Loading...
HomeMy WebLinkAboutCO 2 CITY OF RENTON CAG-19-034, Co #2-20 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Lift Station and Force Main Improvements,Phase 1A-CAG-19-034 C.O.# 2 CONTRACTOR: Equity Builders, LLC SUMMARY OF PROPOSED CHANGE: Provide-all labor,equipment,subcontracting,bonding, insurance for the complete work required for the extra work as outlined below: • ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price Total Price 034. NEW ITEM: LS 1 $9,640.06 $9,640.06 Replace existing concrete pad for generator at Pipers Bluff(regional fuel tank used for design was no longer available,had to upsize the pad for available tank.) 035. NEW ITEM: LS 1 $12,285.78 $12,285.78 Add additional bollards per fire department requirements at Pipers Bluff.(Fire Department required additional bollards,following site Inspection,above what was approved in the original permit.) 036. NEW ITEM: LS 1 $7,096.95 $7,096.95 Additional work to install new electrical components at Oakesdale Lift Station to track condition and alarms for several items not previously connected to the telemetry.(Old telemetry panel did not have the capacity to track these items.The new installed panel did have capacity so we are taking advantage to improve operations.) 037. NEW ITEM: LS 1 $8,577.77 $8,577.77 Additional work to install new electrical components at East Valley Lift Station to track condition and alarms for several items that were not previously connected to the telemetry.(The old telemetry panel did not have the capacity to track these items.The new panel installed by this project did have capacity so we are taking advantage to improve operations.) 038. NEW ITEM: L5 1 $15,030.92 $15,030.92 Additional cost to modify breaker and port on the new portable generator to be consistent with our existing generator system. Sub Total $52,631.48 Sales Tax (10.0%) $5,263.15 Total $57,894.63 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT THIS ORDER TOTAL AFTER CHANGE $996,545.00 S1,020,757.57 S57,894.63 $1,078,652.20 SIGNATURES:Contractor: Date: /f c771.29 —/ Project Engineer: -�,'�1,,`�-//)-7., - Date: / - 2 — Z 0 Approved By: �/�/"'"""' ��� g Date: 116 f' 0 7� Ronald J.Straka, ti ty Systems Director Approved By: - Date: �,�ttaminlr,i Gregg Z,uy)• - PW Administrator OFII�I�� Approved By: � • i � s n,,, .. �� Date: �1Y"v.1 Mayor Armo Pa one - Approved By: * ' SEAL = * Date: // S yam Shane ney,City Attorne � b / Attest: c �. -0 '4/14 ' ' Date: / 0,0 laso eth,City Clerk /1/i, ORA1T E D H:\File Sys\WWP-Was Water\WWP-27-039S4 lift Station Improvements PH IA(Spring 2019)\P4lEjtHAMs\Change Order#2 CAG 39-034.doc\MO