AMENDMENT NO. 4 TO AGREEMENT FOR REPLACEMENT OF
HIGHLANDS 435 PRESSURE ZONE RESERVOIRS AND MAINS -
FINAL DESIGN AND BIDDING CAG-16-103
THIS AMENDMENT, dated October 29, 2019, is by and between the City of Renton (the "City"), a
Washington municipal corporation, and RH2 Engineering, Inc. ("Consultant"), a Washington
corporation. The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-16-103, dated
June 8, 2016,to provide necessary services for the Replacement of Highlands 435 Pressure Zone
Reservoirs and Mains- Final Design and Bidding (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide addition engineering
services and additional time to accommodate the additional work. •
NOW THEREFORE, It is mutually agreed upon that CAG-16-103 is amended as follows:
1. Scope of Work: Section I, Scope of Work, is amended to add work as specified in Exhibit
A-4, which is attached and incorporated herein.
2. Time of Performance:Section V,Time of Beginning and Completion,is amended pursuant
to the schedule(s) set forth in Exhibit 13-4. All Work shall be performed by no later than
December 31, 2020.
3. Compensation: Section VI, Payment, is amended so that the maximum amount of
compensation payable to Consultant is increased by $199,600 from $924,364 to
$1,123,964, plus any applicable state and local sales taxes.The additional compensation
shall be paid based upon Work actually performed according to the rate(s) or amounts
specified in Exhibit C-4, which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF,the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
By: By:
Denis Law Tony ardi
Mayor P ident
V(46,/, /v 3a/9
Date Date
' I
Attest �.
Ja n A. Seth
y Clerk
Approved as to Legal Form
Shane Moloney
Renton City Attorney
Contract Template Updated 09/27/2029
F RE
SEAL -
9Y — SEAL s #
eiFt
io°A'A IED,S'Q``````.
PAGE 2 OF 2
EXHIBIT A-4 — Scope of Work
Amendment No. 4
City of Renton
Highlands 435 Pressure Zone Reservoir Improvements
Phase 1 — 6.3 MG Reservoir and Transmission Main
Final Design
Professional Engineering Services
October 2019
Background
RH2 Engineering, Inc., (RH2) is currently providing engineering services for the design and bidding of
a new 6.3 million-gallon (MG)reservoir and 24-inch transmission main to replace the City of Renton's
(City) existing Highlands 435 Pressure Zone (PZ) reservoirs and transmission main, as well as other
associated improvements. While originally it was assumed that the project would be bid as a single
project, the City has decided to separate the project into multiple phases that will be bid and
constructed separately. Other changes have also occurred during the final design stage which have
affected the project schedule and increased the project complexity which has resulted in additional
design and engineering costs. Design for the Phase 1: 435 Zone and 565 Zone Water Main
Improvements was completed in June 2019 and documents submitted to the City. Design for the
Phase 2: Highlands 435 Zone Reservoir is at approximately 90-percent completion and is expected to
be completed and submitted for permits by Winter 2019/2020 to facilitate a Summer 2020
construction season. This Amendment is an authorization to revise the project Scope of Work and
Fee Estimate (Exhibit C-4) as described below to provide additional services necessary to complete
design and permitting efforts associated with Phase 1 and to provide professional services during
construction for Phase 1.
The estimated level of effort to complete the Phase 1 design was not commensurate of the level of
complexity associated with the installation of the proposed improvements within the NE 12th Street
corridor. Specifically, the full extent of the congested/constraining nature of the utilities within the
NE 12th Street corridor was not identified until after the topographic survey and follow-up
geotechnical and subsurface utility investigations were completed as part of the final design scope
of work. Further, the construction phasing and water system operational limitations further
compounded the efforts needed to complete the design for the off-site and frontage improvements.
Finally,the City has requested that RH2 provide additional design and permitting services to support
the utility coordination, construction permitting, and traffic control planning efforts currently
underway by City staff. Work associated with these tasks is expected to be performed as requested
by the City and on an as-needed time and expense basis, not to exceed the fee estimated in Exhibit
C-4.
The Scope of Work is amended to include the following amended and additional tasks.
•
10/15/20199.49.38 AMZ:\Bothell\Data\REN\113-104\00 Contracts and PM\Project Scoping\Final Design-Amendment 4\PSA_AMEND NO.4_ExhibitA SOW_Final Design and SDC.docx
City of Renton Amendment No.4
Highlands 435 PZ Reservoir Improvements Exhibit A
6.3 MG Reservoir and Transmission Main Scope of Work
GENERAL PROJECT TASKS
Task 1— Project Management Services (Amending Fee Only)
Objective: Provide additional project management services in accordance with the original Scope of
Work for the additional design services provided herein.
Approach:
1.6 Provide additional project management services in accordance with the original Scope of
Work for the additional design services provided herein. This change results in an increase in
fee but does not result in a scope modification.
SCHEDULES B AND C— OFF-SITE WATER MAIN AND FRONTAGE IMPROVEMENTS
Task B-3 .Off-site Water Main Final Design (Amending Scope and Fee)
Objective: Expand the scope of the final water main design tasks to include additional design services
to adequately detail the proposed improvements and to develop comprehensive phasing plans to
address operational limitations associated with the water system, the sequencing for construction
of the proposed improvements, traffic impacts, and timing for restorative efforts. Additional tasks
included the development of additional design drawings including details, upgrades to Highlands
Booster Pump Station (BPS), a pressure reducing valve (PRV) station, and construction phasing, as
well as the supporting advancements to the technical specifications and cost estimate and associated
quality assurance/quality control (QA/QC) reviews.
Approach
B.3.8 Prepare Additional Utility Design Documents — Provide additional design drawings as
necessary to address the proposed improvements and the associated challenges inherent
with the congested utility corridor and the operability of the water system during project
phasing. Update project specifications to address construction phasing requirements and
added design elements to facilitate water system operations.
B.3.8.1 Prepare design drawings for an added PRV Station and Highlands BPS electrical
improvements needed for construction phasing/operations.
B.3.8.2 Prepare ten (10) Detail Drawings for water system connections, temporary water
service, phased repurposing of existing water mains and roadway/corridor
restorations.
B.3.8.3 Prepare four(4) Construction Phasing and Staging Plans to outline the construction
requirements to maintain water system operations, minimize traffic and community
impacts, and timing for restorations.
B.3.8.4 Further develop Technical Specifications to address construction phasing ,
requirements and added design elements.
B.3.8.5 Perform QA/QC review of added plans and updated specifications.
2
10/15/20199.49.38 AMZ:\Bothell\Data\REN\113-104\00 Contracts and PM\Projectscoping\Final Design-Amendment 4\PSA AMEND NO.4 ExhibitA SOW_Final Design and SDC.dacx
City of Renton Amendment No.4
Highlands 435 PZ Reservoir Improvements Exhibit A
6.3 MG Reservoir and Transmission Main Scope of Work
B.3.8.6 Revise Engineer'sl Estimate of probable construction cost to account for the added
project elements and phasing requirements associated with the proposed
improvements and to better align with the project's significant complexities.
RH2 Deliverables:
• Additional design drawings and drawings per original scope.
Task B4 — Additional Design and Permitting for Utility and Traffic Coordination
(Amending Scope and Fee)
Objective: Expand the scope of the final water main design tasks to include additional design and
permitting services related to utility coordination and traffic control and routing. Provide additional
professional services beyond those identified in this Scope of Work, as requested by the City.
Approach:
B.4.1 Provide additional design and/or permitting services related to utility coordination and traffic
control for Phase 1, as requested or approved by the City.
B.4.2 Provide additional design or permitting related services for the project, as requested or
approved by the City. The City shall provide written authorization to proceed with the
additional services tasks.
RH2 Deliverables:
• Other deliverables as requested by the City under the authorization for additional design or
permitting services.
. 3
10/15/20199:49:38 AMZ:\Bothell\Data\REN\113-104\00 Contracts and PM\Project Seeping\Final Design-Amendment 4\PSA_AMEND NO.4 Exhibit A_SOW_Final Design and SDC.docx
Exhibit B- 4 Time Schedule of Completion
City of Renton
•
Highlands 435 Pressure Zone Reservoir Improvements
Phase 1 — 6.3 MG Reservoir and Transmission Main
Final Design
Anticipated
Task Completion
GENERAL PROJECT TASKS
Task 1—Project Management Throughout Contract
Duration
Task 2A and 2B—Permitting Assistance June 30, 2020
Task 3A and 3B—Services During Bidding July 31, 2020
•
Task 4—Additional Design and Permitting Services June 30, 2020
SCHEDULE A—Highlands 435 Reservoir and Street Frontage Improvements
Task Al—Reservoir 60-percent Design Completed
Task A2—Reservoir 90-percent Design Completed
Task A3—Public Meeting Assistance Completed
Task A4—Finalize Reservoir Design September 30, 2020
SCHEDULE B and C—Off-site Water Main and Utility Improvements
Task B1—Topographic Survey and Geotechnical Investigation Completed
Task B2—Off-site Water Main and Utility Preliminary Design Completed
Task 83—Off-site Water Main and Utility Final Design March 31, 2020
Task 84—Additional Design and Permitting for Utility and Traffic March 31, 2020
Coordination
CONTRACT COMPLETION DATE: December 31, 2020
• 10/15/20199:49:00 AM Z:\Bothell\Data\REN\113-104\00 Contracts and PM\Project soaping\Plnal Design-Amendment 4\P5A AMEND ND.4—Exhibit B-2_Completion schedule.docx
Exhibit C-4
Consultant Fee Determination -Summary Sheet
(Negotiated Hourly Rates of Pay)
Fee Schedule
Subconsultant:
RH2 ENGINEERING, INC
Negotiated Hourly Overhead Fee Multiplier Negotiated Rate
Staff Classification Rate Multiplier Per Hour
166.00% 12.00%
Professional I $ 53.03 $ 88.03 $ 16.93 $ 148.00
Professional II $ 57.69 $ 95.76 $ 18.41 $ 161.00
Professional Ill $ 62.70 $ 104.08 $ 20.01 $ 175.00
Professional IV $ 66.28 $ 110.03 $ 21.16 $ 185.00
Professional V $ 71.66 $ 118.95 $ 22.87 $ 200.00
Professional VI $ 76.32 $ 126.69 $ 24.36 $ 213.00
Professional VII $ 82.77 $ 137.39 $ 26.42 $ 231.00
Professional VIII $ 85.99 $ 142.74 $ 27.45 $ 240.00
Professional IX $ 85.99 $ 142.74 $ 27.45 $ 240.00
Technician I $ 39.41 $ 65.42 $ 12.58 $ 110.00
Technician II - $ 42.64 $ 70.78 $ 13.61 $ 119.00
Technician III $ 49.09 $ 81.48 $ 15.67 $ 137.00
Technician IV $ 52.31 $ 86.84 $ 16.70 $ 146.00
' Administrative I ' $ 25.80 $ 42.82 $ 8.23 $ 72.00
Administrative II $ 30.10 $ 49.96 $ 9.61 $ 84.00
Administrative III $ 36.19 $ 60.07 $ 11.55 $ 101.00
Administrative IV $ 42.64 $ 70.78 $ 13.61 $ 119.00
Administrative V $ 49.09 $ 81.48 $ 15.67 $ 137.00
In-House Copies B/W-8.5x11 $ 0.09
In-House Copies B/W-8.5x14 $ 0.14
In-House Copies B/W-11x17 $ 0.20
In-House Copies Color-8.5x11 $ 0.90
In-House Copies Color-8.5x14 $ 1.20
In-House Copies Color-11x17 $ 2.00
CAD Plots Large $ 25.00
CAD Plots Full $ 10.00
CAD Plots Half $ 2.50
CAD System Per Hour $ 27.50
GIS System Per Hour $ 27.50
Mileage Current IRS Rate
1
Subconsultants will be billed at cost plus 15%. ,
Outside direct costs for permit fees, reports, maps, data, reprographics, couriers, postage, and non-
mileage related travel expenses that are necessary for the execution of the project and are not
specifically identified elsewhere in the contract will be billed at cost.
EXHIBIT C-4
City of Renton
Amendment No.4
Highlands 435 Pressure Zone Reservoir Improvements
Phase 1-6.3 MG Reservoir and Transmission Main Final Design
Fee Estimate
Total
Description Total Labor Total Expense Total Cost
Hours
Classification
GENERAL PROJECT TASKS
Task 1 Project Management Services I 58 I$ 13,184 I $ 16 15 13,200
1.6 ;Provide Additional Project Management 58 $ 13,184 $ LG $ 13,200 r
SCHEDULES B AND C-OFF-SITE WATER MAIN AND FRONTAGE IMPROVEMENTS
Task B3 Off-site Water Main Final Design 568 $ 102,229 $ 9,171 $ 111,400
0.3.8 (Prepare Additional Utility Design Documents 568 $ 102,229 $ 9,171 $ 111,400
Task B4 Additional Design and Permitting for Utility and Traffic Coordination 398 $ 68,200 $ 6,800 $ 75,000
6.4.1 Provide Additional Design and Permitting Services for Utility and Traffic Coordination 293 $ 49,980 $ 5,020 $ 55,000
8.4.2 Provide Additional Design and Permitting Services 105 $ 18,220 $ 1,780 $ 20,000
MIIIIMMFota for Amendment No.4 1,024 $ 183,613 $ 15,987 $ 199,601