Loading...
HomeMy WebLinkAboutMFP20000042.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000042 IVR Number: 20000042 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :12/20/2019Application Date:3023059067Parcel Number:3400 EAST VALLEY RD Permit Type:01/16/2020Issue Date:Franchise Permit Work Class:01/15/2021Expiration Date:Minor Utility Job Number:105093581Franchise Type:Electric Description:Work in the ROW at V01 to upgrade existing padmount transformer from 45KVA to 500KVA. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Applicant Corrie Rydberg Puget Sound Energy C: (425) 892-0416Applicant D & C INVESTMENTS 555 SW GRADY WY RENTON , WA 98057 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105093581 CORRIE RYDBERG (253) 234-6410 CORRIE.RYDBERG@PSE.COM 3400 E VALLEY RD WORK IN THE ROW AT V01 (316712-165792) TO UPGRADE EXISTING PADMOUNT TRANSFORMER FROM 45KVA TO 500KVA. NO HS CUTS ANTICIPATED. PLEASE SEE ATTACHED ✔✔ Potelco, Inc. (253) 234-6410 POTELI#227PL BL005109 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.22 00:03:04 -08'00'12/22/19 RESTORATION PER CITY OF RENTON STANDARDS MFP20000042 Scott Warlick 1/14/2020 Holly Powers 1/16/2020 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105093581 Potelco, Inc FABIAN GOMEZ (206) 573-0031 6905 S 228th St, Kent, WA 98032 FABIAN.GOMEZ@PSE.COM 3400 E VALLEY RD TBD TBD CORRIE RYDBERG 12/22/19 Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.22 00:02:35 -08'00' Monday - Friday 8:00AM - 3:00PM MFP20000042 Scott Warlick 1/14/2020 SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). #3400 E VALLEY RDSW 34TH ST RR13 11 12 13 11 12 13 11 12 11111211VO1CONETOPPER W1-4LROAD WORK AHEAD W20-1100'100'100'RIGHT LANE CLOSEDAHEAD W20-5RW4-2LARRW-BRD ROADWORKAHEADW20-1 100'RIGHTKEEPR4-7BRIGHTKEEPR4-7BROADWORKAHEADW20-1100'N PSE PUGETSOUNDENERGY -OB#105093581 3400 E Valley Rd Renton, WA 6th December, 2019 prachi.joshi@pse.com 425-424-7808 SHEET 1 of 1 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31/2021 stephen.gadke@pse.com (425) 424-6431 TEMPORARY TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW UG/BOX/VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP20000042 3400 3351 ROW 80' SW 34TH ST E VALLEY RDROW80'316703-164756 2500 kVA (ABC) 316711-165777 25 kVA 120/240V (B) 316712-165792 45 kVA 120/208V 500kVA 277/480V 316705-164756 CUSTOMER OWNED, INSTALLED, & MAINTAINED 4-RUNS 500 kCMIL SVC 316714-165765 316714-165781 VIC 15 AØ32334 BØ32335 CØ32336 J J J J JOB SITEE VALLEY RD316711-165777 ROW 82' 34' 7'S/WEOPEOP17' J 24'316712-165792 500kVA 277/480V UNDERGROUND CIRCUIT MAP SCALE: 6" = 1 MILE Owner / Developer Contact Info officeATTN: D&C INVESTMENTS 555 SW GRADY WAY RENTON, WA 98057 ADAM PERSON 253-924-9073 105093581GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Superior E-Mail: Cell Phone: Project Manager Contact Information: Manager:FABIAN GOMEZ 206-573-0031 FABIAN.GOMEZ.COM UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP F. GOMEZ 206-573-0031 11/20/19 F. GOMEZ 206-573-0031 11/20/19 S. FOX (714) 893-2405 11/20/19 REQUIRED RENTON WALKER'S RENTON MAZDA 3Ø 500KVA PM TRF UPGRADE & CT SVC 3400 E VALLEY RD, RENTON, WA 98057 N/A N/A N/A 105093581 AS NOTED 1 OF 2 KING N/A N/A CSPSKEIN SE 30-23N-05 N/A N/A 2305E120 2305E124 2305E120 VIC-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105093581508159682 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-15 05/2019 121.00 118.00 116.00 6.75 6.75 6.75 127.75 124.75 122.75 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' OVERHEAD CIRCUIT MAP 2305E124 SCALE: 6" = 1 MILE JOB SITE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 11' X 11' WORK PIT 1/3 CUBIC YARDS OF 6” CRUSHED ROCK AT V01 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) CIRCUIT FEET ADDED: 0' SQ. FOOTAGE: 33,225 SQ FT PANEL SIZE: 600A HEAT TYPE: ELECTRIC EST. DEMAND: 123.71kW LRC: 257A % V. DROP: 1.0% % FLICKER: 2.1% E80' ROW CL W NOT TO SCALE CROSS SECTION - E VALLEY RD LOOKING NORTH PARTIAL PLAN DETAIL SCALE: 1" = 20' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 316712-165792 500kVA 6259250 JOB SITE SITE SPECIFIC NOTES AT V01: 316712-165792 -REMOVE EXISTING 45KVA 120/208V PM TRANSFORMER -REMOVE EXISTING 4'8" X 4'8" X 3'6" VAULT & LID -INSTALL (1) 7' X 7' VAULT W/8' SQUARE COVER & 60" X 24"ACCESS STD. 6045.5000 (PM3P15M) -INSTALL (1) 500KVA 277/480V PADMOUNT TRF (MID: 6259250) -INSTALL (4) 4-POS #2 TO 500 KCMIL CONNECTOR LUGS (MID 7651002) -INSTALL (12) MOUNTING BOLT KITS (MID 7651008) -CONNECT (4) RUNS OF CUSTOMER OWNED, INSTALLED & MAINTAINED 500 KCMIL M01: NEW METER BASE -INSTALL 600A METER POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. 101125210 584045026 587030797 3000429705 508579061 508579067 Service Meter 108117701Removal TRF Upgrade TRF Removal MFP20000042 11' X 11' WORK PITCUSTOMER SUPPLIED W/ 6" BEDDING OF 5/8"316712-165792 500kVA 277/480V MINUS CRUSHED ROCK AØ32334 BØ32335 CØ32336 105093581UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP F. GOMEZ 206-573-0031 11/20/19 F. GOMEZ 206-573-0031 11/20/19 S. FOX (714) 893-2405 11/20/19 REQUIRED RENTON WALKER'S RENTON MAZDA 3Ø 500KVA PM TRF UPGRADE & CT SVC 3400 E VALLEY RD, RENTON, WA 98057 N/A N/A N/A 105093581 AS NOTED 2 OF 2 KING N/A N/A CSPSKEIN SE 30-23N-05 N/A N/A 2305E120 2305E124 2305E120 VIC-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 10' 10' APPROVED TRANSFORMER AREA 10' TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFCOOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN 3' MIN 2" Excavation - 20 cubic yards 8'-0" or 10'-0" 7'-0" 8'-0"8" 4'-2" SIDE VIEW 4'-6"Crushed 6" Rock 11' 11' TOP VIEW 3'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL @ V01 PSE ENTRY CUSTOMER ENTRY CABLE & CONDUIT DETAIL SCALE: NONE MFP20000042