HomeMy WebLinkAboutCO 6 CAG-14-151 , .CO #6- 20
\1 Y 04,
4)F �
"T° Change Order No.6
Contract Title: SW Grady Way Overlay Project
Contractor: Lakeside Industries
Contract No. : CAG-14-151
Federal Aid No. : STPUL-1288(004)
® Ordered by Engineer
❑ Proposed by the Contractor(VECP)
❑ Unilateral
Amount Working Days
Original Contract: $847,338.5 30
Current Contract: $942,807.59 67
Estimated Net Change This Order: $2,206.33 0 _
New Contract: $945,013.92 67
Pre fredi B Issued
/07
Resid t ngineer Date -Engineer(City of Renton Transportation Date
Design Manager)
Reviewed By: Consent By:
/ ,Z./9./�j
Engineer of Record Date Surety(Greater than 25%cost and/or 20% Date
time Increase)
Revie ed Endorsed By:
ity of Renton Project na er Date Contractor Date
Reviewed By: Executed By:
zo
City Attorney(Comer with 2so-o2, Date City of Re tt ublic ors Dl
Section 7.4) Administra or/Mayor
Change Order No. 6
Contract Title: SW Grady Way
Overlay
Contract No. CAG-14-151
Page 1 of 5
•
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
Force account work to cover the following items:
Added thickness of concrete sidewalk which was 12-inches in the field, instead of 4-inches
shown in plans and details.This covers both the added labor to remove the 12-inch-thick panel
and the additional concrete to replace the concrete back at 12-inches due to truck traffic at SE
Lind.
Installation of cold patch asphalt ramps at the NW corner of Oaksdale to allow temporary
pedestrian access during construction and overnight.
Work to be completed under this change order shall be subject to current state prevailing wage
rates.The Contractor and any new or returning subcontractors shall submit new Intent to Pay
Prevailing Wage forms to Labor and Industries for this current work.
Reason for Change:
Match as-built conditions at SE Lind.
Provide temporary pedestrian access due November elections.
Materials:
None
Plans:
None
Change Order No. 6
Contract Title: SW Grady Way
Overlay
Contract No. CAG-14-151
Page 2of5
Adjustment:
Bid item B-20 "Minor Work Items" is added to cover additional force account work
items in the lump sum amount of$2,206.33.
Bid
Item
I No. Description Unit Quantity Unit Price Total Amount
B-20 Minor Work items LS 1 $ 2,206.33 $ 2,206.33
TOTAL THIS CHANGE ORDER = $ 2,206.33
With this Change Order, Bid Schedule B is revised to read as shown on the following
page.
Extension of Time:
None
Equitable Adjustment:
This Change Order includes an equitable adjustment per Section 1-09.4 of the 2014
WSDOT/APWA Standard Specifications and included in the unit process in this change
order.
The Equitable Adjustment lump sum amount was determined using the force account
method as shown in the attached force account tracking sheets. See attached force
account sheets.
Change Order No. 6
Contract Title: SW Grady Way
Overlay
Contract No. CAG-14-151
Page 3 of 5
BID SCHEDULE B—SW Grady Way Curb Ramp Replacements
Bid
Item
No. Description Unit Quantity Unit Price Total Amount
B-1 SPCC Plan LS 1 $ 150.00 $ 150.00
B-2 Mobilization LS 1 $ 5,000.00 $ 5,000.00
Project Temporary Traffic
B-3 Control LS 1 $ 49,000.00 $ 49,000.00
B-4 Roadside Cleanup EST 1 $ 2,500.00 $ 2,500.00
Remove Cement
B-5 Concrete Sidewalk SY 270 $ 77.00 $ 20,790.00
Cement Conc.Sawcutting
B-6 and Grinding EST 1 $ 5,000.00 $ 5,000.00
B-7 Remove Curb and Gutter LF 280 $ 45.00 $ 12,600.00
Crushed Surfacing Top
B-8 Course TON 30 $ 30.00 $ 900.00
B-9 Inlet Protection EA 23 $ 65.00 $ 1,495.00
Erosion/Water Pollution
B-10 Control EST 1 $ 1,000.00 $ 1,000.00
Cement Conc.Traffic
B-11 Curb and Gutter LF 180 $ 50.00 $ 9,000.00
Cement Conc.Traffic
B-12 Curb LF 60 $ 45.00 $ 2,700.00
Cement Conc. Pedestrian
B-13 Curb LF 100 $ 45.00 $ 4,500.00
B-14 Cement Conc.Sidewalk SY 270 $ 100.00 $ 27,000.00
Detectable Warning
B-15 Surface SF 210 $ 22.00 $ 4,620.00
Apply Non-Skid to Utility
B-16 Cover EA 2 $ 850.00 $ 1,700.00
Remove Asphalt Concrete
B-17 Pavement SY 60 $ 40.00 $ 2,400.00
B-18 HMA CI 1/2" PG 52H TON 25 $ 85.00 $ 2,125.00
Traffic Signal System
B-19 Modifications, Complete LS 1 $ 20,000.00 $ 20,000.00
8-20 Minor Work Items LS 1 $ 2,206.33 $ 2,206.33
TOTAL BID SCHEDULE B= $ 174,686.33
Change Order No. 6
Contract Title: SW Grady Way
Overlay
Contract No. CAG-14-151
Page 4 of 5
Sections 1-04.4 and 1-04.5 of the 2014 WSDOT/APWA Standard Specifications shall govern
this Change Order.The Work of the referenced Contract is modified to include the changes
detailed herein.The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
Forms to be attached to Change Order
❑ Plans
❑ Field Directive
® Change Order Quotation
❑ Estimated Change Order Cost
❑ Project Labor List
❑ Force Account Equipment Rate Request (DOT Form 422-010 EF)
• Equitable Adjustment Determination
Change Order No. 6
Contract Title: SW Grady Way
Overlay
Contract No. CAG-14-151
Page 5 of 5