HomeMy WebLinkAboutMFP20000067DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000067 IVR Number: 20000067 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :01/02/2020Application Date:6061400230Parcel Number:5202 NE 24TH ST Permit Type:01/14/2020Issue Date:Franchise Permit Work Class:01/13/2021Expiration Date:Minor Utility Job Number:101124361Franchise Type:Electric Description:Crew to park in ROW and remove existing B/O Handhole and install a new Handhole. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy C: (425) 892-0416Applicant Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL SOUNDBUILT HOMES LLC PO BOX 73790 PUYALLUP , WA 98373 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101124361 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 5202 NE 24TH ST CREW TO PARK IN ROW, NO HS DISTURBANCES PLEASE SEE ATTACHED ✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2020.01.02 11:19:42 -08'00'1/2/2020 MFP20000067 Scott Warlick 1/6/2020 RESTORATION PER CITY OF RENTON STANDARDS Nathan Janders 1/14/2020 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101124361 Potelco, Inc MOHAMMAD MAHMOOD (253) 259-1894 6905 S 228th St, Kent, WA 98032 MOHAMMAD.MAHMOOD@PSE.COM 5202 NE 24TH ST TBD TBD CORRIE RYDBERG 1/2/2020 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2020.01.02 11:19:19 -08'00' MFP20000067 Scott Warlick 1/6/2019Monday - Friday 8:00AM - 3:00PM SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). #5202NE 24TH ST143RD AVE SE16161616 1515NE 25TH STHH1100'ROADWORKAHEADW20-1PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKmaintain (2) 11' lanesROAD WORK AHEAD W20-1X'X'W1-4LROADWORKAHEADW20-1100'100'W1-4RM6-2NPSEPUGETSOUNDENERGY-OB#1011243615202 NE 24th St, Renton, WA 98059December 17, 2019safaa.neema@pse.com(425) 398-6077SHEET 1 of 1TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.PRINT ON11X17" SHEETS ONLYLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWUG/BOX/VAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP20000067 5117 5106 5213 5219 5220 5201 5207 5208 5209 5226 5215 5114 5113 5202 J J 318989-167507 75 kVA 120/240V (C) 318991-167492 318997-167492 PRE 14 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' JOB SITE POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 5'6" X 4'5" WORK PIT AT HH4 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. SITE SPECIFIC NOTES AT HH1: -REMOVE EXISTING B/O HANDHOLE -INSTALL (1) 13"x24" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH14350) -INSTALL (3) 4-POS CONNECTOR BARS -CONNECT EXISTING UG SVC'S ___ PSE 1730 POLYETHELYNE HANDHOLE PLAN VIEW 2" APPROX30" APPROX 17"ELECTRIC 4' - 5" PENTABOLTLOCK COVER 5' - 6" 18" SIDE VIEW4" X 4" KNOCKOUT (2 PLACES) APPROX 27"APPROX 40"20" CONDUITS ENTER FROM BENEATH AT ONE END OF HANDHOLE SINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAIL Not to scale UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. MAHMOOD 253-259-1894 11/07/19 M. MAHMOOD 253-259-1894 11/07/19 E. SCHOTT 714-893-2405 11/07/19 REQUIRED N/A NEWCASTLE TERRACE HANDHOLE REPLACEMENT 5202 NE 24TH ST, RENTON, WA 98059 N/A N/A N/A 101124361 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN NE 3-23N-05E N/A N/A 2305E009 2305E040 2305E009 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:MOHAMMAD MAHMOOD 253-259-1894 MOHAMMAD.MAHMOOD@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER#101124361SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2305E040 Owner / Developer Contact Info officeATTN: SOUNDBUILT HOMES PO BOX 73790 PUYALLUP, WA 98059 TANER ROCCA 253-606-1967 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 0' 2500 SQ FT 100A ELECTRIC 4.9kW 80A 0.9% 2.9% SE 100TH PLILWACO AVE NEROW55'CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 05/2019 364.00 408.00 385.00 0.00 0.00 0.72 364.00 408.00 385.72 506216076 101124361Superior 507252499 594531645Service 108116934Removal 594131337UG Maint MFP20000067