Loading...
HomeMy WebLinkAboutAdden 6 CAG-14-068 , Adden #6-19 4111 � Washington State VI/ Department of Transportation Supplemental Agreement Organization and Address Number 6 CivilTech Engineering,Inc. Original Agreement Number 400 112 Ave NE,Suite 120 Bellevue,WA 98004 CAG-14-068 Phone: 425-453-6488 Project Number Execution Date Completion Date TED403669 05/05/2014 12/31/2021 Project Title New Maximum Amount Payable NE 31 st St Culvert Repair Project,Replacement Alt.-Bridge $34,999(original)+$6,101 (Supplement No.6)=$41,100 Description of Work Extend the contract completion date.Modify scope of work for Task 4-Post Construction.Increase the budget for Task 4-Post Construction. The Local Agency of City of Renton desires to supplement the agreement entered in to with.CivilTech Engineering,Inc. and executed on 05/05/2014 and identified as Agreement No. CAG-14-068 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The Scope of Work of the Original Agreement is supplemented to include the attached Exhibit A-1 (Sup 6). II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for Completion of the work to read: Change contract completion date from December 31,2019 to December 31,2021. III Section V, PAYMENT, shall be amended as follows: See the attached in Exhibit"A"and Exhibit E-1 (Sup 6). • as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By:CivilTech Engineering,Inc. By: Gre g Zimmerman,Public Works Administrator to ul ��� �j Con Itant Signature / /Ap oving Authority Signature /Z/61// °I Date DOT Form 140-063 Revised 09/2005 Exhibit "A" Summary of Payments Basic Supplement#6 Total Agreement Direct Salary Cost $13,228 $2,322 $15,550 Overhead $17,550 $3,081 $20,631 (Including Payroll Additives) Direct Non-Salary Costs $252 $1 $253 Fixed Fee $3,969 $697 $4,666 Total $34,999 $6,101 $41,100 DOT Form 140-063 Revised 09/2005 EXHIBIT A-1 (SUP 6) CAG-14-068,SUPPLEMENTAL AGREEMENT NO. 6 SCOPE OF WORK NE 315T STREET CULVERT REPAIR PROJECT FEMA NO. 033-57745-00 For this Supplemental Agreement, CivilTech Engineering, Inc. ("Consultant") will provide engineering support services to the City of Renton ("City") for the NE 31'Street Culvert Repair Project ("Project"). These services include engineering support during the following phase: post-construction. I. INTRODUCTION The following scope of services and associated costs are based upon the assumptions outlined below. General Assumptions: • Consultant project team is anticipated to include a project manager, project engineer, CAD technician and admin staff member. • The duration for completion of the record drawings is anticipated to be no more than 6 months, once the red line mark-up set of as-built drawings is completed by the City and delivered to the Consultant. II. SCOPE OF WORK The objective and purpose of this Agreement is for the Consultant to provide engineering support during post-construction. Specifically,completion of record drawings for the project. TASK 4—Post-Construction Task 4 of the original agreement is modified as follows: 4.0 Management/Administration for Preparation of Record Drawings: Review monthly expenditures and engineering activities during preparation of Record Drawings. Prepare and submit to City a monthly invoice and progress report describing services provided that month. 4.1 Draft set of Record Drawings:The Consultant shall prepare a draft set of Record Drawings for the City to review.The City will provide final red line mark-up set of as-built drawing sheets to Consultant for incorporation into the draft set of Record Drawings. Revisions shall not be clouded.Significant revisions,as determined by the City,shall be marked with revision triangles and assigned numbers.Revised sheets shall include revision triangles, numbers and description in revision block (e.g. RFI U, Change Order#, etc.). The description for each revision resulting from construction will be provided to the Consultant by the City. Page 1 of 2 The Consultant shall provide a draft set of Record Drawings to the City within twelve(12)weeks from the date of receipt of the final red line mark-up set of as-built drawing sheets from the City. The City will review the draft set of Record Drawings and provide comments to the Consultant (if any)within four(4)weeks from the date the City receives the draft set of Record Drawings. 4.2 Record Drawings: Upon receipt of final review comments from the City, the Consultant shall prepare the final Record Drawings.The Consultant shall provide a final set of Record Drawings to the City,stamped and signed by a Professional Engineer licensed in the State of Washington. The final Record Drawings shall be delivered to the City within eight(8)weeks from the date of receipt of the final review comments from the City. Deliverables • Monthly invoices and progress reports. • Draft Final Record Drawings—one electronic file in pdf format, sheet size 11x17. • Record Drawings—two electronic files: o pdf format(with PE stamp and signature on each sheet),sheet size 11x17; o Auto CAD format(without PE stamp and signature). Page 2 of 2 EXHIBIT E-1(SUP 6) CONSULTANT FEE DETERMINATION SUMMARY SHEET COST PLUS FIXED FEE CivilTech Engineering, Inc. CONTRACT: Engineering Support During Construction PROJECT:NE 31st St Culvert Repair-Replacement Alternative Bridge DIRECT SALARY COST(DSC): Classification DSC HOURS TOTAL Project Manager $ 68.75 x 4 = $ 275 Project Engineer $ 48.56 x 6 = $ 291 Design Engineer $ 40.00 x 0 = $ - CAD Tech $ 45.67 x 36 = $ 1,644 Admin $ 28.00 x 4 = $ 112 DSC Subtotal= 50 $ 2,322 OVERHEAD(OH COST-including Salary Additives) DSC x OH of 132.67% x $ 2,322.48 = $ 3,081 FIXED FEE(FF) DSC(only)x FF Rate of 30.00% x $ 2,322.48 = $ 697 DSC+OH+FF = $ 6,100 REIMBURSABLES: Mileage 1 x $ 0.58 = $ 1 SUBTOTAL = $ 1 MANAGEMENT RESERVE: = $ - TOTAL = $ 6,101 • Page 1of2 EXHIBIT E-1(SUP 6) HOUR AND FEE ESTIMATE CONSULTANT:CivilTech Engineering,Inc. CONTRACT:CAG-14-068,Sup 6 PROJECT:NE 31st St Culvert Repair-Replacement Alternative Bridge Labor Hour Estimate Project Project Design CAD Task Description Manager Engineer Engineer Tech Admin Total $ 68.75 $ 48.56 $ 40.00 $ 45.67 $ 28.00 Task 4-Post Construction 4.0 Management/Admin for Prep of Record Drawings 2 0 0 0 4 $ 250 4.1 Draft Set of Record Drawings 1 4 0 24 0 $ 1,359 4.2 Record Drawings 1 2 0 12 0 $ 714 Totals 4 6 0 36 I 4 $ 2,322 Overhead(OH) OH=DSC x OH% OH%= 132.67% OH= $ 3,081 Fixed Fee(FF) FF=DSC x FF% FF%= 30.00% FF= $ 697 Task 1 Total= $ 6,100 TOTALS= 4 6 0 36 4 50 Page 2 of 2