Loading...
HomeMy WebLinkAboutx5 Consultant Evaluation Form INSPECTION AND DESIGN SERVICES FOR MAPLEWOOD WATER TREATMENT PLANT ROOF REPAIRS CONSULTANT EVALUATION - DECEMBER 2019 DATE: NAME OF APPLICANT/FIRM: NAME OF RATER: EVALUATION OF WRITTEN SOQ/PROPOSAL Review the firm's Statement of Qualifications/ Proposal, and evaluate the following elements; maximum points are indicated for each item. Firm Qualifications: 1 Identifies organizational capabilities, experience, and resources. / 6 2 Identifies relevant organizational accreditations and certificates. / 4 3 Identifies firm experience on projects (minimum 3) of similar size, / 6 scope,complexity, and budget, particularly within the last 5 years. 4 Demonstrates knowledge of operational and engineering principles / 4 required for this project. 5 Provides special skills or"bonuses". / 4 6 Demonstrates knowledge of City of Renton codes, standards, / 4 review, and permitting processes. 7 Demonstrates ability to meet insurance requirements for the / 4 Project. SUBTOTAL / 32 Project Team Qualifications: 1 Identifies technical experience of proposed staff. / 4 2 Identifies relevant personnel accreditations and certificates. / 4 3 Identifies personnel roles and responsibilities and/or Organization / 4 Chart. 4 Identifies personnel experience on projects with similar / 4 responsibilities, particularly within the last 5 years. 5 Indicates time availability and physical location of key staff required / 6 to carry out testing and inspections. 6 Indicates time availability and physical location of testing facilities. / 6 SUBTOTAL / 28 INSPECTION AND DESIGN SERVICES FOR MAPLEWOOD WATER TREATMENT PLANT ROOF REPAIRS CONSULTANT EVALUATION - DECEMBER 2019 Project Management Qualifications: 1 Provides evidence that the firm completes work on time and within / 4 budget. 2 Identifies project manager's experience on projects of similar size, / 6 scope,complexity,and budget, particularly within the last 5 years. 3 Provides a preliminary time schedule for carrying out various tasks. / 4 Provides time estimates for staff members used in each of the 4 / 4 major tasks 5 Demonstrates overall apparent project management ability. / 4 SUBTOTAL / 22 Project Approach Qualifications: 1 Proposes technical approach/approaches to meeting project's / 4 goals. Demonstrates understanding of work flow and communications 2 flow during various project phases with regard to project members / 6 (e.g., City,consultant, sub-consultants, contractor, sub-contractors, inspection firms). 3 Demonstrates ability to meet project goals, regulatory compliance, / 4 and code compliance. 4 Overall approach to project. / 4 SUBTOTAL / 18 TOTAL SCORE / 100