700 • 25,000 Spent Through 1990: 1991 Budget Carry Over: 2,182,000MMOdideg • Remaining Cost: smiggim Period ........................ •;•P+d. T. •::::>::::z:,:::1.982::>:::: ::::::::z::..:.3.998.::::::::...�.�:::::f99A::>:::>�a:::>::<:1<:995:.................:f.998:.<:::; <i:: ;:::>::::::>199'7aa::::::>: EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee ' 980,400 980,400 Construction Eng/Admin 86,600 86,600 Other (Financial) . 78,700 78,700 7'A'tAi.:.FXMAS......... • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand _ Grants Proposed L.I.D.'s Formed 1,145,700 1,145,700 _ L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed i Other Unfunded parAtimeIgrES:::>::>:::>:::r<::>:'>•'>r::>:os ::>::> ::::::::::s:':::::::>:::::<:::::::z:>::::>::>::>::::>:'»::>»::>:::>:z:::>:a:<:>:::::::«:::>:z:<:::::>::::::>::::::>:::::>::::::::<.::::::::'::>::>:::>::>::::>:::::<:::>::>::::::::::r>::>::»::::>::::>::::: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON (^_ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM ' CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 008 Rank: 6 PROJECT TITLE: Park Ave N-Bronson Way N to N 10th St DESCRIPTION: • Reconstruct roadway between Bronson Way N and N 4th St, widen to 5 lanes between N 4th St and N 10th St, signal modifications at N 6th St, N 8th St and N 10th St. Provide new curbs, sidewalks, street lighting, channelization and storm drainage. JUSTIFICATION: This high priority project will ease traffic congestion by improving capacity, thus reducing traffic usage of adjacent residential streets. This project ranks as a high priority project with the TIB based on regional significance of Boeing traffic, access to I-405 and SR-900, and the need for Park Ave to serve as a major transit route. STATUS: Design will start in 1991. Previous Funding: Preconstruction E/A = $340,000; UATA funding of $2.4 million previously requested, additional $2.242 million UATA funding to be requested. CHANGES: Z None I `1132.-/Z� FINANCIAL DATA ::::C::i.'•:si.:::}j::i:::viiii::{::'rii'>::i::i:???.:::::::::::::::::.�0ii:�iii:::::::!r..:M::::..44#10i::.i:.i: Total Project Cost: 7,283,000W` ;Funder 2,280,800::::133,578:: ..:: :- Spent9 Through 1990• 1991 Budget + Carry Over: 340,000:::><U000ed,>:;, 5,002,200 4,642,000 360,200 Remaining Cost: gogimeg Period .... 1'i��Ciitn�.........:.'11�L........ ........:#.�•:.;:.;;:.;;:.;::?.;:.;:.:f99q,>:>:;:.::.:;:::.;:.;::.:: :.;::.::;:.:.;:.;r??.;:.:9r,3.X..>E:.z::>;>::>:: •::;.:;.:;;;;?.ii::::.:::::;?•:.....:................................................... ........_..........................�........... . ...........................�.�.�:_:�......X995.::.:::::.;;>:?.:::::E.!.�9.(i..�::::,.� .: EXPENSES: Project Development Precon Eng/Admin '379,000 279,000 100,000 R-O-W (includes Admin) 2,000,000 1,000,000 1,000,000 Construction Contract Fee 4',226,000 180,000 2,159,800 1,886,200 Construction Eng/Admin , 338,000 160,000 178,000 Other :..:.. :>: ;. .;:.>;::.:;;:;;:::.:::;:.;;:.;:.;:<:;:.:<::?:;:?.:: .:..:.........:.::::::: :: ...:. :.::::::::..:.....:: ....> : :>»ii»::»::rEiii:isnnig:<:»»»i::ri::>::>:::::»>::>::»:, . .............................................. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,300,800 640,000 510,800 150,000 Vehicle License Fee 640,000 240,000 350,000 50,000 Grants In-Hand Grants Proposed (UATA) 4,642,000 579,000 2,559,000 1,504,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand /- Mitigation Proposed f• 1 Other Unfunded 360 200 .360f200 w:.. i:. ::. T€€hL:i'SRCES:•i::,:•::•::,:•i::•:i;:?•;;;};};i;i;>;:::•i:<•i:•;:•. ':•��,,��yy // , ��ii ........................�.7.if47•':afh!(3i:'iii'?;:�3�'•'. :::4i+. •ii . .. •i:•:4:4' :'� "•�• :?•:bi:4:^i:•i}}Ti:•ii:?•i'8:??L:•:•::•i?}i:???L:iiii}}i:•iiii:•ii:J:4:4:??i r'i:'i:::ii;:ii::;ii:; ............:...............::,�:::•::::.�:.�.�•:..................,........x :. ::��'t:Qt�i4:�.ZI#[1:::,:�.�:::::.�::::::::i::::::..:::::.�:::.::�:::::.�::::::•:::::::::...::.:::::::.:;. File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 070 Rank: 7 PROJECT TITLE: Mill Ave S Rebuild W/I405 (WSDOT Project) DESCRIPTION: Reconstruction of existing roadway to include: Raising the Southbound roadway to the same level as the Northbound roadway to provide a 35' residential street. The existing NB roadway and sidewalk will remain. Project will be done jointly with WSDOT I-405 Project. Approximately 50% of the project will be funded by WSDOT. JUSTIFICATION: Reconstruction of Mill Ave is required to meet commitments made to the Renton Hill Community. STATUS: WSDOT will assume lead for design work in 1991 and will administer the construction contract. Previous Funding: Preconstruction. E/A = $47,000 Funding shown below represents City's share of construction and will be matched by an approximately equal share by WSDOT. CHANGES: None FINANCIAL DATA ::::::::n..i•:::::::w:i:4•}vii :di:iix;{rr:::::::ri:::n•::::::::::::::..ivx,•i;••;v:::.imix:::::::::::::::::::: ::::::::::.�:::::::::::::::::•iv:: :::::::n::::::.::.:::w,:::::::m:::::::;:,•:::i�iii}iiiiiiii:•:;•ii::Liii•:::...... ::\vY . ,:i ;$:i•'. iii:iiii:... :i:ii:iiii:::::w::::::.:;�•itiii:�:::ii:'vii ii:�::}iii::i'riy:�'r:C�:;t::ii:{t::::i:i:i;:iii}iii ii}iiiii:i'r::v'r$iii Total Project Cost: 330,000 >:>''<:;''Fwtdec�«::::: 330,000 330,000::::::::::r:::::::::::::::::::::::::•::::•:::•:•::::::r::::::::::::::::::::::::::•. SpentThrough Throu h 1990: 1991 Budget Carry Over: 47,0001M.10.04... Remaining Cost: maggagogt Period <:>::�>:;:»::>:;:»<:::>::::;::>::: ......:::»:<::«;:;:;;<:; <;:<;.;•:: ..::.:.;': .... ::ii::.::.>::::.:....::.::.:::.:�:;;;;:;:�:.:....:..i;:.::.:;:.::.>::::;i•:...•,:�:iiiiii:;•;•:;:•;:•;:i:..:....:;:iiii;i:::.;.;::;..:....:.:::::::::..:::::.::::.:..:..:::::::::. ..........................................:::..::...:..:......... ......................:..:�::,.::992::.:::_,,._::::.199�:.�::._.�,�:.::�::ik9'9...q,,.::.�::::::.�.�:::�995:::>:<::::::;::i�;'•s::>;f�96::.:�.�.,-.�.:�::::.1:99,7..:•::::.: EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee 283,000 283,000 Construction Eng/Admin Other ..�'........... s :::::;:;:k: ::};ii:•iicii:i:::::::::.;.i:;.::i i. ...: .:.:.�::.:.::.: ........::::::: :?;::::::::::::#::::<:':::?::;s:;:s> ::::::::?::::::::::::::5:: :s>:::?::':::�::a:::::::::::s:: :: :: :::::::::::::t:::;: :::: ::::5::::::i::::::$::::::::::: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 283,000 283,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand • `• Mitigation Proposed Other Unfunded .i)T L.. i)I!R 5......... �> s::::::>s::; ..?::'': ::>:�»::»::;:.>::>::>::;>::i::i:.»;:>:•>;::>:>:;<:»:::::>::;:;:>:;:;�>:::<:><>::>::::>:.i::>:::>::;::>:<:>ri;:»»:�»;:>:»:•i>:i::::i:;:•;:::>::;::;::>::>::::.»:<:::;::<:;;:.»:.: ........................................SSS.Q4Q.. ......... ��..yy..py.�p::.:.;:.i::.>:.i:.i:.::.;:;•:;:.:;i:.:.;:.i:.;:.:.;i:.:.:.;:i•:isiiiii;:i.i:.::.i:.::.>:.i:.:.i:.i:.i:.i::.;:i:.;:.:.:.;>:.i:.:.i:.;::.i:.i:.iii:.:.:.:irri:•ii:i.>:.i:.;ii::.i;:.i:.;•:i..:::.�:. File::TIPCIP A.XLS Printed 5/15/91 at 11:33 AM. CITY OF RENTON . { SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON t,. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 024 Rank: 8 PROJECT TITLE: Main Ave S / S 4th St DESCRIPTION: Improvements to Main Ave S including widening and signal reconstruction at the intersection of S 4th St. in conjunction with the work done by WSDOT on the I-405 Project. Includes curbs, sidewalks, signal, channelization, signing and street lighting. JUSTIFICATION: Modifications required to fit with WSDOT 1-405 Project and also needed to reduce accidents and congestion in this heavily travelled corridor. STATUS: UATA funding requested. Previous Funding: Preconstruction E/A = $58,000; ROW = $100,000. CHANGES: None FINANCIAL DATA Total Project Cost: 620,000 530,000 180 000 350 000 Spent Through 1990: .:;::..:. ::,:.ec:s:>€::#€:n::>€::<:z:z:<>z:: 1991 Budget + Carry Over: 158,0001:.€ U i4if t l.:•;;:. 90,000 90,000 Remaining Cost: Mg.6440,41 +OOO Period :>:::I:`E'EM::z<::::::::<::'<:>:<::::<:.>.::=:::k>�. <:IiCAII:::::# ::::�:992:::::::s::::;::::>.::;r>.::3:91�::•.'::•`.:::::s'>:::'::�>:f9B�::�:::::'::�'•::>:�::1f1�9�v:::� :s. �>'' 'f99iQ'' •`. >< ''>1997r EXPENSES: Project Development Precon Eng/Admin 22,000 22,000 R-0-W (includes Admin) • Construction Contract Fee 400,000 400,000 Construction Eng/Adnin 40,000 40,000 Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 22,000 22,000 Vehicle License Fee 350,000 350,000 Grants In-Hand Grants Proposed (UATA) L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded 90,000 90,000 T€i€31ir« 11tC&5 `s`:> #;'<'>`>.> <:>'<? '<; # '::;:<::>4nOata'3 <>':a'':'.?.O.:.:IaQ ;:#': M%<z':'>s? ? >>»r>> z>>?> i< :>:>#AtI:> E):f1>: > <':.>:` ><> `•>`:::'>:»»>>s>>»>;> < File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM t - CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 025 Rank: 9 PROJECT TITLE: Houser Way Relocated- Sunset Interchange to N 8th St Phase I DESCRIPTION: Houser Way Phase I and II will provide a new interchange connection with Sunset Blvd and a new roadway to N 8th St. Phase I will determine the layout for Phase I and II and design and construct the Southbound lane(s) from N 8th to Sunset Blvd. Includes curbs, sidewalks, street lighting, signing, landscaping and channelization. . JUSTIFICATION: This high priority project is a culmination of the North Renton Facilitation process directed by City Council Resolution 2708 with the objectives of providing additional ingress/egress for Boeing and Paccar employees and relieving traffic usage of North Renton residential streets. STATUS: TIA Grant denied, will reapply. Design will start in 1991. Previous Funding: Preconstruction E/A = $210,00, ROW = $10,000 Mitigation Sources: E&H = $540,800 CHANGES: Because of funding short fall, this project has been divided into two phases. The funding need has increased mainly due to Right of Way cost. FINANCIAL DATA •::::.,.:::::•::.•::::::••::::.:�.......�762.,,.:...:::::•.:::::::::::::::::::•::•.:•., Total Project Cost: 2,334,000 `: •.':. 06004: <':; ,000 221 200.. 540 800 S nt Through 1990: Pe Budget Carrye 1991 8 get Over: 220,000MlMifllhde!d«.;::; • 1,572,000 1,572,000 Remaining Cost: mamma Period ME.MOMMOM::P NRE: 'itil: ::>::`:::ARM.:.i.?; :.';.?:::3993:;>Ejili: : 9.1.#0:>:':]P1'; R1.MOJ .I.:::»:»:>E996 >a> ' X1:99:7<> > EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) 790,000 390,000 400,000 Construction Contract Fee 1,227,000 614,000 613,000 Construction Eng/Admin 97,000 49,000 48,000 Other T:.. .. 'A1.:1~XI'.EMSigigagiiiiiiiiiiiiiiiiMigi liggi.110.04;;:;:<::;.><. :.:.::.;:.;;:. .:.::i::i::;:•. ;; SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 160,200 60,000 19,200 81,000 Vehicle License Fee Grants In-Hand Grants Proposed (TIA) 1,572,000 992,000 580,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand 381,800 330,000 51,800 Mitigation Proposed Other Unfunded Irg: l:SOURCES<::»:>s:n!ilii.aR »:»>i%:::Z:?.Idi`0,05:::..ii. ::::>::MP..•E....>;::a<:7::(I63:•€100::>:::::z::«:::::16:'t OtJOW:::>:>':':»<:E: ;i i.i :>:<::::><»::1::::Ii0 >:>»:>iU »»:>::>: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12135 Rank: 10 PROJECT TITLE: Transportation Demand Management Program DESCRIPTION: Develop and implement a program that will maximize the "people-carrying" capacity of the Transportation System by promoting use of high occupancy vehicles. The program will include, but not be limited to, development - of a transportation demand management ordinance, working with major employers.on TDM measures, and recommending facility improvements such as HOV lanes, signal modifications, and park and pool lots. JUSTIFICATION: The City is required by State Legislation passed in 1991 to develop and implement TDM. STATUS: The City is working with King County and other jurisdictions to develop coordinated TDM strategies. CHANGES: New program. . FINANCIAL DATA Total Project Cost: 185,000;:-«::>``l lded < ; 185,000 185,000...........::............................................................................. Spentthrough throw h 1990: 1991 BudgetOver: 9 Carry Remaining Cost: ouggiNg Period EXPENSES: Project Development 185,000 60,000 25,006 25,000 25,000 25,000 25,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other ..+a..�u.........>T�..e;s..............................................ss�o�. ..........:.sQ o�o...:::::;::::::.z�aoa::::.;::>:.;:: :::,gs aoa>«»«<:>:>::::25QpQ:::::>::»::>::»>.;*5 SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee _ 185,000 60,000 25,000 25,000 25,000 25,000 25,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded File::TIPCIP A.XLS Printed 5/19/91 at 3:42 PM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 009 Rank: 11 PROJECT TITLE: Walkway Program DESCRIPTION: This program provides for the development of City-wide non-motorized transportation walkways for pedestrians, and for undertaking improvements identified and prioritized by this program. JUSTIFICATION: Providing safe and convenient non-motorized facilities is an integral part of a complete transportation network. Specific improvements will respond to the needs of school children, the elderly and the handicapped, and will support increased use of transit. STATUS: On-going yearly program. $33,000 spent on improvements in 1990. Needs and Priority Report will be completed in 1991. Previous Funding: Project Development = $25,000; Preconstruction E/A = $11,000; Contract Fee = $73,000; Construction E/A = $8,000. CHANGES: None FINANCIAL DATA INEME:::•:: .�..1.................E,1....dee ' .,:::::.�.�::.:::::::::.r::::::::.;::::,:::::..::.�:::•::::::::.::.�:::::::.;:.�::::::. Total Project Cost: 450,000' FUvdecj ': ;....,:::•;::450,000450000 :::. .......:.......................................................................... S Pent Through 1990• 33,000z > <-`-' «Nz » > » > »: ? s > > < 1991 Budget Carry Over: 117,000 MafinftliiidadO Remaining Cost: »# O0 000 . Period :>E+000 :' t.ti€s `: >'.RMAa>` ><> :3 :>:>:<:>ME10.94ge>:> :>:>1<1 5>::' :>:><::>::>f99:01. :>:::;::SM9'87 >'::>s:i EXPENSES: Project Development Precon Eng/Admin 36,000 6,000 6,000 6,000 6,000 6,000 6,000 R-O-W (includes Admin) Construction Contract Fee 240,000 40,000 40,000 40,000 40,000 40,000 40,000 Construction Eng/Admin 24,000 4,000 4,000 4,000 4,000 4,000 4,000 Other ::::?::>:><:<:: . 't3Q!0::: 0: �#�'�. ::�XM'>*...SSS............:::::::::.;:::::::.:::.::::::.:: �4!4:::>::::>:::<:::;::::>�Q'6 :::>.::;::.<.:»»>:::�0 QO.E1�:::>:::::::::::;<.:::a�?0'•Q�R::::>::::>:::::?::::�Ik•'! :: >:<:>:<:::><::::54 tIv . SOURCES OF FUNDS: • 1/2 Cent Gas Tax Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed ( Other V. y' Unfunded • >: :ia)0':) : :> 90 #3tI0:a:> :ilM 100.M::a::::>:> :0 O.Cfii ::::::::>:::`5if'''i10I1>:::i]iMi>: 0:>t70Q::>::#:::M:5(1.0)a File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM t• CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12111 ' Rank: 12 PROJECT TITLE: CBD Transportation and Streetscape DESCRIPTION: Analyze, design and construct improvements to vehicular and pedestrian traffic patterns and streetscape elements within the City's Central Business District, compatible with CBD development proposals and Comprehensive Plan land use designations. • JUSTIFICATION: Future development and economic vitality of the central business district depends upon the ability of the transportation system to handle additional traffic, parking demand and pedestrian movement. The specific types of transportation improvements need to be coordinated with the type of land use proposed in the Comprehensive Plan. STATUS: The City's Comprehensive Plan, which may propose changes to land use in the CBD, is currently being reviewed. Transportation elements which are compatible with and enhance the proposed land use will be recommended as part of the Transportation Plan initiated in the Spring of 1991. Previous funding: Project Development = $100,000. Remaining $250,000 for streetscape improvements. CHANGES: Combined with CBD Transportation and CBD Streetscape Projects. << _ FINANCIAL DATA BiAluarogo Total Project Cost: 350,000::;:;>;:::;F;undetl :z;: 350,000 350,000 SpentThrough Throu h 1990• 1991 Budget CarryOver: 100 000 > 11'•::fLLs1zC::k ...:::......................................................... ..................... Remaining Cost: ....•• : 25 OO Period :•;:•1fEM:::::<z::::::<: ::::;>:<; <:::>:::E+eld:?iiita:•: EXPENSES: Project Development Precon Eng/Admin 40,000 40,000 R-O-W (includes Admin) Construction Contract Fee 190,000 190,000 Construction Eng/Admin 20,000 20,000 Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 250,000 40,000 210,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded T€TAMSWR ES > > # » > > 3QF3 E» » AOWOD <4 F`0 » > >< < > : > > >K > > > > ? File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON (-- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12109 Rank: 13 PROJECT TITLE: Transit Program DESCRIPTION: Determine short-range and long-range transit needs, routes and facilities, including a transit center, intra-Renton shuttle, rail system and park and ride lots. Work with Metro Transit, Downtown Renton Association, Boeing, etc., for implementation of short-range needs. Include transit improvements in proposed transportation demand management programs, impact fee program and capital facilities needs assessment. JUSTIFICATION: Transit improvements are a vital component of the transportation system's ability to absorb future traffic demand. Transit will be one key to meeting the goals of the downtown area as well as industrial and office park development in other parts of the city. STATUS: Staff is currently working closely with Metro Transit staff on near-term service improvements in Renton. Work is beginning on the Transportation Plan, which will examine the need for future transit improvements. Previous Funding: Project Development = $50,000; Design and Construction = $328,000. CHANGES: $168,000 ending balance of 317 Fund put into Transit Program-plus $160,000 that was replaced by grant for ( NE 44th signals. FINANCIAL DATA Total Project Cost: 828 000€>?•»» :.`''''•'. .......F.uttdect.«.:>: 828,000 828,000':.:: SpentThrough Throu h 1990: 1991 378 BudgetOver: 9 Carry , .....�M1i•.LikSdk�..... Remaining Cost: :.. ::.:<>:ga00 Period �.:::: •':<:;�:992e:.><:>::.:.;::•:::•::•:9953:•>:;:•:;;:•:•:•;:•;:•;:•;: EXPENSES: Project Development 50,000 50,000 Precon Eng/Admin 48,000 24,000 24,000 R-O-W (includes Admin) Construction Contract Fee 320,000 160,000 160,000 Construction Eng/Admin 32,000 16,000 16,000 Other ....................................:::::.�:::.:.:. .:::.::::Mt�`.�...,40.elaVi.Oft.::: ::::::::::.:. :::::::::.:.204 AQQ: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 450,000 50,000 200,000 200,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed . Mitigation In-Hand Mitigation Proposed k Other Unfunded :::::::ZED,DQcL. : : 241f3,.00Q.., File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public.Works Div: Transportation Systems Fund: Proj: Rank: 14 PROJECT TITLE: Houser Way Relocated - Sunset Interchange to N 8th St Phase II DESCRIPTION: Houser Way Phase II will design and construct the new undercrossing of Sunset Blvd and the new Northbound lane(s) from Sunset Blvd to N 8th St. Includes curbs, sidewalks, street lighting, signing, landscaping and channelization. JUSTIFICATION: This high priority project is a culmination of the North Renton Facilitation process directed by City Council resolution 2708 with the objectives of providing additional ingress/egress for Boeing and Paccar employees and relieving traffic usage of North Renton residential streets. STATUS: • Funding to be determined. CHANGES: Because of funding short fall this project has been divided into two phases. The funding need has ( increased mainly due to Right of Way cost. FINANCIAL DATA Milig>: ».:.s: :s » Total Project Cost: 2 261,000 < s� nd : .. .... 30,000 30}000 Spent Through 1990• : ::: y`2ivi .;:: : ; ; :�.: a ::: 1991 Budget CarryOver: 231000 1,100,000 1,131,000 <.:::.:::;:.:.:.;:.;:.;•.;;:.;•.;;;;:..:<::::.>.::.:<:::::..::::::::::: Remaining Cost: ## ?41gtQ Period :.::::.. .....�lt :�"lit8> �::ii;:i;:i•:�; .i::i::i::ii::::i:•":•r•`... •:i:::::ii:;::>•`:::::i::i: :�»»:<:>i>::»::>::>:: :::;•.::::: ......r.....:.......... 1.........:..'892.................'1.893...................1`99?k:::::s::�>::>:�:�>:: ::>'1:93'S::>::>::::::::::::::>�:::::<;:E991� . 9•••',:.;:,;:.;;:• ••v;;..i•;.:;•.�.::_::i:.;;::.:......................................_.........................._.............. ... 1.. 19.•7...•::.:•:•:: EXPENSES: Project Development Precon Eng/Admin 256,000 128,000 128,000 R-O-W (includes Admin) 380,000 380,000 Construction Contract Fee , 1,505,000 1,505,000 Construction Eng/Admin 120,000 120,000 Other SSS............................. ........ :......:::. .......................................................................*'tv.......s..........:::•:::::::>:::•:::::::::::::::::.:•:::.::�:::::::::..:::.::..::i�.'I�.,Q.Off.:.>;:;::.>:<:>.�OS! ........: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 30,000 30,000 Vehicle License Fee Grants In•Hand Grants Proposed (TIA) ' 1,131,000 64,000 254,000 813,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded 1,100,000 34 000 254,000 812,000 F€k'fAt:::::S{1tlRCES::�::;:::i:::>::>:::::::::•'::::>::::>::>:z: ::s:::><:>:::i:::::>::::>:•;•:;. •g>•::.. ;; ::» :a:i::i::::>:<;:i::i::i::i::i::is:i::i::i::i::i>::::i::ii::::::•: > ............................:..:�:,•::::::.�:.�:.�:::::..::.:......, ........�. r :.::::::::.�..�.::.,.:.:�.,.�::::::::::::::::::.:::::::::.::�:.....:.,...R;.........aUB..t)0.0.......1,625.,.80Q...M:::.::::::::::::::::::: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. ti CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 106 Rank: 15 PROJECT TITLE: Bridge Inspection Program DESCRIPTION: Inspect all roadway bridges owned by the City every two years. JUSTIFICATION: Must be done for safety and funding purposes and as part of S.W.I.B.S. Program to determine structural deficiencies, physical deterioration, or functional obsolescence and to qualify for federal bridge replacement grant funding. STATUS: On-going bi-yearly program. $50,000 budgeted for 1991 program. CHANGES: Changed to biannual program and "Emergency Repair" taken out of title. Repairs as required will be funded on case-by-case basis. -•,-• EkiCFINANCIAL DATA :qF > Total Project Cost: 170,000M$00440< 170,000 170,000 SpentThrough T 1990• rou 9 e CarryOver: 50 000� � �`�"'� 1991 Budget :""d Remaining Cost: .'.�.....:.>•1 1 #1QU Period ::::>::: inata:;::>s: :: •`.:>:::>r: <:::>::a097s:':'::':': EXPENSES: Project Development 120,000 40,000 40,000 40,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other .......................::.::....::::..:.:Maaa:.:::::::::::::. ;4a Qa(t: :::::::::::::Ao aoa: SOURCES OF FUNDS: 1/2 Cent Gas Tak Business License Fee 120,000 40,000 40,000 40,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand f" ..n Mitigation Proposed Other -- Unfunded .A1... :4D.IIOa:z::::>«:<:::::>:<::<:<::::::�::>»::>:::::>::::>:::::::::AII>�:. rut:::::<:s»::»>�:>:':>': s>::<::«::<::<>;'..:;<... .:. .I� �......::.:::::::.�.�.::�:.:::.::;:::::::e•::.�::::::�..Q,.(��..::,:.�.�.:::::::;:::.�::::.�:.�.:�:.::;.....c...........:..::..::..:.......�.:::::::::::.�::::..:.p1a.V.V...`:::::::::::>::::::::::::::,:�.::::�.�::,{.b,�s:QQQiiii • File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. . CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON �.� SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM j CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 016 Rank: 16 PROJECT TITLE: Traffic Signal Loop Replacement Program DESCRIPTION: Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve proper installation and assure reliability. JUSTIFICATION: Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed for the intersection controllers and VMS signal coordination system to operate effectively. The detection loops in the pavement must be properly maintained; their failure results in highly inefficient operation. Pavement deterioration due to heavy traffic volumes, trucks, and adverse weather have increased the need for replacement. STATUS: On-going yearly program. CHANGES: None. FINANCIAL DATA Total Project Cost: , 150,000::::::'; <0600 :,:;,; 150,000 150,000 SpentThrough 1990• 1991 Budget CarryOver: » fWOt. Remaining Cost: ._._... ;_1;5€t 000 • Period ............................................................::> :>'1 ::'::<€:#>'•::::><::'•f99tk ::>:.'•.:::::<: #195:::<:>' t€'.>:E:99O::>:»'.< EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee 126,000 21,000 21,000 21,000 21,000 21,000 21,000 Construction Eng/Admin 9,000 1,500 1,500 1,500 1,500 1,500 1,500 Other (City Force) 15,000 2,500 2,500 2,500 2,500 2,500 2,500 SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee ' 150,000 25,000 25,000 25,000 25,000 25,000 25,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed• • Other Unfunded :€kT.MSOURCES:>.>.>::>'>:>:>:?>:>::>:::........:<:.> ;.>.>.:>WMOQ:.".<.s>a.::»:.•5::: .................................................................. .................* a r ..:r.., ..... :.. . r.}.*g}F.. MOOWii;% ::::;izWQOMi<:'S'•i;25kiQtra File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12113 Rank: 17 PROJECT TITLE: Traffic Sign Replacement Program DESCRIPTION: This program provides for the replacement and/or relocation of signs that are obsolete, faded, poorly located or no longer appropriate. JUSTIFICATION: Poor signing can be one of the'highest liability exposures for a city by creating safety problems and driver confusion. STATUS: On-going yearly program. Contract fee amount is for purchase of materials that will be assembled and installed by City. CHANGES: ( None ` FINANCIAL DATA • Total Project Cost: 120,000Fad .::..:::::. :..A 120,000 120,000 Spent 9 99 Throu h 1 0: 1991 Budget Carry Over: MARMON Remaining Cost: '. .. 1ZO O O? Period ........................ C :`�`ti!t8ll�...........'1�..�:............'f.�..................'E99?J�::>::::>:;:::::::::>::>:s::1:995:::>::::>::::;..:::::.:::. ::<:::::::.:>::s::>::>:::. ;:«::>::»•<: .......... .................:.................................._............................_. ..................:�:::.:...�.�:.::;E.996€:::.�::�::.:�.�::::19�:�,..::: ................................................................................ EXPENSES: Project Development Precan Eng/Admin R-O-W (includes Admin) Construction Contract Fee 51,000 8,500 8,500 8,500 8,500 8,500 8,500 Construction Eng/Admin Other (City Force) 69,000 11,500 11,500 11,500 11,500 11,500 11,500 ........................................................:::......::::::ggi:::.r,'�...sn:..:::....MAK.::::::::::::.ar7l . ............IN :::;«:::<:::>:<::::�. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 120,000 20,000 20,000 20,000 20,000 20,000 20,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand • Mitigation Proposed Other Unfunded TATA <<AOP CES::<::?»:<::<:>::>::::>::>::::::::<:<:::>::::>::::>::>:::::>:>:«>;::: Q':00 :::::>:<:>:::?:::; <:. ................................................................................. .f).:.....:::.:. .,.00..............21##10i#:>:;::::::;::>::>::>M:::Cs00z:>»::::::::»:::::20Q04::>: ::>:::>:>:<s>::>:29:;:OOi3>:: File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. ' e CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 091 Rank: 18 PROJECT TITLE: Light Pole Replacement Program DESCRIPTION: This program is for the replacement of damaged luminaire poles. These poles have been damaged in unknown incidents where reimbursement through normal channels is impossible. JUSTIFICATION: Pedestrian and vehicular safety is highly related to adequate street lighting. Purchase of these poles falls beyond normal maintenance budget. STATUS: On-going yearly program. Contract fee amount is for purchase of poles. CHANGES: None. FINANCIAL DATA Total Project Cost: 150,000: > u��`�����' kl. 150,000 150,00q..... SpentThrough 0• 199 . 1991 Budget CarryOver:e 9 Remaining Cost: iliagiagapa Period ::::>:::?<_:»:w:>:>:199•><:>:>>'' EXPENSES: Project Development Precon Eng/Admin 12,000 2,000 2,000 2,000 2,000 2,000 2,000 R-O-W (includes Admin) Construction Contract Fee 138,000 23,000 23,000 23,000 23,000 23,000 23,000 Construction Eng/Admin Other :.........................,..........................:......:...:...:.................�..................:.....�..Ik�.:,...........�'i ::.::.;;:.;:n5 p4!:::<;:::>:::::::;:::>',�5 C�Q..............�. •t1Q?�................ OQCI. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 150,000 25,000 25,000 25,000 25,000 25,000 25,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other \--; Unfunded "ODC3:: ::::;::»:g: ..::::. ;:::zz:»::>?>:«:..;:: . .. .. ..............Z5 #i�t�..............25.aQfl>::::::::::#>::::#:::28�•:OOFk:::::>::s::::>::::>:::2r::17Ui1:» File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. l CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 056 Rank: 19 PROJECT TITLE: Sidewalk Inspection and Replacement Program DESCRIPTION: Inspect sidewalks to determine areas needing repair, notify property owners of those sidewalk areas that are their responsibility to repair and finance repair by City crews of areas that are City's Responsibility. JUSTIFICATION: Dangerous sidewalk sections are safety problem for pedestrians and a liability exposure for City. STATUS: On-going yearly program. Program began in 1990 and will,complete backlog of repair locations in 1992. CHANGES Inspection began in 1990 and will complete backlog of repair locations in 1992. Budget increased from $5,000 to $10,000 per year. / $5,000 for inspection & notification, $5,000 for City repairs. l 'FINANCIAL DATA . ............ .: Total Project Cost: 65,000:::;::<.:::FiPtiezi :::; ,000 65000 ... 65 Spent Through 1990: 1991 Budget + Carry Over: •.`:•.`•<•.`:•kliftitSeletl.;.;:. Remaining Cost: Period <::::::3 :: :€:»::>::> 99 '::'::>:::»: :>X995:::<:`:•.`: <>` t990 > >z'•<:>1919'> >`: ................................................... EXPENSES: Project Development 30,000 5,000 5,000 5,000 5,000 5,000 5,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee 35,000 10,000 5,000 5;000 5,000 5,000 5,000 Construction Eng/Admin Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 65,000 15,000 10,000 10,000 10,000 10,000 10,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed ' Mitigation In-Hand t`.... Mitigation Proposed. Other Unfunded TiI'fJII:SE3tlR.Cg:C:::><::>:::>::>::>:::>::>::::: : ::: : `.: i5 011.E`::>::>:s>: :�5 aT::>'>:»:>:_. .....!«' :>>< <>:. ##190:>:<::»::»:>t3 0th::::::::;::>:::<'::>: :>>."©::::::>::>:? ?:'> .: : ' ........ ....... . ....................................... ._.........:.......� ... ;!•.:.�:. .Q....::: •: '��Lr.•.:...... �[...► 3• r• • • #tlE�:� �" 7i?,.QDiI;. • File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 029 Rank: 20 PROJECT TITLE: Arterial Circulation DESCRIPTION: Completion of a computer model of the City's arterial system is scheduled for 1991. This model will be used to develop an arterial plan as part of the City's Transportation Plan. Transportation projects will be recommended to improve traffic flow on a multi-model basis and will be coordinated with Transportation Demand Management and Clean Air requirements. This fund will provide for planning, design and construction of projects. JUSTIFICATION: Recommendations for arterial system.improvements will be a key product of the Transportation Plan. These projects are essential to support further development and to reduce negative traffic impacts in the City. This fund is necessary to allow for completion of relatively low-cost projects which will improve traffic operations, promote increased use of high-occupancy vehicles and comply with clean air legislation. STATUS: Work is just beginning on development of the Transportation Plan. Initially, this project will fund the planning work which will lead to recommendations of improvement projects. CHANGES: None. ( FINANCIAL DATA Total Project Cost: 6,880,000; :.:<;: ;:,F::poiga: 4,559,000 3,859,000 700,000:yt Spent Through 1990: ::.::::::::::::::::::.:::::::::::::.::..•::::::::::::::.•.:: ::•::::.Ii1.. . funds" 1991 Budget + Carry Over: 120,000M6e6460.::i?. 2,321,000 1,700,000 621,000 Remaining Cost: noggin i Period 1.11.N'391933:::<>::>':<s>:':>:X99!k::> EXPENSES: Project Development 80,000 80,000 Precon Eng/Admin 830,000 80,000 150,000 150,000 150,000 150;000 150,000 R-O-W (includes Admin) 650,000 50,000 150,000 150,000 150,000 150,000 Construction Contract Fee 5,200,000 300,000 1,000,000 1,300,000 1,300,000 1,300,000 Construction Eng/Admin Other :::<:::>x> :.:::.:.;:: ........................................................................... �......s...........:.:::•.........�......:::ri.:..:: �Y40t�..::•::::;# OCG!�..:.:::::::.�694t�OG::.::,..�.64�,Q4�!.:.•::::::::�.,G0.4,49..� ...................................:........ • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 3,739,000 160,000 290,000 449,000 1,030,000 925,000 885,000 Vehicle License Fee 700,000 350,000 350,000 Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand t.., Mitigation Proposed 1,700,000 210,000 400,000 400,000 325,000 365,000 Other Unfunded 621 000 451,000 170,000 C 1'Xlt3>:::>::>::>::>:: . ... .... ... ......................6.. . .............'l6000::> 00A:tl0.Oi3:s::<z::'l:_>G00>':000::::>`::����'600���000:? File::TIPCIP_A.XLS Printed 5/15/91 at 11:36 AM. • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CCONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12117 Rank: 21 PROJECT TITLE: Monster Road Bridge DESCRIPTION: Replace Monster Road bridge. May be combined into Oakesdale Ave SW/Monster Rd to North City Limits project. JUSTIFICATION: Bridge requires interim repairs based on evaluation by an independent bridge engineer. Due to increasing truck traffic, age and condition of structure, partial or full replacement of the structure may soon be required. STATUS: Bridge will be fully evaluated in 1991 as part of S.W.I.B.S. Program, which determines the structural integrity of the bridge and whether it qualifies for Federal Bridge Replacement Funding. CHANGES: f Former scope of work was only for interim repairs. ` • FINANCIAL DATA Total Project Cost: 1,400,000su0d0:F:<_:; 100,000 50000 50000 Spent Through 1990: 1991 Budget + Carry Over: 1,300,000 1,050,000 250,000 Remaining Cost: # 1gt.Q42 1 ; Period :::>:�'.E'Ei�::>::::»:::;::>:::;:::;::;• :<:::s:::PitKfod:'1'tita�€>s:> ::»:1: . �>:'1.998<:;<_>::::::::�:::>:>:<::�99?k::::::::s::::::=::'::::�::::1�1�5::::::»::::>::.; >::>:::f996€::<;::::::::�:::::>::::>::>::1:9J:7::::::s:»::: :>>•::`•::><::>::zz:>:::#:>:#:>::>::>... .9922:>::;::: EXPENSES: Project Development _ Precon Eng/Admin 200,000 100,000 100,000 R-O-W (includes Admin) 100,000 100,000 Construction Contract Fee 1,000,000 1,000,000 Construction Eng/Admin 100,000 100,000 Other .. AM.. I?jSAS:<::`:`.>s'::><:'>:»:><> :<:<:<:::a�ti.C�9!04>�::>:::>;,:<::::;"�51�04'IQ:::::<::<::::�:>.•^r,Q�!'QO.�::>::::...'t ..QO�Q.04............ .. ... . .. .. ............................. ..................................................................................:.................................................:........:.......................................................................................................................... • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 50,000 50,000 Vehicle License Fee 50,000 50,000 Grants In-Hand Grants Proposed 1,050,000 1,050,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed 250,000 50,000 150,000 50,000 �. _ ` Other Unfunded TOTALA::::SOURCES::::::::::::::s:;:::;:z>::>:>::>::»><>::::<:;:<:> s:>:s: >'41Q'•:O113:::::::>:z::;:><TOQ 1lOfl::::::»:><z:20Q':€I.Qd :>::::>:'F•.>.1OIt'#IOEt:::: :::::;>::::>::::>:::<r:::>:::::>:.>•::>::::>::::;:: :::<i:;»#::;:«<:>:: ::::::::::>::::::;s::::::::::::::::::::::::::::::: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 054 Rank: 22 PROJECT TITLE: NE 44th St/I405 DESCRIPTION: This project is signalization of freeway ramps and widening of signal approaches where warranted. JUSTIFICATION: Growing traffic volumes are warrenting signals at this location. STATUS: FAUS funds of $211,222 have been approved. Mitigation funds of $48,778 in hand. Previous Funding: Preconstruction E/A = $44,000.00, including $28,336 FAUS grant. WSDOT money is also available to refurbish bridge deck. CHANGES: None - FINANCIAL DATA Total Project Cost: 260 260,000 ;;::;;;:Futtt ed 260,006 211,222 48,778 SpentThrough Throu h 1990: 1991 Budget Carry Over: 44 0003`:s? : .::`::::::: . .:::. •::.: . Remaining Cost: '.....'>r: M6 #)0O Period i:;:k:ti:::iiti�iiii ••-• 'EEvil::z: >::<:?':<::>:>::?.::::<k4 :''fft <:>.':<:<:1:95.�......:.....:.... EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee 200,000 200,000 Construction Eng/Admin 16,000 16,000 Other :.t7f ! NSS::>:>:>:::>:::>::>#>:»:>:<:::>:><<<:`:<::<:: :.8'004`::=:`:>:::'`.{< :.<: ': <€•.`:>': <>> :!6 41� ': «<:»>:>':::>:>:>:':::`:::>::>:<::« >`>:>«>::»>:>#';»>:>'>:»s::»» >::»»':«:<>>':<. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand (FAUS) 182,886 182,886 Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand 33,114 33,114 r-_ '. Mitigation Proposed E ,_. Other Unfunded OTA :>':SE)URGE^.:::.'•.::: ::>::::::::>:<:>:>.>::»:> :::>::>:`:'.27:1s' I3 :> ': > >s:>`>�> �?� <M'�fi'•DOP < : ::>:>?:::::>>:':> ``:>::»<>:>. '::>>::':>:> »E »>a >:'»<EMM File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 023 Rank: 23 PROJECT TITLE: SW 16th St - West City Limits to Lind Ave SW DESCRIPTION: Roadway improvements to include: Widening to 3 lanes, roadway reconstruction, curbs, sidewalks, street lighting, channelization and storm drainage and bikeway. JUSTIFICATION: Traffic demands due to proposed development in this area, including the Boeing Longacres site, will accelerate the need for this project and a re-evaluation of the project scope, including number of lanes. STATUS: Begin P.S. & E. in 1992 pending funding Previous Funding: Pre-construction E/A =$60,000 CHANGES: West Limit extended from Oakesdale to West City Limits, combining with the former "SW 16th - Oakesdale to Monster Rd" project. FINANCIAL DATA . .. :....::.120:.�.�:::.:..................:.................�.......... .. .................................:. Total Project Cost: 4,302,000 `: Mi:0000:«:;:; ,000 60000 60000 SpentThrough 1990: 1991 Budget + Carry Over: 60,000: :ilrif0hat ?:>z 4,182,000 1,772,000 2,410,000 Remaining Cost: , .:•.'•>4 242,0 Period .................................. . .... ..........::..:.....:..:..........�.:.. �::_�:::::._792,,..:::_:.•:.:_.�.��!.31�::::>::::>::::;>:<;:.;:..:<i€99!k.:::::::._.:>:::::�.•.1�•�..::::.�::..:::..:::;E.99�.�::::..�:::::..:1:9910..:.:::: • EXPENSES: Project Development Precon Eng/Admin 498,000 219,000 279,000 R-O-W (includes Admin) 200,000 200,000 Construction Contract Fee 3,282,000 3,282,000 Construction Eng/Admin 262,000 262,000 Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee 60,000 60,000 Grants In-Hand Grants Proposed 1,772,000 1,772,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand (' Mitigation Proposed 2,410,000 159,000 479,000 1,772,000 • Other Unfunded TPTAWPAgggNMEEMEMMQ2444QP0M24WWWWWPWOORMAIMMEMAREMERWOMMM. File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM \_ CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 032 Rank: 24 PROJECT TITLE: Sunset Blvd N Project Development DESCRIPTION: Conduct preliminary engineering studies for improvements to Sunset Corridor between Maple Valley Wye (SR-169) and Houser Way relocated. JUSTIFICATION: This congested corridor lies between two interchanges to I-405 and is at the confluence of two state routes and three heavily traveled principal arterials. This area contains the two most heavily congested intersections in the City. Long-range and short-range improvements are required. STATUS: Previous Funding: Project Development = $100,000 CHANGES: This project was formerly called "I-405 Studies," but has been narrowed down to this key location. ( FINANCIAL DATA .. Total Project Cost: 100 .;:.>:.;:.;;:.:� 000untled:«::;:•: �•100•000 •���100�000•� SpentThrough Throu h 1990: 1991 Budget CarryOver: 100,000t•:#lflmce�: . .:.. •;;:.; Remaining Cost: Period > N;::>;ME....... ..................................... ........................... ........... ...............C.::: .::::::.:l, ::.M aXX99. MW199:j'::. •:: EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other TOT SOURCES OF FUNDS: 1/2 Cent Gas Tax • Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.1.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded T€k A :'SOURCES:::>:>:>::>': :< > #a> > »>><>.... `.: :::::::%<; W::>:>:`<? File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON - SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON C.\ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 058 Rank: 25 PROJECT TITLE: S 2nd St/Logan Ave S,Williams Ave S &Wells Ave S DESCRIPTION: Bring signal indications up to MUTCD standards. Provide overhead signal displays free from roadside obstructions. Increase intersection visibility and awareness. Major work is signal foundations, wiring and new poles. JUSTIFICATION: Qualified for Federal Safety Funding due to accidents caused by poor signal head visibility. STATUS: Final design and construction are on hold awaiting input from CBD Transportation and Streetscape projects. Previous Funding: Preconstruction E/A = $23,000; Contract Fee $107,000; Construction E/A = $8,889 CHANGES: None. `" FINANCIAL DATA EINSIMENMESSE Total Project Cost: 138,889::;:;< ##F.U.NW:.:, 138,889 13889 125,000 SpentThrough Throu h 1990: 1990 Budget Carry Over: 138,889:x::>atiftitidtrd`«::::• Remaining Cost: MSENEW Period .........................:<:::::s1995: ::::s>.:::>:.;199,0i.i >::'s >:>'199 `::>:'•»'a> EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other T:. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand (HES) Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded ..... .:...................................................... ........................... ........ T(TAl::50IRCES:::`::<:`::::>:::'::::>::ss>::s>:>:>::>:>:s<v:><:>:::>#:::>::<:>'> <:;<:<::` < >>:><::>':>z:'><`< z:>.`< ': ': >## '>>>»>'s`: >':>> ?':> >`> >< : :'::>: ':<':# ' « ?: s :: `:::: <:'•>:: :' File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON ._ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM -. CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 028 Rank: 26 PROJECT TITLE: SW 43rd St/ SR 167 Loop Ramp DESCRIPTION: Construction of new'Southbound to Eastbound off ramp at SW 43rd St and SR-167. WSDOT is lead for design and Construction management. City will hire consultant and manage the funding. JUSTIFICATION: Identified in Valley TBD Study as an improvement needed to reduce congestion at the intersection of SW 43rd St/East Valley Road. STATUS: Previous Funding: Preconstruction E/A = $80,000 CHANGES: r None tFINANCIAL DATA ���'�•'�i:i ii iii}::..... ... .. .. .............................................................. :iii i:J:4i:Yiiiii: •.....:w:::::::::::::::...::::::::::::::::::.v. w•w::::::::::::::::.............................................................. Total Project Cost: 1,050,000:;? F1ed:t:;;: 80,000 66700 13300 Spent Through 1990• 1991 Budget Carry Over: 80,000: #Ih.'uad :0d ;>:: 970,000 639,300 330,700 Remaining Cost: >: ZOWI 0 Period ::::i::::::::�EI�:::::::::::::::::::i::ii:::i<::i:i:ti:::i:::r:�Fl{��i:i•� EXPENSES: Project Development Precon Eng/Admin R-0-W (includes Admin) 20,000 20,000 Construction Contract Fee 860,000 860,000 Construction Eng/Admin 90,000 90,000 Other .. :::>S':: :•<.:::::i::}:>::::>;»>::>::><»::»»»::... :.....:::::i:::.iii:;:iii;:i:::::::::::..::::::;::;::; .: :..::::::::::::.. .. SOURCES OF FUNDS: • 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed (TIA) 639,300 20,000 619,300 L.I.D.'s Formed L.I.D.'s Proposed 330,700 330,700 Mitigation In-Hand Mitigation Proposed Other Unfunded ....... . ....:..... ..........:...::..:.:::::.�::::::::::4�,;QIaf3;.::...:.::••::::.:�.�::,�.�-:��:•::::::241.,IIQQ.::�::::.�:45E)�#�QEk;;...::::.:� .......::•:.:�•::::.�:�,�::.:�,�:,. .... ....... File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works • Div: Transportation Systems Fund: 317 Proj: 12121 Rank: 27 • PROJECT TITLE: Lake Washington Blvd - N Park Dr to N 44th Project Development DESCRIPTION: Preliminary engineering studies on Lake Washington Blvd to rehabilitate the roadway and to conduct safety improvements such as a pedestrian/bike path and traffic metering to N Park Dr. JUSTIFICATION: This is an important route in the City's trail network and the City has made a commitment to limit through traffic in this area. The existing roadway is in poor condition, resulting in high maintenance costs, and is in need of rehabilitation. STATUS: Construction funding to be sought, including grant money. Existing carryover funds will be used to develop proposals for the rehabilitation and trail improvements which will be undertaken as funding is available and in conjunction with the Overlay Program. CHANGES: None FINANCIAL DATA Total Project Cost: 125,000? and d 125,000 1251000 Spent Through 1990: :><:>�a d '::;•;; 1991 Budget Carry Over: Remaining Cost: .'....::..:: . tgD00 Period • • <:.;;:.;:;;«:.:.;:.;;;:.;:;;.�.>::;:•;:1TElU[:.;:<•;;;;:.;:::;:;:::;•;:.;:.:.;.;::Penod:.TetaE::•::::::::..1.9.9.2::::::::.:.�:::::i.993::::::::::::•::•::'1�9........... .........995................... ..... EXPENSES: Project Development 50,000 50,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other ::::::::::::.................................,..........................::.::,.::::.:::::::::::::::::::::::::::::::::::::::::::::::::::::::: SOURCES OF FUNDS: 1/2 Cent Gas Tax • Business License Fee 50,000 50,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.1.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded IOT L. QURCES.......::...:.,................ .............50 AS. .... ... File::TIPCIP A.XLS Printed 6/1/91 at 3:05 PM. • CITY OF RENTON. • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12110 Rank: 28 PROJECT TITLE: Neighborhood Improvement/Beautification Program DESCRIPTION: Provide traffic flow management, and residential street beautification. will include such items as signing, benches and trees. JUSTIFICATION: This program is intended to enhance "livability" qualities on residential streets. • STATUS: Previously funded $70,000 will finance 1992. Previous Funding: Preconstruction E/A = $10,000; Construction Fee = $56,000; Construction E/A = $4,000 CHANGES: ( None FINANCIAL DATA Total Project Cost: 420,00 ig 420 0070,0001117:70t ' > : `ed 0 2000. Spent Through 1990: ..! 1991 Budget CarryOver: O� 0Cec.< � > : 40 :.. . ... .. .... . . .. . .:;;:;; Remaining Cost: iii,Milgang Period ::EM:;>.::>::>::><::: .L?gt#t�:::+it8�:::::: :;;:3993;>:;;<:�::«<:::::s:::f:919Ar:::>::::::•'::::;::::s:::]�95s:::::::::;:::::::>:::::;:::#995:::>s:<>.•;:•:.;:.;:;•;:.•;;1:9'8.'7:::::::::::>s::: ................................ ...:::::::::::1:992> :;::<::::>::::>..... EXPENSES: Project Development Precon Eng/Admin 50,000 10,000 10,000 10,000 10,000 10,000 R-O-W (includes Admin) Construction Contract Fee 280,000 56,000 56,000 56,000 56,000 56,000 Construction Eng/Admin 20,000 4,000 4,000 4,000 4,000 4,000 Other 'O:#" N . <: >> 5 `flOQ:ipie '<< ':> > € >> ! i >:>: > ><>#!'..ti4 >>'.< :::>7di`Of Q >. `. ."itQO :> >>:.`: >'7 g,q,k SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 350,000 70,000 70,000 70,000 70,000 70,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s'Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded :€k�'• :>:: : >:�>:�::�>;:::::;::>::>r,:>:<:::»>::s»:�»::> »»::»>::;..� �•� :>::::::>:::::<:<::s::s>::::�>:�»>:>:<:: >:::<:::>:::;::.. ::.: O�f�;::::;:::::::::;::>:LTi#��#3(TF#::::»>::>::::»:.II>'�#If30> ><::>:::::>::z:74I:':QO(!!::::>:::::::::<:...........QA.... Ai...:SEll�lttOE^�..:::.::�.::�::::::::::::.�:•::::::::::::::.�::.�: I)�•:041)..:..�..:::::::::::::::...:::: .:..::::....�#l.ta..... :::::::::::::........... .�:.:�:::::�...........:::.:......::.......,............,.......... .�. .... • File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12112 Rank: 29 PROJECT TITLE: City Gateways Program DESCRIPTION: Beautify four entrance Locations to the City. Project to include signing and landscaping. • JUSTIFICATION: Displays a sense of civic pride. STATUS: Previously Funding $55,000 will finance 1992. Previous Funding: Preconstruction E/A = $8,000; ROW = $1,000; Contract Fees = $42,000: Construction E/A = $4,000. CHANGES: C None. FINANCIAL DATA Total Project Cost: 220,000 ii,ego ded:F:;;;: 220,000 220,000: SpentThrough Throu h 1990: 1991 Budget Carry Over: 55,000; _ ficleq,:;_, Remaining Cost: Period :«::;:::MM::::::;:>.;::::::;:;::;:::>::;:;:::>::>ilif.0l ::0,141::<:>:::«:>:1:a::;g:::::::;:>:>ag93::<:>::>::>::::::»:«:::>199!X:««<;:::::»:::<::E1995:::::::::<:>::: EXPENSES: Project Development Precon Eng/Admin 24,000 8,000 8,000 8,000 _ R-0-W (includes Admin) 3,000 1,000 1,000 1,000 Construction Contract Fee 126,000 42,000 42,000 42,000 Construction Eng/Admin 12,000 4,000 4,000 4,000 Other Mkg7Ek'>RImSo>':>':'':>s>`` »o €m..........6oG0!Q. ................:........................'�~#QGC......:.......�,� �7Q ............s;S!74Q......................................................... • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 165,000 55,000 55,000 55,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D,'s Proposed Mitigation In-Hand Mitigation Proposed `._.. Other Unfunded f€k 6 ::»<z::::>:<:nal. 41:z'`•`.`:<% # �5'QOF#:':::::>::<:`:`:>5 ::::000:<:::>::::>::>`::<::#<::>:`::< ::€:;::::::'::>:< <::`.:`.:`:€: :.1'1�..:.,'�`�URC�.�i.:..�:z:•r::��rr:�o-:;:::o-o-::�o-:_:;•:::•:•:>:•>:•a:•;;•;::::::::....:x. ..:...:...:.....r r ......,........n......•, File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON - SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM - CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 095 Rank: 30 PROJECT TITLE: S2ndSt /MainAveS DESCRIPTION: Signalization and channelization improvements at intersection. • JUSTIFICATION: Existing signal does not meet current standards. STATUS: On hold waiting input from CBD Transportation and Streetscape Project. Previous Funding: Preconstruction E/A = $10,000; Contract Fee = $60,000; Construction E/A = $5,000 CHANGES: ( None • FINANCIAL DATAmimmmtme ..:...:..:...: : .......... .. r ....r..tt...:................ �'>•'f:�:�:is�>��:...............rt...r.r...........t.. Total Project Cost: 75,000�� Fundeth 75000 75,000:•::::• SpentThrough Throu h 1990: 1991 Budget + Carry Over: ' 75,000 1Muira RWM Remaining Cost: .t..r.......t........t....t.. Period :.; MRME::<R:<::€:`::MIN:'1'Sit2lti':.:z:<.::<:'::::y:99x:::sz:::»:: :::r::>::>3993::;:>%:>::>:�::::::::�91�::::>::#:i'•#::>::>::>::::11;95;:::>:�::»>'sii:::»>�E:99E`i::»>:>`:�>':z<'<:»:>�199:7>•`.::>`: � EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other ..���t {�� `jMi:;isii}$;;{.:;:;:::i:•i::$j:i:rii::y::;;:};:::::yisC iiiiiiiiiiiiiiiiii::i$Vii:ii'is':: $$::%ii i ii}iii}:$iii:iiiiiiiii}}: 'ii Tiij:�{i:::;i%>.jS}{{;:;:}{:;:{i.:{:,:ji:;:;iiii:•:•ii:::•Si iiii:i:%iiiiiii:iiiiiiiiiSi':'viiiyj}::J.+>fi'ri:i?'r�Tj: '!KF. S�f...�14�1iiii:4i:J:4:is^:J;:•i:J:•iii:vv:iiii;4;4}ii;4iii:L•ii:i:LLtoi^i K:!.i}�::::::::w::::::x•iii:4i:4;;::::::w::::x:{.:•{::L:•::;:::ii;::,�::.�{:.w:.�:.�:::::.:�:::::: : :::v�:::::::�:::::�:.............:................ ......r.....4.:�:::.................................. ...................................n:v+.'•............. r: :v• w:::::::::::::::::::::::::is ............ ..................................rr:::::::::::n:........................................... ::.:::�::....f.........t.............................. .......n::�i::�i�4:^iihii. • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand • Mitigation Proposed { Other Unfunded VI: SCS(ROgSt;::•:•;:•;:•;::•;:•;;::•;;;:•::•;:•::•::•;;:-:•;::•;:;:•>:•::;:•:;:•i::•:•:;::•i:•i:.:.;:>::;::;::::.............. Raigeggit File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. s (ITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM . CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Bui.lding/Public Works Div: Transportation Systems Fund: 317 Proj: 033 Rank: 31 PROJECT TITLE: Maple Valley Highway-Maplewood Ave SE to East City Limits (WSDOT Project) DESCRIPTION: Widen existing roadway to 5 lanes, provide new curbs, sidewalks, storm drainage, street lighting and channelization. JUSTIFICATION: Will address highly needed congestion and accident concerns. STATUS: Project will be funded entirety by WSDOT. City Funds of $5,000 budgeted for plan review and construction coordination by City. Scheduled for construction bid ad in February of 1992. CHANGES: I None. FINANCIAL DATA Total Project Cost: 5,000 W008el:«s:•:: 5,0uu 5;000:: SpentThrough Throu h 1990: ...�..................................... 1991 Budget Carry Over: 5,000s`• €]I!fS]Efi9Ed.:;:;<: Remaining Cost: '............................ Period <.:::> >>> >'>> > >:` i 'E`tai «> 992:>;:>w:>::?:::.':::s::1 >:>'•:'•.:.<. ::<::::.<.:»X99?k::>:::z::.r:>:::] 95 '>'.:::s::::::>E998::<:s: r.;!.:3:89T>:<:>'::>< EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other WARPRRIPMgiii:INEME!11]:iiisi MENEWN ;r s ::s t:: ?ag= SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed , Other Unfunded f.€I#'Ai:'SptIRCES::>:`::>•.`:'. >?<>`:'•#`><<:? ;'•'.>a'•='•>.':><>':>'•>�>»> ><� ....................... ................ .......... .�;<::;;k;�:;;;;�ir:;r i:;:5:;;;;�:;:'s�r:?:4:;� r>:;:<#;�:���##>#>r``':�i:�#>:#E'>.:##>:'s>s �%>#�i<?#is:#`#:#?ita:':`#:::�::>:?E�:�:<:#i:'##>:`•:>:%?�#:#:i;:;»`•:`•:`•:%;�:'•>:::E>;�E<:>'� File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. t CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12083 Rank: 32 PROJECT TITLE: N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development DESCRIPTION: Prepare a design report for widening N 4th St to a two-way boulevard. JUSTIFICATION: Will address serious safety and traffic congestion concerns in this area and reduce impacts on residential neighborhoods in accordance with the North Renton Facilitation process and as directed by City Council Resolution 2708. STATUS: Previously funded $50,000 to begin project development in 1991. CHANGES: None. FINANCIAL DATA •i}:.ti4••i;•i}i:??•}:;•:?•i:?rr 9.4:::?????:::•ii:4:?:•i`y:•};::}}i:S:•:??:? :?{•4.,vnh:•i:•iti?4:h:•i:4:???4:?+6:•i}:4:?•i:•:?? .�w:ni:•::.:i'.:::::?-0:::•:{.:w::::: ....••,;?•?i::i::•r ••••ii}iiiiiiiii{::C^:}ii:ii.+•i: ilii}i.+•iiiiiii:isiiiiiiiiii}:%v::iiiiiiiii:'�iiiiiiii:iii: i�:F. / LxR•.. /iii::iii;:i;:;:,+.:{:; .....:::::::::::::::::: :::.�:.�::::ii:ii.y:::::,::isi{F:::ii:::ii::isi:::::i':i::i:: ir':i:::xi::iiii:::::i::iiii::ij::iii::i:i: 80 000 80,000 Total Project Cost: 80,000 �s':-�:':Ft1:.:.....:x:�i:� ::::::.... ......:..............:..........:................:::.�.:.::::::........:::::::::.�::• SpentThrough Throu h 1990: :2't is«.;:.;?: ?i E:?:t:::s � :::? :`:�is �: #� � ...............................................:.............:.....:.............. «:•;:•: 1991 Budget Carry Over: 50,000':•.����': �.tffldAd ' Remaining Cost: ammxtim Period ::�'�i €{:< s > > <k�Kit�'�#Ste�>- >'< 7i992:s><:::a<':> #3893::.<:'•<::>:< :<:::>`.:f91�A;a:>: :�>`<:>:<::::�>'��5<: :.<::<: :>:'•<:::<:'E:99�::>#:<::'.=:':s�:>::a>:f99`i'::::::>:: EXPENSES: Project Development 30,000 30,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other N X#)'FA �X4�...SSR`<`: < ':><<>#»;inalaffaVii€:; ::>��`'Op�3: >:::::::?::::>::::: : ��`?> >>:»>` � �z: <:>::>�:>'<�::<:':> �''s:>>:: ::>:a<�<��:€::>>::<':::<»<<:>: ::>:; SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 30,000 30,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed • Other Unfunded 'i1TAiA::S�URC�^�.::#::>:>::>:`::s>::>:?>::r<::>:>:>`::»`::>>z:>`::>::>:::3T3��OO.f3:: ::>3a:>::::>3il'•���#30f1`::>:>:»'::s>??>:>:»>:>«<:;:<:::::::::€::s::�::r?;<::>:::::::::>::?::::>:::'�?:::'::><.:s:?:::>::<»;::<z:::::::< :::::<::>z«::»»'<:» File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON �-� SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12126 Rank: 33 PROJECT TITLE: Talbot Rd S - S 43rd St to South City Limits. DESCRIPTION: Reconstruct roadway prism in areas with failing pavement and sub-grade conditions and sub-standard cross slopes. Overlay the reconstructed roadway as part of annual overlay program. JUSTIFICATION: Poor existing roadway conditions are a safety and maintenance concern. STATUS: Evaluation of existing conditions will be done in conjunction with • Pavement Management System inspections and analysis. CHANGES: Changed from a study to an improvement. FINANCIAL DATA Total Project Cost: 330,000Pulided : 330,000 30,000 300,000 SpentThrough Throu h 1990: 1991 Budget + Carry Over: ;'<'•<:IJi ftigd d Remaining Cost: '.•..•.:>>3 ': Period EXPENSES: Project Development Precon Eng/Admin 40,000 30,000 10,000 R-O-W (includes Admin) Construction Contract Fee 265,000 265,000 Construction Eng/Admin 25,000 25,000 Other .•TARFAERN : 33tf . 0>:€:>:€:€:>:>»: :z:»><::>:<::<:::::>:««<:::>::>:30000>€:>>._: '(IAO: ............................... ::::::::: SOURCES OF FUNDS: • 1/2 Cent Gas.Tax Business License Fee 30,000 30,000 Vehicle License Fee 300,000 300,000 Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded .............................................:�3tti,Cv�. ........................................30 ...........3G�,Q�4. ................................................................................... File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1:y) CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems ' • Fund: 317 Proj: 12107 Rank: 34 PROJECT TITLE: TBZ Project Development DESCRIPTION: Transportation Benefit Zones are areas of rapid growth within the City. To determine and fund transportation improvements necessary to support new development, traffic studies are performed which recommend projects and determine appropriate fees to charge as part of the mitigation process. This project supports the necessary planning effort to develop and revise TBZ studies and manage the funds collected. JUSTIFICATION: Creation and management of Transportation Benefit Zones are an integral part of planning transportation improvements and ensuring that:new development pays a fair share of the cost. STATUS: TBZs have been finalized in the Valley and Grady Way areas. Interim TBZs have been established in the NE 3rd/4th and NE 44th areas. Ultimately, a city-wide impact fee system will be developed as part of the Transportation Plan process. Previous Funding: Project Development = $115,000. CHANGES: None FINANCIAL DATA Total Project Cost: 115 000 Fuvd > `'`::::>:... 50o :.:;. .:.:�.:::��1.Ir�tled..::.� 115,0 0......115,000..... .. SpentThrough Throu h 1990: 1991 Budget Carry Over: 115 00 ? gnfu'd : Remaining Cost: fflMmmmm Period :<:::�`�`:�<:>::>::�>:::::':<.:<::::>::»:>::::>:E+�r :�`�+eat::::;: �»'1:992:::�::::<:»s::<.: :::::::3:�:::>::::::>:::<:::a::<::::�99�k:::�:':::<:::::::>:<.:>:::::]1395#::::>::>:.�:::::::::'f.99I�:::::f:>s::�::>::::>:::'•:::1:997::::::::::::>::::: EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed . i.—/ Other Unfunded File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12106 Rank: 35 PROJECT TITLE: Missing Links Program DESCRIPTION: This funding provides for the completion of transportation links that do not qualify for other sources of funding. An example would be a section of roadway between two LID's or between two developer mitigation improvement projects. JUSTIFICATION: Making the necessary, and often small-scale, improvements needed to connect other projects can achieve significant benefits. STATUS: Program has functioned well for its intended purpose, providing for timely and cost effective facilities to be installed. Previous Funding of $320,000 will be used in 1992: Preconstruction E/A = $35,000; ROW = $64,000; Contract Fee $205,000; Construction E/A = $16,000 CHANGES: Level of funding adjusted to reflect only solid sources of funding. FINANCIAL DATA Total Project Cost: 446 000> `. `';' '' 1, ... �utttlezl:.:::; 1,446,000����1,446,000���� SpentThrough Throu h 1990: 1991 Budget Carry Over: 446 000i.aU, uf" et1i.;:.: Remaining Cost: i::::::!0.14#04A.04.! Period E+..r '1'sits.::<'::>::<:::»:.:992:::>:«:>:<: EXPENSES: Project Development Precon Eng/Admin 110,000 22,000 22,000 22,000 22,000 22,000 R-O-W (includes Admin) 200,000 40,000 40,000 40,000 40,000 40,000 Construction Contract Fee 640,000 128,000 128,000 128,000 128,000 128,000 Construction Eng/Admin 50,000 10,000 10,000 10,000 10,000 10,000 Other l)':jmp S.S ` < > >< SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 1,000,000 200,000 200,000 200,000 200,000 200,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded T9TAI:>5E)E'FM4g:::`:`:::':`::::>:>::>::::::`:?::: ::<':::>'::<:'>:` IOD 001)<: ':>:><::::>:z::W:>::«::«<:>< `::: QO`a00`:':::<:':#:'201#°'#10E#?::>?::::::>20ff:.;(fF3:Q::.'::::>::<204) OOki:>=::::'::»::2DQ''':001: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12116 Rank: 36 PROJECT TITLE: Oakesdale Ave SW-Monster Rd to SR 900 DESCRIPTION: Construct new 4 to 5 lane arterial with curbs, sidewalk, drainage, street lighting, traffic signals, channelization, retaining walls and bridge structure. Monster Road Bridge project may be combined with this project. JUSTIFICATION: Will serve growing north-south traffic demand and reduce congestion on Rainier Avenue and Grady Way. This project is included in the Grady TBZ and will serve and be.partially financed by development in those areas. STATUS: Initiate project pre-design in 1992. Grady TBZ: River Tech - $70,236; Blume Distributers - $254,791 CHANGES: New project in TIP. FINANCIAL DATA Total Project Cost: 9,450,0008M0600.041- 325,000 19,900315,000 ::::::::::::.::::::::.::::::.::::::::::::::::::::::::::::. SpentThrough 1990: ::::::::::::.::.::::.........................:::,:::.• raM : Pe 9 1991 Budget + Carry Over: €«::iliiuliti :s3 9,125,000 4,725,000 4,400,000 Remaining Cost: mammon Period EXPENSES: Project Development Precon Eng/Admin 1,217,000 50,000 50,000 500,000 617,000 R-O-W (includes Admin) 500,000 500,000 Construction Contract Fee 7,160,000 3,580,000 3,580,000 Construction Eng/Admin 573,000 286,000 287,000 Other ....... a<>::s>?:M#:?`"!4pG:':::: �`°13 SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 10,000 10,000 Vehicle License Fee Grants In-Hand Grants Proposed 4,725,000 275,000 650,000 1,900,000 1,900,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand 315,000 40,000 50,000 225,000 ( '� Mitigation Proposed 4,400,000 467,000 1,966,000 1,967,000 • Other Unfunded i���'OOQ�>::::>: #:�><g{�>�:%000:::: ..........�k1#f00::>=:::»:�:>':=5#f:':a00�:< '� �':�AilEf''#I�tF#:>'::>:>:1?�<'1>��`:>>#1.F3(1:s:>::�'� 6 ... ......... .. T. .... File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION.IMPROVEMENT PROGRAM • CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12114 Rank: 37 PROJECT TITLE: Bronson-Houser Corridor Project Development DESCRIPTION: This program provides for an operational analysis and evaluation of neighborhood impacts of alternatives.to the Bronson - Houser couplet. A design report will be prepared. JUSTIFICATION: This is a critical corridor for the movement of traffic into and through the City. The goal is to provide reduced • congestion at the intersection of Sunset Blvd and Bronson, to reduce the need for traffic to bypass the signal by cutting through the neighborhoods. STATUS: Approved by the Council in 1991 budget for $288,000 to design and construct. Decision has been made to only fund Project Development at this time. Previous Funding: Project Development = $50,000 CHANGES: New project in TIP. FINANCIAL DATA :::•::.;::•::::::::•:::•.:::•:::::: ..#r,`#...........:off!i...f�: a > >:�:>:::>::»>::>�:s:::�»>:>::>:<>>m>`•>'•<:»»:smo':?::><'..>:>'.>`:<::<:' Total Project Cost: 50,000 #Ft'nded«> ': 50,000 50000 Spent Through 1990: 1991 Budget + Carry Over: 50,000::;#::>kli'ffmded ::': Remaining Cost: Emminon Period _ ki;4:•i:•:iii:?iii: ::>::'s:.:::<.::'s::::z'z::<.:<z: ::::::::::> :::�lC#iti��`�sitill�::::::: '::::y:992•::.::;.::.;:•::•;;:.:;:.:3:�::i:::>:s:::::>: :>�:1:99�:<:::`::s:::>::>:��>:11i9S:::<.:< >`:: ::::::::.>:::<::::::::>::::1:98:3'::::::>:::<.:::::':: EXPENSES: Project Development Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other :%<:�::%•`:::2:`:.:: :.:: :::::::::.:':;:;.;}.�:::<.:::::::�:::::<.::^::::;;:;:;:;:;:::;:;:::5;:;::?:::::ti::::::<.'>:::::'::::::::3:::::tk::' ;}.;. :'::'rte:.;:;.;. ;::::: :::::: :: :: r::�:::: :::::�:::: <:::::: :r:':::::::: ':�::';:� : SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed • L.I.D.'s Proposed Mitigation In-Hand r-'-. Mitigation Proposed 4 • Other Unfunded File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12118 Rank: 38 PROJECT TITLE: S Grady Way/Rainier Ave S Project Development DESCRIPTION: This project will grade separate Grady Way and Rainier Ave and provide ramps to connect them. Included will be new roadways, curbs, sidewalks, structures, drainage, signals, lighting, signing and channelization. JUSTIFICATION: Increasing traffic demands in the area, including proposed development of the Boeing Longacres site, will create the need for increasing the capacity at this critical intersection. STATUS: Will be evaluated as part of Arterial Circulation Study. CHANGES: New project in TIP. FINANCIAL DATA .y q::i:?•:::ti%?:::i::ern:i:i}}i•.}•.i::ii'? :.tii:is :.i:{::::::r;::::::::•}v.;.vi:.i':: :,; ::::. ::::::::rrxiiii:•}}:ii}:•iiviX.}�.::..}ry'.i..... :.:..::::.:...::.:...:....:::..: ... v i..:. i41�Y:I::44:... Total Project Cost: 90,000PiiiiNFAt104g1 90,000 30,000 60,000 Spent Through1990: 1991 Budget + Carry Over: ::1:>ilifiltll�lt1111?: Remaining Cost: magmas Period 911%»::>::»::::>::::»:::11 >::>::>:::::>»::>:<::t9915>::::::'::::::>::::>:::::::::%fg93:•.:::::::::::s: :>::::>:::::::::<:::.>:::::»::::>r:<.:::<.:<.::«:>::>::: :.;:.::.::.::�::::.;:.;:.::.;:.;•.;:.;:.;::f'?erTz�:TtstaiE>:%:::>::>::>�:>�f:992>::i<:•.i<:<:;>:>.;::;:1�::::::»:>::::::>::::;::>...1~9 ................... EXPENSES: Project Development 90,000 30,000 60,000 Precon Eng/Admin R-0-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other T ' ..A•t:`AjPF:'ROM » > > #'.><>??. « >>> <<<9:C�!Q€ .>��1G!4�2s= <<>1sO:54t90':<.»>>>`>`>>. >$>»` > > »:.>.>»» >> `'.» ri> ? < <;<' <_ >< '<N?« SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 30,000 30,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand 60,000 60,000 Mitigation Proposed Other Unfunded €k ::MU CES s<>''<>::::: :':>':::>::>:`::`::::::`..:g:>:»:<: 0:060iWi'>::$ :000 : 1<>69 €1!0(1:: :::? >;<' < `• #'?1?` 1<111?:? <z '1::>:::::1:>:::::>:::::::::::>::: :>'::»::>:>:»»> File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON • SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM • CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12115 Rank: 39 PROJECT TITLE: Miscellaneous Traffic Safety Program DESCRIPTION: This program provides for special small-scale traffic safety improvements that are identified and require materials labor or equipment beyond the normal scope of City maintenance crews. • ' JUSTIFICATION: Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for safety projects to address these needs. Projects are typically identified through citizen concerns, analysis of accident records or observation by City Traffic Operations and Maintenance personnel. STATUS: On-going yearly program. Traffic operations section identifying and prioritizing locations. CHANGES: New program initiated in 1991. FINANCIAL DATA EVIIIMISEMe.7411•1344-110410.**"..."11t• Total Project Cost: 300,0002:::2:06000M 300,000 300,000 Spent Through 1990: .,:.::::::::::.�:.�:::::::: .:....:............................................................................ Pe 9 1991 Budget CarryOver: .:..:..:....:...............................:.:.:::....:....:..........:...:...:...:........:...:............:...................... 9 Remaining Cost: `: 00O0O Period ................:::::::.. ::: ::::::>s:::19540.>:.>:;.:.:.;:.;:.;:.;;'1:895:::::R:>::::>::::>::::>:#:995::>«r:::>a'»>1997:>' EXPENSES: Project Development , Precon Eng/Admin 30,000 5,000 5,000 5,000 5,000 5,000 5,000 R-O-W (includes Admin) ' _ • Construction Contract Fee 270,000 45,000 45,000 45,000 45,000 45,000 45,000 Construction Eng/Admin Other -- TMENceggraiNMENNEM:.:::.::�::.;;: Q!tl!l)>:<::><.<:::>::»::�A 441�:::>NM'::>:RQ!W»r<::»:.':::::gin::::#::>:<:::::::: Q: :::::>::>::::::>>::#: . UC!G!: >::>N»>::>::>::>5t1 Q..q • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed • Mitigation In-Hand • Mitigation Proposed Other Unfunded MilitatOtatingENAMEMMOM1?<:::«z:::>:<::<:M:'DDO:>::z::::<:::::>:50a.QFf>:::>:>>:>::.F#<#31)E)::1 ::a>::::>:.a>#ltj0:: >:>:<>;::> 0>Q00>:>:>:>::':'<:<:SQ`'OO File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM f CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 073 Rank: 40 PROJECT TITLE: Guardrail Program DESCRIPTION: Replace existing deteriorating guardrail and install new guardrail sections where needed. JUSTIFICATION: Properly designed, located and'maintained guardrails perform an important safety function in areas where needed. STATUS: On-going yearly program. • CHANGES: - None • FINANCIAL DATA iniMMIEBERTotal Project Cost: 331,500'�z# z 00 331...50U..•.......1...... S nt Pe Through 1990: 1991 BudgetCarry Over: 31 500` # fnOO ,« Remaining Cost: :.....'>g0(,OO- Period :::r:::::;:': Eifs:::::::>::::>::>::>::>s::>gn4't : 'tittil:az :zi:59S:>::::::>'.:::::::: EXPENSES: Project Development Precon Eng/Admin 36,000 6,000 6,000 6,000 6,000 6,000 6,000 R-0-W (includes Admin) Construction Contract Fee 240,000 40,000 40,000 40,000 40,000 40,000 40,000 Construction Eng/Admin 24,000 4,000 4,000 4,000 4,000 4,000 4,000 Other ::::::::::«<::<. Aggi! SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded FLf#JM)lf€GE.S.:»::>:<:<;::;::;::<::::::::>:::><:>:>::<z>::<::»>:>�>;;;>;:�:�. B�'• . :: .:::::.#f II �>:: ::::::::.:E):.:#3 >; <:»:::>;::;::. :. ... .. .. ...... ....'...'�':�'#1...00B..:•:;;;;;::<;:�1# OOt#::•:.::•;:;......5 .. 00...:::>:<:<.....�....OE#.............�0.#1F10:>:' n>MOi3'4OII< File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. 1 CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM ..=' CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 075 Rank: 41 PROJECT TITLE: S 192nd St/ S 200th St - SR 167 to SR 515 Project Development DESCRIPTION: Prepare a feasibility, route and environmental analysis for the City of Renton's portion of a new East-West principal arterial. JUSTIFICATION: This is part of a four-agency (Kent, Renton, King County, SeaTac) study for development of a new East-West principal arterial from I-405 to 140th Ave SE. STATUS: • TIA grant of $200,000 approved. King County to provide $35,000 and City $15,000. Total = $250,000 for project development. $95,000 carryover to be spent in 1991. CHANGES: TIA grant has been approved. FINANCIAL DATA :E : > Na ' B .0i$k ' :'': Gan' le Total Project Cost: 2500006 « ea250,000 15,000 200,000 35,000 ----- Spent Through 1990: MiiiiIBINSMOSMNS ..... 1991 Budget Carry Over: 95,000��'�����'.t� irn�ed.:: Remaining Cost: memo& Period :::::>:<:>::>::>::::>::<::> ::><:>:<:<:::: :: '::::'<::>::>z:#:?;:: €::fie'::::... .. .. ,; ?`.s..`f ...::::::>::::::>:<llit , :»s:::: :»<:;: :»:»:=>��<:I•. `.::�:>::>:::>:::>::f:. . >`:::'::>::><:>::>: :7::::>::::::::::::: .:::::::::.::.:::::::::::.�:.::..���........................... r�'� .;.:..........9�....................i�3.................T'�9!!�...................:895....................99�...................'t9�............ EXPENSES: Project Development 155,000 155,000 Precon Eng/Aconin R-0-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other ' 7�E' IEXPEN$ES><>><:_. :>€s ;>`•#< `: > `1' . `::<:::>:z `::>:><:'»:»::;>:>::>:: >:>:>»:>;>:::><:>;:><::<::><:`:><<::<:::?::<;<::>:>:<z;>>:: r SOURCES OF FUNDS: 1/2 Cent Gas Tax • Business License Fee Vehicle License Fee Grants In-Hand 120,000 120,000 Grants Proposed • L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other - King County 35,000 35,000 Unfunded File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12128 Rank: 42 PROJECT TITLE: S 3rd St / Smithers Ave S/Logan Ave S • DESCRIPTION: Remove signal control from Smithers & rechannelize intersection. JUSTIFICATION: Will improve corridor signal coordination. STATUS: Will be influenced by CBD arterial Circulation Study. CHANGES: None • FINANCIAL DATA Bgi Total Project Cost: 130,0000fdej= 30000 ::::30.,000::::. Spent Through 1990: 1991 Budget Carry Over: 100,000 100,000 Remaining Cost: Period ::::>:.<.::::::�::::::::::;z::;:sv><:::17E .............ems. �#a1.;::.::.;:•;:.:;.• •:«<:.:>:.:>:»<.«>:.: •«<:.:>�:;::.<:;::«:.:'E ......................................�I.:.:....:.................. P '� .........`�. .:...:....:.::..:ism:....:.:..:..:...:...�9�a:.;;:.;::::.::.:.::.;�.;:�.9�5::.;:;:;.:;.::.;;;:.;:;;f �::::>::;::<::::::::::::«::<���7.::::::::. EXPENSES: Project Development Precon Eng/Admin 20,000 20,000 R-O-W (includes Admin) Construction Contract Fee 100,000 100,000 Construction Eng/Admin 10,000 10,000 Other :> :?<t3I)'OD(1's:€:»>:€:�:�::< :;::: :€: ::s: :;::;�:<: <:s€:;::':: : » >ss»€<»� ....::::.;:.;:.;:.:.::.::::.:: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 30,000 30,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed C Other Unfunded 100,000 100,000 File::TIPCIP_A.XLS • Printed 5/14/91 at 10:58 AM. . CITY OF.RENTON t. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: • 317 Proj: 12122 Rank: 43 ' PROJECT TITLE: Monroe Ave NE- SR169 to Sunset Blvd NE Project Development DESCRIPTION: Prepare a design report for a new roadway, including curbs, sidewalks, street lighting, roadway resurfacing, channelization and storm drainage from SR-169 to NE 2nd and evaluate connecting Monroe to SR-900 (Sunset Blvd) as a through route. JUSTIFICATION: Additional North-South route required to meet growing traffic demands. STATUS: Will depend on whether development occurs in the area between NE 4th St and SR-169. CHANGES: This route changed from Edmonds to Monroe. k FINANCIAL DATA .....:..........:............:................... Tota :x::: Project Cost: 50 000 ::>:::::`:: "n' a z:: 50R000 50,000 • • • .. Spent Through 1990: 1991 Budget + Carry Over: :<:x: ifiinited£> Remaining Cost: OOD Period EXPENSES: Project Development 50,000 50,000 Precon Eng/Admin _ R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other TP.7.40!(F'Riggi >:::>:»::>::»z»::<.z:»::::::>::<.::>::»>;<:>:<::SS# .0k::::>::.:<;:::: ::::::<::::< :::.::::::::`:::<;>::::>:««::z<z::::<:::>:::<::::::aq 0lDO::>::::::::::::::»::>::>»::>::::>::>::»»:>::>::»»;>::<:>::>::»>::>>:<:»::>::»:::::<:i]i!: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 50,000 50,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded . File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: • 12123 Rank: 44 PROJECT TITLE: Duvall Ave NE- Sunset Blvd NE to North City Limits Project Development DESCRIPTION: Preliminary Engineering study for widening roadway to 5 lanes, includes: curbs, sidewalks, storm drainage, street lighting, channelization, and bikeway.. JUSTIFICATION: Growing residential areas use this route which is also becoming a major through route between Renton and Bellevue. STATUS: Will be evaluated as part of Arterial Circulation Study. CHANGES: (<7' None FINANCIAL DATA :::;:{:.:�::.iii:•iv,:p•:{:::r ..... ..... n.....v..::..rr..wn�;•••v•::•.�:.n... Tota l Project t Cost: 50,0008# en:d•:::d .h:::.........50�..:.0:.:.0:.:.:0.:. 50,000 :::r::•.iii iiiiiii::ii:}::•ii:iii: -.- SP�Spent t Throu h 1990: . : .. : . : . . ;i : ii . . , . . . .•::i:•:. . . .::: :...:..::::.inn.iii 1991 Budget Carry Over: ::::.:.:.. .::... Remaining Cost: • 5ti Period Ninn.WAREH :•i:t:•iiiii:•i:•it:•i: iii:iii:;zis:�i:�: E°�#<:::::::::::<•<''•<.::::::,>::>:::>:%::�::::::::Pew.�..i�>:.<:::::.....I :.:>i::>:<::<::.....9:90:: <:::::::<39.0d::<: ':::<:>:::€1i:8A::?s:N:�:`::�:':�.....99.5::::::>;:::;:::::>:nei............ EXPENSES: Project Development 50,000 50,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other . .;; :<i.;�:::isri:;•i:•i:•i:•ii:•>:•i:•i:•i:•i:•ii:•i:•i••i:•ii.r .. .,..........:.. :... ii":;":::"":':":iii i.^.;•. 7:`.OTA1,;.�(�N�S�i::.ii>::ii:.>i'.i:.;i'�>;:<.ii:.iiiii:.:;•;;:.i::;z.;:.;:>'�Q . 0:::::;::;::>r�r:':i::>:>ii:.i:.i:.:.i:i:.i:.ii:. ............vt1f O1Dl#:.::i::::::<:<>i::>�::s:'•>i>::ii::>:::<:::>:>:>:':';#:»'•>?>::>%:>:s`:::::»?:»»>::>:`•:>`•>; :..... SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 50,000 50,000 Vehicle License Fee Grants In-Hand _ __ _ Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand { _ Mitigation Proposed �• y Other Unfunded �� #; &•::.::::>:::::�i;:::'>•'i>::::»::::>::::>::::>::::>::::::::<::>:<::::<:>:<::w.a#010!�::::::>::'<::::><::<::«::<::s:::::::::::<::::«::::<::':<:>::::>::::>::<:::::<:::::<:::::::.... . .. .. File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works , Div: Transportation Systems Fund: 317 Proj: 12127 Rank: 45 PROJECT TITLE: SW Grady Way- SR 167 to SR 515 DESCRIPTION: ' Rechannelize and modify signals to provide a continuous eastbound lane from SR 167 to SR 515. Develop capacity, safety, HOV and property access improvements. JUSTIFICATION: Will improve traffic flow and reduce congestion on SW Grady Way. STATUS: Projected for 1993 start. CHANGES: None FINANCIAL DATA RENEEMEMEgfwgissiggigigos Total Project Cost: 60 000 60,000 Spent Through 1990: 9 ��:fir::�:iii?ii$:%%i}i:.':. .. ..................$:•%?:i i...............x......n..........n.................... iV fi? ^i:4i:•:•:4:^''• ..:<iiiiii:vi:J i'iiiii:4*'w::::::::::::::::.�:::.::i':ii:v:•:::i•:iii::•: •::ii:ii::ii:ii•w:.�i:•w:::::::::w::::::::::::::::::. 1991 Budget Carry Over: ?�?��� uAded..i: . 200,000 200,000 Remaining Cost: Emagomt • Period EXPENSES: Project Development Precon Eng/Admin 40,000 40,000 R-O-W (includes Admin) Construction Contract Fee 200,000 200,000 Construction Eng/Admin 20,000 20,000 Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee 60,000 60,000 Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed ti • Other Unfunded 200,000 200,000 T:. :R";. A��Y:h�A A�iiy ��'$��" �o::`;`:::�:%.'•-:%:::�::>:>':::>>#=:>:>:>::<[Fri.V'Y.V.S�+� # > t?�fw..A+vv' r { :£ :: s':=.:#>'::>:>:'><::>'z>'::<:'.`:'.:>:>>:: :: :?:::ii::>'•:E'::'•>:>:>::»>::#::%:`::: File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. • • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works • Div: Transportation Systems Fund: 317 Proj: 010 Rank: 46 PROJECT TITLE: I405 / SR 515 Project Development DESCRIPTION: Prepare a design report for the construction of new I-405 ramps to and from the north at SR-515. Scope project in 1992. Request grant funds in 1993. JUSTIFICATION: High traffic volumes on SR-515 now have to.pass through, and contribute to, the most congested areas of the City to access I-405. STATUS: Will be evaluated as part of the Arterial Circulation Study. CHANGES: None FINANCIAL DATA Total Project Cost: 60,000 'i€s Ki ded' ::»s............................................... :........ ..............................................::.::................................................................................. Spent 1990• 1991 Budget Carry Over: goomi4004 60,000 60,000 Remaining Cost: # 0' Period : .»»N1. 9�NE::ain:::>1:9 G'•>:r :'>:>:>:s'::>s::' 9:7<>:::'::': :::::>::{::::;>::::>:::>::::::>.>:::>:::. ...................... ? . ...........92............:......9.9...:...............19 ......................99.5.................... .9 ...................'i 9............. EXPENSES: Project Development 60,000 60,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand • Mitigation Proposed \..�. Other Unfunded 60,000 60,000 FiLe::TIPCIP A.XLS Printed 5/31/91 at 11:25 ASI. CITY OF RENTON t SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero • DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12120 Rank: 47 PROJECT TITLE: SE Puget Dr-Jones P1 SW to Edmonds Ave SE DESCRIPTION: Roadway reconstruction and resurfacing to include: curbs, sidewalks, street lighting, channelization and storm drainage. JUSTIFICATION: This project would extend the improvements of SE Puget Drive further east into the growing residential area. STATUS: Depends on growth rate and availability of funding. CHANGES: None FINANCIAL DATA :....... Total Project Cost: 1,010,000':>•.`:z:> ':: :;:v:::<:;: >:>:<::..................:.. ................. :s Spent Through 1 ou 990• 9 1991 Budget Carry Over: ...`..`.... 1,010,000 ....1,010...,0. 00::::::: Remaining Cost: 0fttjjfiftl ................................ Period •::::::...........:�..:........e :T is . ..is :>::»»:::<:::>:�>::>; M;49 :;:.;:;:.;:.:.;:�;:.;::.::i EXPENSES: Project Development Precon Eng/Admin 136,000 100,000 • 36,000 R-O-W (includes Admin) 10,000 10,000 Construction Contract Fee 800,000 800,000 Construction Eng/Admin 64,000 64,000 Other .:::::::::::::::.,..:.:.::::..::::::::::.:::.:::.:::.::::.:....RI#)Q 0(?0i :: »nitigngg!M SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed _ L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed Other Unfunded 1,010,000 100,000 910,000 ..af'J'�..SOtIIRjwES>>>g << a> >i >>>>'f'4''##'C!QG File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12124 Rank: 48 PROJECT TITLE: N Park Dr- Lake Washington Blvd to I405 Project Development • DESCRIPTION: Conduct preliminary engineering study to facilitate traffic flow on N Park Dr to and from I-405, including analysis of high occupancy vehicle facilities. JUSTIFICATION: Extremely high traffic volume area impacted by Boeing/Paccar industrial traffic and by I-405 overflow traffic. Providing HOV access on Park to and from I-405 is much desired by Metro. STATUS: TIA grant to be sought with Metro and/or WSDOT to be requested to provide the "other" funding. CHANGES: (- None FINANCIAL DATA nagniiiigniggEMMENEE Total Project Cost: 60,000>:>:< «:<F e _ s»>s::.............................................. • Spent Through 1990: 9 1991 Budget Carry Over: ::'•::::>1Xtifuiii€ted.:: 60,000 30,000 30,000 Remaining Cost: , •...• ;;>;: i>il Period :>?:::::;:<:::::>s:s:>'::::::...........IT... .................................. 'r ::<:<::<:::::::::II:9�'�s:<::>::;::>....... 9'911':::>::::>:::>`::.....SI)4:>::::_:::;::499g::::::::>:>::<::..... S>::::::>`::: .....99...:........ EXPENSES: Project Development 60,000 60,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other MEMENE • SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed (TIA) 30,000 30,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed ..- Other (Metro/WSDOT) 30,000 30,000 Unfunded tTAl..Skil...CES...........:"::M'EE::,:::,:MEM40$100::::::::::::z:<:<:<::>::::>::::>:<:»:<:::>::>«: :::::`:�3�!'0�;: File::TIPCIP A-XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM • CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12125 Rank: 49 PROJECT TITLE: Aberdeen Ave NE-NE 20th St to NE 27th St Project Development DESCRIPTION: Prepare a design report for reconstructing existing roadway, provide curbs, sidewalks, street lighting, water and sewer mains, channelization and new traffic signal at NE 27th St and Aberdeen Ave NE. JUSTIFICATION: Project will be needed when water and sewer are extended into this area and development increases. STATUS: Will depend on land use actions that occur in this area. CHANGES: None • - FINANCIAL DATA eleiieligaTotal Project Cost: 40 000 ` '.yin'acts:::................................................. Spent Through 1990: :................ ..:.:....:........................:..::. 1991 Budget + Carry Over: ;:;:#;:;ljn(unded <; 40,000 40,000 Remaining Cost: giniiiigg00.0 Period . EXPENSES: Project Development 40,000 40,000 Precon Eng/Admin R-O-W (includes Admin) Construction Contract Fee Construction Eng/Admin Other SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand ( . Mitigation Proposed 40,000 40,000 Other Unfunded File::TIPCIP A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON 4 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM • CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12129 Rank: 50 PROJECT TITLE: Benson Rd S/ S 31st St DESCRIPTION: Install a complete actuated traffic signal at Benson Rd S and S 31st St designed to provide for possible future Benson Rd widening. JUSTIFICATION: Location is approaching signal warrants and traffic volume is increasing. Signal will reduce side street delays and improve safety. STATUS: • Projected for 1993 design start. CHANGES: None `• FINANCIAL DATA Total Project Cost: 130,000 ...........................,..................... SpentThrough 7hrou h 199 0•. :19:010:000:1 SIMEMAIIMMEN:;:! 1991 Budget + Carry Over: <> lj f:4ded;# 130,000 106,000 24,000 Remaining Cost: Period .:::::.:::::::.:::::::.�:::.:}:.:::.... .......::::::..:.:,.:.:.::::.:.. :� :>::�:<:<:::::#:ice>::;>::»>»: 9�::<:,..;•.:...:.:...'#SMig1090.Mi:� EXPENSES: Project Development Precon Eng/Admin 20,000 20,000 R-O-W (includes Admin) Construction Contract Fee 100,000 100,000 Construction Eng/Admin . 10,000 10,000 Other TOTAL.I:XP.•.IN 5s ''.>:::::::::'::>:: ;:';::>::::::::::<::::>::»3:: " ......3tt(COQ.::;•;}:•;}:.}}:.;}}:.}:;,>:;.:.:;.}:.:«.}:.}:.;:<;•;;20 P:: :z;:;>:zz::::::'E>'l .::. SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed 106,000 15,000 91,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed �..= Other Unfunded 24,000 5,000 19,000 T4TAi.•SOU .. . .............:...:.X0,0............::...:1...�.. ..._.:.....................:...:.........::.....::.:................................... File::TIPCIP_A.XLS Printed 5/15/91 at 11:40 AM. . CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12130 Rank: 51 PROJECT TITLE: • S 3rd St/Rainier Ave S • DESCRIPTION: Design and construct a signal modification to provide for exclusive double left turn southbound lanes. JUSTIFICATION: Will improve traffic capacity and reduce delays. STATUS: Projected for 1993 design start. • CHANGES: . None FINANCIAL DATA Total Project Cost: 54,000:;:::;`:::;::::;Fuflded Spent Through 990• EgCfilltifj0§<��E�:•:;•>;:;:•::;•::•;:.;::•;•;;:.;:.:.;:.>:>:.;;:;.>;::•:::•>s::>:;:.>: 1991 Budget + Carry Over: €:'•. ;1kftWed.;: 54,000 44,000 10,000 Remaining Cost: IMEIMAN Period EXPENSES: Project Development Precon Eng/Admin 8,000 8,000 R-O-W (includes Admin) Construction Contract Fee 42,000 42,000 Construction Eng/Admin 4,000 4,000 • Other tO.I.MIERENUMMEREMM SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed 44,000 44,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed �.— Other Unfunded 10,000 10,000 .cE t:'#:'>:'•:::`:::s>:>:?:»?<:>''>:: >::?»?.:..,,.....:r<:::>:>i>:<:::>?»>::::>::>::»::>:::::i:.r?>..:..,. ..>::>::>::#>::#:%:r>::E: :::::::::::>:::'•>::>:::'•::r:<:::::>E>:::::s:::'•>:?::z::z<:>::<:»»#?i>:::::`-E:::>:`•s:::::::`:`:::':?::;#:?`::'s>»». File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Hero DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 • Proj: 12131 Rank: 52 PROJECT TITLE: S 2nd St/Rainier Ave S DESCRIPTION: Relocate existing east-west crosswalk to eliminate ped-vehicle conflicts. Construct pedestrian island in middle of S 2nd St from which pedestrians can cross Rainier Ave. JUSTIFICATION: Enhances pedestrian circulation and safety and provides for enhanced signal operation and coordination. STATUS: Projected for 1994 design start. CHANGES: None FINANCIAL DATA Total Project Cost: 234,000 4:'.<: iiiii`? Unded %";:...................... ................................................................................................................... Spent Through 1990: :...;•<.:•.::.:......:.:•.:.......;...:.,::•:::::::..�.�:.... ..;•.>;:.;.; s 1991 Budget + Carry Over: #': jidedi:':. 234,000 176,000 58,000 Remaining Cost: .......<:>.r Period EXPENSES: Project Development Precon Eng/Admin 36,000 36,000 R-O-W (includes Admin) Construction Contract Fee 180,000 180,000 Construction Eng/Admin 18,000 18,000 Other t)':'Ai: .(k N5 3egidgis ; z'?<>?:<':'.s>.>:> '>`'23+# . Q::z '•s36`OAQ:>:>:::`•:`•>:ES6'DQE::z:<::>»z«'.::':r:>:~>::::: :':::::::::>::: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed 176,000 26,000 150,000 L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand f.",- , Mitigation Proposed •,i Other Unfunded 58,000 10,000 48,000 ..............................................�.'.��Qii!.. ..................................:.....:.......................... ,40!4>:.>::.;:.::.;A9130Q:::::::>::::::::::::::::.::::.:.:.::::::;:::.;:.:::::::;;:<.;;:.; • File::TIPCIP A.XLS • Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12133 Rank: 53 PROJECT TITLE: Sunset Blvd NE/Anacortes Ave NE DESCRIPTION: Realignment of intersection and construction of traffic signal. JUSTIFICATION: Safety and operational characteristics can be improved by eliminating off-set of intersection. STATUS: Funding will be generated through development mitigation. CHANGES: None FINANCIAL DATA Total Project Cost: 278,000'•.`:.`:'..'•.#s'':: #de ;'.' SpentThrough Throu h 1990: 1991 Budget + Carry Over: :v itfunded 278,000 278,000 Remaining Cost: Period EXPENSES: Project Development Precon Eng/Admin 36,000 36,000 R-O-W (includes Admin) 50,000 50,000 Construction Contract Fee 175,000 175,000 Construction Eng/Admin 17,000 17,000 Other TCT n• r:x::::::::.�:::::f•4v:x::::::::::::::::.•::::::::i:.:::::x:. .: .:.::.........:�::w:.w:::x:w::: :::: • :: ..... /. ............\•:::::�: : : .:::. :::::::::::::::::::: SOURCES OF FUNDS: 1/2 Cent Gas Tax Business License Fee Vehicle License Fee Grants In-Hand Grants Proposed L.I.D.'s Formed L.I.D.'s Proposed Mitigation In-Hand Mitigation Proposed 278,000 86,000 192,000 t _.. Other Unfunded File::TIPCIP_A.XLS Printed 5/14/91 at 10:58 AM. CITY OF RENTON SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM CITY OF RENTON r-- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM -s� CONTACT: Lee Haro DEPT: Planning/Building/Public Works Div: Transportation Systems Fund: 317 Proj: 12132 Rank: 54 PROJECT TITLE: Other Valley Improvements DESCRIPTION: Design and construction of transportation improvement projects identified to meet future traffic demands within the Valley Transportation area. JUSTIFICATION: This program will construct the projects identified by the Valley Transportation Plan. STATUS: Plan is being re-evaluated. CHANGES: •. None FINANCIAL DATA 'ri'}:iiii:%i�:%iiY' %iii:•ii'i }:w.._...i%x;x is%:?%i:%i. ijiiiiiii:iiiji:•i:•r:. { ..+c..w. ••:Y•:::y:i:%i:%iiiiSi:n..................:'•iii:i Total Project Cost: 18 000 000 «< n%ed :: 0'f REPORT ON 4/2/91 MEETING OF CITIZENS TRANSPORTATION ADVISORY COMMI'1 ThE Recommendations I. Do not reduce transportation funding II. Extend Business License Fee one year. Maintain until new fund source(s) found III. Do not increase Business License Fee from current $55 per capita IV. Try to fmd new source(s) of local transportation funding V. Source(s) of local transportation funding must meet certain defined criteria VI. Advisory Committee to meet quarterly to review local financing options Strategies I. Do not reduce transportation funding A. Transportation system has improved and City cannot afford to fall back to previous levels B. Supplanting legislation will cause us to lose other sources of funding if local funding is cut back. C. Keep Business License Fee until other adequate source(s) of(local) funding are implemented II. Extend Business License Fee year. Maintain until other fund source(s) found A. Lose other funding if supplant existing local funding by dropping Business License Fee B. Also lose grants matched by Business License Fee, which would cripple the Transportation Capital Improvement Program C. BLF is only local source now available D. Has a "user fee" aspect in that individuals employed in Renton use the transportation system and benefit from many of the transportation improvements E. Meets the funding criteria (see V., below) F. Business License Fee is a "flexible" funding source that can be used for non- arterial, non-regional and non-capacity type transportation projects. «\ III. Do not increase Business License Fee A. Some members of the committee strongly believe that the BLF was intended as only a temporary funding measure (there is some disagreement on this point). B. Adjusting for inflation implies a permanency of this tax source C. By not adjusting for inflation the BLF is actually decreasing, which creates an incentive to find other sources of funding. D. Taxes or fees should not be tied to automatic Consumer Price Index increases IV. Look for new local source(s)of funds to replace or broaden the tax base A. Investigate ability to use (transportation utility) residential fee B. Investigate "transportation maintenance levy" (Road Improvement District?) C. Investigate General Obligation bonds D. Aggressively pursue economic development, change business/residential mix, increase sales taxes, etc... E. Seek legislative "relief" (enabling legislation) F. Wrestle with "pass thru" traffic that provide no funds to City G. Review expenses - reduction/efficiency/repriortization _�.. H. Reduce needs by improving public transportation (intra-Renton shuttle) I. Investigate creation of a "reserve account" or "accrual account." J. Review other sources of General Government funds allocated to transportation V. Source(s) of local transportation funding should meet these defined criteria: A. Must be "purpose specific" for transportation B. Must be equitable C. Must be reasonable for City to administer, assess and collect D. Must generate a sufficient revenue level E. Must generate a predictable revenue level F. Must be possible to verify G. Must not put unreasonable bookkeeping demands on the payor H. Must be legally permissable VI. Advisory Committee to meet quarterly to review local financing options A. Will also continue to review projects B. Will explore all possible revenue sources C. Will make recommendations to City Council (Mayor?)