Loading...
HomeMy WebLinkAbout1971 TIP RESOLUTION NO . 1694 WHEREAS the City of Renton, Washington, has heretofore adopted a Comprehensive Six Year Street Program pursuant to the require- ments of Chapter 195 of the 1961 Session Laws , which Program has hereto- fore been amended from time to time , and WHEREAS the City of Renton acting by and through its City Engineering Department , has heretofore proposed certain revisions , modifications and amendments to said Six Year Street Program including the designations of certain arterial projects as specified in Chapter 83 Laws of 1967 , Extraordinary Session, and WHEREAS a public hearing has been held on June 15 , 1970 , /and which was continued until June 22nd,. 1970 after prior notice thereof as required 'by law, to consider the adoption, modification and division of a new Comprehensive Six Year Street Program and all parties having been heard in support thereof or in opposition thereto at said public hearing; NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY OF RENTON , WASHINGTON , AS FOLLOWS : SECTION I : The aforesaid recitals and findings are hereby found to be true and correct in all respects . The City' s Comprehensive Street Program for the ensuing six years , as annually reviewed and modified, is hereby adopted, and a copy thereof, labeled Exhibit "A" is incorporated herein and made a part hereof as if fully set forth. Said Six Year Comprehensive Street Progm, as evidenced. by said exhibit, shall be and constitute the City ' s Comprehensive Program until reviewed annually thereafter and as otherwise provided by law. SECTION II: A copy of aid Comprehensive Street Program shall be filed with the Director of Highways not more than sixty (60 ) days after adoption of this Resolution, together with a certified copy hereof. PASSED AND APPROVED BY THE CITY COUNCIL this 2,2AID day of June, 1970 . Gw- Marshal]., Deputy City Clerk APPROVED BY THE MAYOR this omtipday of June , 1970 . 1' Avery Garrett, Mayor APPROVED AS TO FORM: 2:SQ14' /ac: Gerard M. Shellan, City Attorney • . ----SAF'.- 7.02 - 9/69 ; 1 . , . • NOTE: Urban Arterial Board Approved Projects. SIX YEAR STREET CONSTRUCTION PROGRAM. REVISED 6/22/70 1971-197G . • (1970-1971 THIS SHEET ONLY) . HEARING DATE6/15 & 22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 (CITY) OF • RENTON . (TOWN) ROAD F CIU R ' LOCAL NAME . OR ULRU LENGTH COST ESTIMATE ITEM OF STREET N A 8 R • IN • • NO. ROAD OR STREET NO. C S A ' A TYPE OF WORK MILES 1970 1971 . 1972 I 1973-75 I TOTAL • T S N L i 1 Edmonds Ave. N.E. " 9330 C X Widening, grading; curbs, storm 1.1 290,000 200,000 ; 490,000 . � Sunset Blvd. N.E. to - sewer,' drainage, sidewalk, paving, = II 4 N.E. 27th traffic control, street lighting - 2 Houser Way S. 9360 C X Widening, grading, curbs, storm + I Main Avenue S. to Bronson sewer, drainage, sidewalks, pav- 0.5 50,000 150,000 200,000 ' Way N. ing, traffic control, street . lighting., • 3 Main Avenue S. 9220 C X Retaining wall, storm sewer, 0.2 150,000 11,700 • 161,700 • S. Grady Way to Houser drainage., curbs, paving, traffic - Way S. , . control, street.lighting 4 ' N.E. 27th 9320 C X Widening, grading, paving, "storm 0.5 87,000 119,000 206-,000 .' Edmonds Avenue N.E. to N. . sewer, drainage, curbs, sidewalks, . 28th.-Kennewick- Pl. N.E. . traffic control, street lighting . . i 5 N. 6th St. 9201 S X Widening, storm sewer, drainage; 0.3 163,400 .163,400 ' Logan Ave.. N. to Park curbs, sidewalks, R.R. crossing, { . Avenue N. traffic control, street lighting, Right-of-way. . 1 NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - MAJOR ' • 2, f REVISED 6/22/70 SIX-YEAR STREET CONSTRUCTION PROGRAM •• 1971 - 1976 HEARING DATE 6115&22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON ROAD F C U R• . LOCAL NAME OR U- L R U• LENGTH COST ESTIMATE , ITEM - OF STREET N A B R TYPE OF WORK 1N NO. ROAD OR STREET NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL • 6 Renton Ave. , Airport Way, Logan 9500 M X widening, sidewalks, curbs, storm • 0.9 . Ave. N. from West City limits sewer, paving, traffic control, 368,852 550,000 . .561,080- 1,496,000 to N. 4th St. street lighting, right-of-way, bridge. • 7 Sunset Blvd. N.E. from Edmonds 9363 M X curbs, sidewalks, traffic control, . 1.6 230,000 238,300 468,300 Avenue N.E. to East City limits street lighting, undergrounding (grading & paving by State Highway) 8 . Maple Valley Highway . 9371 M X sidewalks, drainage, street light- 2.1 130,000 275,000 405,000, Bronsn Way to East • ing (grading and paving by State . City limits Highway Department) • - 9 Park Avenue N. from Bronson 9200 M X paving, storm sewer, sidewalks, . Way N. to N. 8th Street 1.1 401,000 . 401,000. curbs, traffic control, street . lighting . 10 MATni ez Avenue North City limits to Grady Way 9000 M X curbs, sidewalks, street lighting, i.8 486,000 .1.:73,000 • 660,000 paving, traffic control and storm sewer (paving participation - by State Highway) . .11 S. 3rd Street from Rainier 9360 M X sidewalks, traffic control, 0.6 380,000 380,000 Avenue S. to Main Ave. S. street lighting, undergrounding • ;paving by State Highway Dept.) - • • NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - MAJOR 3. t REVISED 6-22-70 SIX-YEAR STREET CONSTRUCTION PROGRAM 1971 - 1976 1970 HEARING DATE 6/15 &22 ADOPTION DATE 6-22-70 RESOLUTION NO. 1694 CITY OF RENTON ROAD F C U R ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE OF STREET N A B R TYPE OF WORK IN NO. ROAD OR STREET NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL 12 S. 2nd Street, Main Avenue S. 9350 M X traffic control, street lighting, 0.60 300,000 300,000 to Rainier Ave. S. sidewalks, undergrounding (paving by State Highway Department) 13 Main Avenue S. S. 2nd to Houser Way S. 9220 M X paving, storm sewer, sidewalks, 60,000 60,000 curbs, traffic control, street lighting. 4:-1-- , SIX-YEAR STREET CONSTRUCTION PROGRAM . NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - SECONDARY 19 71 - 1976 V V REVISED 6/22/70 HEARING DATE6/15 & 22,70 ADOPTION DATE _ 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON —_,1-______ _ ROADFCUR -- - - -- -- ITEM LOCAL NAME OR U L BR U R LENGTH . -COST ESTIMATE A OF STREET C S A A TYPE OF WORK IN NO. ROAD OR STREET . NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL. ��- 9001 S X widen, grading, curbs, storm sewer 1.3 127,000 1,700,000 ' 1,696,000 3,523,000 14 S.W. 43rd Street East Valley Highway to Spring- sidewalks, paving, traffic control, i.rook Road street lighting, right-of-way, V structures, drainage. 15 .W. Grady Way - Rainier- Ave. S. 9110 S X widening, regrading, curbs, storm 0.3 125,000 68,000 193,000 to Lind Avenue S.W. sewer, drainage, sidewalks, paving traffic control, street lighting. 16 ells Avenue from S. Grady Way 9191 S X widening, sidewalks, storm sewers, 1.2 520,000 330,000 201,000 1,051,000 drainage, paving, street light- to N. 6th Street ing, traffic control, curbs, alignment adjustment, bridge, , and right-of-way. 17 illiams Avenue 9394 S X structure, widening, grading, 1.2 270,000 I #.,030,000 1,300,000 from S. Grady Way to N. 6th St. paving, curb, sidewalks, storm sewer, street lighting, traffic control, railroad adjustment. 18. Talbot Road from Grady Way to 9041 S X ' widening, paving, traffic signals, 0.5 15,000 . 129,000 144,000 Puget Drive - traffic control, sidewalks, street . lighting, storm drains (City work in conjunction with State Proj.) 19 S.W. Grady Way from Lind Ave. S 9100 S V X widening, paving, curbs, sidewalks 0.9 400,000 1,040,000 1,440,000. to West City limits storm drains, structures, street lighting, traffic control. • • SIX-YEAR STREET CONSTRUCTION PROGRAM 5 . NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - SECONDARY 1971 - 1976 REVISED 6-22-70 6/15 :; 22/70 6-22-70 1694 RFIU7UN HEARING DATE _ ADOPTION DATE RESOLUTION NO.__— CITY OF ROAD FCUR ITEM LOCAL NAME OR ULRU LENGTH COST ESTIMATE _____ OF STREET N BR ___ TYPE OF WORK IN _.__._ -.._._— NO. ROAD OR STREET NO. T SNL MIL ES 1921 1972 1973 19.74-76 TOTAL _ _-_- _. _._-.J___ . _ _.. ___ ___ _.—.___.`_— 20 Logan Avenue from S. 3rd to 9406 S X widening, grading, paving, curbs, 0.4 355,600 355,600 Airport Way sidewalks, street lights, traffic control, right-of-way. 21 Lake Washington Boulevard from 9280 S X widening, grading, storm sewer, 2.5 200,000 4,000,000 4,200,000 Houser Way to N.E. 44th St. curb, paving, street lighting, bridge structure, traffic control. • 6. . t NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS- SIX-YEAR STREET CONSTRUCTION PROGRAM COLLECTOR 1971 - 1976 REVISED 6/22/70 6/15 & 22/70 1694 RENTON HEARING DATE__ ADOPTION DATE 6-22-70_�_ RESOLUTION NO. - CITY OF ROAD IT C U R LOCAL NAME OR U L R U LENGTH COST ESTIMATE iTI`M OF STREET N A 8 R TYPE OF WORK IN —� - NO. ROAD OR STREET NO. T S N A MILES 1971 I 1972 1973 1974-76 TOTAL 22 Union Avenue N.E. from N.E. 4th ISt. to Sunset Blvd. E. 9340 C X widening, grading, curbs, storm 1.1 253,000 323,500 38,500 615,000 sewer, drainage, sidewalks, paving, traffic control, street lighting. 23 Taylor Avenue N.W. & Taylor Pl. 9130 C X widening, grading, curbs, sidewalks 0.6 16,000 598,000 614,000 N.W. paving, storm sewers, street light- ing, traffic control 24 Monroe Ave. N.E. from N.E. 4th 9343 C X widening, curbs, sidewalks, paving, 1.0 114,000 450,000 564,000 Street to N.E. 12th ST. traffic control, street lighting, drainage, grading. 1 25 Shattuck Avenue S. from S. 2nd 9007 C X curbs, storm sewers, sidewalks, 0.5 16,000 318,000 36,000 370,000 to S. 7th Street paving, structure, street lighting, traffic control. 26 N. E. 12th Street from Edmonds 9333 C X widening, grading, curbs, sidewalks 1.25 47,000 663,000 710,000 Avenue N.E. to Union Ave. N.E. storm sewers, drainage, street lighting, traffic control. _ 27 S. 4th Street from Main Avenue S right-of-way, widening, grading, 0.6 227,000 378,000 605,000 to Rainier Avenue S. 9444 C X paving, storm sewers, traffic control, street lighting. 28 East Valley Highway from C X grading, paving, storm sewers, 1.9 1,175,000 705,000 1,880,000 S.W. 16th St. & Lind Avenue S.W. curbs, sidewalks, traffic control, to S.W. 43rd St. street lighting, undergrounding. NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - COLLECTOR REVISED 6/22/70 SIX-YEAR STREET CONSTRUCTION PROGRAM 7. 1971 - 1976 HEARING DATE 6715& 22/70 ADOPTION DATE 6722770 RESOLUTION NO. 1694 CITY OF RENTON ROAD PCUR ITEM LOCAL NAME OR ULRU LENGTH COST ESTIMATE OF STREET N A BR TYPE OF WORK IN NO. ROAD OR STREET y0- T S N L MILES 1971 I 1972 1973 1974-76 TOTAL 29. Edmonds Avenue N.E. from N.E. 4th 9335. C paving, sidewalks, curbs, storm - 0.9 50,000 540,000 590,000 St. to Sunset Blvd. N.E. sewers, street lighting, traffic control. 30 Talbot Road from Puget Drive to 9042 C X widening, curbs, sidewalks, storm 1.6 244,000 440,000 382,000 300,000 1,366,000 S. City limits sewers, drainage, traffic control, street lighting, utility adjust- ments. 31 N.E. 10th St. from Sunset Blvd. 9999 C X widening, grading, ,right-of-way, 0.75 25,000 . 240,000 221,000 486,000 N.E. to Union Avenue N.E. storm sewers, curbs, paving, street lighting and traffic control 32 N. 30th St. from Lake Washington 9300 C X widening, grading, curbs, storm 0.6 305,000 305,000 Blvd. N. & Burnett AVe. North sewer, paving, traffic control, to N. 30th St. & Freeway #405 street lighting. 33 S.W. 16th Street from E. Valley 9003 C X widening, grading, structures 1.1 43,000 687,000 730,000 'Highway to E. City limits right-of-way, storm sewer, drainage, curbs, sidewalks, paving, traffic_ control and _ street lighting. MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED • REVISED 6/22/70 8. SIX-YEAR STREET CONSTRUCTION PROGRAM 1971 - 1976 HEARING DATE6/15 &22/70 ADOPTION DATE 6-22-70 RESOLUTION NO. 1694 CITY OF RENTON ROAD F CUR LOCAL NAME OR U L R U LENGTH COST ESTIMATE ITEM OF STREET N A. A A TYPE OF WORK IN NO. ROAD OR STREET NO. MILES 1971 1972 1973 1974-76 TOTAL T S N L 34 N.E. 30th - Freeway to Kennewick 9320 C X widening, grading, paving, storm 0.2 25,000 85,000 Pl.. N.E. & N.E. 28th sewer, drainage, curbs, sidewalks, (1970-60,001) traffic control, street lighting 35 S. W. Langston Road 9362 C X widening, regrading, storm sewer, 0.6 (1970-160,M°) drainage, street lighting, paving, 20,000 180,000 traffic control. 36 Garden Avenue N. 9181 A X widening, grading, curbs, storm 0.5 100,000 100,000 50,000 250,000 N. 4th St. to N. 8th St. sewer, drainage, sidewalks, pav- ing, street lighting and traffic control. 37 Logan Avenue C X storm sewer, drainage, sidewalks, 0.3 14,000 14,000 28,000 N. 6th to N. 9th traffic control. 38 N. 6th St. ---- -- X grading, paving, widening, storm 0.1 60,000 60,000 Park Ave. N. to Garden Ave. N. sewer, curbs, sidewalks, street lighting. 39 Lind Avenue S.W. 9103 -- X right-of-way, structure, curb, 0.4 10,000 240,000 1,450,000 657,000 2,357,000 S.W. Sunset Blvd to S.W. 7th storm sewers, sidewalks, paving traffic control, street R.R. crossing. 40 Benson Highway (Existing) 9045 S X drainage, storm sewer, paving, 1.8 900,000 900,000 curbs, sidewalks, street lighting and signals. , ,MISCELLANEOUS .PROJECTS - FUNDING TO BE DETERMINED -4- REVISED 6/22/70 . SIX-YEAR STREET CONSTRUCTION PROGRAM 9. 1971 - 1976 HEARING DATE 6/15 &22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON ROAD FCUR ITEM LOCAL NAME OR U L R U LENGTH - COST ESTIMATE OF STREET N A B R TYPE OF WORK IN N0. ROAD OR STREET NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL 41 Lake Ave. S. X curbs, grading, paving, storm 0.25 75,000 75,000 Airport Way to S. 2nd drainage, right-of-way, street lighting. 1 42 Puget Drive X sidewalks 0.5 50,000 50,000 Talbot Road to Benson 43 N. 4th St. -- -- X widening, curbs, sidewalks, storm - 0.3 90,000 90,000 Edmonds Ave. N.E. sewer, street lighting & paving to Jefferson. St. 44 N. 4th St. Jefferson St. X sidewalks, street lighting 0.9 10,000 30,000 100,000 140,000 east City limits 45 N.E. 3rd St. 9150 M X sidewalks, street lighting & 0.9 100,000 100,000 200,000 Sunset Blvd. N. to traffic control N.E. 4th St. curbs, sidewalks, storm sewer, pav-! 46 Lind Ave. S.W. 9103 C Xing, grading, Hiway overcrossing 0.7 220,000 100,000 900,000 1,220,000 Grady to S.W. 16th structure, widening to 44' & St. licghting. 47 Sunset Blvd. W. 9361 M X curbs, grading, paving, sidewalks, 0.8 240,000 240,000 storm sewer, street lighting. . 48 Smithers Ave. S. 9406 -- X grading, drainage, storm sewer, 0.5 60,000 540,000 600,000 S. Grady to S. 3rd. paving, sidewalks, street lights, widening, R.R. crossing, right-of- way. . I MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED 10. - SIX-YEAR STREET CONSTRUCTION PROGRAM REVISED 6/22/70 1971 - 1976 HEARING DATE 6/15 & 22/70ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON ROAD FCUR ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE OF STREET N A B R TYPE OF WORK IN NO. ROAD OR STREET NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL 49 Kirkland Ave. N.E. - N.E. -- A X curb, sidewalks , paving, storm ' 0.25 26,000 26,000 Sunset Blvd. N.E. to 10th sewer 50 Houser Way - Main Avenue S. -- A X curbs, sidewalks, paving, traffic 0.2 60,000 60,000 t,.Burnett Ave. S. control 51 S. Puget Dr. widen, curbs, sidewalks, storm 1.0 380,000 380,000 Benson Rd. S. to Edmonds Ave. S .E. 9052 C X sewer and traffic control 52 N.E. 7th Sunset Blvd. to Monroe 9364 A X curbs, storm sewer, paving, side- 0.8 320,000 320,000 walks, traffic_ control and • street -lighting 53 Sunset Blvd. N.E. S X widening, grading, drainage, 1.7 680,000 680,000- Bronson-Way N. to Edmonds storm sewer, sidewalks, curbs, Avenue N. paving, traffic signals and street lighting 54 Aberdeen Ave. N.E. A X widening, grading, drainage, Sunset .Blvd. N.E. to N.E. 27th storm sewer, curbs, sidewalks, 1.7 680,000 680,000 paving and street lighting 55 N. 4th •St. - Sunset Blvd. to Factory Ave. N. 9182 X R.R. overcrossing, grading, pav- 0.15 300,000 300,000 ing, Railroad, curbs, storm sewer, sidewalks, street lighting and traffic control • .MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED REVISED 6/22/70 j1 . SIX-YEAR STREET CONSTRUCTION PROGRAM 1971 - 1976 HEARING DATE6/15 & 22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON ROAD FCURR —' ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE OF STREET N A B A TYPE OF WORK IN NO. ROAD OR STREET NO. MILES T S N L 1971 1972 1973 1974-76 TOTAL 56 Houser Way sidewalk, curb, storm sewer, 1.1 40,000 400,000 440,000 N. 4th to Lake. Wash. Blvd. 9203 C X drainage, paving, street lighting and traffic control 57 Morris Ave. S. 9366 A X curb, storm sewer, paving S. 2nd to S. 7th street lighting & traffic control 0.5 150,000 150,000 58 Whitworth Ave. S. 2nd to S. 7th 9369 A X curb, storm sewer, paving, street 0.4 125,000 125 ,000 lighting and traffic control 59 S. 4th Pl. 9006 A X curb, storm sewer, sidewalk, 0.1 60,000 60,000 Shattuck Ave. S. to Rainier paving, and street lighting Ave. S. 60 Burnett Ave. N. 9300 C X widening, grading, storm sewer, 0.6 20,000 240,000 260,000 N. 28th to N. 37th curb, paving, street lighting and traffic control PREVIOUSLY FUNDED REVISED 6/22/70 /22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM /z t _ • rCITY OR COUNTY N I HEARING DATE 6/15 & 6/22, 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN COLLECTOR ARTERIAL 1971 1972 1973 -- -_-- _ - TRUST 1974 1975 1976 FUNDS 1/1 7 'l 1 '1 7 -1 1/1 7'1 to to to fc to to I..•, it N:tni, “I \rlrnal \rl.•ii.,l \,• PIIorit\ 6 /30 12 '3 1 6/30 12/31 6/30 1 2'31 Edmonds Avenue N.E. 9330 5 I, F I), ;.tiled Location nl Prowet and 'frinnni I rnitlh to \III, . Sunset Boulevard N.E. to 1.1 It ,11 N.E. 27th St. 1,,,,,,111,1,1• I'r.p. cd '`t"'', widen, grade, curbs, storm sewer, sidewalks, paving, traffic control, street lighting. t „r,••, ESTIMATE OF TOTAL COST 200,00C 1'rrlim. I.n., Right of\1.r\ t .m•-Inn tum Total Total 446 400 200,OOC • 44,700 — 401,700 r Local Nano of Arterial Arterial No. Priority No. 5. P.F. 1 Houser Way S. 9360 2,50C Detailed Location of PrujcrI anti 'lemon' Length to Miles R'1\ Main Avenue S. to Bronson Way N. 0.5 Description of Proposed Work widen, grade, curbs, storm sewers, Const. sidewalks, pave, traffic control, street lighting. >- f 113,34 0 ESTIMATE OF TOTAL COST Total w H Prelim. Eng. Right of Wa,, Construction Total U 115,8W 1 . 0 • 12,500 -- 113,300 125,800 • a • Local Name of Arterial Arterial No. Priority No. 5. P.E. tj > Main Avenue So. 9220 0 _ a Detailed Location of Protect andermtnt length in Miles R''N Q 'l • 0.20 mS. Grady Way to Houser Way S. - o Description of Proposed Work retaining wall, storm sewer, Const, z drains e, curbs,, paving, traffic control, street 16,0003 lighting. o ESTIMATE OF TOTAL COST Total a, Prelim. Eng. Right of Way Construction Total = F- 16,200 145,500 161,700 16,000, --i-- FUNDED FUNDED PREVIOUSLY REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM 13 CITY OR COUNTY — — . HEARING DATE_6/15 & 6 22 , 1970 ADOPTION DATE 6/22/70_____ RESOLUTION NO. 1694 EENO-N- _ _.__ -- REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD 1 _ FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1972 1973 • _ COLLECTOR ___ -_- J TRUST 1974 1975 1976 FUNDS 1./1 7 '1 1 /1 7 , 1 1;1 7 /1 to to to 10 to to ;1 I I "r,il N:uv.' ..I \rtc.iol \,i. Hal No 131.11q 11% No 6130 1 2 /31 6/30 12 ,31 6 /30 1 2/31 N.E. 27th Street 9320 5 P.F. Det.iil,'.I I na alr'i. ..I I'rni, CI and I 'nn.ni I.,•ngth in \I.lr, Edmonds Ave. N.E. to -0.5 R -11 N.E. 28th St.-Kennewick P1. N.E. I),—1,p1,.., Pl..I.... On" widening, grading, paving, storm - sewers, drainage, curbs, sidewalks, traffic control, (.,,,., . street lighting. • 68,300 ESTIMATE OF TOTAL COST I. I'rrin, I a... Iti:dit "1 1\,.,, I 'a 'ii' '1 Total I'.,tat 18,700 -- 168,300 187,000 68,300 I. L.,• . i \:.,., "I \.I„lal lnenal No, Priority nonh N.,, 5.. P.P. 1- IetaiL it Lot:.lion to. POti,,I ,nnl 'I,room Length In Miles R 'Nl i 1. Dc cripti"n of Proposed 11ork -Const, >- _i J Z n ' ESTIMATE OF TOTAL COST Total v) I t-- .4. 4. Pieinn. Eng. R.0hl ''I\\:n construction Total V W O • ce • a_ I. Local Name of Arterial \rt,rial No. Priority No. 5. P.R. g • > O ce a - a 2. Octane,' I ocaln.n of Protect ,.n.i 'l 'lnu n, Lxnglh in f\lilcs R,'Il Q ce • O Li_ 3. Description of Proposed Work Const, Z - J O ESTIMATE OF TOTAL COST Total to 4. Prelim. Eng. Right of Way Construction Total F=- w D UAB-1 REV 1 /70 . -!— FUNDED PREVIOUSLY REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM /4 CITY OR COUNTY HEARING DATE_6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. .1694 RENTON, - REQUESTED REQUESTED U. A. TF.UST FUNDS BY PERIOD • FUNCTIONAL CLASS OF ARTERIAL URBAN L ARTERIAL 1971 1972 1973 SECONDARY TRUST1974 1975 1976 FUNDS 1/1 7/1 1 /1 7 /1 1/1 7/1 to to to to to to I. Local Name of Arterial Arterial No. Priority No. 6/30 12/31 6'30 12/31 6 /30 12/31 N. 6th Street 9201 ' P.E. 10,000 2. Detailed Location of Project and Termini Length in :Miles LOGAN AVENUE. N. TO PARK AVENUE N. 0,30 R11 __ 3 Description of Proposed Work widening, storm sewers, drainage, curbs; sidewalks, railroad crossing, traffic control, (.,,n.t. street lighting, right-of-way. • 121,500 ESTIMATE OF TOTAL COST 4: Prelim. Ifog. Right of Way . ('onU.ttut.iton Total Total 14,850 - 133,700 148,550 131,500 I. Local Name of Artctial Arterial Ni. Priority Ni,g5, P.17.. 1 . • 2. Detailed Location of Project and Termini Length in Miles R 'W 3. Description of Proposed Work Const. •• J Z . O ESTIMATE OF TOTAL COST Total cn l- 4. Prelim. Eng. Right of Way Construction Total U w O Ci_ O I. Local Name of Arterial Arterial No. Priority No. 5. P.E. u.] > O d d 2. Detailed Location of Project and 'Termini Length in Miles R,W Q K • O LL 3. Description of Proposed Work Const. Z D . J . • 0 U ' ' ESTIMATE OF TOTAL COST Total in .• 4. 'Prelim. Eng., Right of Way Construction Total = H . , •., to D REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM i. CITY OR COUNTY RE�VTOIV - i HEARING DATE_6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. •1694 R.EQUESTEC REQUESTED U. A TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN i-- ARTERIAL. 1971 1972 1973 MAJOR ARTERIAL _ TRUST - 1974 1975 1976 - - FUNDS 1 •1 7 •1 1 '1 7 1 1/1 7 '1 to to to to to to 1 1.0,a1 Name of :\rtcr,aiRenton Ave. 9500Vic!ial No Priori) No 6 X30 12 '31 6 30 12:31 6 '30 12/31 Airport Way 9400 1 5 1, 1: Lo•an Ave. N. 9406 67,320 I)ei.•iieil I o.alnn, nI Protect and l,•rntini Length in Mil), 67,320 i W. City Limits to Airport Way 0.9 It'\\ Air•ort Wa to Logan Ave. N.-Logan Ave. N.to 4th St. t Dem„i,,lim: ,l I'rnl,,-,d nark widening, sidewalks, curbs, storm 18,000 18,000 sewer, paving, traffic control, street lighting, right-of-wayabridge. 1,261,080 250,000 250,000 250,000 250,000 261,080 ' ESTIMATE OF TOTAL COST 4. I'i •lo . Iii_. Itighl of \\,i I m.vu,-tion -Itel 1n,;,l 335,320 250,000 250,000 250,000 261 ,080 74,800 20,000 1,401,200 1,496,000 1,346,400 I 1 .. ,.:I .,:one of :\riciiiii \rI rtal No. Priority No. 5• P.F w 1 > 1 Sunset Boulevard East 9363 2 18,315 0 18,315 2. I), ).).led Location of I'iHi-ct ;toil I,'mntti length in Miles Q - Edmonds Ave. N.E. to 1.6 0 Fact C;ty T.i ri 1. o;, ,,,,,,,n of Proposed Work I' curbs, sidewalks, traffic control const. z street lighting, undergrounding. (Grading & paving by D 403,155 -1 200,000 203,155 State Highway Dept.) ESTIMATE OF TOTAL COST Total • w 4. I n:lim. Eng. Right of Way Construction Total 1- 20,350 -- 447,950 468,300 421,470 ? 218,315 203,155 UAB-1 REV..1/70 I _- --- 1. Local Name of Atlen:II .\rtetial No. Priority No 5. P.E. Maple Valley Highway 9371 3 18,225 18,225 2. Detailed Location of I'intect and .1:mom Length in Milos R'W Bronson Way to East City Limits 2.1 - 3. Description of Proposed Work Const. sidewalks,Astreer lighting (Grading & paving by 346,275 100,000 100,004 146,275 z - . ' ., , I-. ESTIMATE OF TOTAL COST Total rn I- 4. P,clim. Eng. Right of\lav Construction Total 1 364,500 w 118,225 100,000 146,275 20,250 -- 384,750 405,000 0 rr REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION• PROGRAM 4'., / . . • HEARING DATE__6/15, & 6/22, 1970 ADOPTION DATE • 6/22/70 r_, RESOLUTION NO. 1694 • CITY OR COUNTY - r RENTON I REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD URBAN ARTERIAL 1971 1972 1973 FUNCTIONAL CLASS OF ARTERIAL TRUST r1974 1975 1976 _- - FUNDS 1/1 7 'l 1 /1 7: 1 1/1 7 '1 MAJOR ARTERIAL to to to to to to `--- - --J 6 /30 12 '31 6 '30 12'31 6 '30 1 2/31 a Id 1 ,n.ii Name of \iirii;il \rt.•ii,ii No. Priori I\ Nn 5. RI, W Park Avenue N. 9200 o o • 4 17,370 a 17,370 1 . I1�•larled Loeatmn „t P „t,_ i on,l I moot, length in Miles R.'\\ Q Bronson Way N. to I.1 o- N. 8th Street 4,500 0 4,500 1),,iil,ii,,n ,.i I'ropo..,1 \\oil (ons' Z paving, storm sewer, sidewalk, 1 I curbs, traffic control, street lighting. 339,030 113,500 225,530 i o I ESTIMATE OF TOTAL COST lit"I _ 4. PieIim. Fop. Right of\\•iv (-imtrneti ti Intal 360 900 i-- 135,370 225,530 , 19,300 5,000 .376,700 401,000 ' UAB-1 REV-.1/70 _ ) It. Local Name of Art :real Arterial No. Priority No. 5. Pt.. r I Rainier Avenue 9000 5 27,090 27,090 I 12 Derdiled Location of Pi jecl ami termini i Length in Miles R 'W North City Limits to 1.8 - - . Grady Way 3. Description of Proposed Work curbs, sidewalks, street Coni. l lighting, paving, traffic control and storm sewer. 566,910 200,'000 214,710 152'i20'0 `{ (paving participation by State Highway Dept.) zo ESTIMATE OF TOTAL COST total v.> t 4. Pr-hni. Eng. Right of\\ac a tam ,• ,• Total U W 30,100 -- - 227,090 214,710 1.52`,200 • 629,900 660,000 594,000 a I. Local Name nl Arterial Arterial No. Priority No, 5. P.E. S. 3rd St. 9360 6 15,930 15,930 2.• Detailed Location of Project and Termini Length in Miles I('W Rainier Avenue S. to 0.6 Main Avenue S. 3. Description of Proposed Work sidewalks, traffic control, street Const. lighting, undergrounding. (Paving by State Hwy. Dept.) 326,070 J 173,400 152,670 z 0 ESTIMATE OF TOTAL COST Total vt 1- 4: Prelim. Eng. Right of\\av (•onstrir. ti,n, Total i'8 �` 3o 152,670 • 17,700 - 362,300 380,000 342,000 w . --- REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM / 7 CITY OR COUNTY HEARING DATE_6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 41694 RENTON REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1972 1973 MAJOR ARTERIAL TRUST 1974 1975 1976 FUNDS 1/1 7./1 l /l 7 .1 1/1 7/1 to to to to to to I Loral Name of Arterial Arterial No. Priority No. 6/30 12/31 6/30 12/31 6 X30 1 2/31 South 2nd St. 9350 7 5 P.E. 2. Detailed Location of Ptojeet and Ti'imini Length in Miles 13,500 13;500 . Main Ave. So. to Rainier Avenue So. 0.60 R '\\ D`.""'"i"" "1 Proposed ""'k traffic control, street lighting, sidewa�.)cs undergroun ing. (paving by State Highway Dept.) ('"rnst. ESTIMATE OF TOTAL COST • 256,500 256,500 i. Prelim. Fog. Right of guy ('nnslruLtinn Total Total 15,000 -- 285,000 300,000 270,000 270,000 I Local Name of Arterial Arterial No. Priority No. Main Avenue So. 9220 .8 5. P.E. 2. Detailed Location of Protect and Termini Length in Miles 5,400 5,400 . South 2nd St. to 0.1 R,W • Houser Way So. 3. Description of Proposed Work paving, storm sewer, sidewalks, • ' curbs, traffic control, street lighting. Const: • • -ESTIMATE OF TOTAL COST 48,600 ;:48,600 . 4. Prelim. Fng. Right of Way Construction Total Total 54,000 6.,0,00 --- 154,000 1.60,000 "54;000 t = 1 1— 1 1 't. Local Name of Arterial Arterial No. Priority No. 5. P.E. w > • 0 a a- R,'N' 2. Detailed Location of Project and Termini Length in Miles Q • O U- 1. Description of Proposed Work Const. Z 0 U i ' ESTIMATE OF TOTAL COST Total w • 14. - PreE lim. ng. Right of Way Construction Total I- .. . w Lt • REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM 1g CITY OR COUNTY • ON HEARING DATE_6/15 & 6 22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1972 1973 SECONDARY ARTERIAL TRUST 1974 1975 1976 FUNDS 1/1 7/1 1 /1 7/1 1/1 7/1 • to to to tc to to I Local Nani,: of \rtcrial Arterial No Priority No. 6/30 1 2/3 1 6/30 12/31 6/30 12/31 1 / 5 P.G. S.W. 43rd St. 9001 135,000 2. Detailed Location of Project and 'termini Length in Miles 55,000 80,000 • E. Valley Highway and Renton portion of .1.3 It \+. W. Valley Highway to Springbrook Road. 60 000 48 000 3 Dr••'iipuon ,�I l' poyedWork Widen, grading, curbs, storm 108,000 sewers, drainage, sidewalks, paving, traffic control, - street lighting, right-of-Way, . structures 2, 977 , 926 400,000 1,000,00C 500,000 577,926 ESTIMATE OF TOTAL COST - .-J. holm,. Lint. - Right of 1\ay construt.tion 'total Toto! - - 150,000 120,000 3 ,253 , 251 3 ,523 , 251 3, 220, 926 115,000 528,000 1,000,000 500,000 577,926 • 1.. Lora) Name of Atl,.11al Arterial No. Priority No_ 5. P.E. . S.W. Grady Way . 9110 14 400 • 2 u 14,400 . 2. Detailed Location of Projes t and 'termini Length in Miles R'11' - . Rainier Ave. S. ' to 0.25 - Lind Ave. S.W. 3. .Description or Proposed Work widening, regrading, curbs, storm cont- .sewer, drainage, sidewalks, paving, traffic control, 159,300 Z 100,000 59,300 • street lighting. e ESTIMATE OF TOTAL COST !Total `i' I- 4. Piclim, Eng. light of Way Construction Total 173,700 w 114,400 59,300 . - O 16,000 -- 177,000 193,000 a 1. Local Name of Arterial Arterial.No. Priority No7 5. P-F. LLA WELLS AVENUE 9191 3 72,000 0 72,000 R,'1\ a 2. Detailed Location of Project and Tormini Length in Miles Q S. Grady Way to North 6th St. 1.20 40,500 o0 40,500 3. Description of Proposed Work widening, sidewalks, storm sewers Const, . drainage, paving, street lighting and traffic control 'curbs, alignment adjustment, Bridge. 833,400 0 368,500 _ 150,000 150,000 164,900 ESTIMATE OF TOTAL COST Total in ' 4. Prelim. Eng. Right of Way Construction Total • i_ • 80,000 45,000 926,000 1,051,000 945,900 w 481,000 150,000 150,000 164,900 _ _ REVISED 6/2.2/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM ..j9 • CITY OR COUNTY T� HEARING DATE6/ _6/15 & 6/22 , 1970 ADOPTION DATE 61_222.71 __ RESOLUTION NO. 1694 REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN SECONDARY ARTERIAL ARTERIAL 1971 1972 1973 TRUST 1974 1975 1976 FUNDS 1 /1 7/1 1 /1 7/1 1/1 7/1 to to to to to to 6/30 12/31 6/30 12/31 6 /30 12/31 • I. Local Name of Arterial Aiterial No. Priority No. 15. P.F. Williams Avenue 9394 4 135,000 35,000 100,000 _ Detailed Location of Project and [termini Length in Miles R 'll South Grady Way to 1.2 27,000 27,000 N_ 6th .1-r-pet 3. Description of Ptopo.ed Wotk structure, widening, grading, pay- ('ons'. ing, curb, sidewalk, storm sewer, street lighting, 1,008,000 98,000 910,000 traffic control . o ESTIMATE OF TOTAL COST ii H 4. Pio Inn. Eng. Right of I\ay Cons true lion Total U 62,000 198,000 910,000 1,170,000 150,000 30,000 1,120,000 1,300,000 CL 1 Local Name of Arterial Arterial No Priority No. Talbot Road 9041 5 5. P.E. 2. Det.tiled Location of Project and "f.•rmini Length in Miles 12,600 12,600 Grady Way to 0.5 Rw Puget Drive - 3. Description of Proposed Work . widening, paving,traffic signals, Traffic control (STATE) sidewalks, street lighting const: . storm drains (City work in conjunction with State pro ) ESTIMATE OF TOTAL COST 117,000 67,000 50,000 4. Prelim. ling. Right of\1'av Construction Total Total 14,000 -- 4.30,000 144,000 129,600 12,600 67,000 50,000 I. Local Name of Arterial Arterial No. Priority No. 5. P C W S.W. Grady Way 9100 o 6 117,000 cc a 90,000 27,000 a 2. Detailed Location of Project and 'Termini Length in Miles R,'W Q Lind Avenue S. toix _ _ .West City Limits 0-9 - o 3. Description of Proposed Work widening, paving, curb, sidewalks, Const. g storm drainage, structures, street lighting, trafficD control. 1,179,000 0 279• ,000 900,000 • ESTIMATE OF TOTAL COST Total ,n 4. Prelim. Eng. Right of Way Cor•trnetion Total f.. 130,000 --, 1, 1QsN® 1, 49,000 1.296,000 h 90,000 3p6,000 900,000 D I - REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM 2d. . CITY OR COUNTY RENTON HEARING DATE 6/15 & 6/22, 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1'69.4 T ' REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD . , • FUNCTIONAL CLASS OF ARTERIAL URBAN • SECONDARY ARTERIAL ARTERIAL 1971 1972 1973 . TRUST 19.74 1975 197b FUNDS 1/1 7/1 1/1 7/1 1/1 7/1 to to to to to to 6/30 12/31 6/30 12/31 6/30 12/31 i • - - - , 1. ideal Name of Arterial Arterial No. Priority No. 5. P.E. Logan Avenue 94067 27,000 27,000 2.• Detailed Location of Project and Termini Length in Miles R/W ' : South 3rd to 0.409,000 • Airport Way 9,000 3:7 Description,of Proposed Work widening, grading, paving, curbs, Const. . .. ,. sidlights, right—of—ewalks, street traffic control, r L84,040 Z $4040 200,000 way. t o • ESTIMATE OF TOTAL COST Total v)! t- 4. Prelim. Eng. Right of Way Construction Total U • 1201040 200,000 30,000 10,000 315,600 355,600 320,040 0. 0 1. Local Name of Arterial Arterial No. Priority No. 5- P.E. w Lake Washington Boulevard 9280 0 100,000 80,000 8 180,000 ce a R,'W 2. Detailed_Location of Project and Termini Length in Miles a 90,000 o Houser Way to ce 2.5 90,000 N.E. 44th Street 3. Description of Proposed Work widening, grading, storm sewer, Const. Z curb, paving, street lighting, bridge structure, 1,600,000 ]1.,910,,000. traffic control 3,510,000 o ESTIMATE OF TOTAL COST Total N 4. Prelim. Eng. Right of Way Construction Total l- 100,000 80,000 1,690,000 1,910,000 200,000 100,000 3,909,000 4,200,000 3'780,000 w - D UAB-1 REV.1/70 REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM a/ CITY OR COUNTY HEARING DATE_6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70RESOLUTION NO. 1694 lTON REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN COLLECTOR ARTERIAL 1971 1972 1973• 1974 1975 1976 TRUST FUNDS 1/1 7 '1 1 /1 7/1 1/1 7/1 to to to to to to I. Local Name of Arterial Artc nal No Ptiorily No. 6/30 12/31 6/30 12/31 6/30 1 2/31 Union Avenue N.E. 9340 1 5 P.E. 2. ISetailed Location of Project and Termini Length in \Isles 31,500 31,500 N.E. 4th St. to 1.1 R '\\ Sunset Boulevard East . ProposedOork 9,000 9,000 3 Dcstnption of Proposed widening, grading, curbs, storm swer, dr nagtins dewalks, paving, traffic control (•„,„t. ESTIMATE OF TOTAL COST 513,000 189,500 200,000 123,500 4. Piclini. I.Mg. Eight of\\;ie ('nor,truclion Toted Total 35,000 10,000 570,000 615,000 553,500 230,000 200,000 123,500 1 Lest Namc of ,\itelial Arterial No Priority No. Taylor Avenue N.W. & 91305 P.E. Tasrlor P1.N.W. 9121 2 32,850 16,000 16,850 2. D,•lailed Location cml Project and Termini Length in Miles Renton Ave. Extension to N.W. 0.6 tz'w 7th St. & Stevens Ave. N.W. 13,500 13,500 • 3..Description or Proposed Work widening, grading, curbs, side- walks, paving, storm sewer, street lighting, traffic const: control - ESTIMATE OF TOTAL COST 506,250 300,000 206; 50 4.. Prelim. Eng. Right or Way Construction Total Total 16,000 330,350 206,250 36,500 15,000 562,500 . 614,000 552,600 • I. 'Local Name of Arterial Arterial No. Priority No. 5. P.E. Monroe Avenue N.E. 9343 3 25,200 12,000 13,200 2.. Detailed Luca lion of I'iolrc I and Termini Length in Miles R,'\V N.E. 4th St. to 1.0 :9;000 9,000 . N F. 12th St_ 3. Description of Proposed Work widening, curbs, sidewalks, pavinq const• 'traffic control, street lighting. r 69,800 200,000 2(4 ,60() 473,400 Z © . . . ESTIMATE OF TOTAL COST Total w I- 4. Prelim. ling. Right of Way Construction Total 507.,600 CJ w • 12,000 92,000 200,000Q �CRp .. 28,000 10,000 526,000 564,000 re • REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM K‹ • CITY OR COUNTY RESOLUTION NO. 1694 • HEARING DATE__6/15_ & 6 22 , 1970 ADOPTION DATE 6/22/70 _Y__ �� • REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1972 1973 COLLECTOR TRUST FUNDS 1/1 7/1 1 /1 7/1 1/1 7/1 1974 1975 1976 toto to to to to 6/30 12.131 1 6 '30 12/31 6/30 1 2/31 i. I.n„,I Name of:\rteiial Arterial No. Priority No. 5. P.E. Shattuck Avenue So. 9007 4 14,850 14,850 2 De ailed I_oea!ion ,.I PtoL t I and 'Fermin! Length in Miles R "\l South 2nd to 0.5 9,000 9,000 South 7th Streets - -- - Const. 3. 1)esr•ri,ttioo ,tf Pior.•„ d \\„ I, curbs, storm sewers, sidewalks, >- paving, structure, street lighting, traffic control. 309,150 309,150 z 0 ESTIMATE OF TOTAL COST Total l--- -I. Prelim, I-.ng.. Kurt! sof\\av Cons true tion Total 333,000 w 14,850 9,000 309,150 16,500 10,000 343,500 _ 370,000 w EL 1 Local Name of Atter:al Arterial No Priority No.N.E. 12th Street 9333 5 5. P.E. 2. I)eiailed Location of Project and Termini Length in Miles 30;600 12,000 18,600: Edmonds Avenue N.E. to 1.25 R.'W Union Avenue N.E. 9,000 3.. Description of Proposed Work widening, grading, curbs, side- 9,000 . walks, storm sewer, drainage, street lighting, traffic Const. control. . 300,000 299,400 ESTIMATE OF TOTAL COST 599,400 I 4. Prelim. Eng. Night of Way Construction Total Total I . ' 34,000 10,000 W.f0 Q9 710,000 639,000 12,000 27,600 ; 300,000 299,400 • & I. Local Name of Arterial Arterial No. Priority No. 5. P.E. w South 4th Street 6 26,550 0 26,550 EL 2. De tailed.1,oeti lion of Project and Termini Length in Miles R;R' 0 Main Avenue South to 0.6cK Rainier Avenue So. 180,000 0 180,000 3. Description of Proposed Work right-of-way, widening, grading, Const° z paving, storm sewer, traffic control, street lighting 337,950 D 200,000 i37,950' • o . V . ESTIMATE OF TOTAL COST Total v) 4. Prelim. Eng. Right of Way Construction Total I- 544,500 w 206,550 200,000 137,95b 2ca-inn. 2nn_nnn .-375 ,500 V25.000 . ' REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM 2 CITY OR COUNTY - HEARING DATE 6/15 & 6/22, 1970 ADOPTION DATE 6/22/70 RESOLUTION Na-:-.1694.- ‘. .....__. REQUESTED REQUESTED-U. A. TRUST FUNDS BY-PERIOD .FUNCTIONAL CLASS OF ARTERIAL URBAN - • • ARTERIAL 1971 1972 1973I . COLLECTOR TRUST 1974 1975 1976 FUNDS . 1/1 7/1 1/1 7/1 1/1 7/1 - to to to to to to 6/30 12/31 6/30 12/31 6/30 12/31 . Local•Name of Arterial Arterial No. Priority No. 5. P.E. E. �Valley Highway V l 3. 84,600 84,600 Detailed Location of Project and Termini Length in Miles R/N S.W. 16th St. and Lind Avenue S.W. to . 1.9 90,000 90,000 •S:W_ 41rd St. . Description.of Proposed Work . Grading, paving,storm sewers, Const. . -curbs,. sidewalks, traffic control, street lighting, 1,517,400 500,000 500,000 517,400 :.undergrbundinq. o . • ESTIMATE OF TOTAL COST Total w . 1- . Prelim. Eng. Right of Way Construction TotaltU , • '�' 674,600 500,000 517,400 - 94,000 100,000 1,686,000 1,880,000 1,692,000 i a. . • Local Name of Arterial Arterial No. Priority No. 5. P.E. ei Edmonds Ave. N.E. 9335 -> 26.550 8 26,550 a . R,'1l' m - . Detailed Location of Project and Termini Length in Miles 4 • . N.E. 4th Street to Sunset Blvd. N.E. 0.9 m 18,000 ow 18,000 . Description of Proposed Work Const. Z paving, sidewalks, curbs, storm 290,000 196,450 sewers, street lighting, traffic control. 486,450 r o . ESTIMATE OF TOTAL COST Fill ,,, . .Prelim. Eng. Right of Way (Vonstruction Total 1=- 44,,35b 290,000 196,450 29,500 20,000 540,500 590,000 531,000 w D t . Local Name of Arterial Arterial No. Priority No 5. P.E. • Talbot Road 9042 9 46,125 46,125 Detailed Location of Proje,t and Termini Length in Miles R•\ Puget Drive to 1.6 36,000 36,000 Snlnth ri ty l imi to Description of Proposed Work Widening, curbs, sidewalks, storm Const. sewers, drainage, traffic control, street lighting. 883,575 Z 140,000 200,000 200,000 343,575 ESTIMATE OF TOTAL COST Total ,,, . Prelim. Eng. Right of flay (''instruction Total U 965,700 w 222,125 200,000 200,000 ' 343,575 51,250 40,000 1, 274, 750 '1, 366, 000 1 I 1ZGV L j.JJ v/ ,‘,/ , ,, U /11311.111 tiltil+Ati 171.11 I .r.J tilt, V VIN 0 11LU di 1 1V1N t-tf,Vlitf,11iVi - rs-r • CITY OR COUNTY 0,� I HEARING DATE 6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 FUNCTIONAL CLASS OF ARTERIAL REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD URBAN ARTERIAL 1971 1972 1973 COLLECTOR I TRUST 1974 1975 1976 FUNDS 1/1 7.11 1 /1 7/1 1/1 7/1 to to to to to to 6/30 12/31 6/30 12/31 6/30 1 2/31 • Loin Name of Arterial Arterial No. Priority No. 5. P.E w w N.E 10th Street 9999 23,400 > 23,400 _ 10 a . d R,'\\ •Detailed Location of Project and Termini Length in Miles Q • Sunset Blvd. N.E. to 0.75 18,000 w o 18,000 jnion Avenue N.E. w Description of Proposed Work widening, grading, right-of-way, Const, Z storm sewer, curbs, paving, street lighting, and 396 000 : 200,000 196,000 traffic control. ' o LI - ESTIMATE OF TOTAL COST - local "' I. Fret i n. ling. Right of Way Construction Total 1- 23,400 18,000 200,000 196,000 437,400 w 26,000 20,000 440,000 486,000 Ln IAB-1 REV,1/70 ' 1 Local Name of Arterial Arterial No. Priority No. 'N. 30th Street 9300 - 11 5. P.E. 2. Detailed Location of Project and Termini tO Lcn6tltin Miles 13,725 I 13,725 ii»namett/Aveiue::N , Lg*e Wash. Blvd N. /N.30th 0.3 R•'W > F'.A.I. #405 i. Description of Proposed Work widening, grading, curbs, storm 4,500 4,500 sewer, paving, traffic control, street lighting. Const: • ESTIMATE OF TOTAL COST 256,275 256,275 i. Prelim. Eng. Right of Way Construction Total Total 15,250 5,000 284,750 305,000 274,500 18,225 256,275 ----- . . I. Local Name of.Arterial Arterial No. Priority No. 5. P.E. w - - S.W. 16th St. 9003 12 32,850 ce 16,000 16,850 a- . . El_ . 2. Detailed Location of Project and Termini Length in Miles .< E. Valley Highway to 1.1 18,000 0 10,000 8,000 3. Description of Propose Work widening, grading, structures, 'Const. Z . right-of-way, storm sewer, drainage, curbs, sidewalks, n 606,150 .paving, traffic control and street lighting. 606,150 0 ' ESTIMATE OF TOTAL COST Total ,,, • . . 4:*:.. Prelim: Eng. Right of Way Construction Total 657,000 16,000 26,850 614,150 36;500 20,000 673,500 730,000 Rev. 6-22-70 Exhibit A URBAN AREA SIX YEAR CONSTRUCTION PROGRAM -25 Item 1 & 2 • CITY OR COUNTY . • 6/15 & 22, 1970 6/22/70 1694 • HEARING DATEADOPT ION DATE RESOLUTION NO. Renton - - REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD FUNCTIONAL CLASS OF ARTERIAL URBAN ARTERIAL 1971 1972 1 1973 __-- COLLECTOR TRUST - - --- - -- - - - -_J 1974 1975 1976 FUNDS 1/1 7!1 1 /1 7.-1 1/1 I7/1 _____ to to to to td to I. Local Name ol'.\rlerial Arterial No Priority No. 6/30 12 /31 6/30 12/31 6/30 1 2/31 Proposed Route - --; - -- --- -- ----- --------- Lind Ave. S.W. 9103 13 s P.E. 2. ll, i,,l Location of Project .,nd Termini Length in Ohl.., 153,000 10,000 20,000 20,000; 50,000 53,000 S.W. Sunset Blvd. to S.W. 7th 0.4 R % - - - -- - - --- -- ---- -i_- __. - -- 297,000 100,000 100,000 97,000 nc.<,r�l,�i„n ,,I I�r,,,,,,:,,',I k right-of-way, structure, curb, storm sewers, sidewalks, paving, R.R. crossing, traffic- - g� i i - - control, and street lighting ESTIMATE OF TOTAL COST 1,671,750 500 000 580 000 ----- - -' - - - - 591,.750 - 4. Ptelini. Hip. I Right of 1\ay 1 ('onstni,. toil 1 'total 'Total 2,121,750 10,000 120,0001 120,000 147,000 553,000 580,000 I 591,750 170,000 1 330,000 1,857,500 12,357,500 __ -- - I. Loral Nann• n( •\nerial :\iiorial No. Priority No, 5. P.E. - - ------ - ------ --- Lind Avenue S.W. 9103 14 108,000 20,000 88,000 Ih'lailetl Location of Project and Termini Length in Miles R 'W i 90'000 90,000 Grady Way to S.W. 16th 0,7 3. .Description of Proposed Work curb, sidewalk, widen to 44' , Const. hhwy ovcrossir�g s �trm sewer paving, grading, 900,000 a 500,000 400,000 street lig i.ng an tea is signals ESTIMATE OF TOTAL COST Total - I- 4. Prelim. Ing. Right of 11 ay , Construction Total U 120,000 100,000 1,000,000 1,220,000 1,098,000 0 20,000 178,000 500,000 400,000 r 1. LncaI Name or Arterial Arterial No. Priority No. 5- P.H. w 0 • ce - a . . a. 1. Detailed Location of Project and 'termini Length in Miles R,'W Q ce O • u_ • 3. Description of Proposed Work Const. Z D J 0 t 1, ESTIMATE OF TOTAL COST Total 4. • Prelim. Eng. - Right of Way Construction Total = W U) D IIAQ 1 ['CU 1 /7n