Loading...
HomeMy WebLinkAbout0819_001.pdfEarth Solutions NWLLC ESNW Rep Page Report No. " AK 0895.06 1 of 2 10 !- , 15365 NE mond Street, Suite 100 (425) 449-4711 Time On Site Time Off Site Date Day of Week Main (425) 449-4704 1 Fax (425 Redmond, WA 9 1:45 PM 2:15 PM 1/6/20 Monday www.esnw com Reviewed WAR -307963 �` I CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT - ------- Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Erosion Control BMPs Overall Needs (13 Elements) Condition Repair? Comments (Cood; fair; Poor) 66; No) 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas G ! N Silt fence working as intended • Silt Fence 2. Establish Construction Access • Fabric; Quarry Spalls G N Sweep roadway when soil is seen on surface, • Wheel Wash • Sweeper Truck 3. Control Flow Rates replenish quarry spalls as needed • Stormwater Vault or Facility • Straw Wattles • Check Dams_ G N Add check dams and straw wattles as needed to slow stormwater onsite 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw G N Add straw as needed throughout the site, 2" • Sediment Ponds, Traps & Filters minimum • Treatment • Sediment Pond (Temp. or Perm.) • Water Truck 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting G N • Straw Stockpiles • Stockpiles • PAM 6. Protect Slopes G N • Benching; Track -Walking • Pipe Slope Drains • Plastic Sheeting; Anchors 7. Protect Drain Inlets { • Catch Basin Inserts G N CB inserts working as intended • Gutter; Road N/A N/A N/A 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets 9. Control Pollutants N/A N/A N/A • Chemical Storage Area Covered • Concrete Handling 10. Control Dewatering N/A N/A N/A 11. Maintain BMPs G N See recommended notes 12. Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low -Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement N/A N/A N/A w Earth Solutions NWLLc 15365 NE 90" Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 www.esnw.com ESNW Rep. AK 0895.06 Page 2 of 2 Report No. Time On Site Time Off Site Date Day of Week 1:45 PM 2:15 PM 1/6/20 Monday WAR -307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT — FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes 0 No List the completed, not -yet -completed, or ongoing action items in the table below: Actions Items Completed? Date `Lies; No; Ongoing) (If Completed) Sweep site entrance when soil is seen on roadway Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Current Weather: 40sO F, Rain Precipitation since last inspection (approximate): 0.58 inches Precipitation in the last 24 hours (approximate): 0.36 inches r Was water quality sampling part of this inspection? ❑ Yes 0 No If "Yes": • Record results in the table below. ; • Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, if present: N/A • Hanna Turbidity Meter # Monitoring Location Turbidity pH Notes Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No If "No": • Indicate the tasks necessary to bring the site into compliance in the table above • Has the non-compliance been reported to the Department of Ecology? ❑ Yes • Should the SWPPP be modified? ❑ Yes ❑ No "This report is true, accurate, and complete to the best of my knowledge and belief." ❑ No Name: Andrew Kimn CESCL Number: CESCL-EF8182309 Inspection Date: 1/6/20 Earth Solutions NW«C tSNw Rep. " MTK 15365 NE 90`h Street, Suite 100 t t Redmond, WA 98052 Time On Site Main (425) 449-4704 Fax (425) 449-4711 9:00 com Travel Time DAILY FIELD REPORT 1.25 RT Project Name Job Location Weatherly Inn 4500 Talbot Road, Renton Contractor #1 Contact Contractor #2 Contact Project No. Page Report No. 0895.06 1 of 1 t o rte. Time Off Site Date Day of Week 10:15 1/7/2020 Tuesday Weather 55° F, Overcast Client/Owner RJ Development Field Supervisor Reviewed Project Manager Are approved plans/permits on site? Project No. Permit No. F As requested, ESNW representative was on-site to review Stormwater Pollution Prevention Plan with Accrete Construction. Based on our observations, ESNW representative recommends the following: • Continuation of silt fence around sump at construction entrance, to a point in which any overflow will not flow to the street. ■ Installation of at least 3 diversion trenches within the quarry spall construction road that directs water to nearby sump, which is then pumped into baker tank. • Refresh quarry spall construction road weekly when trucking import and export. • Continue to have sweeper onsite daily when trucking. • When authorized, discharge to sewer stub instead of main sewer line to avoid delay in trucking. • Install at least 2' of 6"-8" quarry spall road in all areas that receive high truck traffic. ■ Install wheel wash by job shack, with Swale connected to baker tanks or sump for water collection. • If significant rainfall occurs, place silt fence at entrance of site to avoid water leaving site. • Maintain SWPPP book onsite with weekly reports and updated TESC map. ESNW will return when requested Marley T Kirkham Assistant Erosion Control Manager (206) 235-3250