Loading...
HomeMy WebLinkAboutMFP20000152.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000152 IVR Number: 20000152 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :01/13/2020Application Date:5128000115Parcel Number:14804 130TH AVE SE Permit Type:01/17/2020Issue Date:Franchise Permit Work Class:01/16/2021Expiration Date:Minor Utility Job Number:186055931Franchise Type:Electric Description:At P01 raise street light arm on existing pole 1' above communication lines. At P02 ziptie 1 span of secondary to neutral. At P03 raise street light arm on existing pole 1' above communications lines. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416Applicant Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL EDWARD ZHANG 8428 143RD CT NE REDMOND , WA 98052 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Wh'd^KhEEZ'zͲ>dZ/ ϭϴϲϬϱϱϵϯϭ KZZ/ZzZ'KZZ/͘ZzZ'ΛW^͘KD ϭϰϴϬϰϭϯϬd,s^ dWϬϭ;ϯϭϳϰϰϮͲϭϲϳϭϰϲͿZ/^^dZd>/',dZDKEy/^d/E'WK>WWZKyϭΖKsdKWKDD^͘ dWϬϮ;ϯϭϳϰϮϳͲϭϲϳϭϲϯͿ/Wd/ϭ^WEK&^KEZzdKEhdZ>͘dWϬϯ;ϯϭϳϯϳϳͲϭϲϳϮϱϰͿZ/^^dZd>/',dZDKEy/^d/E' WK>WWZKyϭΖKsdKWKDD^͘EKd,^hd^Ed//Wd͘W>^^dd,͘ WKd>K͕/E͘ϮϱϯͲϮϯϰͲϲϰϭϬ WKd>/ηϮϮϳW>>ϬϬϱϭϬϵ ϭͬϳͬϮϬϮϬCorrie Rydberg Digitally signed by Corrie Rydberg Date: 2020.01.07 12:42:26 -08'00' MFP20000152 Scott Warlick 1/13/2020 Holly Powers 1/17/2020 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering ϭϰϴϬϰϭϯϬd,s^ d ddd dWϬϭ;ϯϭϳϰϰϮͲϭϲϳϭϰϲͿZ/^^dZd>/',dZDKEy/^d/E'WK>WWZKyϭΖ KsdKWKDD^͘dWϬϮ;ϯϭϳϰϮϳͲϭϲϳϭϲϯͿ/Wd/ϭ^WEK&^KEZzdKEhdZ>͘dWϬϯ;ϯϭϳϯϳϳͲϭϲϳϮϱϰͿZ/^^dZd>/',dZDKEy/^d/E' WK>WWZKyϭΖKsdKWKDD^͘EKd,^hd^Ed//Wd͘W>^^dd,͘ WKd>K͕/E͘ :^KE^dZdZ :^KE͘^dZdZΛW^͘KD ϲϵϬϱ^ϮϮϴd,^d <Ed ϵϴϬϯϮ MFP20000152 Monday - Friday 8:00AM - 3:00PM Scott Warlick C.E.D.1/13/2020 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date KZZ/ZzZ' ϭͬϳͬϮϬϮϬ Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2020.01.07 12:42:45 -08'00' 14804 130th Ave SE Renton WA 98058 USAP01P02ONLY BUS SE RENTON MAPLE VALLEY RD (SR - 169)13 1 S T A V E S E SE 149TH ST SE 148TH ST SE 148TH ST111111111111 11 11 11 11ONLYBUS BUSSTOPBUSSTOP131STAVE S E STOP FLAGGER STOP FLAGGER STOP FLAGGER STOP FLAGGER W2 0 - 7 AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4 10 0 ' 10 0 '100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'RO A D WO R K AHE A D W20-1BEPR E P A R E D TO STO P W3-4100'100'W20-7ARO A D WO R K AH E A D W20-1W20-4ONE L A N E ROA D AHE A D100'100'100'W2 0 - 7 AROADWORKAHEADW2 0 - 1 BEPREPAREDTOSTOPW3- 4 X' X' X'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'USE MAXIMUM AVAILABLESPACE FOR SIGNSW20-7ARO A D WO R K AH E A D W20-1BEPR E P A R E D TO ST O P W3-4X'X'X'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-OB18605593114804 130th Av SE, Renton, WA12/19/2019YURIY.BASHTOVOY@PSE@PSE.COM(425)424-6603SHEET 1 of 4TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.0'60'30'PRINT ON 11 X 17SHEETS ONLY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYP01P02P03VICINITY MAPWORK AREASEE SHEET 4 FORWSDOT NOTESMFP20000152 14804 130th Ave SE Renton WA 98058 USAP01P02ONLY BUS SE RENTON MAPLE VALLEY RD (SR - 169)1 3 1 S T A V E S E SE 149TH ST SE 148TH ST SE 148TH ST11 11 11 11 11 11 11 11 11 11ONLYBUS BUSSTOPBUSSTOP131STAVE SESTOP FLAGGER STOP FLAGGERROADWORKAHEADW2 0 - 1 10 0 'W20-7ARO A D W O R K AH E A D W20-1W20-4ON E L A N E RO A D AH E A D100'100'100'W20-7ABEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1USE MAXIMUM AVAILABLESPACE FOR SIGNSRO A D WO R K AH E A D W20-1BEPR E P A R E D TOST O P W3-4X'X'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4X'X'ROADWORKAHEADW20-1W 2 0 - 1 ROADWORKAHEADBEPREPAREDTOSTOPW3 - 4 100 'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-OB18605593114804 130th Av SE, Renton, WA12/19/2019YURIY.BASHTOVOY@PSE@PSE.COM(425)424-6603SHEET 2 of 4TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.0'60'30'PRINT ON 11 X 17SHEETS ONLY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSEE SHEET 4 FORWSDOT NOTESMFP20000152 P03©©8 1 2 1 2 1 2 12 1 2 8 10 11 12 11 1112 1 2 1 2 1 2 1 2 8 SE RENTON MAPLE VALLEY RD (SR - 169)8 12 12 12 12 8 140TH WAY SE©SRMP23.1 ©SE RENTON MAPLE VALLEY RD (SR - 169)SHOULDERWORKW21-5UTILITYWORKAHEADW21-7 100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY-OB18605593114804 130th Av SE, Renton, WA12/19/2019YURIY.BASHTOVOY@PSE@PSE.COM(425)424-6603SHEET 3 of 4TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603Notes:1. All signs and spacing to conform to theMUTCD and City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.0'60'30'PRINT ON 11 X 17SHEETS ONLY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP20000152 PSEPUGETSOUNDENERGY-OB18605593114804 130th Av SE, Renton, WA12/19/2019YURIY.BASHTOVOY@PSE@PSE.COM(425)424-6603SHEET 4 of 4WSDOT NOTES & TABLESPuget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603PRINT ON 11 X 17SHEETS ONLY””–MFP20000152 "13103" "13111" "14804" SE R E N T O N M A P L E V A L L E Y R D 130TH AVE SE131TH AVE SEROW: 100' ROW: 28' SE R E N T O N M A P L E V A L L E Y R D EOP: 78' ROW: 194' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POWER GENERAL NOTES 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.All work is to be done in accordance with local municipal and county permit requirements as applicable. 5.Inclement weather conditions may cause delays in construction times and dates. SCALE: 1:100 SITE PLAN 508221496 186055931 N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Sub Order SITE SPECIFIC NOTES P01 (317442-167146) -RAISE STREET LIGHT ARM 1' ABOVE TOP COMMS -CLEAN DRIP LOOPS -CREW TO MAINTAIN SAFETY SPACE CLEARANCES P02 (317427-167163) -ZIPTIE SEC TO NEUT APPROX 170' TO P01 -CREW TO MAINTAIN MIN. 30" OF MIDSPAN CLEARANCE P03 (317377-167254) -RAISE STREET LIGHT ARM 1' ABOVE TOP COMMS -CREW TO MAINTAIN MIN. 30" OF MIDSPAN CLEARANCE N/A N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIGSAP W.O. #186055931VICINITY MAP FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. OH CIRCUIT MAP: 2305E088 SCALE 6" = 1 MILE DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. STEETER 253-263-2737 12/13/19 J. STEETER 253-263-2737 12/13/19 N/A N/A N/A C. CANO 253-841-6252 12/13/19 N/A CITY OF RENTON ENGR1 MCI TK# 4024255 ZIP TIE SEC TO NEUT; RAISE 2 S/L ARMS 14804 130TH AVE SE, RENTON, WA 98058 POTELCO N/A N/A N/A 186055931 AS NOTED 1/1 KING N/A N/A QL T23N-R05E-22S N/A N/A 2305E086 2305E088 2305E086 FWD-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A JOB SITE JOB SITE SCALE: 1:100 SITE PLAN MFP20000152