HomeMy WebLinkAbout1972 TIP CITY OF RENTON
RESOLUTION NO. 7753
WHEREAS .the City of Renton has heretofore adopted an Arterial
Street Plan as well as its so called "Six_ Year Street Construction
Plan" , all pursuant to Chapter7,Extraordinary Session Laws of 1961 of
the State of Washington, and Chapter 1.95 of the 1961 Session Laws of
the State of Washington, and .such plans and projects having been duly
amended and modified from time to time, and
WHEREAS the City Council, after. recommendation of its Engineering
Department, caused to be held a public hearing on July 14, 1.971 by. and
through its Transportion Committee , as required by law, .to. consider
the adoption, modification and amendments.. Of. said plans and programs ,
and
WHEREAS it is now. deemed advisable to update. such programs
as aforesaid, NOW. THEREFORE
BE IT RESOLVED BY THE MAYOR AND THE CITY :COUNCIL 'OF. THE CITY
OF RENTON, WASHINGTON, AS FOLLOWS :
SE'.CTION 'I : The City' s Six Year Street Construction Program
is hereby further amended and modified. as more particularly shown on
the attached exhibit, labeled "Exhibit A" which is incorporated, herein
and made a part hereof as if fully set forth.
The City' s Arterial .Street Plan, as her.etofore adopted and
amended , is further amended and modified as more particularly shown on
the .attached exhibit, labeled "Exhibit B" , which is incorporated herein
and made a part hereof as if. fully set forth.
. The aforesaid pians and programs shall be and constitute
the City' s -"Six. Year Street Construction Program" and the City' s
"Arterial Street Plan" until further reviewed, amended and modified as
'provided by law..
SECTION 'II: .The City Engineer. and City Clerk are. hereby
authorized and directed to file this amendment with. the Director of
HIghways for the* State of Washington, ,together with a certified copy
of this resolution and as otherwise provided by law.
-1-
PASSED BY THE CITY COUNCIL THIS: 26th day of .July, 1971 .
Helmie Naso�, CityCler.
•
APPROVED BY THE MAYOR this 26th day of July, 1971.
Avery Garrett., Mayor
Appr.ov as to form:#
frz,
• • !,
Ger%ai:// M. She lay , City Attorney
-2-
111X1-1/B/T A Page 1 of 10
SIX-YEAR STREET CONSTRUCTION PROGRAM
W72- 1977 .
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON •
ROAD F C U R --- .. __
LOCAL NAME OR U L R U LENGTH COST ESTIMATE
I?EM OF STREET N A B .R TYPE OF WORK IN
NO. ROAD OR STREET NO• T S N AL MILES 1972 1973 1974 1975-77 TOTAL
1 - Rainier Avenue from North City 9000 M X Widening, curbs , sidewalks , s tree 1 1 .8 660,000 660 ,00(
lighting, paving, traffic control ,
limits to S. Grady Way traffic signals , storm sewer and
landscaping.
2 Renton Ave. Extension, Airport 9500 N X Widening, sidewalks , curbs , storm 0.9 1 ,496,000 1 ,496 00d
Way, Logan Ave. N. from West City sewer, paving, traffic control ,
limits to N. 6th Street street lighting, right-of-way,
bridge
1 468,30
3. Sunset Blvd. N.E. from Edmonds 9363 M X Widening, curbs , sidewalks, 1 .6 468,300
Avenue N.E. to East City limits traffic control , street lighting,
undergrounding, traffic signals , .
drainage and landscaping -
0.6 380,000 380 ,00'
9360' M X Sidewalks, traffic Signals ,
traf-
4. ' S. 3rd_ Street from Rainier fic control , paving, street light
Avenue S. to Main Ave. S. ing, undergrounding, drainage and
landscaping
5. S. 2nd Street, Mill Avenue S. 9350 M X Traffic col+trol , traffic Signals , 0.7 300,000 300,000'
to Rainier Ave. S. street lighting, sidewalks,
undergrounding, landscaping, • .
drainage and paving.
1 4 1 Is.
,
Page 2 of 10
SIX-YEAR STREET CONSTRUCTION PROGRAM
1972- 1977
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON
- ROAD F. C U R
LOCAL NAME OR U L R- U LENGTH COST ESTIMATE
ITEM OF STREET N A B R TYPE OF WORK IN I _
NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 .1975-77 TOTAL_
6. Main Avenue S. 9220 M X Paving, storm sewer, sidewalks , 0.1 60,000 60 ,000
S. 2nd to Houser Way S. curbs , traffic signals, traffic
control , street lighting, under-
grounding, landscaping.
7. Maple Valley Highway Widening, curbs , sidewalks , drain- 2 l 180,000 225,000 405,000
Bronson WayNto East City limits 9371 M X age, street lighting, traffic
N. control and landscaping.
8. Park Avenue N . from Bronson 9200 M X Paving, storm sewer, sidewalks , 1 .1 401 ,000 401 ,()0? .
Way N. to N. 8th Street curbs , traffic control , street
lighting.
9. N.E. 4th St. - Jefferson St. N.E. 9150 M X Sidewalks , street lighting. 0.9 30,000 100,000 130,000
to East City limits
N.E. 3rd St. Sunset Blvd. N. 9140 M X Sidewalks, street lighting, 0.9 100,000 100;000 200,000
10. to N.E. 4th St. rd traffic control . - -
11 . Sunset Blvd. S..W. 9359 M x Curb, sidewalks, Street lighting 2.0 160,000 160,000
Rainier Avenue S. to West and traffic control
City limits
Page 3 of 10
A
SIX-YEAR STREET CONSTRUCTION PROGRAM
1972- 1977
HEARING DATE 7/14/71 ADOPTION DATE ._ 7/26/71 RESOLUTION NO. 1751 CITY OF RENTON
•
ROAD 4F C U R
LOCAL NAME OR U L R U LENGTH COST ESTIMATE
ITEM OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR. STREET NO. C S N A MILES
T S N L 1972 1973 1974 1975-77 TOTAL.
12. N. 6th Street
9201 S X Widening, storm sewer, drainage, 0.5 180,000 180 ,00
Logan Ave. N. to Gar.Jen Ave. N. curbs , sidewalks , R.R. crossing,
traffic control , traffic signals ,
street lighting, right-of-way and
landscaping. _
13. ' Wells Avenue from S. Grady Way 9191 S
X Wi dening, sidewalks , storm sewers , 1 .2 40.0,000 520,000 330,000 201 ,000 1 ,451 ,00
to N. 6th Street drainage, paving, street light-
ing, traffic control , traffic
signals , curbs , alignment adjust-
ment, bridge, and right-of-way. v
14. S.W. 43rd Street
9001 1 S X Widen , grading, curbs , storm sewers 1 .6 354,000 1 ,700,000 1 ,696,000 3,750,00
West Valley Highway to Spring- sidewalks , paving, traffic control
brook Road street lighting, right-of-way.,
structures , drainage, & landscapin 1
Also traffic signals.
•
15.
9406 S X , ,
Widening, grading, paving, curbs, 0.4 155,000 200,600 355,60
Logan Avenue S. from S. 3rd Sl . sidewalks , street lights , traffic
to Airport Way control , traffic signals, right-
. of-way , drainage & landscaping. _
16. r 9041 S T X Widening, paving, traffic signals , 0.5 144,000 ' 144,0C
Talbot Road Extension from - traffic control , sidewalks , street
S. Grady Way to Puget Drive S. lighting, storm drains. -
Page 4 of 1U
..
SIX-YEAR STREET CONSTRUCTION PROGRAM
. . 1972- 1977
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON .
-
ROAD F C U R -..- -- -
ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE
OF STREET N A 8 R TYPE OF WORK IN - -
N0. ROAD OR STREET NO. T S N A MILES 1972 1973 1974 1975-77 TOTAL
17. S.W. Grady Way from Rainier Ave. 9100 S X Widening, paving, curbs , sidewalks , 1 .2 100,00 400,000 1 ,040,000 1 ,630,00(
S. to West City limits storm drains , structures , street
lighting, traffic signals , traffic
control , bridge and landscaping.
18. Williams Avenue from S. Grady 9394 S X 7tructure, widening, grading, 1 .2 30,000. 270,000 500,000 500,000 1 ,300,00(
Way to N. 6th St. paving, curb, sidewalks , storm
sewer, street lighting, traffic
control , railroad adjustment and
1 andscaping.
19. Sunset Blvd. N.E. 9362 S X Widening, grading, drainage, 1 .7 300,000 380,000 680,00(
Bronson Way N. to Edmonds storm sewer, sidewalks , curbs ,
Avenue N.E. paving, traffic signals , traffic
control and street lighting.
20. Lake Washington Blvd. N. from 9280 S X Widening, grading, storm. sewer, 2.5 200,000 4,000,000 4,200,00(
Houser Way N. to North 44th St, curb, paving, street lighting,
bridge structure, traffic control . •
21 . • 9045 S X Widening, drainage, storm sewer, 1 .8 90,000 900,000 110,000 1 ,100,00(
Benson Road So. (Existing) paving, curbs, sidewalks , street •
S. Grady Way to S. City limits lighting, signals and landscaping.
Page 5 of 10
SIX-YEAR • STREET CONSTRUCTION PROGRAM
• 1972- 1977 .
•
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71_-.___ RESOLUTION NO. 1753 __ ___ CITY OF 'RENTON •
— .
•
•
ROAD F C U R — --------- - --- - ----- --- ----- - -
LOCAL NAME • OR U L R U - LENGTH COST ESTIMATE
17tMOF STREET N A B R TYPE OF WORK • IN
NO. ROAD OR•STREET NO. T S N L • MILES 1972 1973 1974 1975-77 TOTAL •
22. Garden Avenue N. from 91.81 C X. Widening, grading, curbs , storm 0.5 20,000 100,000 30,000 15(.1,000
•
N. 4th St. to N. 8th St. sewer, drainage, sidewalks , pav- .
ing, street lighting & traffic
• control . •
•
•
23. • 9007 C X Widening, curbs , storm sewers , • 0.5 300,000 34,000 36,000 • 3/0 ,01)0
Shattuck Avenue S. from S. 2nd sidewalks , paving, structure, _
Street to S. 7th Street street lighting, traffic control • .
.nd .landscaping. • .
24. Houser Way S. from _ 9360 C X Widening, bridge reconstruction, 0.5 270,000 • 270,000 •
. Main Avenue S. to Bronson grading, curbs , storm sewer,
Way N. drainage, sidewalks, paving,
traffic control , street lighting.
25. S. Puget Dr. , S.E. Puget Dr. 9052 • C X Widen, curbs, sidewalks, storm 1 .2 70,000 180,000 200,000 •
450,000
• Talbot Rd-. S. to
Edmonds .
traffic signals , traffic
_ . Avenue S.E. control & landscaping.
1 •
Page 6 of 10
SIX -YEAR STREET CONSTRUCTION ,PROGRAM
1972- 1977
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 . RESOLUTION NO. 1753 CITY OF RENTON
ROAD F C U R ,
LOCAL NAME OR U L R /. LENGTH COST ESTIMATE
TEM OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 . 1975-77 • TOTAL
---
26. 4.E. 12th Street from EdIuoiids 9333 C X Widening, grading, curbs, side- 1 0 100,000 47,000 663,000 810,000
Avenue N .E. to Union AVe. N.E. walks, storm sewers , drainage,
street lighting, & traffic control
27. S. 4th Street from Main Ave. S. 9444 C X Right-of-way, widening, curbs, 0.5 227,000 378,000 605 ,000
to Shattuck Ave. S. sidewalks , grading, paving, storm
se ;ers , traffic control , street
lighting & landscaping
28. East Valley Highway from 9103 C 7 Widening, gre.ding, paving, storm 1 .9 1 , 175 ,000 705,000 1 ;880 ,000
S.W. 16th St. & Lind Ave. S.W. sewers , curbs, sidewalks , traffic
to S.W. 43rd St. control , St. lighting & Undergroundiing
29 Edmonds Avenue N.E. from N.E. 9335 C Widening, paving; curbs , sidewalks , 1 . 1 30,000 50,000 140,000 200,000 420;000
3rd St. to Sunset Blvd. N.E. storm sewers , street lighting,
traffic control .
30. Talbot Road S. from S. Puget C X Widening, curbs , sidewalks , storm . 1 .0 40 ,000 80 ,000 50,000 200,000 370,000
Dr. to S. 19th St. & S. 23rd 9042 sewers , drainage, traffic control ,
Street to 32nd Street. street lighting, utility adjust-
ments. •
•
31 . 9999 C X. Widening, grading, right-of-way, 0.75 25,000 240,000 221 ,000 486,000
N.E. 10th St,. from Sunset Blvd. storm sewers , curbs , sidewalks , .'
N.E. to Union Avenue N.E. paving, street lighting and.
traffic control .
r.
A,
Page 7 of 10
SIX-YEAR STREET CONSTRUCTION PROGRAM .
1972- 1977 •
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON
ROAD F C U R
ITEM LOCAL NAME OR U L R U LENGTH - COST ESTIMATE
OF STREET N A B R TYPE OF WORK IN
NO- ROAD OR STREET NO. T S N LL
MILES 1972 1973 1974 1975-77 TOTAL
32. Burnett Avenue N . from Lake 9300 C X Widening, grading, curbs , side- 0.6 305 ,000 305,000
Washington Blvd. N. to N. 30th walks , storm sewer, paving, traf-
St. & N. 30th St. Lo F.A.I . WS fic control , street lighting
33. S.W. 16th Street from E. Valley 9003 C X Widening, grading, structures , '1 .1 43,000 687,000 730,000
Highway to Monster Road S.W. right-of-way , storm sewer,
drainage, curbs , sidewalks ,
paving, traffic control and
street lighting.
34. Taylor Avenue N.W. & Taylor P1 . 9130 C X Widening, grading, curbs , sida'al . 0.6 16,000 50,000 30,000 54,000 150,000
N.W. from Renton Avenue Ext. paving, storm sewers , street
to Stevens Avenue N.W. lighting, traffic control
35. Monroe Ave. N.E. from N.E. 4th 9343 C X . Widening, curbs , sidewalks , pay- 1 .0 114,000 200,000 250,000 564,000
Street to N.E. 12th St. ing, traffic control , street
lighting, drainage, grading.
36. 9366 C X Curbs , sidewalk, storm.sewer, 0.3 10,000 10,000.
•
Morris Avenue S. from S. 2nd paving, street lighting &
St. to S. 4th St. traffic control
37. Whitworth Avenue S. from S. 9369 C X curb, sidewalk, storm sewer, 0.3 10,000 10,.000.
2nd St. to S. 4th St. paving, street lighting and
•
traffic control .
i
Page 8 of 10.
,
k
SIX-YEAR STREET CONSTRUCTION PROGRAM
1972- 1977
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF REN.TON
ROAD F C U R
LOCAL NAME OR U L R U LENGTH COST ESTIMATE
ITEM OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 1975-77 TOTAL
38. S. 4th Pl . from
Shattuck Ave. S. to Rainier Ave. 9006 C X curb, sidewalk, storm sewer, 0.1 20,000 20,000
S. paving; and street lighting
39' 9230 C .X Widening, grading, storm sewer, 0.6 20,000 240,000 260,000
Burnett Avenue N. from
curb, paving, street lighting
;1. 30th St. to Lake ;lash. Blvd.N and traffic control .
40 C X Widening, grading, storm sewer, 0.8 20,000 - 20,000 10,000 460,000 510,000_..
Union Avenue N.E. from N.E. 9340 I curb, sidewalk, paving, street
Sunset Blvd. to North City limits lighting, traffic control &
• _ 1.,n dscp..t .___,_
41 . Kirkland Ave. N.E. from N.E. 0-' 1 C X curb, sidewalks , paving, storm 0.25 26 ,000 26,000
Sunset Blvd. to N.E. 10th St. sewer
42. Aberdeen Ave. N.E. from 9336 C X Widening, grading, drainage, 1 .7 680,000 680,000
Sunset Blvd. N.E. to N.E. 27th storm sewer, curbs , sidewalks ,
St. paving and street lighting
43. N.E. 7th Si. from Sunset Blvd. 9365 C X Curbs , storm sewer, paving, side- 0.8 . . 320,000 320,000
N .E. to Monroe Avenue N.E. walks , traffic control and
street lighting. _
Page.:9:.. f 111
SIX-YEAR STREET CONSTRUCTION PROGRAM
•
1972- 1977
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 . RESOLUTION NO. 1753 CITY OF RENTON.
ROAD ` F C U R
LOCAL NAME OR U L R U LENGTH COST ESTIMATE
ITEM OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. T S N L MILES 1972 1973 1974 1975-77 TOTAL
44. Lind Avenue- S.W. from S.W. Sun- 9103 C X Curbs , sidewalks, storm sewer, 1 .0
440,000 200,000 1 ,800,000
set Blvd. to S.W. 16th St. paving, grading, Highway over- 2, 440 ,00(.
crossing structure, widening to
44' & St. lighting. R. R. Crossing.
45. Smithers Ave. S. from 9406 C X Widening, grading, drainage, storn 0.5 40,000 60,000 300,000 200,000 600,000
S. Grady to S. 3rd St. sewer, paving, sidewalks , street
lights , R. R. crossing, right-of-
way.
46. S. 7th St. from Rainier Ave. C X Widening, storm sewer, sidewalks , 1 .8 30,000 20,000 .20,000 200,000 270,000
S. to,Hardie Ave. S.W. & street lights , paving, Traffic
Rainier Ave. S. to S. Grady Signals.
Way.
47. Monster Road S.W. from S. 140th C X Widening, curbs , gutters , side- 1 .8 20,000 20,000 40,000 500,000 580,000
St. to S.W. 16th St. walks , drainage, paving, street
lighting, traffic control . ..
. 48. 9103 C X New Construction: 1 .75 20,000 20,000 40,000 800,000 880,000
Lind Ave. S.W. from S.W. 16th Right-of-way, paving, curbs ,
St. to S.W. 43rd St. gutters ; sidewalks , drainage,
street lighting, traffic control . .
49.. ^` C X Widen, storm sewer, sidewalk, 0.30 20,000 20,000
Burnett Avenus S. from curbs, paving, signals, street
Houser Way S. to S. 2nd St._ lighting. ,
S.E. 31st St. from Benson C X Widening, storm sewer, sidewalk, 0.1 4,000 Off'- .
- Highway S. to Kennewick Pl. S.E curbs, paving, signals , street
. ,1 tghtl:rig.
Page:40,:bf -le,
.4.
, x
SIX-YEAR STREET CONSTRUCTION PROGRAM
. .
•
1972- 1977. .. . . . . . . .
HEARING DATE 7/14/71 ADOPTION DATE 7/26/71 RESOLUTION NO. 1753 CITY OF RENTON
. . . ...... .:
• ,.. , . .
• ••• •
• ROADFCUR . .
LOCAL NAME OR U L R U LENGTH . COST ESTIMATE
ITE.M N A B R
OF STREET TYPE OF WORK IN MILES
NO.' ROAD OR STREET NO. C S A A
•
T S N L 1972 1973 1974 1975-77 TOLL
• • . .
51 . N.E. 6th St. (S.E. 124th St. ) A X New Construction:
0.25 25,000 25 ,000
from Union Ave. N.E. to right-of-way, paving, curbs ,
.
. , East city limits gutters , sidewalks , drainage, . .
street lighting, traffic control
-52. Stevens Avenue N.W. .from A X Widening, grading, curbs , 0.25 - 120,000 120 .O00
- , Taylor -Pl . N .W. to N.W. 4th St. sidewalks , paving, street. 1 ightinii
traffic control
•
53. Lind Avenue N.W. from A X Widening, grading, curbs , • 0.45 . 135,000 135,000
Taylor P1 . N.W. to N.W. 2nd P1 . sidewalks , paving, street
• & N.W. 2nd P1 . to Taylor Ave. lighting, and traffic control . . .
N.W.
. . .. . .
.. ..•
- ,
. • • .
, . •
. •
•
. .
. . • .
. ."
. .
. .
. • . :
.. . .
- . . .
. . ,
• •
• . .
. . ,
. .
...
.
. .
. . .
. .