Loading...
HomeMy WebLinkAboutMFP20000149.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000149 IVR Number: 20000149 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :01/07/2020Application Date:3628600010Parcel Number:1201 N 37TH ST Permit Type:01/16/2020Issue Date:Franchise Permit Work Class:01/15/2021Expiration Date:Minor Utility Job Number:105086571Franchise Type:Electric Description:At P01 crew to replace 15KVA with new 37.5KVA. Dig 2 work pits and bore under N 37th St. Install (1) run 350 UG TPX at P01. Pothole all existing utilities. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416Applicant Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CAMPBELL JULIE E+KIMIAI ALI 1201 N 37TH ST RENTON , WA 98056 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date WƵŐĞƚ^ŽƵŶĚŶĞƌŐLJͲůĞĐƚƌŝĐ ϭϬϱϬϴϲϱϳϭ ŽƌƌŝĞZLJĚďĞƌŐĐŽƌƌŝĞ͘ƌLJĚďĞƌŐΛƉƐĞ͘ĐŽŵ ϭϮϬϭEϯϳd,^d dWϬϭ;ϯϭϵϰϰϵͲϭϲϲϭϵϬͿZtdKZW>ϭϱ<st/d,Etϯϳ͘ϱ<sEh^dKDZdKysdtKZ<W/dϰΖyϰΖyϯΖ͘ h^dKDZdKysdϰΖyϲΖyϯΖKZW/ddE͘^/K&E͘ϯϳd,^dEKZhEZϯϳd,^d͘WWZKyϲϬΖ͘Ztt/>>/E^d>>;ϭͿZhEϯϱϬh' dWydWϬϭ;ϯϭϵϰϰϵͲϭϲϲϭϵϬͿ͘W>^^dd, ϱΖyϭϮΗyϯΖ WKd>K͕/E͘ϮϱϯͲϮϯϰͲϲϰϭϬ WKd>/ηϮϮϳW>>ϬϬϱϭϬϵ ϭͬϳͬϮϬϮϬCorrie Rydberg Digitally signed by Corrie Rydberg Date: 2020.01.07 10:07:40 -08'00' MFP20000149 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 1/13/2020 Holly Powers 1/16/2020 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering ϭϮϬϭEϯϳd,^d dddd Eh^dKDZdKysdtKZ<W/dϰΖyϰΖyϯΖh^dKDZdKysdϰΖyϲΖyϯΖKZW/ddE͘^/K&E͘ϯϳd,^dEKZhEZϯϳd,^d͘ dWϬϭ;ϯϭϵϰϰϵͲϭϲϲϭϵϬͿZtdKZW>ϭϱ<st/d,Etϯϳ͘ϱ<s WWZKyϲϬΖ͘Ztt/>>/E^d>>;ϭͿZhEϯϱϬh'dWydWϬϭ;ϯϭϵϰϰϵͲϭϲϲϭϵϬͿ͘W>^^dd, WKd>K͕/E͘ &/E'KD&/E͘'KDΛW^͘KD ϲϵϬϱ^ϮϮϴd,^d <Ed͕tϵϴϬϯϮ MFP20000149 1/13/2020 Monday - Friday 8:00AM - 3:00PM Scott Warlick C.E.D Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date KZZ/ZzZ'ϭͬϳͬϮϬϮϬCorrie Rydberg Digitally signed by Corrie Rydberg Date: 2020.01.07 10:08:02 -08'00' 1212N 37th STWELLS AVE N1212WELLS AVE N 111117171212P01STO P FLAGGERSTOP FLAGGER N 37TH STONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1ROADWORKAHEADW20-1 ONE LANEROADAHEAD W20-4X'100'X'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1PARK AVE NPARK AVE N#1201FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000 000 NO PARKINGNO-PARKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPATH OF INSTALLATIONNCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050865711201 N 37th ST, Renton WAOctober 13, 2017Sheet 1 of 2 ryan.honeysett@pse.com(425)457-5381PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381MFP20000149 1212N 37th STWELLS AVE N1212WELLS AVE N 111117171212P01STOP FLAGGERHH1 N 37TH STX'100'ROADWORKAHEADW20-1W20-7AONE LANEROAD AHEAD W20-4100'100'100'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1PARK AVE NPARK AVE N#1201FROMTOTOW AWAY AREAPHONE 888-9999 INFRASOURCE LLC 000 0000 000 NO PARKINGNO-PARKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1100'100'BEPREPAREDTOSTOPW3-4100'STOPFLAGGER PATH OF INSTALLATIONNCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050865711201 N 37th ST, Renton WAOctober 13, 2017Sheet 2 of 2 ryan.honeysett@pse.com(425)457-5381PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381MFP20000149 D/R "1201"DRIVEWAYN 37TH STN 37TH ST 60' 319450-166172 STORM DRAIN WHITE LINE HAZ 15 ADU 319451-166208 319449-166190 15 KVA 120/240V 37.5 KVA 120/240V JOB SITE ASPHALT SHOULDER STORM DRAIN 4' X 4' WORK PIT 3/4 YARD OF SAND N 37TH STN 37TH ST 3' 10' 15' BORE ±60' 4' X 4' WORK PIT 4 'X 4' WORK PIT 5' X 6' WORK PIT 4' X 6' BORE PIT DRIVEWAY-CUSTOMER TO INSTALL 1-3"SCH'L 80 CONDUIT, ±145' -PSE TO INSTALL 1-RUN 350KCMIL UG TPX, ±145' -PSE TO INSTALL 1-RUN OF 4/0 KCMIL UG TPX TAIL, ±10' -CUSTOMER TO INSTALL 1-3"SCH'L 80 CONDUIT, ±210' -PSE TO INSTALL 1-RUN 350KCMIL UG TPX, ±210' -PSE TO INSTALL 1-RUN OF 4/0 KCMIL UG TPX TAIL, ±10' WHITE LINE C:\Users\tinguy\AppData\Local\Temp\NM_16_1_GG_9353eb06-2255-438e-8ac1-e5e71a4fbf40.png JOB SITE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: ALI KIMIAI 1201 N 37TH ST RENTON, WA 98056 ALI KIMIAI 425-919-1809 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILESCALE: NONE CIRCUIT ONE-LINE DIAGRAM CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HAZ-15 2017 201 261 240 -3.95 - 201 264.95 240 OH TRF Removal Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 104296642505017596 108103039 101108129505017544 108103038 101108127 CABLE TV PHONE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:FABIAN GOMEZ 206-573-0031 FABIAN.GOMEZ@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 319449-166190 37.5 KVA 120/240V 6211300 SCALE: 1" = 50'105086571THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105086571 593188626 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP FABIAN GOMEZ 206-573-0031 10/2/17 FABIAN GOMEZ 206-573-0031 10/2/17 N/A N/A N/A TIN NGUYEN 253-244-4303 10/2/17 EASEMENT RENTON ALI KIMIAI OH TO UG CONVERSION /W POLE REM & OH TRF UPGRADE 1201 N 37TH ST, RENTON WA 98056 N/A N/A N/A 105086571 N/A 1/2 KING N/A N/A CSPSKEIN NW32-24N-05E N/A N/A 2405E126 2405E136 2405E126 HAZ-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 504858529 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2780 SQ. 200 AMPS ELECTRIC 14 KW 115 A 3.3 % 3.3 % SITE SPECIFIC NOTES P01 GRID# 319449-166190: -REMOVE EXISTING B/O 40' POLE -INSTALL 1-45' CL-3 DISTRIBUTION POLE W/GNDS -INSTALL 1-POLE TOP PIN -REMOVE EXISTING 15KVA 120/240 OH TRF -INSTALL 37.5KVA 120/240 OH TRF -INSTALL LB C/O FUSE @15T & TAP BØ -INSTALL 1-STIRRUP BOLT -INSTALL 2-RIGID CLEVIS (NORTH & SOUTH) -TRANSFER OH SERVICE "1114", "1202", "1115" -COMMUNICATIONS TO TRANSFER -INSTALL NEW GRID# 319437-166190 HH1: -INSTALL 17"X30" SECONDARY HANDHOLE -INSTALL 3-6 POSITION FARGO BARS M01: -INSTALL 1-200AMP METER M02: -INSTALL 1-200AMP METER SPAN SPECIFIC NOTES P01/X01-HH1: -BORE AND INSTALL 1-3" RED POLY CONDUIT, ±75' -INSTALL 1-RUN OF 350KCMIL UG TPX, ±110' P01-"1201": -REMOVE EXISTING OH SEC CONDUCTOR & EXISTING METER HH1 - M01: -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±145' -PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±155' -PSE TO INTERCEPT & INSTALL 1-RUN OF 4/0KCMIL UG TPX TAIL, ±10' HH1 - M02: -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±210' -PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±220' -PSE TO INTERCEPT & INSTALL 1-RUN OF 40/KCMIL UG PTX TAIL, ±10' CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS. #6750.6500 **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01. -CUSTOMER IS REQUIRED TO PROVED A 4' x 6' BORE PIT ON P01 SIDE. -CUSTOMER IS REQUIRED TO PROVIDE A 5' X 6' WORK PIT AT HH1. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M02. -CUSTOMER TO BORE & INSTALL ±75' OF 1-3" DISCONTINUOUS RED POLY CONDUIT FROM P01-HH1. -CUSTOMER TO EXCAVATE & INSTALL ±145' OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT FROM HH1-M01. --CUSTOMER TO EXCAVATE & INSTALL ±210' OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT FROM HH1-M02. -CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN CONDUIT. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF WAY. -CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF BUILDING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION 583057918 OUTAGE LIST 1115 N 37TH ST, RENTON WA 98056 1201 N 37TH ST, RENTON WA 98056 1114 N 37TH ST, RENTON WA 98056 1202 N 37TH ST, RENTON WA 98056 CIRCUIT FEET ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1600 SQ. 200 AMPS ELECTRIC 13 KW 80 A 3.5 % 2.6 % HH1-M02 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319449-166190 15KVA 120/240V Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale 186050040 P01-HH1 HH1-M01 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: SQ. AMPS 27 KW A 2.8 % 2.3 % New Handhole/Pole Pole Removal OH Misc Purchase Conduit Perm. Service Ex. Svc Removal POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 319449-166190 40 1956 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 319449-166190 45 3 2017 PSE Equip #8974503 WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 M01 UNK 1 85 FT MFP20000149 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP FABIAN GOMEZ 206-573-0031 10/2/17 FABIAN GOMEZ 206-573-0031 10/2/17 N/A N/A N/A TIN NGUYEN 253-244-4303 10/2/17 EASEMENT RENTON ALI KIMIAI OH TO UG CONVERSION /W POLE REM & OH TRF UPGRADE 1201 N 37TH ST, RENTON WA 98056 N/A N/A N/A 105086571 N/A 2/2 KING N/A N/A CSPSKEIN NW32-24N-05E N/A N/A 2405E126 2405E136 2405E126 HAZ-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. Backfill for Conduit Free of rocks larger than 8" in diameter) FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 80 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr PERMANENT METER DETAIL AT M01 & M02 SCALE: NONE BORE PIT DETAIL Electric Service Cable in Conduit Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Red Polyethelene SCALE: NONE Customer's service conductors27-1/4" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW 2" 30" Approx Approx 17" TOP VIEW 6' 5' SINGLE PHASE SECONDARY HANDHOLE AT HH1 SCALE: NONE 6050.2000 MFP20000149