HomeMy WebLinkAboutAdden 2 CAG-18-109,Adden#2-19 cv c 4. 'a 4 Ni AMENDMENT NO. 2 TO AGREEMENT FOR EXTENSION OF CEDAR RIVER TRESTLE BRIDGE PROFESSIONAL SERVICES THIS AMENDMENT, dated December )7 , 2019, is by and between the City of Renton (the "City"), a Washington municipal corporation, and WSP USA, INC. ("Consultant"), a New York corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-18-109, dated June 5, 2019,to provide necessary services for the Cedar River Trestle Bridge (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to change the time for performance and change the compensation in order to extend engineering, bidding support and construction administration support services for Cedar River Trestle Bridge. NOW THEREFORE, It is mutually agreed upon that CAG-18-109 is amended as follows: 1. Scope of Work:Section 1,Scope of Work, is amended to as specified in Exhibit A-2,which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-2. All Work shall be performed by no later than December 31, 2020. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $ 3,800.00 from $ 96,661.00 to $ 100,461.00, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A-2,which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT By: ,r1I1 Kelly Beyme / Scott Branlund, PE,SE Administrator Senior Project Manager h� l ' /q Date Date Approved as to Legal Form Shane Moloney Renton City Attorney Contract Template Updated 09/17/2019 PAGE 2 OF 2 Exhibit A-2 December 13, 2019 Mr. Alan Wyatt Capital Projects Manager City of Renton 1055 South Grady Way Renton, WA 98057 Subject: Modification of Contract CAG-18-109 for Cedar River Trail Bridge Construction Support—Fee Modification Dear Mr. Wyatt: WSP USA is pleased to submit our fee proposal modification to the City of Renton to provide services for the Cedar River Bridge Repairs project. Our fee modification is to adjust the contract rates from the 2018 rates and match the WSP 2020 rates. This rate increase is due to the contract extension, as the contract will be extended from the completion date of December 31, 2019 provided in Amendment Number. Amendment 1 Contract Authorization $96,661 Additional Requested Amount: $3,800 Proposed Total Contract Amount: $100,461 The proposed contract modification would add$3,800(Three Thousand and Eight Hundred dollars)to perform this work on a time-and-materials basis. The total contract value would increase to a maximum of$100,461. We will perform the work in accordance with the terms and conditions as were accepted by the City of Renton and WSP per contract CAG-18-109. We look forward to the opportunity to continue in assisting the City of Renton with its engineering needs. Sincerely, 90 ,fLa Joseph A. Stockwell, PE Director—U.S. Maritime Division JAS:GDN: Attachments Attachment A—WSP Fee Proposal WSP USA Suite:s00 33301 Ninth,Avenue South Federal Way WA 98003-2€00 1 206-431-23t70 w,F can) ATTACHMENT A- PROPOSAL FOR ASSESSMENT SERVICES Location: Renton,Washington Facility: Cedar River Bridge,Steel Truss Inspection and Trestle Repair Documents Fee Estimate-BergerABAM(BA)Labor,Subconsultants,and Expenses-13 December 2019 Senior Project Project Senior Senior Comm. Project Manager Engineer Const. CAD Specialist Manager Specialist Operator Item $280 $226 $143 $151 $133 $114 Costs Task 1 -Project Management/Coordination $ - 1.1 Management/Coordination/Document Control $ - _ 1.2 Client Communications including draft review $ - 1.3 Quality Assurance/Quality Control Plan $ - 1.4 Quality Control Review $ - 1.5 Budget Monitoring and Invoicing $ - Task 6-Bid Support and Construction Support Services $22,944 6.1 Bid Support Question and RFI Responses 1 8 $ 1,424 6.2 Construction Support Submittal Responses 2 36 4 $ 6,312 6.3 Construction Support RFI Responses 4 16 $ 3,408 (Assume 10 RFI's total) 6.4 Construction Site Visits(assume a max of 3) _ 16 $ 2,416 6.5 Construction Site Visit Memos 2 6 $ 1,466 6.6 Project Completion Walk-Through 6 6 $ 1,764 6.7 As-Built Drawings 2 16 24 1 $ 6,154 Total BergerABAM Hours: 11 82 32 24 1 139 Subtotal BA Labor(with Overhead&Profit):J $3,080 J$11,726 I $4,832 I $3,192 I $114 ( $22,944 Sub-Consultants Subtotal Subconsultants: Expenses(BergerABAM only) Mileage= $ 0.580 per mile x 20 miles x 4 day(s)= $46 Meals&Miscellaneous Expenses= per day x people x day(s)= Subtotal Expenses: $46 TOTAL COST,ROUNDED: Say: $23,000