LETTER OF TRANSMITTAL
RJ Development Date: December 10, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane,accrete.build
No. of
Copies Date Description
1 12/2-12/6/19 Daily Field Report(s) # 85-89
Comments:
CC:
1: John Wilson
2:
Mark Richardson
3:
Jeff Brain
4:
Jennifer Vogele
5:
_
Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN: iohnw(&rinocon.com
ATTN: rnark@accrete.build
ATTN: jeff(d-)accrete.build
ATTN: Jennifer@accrete. build
ATTN: jchavez@rentonwa.gov
1805 —136th PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NyYLLC
15365 NE 90th Street, Suite 100
in Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
ESNW Rep.
AK
Time On Site
8:15 AM;
2:30 PM
Travel Time
1.25 Hr. RT
Project No.
Page
1�2
Report No.
0895.06
Fill
85
Time Off Site
Date
Day of Week
9:45 AM;
Dry Density
Monday
3:00 PM
12/2/19
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
Weather
40s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC tLJa
Project Manager Reviewed
SSR
Permit No.
Test Test Location
Reference
Maximum
Fill
Test
% of
Number (S Ma)
Elevation
Compaction
Curve
Dry Density
Moisture
Dry Density
Maximum
(pcf)
(%)
10.5
11.0
(pcf)
Dry Density
91 See map for approximate location
SG
3 122.0
3 122.0
116.7
96
92 See map for approximate location
SG
116.9
96
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall backfill, vault excavation and
backfill.
Lock and Load Wall Backfill
While onsite, rep observed wall contractor install the second tier of the lock and load wall. Rep observed contractor
grade and place import gray 5/8" minus crushed recycled concrete in loose—6"--12" lifts. Rep observed contractor
place geo-grid as per plan (8XT). Once lifts were placed, rep observed contractor use a medium sized plate
compactor or a medium sized double drum roller for compaction. Rep took compaction tests on fill and observed
material to be adequate of at least 95% of its maximum dry density (122.0 lbs./cu. ft.).
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within. Rep observed that contractor had covered the slopes
with plastic sheeting to minimize stormwater on exposed surfaces.
Rep met with Key -West's Steve and Rino rep to discuss possible changes to the slope. ESNW observed that the
slope approximately 1 00'from the east end was very dense and unyielding. ESNW recommended that bank also
be cut to fit at least 4' of geo-grid for the first —4' of the third tier and the top —4' of the third tier be cut back to fit 8'
of geo-grid. For the third tier, contractor expressed plans that were confirmed by ESNW to use all 5/8" minus
crushed recycled concrete for backfill instead of the clean crushed behind the panels.
Vault Excavation and Backfill
Rep observed contractor placing 6" perforated drain pipe at the toe of the vault footings. Rep observed contractor
wrapping a 12" lift of 1"-2" wash rock and embedding the pipe in the wash rock. Contractor was observed raising
the elevation of the pipe due to the design elevation needs.
ESNW rep will return to observe earthwork activities when requested by client.
4J__5 ;1lL_
Andrew Kimn, Senior Technician, 206-430-9183
.. Earth Solutions NW«C
` t 15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep.
AK
Time On Site
8:15 AM;
2:30 PM
Travel Time
1.25 Hr. RT
Project No.
Page
Report No.
0895.06
2/2
85
.........
Time Off Site
.... -
Date
Day of Week
9:45 AM;
Monday
3:00 PM
12/2/19
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
I Weather
40s°F, Clear
Client/Owner
F
Development, LLC
d Supervisor Reviewed
C
Project Manager I Reviewed
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
I
ti Earth Solutions NW«C
t 15365 NE 90"' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 i Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep.
AK
Project No.
0895.06
Page
1/1
Date
Report No.
86
Time On Site
Time Off Site
Day of Week
Tuesday
10:15 AM
12:30 PM
12/3/19
Travel Time
1.25 Hr. RT
Weather
50s°F, Overcast
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No.
Supplementary Reporl:
At the client's request, ESNW rep was onsite to observe lock and
load wall, and earthwork activities.
Lock and Load Wall Backfill
While onsite, rep observed that second tier of the lock and load
wall completed. ESNW observed that the slope approximately
100' from the east end was very dense and unyielding. ESNW
recommended that bank also be cut to fit at least 4' of geo-grid for
the first —4' of the third tier and the top —4' of the third tier be cut
back to fit 8' of geo-grid. For the third tier, contractor expressed
plans that were confirmed by ESNW to use all 5/8" minus crushed
recycled concrete for backfill instead of the clean crushed behind
the panels.
Rep observed contractor use a large excavator and small
excavator to excavate and cut the bank of the slope for the third
tier of the lock and load wall. Rep observed that contractor was
cutting material to ESNW recommendations. Rep met with ESNW
manager Scott onsite.
Earthwork Activities
Rep observed contractor grading throughout the site with a large
excavator, a medium sized dozer, and a large haul truck. Rep
observed that contractor was grading and clearing the over
saturated material from the proposed building pad and the west
end parking lot.
ESNW rep will return to observe earthwork activities when
requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC �* 11-/8
Project Manager Reviewed
SSR -
Permit No.
F:�rth
S01111io s
NWLI(:
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Earth Solutions NWLLC
ESNW Rep.
AK
Project No.
0895.06
Page 1/2
Report No.
87
Fill
15365 NE 901' Street, Suite 100
Time On Site
Time Off Site
Date
Day of Week
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
11:00
1:30 PM;
Maximum
Wed
www.esnw.com
3:45 PMM
4:15 PM
12/4/19
(%)
DAILY FIELD REPORT
Dry Density
93
See map for approximate location
-2'
Travel Tfine
1.25 Hr. RT
Weather
40s0F, Overcast
16.0
Job Location
Client/Owner
94
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
Contact Field Supervisor Reviewed
Mike LAC 12-12.
Contact Project Manager Reviewed
ss IL
Are approved plans/permits on site? Project No. Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(See Map)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
93
See map for approximate location
-2'
4
118.4
16.0
112.1
95
94
See map for approximate location
-7
4
118.4
15.5 1
111.9
95
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall backfill, building footings, and
earthwork activities.
Lock and Load Wall Backfill
While onsite, rep observed wall contractor install the third tier of the lock and load wall. Rep observed contractor
grade and place import gray 1/2" minus crushed recycled concrete in loose -6%-12" lifts. Rep observed contractor
place geo-grid as per plan (8XT). Once lifts were placed, rep observed contractor use a medium sized plate
compactor for compaction. Rep took compaction tests on fill and observed material to be adequate of at least
95% of its maximum dry density (118.4.0 lbs./cu. ft.).
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within.
Rep observed that bank was cut to fit at least 4' of geo-grid for the first -4' of the third tier and the top -4' of the
third tier to fit 8' of geo-grid.
Building Footings
Rep met with Rino foreman, Mike, and Accrete representative to discuss the building footings. Rep recommended
that contractor cut and slope the footings with a 4"-12" over -excavation and placing a clean crushed rock for the
basecourse. The basecourse would help minimize oversaturation of the subgrade material and create a stable
surface for forming footing boards. Sloping the footings would help to control the flow of water out of the footings
and reduce pooling of stormwater.
Earthwork Activities
Rep observed contractor grading throughout the site with a large excavator, a medium sized dozer, and a large
haul truck. Rep observed that contractor was grading and clearing the over saturated material from the proposed
building pad and the west end parking lot.
ESNW rep will return to observe earthwork activities when requested by client.
Earth Solutions NWLLC
OW15365 NE 90"' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
ESNW Rep.
AK
Project No.
0895.06
Page
2/2
Report No
.87
Time On Site
Time Off Site
Date
Day of Week
11:00 AM;
1:30 PM;
12/4/19
Wed
3:45 PM
4:15 PM
Contractor #2
............... -
Contact
Travel Time
Weather
1.25 Hr. RT
40s°F, Overcast
....-.............
Project Name
_._....--
Job Location
...............
Client/Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
Contractor #1
Contact
Field Supervisor
Reviewed
Rino Construction
Mike
LAC
Contractor #2
............... -
Contact
Project Manager
Reviewed
Are approved plans/permits on site? Project No- Permit No. i
Supplementary Report:
. , .i:.� • r a` ' { ..yaw � w�r. r � r.r.- i
Gt W4.
93 i 94
y Earth Solutions NW«C
15365 NE 90`h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep.
AK
Project No.
0895.06
Page
1�2
Report No.
[88
Time On Site
Time Off Site
Date
Day of Week
12:15 PM;
3:30 PM
2:00 PM;
3:45 PM
12/5/19
Thursday
1.1 ravel Time
1.25 Hr. RT
Weather
40s°F, Overcast
Job Location Client/Owner
4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contact Field Supervisor Reviewed
Mike LAC 1IAS
Contact Project Manager Reviewed
SSI_
Are approved plans/permits on site? Project No. Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
r ip)
Elevation Compaction
Curve
Dry Density
Moisture
Dry Density
Maximum
L4(. +M
Al 1
(pcf)
(%)
(pcf)
Dry Density
95
See map for approximate location
-1' 4
118.4
16.0
112.1
95
96
See map for approximate location
-6' 4
118.4
15.5
111.9
95
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall backfill and site ctb.
Lock and Load Wall Backfill
While onsite, rep observed wall contractor install the third tier of the lock and load wall. Rep observed contractor
grade and place import gray 1/2" minus crushed recycled concrete in loose—6"--12" lifts. Rep observed contractor
place geo-grid as per plan (8XT). Once lifts were placed, rep observed contractor use a medium sized double
drum roller for compaction. Rep took compaction tests on fill and observed material to be adequate of at least
95% of its maximum dry density (118.4.0 lbs./cu. ft.). Rep observed contractor using a cad truck to belt and place
material on the top tier of the lock and load wall.
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within.
Site CTB
Rep observed contractor grading throughout the site with a cement powder. Rep observed contractor placing a
cement treated base (CTB). Rep observed contractor mix 3% of cement powder into the native material. Rep
observed contractor mix material with a cement powder grader and compact with a large single drum roller.
ESNW rep will return to observe earthwork activities when requested by client.
__� 7L_
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLC ESNW Rep. Project No Page Report No
AK 0895.06 2/2 88
15365 NE 90" Street, Suite 100
t Redmond, WA 98052 Time On Site Time Off Site ` Date Day of Week
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw corn 12/5/19
PM; 2:00 PM; 12/5/19
DAILY FIELD REPORT 3:30 PM 3:45 PM Thursday
Travel fime Weather
1.25 Hr. RT 40s°F, Overcast
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
...............
Contractor #2 Contact Project Manager Reviewed
Are approved plans/permits on site?
Supplementary Report:
Project No.
Permit No.
L
.� w�
95 . "L96 J.
Earth Solutions NW«C
15365 NE 9o"' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
*X www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep
Project No.
Page
Report No.
AK
0895.06
1/2
89
Time On Site
Time Off Site
Date
Day of Week
1:45 PM
3:30 PM
12/6/19
Friday
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Weather
40s°F, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC "A.
Project Manager Reviewed
SSP_
Are approved plans/permits on site? Project No. Permit No
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
Ma�
�
Elevation
Compaction
Curve
Dry Density
Moisture
Dry Density
Maximum
w(1P J
w�11\
(pcf)
(%)
(pcf)
Dry Density
97
See map for approximate location
SG
4
118.4
16.1
112.8
95
98
1See map for approximate location
4'
4
118.4
15.7
1 112.2
95
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall backfill and footing
excavations.
Lock and Load Wall Backfill
While onsite, rep observed wall contractor install the third tier of the lock and load wall. Rep observed contractor
grade and place import gray 1/2" minus crushed recycled concrete in loose—6"--12" lifts. Rep observed contractor
place geo-grid as per plan (8XT). Once lifts were placed, rep observed contractor use a medium sized double
drum roller for compaction. Rep took compaction tests on fill and observed material to be adequate of at least
95% of its maximum dry density (118.4.0 lbs./cu. ft.). Rep observed contractor using a cad truck to belt and place
material on the top tier of the lock and load wall.
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within.
Footing Excavations
Rep observed contractor using two medium sized excavators to excavate the west footings of the building. Rep
observed that contractor was over -excavating at a 1" continuous slope. Rep used a'/" steel t -probe and observed
that the footing subgrade was very dense, firm, unyielding, and suitable for support of the proposed building
footings. Contractor expressed plans to continue excavating the footings next week.
ESNW rep will return to observe earthwork activities when requested by client.
4J6)IL_
Andrew Kimn, Senior Technician, 206-430-9183
y Earth Solutions NWLLC
ESNW Rep.
AK
15365 NE 90" Street, Suite 100
F
Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
1:45 PM
DAILY FIELD REPORT
---
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Project No. Page Report No
0895.06 2/2 89
.................
Time Off Site Date Day of Week
3:30 PM 12/6/19 Friday
Job Location
4500 Talbot Rd. S., Renton, WA
---------------
Contact
Mike
Contact
Project No
}
w
97 I
Weather W
40s°F, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager I Reviewed
Permit No.