Minor Franchise Permit: MFP20000084
IVR Number: 20000084
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :01/07/2020Application Date:7227801405Parcel Number:975 NE 12TH ST
Permit Type:01/07/2020Issue Date:Franchise
Permit Work Class:01/06/2021Expiration Date:Minor Utility
Job Number:N.556456Franchise Type:Telephone
Description:Century Link to dig and fix damaged conduit. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Austin Sweeney
Century Link
Applicant
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐ Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Austin Sweeney
Qwest Corp d/b/a CenturyLink
Austin Sweeney
253-766-7549
austin.sweeney@centurylink.com
975 NE 12th St N.556456
CenturyLink to dig and fix damaged conduit.
Restorations to be completed to city of Renton standards.
North Sky Communications 503.582.1263
NORTHSC857Q4 BL.028638
1/7/2020
MFP20000084
Scott Warlick 1/7/2020
Holly Powers 1/7/2020
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.556456
North Sky Communications 503.582.1263
Austin Sweeney 253.766.7549
23315 66th Ave S Kent, WA 98032
austin.sweeney@centurylink.com
975 NE 12th St
Reset FormPrint Form
Austin Sweeney
Austin Sweeney 1/7/2020
MFP20000084
Monday - Friday
8:00AM - 3:00PM Scott Warlick
1/7/2020
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
NE 12TH ST @ JEFFERSON AVE NE
DIG & FIX CONDUIT
SHOULDER WORK
TRAFFIC CONTROL PLAN
JOB # N. 556456. C. 45
PERMIT #
Comments:
SIGN SPACINGMPH "X"45+ 500'35 350'30 200'25 100'150' Seattle200' Sea TacJeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'25 / 30 20' 40'ONE-LANE TWO-WAYTAPER 50' TO 100'max
Designed For: CENTURYLINK
Project # N. 556456. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Approved 12/19/2019
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
NOT TO
SCALE Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTHL MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245SHOULDER 40 270 295 320TAPER 45 450 495 5401/3 L
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTERTHIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
Comments:
DIG & FIX CONDUIT AT ROADWAY EDGE.
THIS WILL BE SHOULDER WORK.
TRAFFIC FLOW IS NOT IMPACTED.
MAINTAIN 11' MINIMUM LANE WIDTHS.
RESTRICTED PARKING IN WORK ZONE.
SPOTTER ASSISTS AT WORK AREA.
N
SPEEDLIMIT
25
Date:12/19/2019 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 556456. C. 45
CERT:WA TCS # 011989 CENTURYLINK:Certified Traffic Control Plan [DO NOT ALTER]
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
16 16
202010102034
11' MIN
NOFROMTOTOW AWAY AREAPHONE 684-5444
YOUR COMP
ANY N
AM
E
5
55-
555
5 PARKINGR7-T39 NOFROMTOTOW AWAY AREAPHONE 684
-5
444
YOUR COMPANY
NAME
5
55
-
555
5 PARKINGR7-T39
NE 12TH ST
NE 12TH STJEFFERSON AVE NEHARRINGTONPL NEW20-1ROADWORKAHEAD100' +-100' +-SHOULDERWORKW21-5W2
0
-
1
RO
A
D
WO
R
K
AH
E
A
D
100' +-
SIDEWALK
SIDEWALK
PARKING AREA
K
E
E
P
L
E
F
T
R
4
-
8
b
S
DIG & FIX
CONDUIT
WORK ZONE
8' X 80'W20-1ROADWORKAHEAD100' +-W20-1ROADWORKAHEAD100' +-SIDEWALKSIDEWALKLEGEND
CONES S SPOTTER
WORK AREA WORK TRUCK
www.invarion.com
MFP20000084
MFP20000084
MFP20000084