HomeMy WebLinkAbout20191203151505.pdfL-S
1h
io nt i��
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Mever
Email: duan accrete.build
No. of
Date: December 3, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
Uo res uate uescn tion
1 1 11/20-11/22/19 Daily Field Report(s) # 78-80
Comments:
CC:
1:
John Wilson
ATTN:
johnw@rinocon.com
2:
Mark Richardson
ATTN:
mark accrete. build
3:
Jeff Brain
ATTN:
]eff(a-accrete.buiid
4:
Jennifer Vo ele
ATTN:
jennifer@accrete. build
5:
Jonathan Chavez
ATTN:ichavez
rentonwa. ov
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 —136th PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
" Earth Solutions NWLLc
ESNRep.
Test % of
AK
AK
15365 NE 90`h Street, Suite 100
Dry Density Maximum
t I Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
7:45 AM;
www esnw.com
11:15 AM;
DAILY FIELD REPORT
See map for approximate location _8' 3 122.0 11,8
Travell45
Trav T 'I'i me
77
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No.
0895.06
Time Off Site
8:15 AM;
12:30 PM;
4:45 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No.
Page
1/2
Date
11/20/19
Report No.
78
Day of Week
Wed
Weather
50s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC L4 -
Project Manager Reviewed
Ray
Permit No
Test
Test Location Reference Maximum Fill
Test % of
Number
Elevation Compaction Dry Density Moisture
(See apj
Dry Density Maximum
r o
BOG 41 WR>.1 Curve (pcf) (/o)
See map for approximate location -8' 3 122.0 12.6
(pcf) Dry Density
116.3 95
74
75
See map for approximate location -6 3 122.0 12.0
117.8 97
76
See map for approximate location _8' 3 122.0 11,8
115.9 95
77
See map for approximate location -6' 3 122.0 11.6
116.5 96
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall.
Lock and Load Wall
While onsite, rep observed wall contractor install the first tier of the lock and load wall.
Rep observed contractor
grade and place import gray 5/8" minus crushed recycled concrete in loose -6"--12" lifts.
Rep observed contractor
place geo-grid as per plan. Once lifts were placed, rep observed contractor use a medium sized plate compactor
or a medium sized double drum roller for compaction. Rep took compaction tests on fill
and observed material to
be adequate of at least 95% of its maximum dry density (122.0 lbs./cu. ft.).
ESNW rep(s) will return to observe earthwork activities when requested by client.
4-1-1. �--
Andrew Kimn, Senior Technician, 206-430-9183
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
Earth Solutions NW«r,
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
ESNW Rep
AK
Project No-
0895.06
Page
2/2
Report No.
78
Time On Site
7:45 AM;
Time Off Site
8:15 AM;
Date
11/20/19
Day of Week
Wed
www.esnw.com
11:15 AM;
12:30 PM;
DAILY FIELD REPORT
2:45 PM
4:45 PM
Travel Time
Weather
1.25 Hr. RT
50s°F, Clear
n
Project Name
Job Location
E76, 77 $
*_
Client/Owner
Weatherly Inn
%
4500 Talbot Rd.
S., Renton, WA
RJ Development, LLC
Contractor #1
Contact
Field Supervisor
Reviewed
Rino Construction
Mike
LAC
Contractor #2
Contact
Project Manager
Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
10
n
#
74,75
E76, 77 $
*_
%
f
Earth Solutions NWLLC
ESNRep.
0895.06
AK
AK
15365 NE 901h Street, Suite 100
Date Day of Week
t - Hilt Redmond. WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
7:00 AM;
www.esnw.com
8:15 AM;
DAILY FIELD REPORT
1:15 PM
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No.
Page Report No.
0895.06
1/2 79
Time Off Site
Date Day of Week
7:15 AM;
Thursday
10:00 AM;
11/21/19
2:15 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Weather
40s°F, Fog
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC A- �L�Z
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No.
Test Test Location Reference Maximum Fill Test % of
Number` 1 (see M pj " Elevation Compaction Dry Density Moisture Dry Density Maximum
L 4. Curve (pcf) N (pcf) Dry Density
78 See map for approximate location -4' 1 3 122.0 12.4 117.0 g6
79 See map for approximate location f -4' 3 122.0 11,8 117.2 96
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall.
Lock and Load Wall
While onsite, rep observed wall contractor install the first tier of the lock and load wall. Rep observed contractor
grade and place import gray 5/8" minus crushed recycled concrete in loose—6"--12" lifts. Rep observed contractor
place geo-grid as per plan. Once lifts were placed, rep observed contractor use a medium sized plate compactor
or a medium sized double drum roller for compaction. Rep took compaction tests on fill and observed material to
be adequate of at least 95% of its maximum dry density (122.0 lbs./cu. ft.).
ESNW rep(-s`)�will return to observe earthwork activities when requested by client.
i
Andrew Kimn, Senior Technician, 206-430-9183
" Earth Solutions N fW LLC
E Rep
Report No
K
AK
15365 NE 90t1 Street, Suite 100
79
Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
7:00 AM;
www esnw.com
8:15 AM;
DAILY FIELD REPORT
1:15 PM
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No
Page
Report No
0895.06
2/2
79
Time Off Site
.
Date
-- ...... . ..._..— ....
Day of Week
7:15 AM;
Al
Thursday
10:00 AM;
11/21/19
2:15 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
A� re approved plans/permits on site? Project No.
Supplementary Report:
Weather
40s°F, Fog
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
Permit No.
Al
78
79 a
Earth Solutions NW«C
15365 NE 901h Street, Suite 100
t t Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep.
Project No
Page
AK
0895.06
1/2
Time On Site
Time Off Site
Date
8:45 AM;
11:00 AM;
11/22/19
12:00 PM
1:15 PM
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Report No.
80
Day of Week
Friday
Weather
40s°F, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC IL�2
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No
Test
Number
Test Location
(See Map)
ak - Lj&>r 611)
Elevation
-2'
-2'
Reference I Maximum
Compaction Dry Density
Curve (pcf)
3 122.0
Fill Test % of
Moisture Dry Density Maximum
(%) (pcf) Dry Density
80
See map for approximate location
12,2 116.7 96
81
See map for approximate location
3 122.0
11.5 117.1 96
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall, vault excavation and backfill.
Lock and Load Wall
While onsite, rep observed wall contractor install the first tier of the lock and load wall. Rep observed contractor
grade and place import gray 5/8" minus crushed recycled concrete in loose—6"--12" lifts. Rep observed contractor
place geo-grid as per plan. Once lifts were placed, rep observed contractor use a medium sized plate compactor
or a medium sized double drum roller for compaction. Rep took compaction tests on fill and observed material to
be adequate of at least 95% of its maximum dry density (122.0 lbs./cu. ft.).
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within. Rep observed that contractor had covered the slopes with
plastic sheeting to minimize stormwater on exposed surfaces.
Rep collected sample proctor of the backfill material for the lock and load wall (Crushed recycled concrete). Rep
met with ESNW manager, Scott, onsite to discuss and review the progress of the lock and load wall.
Vault Excavation and Backfill
Rep observed contractor working near or in the vault excavation. Rep observed south slopes of the excavation to
be near vertical. Rep observed that the west slopes of the excavation were near a 1.5:1 (H:V) slope. Although over -
steepened, slopes are stable in current configuration and stable to work within. Rep observed that contractor had
covered the exposed slopes with plastic sheeting. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep will return to observe the conditions of the slopes while
contractor is working in the excavation.
ESNW rep w`iill return to observe earthwork activities when requested by client.
T --
Andrew Kimn, Senior Technician, 206-430-9183
" Earth Solutions NW«C
ESNW Rep.
Report No.
AK
15365 NE 90" Street, Suite 100
80
t Redmond. WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
8:45 AM;
www.esnw com
12:00 PM
DAILY FIELD REPORT
11/22/19
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No.
Page
Report No.
0895.06
2/2
80
Time Off Site
Date
Day of Week
Friday
11:00 AM;
11/22/19
1:15 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Weather
40s°F, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No