Loading...
HomeMy WebLinkAbout2041.01 McCarthy Impacts Ltr 10-18-19 19019 36th Avenue West, Suite E Lynnwood, Washington 98036 (425) 582-9928 Zipper Geo Associates, LLC Geotechnical and Environmental Consulting Project No. 2041.01 October 18, 2019 Mary McCarthy 3403 Burnett Avenue North Renton, WA 98105 Subject: Short and Long Term Impacts McCarthy Slope Stabilization 3403 Burnett Avenue North Renton, WA Dear Ms. McCarthy: Zipper Geo Associates, LLC prepared retaining wall construction plans and stability calculations for the proposed slope stabilization project located on your property dated August 8th , 2019. The City of Renton granted an emergency exemption to begin the work prior to obtaining all of the necessary permits due to the emergency nature of the project. As a condition to granting the exemption, the City will not finalize the permit until a Shoreline Permit, Critical Areas Permit, and a Wall Modification have been approved. In order to further process the required additional permits/approvals, the City has requested a narrative describing the short and long term impacts the project may have on adjacent properties. The purpose of this letter is to provide that narrative. Short Term Impacts The project involves earth work on a steep slope with areas of relatively unstable soils. The work will expose soils highly susceptible to erosion. Additionally, the work could result in shallow landslides in the unstable soils. The potential impacts of erosion are deposition and transport of sediment off-site. The potential impacts of landslides include safety concerns for the traveling public along Lake Washington Boulevard below and potentially destabilizing areas along the sides and tops of the slope. The project plans were developed to mitigate the potential short term impacts through the use of temporary erosion and sediment control measures and observatio n of construction by a geotechnical engineer from Zipper Geo Associates. The work is currently proceeding and the mitigation measures outlined in the plans are proving successful at mitigating the potential short term impacts. Long Term Impacts The long term impacts of the project are, in our opinion, beneficial to neighboring properties. Specifically, prior to construction, the slope was over-steepened, covered with invasive plant species, and contained areas of unstable soils. The project will stabilize an otherwise unstable slope, which if failed, would have negative impacts on adjacent properties. The project will remove invasive species and replace them with non-invasive species therefore increasing the potential for biodiversity in the area. As such, we do not foresee negative long term impacts associated with the work. Zipper Geo Associates, LLC McCarthy Slope Stabilization Project No. 2041.01 October 18, 2019 19023 36th Avenue West, Suite D Lynnwood, Washington 98036 (425) 582-9928 Page 2 We trust this information meets the City’s current request. If we can be of further assistance, please contact us. Respectfully submitted, Zipper Geo Associates, LLC Robert A. Ross, P.E. Principal Copies: Vanessa Dolbee (City of Renton) – 1 electronic copy, Jason Laskelle (May Creek Landscaping) – 1 electronic copy 10/18/19