Loading...
HomeMy WebLinkAboutMFP19006536DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19006536 IVR Number: 19006536 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :12/09/2019Application Date:6928000280Parcel Number:5002 NE 1ST ST Permit Type:12/20/2019Issue Date:Franchise Permit Work Class:12/21/2020Expiration Date:Minor Utility Job Number:105093544Franchise Type:Electric Description:Park in ROW to work at HH2. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy C: (425) 892-0416Applicant Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL ANDREW MICHAEL CONSTRUCTION PO BOX 6127 BELLEVUE , WA 98008 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105093544 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 5002 NE 1ST ST PARK IN ROW TO WORK AT HH2. NO TRENCHING IN ROW. PLEASE SEE ATTACHED ✔✔✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.09 15:04:14 -08'00'12/9/19 MFP19006536 Scott Warlick 12/11/2019 Nathan Janders 12/20/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105093544 Potelco, Inc JENNY CHAU (253) 208-9480 6905 S 228th St, Kent, WA 98032 JENNY.CHAU@PSE.COM 5002 NE 1ST ST TBD TBD CORRIE RYDBERG 12/9/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.09 15:03:56 -08'00' MFP19006536 12/11/2019 Scott Warlick Monday - Friday 8:00AM - 3:00PM SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 153 113 107 125 120 114 108 102 101 104 101 119 4917 4911 4906 4901 4908 4914 501350015007 4923 5008 50095003 115 5015 4920 HOQUIAM AVE NENE 1ST ST HOQUIAM AVE SENE 1ST ST 5002 MAP 17 MAP 17001"2" 00 50'100' 60' ROW PSE INSTALLED 1/0 UG TPLX CUSTOMER PROVIDED 3" GRAY SCH40 PVC CONDUIT CUSTOMER PROVIDED 3/4 YD SAND ±40' CUSTOMER PROVIDED 4'x4' WORK PIT 3/4 YD OF 5/8" MINUS CRUSH ROCK CUSTOMER PROVIDED 4'x4' WORK PIT ±10'90° R=36" 5008 50095003 NE 1ST ST 5002 20' EOP60' ROW COMMS 7'9' 22' CULVERT 18' SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.483281, -122.151893 Owner / Developer Contact Info officeATTN: TUSCANY CONSTRUCTION PO BOX 6127 BELLEVUE, WA, 98008 JIM TANGEMAN 425-766-1936 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE CIRCUIT ONE-LINE DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. HP Svc/MSA Distribution Perm. Service HH Removal Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/A 104321228508517720 108117197- CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 0' 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2994 SQ. 200 AMPS GAS 4.08 KW 65 A 2.2 % 2.1 % 8. 9. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'105093544THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 105093544 N/A N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JENNY CHAU 253-208-9480 10/29/19 STEPHAN SHAW 253-234-6405 11/12/19 N/A N/A N/A 253-234-6405 253-234-6405 11/12/19 RW-115872 CITY OF RENTON NE 1ST ST HH UPG W/ NEW RES UG SVC 5002 NE 1ST ST, RENTON, WA 98059 N/A N/A N/A 105093544 AS SHOWN N/A KING N/A N/A CSPSKEPM NE 15-23N-05E N/A N/A 2305E057 2305E088 2305E057 MAP-17 PSE EASEMENT DEPT PHOMMAVONG, SNITA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 508395261 N/A 317907-167419 50 kVA 120/240V (B) 1Ø A: 10459 318016-167457 50 kVA 120/240V (C) 317909-167447 50 kVA 120/240V (B) E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM JOB SITE JOB SITE FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION SILT FENCE DETAIL Not to Scale 0150.3200AND SEDIMENT CONTROL SITE SPECIFIC NOTES AT V01: 317909-167447 -EXISTING Ø1 120/240v PM XFMR TO REMAIN AT HH1: -EXISTING HH TO REMAIN -DE-ENERGIZE SECONDARY TO HH2 AT HH2: -EXISTING HH TO BE REMOVED -INSTALL (1) 17” X 30” PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350) -INSTALL (3) 6 POS #10 - 350KCMIL CONNECTION BARS (MID:7651006) SPAN SPECIFIC NOTES HH1 TO M01: -INSTALL 1-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT, ± 40' ___' ACTUAL -INSTALL 1-RUN 1/0 UG TPX, ± 50’ ___' ACTUAL DEVELOPER & CUSTOMER NOTES: THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM HH2 TO M01 ±40' -REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS FROM HH2 TO M01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT HH2 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -CUSTOMER IS REQUIRED TO SUPPLY AND INSTALL PHENOLIC LABLE ON METER BASE PRIOR TO SERVICE CONNECTION -L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION -RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING Customer's service conductors Captive L-Bolt 27-1/4" 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW Lock Cover 30" Approx Approx 17" Set handhole flush to final grade SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 40" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. PARTIAL PLAN SCALE: 1" = 20' COMM PED. WATER METER N 60' R/W CL S 6' MFP19006536 NE 1ST STNE 1ST STHOQUIAM AVE NE HOQUIAM AVE NE 161616161515 1010 1010 #5002HH1FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 0 0 0 0 0 0 0 0 0 0 NO PARKING NO-PARK ROAD WORK AHEAD W20-1SHOULDER WORK W21-5100'100'ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1100'ROADWORKAHEADW20-1100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-O%#1050935445002 NE 1ST ST, RENTON11/15/19FLAVIANA.NUNES@PSE.COM425-424-7809SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431TEMPORARY TRAFFIC CONTROL PLANLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWHAND HOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19006536