HomeMy WebLinkAboutERC_Determination_Internal_Email_191217DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNSM: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED
ACTION HAS PROBABLE SIGNIFICANT IMPACTS THAT CAN BE MITIGATED THROUGH MITIGATION MEASURES.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
December 17, 2019
PROJECT NAME/NUMBER: PR19-000441 / La Fortuna Building Configuration /
LUA19-000263
PROJECT LOCATION: 17304 127th Pl SE (APN 3956200040)
APPLICANT/PROJECT CONTACT
PERSON:
Pamela Derry, Tonkin Architecture/2701 1st Ave, Suite 520, Seattle, WA 98121/
pam@tonkinarchitecture.com
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also http://bit.ly/2pxY9Js
PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review and Environmental
(SEPA) Review for the construction of twelve (12) new attached townhome units. The subject site is located off of 127th
Pl SE between SE 172 St and SE Petrovitsky Rd and includes the following parcels: 3956200010, 3956200020,
3956200030, 3956200040, 3956200080, and 3956200080. The project site totals approximately 195,800 square feet
(4.5 acres) in area and is located within the Residential 10 du/ac (R-10) zoning classification. The site plan for the La
Fortuna development located on the site was originally approved by King County in 2005. The approved site plan included
eight (8) buildings with a total of 41 attached townhouse units. Four of the eight buildings have been completed for a
total of 23 and are currently occupied. The site was annexed to the City of Renton in March of 2008, prior to the
construction of any of the units. Building permits and Certificates of Occupancy for the existing four buildings were
issued by the City of Renton after annexation. The proposal would replace the remaining four unbuilt buildings with
three, four-unit buildings. The total number of units in the development at project completion would be 35 (23 previously
constructed + 12 proposed units). Access to both the existing and proposed units on site is via a private road that dead
ends at the southern boundary of the site. The applicant has proposed the construction of 26 surface parking stalls in
order to provide parking for the future residents. In addition, a new stormwater vault is proposed on the site. According
to materials submitted by the applicant, both a Category 2 and Category 3 wetlands are present on the western portion
of the project site. No trees are proposed for removal. The applicant submitted a geotechnical report, drainage report,
traffic analysis, and wetlands report with the application.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on December 31, 2019,
together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057.
Appeals to the Examiner are governed by City of RMC 4-8-110 and information regarding the appeal process may be
obtained from the Renton City Clerk’s Office, (425) 430-6510.
PUBLIC HEARING: If the Environmental Determination is appealed, a public hearing will be set and all parties notified.
NOTICE
DEPARTMENTOFCOMMUNITYANDECONOMICDEVELOPMENTENVIRONMENTAL(SEPA)DETERMINATIONOFNON-SIGNIFICANCE-MITIGATEDfDNS-M)PROJECTNUMBER:LUA19-000263,ECF,SA-AAPPLICANT:PamelaDerry,TonkinArchitecture/27011stAye,Suite520,Seattle,WA98121PROJECTNAME:LaFortunaBuildingConfigurationPROJECTDESCRIPTION:TheapplicantisrequestingAdministrativeSitePlanReviewandEnvironmental(SEPA)Reviewfortheconstructionoftwelve(12)newattachedtownhomeunits.Thesubjectsiteislocatedoffof127thP1SEbetweenSE172StandSEPetrovitskyRdandincludesthefollowingparcels:3956200010,3956200020,3956200030,3956200040,3956200080,and3956200080.Theprojectsitetotalsapproximately195,800squarefeet(4.5acres)inareaandislocatedwithintheResidential10du/ac(R10)zoningclassification.ThesiteplanfortheLaFortunadevelopmentlocatedonthesitewasoriginallyapprovedbyKingCountyin2005.Theapprovedsiteplanincludedeight(8)buildingswithatotalof41attachedtownhouseunits.Fouroftheeightbuildingshavebeencompletedforatotalof23andarecurrentlyoccupied.ThesitewasannexedtotheCityofRentoninMarchof2008,priortotheconstructionofanyoftheunits.BuildingpermitsandCertificatesofOccupancyfortheexistingfourbuildingswereissuedbytheCityofRentonafterannexation.Theproposalwouldreplacetheremainingfourunbuiltbuildingswiththree,fourunitbuildings.Thetotalnumberofunitsinthedevelopmentatprojectcompletionwouldbe35(23previouslyconstructed+12proposedunits).Accesstoboththeexistingandproposedunitsonsiteisviaaprivateroadthatdeadendsatthesouthernboundaryofthesite.Theapplicanthasproposedtheconstructionof26surfaceparkingstallsinordertoprovideparkingforthefutureresidents.Inaddition,anewstormwatervaultisproposedonthesite.Accordingtomaterialssubmittedbytheapplicant,bothaCategory2andCategory3wetlandsarepresentonthewesternportionoftheprojectsite.Notreesareproposedforremoval.Theapplicantsubmittedageotechnicalreport,drainagereport,trafficanalysis,andwetlandsreportwiththeapplication.PROJECTLOCATION:17304127thPISE(APN3956200040)LEADAGENCY:CityofRentonEnvironmentalReviewCommitteeDepartmentofCommunity&EconomicDevelopmentTheCityofRentonEnvironmentalReviewCommitteehasdeterminedthatitdoesnothaveaprobablesignificantadverseimpactontheenvironment.AnEnvironmentalImpactStatement(EIS)isnotrequiredunderRCW43.21C.030(2)(c).ConditionswereimposedasmitigationmeasuresbytheEnvironmentalReviewCommitteeundertheirauthorityofSection4-9-070DRentonMunicipalCode.Theseconditionsarenecessarytomitigateenvironmentalimpactsidentifiedduringtheenvironmentalreviewprocess.Becauseotheragenciesofjurisdictionmaybeinvolved,theleadagencywillnotactonthisproposalforfourteen(14)days.Appealsoftheenvironmentaldeterminationmustbefiledinwritingonorbefore5:00p.m.onJanuary3,2020.Appealsmustbefiledinwritingtogetherwiththerequiredfeewith:HearingExaminer,CityofRenton,1055SouthGradyWay,Renton,WA98057.AppealstotheExamineraregovernedbyRMC4-8-110andmoreinformationmaybeobtainedfromtheRentonCityClerk’sOffice,(425)430-6510.DATEOFDECISION:December17,2019
1/74Date12/17/19z___sJ--t2j1/fDate1/1719RickM.Marshall,AdministratorRentonRegionalFireAuthorityJCE.Vincent,ministratorDepartmentOfCommunity&EconomicDevelopmentSIGNATURES:%r(iim’GreggZi7,er1)RAdministratorDate1/17/19PublicWofksDepartmentCj—o1L2J,‘2.(].I9KellyBeymer,Administrator\Date12/17/19CommunityServicesDepartment
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_ERC Report_La Fortuna_191212_v2_FINAL
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: December 16, 2019
Project File Number: PR19-000441
Project Name: La Fortuna Phase II
Land Use File Number: LUA19-000263, S-A, ECF
Project Manager: Alex Morganroth, Senior Planner
Owner: Habitat for Humanity Seattle-King County, 560 Naches Ave SW, Ste 110, Renton,
WA 98057
Applicant/Contact: Pamela Derry, Tonkin Architecture, 2701 1st Ave, Suite 520, Seattle, WA 98121
Project Location: 17304 127th Pl SE
Project Summary: The applicant is requesting Administrative Site Plan Review and Environmental
(SEPA) Review for the construction of twelve (12) new attached townhome
units. The subject site is located off of 127th Pl SE between SE 172 St and SE
Petrovitsky Rd and includes the following parcels: 3956200010, 3956200020,
3956200030, 3956200040, 3956200080, and 3956200080. The project site
totals approximately 196,510 square feet (4.5 acres) in area and is located
within the Residential 10 du/ac (R-10) zoning classification. The total number of
units in the development at project completion would be 35. Access to both the
existing and proposed units on site is proposed via an existing private road that
dead ends at the southern boundary of the site. The applicant has proposed the
construction of 27 surface parking stalls in order to provide parking for the
future residents. In addition, a new stormwater vault is proposed on the site
under one of the new surface lots. According to materials submitted by the
applicant, both a Category 2 and Category 3 wetlands are present on the
western portion of the project site. No trees are proposed for removal. The
applicant submitted a geotechnical report, drainage report, traffic analysis, and
wetlands report with the application.
Exist. Bldg. Area SF: 16,498 Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
8,043 SF
16,559 SF
Site Area: 196,510 SF Total Building Area GSF: 33,057 SF
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance - Mitigated (DNS-M).
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 2 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The site plan for the La Fortuna development located on the site was originally approved by King County in 2005.
The approved site plan included eight (8) buildings with a total of 41 attached townhouse units. Four of the eight
buildings were completed with a total of 23 units and are currently occupied by residents. The site was annexed to
the City of Renton in March of 2008, prior to the construction of any of the units. Building permits and Certificates
of Occupancy for the existing four buildings were issued by the City of Renton after annexation. The proposal would
replace the remaining four unbuilt buildings with three, four-unit buildings built per City of Renton code. The total
number of units in the development at project completion would be 35 (23 previously constructed + 12 proposed
units).
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS-M with a 14-day Appeal Period.
B. Mitigation Measures
1. The applicant shall submit an updated Wetlands Delineation Report prepared by a professional
wetlands ecologist or equivalent that includes a specific determination of no impact on the wetlands
created by the buffer encroachment. If the consultant finds that impacts are expected, the applicant
shall either provide a mitigation plan to be reviewed and approved by the Current Planning Project
Manager at the time of Construction Permit submittal, or redesign the project in a way that does
not result in impacts to the wetlands.
2. Earthwork outlined in the Geotechnical Report shall be limited to seasonally drier periods (typically
April 1 to October 31) in accordance with the geotechnical recommendation made by South Sound
Geotechnical Consulting, unless otherwise approved by Community and Economic Development
staff.
3. The applicant shall comply with the recommendations found in the Geotechnical Engineering Report
completed by South Sound Geotechnical Consulting (dated July 31, 2019) or an updated report
submitted at a later date, unless otherwise approved by Community and Economic Development
staff.
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 3 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Landscape Plan
Exhibit 4: Elevations
Exhibit 5: Boundary and Topographic Survey, prepared by 4Site Surveying and Consulting, dated
September 23, 2019
Exhibit 6: Drainage Report, prepared by Coterra Engineering, dated October 15, 2019
Exhibit 7: Conceptual Drainage/Utilities Plan, prepared by Coterra Engineering, dated October 15,
2019
Exhibit 8: Geotechnical Report, prepared by South Sound Geotechnical Consulting, dated July 31,
2019
Exhibit 9: Traffic Analysis, prepared by Gibson Traffic Consultants, Inc, dated October 7, 2019
Exhibit 10: Wetland Delineation Report, prepared by The Watershed Company, dated September
10, 2018
Exhibit 11: Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Earth
Impacts: The applicant submitted a Geotechnical Engineering Report for La Fortuna Phase II prepared by
South Sound Geotechnical Consulting, Inc. (dated July 31, 2019; Exhibit 8). The field study of the site
included excavation of four (4) exploration pits using a track-mounted excavator. The test pits extended to a
maximum depth of five (5) feet below existing grade. The subsurface soils encountered on the site included
topsoil or crushed gravel (approximately one foot below grade) overlying medium-dense silty sand with
gravel and occasional cobble (glacial till). Existing fill (crushed gravel and topsoil) was observed in two of the
four exploration pits to depths of up to approximately three (3) feet. No bedrock was encountered in the
explorations, but it is possible that bedrock may be below the deeper site utility excavations. Most of the
existing fill consisted of sand with silt and gravel that was similar to native soils. Ground water seepage was
not encountered in any of the test pits and was interpreted by the engineer to be due to the dense, highly
impermeable glacial till. Ground water conditions should be expected to vary in response to changes in
season, weather, on- and off-site land use, and other factors. According to the Geotechnical Report, most of
the shallow site soils are either dense and impermeable or saturated, especially towards the wetlands on
the western portion of the site. Therefore, storm water infiltration using shallow strategies does not appear
feasible. Further geotechnical work would be required in order to support the use of storm water infiltration
for the project which may not be feasible due to the glacial till creating a natural barrier to vertical
groundwater flow.
The applicant proposes a net cut of approximately 2,000 cubic yards (cy) of material and native soils.
Detailed plans of the cut and fill operation would be submitted with the civil construction permit application
showing the angle of slope, contours, compaction and any retaining walls. All fill utilized for the project
would be taken from the cut material and would not be brought in from off-site. The applicant would be
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 4 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
required to design and install temporary erosion and sedimentation control measures (TESC) in order to
capture runoff water and sediment during construction. All work proposed outside of the applicant’s
property would require a permanent drainage easement to be provided to the City and a temporary
construction easement.
According to South Sound Geotechnical Consulting, the top soil on the site is not appropriate for use as
structural fill. Therefore stripping of the top soil and other loose fill is recommended for areas with either
buildings or pavement proposed. Recommendations from the report include applying control methods to
limit earthwork to seasonally drier periods (typically April 1 to October 31), use of perimeter silt fences,
retention of existing vegetation as much as possible during grading practices, replanting as soon as possible,
and placing straw mulch in exposed areas. Therefore, staff recommends a SEPA mitigation measure that the
project earthwork outlined in the Geotechnical Report be limited to seasonally drier periods (typically April 1
to October 31) in accordance with the geotechnical recommendation made by South Sound Geotechnical
Consultants.
The geotechnical report concludes that the proposed project is feasible provided the recommendations are
followed. The geotechnical report specific recommendations for the site include: site preparation, structural
fill, foundations, floor support, drainage considerations, sediment retention, cover measures, traffic area
stabilization, and perimeter protection. As such, staff recommends a mitigation measure that the applicant
shall comply with the recommendations found in the Geotechnical Engineering Report completed by South
Sound Geotechnical Consulting (dated July 31, 2019) or an updated report submitted at a later date.
Mitigation Measures:
1. Earthwork outlined in the Geotechnical Report shall be limited to seasonally drier periods
(typically April 1 to October 31) in accordance with the geotechnical recommendation made by
South Sound Geotechnical Consulting.
2. The applicant shall comply with the recommendations found in the Geotechnical Engineering
Report completed by South Sound Geotechnical Consulting (dated July 31, 2019) or an updated
report submitted at a later date.
Nexus: State Environmental Policy Act (SEPA) Environmental Review and RMC 4-4-060 Grading, Excavation
and Mining Regulations.
2. Air
Impacts: It is anticipated that some temporary air quality impacts could be associated with site work and
building construction required to develop this site. Project development impacts during construction
may include dust as a result of grading and exhaust from construction vehicles and equipment. Dust
control would be mitigated through the use of temporary erosion control measures, watering or other
measures to remediate impacts as needed (Exhibit 15).
No further site specific mitigation for the identified impacts from typical vehicle and construction
exhaust is required.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
3. Water
a. Wetland, Streams, Lakes
Impacts: According to COR Maps, a wetlands is located on the western portion of the project site.
The applicant submitted a Wetlands Delineation Report prepared by The Watershed Company
(Exhibit 10). In the report, the consultant describes two individual wetlands on the site. Wetlands A
(as named in the report), approximately five (5) acres in size, is classified as a palustrine forested,
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 5 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
depressional wetland that drains south to a larger wetlands system and ultimately discharges into
Soos Creek. Wetland B (as named in the report), approximately 4,000 sq. ft. in size, is a palustrine
forested, depressional Category III wetland directly upslope from Wetland A. Based on field
observations that determined separate habitat, water quality, and habitat values, the consultant
assigned a rating of Category II to Wetlands A and Category III to Wetlands A. During the first phase
of construction under King County jurisdiction, multiple mitigation projects required as part of the
land use entitlement process enhanced and improved the wetlands systems on site. The wetlands
have remained largely untouched since the first phase was completed. The report did not identify
any streams on the site.
Based on the buffer requirements in RMC 4-3-050, a Category II wetland with a habitat score of 6 is
required to maintain a standard buffer of 100 feet with an additional 15 foot structure setback from
the edge of the buffer. A Category III wetland with a habitat score of 4 is required to maintain a
standard buffer of 50 feet with an additional 15 foot structure setback from the edge of the buffer.
As proposed, both the parking lot near the site entrance and proposed Building A are located within
the required buffers for Wetland A and Wetland B. The applicant is requesting relief from the
required buffers through the provision of RMC 4-3-050.B.g, which grant the administrator the ability
to allow development on a site that is separated from the critical area by a pre-existing, intervening,
and lawfully created structure, road, or other substantial existing improvements. The existing 30
foot side paved private road meets each of the criteria and clearly separates the wetlands from the
northwest portion of the site. The Wetlands Delineation Report submitted by the applicant did not
explicitly determine that the proposed development would have no impact on the wetland due to
the construction occurring on the other side of the private road. Therefore staff recommends as a
mitigation measure that the applicant submit an updated report that makes an explicit
determination of no impact on the wetlands. If impacts are expected, the applicant shall either
provide a mitigation plan to be reviewed and approved by the Current Planning Project Manager at
the time of Construction Permit submittal, or redesign the project in a way that does not result in
impacts to the wetlands. In addition, the report did not discuss the potential temporary or
permeant impacts to the wetlands created by utilizing targeted basic dispersion in the wetlands
buffer. If any dispersion into the wetlands is proposed as part of the drainage plan, the Wetlands
Delineation Report should be updated to include a finding that the dispersion will not negatively
impact the wetlands on or off-site.
Mitigation Measures:
1. The applicant shall submit an updated Wetlands Delineation Report prepared by a professional
wetlands ecologist or equivalent that includes a specific determination of no impact on the
wetlands create by the buffer encroachment. If the consultant finds that impacts are expected,
the applicant shall either provide a mitigation plan to be reviewed and approved by the Current
Planning Project Manager at the time of Construction Permit submittal, or redesign the project
in a way that does not result in impacts to the wetlands.
Nexus: State Environmental Policy Act (SEPA) Environmental Review and RMC 4-3-050 Critical Areas
Regulations
b. Storm Water
Impacts: The applicant submitted a Preliminary Drainage and Technical Information Report
prepared by Coterra Engineers PLLC (dated October 15, 2019; Exhibit 6) with the land use
application. The report analyzes on and off-site drainage and project surface water collection and
distribution and discusses all nine core requirements and the six special requirements. According to
the report, the project site generally slopes to the west but is relatively flat with an overall elevation
change of +/- 24 feet across the site. The stormwater runoff generally drains to the west into the
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 6 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
wetlands on the site. The wetlands on site drains into a larger wetlands system to the south and
from there into Soos Creek. The site is located in the Lower Cedar River Drainage Basin.
As described in both drainage and geotechnical reports, infiltration is not considered feasible due to
dense and impermeable or saturated soils. However, on-site full-dispersion may be possible in a
portion of the wetlands buffer located on the site. The applicability of basic dispersion of target
impervious surfaces into the wetland buffer should also be evaluated in the Final TIR in conjunction
with full-dispersion.
The developed project site would provide flow control and Enhanced Basic Water Quality treatment
prior to discharge before continuing to drain into the wetlands which is the site’s natural discharge
location. A detention vault is proposed to meet the flow control facility requirement. Project water
quality treatment would consist of conveyance to a bioretention facility following the proposed
detention vault prior to entering the wetlands. A Level 1 downstream analysis describing the
potential impact of stormwater discharge on wetland hydrology should be provided in the Final TIR.
Based on the City of Renton’s flow control map, the site falls within the Flow Control Duration
Standard area matching Forested Site Conditions and is within the Lower Cedar River Drainage
Basin. Appropriate onsite BMPs would be required to help mitigate the new runoff created by this
development. The development is subject to Full Drainage Review in accordance with the 2017
Renton Surface Water Design Manual (RSWDM).
Mitigation Measures: No further mitigation measures recommended.
Nexus: N/A
4. Vegetation
Impacts: In the Environmental Checklist submitted with the application, the applicant identified
deciduous and evergreen trees, shrubs, grasses, and a variety of plant associated with wetlands on the
project site. The applicant did not propose the removal of any vegetation within the wetlands or
wetlands buffer, except for the area within the buffer but across the private street. The majority of the
areas where construction would occur is already cleared and contains only sparse grasses and shrubs.
A landscape plan prepared by Tonkin Architecture (Exhibit 3) identified approximately 47 significant
trees (greater than 6” DBH) and 13 landmark trees (greater than 30” DBH) on the site ranging in size
from 6 inches to 54 inches in diameter. No trees would be removed as a part of the project and the
existing landscaping installed as part of Phase I would remain, therefore an Arborist Report was not
required to be submitted. The applicant has proposed the installation of approximately 64 new trees
including Vine Maple, Amur Maple, Serviceberry, Dogwood, Flowering Cherry, and Magnolia. The trees
are proposed primarily around the perimeter of the site and along the private road in order to provide
shade for residents and screening between the new units and adjacent single-family residential uses to
the north and east of the project site.
During construction, existing trees proposed for retention (protected trees)would be required to be
protected per RMC 4-4-130H.9. The eight central components of tree protection include defining and
protecting the drip line, erecting and maintaining a temporary six-foot-high chain link construction fence
with placards around the tree to be retained, protecting the tree from grade changes, keeping the area
clear of impervious surface material, restricting grading within the drip line, providing three inches (3”)
of bark mulch within the required fencing, retaining a certified arborist to ensure trees are protected
from development activities, and alternate protection/safeguards as necessary.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
5. Environmental Health
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 7 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
a. Noise
Impacts: Noise impacts would primarily result from the construction of the proposed road
improvements and new structures. The construction noise would be regulated through the City’s
adopted noise level regulations per Chapter 8-7, RMC. The City’s noise regulations limit haul hours
between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the
Development Services Division. Permitted work hours in or near residential areas are restricted to
the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m. for multi-family
construction activities from Monday through Friday. Work on Saturdays is restricted to the hours
between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work is permitted on Sundays
(Exhibit 20).
Temporary noise impacts are anticipated that would be commonly associated with multi-family
development.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
6. Transportation
Impacts: A traffic impact analysis is required when estimated vehicular traffic generated from a
proposed development exceeds 20 vehicles per hour in either the AM (6:00 - 9:00) or PM (3:00 –6:00)
peak periods. Generally this includes residential plats of 20 lots or more lots. A multi-family residential
project consisting of 12 new townhome units is not expected to generate more that 20 new peak hour
trips (as per the ITE Trip Generation Manual); therefore, the applicant submitted a Traffic Memo
detailing expected new trips.
The Traffic Impact Analysis was prepared by Gibson Traffic Consultants, Inc (dated October 5, 2019)
(Exhibit 19). Site generated traffic volumes were calculated using data from the Institute of
Transportation Engineers (ITE) Trip Generation Manual, 9th Edition, (2009). Based on the calculations
provided, the proposed development would generate approximately 88 net new average weekday daily
trips. During the weekday AM peak hour, the project would generate approximately 6 net new trips (1
inbound and 5 outbound). During the weekday PM peak hour, the project would generate
approximately 7 net new trips (4 inbound and 33 outbound). The estimated distribution of project traffic
was based on existing traffic patterns.
The subject property is accessed by an entrance off of 127th Ave SE to the north of the subject site. At
the site entrance, the street transitions into a small network of internal private streets (SE 173rd St, SE
173rd Pl, SE 174th St, and 127th Pl SE) within the site. The private streets dead-end within the site via
hammer-head turnarounds. Staff has determined that the private streets can continue to function as
“parking lots” serving a townhouse project and that dedication of public right-of-way is not required
based on additional criteria listed below. The parking lot construction would be completed in
accordance with City Code. Street lighting and street trees are also proposed and are required to meet
current city standards.
The payment of the transportation impact fee would be assessed at the time of building permit
application. Payment of code required impact fees would adequately mitigate the expected traffic
impacts of the project.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
7. Fire & Police
City of Renton Department of Community & Economic Development
La Fortuna Phase II
Staff Report to the Environmental Review Committee
LUA19-000263, S-A, ECF
Report of December 16, 2019 Page 8 of 8
SR_ERC Report_La Fortuna_191212_v2_FINAL
Impacts: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to
the proposed development; subject to the condition that the applicant provides Code required
improvements and fees.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
The Environmental Determination decision will become final if the decision is not appealed within the 14-day
appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in
writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA
98057, on or before 5:00 p.m. on December 31, 2019. RMC 4-8-110 governs appeals to the Hearing Examiner and
additional information regarding the appeal process may be obtained from the City Clerk’s Office, Renton City Hall –
7th Floor, (425) 430-6510.
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
La Fortuna Phase II
Land Use File Number:
LUA19-000263, S-A, ECF
Date of Meeting
December 16, 2019
Staff Contact
Alex Morganroth
Senior Planner
Project Contact/Applicant
Pamela Derry
Tonkin Architecture
2701 1st Ave, Suite 520,
Seattle, WA 98121
Project Location
17304 127th Pl SE
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Landscape Plan
Exhibit 4: Elevations
Exhibit 5: Boundary and Topographic Survey, prepared by 4Site Surveying and Consulting, dated
September 23, 2019
Exhibit 6: Drainage Report, prepared by Coterra Engineering, dated October 15, 2019
Exhibit 7: Conceptual Drainage/Utilities Plan, prepared by Coterra Engineering, dated October 15,
2019
Exhibit 8: Geotechnical Report, prepared by South Sound Geotechnical Consulting, dated July 31,
2019
Exhibit 9: Traffic Analysis, prepared by Gibson Traffic Consultants, Inc, dated October 7, 2019
Exhibit 10: Wetland Delineation Report, prepared by The Watershed Company, dated September
10, 2018
Exhibit 11: Advisory Notes
IcIcIcIcIcIcIcIcIcIcIcIcIcIcIcVdVdVdVdVdVdVdVdVdVdVdVdVdVdIcIcIcVdVdVdVdVdVdVdVdVdAgAgAgAgAgAgAgAgAgAgAgAgAgAgAgAgAgAgAgDvDvDvIcIcIcIcIcIcIcIcIcIcIcVoVoVoVoVoVoVoVoVoVoVoVoVdVdVdVdVdVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoBmBmBmBmBmBmBmBmBmBmVoVoVoVoVoVoVoVoVoVoVoVoVoVoBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxBmBmBmCxCxCxBmBmBmBmVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxIcIcIcIcIcIcIcVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoIcIcIcIcIcIcIcIcIcIcIcIcPcPcPcPcPcPcPcPcPcPcPcPcPcPcPcPcPcVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoAgAgAgAgAgVoIgIgIgIgIgIgIgIgIgIgIgIgVdVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVoVdVdVdVdCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxVoVoVoDvDvDvDvCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmVdVdVdCxCxCxCxCxCxCxCxLpLpLpLpLpVdVdVdVdVdVdVdVdVdVdCxCxCxCxCxCxVdVdVdVdVdPcPcPcPcPROPERTYLINEBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmBmIgCxCxCxPkPkPkPkPkPkPkPkPkPkCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxCxVdDvDv1 2 7 T H A V E S EP R I V A T E R O A DEX. BLDGEX. BLDGEX. BLDGPARKINGLOTPARKINGLOTPARKINGLOTPARKINGLOTOPENSPACECOMMUNITYGARDENP R I V A T E R O A DBLDG ABLDG BBLDG C404139383742434546484749505152535455445657585960252635363433323130292728212423222019181716159321111210136457814WETLANDBUFFER15' SETBACKEXISTING TREE TO BE RETAINED,SEE SHEET L0.2 FOR TREELEGEND AND NOTES, TYP.PROPOSED TREES AND LANDSCAPE SHOWNFOR REFERENCE ONLY, NOT INCLUDED INMINIMUM TREE DENSITY CALCULATIONS.SEE L1.1 FOR PROPOSED TREES ANDLANDSCAPE, TYP.STA
T
E
OFWASHINGTONNO.8.
K
A
RENSKIEST50EXPLICENSEDLANDSCAPEARC
HITECT .121
020
/
19
/111 west john street suite 306seattle washington 98119206 323 6032www.kk-la.comKaren KiestLandscape ArchitectsDRAWING ISSUESCALE:PROJ. MGR.:PRINCIPAL:PLOT DATE:DRAFTER:SHEET NO.DRAWING TITLETHIS DOCUMENT HAS BEEN PREPARED FORAND MODIFICATIONS BY GOVERNMMENT AGENCIESPERMIT APPLICATION AND IS SUBJECT TO REVIEWFOR PERMITNOT FORCONSTRUCTIONKKDHDHLAND USE10/15/2019LA FORTUNA PHASE II
12710-12748 SE 173RD STREET,
17210 -17324 127TH STREET SE, RENTON, WA 98058
HABITAT FOR HUMANITY SEATTLE/SOUTH KING COUNTY
560 NACHES AVENUE SW, SUITE 110, RENTON WA 9805710/14/2019AS SHOWN0scale 1" = 20' - 0"20 40Landscape Plan1L0.1Tree PlanNOTE:1. FOR EXISTING TREE LEGEND ANDNOTES, SEE SHEET L0.22. FOR PROPOSED PLANTING ANDTREES, SEE SHEET L1.1
1ST FLOOR A-1
392' -6"
1ST FLOOR A-2
393' -6"
2ND FLOOR A-1
401' -8"
ROOF A-1
409' -9"
ROOF A-2
410' -9"
2ND FLOOR A-2
402' -8"8' - 1 5/8"8' - 1 1/8"9' - 1 3/4"25' - 4 1/2"AVERAGE GRADE PLANE,
BLDG A = 391.88'AVERAGE GRADE PLANE TO HIGHEST POINT26' - 5"8' - 1 1/2"8' - 1"9' - 2"2x8 FASCIA BOARD
3-1/2" WINDOW TRIM
6' CEDAR FENCE
ASPHALT SHINGLE ROOFING
1ST FLOOR A-1
392' -6"
1ST FLOOR A-2
393' -6"
2ND FLOOR A-1
401' -8"
ROOF A-1
409' -9"
ROOF A-2
410' -9"
2ND FLOOR A-2
402' -8"9' - 1 3/4"8' - 1 1/8"8' - 1 5/8"9' - 1 3/4"8' - 1 1/8"8' - 1 5/8"25' - 4 1/2"25' - 4 1/2"2x8 FASCIA B0ARD
3-1/2" WINDOW TRIM
6' CEDAR FENCE
ASPHALT SHINGLE ROOFING
ASPHALT SHINGLE ROOFING -CASTLE GREY
UNIT DOORS -URBAN GOLD VAL 40002 CEMENTITIOUS HORIZONTAL LAP SIDING, 6" REVEAL -DOWNTOWN VAL 40074
CEMENTITIOUS HORIZONTAL LAP SIDING, 6" REVEAL -TURNPIKE VAL 40043
CEMENTITIOUS HORIZONTAL LAP SIDING, 7" REVEAL -CRANBERRY DARK CHOCOLATE VAL 20082
EXTERIOR MATERIALS LEGEND -BUILDING A
TRIM -WHITE
DRAWING ISSUE
SCALE:
PROJ. MGR.:
PRINCIPAL:
PLOT DATE:
DRAFTER:
SHEET NO.
DRAWING TITLE
THIS DOCUMENT HAS BEEN PREPARED FOR
AND MODIFICATIONS BY GOVERNMMENT AGENCIES
PERMIT APPLICATION AND IS SUBJECT TO REVIEW
FOR PERMIT
NOT FOR
CONSTRUCTIONPAMELA L. DERRY9918REGISTEREDARCHITECTSTATE OF WASHINGTONAs indicated
A30.1
10/15/19
PD
HJ
KS
BUILDING
ELEVATIONS -
BLDG A
LAND USE 10/15/2019LA FORTUNA PHASE II12710-12748 SE 173RD STREET,17210 -17324 127TH STREET SE, RENTON, WA 98058HABITAT FOR HUMANITY SEATTLE/SOUTH KING COUNTY560 NACHES AVENUE SW, SUITE 110, RENTON WA 980570' 2' 4'8' 12'
SCALE: 1/4" = 1'-0"
1 BLDG A - SE 173RD STREET SOUTH ELEVATION
SCALE:1/4" = 1'-0"2 BLDG A - NORTH ELEVATION
NO REV DATE
coterra
321 3rd Avenue South, Suite 406
Seattle, Washington 98104
206.596.7115
TECHNICAL INFORMATION REPORT
Project: Habitat For Humanity
La Fortuna Townhomes
Renton, WA 98058
Prepared For: Tonkin Architecture
2701 1st Ave #520
Seattle, WA 98121
Prepared By: Max Berde, PE
Reviewed By: Peter Apostol, PE
Date: October 15, 2019
ENGINEERING PLLC
RECEIVED
11/04/2019
amorganroth
PLANNING DIVISION
coterra321 3rd Ave South, Suite 406Seattle, Washington 98104ph 206.596.7115coterraengineering.comENGINEERING PLLCNOT FORCONSTRUCTIONDRAINAGECONTROL PLAN
South Sound Geotechnical Consulting
July 31, 2019
Habitat for Humanity – Seattle/King County
560 Naches Avenue SW, Suite 110
Renton, WA 98057
Attention: Mr. Brett VanSlyke
Subject: Geotechnical Engineering Report
LaFortuna Development
127th Avenue E.
Renton, Washington
SSGC Project No. 19061
Mr. VanSlyke,
South Sound Geotechnical Consulting (SSGC) has completed a geotechnical assessment for the above
referenced project. Our services have been completed in general conformance with our proposal P19056
(dated June 13, 2019) and authorized per signature of our services agreement. Our evaluation included
completion of four test pits on the property, engineering analyses, and preparation of this report.
PROJECT INFORMATION
Three town-house buildings are planned on the property, located near the looped portion of 127th Street
SE, south of SE 172nd Street. Conventional spread footing foundations will be used for support of the
structures, with concrete slab-on-grade floors.
SITE CONDITIONS
The property is characterized with west-facing sloping ground in the eastern portion, with relatively level
ground in the western portion. Overall elevation change across the site is on the order of 24 (+/-) feet.
The upper eastern site is covered with grass. The western portions are used for equipment storage and
construction offices. It appears that cuts on the east side of 127th Street SE were completed for the road
and have resulted in steeper cut slopes in this area.
SUBSURFACE CONDITIONS
Subsurface conditions were characterized by completing four test pits on the site on July 9, 2019. Test
pits were advanced to final depths between about 3.5 and 5 feet below existing ground surface.
Approximate locations of the test pits are shown on Figure 1, Exploration Plan. Logs of the test pits are
provided in Appendix A. A summary description of observed subgrade conditions is provided below.
RECEIVED
11/04/2019
amorganroth
PLANNING DIVISION
2813 Rockefeller Avenue Suite B Everett, WA 98201
Tel: 425-339-8266 Fax: 425-258-2922 E-mail: info@gibsontraffic.com
MEMORANDUM
To: Brett Van Slyke, Habitat for Humanity
From: Brad Lincoln, PE
Project: Habitat for Humanity Development
GTC #19-248
Subject: Traffic Analysis
Date: October 7, 2019
This memorandum summarizes the trip generation and traffic mitigation fee calculations for the
Habitat for Humanity Development. The development site is located along 127th Avenue SE, south
of SE 172nd Street, in the City of Renton. A site vicinity map in included in Figure 1.
Figure 1: Site Vicinity
SE 172nd St 128th Ave SE SITE 127th Ave SE RECEIVED
11/04/2019
amorganroth
PLANNING DIVISION
Habitat for Humanity Traffic Analysis
Gibson Traffic Consultants, Inc. October 2019
info@gibsontraffic.com 2 GTC #19-248
1. Trip Generation Calculations
The Habitat for Humanity development is proposed to include 12 residential units arranged three 4-
plex buildings. The trip generation calculations for the Habitat for Humanity development are based
on data contained in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, 10th
Edition (2017). The average trip generation rates for ITE Land Use Code 220, Multifamily Housing
(Low-Rise), have been used for the trip generation calculations. The new trips generated by the
proposed Habitat for Humanity development are summarized in Table 1.
Table 1: Trip Generation Summary
12 New
Residential Units
Average Daily Trips AM Peak-Hour Trips PM Peak-Hour Trips
Inbound Outbound Total Inbound Outbound Total Inbound Outbound Total
Generation Rate 7.32 trips per unit 0.46 trips per unit 0.56 trips per unit
Splits 50% 50% 100% 23% 77% 100% 63% 37% 100%
Trips 44 44 88 1 5 6 4 3 7
The Habitat for Humanity development is anticipated to generate 88 average daily trips with 6 AM
peak-hour trips and 7 PM peak-hour trips.
The City of Renton Policy Guidelines for Traffic Impact Analysis for New Development identifies
that a traffic impact analysis is only required for developments that generate 20 or more AM or PM
peak-hour trips. The Habitat for Humanity development does not exceed this threshold and, therefore,
a full traffic impact analysis is not required.
2. Transportation Impact Fees
The transportation impact fee for the Habitat for Humanity development have been determined based
on criteria identified in Renton Municipal Code (RMC) 4-1-210. The Habitat for Humanity
development meets the eligibility requirements of RMC 4-1-210.B.3 and therefore transportation
impact fees should not be required for the Habitat for Humanity development.
September 10, 2018
Kelly Morgan
Habitat for Humanity
560 Naches Ave SW, Ste. 110
Renton, WA 98057
Email: Kelly.morgan@habitatskc.org
Phone: (206) 456-6871
Re: Renton La Fortuna Townhome Property, Wetland Delineation
Report
The Watershed Company Reference Number: 180810
Dear Kelly:
On August 21, 2018, ecologists Sam Payne and Logan Dougherty, visited the La Fortuna
Townhome Property in Renton, Washington (parcel #3956210000) to screen for
jurisdictional wetland and streams within a defined study area. This letter summarizes
the findings of the study and details applicable federal, state, and local regulations. The
following documents are enclosed:
• Wetland Delineation Sketch
• Wetland Determination Data Forms
• Ecology Rating Forms and Figures
Methods
Public-domain information on the subject properties was reviewed for this delineation
study and include the following:
• USDA Natural Resources Conservation Service, Web Soil Survey (WSS)
application
• U.S. Fish and Wildlife Service National Wetland Inventory (NWI) maps
• Washington Department of Fish and Wildlife interactive mapping programs
(PHS on the Web, SalmonScape)
• Washington Department of Natural Resources, Forest Practices Application
Mapping Tool (FPARS)
RECEIVED
11/04/2019
amorganroth
PLANNING DIVISION
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 8 LUA**-000***
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Alex Morganroth, 425-430-7219,amorganroth@rentonwa.gov)
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division.
2. Commercial, multi-family, new single family and other nonresidential construction activities shall be
restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through
Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight
o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed bet ween the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior to
final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is
being cleared.
5. The applicant will be required to submit a Final Stream Mitigation Report and Maintenance and
Monitoring proposal. In addition, the applicant will be required to comply with all the code requirements
of RMC 4-3-050 Critical Areas. This includes, but is not limited to, placing the critical area within a Native
Growth Protection Easement, providing fencing and signage, and providing the City with a site
restoration surety device and, later, a maintenance and moni toring surety device.
6. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or
fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the
area defined by the drip line of any tree to be retained.
7. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around
the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be
placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on
each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the
applicant shall provide supervision whenever equipment or trucks are moving near trees.
8. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible
for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and
/or your U.S. Fish and Wildlife Service permit.
Development Engineering:
(Contact: Michael Sippo, 425-430-7293, msippo@rentonwa.gov)
1. See Attached Development Engineering Memo dated x, 2017
Fire Authority:
ADVISORY NOTES TO APPLICANT
Page 2 of 8 LUA19-000263
(Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov)
1. Fire impact fees are required at the rate of $964.53 per townhome unit. This fee is paid at time of
building permit issuance.
Community Services:
(Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov)
1. Parks Impact fee per Ordinance 5670 applies.
Building:
(Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov)
1. Recommendations of the geotechnical report must be followed as a condition of building permits.
ADVISORY NOTES TO APPLICANT
Page 3 of 8 LUA19-000263
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: December 6, 2019
TO: Alex Morganroth, Planner
FROM: Michael Sippo, Civil Plan Reviewer
SUBJECT: Utility and Transportation Comments for the La Fortuna Building Configuration - 12 New
Townhomes
17304 127th PL SE, Renton, WA 98058
LUA19-000263
I have reviewed the application for the La Fortuna Building Configuration - 12 New Townhomes located at 17304 127th
PL SE, Renton, WA 98058 and have the following comments.
EXISTING CONDITIONS
The subject site is located off of 127th Pl SE between SE 172 St and SE Petrovitsky Rd and includes the consists of parcel
3956210000. The project site totals approximately 196,507 square feet (4.51 acres) in area and is located within the
Residential 10 du/ac (R-10) zoning classification. The site plan for the La Fortuna development located on the site was
originally approved by King County in 2005. The approved site plan included eight (8) buildings with a total of 41 attached
townhouse units. Four of the eight buildings have been completed for a total of 23 and are currently occupied. The site
was annexed to the City of Renton in March of 2008, prior to the construction of any of the units but following the
construction of the internal private access roads. Building permits and Certificates of Occupancy for the existing four
buildings were issued by the City of Renton after annexation. The proposal would replace the remaining four unbuilt
buildings with three, four-unit buildings. The total number of units in the development at project completion would be 35
(23 previously constructed + 12 proposed units). Access to both the existing and proposed units on site is via a private
road that dead ends at the southern boundary of the site. The applicant has proposed the construction of 26 surface
parking stalls in order to provide parking for the future residents. In addition, a new stormwater vault is proposed on the
site. According to materials submitted by the applicant, both a Category 2 and Category 3 wetland are present on the
western portion of the project site. No trees are proposed for removal.
Water Water service is provided by Soos Creek Water and Sewer District.
The site is located outside of an Aquifer Protection Area.
Sewer Wastewater service is provided by Soos Creek Water and Sewer District.
Storm There are existing storm drainage systems located in SE 173rd St, SE 173rd Pl and 127th Pl SE that were installed
during the construction of the original 23 units and as a part of the private street construction. Stormwater
from the existing site improvements is routed to a detention vault located near the south property line and
discharges west into the Wetland A buffer. The existing undeveloped portion of the property is stabilized and
graded in a manner that sheet flows surface runoff toward the private on-site drainage system, however, does
not contain any direct tight-line connections. There are also stormwater mains located offsite in SE 172nd St and
127th Ave SE that collects and conveys runoff to outfalls located near the northern site property line. The outfalls
ADVISORY NOTES TO APPLICANT
Page 4 of 8 LUA19-000263
discharge runoff into the Wetland A buffer and bypasses the existing onsite conveyance and detention system.
Runoff from the existing site includes 4 buildings. Runoff from the site and upstream tributary area is dispersed
into wetland A where it continues to the west and south off-property and is ultimately conveyed to the south
across SE Petrovitsky Rd via a culvert (Facility ID #400280).
Streets The subject property is accessed by 127th Ave SE from the north and transitions to internal private streets (SE
173rd St, SE 173rd Pl, SE 174th St, and 127th Pl SE) within the site. The private streets dead-end within the site via
hammer-head turnarounds. The composition of the adjacent streets and internal streets are as follows:
a. 127th Ave SE is a public Residential Street with an existing right of way (ROW) width of 60' as measured
using the King County Assessor’s Map. 127th Ave SE consists of approximately 30’ width of pavement and
contains an approximate 5-6’ wide shoulder for bike and pedestrian access separated by an extruded curb.
Where 127th intersects SE 172nd St, there is a small traffic circle that provides traffic calming. 172nd contains
2 travel lanes and a striped bike/pedestrian walking and shoulder refuge area. The public streets connecting
to the project were previously permitted and constructed under King County jurisdiction and do not match
City of Renton street standards.
b. 127th Ave SE/SE 173rd St entering the site from the north is a private Residential Street constructed in 2006
and prior to the construction of the original 23 units in 2010-2015. SE 173rd St consists of approximately 22’
width of pavement with rolled curb and gutter on both sides and a 5’ wide sidewalk on the north side.
c. 127th Pl SE is a private Residential Street constructed in 2006 and prior to the construction of the original
23 units in 2010-2015. 127th Pl SE consists of approximately 22’ width of pavement with rolled curb and
gutter on both sides and a 5’ wide sidewalk on the east side until the street crosses SE 173rd Pl and contains
5’ sidewalk on both the west and east sides of the street.
d. SE 173rd Pl is a private Residential Street constructed in 2006 and prior to the construction of the original
23 units in 2010-2015. SE 173rd Pl consists of approximately 22’ width of pavement with rolled curb and
gutter on both sides and a 5’ wide sidewalk on the south side of the street.
e. SE 174th St is a private Residential Street constructed in 2006 and prior to the construction of the original
23 units in 2010-2015. SE 174th St consists of approximately 22’ width of pavement with rolled curb and
gutter on the north side of the street. The private street contains no sidewalks and serves primarily as a
hammerhead fire-turnaround and building garage parking access to the south.
CODE REQUIREMENTS
WATER
1. A water availability certificate from Soos Creek Water and Sewer District is required as part of the construction
permit submittal.
2. The applicant shall provide a water availability certificate from Soos Creek Water and Sewer District. A copy of the
approved water plan Soos Creek Water and Sewer District shall be provided to the City prior to approval of the
Utility Construction Permit.
a. City staff confirmed with Soos Creek Water and Sewer District via telephone conversation on November
27, 2019 that water is available to the site.
3. The proposed water main improvements are required to be shown on the composite utility civil plan submitted
with the Land Use Application. Renton Fire Authority has determined that the preliminary fire flow demand for
the proposed development is 1,750 gpm. The following fire system improvements are required:
ADVISORY NOTES TO APPLICANT
Page 5 of 8 LUA19-000263
a. A minimum of two fire hydrants are required. One within 150-feet and one within 300-feet of each
building. One hydrant shall be within 50-feet of each fire department connection for the fire sprinkler
system. Proposed fire hydrant plan appears acceptable.
b. Approved fire sprinkler and fire alarm systems are required for each building. Separate plans and
permits required by the fire department for the installation of these systems. Fully addressable and full
detection is required for the fire alarm system. All buildings require the installation of an NFPA 13R fire
sprinkler system.
c. Fire department apparatus access roadways are required within 150-feet of all points on the building.
Fire lane signage required for the onsite roadway. Required turning radius are 25-feet inside and 45-
feet outside. Roadways shall be a minimum of 20-feet wide and provide a minimum vertical clearance
of 13.5-feet. Existing fire lanes and fire apparatus turnarounds shall be maintained. Approved fire
sprinkler, standpipe and fire alarm systems are required throughout all the buildings. Dry standpipes
are required in all stairways. Direct outside access is required to the fire sprinkler riser room. Fire alarm
system is required to be fully addressable and full detection is required. Separate plans and permits
required by the fire department.
d. Fire impact fees are required at the rate of $964.53 per townhome unit. This fee is paid at time of
building permit issuance.
SEWER
1. A sewer availability certificate from Soos Creek Water and Sewer District is required as a part of the construction
permit submittal.
2. The applicant shall provide a sewer availability certificate from Soos Creek Water and Sewer District. A copy of the
approved sewer plan from Soos Creek Water and Sewer District shall be provided to the City prior to approval of
the Utility Construction Permit.
a. City staff confirmed with Soos Creek Water and Sewer District via telephone conversation on November
27, 2019 that sewer is available to the site.
SURFACE WATER
1. A geotechnical report, dated July 31, 2019, completed by South Sound Geotechnical Consulting for the site has
been provided. The submitted report describes the site as a Low Erosion Hazard area. Erosion control measures
will need to be in place prior to starting grading activities on the site. The report needs to discuss the soil and
groundwater characteristics of the site including infiltration potential and provide recommendations for project
design and construction. Geotechnical recommendations presented need to be address within the project plans.
a. Based on the geotechnical report: “Infiltration to control stormwater is not considered feasible at this
site due to the presence of dense glacial till at shallow depths. Assessment of infiltration rates using
small-scale Pilot Infiltration Test (PIT) procedures in similar soils in the a rea have shown negligible
infiltration during the soak period of the test. Other detention/retention facilities will be required to
control stormwater runoff at this site”.
2. A Preliminary Drainage Plan and Technical Information Report (TIR), dated October 15, 2019, was submitted by
Coterra Engineer PLLC with the Land Use Application. Based on the City of Renton’s flow control map, the site falls
within the Flow Control Duration Standard area matching Forested Site Conditions and is within the Lower Cedar
River Drainage Basin. The development is subject to Full Drainage Review in accordance with the 2017 Renton
Surface Water Design Manual (RSWDM). All nine core requirements and the six special requirements have been
discussed in the Technical Information Report. The following stormwater improvements are required and shall be
discussed within the TIR:
a. Applicant has included discussion of core requirement #6, which relates to the aquifer protection area,
in the preliminary drainage report. The 2017 RSWDM and preliminary drainage report indicate that the
project is within Zone 2 of the APA, however, updated wellhead protection boundaries have been
ADVISORY NOTES TO APPLICANT
Page 6 of 8 LUA19-000263
updated in the City of Renton Maps (online COR Maps) and the site is no longer within the Zone 2
protection area. Final TIR shall indicate this update.
b. Appropriate flow control BMPs are required to help mitigate the new runoff created by this
development. The preliminary drainage plan indicates that the on-site full-dispersion BMP is infeasible,
however, there is a large portion of wetland buffer located on the site where some of the new
impervious surface can be routed to via full-dispersion techniques. Specifically, section C.1.3.2(1) of the
RSWDM states: “The feasibility and applicability of full dispersion as detailed in Appendix C, Section
C.2.1 must be evaluated for all target impervious surfaces. If feasible and applicable for any such
surface, then full dispersion must be applied to that surface and implemented as part of the proposed
project”. Since the project may use unsubmerged critical areas and critical area buffers for delineation
of the ‘native vegetated surface’, the 15% ratio of dispersed area to native vegetated surface set aside
in tract or easement is feasible for some amount of target impervious surface. The applicability of basic
dispersion of target impervious surfaces into the wetland buffer should also be evaluated in conjunction
with full-dispersion.
c. Due to the infeasibility of on-site infiltration as described in the geotechnical report, for permeable
pavement to quality as on on-site BMP, it must contained an underdrain per Section C.2.7 of the 2017
RSWDM.
d. In addition to full infiltration, the feasibility and applicability of limited infiltration shall be evaluated
for all target impervious surfaces, as detailed in Section C.2.3 of the 2017 RSWDM.
e. Discussion of the applicability of BMP’s in relation to onsite impervious area per C.1.3.2 (5)(a) – Large
Lot BMP Requirements shall be provided in the TIR and analysis. Specifically: “For projects that will
result in an impervious surface coverage on the buildable portion of the site/lot of less than 45%, on -
site BMP’s must be applied to 50% of target impervious surfaces. Show how project is meeting this
requirement. If the 50% requirement cannot be met utilizing full dispersion, full infiltration, limited
infiltration, bioretention, permeable pavement, or basic dispersion then reduced impervious surface
credit, native growth retention credit or tree retention credit must be applied.
f. Alternatively, since the project is proposing a detention facility, the application of the LID flow control
development standard is also applicable (RSWDM 1.2.9.1 B and 1.2.9.2.2-1 pgs 1-75 & 1-78) and may
be utilized in lieu of determining that BMP’s are infeasible. The civil construction plans and TIR will need
to address this discrepancy and provide appropriate facilities and/or increase the size of the detention
facility.
g. Roof drains require a minimum 10-foot easement. Applicant shall provide details on how the roof drains
will be connected into the public storm drain system. Such connections shall be in accordance with City
of Renton standards and the 2017 RSWDM. Perforated pipe connections are required where roof
downspouts connect to the local drainage system without first connecting to a flow control facility,
dispersion BMP, or full infiltration BMP.
h. All stormwater facilities and on-site BMPs (including amended soils) shall be shown on the Civil Plans.
3. The development is required to provide enhanced water quality treatment prior to discharge. Project water
quality treatment will consist of conveyance to an approved water quality facility prior to discharge into the
wetlands on the western half of the site.
a. The applicant is proposing the use of bioretention facilities to provide water quality for all pollution
generating impervious surface areas (PGIS). Per the 2017 RSWDM, bioretention is an approved method
for meeting the ‘enhanced basic water quality menu’ provided that the facility contain an underdrain
due to the infeasibility of on-site infiltration as described in the geotechnical report. However,
bioretention with an underdrain does not qualify as an on-site BMP per Section C.2.6 of the 2017
RSWDM. Additionally, based on the size of contributing parking, PGIS and contributing surface areas,
presettling may be required prior to entering the bioretention facility. See section 6.8 of the 2017
RSWDM for further details.
b. The conveyance and water quality systems shall be designed in accordance with the RSWDM that is
current at the time of civil construction permit application.
c. Maintenance access to the stormwater facilities and connected structures shall be provided in
accordance with the design requirements outlined in the RSWDM.
ADVISORY NOTES TO APPLICANT
Page 7 of 8 LUA19-000263
4. The TIR did not identify any downstream flooding or erosion issues, however, a full level 1 downstream analysis
was not performed.
a. A level 1 downstream analysis shall be provided with the civil construction submittal and will need to
include discussion of the downstream drainage basin and critical areas (onsite and offsite), including
the onsite wetlands.
b. As a part of Task 4 of the level 1 downstream analysis, describe the potential impact to wetland
hydrology (problem type 4, 1.2.2.1.1) in accordance with RSWDM reference section 5. Provide
confirmation that impact exists within the allowable tolerances or provide mitigation measures as
required. Please note per section 1.2.2.2 (Drainage Problem Impact Mitigation and Drainage Problem
Specific Mitigation Requirements section 3) that: “If it is identified through critical area review as
described under ‘Potential Impacts to Wetlands Hydrology Problem (Type 4),’ that the quantity of
surface and storm water runoff from a proposed project or threshold discharge area within a proposed
project could significantly alter the hydrology of a wetland (Type 4 problem), THEN CED shall r equire
the applicant to implement additional flow control or other measures to mitigate the adverse impacts
of this alteration in accordance with the wetland hydrology protection guidelines in Reference Section
5”.
c. The development shall not create protected slopes as defined by RMC 4-3-050.
d. Grading shall be in accordance with RMC 4-4-060.
5. Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is
current at the time of civil construction permit application. Separate structural plans will be required to be
submitted for review and approval under a separate building permit for the detention and/or water quality vault.
Special inspection from the building department is required.
6. All work proposed outside of the applicant’s property will require a permanent drainage easement to be provided
to the City and a temporary construction easement prior to any permits being issued.
7. A Construction Stormwater General Permit from Department of Ecology will be required if grading and clearing of
the site exceeds one acre. A Stormwater Pollution Prevention Plan (SWPPP) is required for this site.
8. Surface water system development fee is $0.720 per square foot of new impervious surface, but not less than
$1,800.00. This is payable prior to issuance of the construction permit.
TRANSPORTATION
1. The subject property is accessed by 127th Ave SE from the north and transitions to internal private streets (SE 173rd
St, SE 173rd Pl, SE 174th St, and 127th Pl SE) within the site. The private streets dead-end within the site via hammer-
head turnarounds. Staff has determined that the private streets can continue to function as “parking lots” serving
a townhouse project and that dedication of public right-of-way is not required based on additional criteria listed
below.
a. Street lighting is required along the internal site street and along the 127 th Place SE frontage. City
preference is for street lighting to match public way standards, however, street lightin g that matches
code requirements is acceptable. This lighting will be considered “parking lot” lighting.
b. Parking lot construction shall be in accordance with City code 4-4-80G.Street lighting and street trees
are required to meet current city standards. Lighting plans are required to be submitted with the land
use application and will be reviewed during the construction utility permit review.
c. A sidewalk is not required on the west side of the on-site road. For pedestrian access to the proposed
west side parking lot, a striped crosswalk across the on-site road to the sidewalk on the east side is
recommended.
2. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each intersection. Ramps shall
be oriented to provide direct pedestrian crossings.
a. ADA access is shown crossing 127th Place SE to access the west parking lot and proposed open space
Area B.
3. A traffic analysis (trip generation memorandum) dated October 7, 2019, was provided by Gibson Traffic
Consultants, Inc. The site generated traffic volumes were calculated using data from the Institute of
Transportation Engineers (ITE) Trip Generation Manual, 10th Edition, (2017). Based on the calculations provided,
ADVISORY NOTES TO APPLICANT
Page 8 of 8 LUA19-000263
the proposed development would average 88 new daily vehicle trips. Weekday peak hour AM trips would generate
6 new vehicle trips, with 5 vehicles leaving and 1 vehicles entering the site. Weekday peak hour PM trips would
generate 7 new vehicle trips, with 4 vehicles entering and 3 vehicles exiting the site. The City of Renton Policy
Guidelines for Traffic Impact Analysis for New Development identifies that a traffic impact analysis is only required
for developments that generate 20 or more AM or PM peak-hour trips.
a. The project does not exceed the 20 or more AM or PM peak-hour trip threshold so a full traffic impact
analysis is not required.
4. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay Requirements.
5. Payment of the transportation impact fee is not applicable as long as the project qualifies as an affordable housing
residential project meeting the requirements of RMC 4-1-210.
6. Transportation Concurrency is provided under separate cover.
GENERAL COMMENTS
1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage or
within the site must be underground. The construction of these franchise utilities must be inspected and approved
by a City of Renton inspector.
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the right-of-way as
outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls.
3. Adequate separation between utilities as well as other features shall be provided in accordance with code
requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with
the exception of water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building.
4. A civil construction permit for the site, utility and street improvements will require a separate plan submittal.
Civil construction plans shall conform to the City Renton Drafting Standards. A licensed Civil Engineer shall
prepare the civil plans. Please visit the City’s website for submittal requirements:
https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9687014
5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets.
6. Fees quoted in this document reflect the fees applicable in the year 2019 only and will be assessed based on the
fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit
www.rentonwa.gov for the current development fee schedule.