Loading...
HomeMy WebLinkAbout1972 TIP CITY OF RENTON RESOLUTION NO. 7753 WHEREAS .the City of Renton has heretofore adopted an Arterial Street Plan as well as its so called "Six_ Year Street Construction Plan" , all pursuant to Chapter7,Extraordinary Session Laws of 1961 of the State of Washington, and Chapter 1.95 of the 1961 Session Laws of the State of Washington, and .such plans and projects having been duly amended and modified from time to time, and WHEREAS the City Council, after. recommendation of its Engineering Department, caused to be held a public hearing on July 14, 1.971 by. and through its Transportion Committee , as required by law, .to. consider the adoption, modification and amendments.. Of. said plans and programs , and WHEREAS it is now. deemed advisable to update. such programs as aforesaid, NOW. THEREFORE BE IT RESOLVED BY THE MAYOR AND THE CITY :COUNCIL 'OF. THE CITY OF RENTON, WASHINGTON, AS FOLLOWS : SE'.CTION 'I : The City' s Six Year Street Construction Program is hereby further amended and modified. as more particularly shown on the attached exhibit, labeled "Exhibit A" which is incorporated, herein and made a part hereof as if fully set forth. The City' s Arterial .Street Plan, as her.etofore adopted and amended , is further amended and modified as more particularly shown on the .attached exhibit, labeled "Exhibit B" , which is incorporated herein and made a part hereof as if. fully set forth. . The aforesaid pians and programs shall be and constitute the City' s -"Six. Year Street Construction Program" and the City' s "Arterial Street Plan" until further reviewed, amended and modified as 'provided by law.. SECTION 'II: .The City Engineer. and City Clerk are. hereby authorized and directed to file this amendment with. the Director of HIghways for the* State of Washington, ,together with a certified copy of this resolution and as otherwise provided by law. -1- PASSED BY THE CITY COUNCIL THIS: 26th day of .July, 1971 . Helmie Naso�, CityCler. • APPROVED BY THE MAYOR this 26th day of July, 1971. Avery Garrett., Mayor Appr.ov as to form:# frz, • • !, Ger%ai:// M. She lay , City Attorney -2- 111X1-1/B/T A Page 1 of 10 SIX-YEAR STREET CONSTRUCTION PROGRAM W72- 1977 . HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON • ROAD F C U R --- .. __ LOCAL NAME OR U L R U LENGTH COST ESTIMATE I?EM OF STREET N A B .R TYPE OF WORK IN NO. ROAD OR STREET NO• T S N AL MILES 1972 1973 1974 1975-77 TOTAL 1 - Rainier Avenue from North City 9000 M X Widening, curbs , sidewalks , s tree 1 1 .8 660,000 660 ,00( lighting, paving, traffic control , limits to S. Grady Way traffic signals , storm sewer and landscaping. 2 Renton Ave. Extension, Airport 9500 N X Widening, sidewalks , curbs , storm 0.9 1 ,496,000 1 ,496 00d Way, Logan Ave. N. from West City sewer, paving, traffic control , limits to N. 6th Street street lighting, right-of-way, bridge 1 468,30 3. Sunset Blvd. N.E. from Edmonds 9363 M X Widening, curbs , sidewalks, 1 .6 468,300 Avenue N.E. to East City limits traffic control , street lighting, undergrounding, traffic signals , . drainage and landscaping - 0.6 380,000 380 ,00' 9360' M X Sidewalks, traffic Signals , traf- 4. ' S. 3rd_ Street from Rainier fic control , paving, street light Avenue S. to Main Ave. S. ing, undergrounding, drainage and landscaping 5. S. 2nd Street, Mill Avenue S. 9350 M X Traffic col+trol , traffic Signals , 0.7 300,000 300,000' to Rainier Ave. S. street lighting, sidewalks, undergrounding, landscaping, • . drainage and paving. 1 4 1 Is. , Page 2 of 10 SIX-YEAR STREET CONSTRUCTION PROGRAM 1972- 1977 HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON - ROAD F. C U R LOCAL NAME OR U L R- U LENGTH COST ESTIMATE ITEM OF STREET N A B R TYPE OF WORK IN I _ NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 .1975-77 TOTAL_ 6. Main Avenue S. 9220 M X Paving, storm sewer, sidewalks , 0.1 60,000 60 ,000 S. 2nd to Houser Way S. curbs , traffic signals, traffic control , street lighting, under- grounding, landscaping. 7. Maple Valley Highway Widening, curbs , sidewalks , drain- 2 l 180,000 225,000 405,000 Bronson WayNto East City limits 9371 M X age, street lighting, traffic N. control and landscaping. 8. Park Avenue N . from Bronson 9200 M X Paving, storm sewer, sidewalks , 1 .1 401 ,000 401 ,()0? . Way N. to N. 8th Street curbs , traffic control , street lighting. 9. N.E. 4th St. - Jefferson St. N.E. 9150 M X Sidewalks , street lighting. 0.9 30,000 100,000 130,000 to East City limits N.E. 3rd St. Sunset Blvd. N. 9140 M X Sidewalks, street lighting, 0.9 100,000 100;000 200,000 10. to N.E. 4th St. rd traffic control . - - 11 . Sunset Blvd. S..W. 9359 M x Curb, sidewalks, Street lighting 2.0 160,000 160,000 Rainier Avenue S. to West and traffic control City limits Page 3 of 10 A SIX-YEAR STREET CONSTRUCTION PROGRAM 1972- 1977 HEARING DATE 7/14/71 ADOPTION DATE ._ 7/26/71 RESOLUTION NO. 1751 CITY OF RENTON • ROAD 4F C U R LOCAL NAME OR U L R U LENGTH COST ESTIMATE ITEM OF STREET N A B R TYPE OF WORK IN NO. ROAD OR. STREET NO. C S N A MILES T S N L 1972 1973 1974 1975-77 TOTAL. 12. N. 6th Street 9201 S X Widening, storm sewer, drainage, 0.5 180,000 180 ,00 Logan Ave. N. to Gar.Jen Ave. N. curbs , sidewalks , R.R. crossing, traffic control , traffic signals , street lighting, right-of-way and landscaping. _ 13. ' Wells Avenue from S. Grady Way 9191 S X Wi dening, sidewalks , storm sewers , 1 .2 40.0,000 520,000 330,000 201 ,000 1 ,451 ,00 to N. 6th Street drainage, paving, street light- ing, traffic control , traffic signals , curbs , alignment adjust- ment, bridge, and right-of-way. v 14. S.W. 43rd Street 9001 1 S X Widen , grading, curbs , storm sewers 1 .6 354,000 1 ,700,000 1 ,696,000 3,750,00 West Valley Highway to Spring- sidewalks , paving, traffic control brook Road street lighting, right-of-way., structures , drainage, & landscapin 1 Also traffic signals. • 15. 9406 S X , , Widening, grading, paving, curbs, 0.4 155,000 200,600 355,60 Logan Avenue S. from S. 3rd Sl . sidewalks , street lights , traffic to Airport Way control , traffic signals, right- . of-way , drainage & landscaping. _ 16. r 9041 S T X Widening, paving, traffic signals , 0.5 144,000 ' 144,0C Talbot Road Extension from - traffic control , sidewalks , street S. Grady Way to Puget Drive S. lighting, storm drains. - Page 4 of 1U .. SIX-YEAR STREET CONSTRUCTION PROGRAM . . 1972- 1977 HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON . - ROAD F C U R -..- -- - ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE OF STREET N A 8 R TYPE OF WORK IN - - N0. ROAD OR STREET NO. T S N A MILES 1972 1973 1974 1975-77 TOTAL 17. S.W. Grady Way from Rainier Ave. 9100 S X Widening, paving, curbs , sidewalks , 1 .2 100,00 400,000 1 ,040,000 1 ,630,00( S. to West City limits storm drains , structures , street lighting, traffic signals , traffic control , bridge and landscaping. 18. Williams Avenue from S. Grady 9394 S X 7tructure, widening, grading, 1 .2 30,000. 270,000 500,000 500,000 1 ,300,00( Way to N. 6th St. paving, curb, sidewalks , storm sewer, street lighting, traffic control , railroad adjustment and 1 andscaping. 19. Sunset Blvd. N.E. 9362 S X Widening, grading, drainage, 1 .7 300,000 380,000 680,00( Bronson Way N. to Edmonds storm sewer, sidewalks , curbs , Avenue N.E. paving, traffic signals , traffic control and street lighting. 20. Lake Washington Blvd. N. from 9280 S X Widening, grading, storm. sewer, 2.5 200,000 4,000,000 4,200,00( Houser Way N. to North 44th St, curb, paving, street lighting, bridge structure, traffic control . • 21 . • 9045 S X Widening, drainage, storm sewer, 1 .8 90,000 900,000 110,000 1 ,100,00( Benson Road So. (Existing) paving, curbs, sidewalks , street • S. Grady Way to S. City limits lighting, signals and landscaping. Page 5 of 10 SIX-YEAR • STREET CONSTRUCTION PROGRAM • 1972- 1977 . • HEARING DATE 7/14/71 ADOPTION DATE 7/26/71_-.___ RESOLUTION NO. 1753 __ ___ CITY OF 'RENTON • — . • • ROAD F C U R — --------- - --- - ----- --- ----- - - LOCAL NAME • OR U L R U - LENGTH COST ESTIMATE 17tMOF STREET N A B R TYPE OF WORK • IN NO. ROAD OR•STREET NO. T S N L • MILES 1972 1973 1974 1975-77 TOTAL • 22. Garden Avenue N. from 91.81 C X. Widening, grading, curbs , storm 0.5 20,000 100,000 30,000 15(.1,000 • N. 4th St. to N. 8th St. sewer, drainage, sidewalks , pav- . ing, street lighting & traffic • control . • • • 23. • 9007 C X Widening, curbs , storm sewers , • 0.5 300,000 34,000 36,000 • 3/0 ,01)0 Shattuck Avenue S. from S. 2nd sidewalks , paving, structure, _ Street to S. 7th Street street lighting, traffic control • . .nd .landscaping. • . 24. Houser Way S. from _ 9360 C X Widening, bridge reconstruction, 0.5 270,000 • 270,000 • . Main Avenue S. to Bronson grading, curbs , storm sewer, Way N. drainage, sidewalks, paving, traffic control , street lighting. 25. S. Puget Dr. , S.E. Puget Dr. 9052 • C X Widen, curbs, sidewalks, storm 1 .2 70,000 180,000 200,000 • 450,000 • Talbot Rd-. S. to Edmonds . traffic signals , traffic _ . Avenue S.E. control & landscaping. 1 • Page 6 of 10 SIX -YEAR STREET CONSTRUCTION ,PROGRAM 1972- 1977 HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 . RESOLUTION NO. 1753 CITY OF RENTON ROAD F C U R , LOCAL NAME OR U L R /. LENGTH COST ESTIMATE TEM OF STREET N A B R TYPE OF WORK IN NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 . 1975-77 • TOTAL --- 26. 4.E. 12th Street from EdIuoiids 9333 C X Widening, grading, curbs, side- 1 0 100,000 47,000 663,000 810,000 Avenue N .E. to Union AVe. N.E. walks, storm sewers , drainage, street lighting, & traffic control 27. S. 4th Street from Main Ave. S. 9444 C X Right-of-way, widening, curbs, 0.5 227,000 378,000 605 ,000 to Shattuck Ave. S. sidewalks , grading, paving, storm se ;ers , traffic control , street lighting & landscaping 28. East Valley Highway from 9103 C 7 Widening, gre.ding, paving, storm 1 .9 1 , 175 ,000 705,000 1 ;880 ,000 S.W. 16th St. & Lind Ave. S.W. sewers , curbs, sidewalks , traffic to S.W. 43rd St. control , St. lighting & Undergroundiing 29 Edmonds Avenue N.E. from N.E. 9335 C Widening, paving; curbs , sidewalks , 1 . 1 30,000 50,000 140,000 200,000 420;000 3rd St. to Sunset Blvd. N.E. storm sewers , street lighting, traffic control . 30. Talbot Road S. from S. Puget C X Widening, curbs , sidewalks , storm . 1 .0 40 ,000 80 ,000 50,000 200,000 370,000 Dr. to S. 19th St. & S. 23rd 9042 sewers , drainage, traffic control , Street to 32nd Street. street lighting, utility adjust- ments. • • 31 . 9999 C X. Widening, grading, right-of-way, 0.75 25,000 240,000 221 ,000 486,000 N.E. 10th St,. from Sunset Blvd. storm sewers , curbs , sidewalks , .' N.E. to Union Avenue N.E. paving, street lighting and. traffic control . r. A, Page 7 of 10 SIX-YEAR STREET CONSTRUCTION PROGRAM . 1972- 1977 • HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON ROAD F C U R ITEM LOCAL NAME OR U L R U LENGTH - COST ESTIMATE OF STREET N A B R TYPE OF WORK IN NO- ROAD OR STREET NO. T S N LL MILES 1972 1973 1974 1975-77 TOTAL 32. Burnett Avenue N . from Lake 9300 C X Widening, grading, curbs , side- 0.6 305 ,000 305,000 Washington Blvd. N. to N. 30th walks , storm sewer, paving, traf- St. & N. 30th St. Lo F.A.I . WS fic control , street lighting 33. S.W. 16th Street from E. Valley 9003 C X Widening, grading, structures , '1 .1 43,000 687,000 730,000 Highway to Monster Road S.W. right-of-way , storm sewer, drainage, curbs , sidewalks , paving, traffic control and street lighting. 34. Taylor Avenue N.W. & Taylor P1 . 9130 C X Widening, grading, curbs , sida'al . 0.6 16,000 50,000 30,000 54,000 150,000 N.W. from Renton Avenue Ext. paving, storm sewers , street to Stevens Avenue N.W. lighting, traffic control 35. Monroe Ave. N.E. from N.E. 4th 9343 C X . Widening, curbs , sidewalks , pay- 1 .0 114,000 200,000 250,000 564,000 Street to N.E. 12th St. ing, traffic control , street lighting, drainage, grading. 36. 9366 C X Curbs , sidewalk, storm.sewer, 0.3 10,000 10,000. • Morris Avenue S. from S. 2nd paving, street lighting & St. to S. 4th St. traffic control 37. Whitworth Avenue S. from S. 9369 C X curb, sidewalk, storm sewer, 0.3 10,000 10,.000. 2nd St. to S. 4th St. paving, street lighting and • traffic control . i Page 8 of 10. , k SIX-YEAR STREET CONSTRUCTION PROGRAM 1972- 1977 HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF REN.TON ROAD F C U R LOCAL NAME OR U L R U LENGTH COST ESTIMATE ITEM OF STREET N A B R TYPE OF WORK IN NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 1975-77 TOTAL 38. S. 4th Pl . from Shattuck Ave. S. to Rainier Ave. 9006 C X curb, sidewalk, storm sewer, 0.1 20,000 20,000 S. paving; and street lighting 39' 9230 C .X Widening, grading, storm sewer, 0.6 20,000 240,000 260,000 Burnett Avenue N. from curb, paving, street lighting ;1. 30th St. to Lake ;lash. Blvd.N and traffic control . 40 C X Widening, grading, storm sewer, 0.8 20,000 - 20,000 10,000 460,000 510,000_.. Union Avenue N.E. from N.E. 9340 I curb, sidewalk, paving, street Sunset Blvd. to North City limits lighting, traffic control & • _ 1.,n dscp..t .___,_ 41 . Kirkland Ave. N.E. from N.E. 0-' 1 C X curb, sidewalks , paving, storm 0.25 26 ,000 26,000 Sunset Blvd. to N.E. 10th St. sewer 42. Aberdeen Ave. N.E. from 9336 C X Widening, grading, drainage, 1 .7 680,000 680,000 Sunset Blvd. N.E. to N.E. 27th storm sewer, curbs , sidewalks , St. paving and street lighting 43. N.E. 7th Si. from Sunset Blvd. 9365 C X Curbs , storm sewer, paving, side- 0.8 . . 320,000 320,000 N .E. to Monroe Avenue N.E. walks , traffic control and street lighting. _ Page.:9:.. f 111 SIX-YEAR STREET CONSTRUCTION PROGRAM • 1972- 1977 HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 . RESOLUTION NO. 1753 CITY OF RENTON. ROAD ` F C U R LOCAL NAME OR U L R U LENGTH COST ESTIMATE ITEM OF STREET N A B R TYPE OF WORK IN NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 1975-77 TOTAL 44. Lind Avenue- S.W. from S.W. Sun- 9103 C X Curbs , sidewalks, storm sewer, 1 .0 440,000 200,000 1 ,800,000 set Blvd. to S.W. 16th St. paving, grading, Highway over- 2, 440 ,00(. crossing structure, widening to 44' & St. lighting. R. R. Crossing. 45. Smithers Ave. S. from 9406 C X Widening, grading, drainage, storn 0.5 40,000 60,000 300,000 200,000 600,000 S. Grady to S. 3rd St. sewer, paving, sidewalks , street lights , R. R. crossing, right-of- way. 46. S. 7th St. from Rainier Ave. C X Widening, storm sewer, sidewalks , 1 .8 30,000 20,000 .20,000 200,000 270,000 S. to,Hardie Ave. S.W. & street lights , paving, Traffic Rainier Ave. S. to S. Grady Signals. Way. 47. Monster Road S.W. from S. 140th C X Widening, curbs , gutters , side- 1 .8 20,000 20,000 40,000 500,000 580,000 St. to S.W. 16th St. walks , drainage, paving, street lighting, traffic control . .. . 48. 9103 C X New Construction: 1 .75 20,000 20,000 40,000 800,000 880,000 Lind Ave. S.W. from S.W. 16th Right-of-way, paving, curbs , St. to S.W. 43rd St. gutters ; sidewalks , drainage, street lighting, traffic control . . 49.. ^` C X Widen, storm sewer, sidewalk, 0.30 20,000 20,000 Burnett Avenus S. from curbs, paving, signals, street Houser Way S. to S. 2nd St._ lighting. , S.E. 31st St. from Benson C X Widening, storm sewer, sidewalk, 0.1 4,000 Off'- . - Highway S. to Kennewick Pl. S.E curbs, paving, signals , street . ,1 tghtl:rig. Page:40,:bf -le, .4. , x SIX-YEAR STREET CONSTRUCTION PROGRAM . . • 1972- 1977. .. . . . . . . . HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON . . . ...... .: • ,.. , . . • ••• • • ROADFCUR . . LOCAL NAME OR U L R U LENGTH . COST ESTIMATE ITE.M N A B R OF STREET TYPE OF WORK IN MILES NO.' ROAD OR STREET NO. C S A A • T S N L 1972 1973 1974 1975-77 TOLL • • . . 51 . N.E. 6th St. (S.E. 124th St. ) A X New Construction: 0.25 25,000 25 ,000 from Union Ave. N.E. to right-of-way, paving, curbs , . . , East city limits gutters , sidewalks , drainage, . . street lighting, traffic control -52. Stevens Avenue N.W. .from A X Widening, grading, curbs , 0.25 - 120,000 120 .O00 - , Taylor -Pl . N .W. to N.W. 4th St. sidewalks , paving, street. 1 ightinii traffic control • 53. Lind Avenue N.W. from A X Widening, grading, curbs , • 0.45 . 135,000 135,000 Taylor P1 . N.W. to N.W. 2nd P1 . sidewalks , paving, street • & N.W. 2nd P1 . to Taylor Ave. lighting, and traffic control . . . N.W. . . .. . . .. ..• - , . • • . , . • . • • . . . . • . . ." . . . . . • . : .. . . - . . . . . , • • • . . . . , . . ... . . . . . . . .