HomeMy WebLinkAbout1984 TIP / ,v
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2516
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY' S SIX YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 1984-1989
WHEREAS the City of Renton has heretofore adopted a "Six-
Year Transportation Improvement Program" pursuant to Chapter 7 ,
Extraordinary Session Laws of the State of Washington, and Chapter
195 of the 1961 Session Laws of the State of Washington, and as
same has heretofore been amended from time to time , and such plan
and program having heretofore been duly amended and modified from time
to time as authorized by law; and
WHEREAS the City Council , after recommendation of its Public
Works Department , caused to be held a public hearing thereon on June
20, 1983 , and after notice to the public as provided by law, for the
purpose of considering adoption, modification and amendments of said
plan and program, and
WHEREAS at such public hearing held on June 20, 1983 , due
consideration was given to the proposed changes and amendments for
the purpose of updating such plan and program, NOW. THEREFORE
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS :
SECTION I : The City' s "Six-Year Transportation Improvement
Program" and the City' s "Arterial Street Plan" are hereby further
amended and modified, all as more particularly shown on the attached
Exhibits "A" , "B" and "C" incorporated herein as if fully set forth.
•
SECTION II : The aforestated plan and program, as evidenced
by said Exhibits shall be and constitute the City' s "Six-Year Trans-
portation Improvement Program" and the City' s "Arterial Street Plan"
and same to remain in full force and effect until further revised,
amended and modified as provided by law.
SECTION III : The Director of Public Works and the City Clerk
are hereby authorized and directed to file this Resolution together
with the Exhibits with the Director of Highways for the State of
Washington, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 27th day of. June, 1983 .
Marilyn J Pe ersen, Deputy City Clerk
APPROVED BY THE MAYOR this 27th day of June, 1983 .
Barbara Y�hinpoctl, Mayor
Approved as to form:
Ld
ce J. Waxen, City Attorney
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1984 - 1989
CITY
PRIORITY # ANNUAL ELEMENT PROJECTS
1 Grady Way Bridge Replacement
2 Renton Area Transportation Study •
3 Wells Avenue Bridge Replacement
4 Garden Ave. N, N 4th St. to N 4th St.
5 SW Grady Way, Lind Ave. SW to Longacres Dr.
6 NE 3rd St./NE 4th St. , Sunset Blvd. N to Union Ave. NE
7 Talbot Road S, S 16th St. to S 41st St.
8 N 1st St. , Park Ave. N to Burnett Ave. N
9 S 2nd St. & Burnett Ave. S Intersection
10 Monroe Ave. NE, NE 6th St. to SE 12th St.
11 Rainier Ave. S, S Grady Way to Airport,Way
12 SW Sunset Blvd. , Rainier Ave. S to Stevens Ave. SW
13 Miscellaneous Street Improvements
14 Lind Ave. SW, SW 16th St. to SW Grady Way
SECOND YEAR PROJECTS
15 Rainier Ave. S & S Grady Way Intersection
16 SW 16th St., Lind Ave. SW to Monster Road SW
THIRD YEAR PROJECTS
17 S 7th St., Rainier Ave. S to Smithers Ave. S
18 Oakesdale Ave. SW, SW Grady Way to Sunset Highway (SR 900)
19 Oakesdale Ave. SW, SW 16th St. to SW 34th St.
FOURTH - SIXTH YEAR PROJECTS
20 Oakesdale Ave. SW, SW 16th St. to SW Grady Way
21 Lake Washington Blvd. N, N Park Dr. to City Limits
22 SW 27th St. , Oakesdale Ave. SW to West Valley Road
23 SE Puget Dr. , Jones Place SE to Edmonds Ave. SE
24 Monster Road SW - Alternate Access
25 Sunset Blvd. NE, I-405 to NE Park Dr.
26 Taylor Ave. NW, Renton Ave. Ext. to Stevens Ave. NW
27 NE 12th St. , Lynnwood Ave. NE to Union Ave. NE
28 Union Ave. NE, NE Sunset Blvd. to NE 24th St.
29 Edmonds Ave. Extension
30 N/NE 3rd St. - I-405 Undercrossing
31 Union Ave. NE/SE, NE 4th St. to SE 4th St.
32 Miscellaneous Railroad Crossing Improvement
Rev. 6/20/83
�-X - YEAR. TRANSPORTATION IMPROVEMENT PROGRAM 19 8 4 TO 19 89 Page 1 of 5 -
- OBLIGATION PROGRAM ` Hearing pate June 20, 1983
EXHIBIT "A" Adoption Date June 27, 1983
"_Cify/.County _keypunching Note: Data entered in cols I-8 must Reaolutian Number 2516
City No. 1 0 7 0 3-6 be an .all cards punched from
County No. 1 7 7-8 this form. ex PR OJ' .CT-CO5T5 1 N THOUSANDS OF 'DOLLARS
• PROJECT IDENTIFICATION ., a 1 OBLIGATION :.SCH'EDULE -FUNDING SOURCE
Title,Route,Road LogNo., Section No., Total d �-
�°,o Work c ___Y__E . A R
E Location Termini,Deecription of Work, 03 Code Length += \ •�a iat FEDERAL FUND
(miles) u - 2nd 3rd 4,5 U.A.B. LOCAL, FUNDS
u Beginning Milepost 4 bridge No. 'd o c "� t (Ar,rlocil 6th AMOUNT PROGRAM
►-+ as cc 0 Element)
2 L.S -_ 4 5 878 9 - __ 10 . . II 12 13 -.: 14 15 16. 17.
aim 37 40,41 44 4S 48 47 46 " 114 52____ . 35 39 39 GO 63 04 67 ea 11 72 75 76 79 AO - as
GIR,AID,YI 1W,A,Y1 tB1RIIIDIG,E, ,RIE,PILIAICIEIMIEIN 4RA,BIDIH ,011,0 M U X 191319 412, 2, 7641212, 7 1 148121119, 11 I 4 '► 1 i •1111714, 1 1913,90
1
• Bridge Replacement (joint with Tukwila) Construction. I' Bridge Forward
Repl. Thr. &
Tukwila
RENTON AREA TRANSPORT S T U D Y 8 /.0 U 3 0 3 0 6 0 . 0
2.
Develop a multi-modal transportation plan for the •
city. (Phase II)
3. WIEILILISI ,AIV,EI IB,RIIIDIGIEI ,R,EIPILIAICIE,M,E1N 4 /,A1B,F,G , £0,4 S U X 1101010 1E9810 , 1 1 1 1 1 1131414 11 I 1 1 1 131316 I 1l161819
H J L
Bridge Replacement.
• G,A,R,D,E,NI IA,V, E, ,-1 301 ,4,T1H T O NI ,81T,H 2 , BIDIF,G , 42, 5 S U 131010 1 1 1 1 1 1 1 1 1 ! Li 1 1 1 1 1 1 1310LO 1 , 131010
4 . H J _
Drainage, paving, curb, sidewalks, illumination.and U.A.B. L.I.D.
channelization. possible
SW G R A DY LIND TO LONGACRES 2 BDFG 7 0 S U 1 5 0 0 1 5 0 0 1 5 0 0
5- Drainage, paving, curbs, sidewalk, illumination, H J L • • FAUS U.A.B. L.I.D.
channelization, P-1 BR. 56' roadway taper w/half to possible possible
44' design Loney
NE 3RD NE 4TH - SUNSET - UNION 2 BDFG 1 2 3 M U 2 8 0 2 5 2 2 8 2 8 0
6 . Drainage, reconstruct eastbound traffic lanes, install H U.A.B. UAB w/
telemetry for water and sewer to City Shops. z Gas match
help from King Co.
,„ TALBOT , RD, -,S1 ,1161T1H, ITIO, ISI ,41STI 2�jB,D,F1G , 118,0 C U 111010 1 1 1 .1 1 1 I I 'I 1 1 1 1 1 1 1 19,0 1 1110 , I , 11010
• Drainage, paving, shoulders, pre-level, channeliza- H J Forward 50%
tion (joint with King County) . Thrust . King
�/�� possible
Ni ,l, S1T1 , -, , P1A,R,K, ,T,O� 1B,UIR,N1EIT1T1 ,. , , 41UGBIDIFIH_ X04312 C U i110i5 1 I I . I 1 I 1 I I I I I I I I I I I 111015 11 111015
8. Reconstruction - new curbs, gutters, A.C. pavement, i Gas
storm drainage, coordinate w/12" watermain and new U.A.B.
sanitary sewer.
D15TRtBUTION
I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY C,R.A.B.(COUNTIES ONLY
Jan, 1990
I5IA1l-2 .5 X _ YEAR. TRANSPORTATION IMPROVEMENT PROGRAM 19 84 TO 1989 Page 2 of' 5
- OBLIGATION PROGRAMHeolring Date June 20, 1983
EXHIBIT "A" Adoption Date June 27, 1983
__Cif9/.County _Keypunching Note: Data entered in cols I-S must Resolution Number 2516
City No. 1 0 710 3-4. be on all cards punched from I� •
. County No. 1 7 7-8 This form. VI X PR OJ'ECT-COSTS 1 N THOUSANDS OF-DOLLARS
o_�' a OBLIGATION.'S'CH'EDULE _FUNDING SOURCE
•o PROJECT IDENTIFICATION oY .n
Title,Route, Road,Log No., Section No., o Work _Total d -_Y__E-. A R
Location Termini Deecri tion of Work ,.3 Length Al \ ;o , FEDERALFUND_TOTAL
P > _�� Code (miles) u _ �► 1st end 3rd 4,5 U.A.B. LOCAL. FUND`5
a Beginning Milepost Bridge No, c a .0 2 t (Annucil
i-1 le ec 0 Element) G th WONT PROGRAM
A. -;r "_.-:3.� 4 .. ... 5 6 7 g 3 ._ JO .. 11 12 13
14. 15 16. . 17'
-9 . ._ . I+S 3Q '"37 40,41 44�45 40 47 40 5t 52---- . 55 SO 38 GO 63 os 's i ea II 12 15 76 70
08 E8
9. S , 121NID1 I&I IBIUIR,N,EIT,T, ,I,NITIEIRISIEICITII10 6RI , 1 1 101018 M U 1 .1210 • , I ♦ I 1 I 1 1 1 4 I I I . 1 I 1 . I 1 1 ♦ i 1210. 1 •1 I ► 21 of
Traffic signal installation with surplus equipment.
10. M10,N1R,0,E1 ,AIV, ,NIEL 161T,HL 1T101 IN1E1 L1 ,21T1H 2FIB1D1F ,G 3,8 C U 1,51810 I , 1 1 ii III III 1 i 1 , 1 11518,0 1 1.115, 810
Drainage, paving, curbs, sidewalk, illumination, H J UAB 25% LID
channelization. possible Fwd.Th.
possible
1• RIAIIINIIIE,R1- ,GIRIAIDIYI 111,0i 1A,IIRIPIOIRITI 14,71Y 6 �%/I 'S , 1 ,1010 M U 111310 1 1 1 I I I I I I 111018 III III , , 2,2 I I 111 310_
Installation traffic detection system, update FAUS
1controllers, new loops for traffic flow monitoring,
time of day signing.
S ,W, ,S,U,NIS,E,T,- ,R,AII,N,I1E,R, 1T,0, ,S1TJE,VIE ,N 2RB1D4F ,G ,01412 M U 121510 I i i , i I ill 121310 1 1 1 1. 1 1 1 I i2i0 1 , 1 21 51 0
12. Add two-way left turn lane, traffic signal improve- - H I J FAUS Forward
ment, underground power, new street lights. Coordin- Thrust .
ate w/12" watermain and sanitary sewer possible
MISCELLANEOUS STREET I M P R O V 4 /D 7 4 4 7 4
13. Street Division Overlays. See attached sheet with .
listings.
L IND •
AVE S W 1 6 T H TO SW G R A D•Y. 2 A B D F G 0 2 0 S U 2 4 0 0 2 4 0 0 2 4 0 0
14. Drainage, paving, curbs, gutter, sidewalk, illumine- HIJL UAB Developer
tion, signal, channelization, bike route, landscaping, M 0 possible,
FAI-405 Bridge, roadway. Jobs Now possib-e
R A I N I E R & S GRADY WY I N T E R S FABFHH 2 5 M U 1 5 0 5 0 1
15. Add new eastbound right turn lane to freeway on-ramp. I J LID
•
S W 1 ,116 ,T,H, ,LII ,N ,D1 ,A,VE1 ,T,01 ,M,OINIS,TIE,R 2fi//BID,FIG 1 1910 C U i , j 2101010 III tit III , , 2 ,010,0 , 1 12101010
16.
Drainage, paving, curbs, gutters, sidewalks, illum- H J L UAB LID 100%
ination, channelization, bridge and roadway. 'possible Fwd.Th.
- • possible
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
DoT 140-049 I COPY C.R.A.B.(COUN-T1E5 ONLY)
Jan_ !ARO
ISIA I.E. 51-X - YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 8 4 TO 1989 Page 3 of -
— OBLIGATION PROGRAMHearing Date June 20, 1983
EXHIBIT "A" Adoption Date June 27, 1983 .
.1 City/County _Keypunching Note: Data entered in cols 1-8 must Resolution Number 2516
City No. 1 0 7 0 3=6. be an alt cards punched from 11 •
County iNlo. '1 7 7-8 this -form. E x PR Oj:ECT.CO5T5' IN THOUSANDS OF 'DOLLARS
a rv,
a
PROJECT IDENTIFICATION .6` G .oa 1 OBLIGATION _SCH'EDULE FUNDING SOURCE
2 Title,Route,Road !.o No., Section NoTotal d __.Y__E._ A R
9 vo Work FEDERAL TOTAL
1,ocation/Termini,Deecripiion of Work, 03 Code Length
at 2nd 3rd 4,5 U.A.B. LOCAL FUNDS
»� Beginning Milepost bridge No. 'd o (Ar,nueii at.Gth AMOUNT PROGRAM
;.4 14 a C.) Element)
3 1. -- s -" 4 . 5 B. 7 B 9 �. 10 . 11. 12 13 14 15 16. - 17'
s 3!SG 87 40 41 44 45 46 47 46 ' Si 52____ . 55 39 59 Go C3 84 61 es 11 72 75 76 79 30 • s6
17. S , ,71T,H1 IRIAIIINIIIEIRI IT,0, ISIM,IITIHIEIRISI 1 21//AIBIDIF. , 15 ,0 S U III , , 1 • 12121Q• 1 I I , I I I . 1 I 1 . '1 1 , • 121210. 1 1 121210A
Drainage, paving, curbs, gutters, sidewalks, ilium- FAUS & Devel-
ination, channelization. Fwd.Th. oper &
possible LID _
18. O A K E S DALE S W , G R A D Y - SUN S E T H1 / ABDF 1 0 OMU 5 5 0 0 5 5 0 0 5 5 0 0
Grading, drainage, paving, curbs, sidewalk, gutter, GHIJ U.A.B. Devel-
illumination, ' signal, bike route, channelization, L M 0 possible oper
landscaping, bridge, roadway.
19. OIAIKIE,S,D,AIL,E1 . IAIV1-,SIW,1161T1H1 1-1 ISIWI 1314 l A,B,D__,F ,147,0 M U I i 1 i 1 1 3, 01010 3101010 I I I 11 I 1 1 1 6101010 I 16101010
Grading, drainage, paving, curbs, gutters, sidewalk, GHIJ Devel-
illumination,, signal, bike route, channelization, . L M 0 oper
landscaping. bridge.
20. O,AAK,E, S,D,AIL,E, ,A,V1-1S,W11,61T H - GIR,AID,Y 1iaAIB4DIG ,011,0 M U ,. 11 l i t ' , 1 1 5101010 I I I I I 1 1 i ,510 ,010 , ,5,01010
Grading, drainage, paving, curbs, gutter, sidewalk, HIJL UAB 20% LID
illumination, signal, bike route, channelization, M 0 possible
landscaping. bridge, roadway.
21. L K WASH BLVD N PK 'T O CITY L 2 /,B D F G 3 0 3 S U 4 8 0 0 4 8 0 0 4 8 0 0
Drainage, paving, curbs, sidewalks, gutter, illumin- UAB 25% LID
ation, channelization, bikeway. possible V
22. S W 2 7TH - OAKESDALE - W V , L L'E 1 . ABDF 0 5 3 S U 2 5 0 0 2 5 0 0 2 5 0 •0
Grading, drainage, paving, curbs, gutter, sidewalks, GHIJ Devel-
illumination, signal, bike route, channelization, L M 0 oper
landscaping, roadway. _
23. S E P U GET - J O N E S TO EDMONDS 2 V B D F G 0 7 8 S U 9 . , 9 6 0 9 6 0
Drainage, paving, curbs, sidewalk, gutter, illumina- Forward
tion,, channelization, roadway. V V Thrust
possible _
24. MjO,N,S,T,EIR, ,RmD,- ,AIL,T,ELR,NIA,T,E, ,AIC,C,E ,S ,S 1RA.03IDLE 104212 C U 1 1 1 , i 1 1 1 1 121110 1 1 1 1 I I I I I 124110 I , ,21110
Realignment of roadway. H J UAB Forward
possible Thrust
_ ,DoSSible
015TRI BUT ON '
I COPY DISTRICT STATE AID ENGINEER
DoT 140-049OI COPY C.R.A.B.(CoUMTIE5 O1JLY)
_ MO""
.Inr,
15iAl1.2 .5-X - YEAR. TRS N5PORTATI.OM IMPROVEMENT PROGRAM 19 O 4 TO 19 89 Page 4 of`5
— OBLIGATION PROGRAM — June
„A11 Hearing Date•
June 20, 1983
Adoption Date June 27, 1983 .
__City/.County _Keypunching Note: Data entered in cols I-8 mustReaolutian Nunnber 2516
- City No. 1 0 710 3-8. be an all cards punched from
County No. 1 7 7-8 this form. V ' PROJ'ECT_COSTS. 1N THOUSANDS OF •DOLLAR5
•
o r
• PROJECT IDENTIFICATION • .0 .cc 1 OBLIGATION.-:SCH'EDULE _FUNDING SOURCE
z mile,Route, Road Log No., Section. No., o Work _Total 7 . ____Y__E . A R
Location Termini Deacri Pion of Work ,3 Length \ •' FEDERAL. _7107A L.
�. P o Code (Mil9s u 'a 1st 2nd 3rd 4,5 . U.A.B. LOCAL FUNDS
M Beginning Milepost bridge No. • 'd o ,,r `5 L (Ai-mil-di - 4.G+h AMOUNT PROGRAM
. • •• cc 0 Element) _
..i ._2. -,L3 - 4 -. 5 8 7 8 5 .--. JO . 11- 12 13 . . 14 15 16. 17'.
-9”..._ . 155G 37 40 41 44 45 48 47 4e ' 81 52__"__ 55 SO • 53 Go O3 64 G7 98 7172 7576 7883 186
S,U,NIS,EITI ,B,LIVID1 1114,0,5, •,TIO, 1PIA1R1K1 IDIR 2RB1D1FIG ,01910 S U i .1 . .1 I . 1 t + 1 1 1 •1181 OIO I I I . I t 1 .'I 1 1 •1 ,81010. 1 •11181010,
25. Drainage, paving, curbs, sidewalk, gutters, channel- H J Forward .
ization, illumination and bikeway. Thrust
•
possible
T,A,Y,L,O,R,_ IN1W, ,R]EIN1T101N[ ,TIO, ISIT,E`V1E,NIS 2r2.B,DIF,G ,046,0 Cu 1 1 1 , , 1 1 1 1 17, 2, 0 III 11 1 111 1712,0 . 1 1 ,7,2,0_
26. Drainage, paving, curbs, gutters, sidewalks, ilium- H J - U.A.B. 25% LID
ination, channelization. • possible Fwd.Thr.
• possible
N1EI 11,2,T,H1 ,LI YIN,N,W�OIO,D1 ,TIO, IUINII,01N, , 2�% B,D,F,G ,016,0 C U III lit 1 ii 11010, 0 I i I lit 1 I 1 1101010 i 11,01010
27' Drainage, paving, curbs, gutters, sidewalks, ilium- H J U.A.B. 50% LID
ination, channelization. possible Fwd.Thr.
-- possible
U,N, I,O,N, ,A1V, ,NSE, 1S1ULN,S,EJT, ,T101 ,N1E,214,T 2 j,BID4F,G ,017, 0 S U 1 I I I I I III 161010 1 I I I I I , I I I 16 ,0 ,0 , „6,0,0
28• Drainage,, paving, curbs, gutter, sidewalk, channel- H 50% LID
ization. Fwd.Thr.
•
possible •
E,D,MIOINIDISI ,AVE 1 tEXTENSION 1 I I I A 1�%A1B1D.F ,01719 U 1 1 1 1 1 1 I I I 1 1 1 I I I 1 1 1 1 1 1 1 1 1 I I t l 1
29. NE 3rd to Maple Valley Highway - GHIL
K
N,/1N,E1 131R,D, , SIT, III-141015 , IUIN1DIEIR,C,R10,S 2 �,A1$1DIF 1 4019 S.0 1 1 1 III 1 1 1 1,01010 1 1 1 1 I 1 1 ,9,0 1 ,1,0 I 11101 0, 0
30 . Widening - add two more travel lanes. GHIJ U.A.B.
UNION NE SE NE 4TH - SE 4 T 2 V B D F 7 2 S 7 2 0 . I ' 7 0
31. Drainage, paving, curbs, gutters, sidewalks, H LID
illumination, channelization. Fwd.Th.
possible
MIIIS,CI 1R,A11,L1 R,01A1DI 1X11,N1G1 ,1,M1PIR101V1 1 4C/�1i�C1D,HIJ , , 2, 5 S U , j III III 11 310 1 1 2, 7 1 1 1 1 1 1 1 1 13 1 1 1 1310
32. Miscellaneous surfacing, channelization, lighting K FASP
and signing. •
D15TRLBuTI O1V
I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY C.R.A.B.(COUNTIES ONLY)
Jan. .1990
I51AI1-2. 69-X - YEAR. TRAN5PORTATION IMPROVEMENT PROGRAM 19 84 TO 19 89 Page 5 of 5
— OBLIGATION PROGRAM — June 20, 1983
EXHIBIT "A" ,adoption Date June 27. 1983 -
__City/County .keypunching Note: Data entered in cols I-8 must ADDENDUM #1 - STATE HIGHWAY PROJECTS Resolution Number 2516
City. No. 1 0 7 0 3-6 be on all cards punched from
County No. _1 7 7-8 this form, c v pRO-t):ECT_COSTS• 1N THOUSANDS OF 'DOLLARS
• PROJECT IDENTIFICATION ., .43 OBLIGATION.:SCHE.DULE FUNDING SOURCE
Z Title,Route, Road Log No., Section No., 2 o Work -illf
Total d a ,t. ____Y._E . A !�
Location Termini Deecri lion of Work, 03 Length 2 \ .o FEDERAL TOTAL
E Beginning Milepost 4 Bridge No. .tl a Code {Miles) ,E(Ann��t nd 3rd 4,5 V.A.B. l,.oCA1, FUNDS
►-+ e.: a cg Element) �. it Gib AMOUNT PROGRAM
• ..1 _.2 • =S _ 4 5 9 78 9 .�: JO . li to 13 14 15 16. I?` •
.-9 ._ . bs 54:La? 4O 4I 44 45:4$ 07,48 ' 51 52_1_ . 55,S0 ss,Go 63 G4 •61 OS - 11 72 7576 . 7a AD es
F,A,I1 ,41015, ,N1 1C111TIY1 IT,01 IS, ICIIITIY1 1 I 2f// 1 1 1 ,61,444 ,My _ 1 1 1 • -1 . 1 I • , i I • 1_ 1 I • 11 1 . 1 I I ♦ •L I • I I 1_ _s 1 1 1 1 Ii
State DOT Project - capacity improvements. HCV lanes.
•
SIR1 ,1,6191 ,Q1 UI E,EI NI 181E, LT101 1l14191T1H1 ISLE 1M. iii ,l14,4 M U 1 1 1 1 1 1 1 1 1 , 1 1 1 1 1 1 11 , 1 1 1 , 1 1_ 1 1 1 1 1 1
State Project - construct five lane roadway.
•
SIR! 191010, IRI EINIT,OINI ITIO1 IIISISIAlOIUtAiH, I 2Y/G 1 1 I 1,140,0 M U I I I Ili 1 1 1 11 1 III III 1 I 1 III 1 I I 1 1
State Project - widen to four lanes with five lanes
at intersections. -
, 1 1 , 1 1 I 1 t 1 1 I 1 1 l I 1 1 1 1 1 1 1 I 1 1 , I'!!I�/��
l 1 _i , I j 1 _ , I I 1 I L L 1 t 1 1 I 1 1 1 1 , 1 1 1 I I I_ _ _LJ_ 1 _ L I I 1 I .
1 1 1 1 1 1 1 I 1 11111111 I I I I I 'I 1 1 1 Y// I 1 1 1 4 I I -1 I III ill 1 1 I I 1 I I 1 1 1 I 1 , 1 1 1 I 1 1 1 1
•
•
, 1 1 1 l t 1 1 1 , I I 1 I 1 l 1 1 1 1 1 1 • 4 i . 1 1 1 1 1 11 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 III MI I I I '
I '
1 1 , I , I I 1 I 1 , I I 1 I , 1 1 , I 1 I I 1 1 1 1�//. 1 I I, 1 4_1 1 1u1 1 I I 1 I 1 1 l 1 III III iii III L 1 I 1 1
015TRlBUTION
. I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY C.R.A,B.(COUNTIES ONLY)
Jan, 1980
1984 OVERLAYS
1/U GAS TAX PROJECTS
' Williams Ave. South
from S 4th St. to Grady Way $23,800.00
SE 5th Street
from Maple Valley to Dead End $24,500.00
SE 6th Street
from Newport Ave. SE to Dead End $11 ,375.00
SE 6th Street
from SE 5th St. to Newport Ave. SE $14,000.00
$73,675.00
•
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2516
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY' S SIX YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 1984-1989 ' -
WHEREAS the City of Renton has heretofore adopted a "Six-
Year Transportation Improvement Program" pursuant to Chapter 7 ,
Extraordinary Session Laws of the State of Washington, and Chapter
195 of the 1961 Session Laws of the State of Washington, and as
same has heretofore been amended from time to time , and such plan
and program having heretofore been duly amended and modified from time
to time as authorized by law; and
WHEREAS the City Council , after recommendation of its Public
Works Department, caused to be held a public hearing thereon on June
20, 1983 , and after notice to the public as provided by law, for the
purpose of considering adoption, modification and amendments of said
plan and program, and
WHEREAS at such public hearing held on June 20, 1983 , due ,
consideration was given to the proposed changes and amendments for
the purpose of updating such plan and program, NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS :
SECTION I : The City' s "Six-Year Transportation Improvement
Program" and the City' s "Arterial Street Plan" are hereby further
amended and modified, all as more particularly shown on the attached
Exhibits "A" , "B" and "C" incorporated herein as if fully set forth.
.
SECTION II : The aforestated plan and program, as evidenced
by said Exhibits shall be and constitute the City' s "Six-Year Trans-
portation Improvement Program" and the City' s "Arterial Street Plan"
and same to remain in full force and effect until further revised,
amended and modified as provided by law.
SECTION III : The Director of Public Works and the City Clerk
are hereby authorized and directed to file this Resolution together
with the Exhibits with the Director of Highways for the State of
Washington, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 27th day of June, 1983 .
Marilyn J Pe ersen, Deputy City Clerk
APPROVED BY THE MAYOR this 27th day of June, 1983 .
c Gs1w �0c.L..
Barbara Y. hinpocH, Mayor
Approved as to form:
Laence J. Wagen, City Attorney
•
•
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1984 — 1989
CITY
PRIORITY # ANNUAL ELEMENT PROJECTS
1 Grady Way Bridge Replacement
2 Renton Area Transportation Study •
3 Wells Avenue Bridge Replacement
4 Garden Ave. N, N 4th St. to N 4th St.
5 SW Grady Way, Lind Ave. SW to Longacres Dr.
6 NE 3rd St./NE 4th St. , Sunset Blvd. N to Union Ave. NE
7 Talbot Road S, S 16th St. to S 41st St.
8 N 1st St., Park Ave. N to Burnett Ave. N
9 S 2nd St. & Burnett Ave. S Intersection
10 Monroe Ave. NE, NE 6th St. to SE 12th St.
11 Rainier Ave. S, S Grady Way to Airport Way
12 SW Sunset Blvd. , Rainier Ave. S to Stevens Ave. SW
13 Miscellaneous Street Improvements
14 Lind Ave. SW, SW 16th St. to SW Grady Way
SECOND YEAR PROJECTS
15 Rainier Ave. S & S Grady Way Intersection
16 SW 16th St., Lind Ave. SW to Monster Road SW
THIRD YEAR PROJECTS
17 S 7th .St., Rainier Ave. S to Smithers Ave. S
18 Oakesdale Ave. SW, SW Grady Way to Sunset Highway (.SR 900)
19 Oakesdale Ave. SW, SW 16th St. to SW 34th St.
FOURTH - SIXTH YEAR PROJECTS
20 Oakesdale Ave. SW, SW 16th St. to SW Grady Way
21 Lake Washington Blvd. N, N Park Dr. to City Limits
22 SW 27th St. , Oakesdale Ave. SW to West Valley Road
23 SE Puget Dr. , Jones Place SE to Edmonds Ave. SE
24 Monster Road SW - Alternate Access
25 Sunset Blvd. NE, I-405 to NE Park Dr.
26 Taylor Ave. NW, Renton Ave. Ext. to Stevens Ave. NW
27 NE 12th St. , Lynnwood Ave. NE to Union Ave. NE
28 Union Ave. NE, NE Sunset Blvd. to NE 24th St.
29 Edmonds Ave. Extension
30 N/NE 3rd St. - I-405 Undercrossing
31 Union Ave. NE/SE, NE 4th St. to SE 4th St.
32 Miscellaneous Railroad Crossing Improvement
Rev. 6/20/83
is IA ,-z
•SIX YEAR. TRAN5PORTATION IMPROVEMENT PROGRAM 19 8 4 TO 19 89. Page 1 of 5 .
— OBLIGATION PROGRAM -" Hearing pate June 20, 1983
EXHIBIT "A" Adoption Date June 27, 1983
__Cify/"County ..Keypunching Mote: Data entered in cols 1-8 mustResolution Number
2516
City No. 1 0 7 0 3_0 be an all cards punched from
County No. 1 7 7-8 this form. 0 x PRO-J:ECT_COSTS" IN THOUSANDS OF 'DOLLARS
o
PROJECT IDENTIFICATION •0 ,°t OBLiGAT1ON : SCH'E.DULE FUNDING SOURCE
2 Title,Route,Road Log No., Section No., or
o Work -Total __ YEAR_ .
Location Termini,Deecription of Work, 03 Code Length .2 \ ;o r FEDERAL TOTAL
UBeginning Milepost Bridge No. •d o (Miles) s . (An��d1 2nd 3 rd 4,5 U.A.B. LOCAL FUNDS
w Ii a C.) Element) 6th i4M0UNT PROGRAM
-i - L3 - 4 5 0 7 8 3 ._ . :10 . II 12 13 -::.. 14 15 18. I7
-J
. 3936 ' 37 40 _
41 44 45 4s SR 48 52__ . 55 SG 59 CO 63 44 '67 ea 7l 72 75 76 7965 8$
G,R,A,D,Y1 1W,A,Y1 IB,R,IIDIGIE, •1RIEIP,LIALCIEIMIEIN 4RA,B,D1H ,01110 M U X 191319‘412, 217.412, 217 A. 1 1 8t21119r I I I ` 1 1161111714. I ►91319134
1. Bridge Replacement (joint with Tukwila) Construction. L Bridge Forward
Repl. Thr. &
Tukwila
2 R,E,N1T,O,NL ,AI R, E,A, IT1R,A1NLS,P,0, R1T1 ,S1,T,U1D1Y 8W U, , , , 1 , U , , 310 1 , 3, 0 , 1 I III III III j I I I L6'0 1 , I i610
Develop a multi-modal transportation plan for the .
city. (Phase II)
+3� WELLS AVE 'B R I D G E R E P L A C E M E N 4 ' ABFG 0 4 S U X 1 0 0 0 6 8 0 1 3 4 4 ' • _ . 8 6
H J L
Bridge Replacement.
G,AIR,D,E,NI jA,V, E, 1—I 1NT�
, ,4,TIH, , 01 ,NJ ,81T,H 2 , B1D1F1G 1 12,5 S U 131010 1 1 1 5 I I III III 11 I . I I I 1310LO I I 131010
4
Drainage, paving, curb, sidewalks, illumination and H J U.A.B. L.I.D.
channelization. possible
I
SIW, IG, R,AID, Y1 , LIIINID1 1T1O1 ILIO,NIGIAIC,RIELSI 2MB1D,F,G , 4 7,0 S U 1, 5, 010 III III IIII I I I I I I III 1151010 I 11151010
5- Drainage, paving, curbs, sidewalk, illumination, H J L • • FAUS U.A.B. L.I.D.
channelization, P-1 BR. 56' roadway taper w/half to possible possible
44' dpsigp stoney
NE 3RD NE 4TH - SUNSET - UNION 2 / BDFG 1 2 3 M U 2 8 0 2 5 2 2 8 2 8.0
6 . Drainage, reconstruct eastbound traffic lanes, install H U.A.B. UAB w/ '
telemetry for water and sewer to City Shops. zG Gas Match
help from King Co.
T,A,L,BIO,T, , RID, -,SI 11, 61T,H1 IT1O, , S1 41ST2 /B,DF,G ,148,0 C U 11, 010 1 1 1 I I I I I "1 I I I I I I I 1910 I 1110. I I , 1, 010
7• Drainage, paving, shoulders, pre-level, channeliza- H J Forward 50%
tion (joint with King County) . Thrust King
possible
NI 1l, S, TI , -, , P1A,RIK, ,T,01 ,BIUIRINIEITITI 1 J 1 4 /„BIDIFIH ,01312 C U 111015 1 I I 1 1 1 11 I I I I I I I I I I ,11015 1 I 111015
8 . Reconstruction - new curbs, gutters, A.C. pavement, 12 Gas
storm drainage, coordinate w/12" watermain and new U.A.B.
sanitary sewer. _ ,
Dt5TR,BUTIOM
I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY C.R.A.8,(CoUNT1E5 ONLY)
Jan. IRO
- 151A.11!23 X - YEAR TRANSPORTATION IMPROVEMENT PROGRAM IS 84 TO 1989 Page 2 of 5 •
— OBLIGATION PROGRAM — }searing Date June 20, 1983
EXHIBIT "A" Adoption Date June 27, 1983
__City/Count _Keypunching Note: Data entered in cols I-S must Resolution Number 2516 -
City No. 1 0 7 0 3 ,24 on all cards punched from
County No. 1. 7 7-8 this -Form. II -, PR O-JECT_CO5T5' 1 N THOUSANDS- OF 'DOLLARS
c r•
• PROJECT IDENTIFICATION .qY ,°o OBL[GATION:'S'CH'EDUL FUNDING SOURCE
z Title,Route,Road Log No., Section No., L Tota( d a ___Y___E . A R
„o Work FEDERAL TOTAL
£ I„ocation Termini,Deacripiion of Work, Code M Legh u �` g, i sit- z nd � 3rd 4,5 U.A.B. LOCAL. FUND S
N Beginning Milepost Drid9e No. 0 /M.
)• ,? a S Eement)
6th AMOUNT PROGRAM
.4 .__8 _ 4 . _. 5 0 7 8 °� . _
-9 __ . 15 as 87 4041 44 . ll t2 13 !4. 15 16. 17'
,45 4$,47 4Q • Si5T 52____ SS SO S9 60 G3 04 C1 A 11 12 7S 76 7D AD as
9• S I 121N,D1 ,&I ,B1U►R,NIEIT,T, IIINIT,EIRISLEICITII 10 6 VII L 1 ,01018 M U 1 .1210 1 - , I ♦ LII 1 1 1 . 1 1 1 . 1 1 1 I i 1 . 1 12,0, 1 i" 1 1210)
Traffic signal installation with surplus equipment.
M ,O,N,RJO,EL ,A,V, ,NIEL 161T,HL ,T.1.O, 1N1E1 11 ,2 ,T1H 2 MBIDIF ,G , 13,8 C U 1,5, 810 1 1 1 III III Ili 111 III 115L8,0 1 , 11 51 81 0
10. Drainage, paving, curbs, sidewalk, illumination, H J UAB 25% LID
channelization. possible Fwd.Th.
possible
R A I N I E R - G R •A D Y TO AIRPORT W Y 6 IS 1 0 0 M U 1 3 0 1 0 8 2 2 1 3 0
11.
Installation traffic detection system, update FAUS
controllers, new loops for traffic flow monitoring,
time of day signing. .
S ,W, ,S,U ,N,S1E,T1- ,RIAIIIN1I1E,R1 ,T,O1 ,SIT1E,VIE ,N 2 lBLDIFIG 101412 M U 121510 1 1 1 1 , i 11 I , 12L310 I I I ii 1 1 12E0 1 1 , 2, 51 0
12. Add two-way left turn lane, traffic signal improve- H I J FAUS Forward
ment, underground power, new street lights. -Coordin- - Thrust
ate w/12" watermain and sanitary sewer possible
1,4 1S 1C1E L,L 1A1N 1E ,() ,U iSi ,S '1 R 1E 1E,T1 IIIMIP1R,OIV 4 jD1 , 1 1 1 17,4 I I I , I I 1 1 1 I I I I I I 11 1 I 1714 11 1 1714
13. Street Division Overlays. See attached sheet with
• listings. -
LIND AVE S W 1 6TH T O SW G R A D•Y 2 B D F G 0 2 OSU 2 4 0 0 2 4 0 0 2 4 0 0
14. Drainage, paving, curbs, gutter, sidewalk, illumine- HIJL UAB Developer
tion, signal, channelization, bike route, landscaping, M 0 possible,
FAI-405 Bridge, roadway. Jobs Now possibe
RAINIER & S GRADY WY I N T E R S 2 V A B F H 2 5 M U 1 5 0 5 0 S
15. Add new eastbound right turn lane to freeway on-ramp. I J LID
SSW , L116 ,TIH, ,LII ,N,D, ,A,VIE , ,T101 'LOIN IS,T ,E ,R 2R.BID'FIG 1 1910 C U 1 1 1 2101010 , 1 1 1 1 1 1 , 1 1 1 , , 1 1 2 ,01010 I ,2,0,010
16. Drainage, paving, curbs, gutters, sidewalks, illum- H J L
UAB LID 100%
ination, channelization, bridge and roadway. possible Fwd.Th.
. possible _
D15TRtBUTIOI4 '
I COPY PISTRICT STATE AID st4OttI ER
DOT 140-049
.1..... „p,� 1 COPY C.R.A.B.(CouAiTIES ONLY)
•5-X - YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19 8 4 TO 1989 Page 3 of 5 .
— OBLIGATION PROGRAM — Hearing Date June 20, 1983
EXHIBIT "A" Adoption Date June 27, 1983
_:City/.County • _Keypunching Note: Data entered in cots I-S must Resolution Number 2516
City No. 1 0 7 0 3=3 be en all cards punched from ; •
• County t1o. 1 7 7-8 this -Form. 8 RPROD:ECT.COSTS' m THOUSANDS OF 'DOLLARS
• PROJECT IDENTIFICATION �Y ,°Q _1 OBLIGATION _S•CH'E.DULE .FUNDING SOURCE
z 'Tit le,Route,Road LogNo., Section No., s Total d t " _ ___Y__E . A R
�o WorkFEDERAL _TOTAL
Location Terrnini,Description of Work, 03 "Length \ •o
-� Code. 9 �= - tat - 2nd 3rd 4 5 U.A.B. LOCAL FUND5
P. Beginning Mitepoof 4 Drid9e No. . •d a (Miles) : r (An��� . 6th AMOUNT PROGRAM
;.., k: a 0 Element)
• —i .1. -3 - 4 .. .-. 5 6 7 8 5 :10 . 11 12 13 14 15 16. I7`
s5 54 •'. 87 4Q 41 44 45 46 47 49 ' Si 52__:._ 75 30 . 30 co 63 64 '67118 II 72 75 76 78 BO 38
17. S , ,71T,H1 IRIA,IINII,EIRI ,T,0, 1SIM,IITIHIE1R1S1 1 2RA,B1DIF , 1,510 S U i I 1 • 1 • , I ,21210. 1 I I 11 1 . 1 1 1 ‘ •1 1 i • 121210. l 1 121210,
Drainage, paving, curbs, gutters, sidewalks, ilium- FAUS & Devel-
ination, channelization. Fwd.Th. oper &
possible LID
18. O ,A,K,E,S,D,A,L,E, ,S1W1,1G1R,AD1Y1-,SUNSET, 1H 1 A,B1D1F 100 M U 5, 510,0 , 1 1 1 1 1 I „ 1 , 1 51510 ,0 I ,5,5,010
Grading, drainage, paving, curbs, sidewalk, gutter, GHIJ U.A.B. Devel-
•
illumination, signal, bike route, channelization, L M 0 possible oper •
landscaping, bridge, roadway.
19. 01A1K1E1S,D,AIL,E1 1AV,-ISW,I6,TiH1 1-I 1S1W1 ,3 ,4 1A,B,D,F ,117,0 M U 1 1 1 I , I 3, 01010 3101010 I I I I I I , 1 1 60100 I 16101010
Grading, drainage, paving, curbs, gutters, sidewalk, GHIJ Devel-
illumination, signal, bike route, channelization, . L M 0 oper .
landscaping, bridge.
2l). O A K E S DALE A V - S W 1 6 T H - G R A D Y 1 //A B D G 0 1 0 M U 5 e 0 0 5 0 0 0 5 0 0 0
Grading, drainage, paving, curbs, gutter, sidewalk, HIJL UAB 20% LID
illumination, signal, bike route, channelization, M 0 possible
landscaping, bridge, roadway. •
21. L K WASH BLVD N PK TO CITY L 2 ,B D F G 3 0 3 S U 4 8 0 0 4 8 0 0 4 8 0 0
Drainage, paving, curbs, sidewalks, gutter, illumin- UAB 25% LID
• ation, channelization, bikeway. possible •
22. S W 2 7TH - O A K E S D A L E - W V ' L L'E 1 ABDF 0 5 3 S U' 2 5 0 0 2 5 0 0 2 5 0 0
Grading, drainage, paving, curbs, gutter, sidewalks, GHIJ Devel-
illumination, signal, bike route, channelization, L M 0 oper
landscaping, roadway. •
23. S E P U GET - J O N E S TO EDMONDS 2 V B D F G 0 7 8 S U 9 . i 9 6 0 9 6 0
Drainage, paving, curbs, sidewalk, gutter, illumina- Forward
tion, channelization, roadway. Thrust
possible
24. MIO1N,S,T,E,R, ,RID,- 1A1LIT,EIR,N ,A1T1E1 ,AICIC,E ,SIS 1 AIB,DIF 104212 C U i 1 i 1 ii 1 1 1 121110 III 1 1 1 , 1 ► ,21110 11 121110
Realignment of roadway. H J UAB Forward
possible Thrust
• , - - -. pnssibl P _
D151121 BUT 1 ON
I COPY U15TRICT STATE AID ENGINEER
ooT 140-049 I COPY C,R.A.B.(COUNTIES ONLY)
Jan. 19RO
[5IA,1.2 Mi X - YEAR. TRANSPORTATION IMPROVEMENT PROGRAM 19 8 4 TO 19 89 Page 4 of. 5
- OBLIGATION PROGRAM - June"A"
hearing Date June 20, 1983 •
Adoption Date June 27, 1983
_:City/.County • _Keypunching Note: Data entered in cola I-8 must Resolution Number 2516
_. City No. 1.1 I O 17 0,3=.6 be an all cards punched from i •
• County No, l 7 7-8 'this form. g x PR O-J:ECT.COSTS 11\1 THOUSANDS• OF 'DOLLARS
or
• PROSECT IDENTIFICATION qY _ 1 OBLIGATION.5CH'EDULE _FUNDING' SOURCE
z 'Title,Route,Road LogNo., Section No., Z'o.tal d ___.Y__E-. A R
2,o Work FEDERAL .TOTAL
Location Termini Deocri -tion of Work ..3 Length \ .o
P o Code 46 'a 1 at . 2nd 3rd 4,5 U.A.B. LOCAL FUNDS
a Beginning Milepost 4 Bridge No. --34.-
t, (Miles) ,� . r (Ann�� elf 6th AMOl1NT PROGRAM
,.., 2 . y,: a 0 Element)
1-3 - 4 .. 5 8 7 B " 5 .._. 10 11 12 '. 13 - 14 15 16. 17`
9 S3 34 `. 37 40 41 44 41S 48 47 48 ' Si 52__1_ 55 50 ' 59 80 0 04 67 48 71 12 73 76 78 80 88
SIUINISIEIT1 IB,LIVIDI II1410,5, 1T101 IPIALRIKI }DIR. 2RB,DIFIG ,01910 S U 1 -1 1 , - 1 I 11 1 •1181010 I I I . I I 1 4 i 1 I .1181010, i ili81010�
25. Drainage, paving, curbs, sidewalk, gutters, channel- H J Forward
ization, illumination and bikeway. Thrust
. possible
TIALY,L,O,R, ,NIW, ,RIEINIT10,N, ,T10, I.SITIELV,EINIS 2M.B,D,F,G ,016, 0 C U , 1 , III 1 1 I , 71 210 1 , 1 III , 1 , 17 ,210 1 , ,71210
26. Drainage, paving, curbs, gutters, sidewalks, ilium- H J U.A.B. 25% LID
ination, channelization. possible Fwd.Thr.
possible
�
NE 12TH LYNNWOOD TO UNION 2 ' B D F G 0 6 0 C U 1 0 0 0 1 0 0 0 1 0 0 0
27' Drainage, paving, curbs, gutters, sidewalks, ilium- H J U.A.B. 50% LID
ination, channelization. possible Fwd.Thr.
possible
UNION AV NE SUNSET TO N E 2 4 T 2 / B D F G 0 7 0 S U • 1 1 6 0 0 6 0 0
28. Drainage, paving, curbs, gutter, sidewalk, channel- H 50% LID
ization. Fwd.Thr.
,possible
E D M O N D S AVE EXTENSION 1 V A B D F 0 7 9
29• NE 3rd to Maple Valley Highway GHIL •.
K
N,/,N,E, 13,R,D, 1S ,T, III-J4,015 , ,U1NIDIEIR,C,R 0 S A : P I • S U 1 0 0 0 9 0 1 0 1 0 0 0
30. Widening - add two more travel lanes. GHIJ U.A.B.
UNION NE SE NE 4TH - SE 4 T 2 , B D F 7 2 S 7 2 0 • 7 0
31. Drainage, paving, curbs, gutters, sidewalks, H LID
illumination, channelization. Fwd.Th.
possible _
MIIIS,CI 1R,A, I,L1R,O,A,D, 1XiI,N1G, ,I,M1PIR,01V, , 4R,C1D,H1J X1215 S U .1 1 i , 1 I 1 1 1 11 310 11 21 7 1 1 1 1 , 1 1 ,3 1 , 1 1310
32. Miscellaneous surfacing, channelization, lighting K FASP
and signing. _
Dt5TRL BUT I O1V
-
•
l COPY DISTRICT STATE AtD EN&tN£ER
DOT 140-049 I COPY C.R.A.B.(COUM.TIE5 ONLY)
Jan, 1980
•SIA ,-2. 5-X - YEAR. TRANSPORTATION IMPROVEMENT PROGRAM 19 84 TO. 19 89 Page 5 of 5
— OBLIGATION PROGRAMHEaring Date June 20, 1983
EXHIBIT "A" Adoption Date June 27. 1983 .
_1 Cify/.County • _Keypunching Note: Data entered in cols 1-8 must ADDENDUM #1 - STATE HIGHWAY PROJECTS Resolution Number 2516
. City .No. 1 0 7 0 3-6 be on all cards punched from
County Nn. -1 7 7-8 fhis Form. 2 R • PR-OJ:ECT CO5T5. 1 N THOUSANDS OF 'DOLLARS
• e ry
• PROJECT IDENTIFICATION qY DBL[GAT1ON.:.SCH'E.DULE FUNDING SOURCE
Z Title,Route, Road Log No., Section No., Tota( d L
. Work 7 -__Y._E
Location Termini,Deecripiion of Works 03 Length F. \ .o FEDERAL, TOTAL
q Beginn.Ing Milepost bridge No. .�o Code {Miles) .� '�(Annual 2nd • 3rd 4:5—
" ' U.A.B. 1,ACAL FUNDS
i y oc '5 Element) 6th AMOUNT PROGRAM
-
• _i _ . 2 . • --sl - 4 . 5 8 7 8 9 -_. JO O . li 1Z . 13 - • 14 15 1G. I?`.
. b5 3C_:-.,37 40,41 44 45 48J47 4B '' S1 52____ . 55 SO 58.46 C9 64 •G7 48 '11 7P 75 78 78 ea 85
F,A,I[ ,4,0151 ,N1 ,C, I,TIY, 1T101 ISI 1C1I1T1Y1 1 1 2l%/� 11 I ,6,414 M U 1I 1 I • I I ♦ t 11 I , I l I . l 1 I 11 I 1 1 1 . 1 1 1 1 1
State DOT Project - capacity improvements. HOV lanes. -
SIR, ,1,619, ,Q,U1E,EJN, IS,E1 „T10, , 1, 4191TIH, ISLE 1I/!/. I I „144,4 M U 1 1 I I I I III III I l I I I I ILI I I_ I I I I I I
State Project - construct five lane roadway.
SIR! 191010, IR,EtNI•TIOINI IT1OI IIISISlA101UiAIHI i 2P, 1 1 1 1,110,0 M U 1 1 1 f I L I I l t ill 11 1 I I I Ili I1 1 I I _
State Project - widen to four lanes with five lanes
at intersections.
•
. 1 I _II I I I 1 1 1 1 1 1 I_ 1 I 1 I I I I I I I 1 I / I J 1 _ I j I I I I 1 I I I 1 I I I 1 1 L I I 1 1 1 1 1 1 1_ 1 1 i 1 1 I _
•
I 1 I 1 1 I 1 1 1 1 1 I 1 I I I I I 1 I 1 I 1 1 1 I Y//, 1 I I 1 1 I 1 I 1 I I 1 1 I I I 1 1 I 1 1 I I 1 I I I I I 1 I l 1 1 I
•
•
. . /
•
I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I P.. 1 1 1 1 ; 1 ,. I 1 I I 1 1 I L I I I .I I I I I 1 1 I I I I 1 I 1 1 1 1 1
1 1 L I . 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 , 1 1 1 1 I_ 1///w I l 1. i 1 1 1 1 i 1 I 1 111 1 I 1 Ill 1 I 1 III I - 1 1 J 1 1 1 1
•
o 5TRIBu7ION
• I COPY DISTRICT STATE AID ENGINI ER
ooT 140-049 I COPY C.R.A,B.(COUNTIE5 ONLY) •
Jan. 1980
1984 OVERLAYS
1/2G GAS TAX PROJECTS
' Williams Ave. South
from S 4th St. to Grady Way $23,800.00
SE 5th Street
from Maple Valley to Dead End $24,500.00
SE 6th Street
from Newport Ave. SE to Dead End $11 ,375.00
SE 6th Street
from SE 5th St. to Newport Ave. SE $14,000.00
$73,675.00
17,
1�Q JIM,
9C
� �
-
Y
p. pet
ill. .i_ Si to •ru,w
w �� >lll�'s I•-►j .�!tf,i 01 �/
''
I mill
Z
•Z.
Cm
t
3
i
t
SOUTHERN PORTION
MAJOR ARTFRIALS
1. Airport Nay Erom Ra lnler Ave. S to Logan Ave. S
2. Bronson May S/Bronson Nay N rrrnn Win Ave. S t. Sunset Blvd. N
3. Logan Ave. S/Logan Ave. N fmm Airport Nay to N 6th St.
s. Logan Ave. S/Smithers Ave. S from Airport May to S 7th St.
S. Win Are. S from S C,rady Nay to Bronson Way S
6. WPle Yalley Highway from Sunset Blvd. N to Fast City I.imitf
7. N 3rd St. from Logan Ave. N to Sunset Blvd. N
B. N 3rd P1./N Ath St, from Houser May N to Loran Are. N
9. NE 3rd St./NE Ath St. from Sunset Blvd. N to East City Limits
10. Park Ave. N from Bronson Nay N to N Park Dr.
It. N Part Dr./NE Park Dr. from Park Ave. N to Edmonds Ave. Nr
12. NE Suuet Blvd. from Edmonds Ave. NE to Fast City Limits
IS. Re Ala Are. N/Balm to
Ave. S from North City Limits to S Cradv Nar
is. 5 Ind St. fro. Win Ave. S to Rainier Ave. S
IS. 5 3rd St. from Rainier Ave. S to Win Ara. S
16. Banton Ave. Extension from Rminler Ave. S to most City Limits
l7. IN Sunset Blvd. from Nest City Limits to Rainier Ave. S
ill Sunset Blvd. N from Bronson Nay N to FAI e05
19. Houser May S/Houser Nay N from Win Ave. South to Rrenson May N
20. South Grady Nay from Rainier Ave. S to Mein Ave. S
21. N Vmi1.Y Road from SN Alyd St. to North City Limits
22. SM a3rd St./S 13rd St. from N Valley Road to Ta lhot Road S
23, Talbot Road S from S 7th St. to 5 Puget Drive
24. Davison on re 5 from S PuRet Drive to South City Limits
2S. O.kasdale Ave. SW from SM Ilyd St, to Sunset Highway
26. N 6th St. from 11Ran Ave. N to Park Ave. N
SFC:ONDARY ARTERIALS
27. Benson koad 5 from 5 Grady Nay to S City Limits
21. Lind Ave. IN from SN 7th St. to SN 4
3rd St.
29. SN Grady Nary fmn R.inler Ave. S to most
City Lldts
30. 5 Puget Drive/PuRet Drive SF from Talbot Road S to Pdmonds Ave. Sr
31. Edmonds Ave. SE from Puget Drive SE to South City Limits
32. 5 Ath Pl./S ath St. from Rainier Ave. S to Main Ave. S
33, Sh attuok Ave. S from 5 ath St. to S Grady Nay
34. S 7th St./SW 7th Street from Burnett Ave. S to Oakesdaie Ave. SIN
3S. M1II Ave. 5 from Houser Nay S to Bronson Nay S
36. S 2nd St. from Mill Ave. S to Win Ave. S
37. Malls Ave. S/Malls Ave. N fmn S Grady Nay to S 6th St.
38. Williams Ave, N/Ntlit-$ Ave. S from N 6th St. to S Cradv Nar
39. N 6th St. from Park Ave. M to Garden Ave. N
40. Garden Ave. N from Bronson May N to N Park Drive
41. N ath St. from Park Ave. N to Garden Ave. N (North Lee)
42. Sunset Blvd. ME from FAI a05 to 'IF Perk Drive
♦7. Onion AVe. NE from South City Limits to North City Limits
H . Edmonds Ave. NE from NE Sunset Blvd. to SIT 27th St.
AS. NE 30th St./Kennet ck Place NE/NE 27th St. from FAI 405 to Edmonds Ave. NF
46. N 30th St. from Burnett Ave. N to FAI 4
05
47. Lake Neshi ngton Blvd. NINE from N Park Drive to North City Limits
96IN 27th St. from Nest Valley Road to East Yal tey Road
49: Duvall AVe. HE Evan North City Limits to South City Limits
COLLECTOR ARTERIALS
So. Park Ave. N/N 40th St. from N loth St. to Lake Washington Blvd. N
SI. 9urnott Ave. N from Lek. N.shlAgton Blvd. N (S. Tenn.) to take NasA. Blvd. N (N. Tem.)
S2. Aberdeen Are. NE from Sunset Blvd. NP. to HE 27th St.
S3. WE 16th St. frw Jones Ave. NE to Edmonds AV a. ME
K. WE l2th St, from Edmonds Ave, NF to Union Ave. NE
SS. Monro. Ave, HE fmn NE Ind St. to HE 12th St.
S6. ME 2nd St. from Monroe Ave. WE
to City Shops Fntry
S7. WE loth St. from ME Sunset Blvd. to Monroe Ave. NF
SB. WE 7th St. from NE Sunset Blvd. to Monroe Ave. NF
59. Edmonds Ave. Ne from HE Sunset Blvd. to We 9th It.
60. Bronson Nay ME/NF Ith St. from NE 3rd St. to Jefferson Ave. ME
61. Taylor Are. NE/T.yl or P1. NW from Renton Ave. Es tension to Nest City Limits
62. Mead" Ave. North from Bronson Nay N to N Ith St.
63. Factory Ave. N from Bronson Nay N to N 4th St.
61, SW Langston Road from SW Sunset Blvd. to We
City Limits
65. S 3rd Pl. fro. Rainier Av.. S to Shattuck Ave. S
66. Shattuck Ave. S from S 2nd St. to S Ath St.
67. Whit wo rth Ave. S from S Ind 3t. to S Ath St.
69. Morris Ave. S from 5 2nd St. to S Ath It.
69. Burnett Ave. 5 from S 2nd St. to S 7th St.
70. Non ter Road SW from 5 hs Oth St. to IN 16th St.
71. SN 16th St. fmn East Valley Road to Monster (load SN
72. East Y.i,.y Road from SW 16th St. to IN 4
3rd St.
73. Talbot Road S from S 16th St. to South City Limits
7s, SN /1st St. from Fast Yalley Road to Oakesd.l. Are. 51
7S. IN lath St. from East Valley Road to Oakes da is Ars. SW
as 016
MERCER
I S L A N D
I
c
O
(SEE INSERT ABOVE
FOR SOUTHERN PORTION
0
PMT 1
t
I
•
O
1
4'
1■l■1■�M■1■l■ PRINCIPAL ARTERIAL
�� ■ B� ■
❑ MINOR ARTERIAL
■■■■a■■■■ COLLECTOR ARTERIAL
- T-TT'RTT'
(n, •'linr�^�,�
1-9 8 3
ARTERIAL
STREETS
Gfvy fj
r.,
SCALE 1"-800'
EXHIBIT V
HEARING ✓UNE 20, /983
ADOPTED ✓UNE 27, /983
RESOLUTION 2516