Loading...
HomeMy WebLinkAboutS_Apron D PH 2-3 Bond Qty_190401_v3-RD.pdfPlanning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200••Section I: Project Information•••Section II: Bond Quantities Worksheets••Section II.a  EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))•Section II.b TRANSPORTATION (Street and Site Improvements)•Section II.c  DRAINAGE (Drainage and Stormwater Facilities): •Section II.d WATER ‐ ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON•Section II.e SANITARY SEWER  ‐ ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON••••••Section III. Bond Worksheet•BOND QUANTITY WORKSHEET INSTRUCTIONSThis worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial submittal to project close‐out approval. Submit this workbook, in its entirety, as follows:The following forms are to be completed by the engineer/developer/applicant as applicable to the project: The Bond Worksheet form will auto‐calculate and auto‐populate from the information provided in Section I and Section II.This section includes all pertinent information for the projectSection II contains a separate spreadsheet TAB for each of the following specialties: (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part of the Technical Information Report (TIR).(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close‐out submittal.This section must be completed in its entiretyInformation from this section auto‐populates to all other relevant areas of the workbookThis section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close‐out submittals to release the permit bond on a project. All unit prices include labor, equipment, materials, overhead and profit. Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right‐of‐Way (ROW), Future Public Improvements and Private Improvements.The 'Quantity Remaining' column is only to be used when a project is under construction.  The City allows one (1) bond reduction during the life of the project with the exception of the maintenance period reduction.Excel will auto‐calculate and auto‐populate the relevant fields and subtotals throughout the document.  Only the 'Quantity' columns should need completing.Additional items not included in the lists can be added under the "write‐in" sections. Provide a complete description, cost estimate and unit of measure for each write‐in item. Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the form. Stormwater facilities (public and private) are required to be included in the bond amount.Page 1 of 14Ref 8‐H Bond Quantity WorksheetINSTRUCTIONSUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########UnitReference # Price Unit Quantity CostBackfill & compaction‐embankmentESC‐16.50$                                            CY Check dams, 4" minus rockESC‐2SWDM 5.4.6.380.00$                                          Each Catch Basin ProtectionESC‐335.50$                                          Each 22781.00Crushed surfacing 1 1/4" minusESC‐4WSDOT 9‐03.9(3)95.00$                                          CY DitchingESC‐59.00$                                            CY Excavation‐bulkESC‐62.00$                                            CY Fence, siltESC‐7SWDM 5.4.3.11.50$                                            LF Fence, Temporary (NGPE)ESC‐81.50$                                            LF 13372,005.50Geotextile FabricESC‐92.50$                                            SY Hay Bale Silt TrapESC‐100.50$                                            Each HydroseedingESC‐11SWDM 5.4.2.40.80$                                            SY Interceptor Swale / DikeESC‐121.00$                                            LF Jute MeshESC‐13SWDM 5.4.2.23.50$                                            SY Level SpreaderESC‐141.75$                                            LF Mulch, by hand, straw, 3" deepESC‐15SWDM 5.4.2.12.50$                                            SY Mulch, by machine, straw, 2" deepESC‐16SWDM 5.4.2.12.00$                                            SY Piping, temporary, CPP, 6"ESC‐1712.00$                                          LF Piping, temporary, CPP, 8"ESC‐1814.00$                                          LF Piping, temporary, CPP, 12"ESC‐1918.00$                                          LF Plastic covering, 6mm thick, sandbaggedESC‐20SWDM 5.4.2.34.00$                                            SY Rip Rap, machine placed; slopesESC‐21WSDOT 9‐13.1(2)45.00$                                          CY Rock Construction Entrance, 50'x15'x1'ESC‐22SWDM 5.4.4.11,800.00$                                    Each Rock Construction Entrance, 100'x15'x1'ESC‐23SWDM 5.4.4.13,200.00$                                    Each Sediment pond riser assemblyESC‐24SWDM 5.4.5.22,200.00$                                    Each Sediment trap, 5'  high berm ESC‐25SWDM 5.4.5.119.00$                                          LF Sed. trap, 5' high, riprapped spillway berm section ESC‐26SWDM 5.4.5.170.00$                                          LF Seeding, by handESC‐27SWDM 5.4.2.41.00$                                            SY Sodding, 1" deep, level groundESC‐28SWDM 5.4.2.58.00$                                            SY Sodding, 1" deep, sloped groundESC‐29SWDM 5.4.2.510.00$                                          SY TESC SupervisorESC‐30110.00$                                       HR Water truck, dust controlESC‐31SWDM 5.4.7140.00$                                       HR UnitReference # Price Unit Quantity Cost100.00$                                       TON 505,000.00  EROSION/SEDIMENT SUBTOTAL: 7,786.50SALES TAX @ 10% 778.65EROSION/SEDIMENT TOTAL: 8,565.15(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)Asphalt Berm for TESCWRITE‐IN‐ITEMS Page 3 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostGENERAL ITEMS Backfill & Compaction‐ embankment GI‐16.00$              CYBackfill & Compaction‐ trench GI‐29.00$              CY 840075,600.00Clear/Remove Brush, by hand (SY) GI‐31.00$              SYBollards ‐ fixed GI‐4 240.74$          EachBollards ‐ removable GI‐5 452.34$          EachClearing/Grubbing/Tree Removal GI‐6 10,000.00$    AcreExcavation ‐ bulk GI‐72.00$              CY 6101,220.00Excavation ‐ Trench GI‐85.00$              CY 840042,000.00Fencing, cedar, 6' high GI‐9 20.00$            LFFencing, chain link, 4' GI‐10 38.31$            LFFencing, chain link, vinyl coated,  6' high GI‐11 20.00$            LF 50010,000.00Fencing, chain link, gate, vinyl coated,  20' GI‐12 1,400.00$      Each 11,400.00Fill & compact ‐ common barrow GI‐13 25.00$            CYFill & compact ‐ gravel base GI‐14 27.00$            CYFill & compact ‐ screened topsoil GI‐15 39.00$            CYGabion, 12" deep, stone filled mesh GI‐16 65.00$            SYGabion, 18" deep, stone filled mesh GI‐17 90.00$            SYGabion, 36" deep, stone filled mesh GI‐18 150.00$          SYGrading, fine, by hand GI‐19 2.50$              SYGrading, fine, with grader GI‐20 2.00$              SYMonuments, 3' Long GI‐21 250.00$          EachSensitive Areas Sign GI‐22 7.00$              EachSodding, 1" deep, sloped ground GI‐23 8.00$              SYSurveying, line & grade GI‐24 850.00$          DaySurveying, lot location/lines GI‐25 1,800.00$      AcreTopsoil Type A (imported) GI‐26 28.50$            CYTraffic control crew ( 2 flaggers )GI‐27 120.00$          HRTrail, 4" chipped wood GI‐28 8.00$              SYTrail, 4" crushed cinder GI‐29 9.00$              SYTrail, 4" top course GI‐30 12.00$            SYConduit, 2" GI‐31 5.00$              LFWall, retaining, concrete GI‐32 55.00$            SFWall, rockery GI‐33 15.00$            SFSUBTOTAL THIS PAGE:130,220.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)Page 4 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000sy RI‐1 30.00$            SYAC Grinding, 4' wide machine 1000‐2000sy RI‐2 16.00$            SYAC Grinding, 4' wide machine > 2000sy RI‐3 10.00$            SYAC Removal/Disposal RI‐4 35.00$            SY 4300150,500.00Barricade, Type III ( Permanent )RI‐5 56.00$            LFGuard Rail RI‐6 30.00$            LFCurb & Gutter, rolled RI‐7 17.00$            LFCurb & Gutter, vertical RI‐8 12.50$            LFCurb and Gutter, demolition and disposal RI‐9 18.00$            LFCurb, extruded asphalt RI‐10 5.50$              LFCurb, extruded concrete RI‐11 7.00$              LFSawcut, asphalt, 3" depth RI‐12 1.85$              LF 13002,405.00Sawcut, concrete, per 1" depth RI‐13 3.00$              LF 1560046,800.00Sealant, asphalt RI‐14 2.00$              LFShoulder, gravel, 4" thick RI‐15 15.00$            SYSidewalk, 4" thick RI‐16 38.00$            SYSidewalk, 4" thick, demolition and disposal RI‐17 32.00$            SYSidewalk, 5" thick RI‐18 41.00$            SYSidewalk, 5" thick, demolition and disposal RI‐19 40.00$            SYSign, Handicap RI‐20 85.00$            EachStriping, per stall RI‐21 7.00$              EachStriping, thermoplastic, ( for crosswalk )RI‐22 3.00$              SFStriping, 4" reflectorized line RI‐23 0.50$              LFAdditional 2.5" Crushed Surfacing RI‐24 3.60$              SYHMA 1/2" Overlay 1.5" RI‐25 14.00$            SYHMA 1/2" Overlay 2" RI‐26 18.00$            SYHMA Road, 2", 4" rock, First 2500 SY RI‐27 28.00$            SYHMA Road, 2", 4" rock, Qty. over 2500SY RI‐28 21.00$            SYHMA Road, 4", 6" rock, First 2500 SY RI‐29 45.00$            SY 2500112,500.00HMA Road, 4", 6" rock, Qty. over 2500 SY RI‐30 37.00$            SY 180066,600.00HMA Road, 4", 4.5" ATB RI‐31 38.00$            SYGravel Road, 4" rock, First 2500 SY RI‐32 15.00$            SYGravel Road, 4" rock, Qty. over 2500 SY RI‐33 10.00$            SYThickened Edge RI‐34 8.60$              LFSUBTOTAL THIS PAGE:378,805.00(B)(C)(D)(E)Page 5 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)PARKING LOT SURFACING No.2" AC, 2" top course rock & 4" borrow PL‐1 21.00$            SY2" AC,  1.5"  top course & 2.5" base course PL‐2 28.00$            SY4" select borrow PL‐35.00$              SY1.5" top course rock & 2.5" base course PL‐4 14.00$            SYSUBTOTAL PARKING LOT SURFACING:(B)(C)(D)(E)LANDSCAPING & VEGETATION No.Street Trees LA‐1Median Landscaping LA‐2Right‐of‐Way Landscaping LA‐3Wetland Landscaping LA‐4SUBTOTAL LANDSCAPING & VEGETATION:(B)(C)(D)(E)TRAFFIC & LIGHTING No.Signs TR‐1Street Light System ( # of Poles) TR‐2Traffic Signal TR‐3Traffic Signal Modification TR‐4SUBTOTAL TRAFFIC & LIGHTING:(B)(C)(D)(E)WRITE‐IN‐ITEMSConcrete Pavement Removal 30.00$            SY 9250277,500.00Concrete Pavement 400.00$          CY 400160,000.00Control Density Fill 30.00$            TON 3129,360.00SUBTOTAL WRITE‐IN ITEMS:446,860.00STREET AND SITE IMPROVEMENTS SUBTOTAL: 955,885.00SALES TAX @ 10% 95,588.50STREET AND SITE IMPROVEMENTS TOTAL: 1,051,473.50(B)(C)(D)(E)Page 6 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D‐1 26.00$             SY* (CBs include frame and lid)Beehive D‐2 90.00$             EachThrough‐curb Inlet Framework D‐3 400.00$           EachCB Type ID‐4 1,500.00$       Each 34,500.00CB Type IL D‐5 1,750.00$       EachCB Type II, 48" diameter D‐6 2,300.00$       Each     for additional depth over 4'    D‐7 480.00$           FTCB Type II, 54" diameter D‐8 2,500.00$       Each     for additional depth over 4' D‐9 495.00$           FTCB Type II, 60" diameter D‐10 2,800.00$       Each     for additional depth over 4' D‐11 600.00$           FTCB Type II, 72" diameter D‐12 6,000.00$       Each     for additional depth over 4' D‐13 850.00$           FTCB Type II, 96" diameter D‐14 14,000.00$     Each     for additional depth over 4' D‐15 925.00$           FTTrash Rack, 12" D‐16 350.00$           EachTrash Rack, 15" D‐17 410.00$           EachTrash Rack, 18" D‐18 480.00$           EachTrash Rack, 21" D‐19 550.00$           Each 1550.00Cleanout, PVC, 4" D‐20 150.00$           EachCleanout, PVC, 6" D‐21 170.00$           EachCleanout, PVC, 8" D‐22 200.00$           EachCulvert, PVC, 4" D‐23 10.00$             LF 3253,250.00Culvert, PVC, 6" D‐24 13.00$             LFCulvert, PVC,  8" D‐25 15.00$             LFCulvert, PVC, 12" D‐26 23.00$             LFCulvert, PVC, 15" D‐27 35.00$             LFCulvert, PVC, 18" D‐28 41.00$             LFCulvert, PVC, 24" D‐29 56.00$             LFCulvert, PVC, 30" D‐30 78.00$             LFCulvert, PVC, 36" D‐31 130.00$           LFCulvert, CMP, 8" D‐32 19.00$             LFCulvert, CMP, 12" D‐33 29.00$             LFSUBTOTAL THIS PAGE:8,300.00(B) (C) (D) (E)Quantity Remaining (Bond Reduction) (B) (C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESPage 7 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostQuantity Remaining (Bond Reduction) (B) (C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, CMP, 15" D‐34 35.00$             LFCulvert, CMP, 18" D‐35 41.00$             LFCulvert, CMP, 24" D‐36 56.00$             LFCulvert, CMP, 30" D‐37 78.00$             LFCulvert, CMP, 36" D‐38 130.00$           LFCulvert, CMP, 48" D‐39 190.00$           LFCulvert, CMP, 60" D‐40 270.00$           LFCulvert, CMP, 72" D‐41 350.00$           LFCulvert, Concrete, 8" D‐42 42.00$             LFCulvert, Concrete, 12" D‐43 48.00$             LFCulvert, Concrete, 15" D‐44 78.00$             LFCulvert, Concrete, 18" D‐45 48.00$             LFCulvert, Concrete, 24" D‐46 78.00$             LFCulvert, Concrete, 30" D‐47 125.00$           LFCulvert, Concrete, 36" D‐48 150.00$           LFCulvert, Concrete, 42" D‐49 175.00$           LFCulvert, Concrete, 48" D‐50 205.00$           LFCulvert, CPE Triple Wall, 6" D‐51 14.00$             LFCulvert, CPE Triple Wall, 8" D‐52 16.00$             LFCulvert, CPE Triple Wall, 12" D‐53 24.00$             LFCulvert, CPE Triple Wall, 15" D‐54 35.00$             LFCulvert, CPE Triple Wall, 18" D‐55 41.00$             LFCulvert, CPE Triple Wall, 24" D‐56 56.00$             LFCulvert, CPE Triple Wall, 30" D‐57 78.00$             LFCulvert, CPE Triple Wall, 36" D‐58 130.00$           LFCulvert, LCPE, 6" D‐59 60.00$             LFCulvert, LCPE, 8" D‐60 72.00$             LFCulvert, LCPE, 12" D‐61 84.00$             LFCulvert, LCPE, 15" D‐62 96.00$             LFCulvert, LCPE, 18" D‐63 108.00$           LFCulvert, LCPE, 24" D‐64 120.00$           LFCulvert, LCPE, 30" D‐65 132.00$           LFCulvert, LCPE, 36" D‐66 144.00$           LFCulvert, LCPE, 48" D‐67 156.00$           LFCulvert, LCPE, 54" D‐68 168.00$           LFSUBTOTAL THIS PAGE:(B) (C) (D) (E)Page 8 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostQuantity Remaining (Bond Reduction) (B) (C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, LCPE, 60" D‐69 180.00$           LFCulvert, LCPE, 72" D‐70 192.00$           LFCulvert, HDPE, 6" D‐71 42.00$             LFCulvert, HDPE, 8" D‐72 42.00$             LFCulvert, HDPE, 12" D‐73 74.00$             LFCulvert, HDPE, 15" D‐74 106.00$           LFCulvert, HDPE, 18" D‐75 138.00$           LFCulvert, HDPE, 24" D‐76 221.00$           LFCulvert, HDPE, 30" D‐77 276.00$           LFCulvert, HDPE, 36" D‐78 331.00$           LFCulvert, HDPE, 48" D‐79 386.00$           LFCulvert, HDPE, 54" D‐80 441.00$           LFCulvert, HDPE, 60" D‐81 496.00$           LFCulvert, HDPE, 72" D‐82 551.00$           LFPipe, Polypropylene, 6" D‐83 84.00$             LFPipe, Polypropylene, 8" D‐84 89.00$             LFPipe, Polypropylene, 12" D‐85 95.00$             LFPipe, Polypropylene, 15" D‐86 100.00$           LFPipe, Polypropylene, 18" D‐87 106.00$           LFPipe, Polypropylene, 24" D‐88 111.00$           LFPipe, Polypropylene, 30" D‐89 119.00$           LFPipe, Polypropylene, 36" D‐90 154.00$           LFPipe, Polypropylene, 48" D‐91 226.00$           LFPipe, Polypropylene, 54" D‐92 332.00$           LFPipe, Polypropylene, 60" D‐93 439.00$           LFPipe, Polypropylene, 72" D‐94 545.00$           LFCulvert, DI, 6" D‐95 61.00$             LFCulvert, DI, 8" D‐96 84.00$             LFCulvert, DI, 12" D‐97 106.00$           LF 151,590.00Culvert, DI, 15" D‐98 129.00$           LFCulvert, DI, 18" D‐99 152.00$           LFCulvert, DI, 24" D‐100 175.00$           LFCulvert, DI, 30" D‐101 198.00$           LFCulvert, DI, 36" D‐102 220.00$           LFCulvert, DI, 48" D‐103 243.00$           LFCulvert, DI, 54" D‐104 266.00$           LFCulvert, DI, 60" D‐105 289.00$           LFCulvert, DI, 72" D‐106 311.00$           LFSUBTOTAL THIS PAGE:1,590.00(B) (C) (D) (E)Page 9 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostQuantity Remaining (Bond Reduction) (B) (C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESSpecialty Drainage ItemsDitching SD‐19.50$               CYFlow Dispersal Trench    (1,436 base+) SD‐3 28.00$             LF    French Drain  (3' depth) SD‐4 26.00$             LFGeotextile, laid in trench, polypropylene SD‐53.00$               SYMid‐tank Access Riser, 48" dia,  6' deep SD‐6 2,000.00$       EachPond Overflow Spillway SD‐7 16.00$             SYRestrictor/Oil Separator, 12" SD‐8 1,150.00$       EachRestrictor/Oil Separator, 15" SD‐9 1,350.00$       EachRestrictor/Oil Separator, 18" SD‐10 1,700.00$       EachRiprap, placed SD‐11 42.00$             CYTank End Reducer (36" diameter) SD‐12 1,200.00$       EachInfiltration pond testing SD‐13 125.00$           HRPermeable Pavement SD‐14Permeable Concrete Sidewalk SD‐15Culvert, Box      __ ft  x  __ ft SD‐16SUBTOTAL SPECIALTY DRAINAGE ITEMS:(B) (C) (D) (E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention Pond SF‐1Each Detention Tank SF‐2Each Detention Vault SF‐3Each Infiltration Pond SF‐4Each Infiltration Tank SF‐5Each Infiltration Vault SF‐6Each Infiltration Trenches SF‐7Each Basic Biofiltration Swale SF‐8Each Wet Biofiltration Swale SF‐9Each Wetpond SF‐10 Each Wetvault SF‐11 Each Sand Filter SF‐12 Each Sand Filter Vault SF‐13 Each Linear Sand Filter SF‐14 Each Proprietary Facility SF‐15 Each Bioretention Facility SF‐16 Each SUBTOTAL STORMWATER FACILITIES:(B) (C) (D) (E)Page 10 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostQuantity Remaining (Bond Reduction) (B) (C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESWRITE‐IN‐ITEMS (INCLUDE ON‐SITE BMPs)Oil Stop Valve WI‐1 5,000.00$       EA 15,000.00CB Type II, 84" Diamater WI‐2 17,500.00$     EA 117,500.00additional depth over 4' WI‐3 900.00$           FT 76,300.00Duraslot Slot Drain WI‐4 200.00$           LF 408,000.00WI‐5WI‐6WI‐7WI‐8WI‐9WI‐10WI‐11WI‐12WI‐13WI‐14WI‐15SUBTOTAL WRITE‐IN ITEMS:36,800.00DRAINAGE AND STORMWATER FACILITIES SUBTOTAL: 45,100.00SALES TAX @ 10% 4,510.00DRAINAGE AND STORMWATER FACILITIES TOTAL: 49,610.00(B) (C) (D) (E)Page 11 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostConnection to Existing Watermain W‐1 2,000.00$      EachDuctile Iron Watermain, CL 52, 4 Inch Diameter W‐2 50.00$            LFDuctile Iron Watermain, CL 52, 6 Inch Diameter W‐3 56.00$            LFDuctile Iron Watermain, CL 52, 8 Inch Diameter W‐4 60.00$            LFDuctile Iron Watermain, CL 52, 10 Inch Diameter W‐5 70.00$            LFDuctile Iron Watermain, CL 52, 12 Inch Diameter W‐6 80.00$            LFGate Valve, 4 inch Diameter W‐7 500.00$          EachGate Valve, 6 inch Diameter W‐8 700.00$          EachGate Valve, 8 Inch Diameter W‐9 800.00$          EachGate Valve, 10 Inch Diameter W‐10 1,000.00$      EachGate Valve, 12 Inch Diameter W‐11 1,200.00$      EachFire Hydrant Assembly W‐12 4,000.00$      EachPermanent Blow‐Off Assembly W‐13 1,800.00$      EachAir‐Vac Assembly,  2‐Inch Diameter W‐14 2,000.00$      EachAir‐Vac Assembly,  1‐Inch Diameter W‐15 1,500.00$      EachCompound Meter Assembly 3‐inch Diameter W‐16 8,000.00$      EachCompound Meter Assembly 4‐inch Diameter W‐17 9,000.00$      EachCompound Meter Assembly 6‐inch Diameter W‐18 10,000.00$    EachPressure Reducing Valve Station 8‐inch to 10‐inch W‐19 20,000.00$    EachWATER SUBTOTAL:SALES TAX @ 10%WATER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B) (C)Page 12 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 CED Permit #:########Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D) (E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostClean Outs SS‐1 1,000.00$      EachGrease Interceptor, 500 gallon SS‐2 8,000.00$      EachGrease Interceptor, 1000 gallon SS‐3 10,000.00$    EachGrease Interceptor, 1500 gallon SS‐4 15,000.00$    EachSide Sewer Pipe, PVC. 4 Inch Diameter SS‐5 80.00$            LFSide Sewer Pipe, PVC. 6 Inch Diameter SS‐6 95.00$            LFSewer Pipe, PVC, 8 inch Diameter SS‐7 105.00$          LFSewer Pipe, PVC, 12 Inch Diameter SS‐8 120.00$          LFSewer Pipe, DI, 8 inch Diameter SS‐9 115.00$          LFSewer Pipe, DI, 12 Inch Diameter SS‐10 130.00$          LFManhole, 48 Inch Diameter SS‐11 6,000.00$      EachManhole, 54 Inch Diameter SS‐13 6,500.00$      EachManhole, 60 Inch Diameter SS‐15 7,500.00$      EachManhole, 72 Inch Diameter SS‐17 8,500.00$      EachManhole, 96 Inch Diameter SS‐19 14,000.00$    EachPipe, C‐900, 12 Inch Diameter SS‐21 180.00$          LFOutside Drop SS‐24 1,500.00$      LSInside Drop SS‐25 1,000.00$      LS8" Concrete Pipe Lining SS‐26 190.00$          LF 740140,600.00Lift Station (Entire System) SS‐27 LSSANITARY SEWER SUBTOTAL:140,600.00SALES TAX @ 10% 14,060.00SANITARY SEWER TOTAL: 154,660.00(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B) (C)Page 13 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019 Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right‐of‐Way Improvements Subtotal (b) (b)154,660.00$                                                 Future Public Improvements Subtotal(c)‐$                                                               Stormwater & Drainage Facilities (Public & Private) Subtotal(d) (d)49,610.00$                                                   (e)(f)Site RestorationCivil Construction PermitMaintenance Bond40,854.00$                                                   Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only  ‐ May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. EST1((b) + (c) + (d)) x 20%‐$                                                           MAINTENANCE BOND */**(after final acceptance of construction)8,565.15$                                                 154,660.00$                                            281,600.00$                                            8,565.15$                                                 ‐$                                                           49,610.00$                                               ‐$                                                           290,165.15$                                            P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS3/21/2019Travis Neu45379DOWLR((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right‐of‐Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R ‐ S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)425‐869‐2670tneu@dowl.comApron D Utilities Replacement Phase 2 & 3##‐######101‐499 N 6th ST0723059046, 0723059001PROJECT CLOSEOUT########8420 154th Avenue NEPage 14 of 14Ref 8‐H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 4/1/2019