15365 NE mond Street, Suite 100 (425) 449-4711 Time On Site Time Off Site Date Day of Week
Main (425) 449-4704 1 Fax (425
Redmond, WA 9 1:45 PM 2:15 PM 1/6/20 Monday
www.esnw com Reviewed
WAR -307963 �` I
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
- -------
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC
Erosion Control BMPs Overall Needs
(13 Elements) Condition Repair? Comments
(Cood; fair; Poor) 66; No)
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
G
! N
Silt fence working as intended
• Silt Fence
2. Establish Construction Access
• Fabric; Quarry Spalls
G
N
Sweep roadway when soil is seen on surface,
• Wheel Wash
• Sweeper Truck
3. Control Flow Rates
replenish quarry spalls as needed
• Stormwater Vault or Facility
• Straw Wattles
• Check Dams_
G
N Add check dams and straw wattles as needed to
slow stormwater onsite
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
G
N
Add straw as needed throughout the site, 2"
• Sediment Ponds, Traps & Filters
minimum
• Treatment
• Sediment Pond (Temp. or Perm.)
• Water Truck
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting
G
N
• Straw Stockpiles
• Stockpiles
• PAM
6. Protect Slopes
G
N
• Benching; Track -Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
7. Protect Drain Inlets
{
• Catch Basin Inserts
G
N
CB inserts working as intended
• Gutter; Road
N/A
N/A
N/A
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
9. Control Pollutants
N/A
N/A
N/A
• Chemical Storage Area Covered
• Concrete Handling
10. Control Dewatering
N/A
N/A
N/A
11. Maintain BMPs
G
N
See recommended notes
12. Maintain SWPPP & Site Logbook
G
N
Available upon request
13. Protect Low -Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
N/A
N/A
N/A
w Earth Solutions NWLLc
15365 NE 90" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
ESNW Rep.
AK
0895.06
Page
2 of 2
Report No.
Time On Site
Time Off Site
Date
Day of Week
1:45 PM
2:15 PM
1/6/20
Monday
WAR -307963
Reviewed
CONSTRUCTION STORMWATER
GENERAL PERMIT — FIELD REPORT
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes 0 No
List the completed, not -yet -completed, or ongoing action items in the table below:
Actions Items
Completed?
Date
`Lies; No; Ongoing)
(If Completed)
Sweep site entrance when soil is seen on roadway
Ongoing
Add 2" straw throughout the site over exposed soils as needed
Ongoing
Replenish quarry spalls at the main entrance to the site as needed
Ongoing
Replace plastic sheeting on exposed slopes as needed
Ongoing
Current Weather: 40sO F, Rain
Precipitation since last inspection (approximate): 0.58 inches
Precipitation in the last 24 hours (approximate): 0.36 inches
r
Was water quality sampling part of this inspection? ❑ Yes 0 No
If "Yes":
• Record results in the table below.
;
• Characterize the stormwater discharge, e.g., the presence of suspended sediment,
"cloudiness", discoloration, or oil sheen, if
present: N/A
• Hanna Turbidity Meter #
Monitoring Location Turbidity
pH Notes
Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No
If "No":
• Indicate the tasks necessary to bring the site into compliance in the table above
• Has the non-compliance been reported to the Department of Ecology? ❑ Yes
• Should the SWPPP be modified? ❑ Yes ❑ No
"This report is true, accurate, and complete to the best of my knowledge and belief."
❑ No
Name: Andrew Kimn CESCL Number: CESCL-EF8182309 Inspection Date: 1/6/20
Earth Solutions NW«C tSNw Rep.
" MTK
15365 NE 90`h Street, Suite 100
t t Redmond, WA 98052 Time On Site
Main (425) 449-4704 Fax (425) 449-4711 9:00
com Travel Time
DAILY FIELD REPORT
1.25 RT
Project Name Job Location
Weatherly Inn 4500 Talbot Road, Renton
Contractor #1 Contact
Contractor #2
Contact
Project No. Page Report No.
0895.06 1 of 1 t o rte.
Time Off Site Date Day of Week
10:15 1/7/2020 Tuesday
Weather
55° F, Overcast
Client/Owner
RJ Development
Field Supervisor Reviewed
Project Manager
Are approved plans/permits on site? Project No. Permit No.
F
As requested, ESNW representative was on-site to review Stormwater
Pollution Prevention Plan with Accrete Construction. Based on our
observations, ESNW representative recommends the following:
• Continuation of silt fence around sump at construction
entrance, to a point in which any overflow will not flow to the
street.
■ Installation of at least 3 diversion trenches within the quarry
spall construction road that directs water to nearby sump,
which is then pumped into baker tank.
• Refresh quarry spall construction road weekly when trucking
import and export.
• Continue to have sweeper onsite daily when trucking.
• When authorized, discharge to sewer stub instead of main
sewer line to avoid delay in trucking.
• Install at least 2' of 6"-8" quarry spall road in all areas that
receive high truck traffic.
■ Install wheel wash by job shack, with Swale connected to
baker tanks or sump for water collection.
• If significant rainfall occurs, place silt fence at entrance of site
to avoid water leaving site.
• Maintain SWPPP book onsite with weekly reports and
updated TESC map.
ESNW will return when requested
Marley T Kirkham
Assistant Erosion Control Manager
(206) 235-3250