HomeMy WebLinkAboutCO 02 % Community Services
Facilities Division CONTRACT NO: CAG-19-196 CO NO. 2
CONTRACT CHANGE ORDER(CO) PROJECT TITLE: Police Training Center& City Attorney TI
TO: Klinge &Associates, Inc. (CONTRACTOR)
The following mutually agreed to and Owner approved Change Order Proposal(s)are hereby incorporated by reference into
the contract.
Description Amount
COP#002 Change Wood To HM Frames $ 3,027.10
CONTRACT SUM:
❑ NO CHANGE
0 INCREASE OF: $ 3,027.10
O DECREASE (WASHINGTON STATE SALES TAX INCLUDED)
CONTRACT TIME:
❑ NO CHANGE
2 INCREASE OF: 2
❑ DECREASE CALENDAR DAYS
The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and
effect.
CONTRACT SUMMARY(Internal Use Only)
ORIGINAL CONTRACT SUM $ 958,022.00
PREVIOUS ADDITIONS/DELETIONS $ 9,511.49
PREVIOUS TOTAL $ 967,533.49
CHANGE AMOUNT THIS CHANGE ORDER $ 3,027.10
REVISED CONTRACT TOTAL $ 970,560.59
PERCENT TOTAL CHANGE FROM ORIGINAL 1.31%
NOTICE TO PROCEED DATE September 3, 2019
PREVIOUS CONTRACT CALENDAR DAYS 103
PREVIOUS SUBSTANTIAL COMPLETION DATE December 15, 2019
REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 105
CURRENT SUBSTANTIAL C L TION tDecember 17, 2019
Architect Acknowledgement Date cknow dgement Date
The City of Renton hereby accepts the foregoing Change Order Proposal(s).This formal acceptance constitutes a Change to the contract only
when authorizing signature is affixed.Invoices incorporating this Change Order constitute acceptance by the Contractor as total
reimbursement due in connection with this Change Order
1 /24/6///
r '
AUTHORIZ G SI r ATU'E DATE
Klinge and Associates, Inc.
PO Box 866, Kirkland, WA 98083 206.793.2394
Project Title: Renton Police Training Center and City Attorney TI
Project Location: 1005 S. Grady Way, Renton, WA 98056
CIP Number: CAG- 19-196
Change Order Proposal Cover Sheet
COP#002 Wood to HM Door Frames
Date: 11/15/19
Summary: Change Wood To HM Frames
Total Cost: $3,027.10
Total Days: 2 (days must be approved through a signed change order)
Signature indicates:
• The Change Order Proposal Contractor Breakdown Summary and supporting documents are attached.
• Documents attached are reviewed and all parties agree scope and cost are acceptable.
Signature
Date
Contractor—
Klinge and Associates, Inc.
Architect—
McKenzie
Owner's Rep—
City of Renton
Contractor is hereby given notice to proceed on COP# , and is authorized to apply for payment under the
contract's lump sum allowance.
COP# will be added to CO# and will receive notice to proceed upon approval of the associated change
order. The change order will adjust the total contract value.Any adjustment of days must be through a change order.
General Contractor Cost Proposal Breakdown Summary
PROJECT NAME: Renton Police Training and City Attorney TI COP #002
Project No.CAG-19-196 Date: 11/10/2019
GENERAL CONTRACTOR: Klinge and Assoc. Inc.
Description: COP#002: Architect directive to change base bid wood frames to HM frames for all new door openings.
Proposal for Contractor to furnish"HM frames and wood doors by vendors approved supplier"including credit for
substitution of manufacture not in specifications equal to materials specified.
X This Cost Directive/Cost Proposal may have time and/or cost impacts to the project.
X This Shall serve as Notification to the owner/Architect that the Contractor may submit for eitheror both cost&time changes
1.LABOR COSTS
a. labor costs from breakdown $96.80 2 Hrs. Normal time
b. foreman(includes supervision) Hrs.
c. lead foreman(includes supervision) Hrs. 0
DIRECT LABOR SUBTOTAL $193.60
Supervision
d. direct supervision(NTE 15%of 1a) $29.04
e. payroll taxes
f. safety(NTE 2%of lines 1a,b,&c) $3.87
g. travel(if applicable,itemize) $0.00
1.LABOR COSTS $226.51
2. MATERIALS COSTS
a.material costs Dumpster&Disposal fee $0.00
b.material costs $0.00
c.freight costs(Itemize)
2.MATERIAL COSTS $0.00
3. EQUIPMENT COSTS
a. owned equipment(per spec approved source)
b. rental equipment(per invoices attached)
3.EQUIPMENT COSTS $0.00
4. SMALL TOOLS
a. small tools(NTE 3%of la,&b)
4.SMALL TOOLS $5.81
SUBTOTAL 1,2,3,&41 $232.32
5. OVERHEAD and PROFIT allowance
a. Overhead 16%portion of 1,2,3,&4
b. Profit 6%portion of 1,2,3,&4
5.Pao $51.11
6. SUBCONTRACTORS
a. Sullivan Millwork-Change wood to HM frames(10-29-19) $4,556.00
b. Sullivan Millwork-Credit for substitution frames vendor(10-29-19) ($1,668.00)
c. Sullivan Millwork-Credit for substitution wood door vendor(10-29-19) ($750.00)
6.SUBCONTRACTORS $2,138.00
7. OVERHEAD and PROFIT on SUBCONTRACTORS
a. Overhead 16%on each sub
b. Profit 4%on each sub 7.Pao $427.60
8. INSURANCE
a. payroll driven liability insurance(2%of 1)
b. volume driven liability insurance(2%of 1 thru 7)
8.INSURANCE $56.98
9. BOND
a.Bond(2.50%of 1 thru 8)
9.BOND $106.51
10.SUBTOTAL 10.Subtotal) $3,012.52 I
11.B&O TAX
a.B&O TAX (0.484%=0.00484)
11.a&O Tax $14.58
TOTAL COST 1 THRU 11 I $3,027.10
1 insfzols Page 1 of_ GC PR a02 Change Wood frames to HM(11-10-19)
11
IWO
Document G709"N - 2018
Proposal Request
PROJECT:(name and address) CONTRACT INFORMATION: Architect's Project Number:2170712.00
City Attorney j Police Training Center4t Contract For:General Construction Proposal Request Number.002
Floor Tenant Improvement
1055 S Grady Way,Floor 4 Date:August 28,2019 Proposal Request Date:11/01/2019
Renton,WA 98057
OWNER:(name and address) ARCHITECT:(name and address) CONTRACTOR:(name and address)
City of Renton Mackenzie Klinge&Associates
1055 S Grady Way 500 Union St,#410 PO Box 866
Renton,WA 98057 Seattle,WA 98101 Kirkland,WA 98083
The Owner requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to
the Contract Documents described herein.The Contractor shall submit this proposal within Zero(0)days or notify the
Architect in writing of the anticipated date of submission.
(Insert a detailed description of the proposed modifications to the Contract Documents and, if applicable,attach or reference
specific exhibits.)
1.Update all door frames listed on Door Schedule(sheet A6.10)from wood to hollow metal.Wood frames to remain at interior relites.
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE,OR A DIRECTION TO PROCEED WITH THE WORK
DESCRIBED IN THE PROPOSED MODIFICATIONS.
REQUESTED BY THE ARCHITECT:
Kim Doyle-Project Manager
PRINTED NAME AND TITLE
AIA Document G709,—2018.Copyright A 1993,2001 and 2018 by The American Institute of Architects.All rights reserved.WARNING:This MA*
Document is protected by U.S.Copyright Law and international Treaties.Unauthorized reproduction or distribution of this AIA*Document,or any
portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document
was produced by AIA software at 18:28:23 ET on 11/01/2019 under Order No.6625437147 which expires on 11/29/2020,and is not for resale.
User Notes: (3B9ADA5E)
Sullivan Millwork L.L.C.
10864 SE 200TH St.
Kent, WA 98031
Email:sullivanmillwork@gmall.com Phone:(253)-850-5787
Fax: (253)850-5824 Cell:(206) 941-1908 6, 2019
OCTOBER 29,2019
PROJECT: CITY ATTORNEY/POLICE TRAINING CENTER 4TH FLOOR TENANT
IMPROVEMENT
RE: RECAP OF PURCHSE ORDER ADDITIONS TO 10-29-19
Net Increase for 18 HM Frames $ 4,556.00
Less: Credit to City of Renton for Substitution-Frames -1,668.00
Less: Credit for Substitution of Doors -750.00
TOTAL ADDITION TO PURCHASE ORDER $ 2,138.00
Please contact us if there are any questions regarding whatwe have
quoted.
Terry Sullivan
Sullivan Millwork LLC