Loading...
HomeMy WebLinkAboutAdden 1 CAG-18-078,Adden#1-20 AMENDMENT NO. 1 TO AGREEMENT FOR GEOTECHNICAL SERVICES CAG-18-078 THIS AMENDMENT, dated .J \ t , 2020, is by and between the City of Renton (the "City"), a Washington municipal corporation, and The Riley Group("Consultant"),a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-18-078, dated 05/09/2018, to provide necessary services for the Family First Community Center (referred to herein as the"Agreement"); Whereas, the Parties wish to amend the Agreement to provide necessary geotechnical inspections to confirm conditions and work conform to specification requirements,work will be done to coincide with and support project construction,and additional fees are estimated to be $16,265.00. NOW THEREFORE, It is mutually agreed upon that CAG-18-078 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add required field inspections and analysis reviews and reporting to support the construction of the Family First Community Center as specified in Exhibit A-1,which is attached and incorporated herein. 2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule set forth in Exhibit A-1.All Work shall be performed by no later than December 31, 2021. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $16,265.00 from $7,950.00 to $24,215.00, plus any applicable state and local sales taxes.The additional compensation shall be paid based upon Work actually performed according to the rates or amounts specified in Exhibit A-1 which is attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Wor<performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF,the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT k/By: By: Kelly Beym°/, Print Name (,-' : t 'Af' r Administrator Print Title ; r,-,c : 'e�# '')), ,e./.,,- 07/Zt. IA g 7.,,, Date Date Approved as to Legal Form By: .....Ad1L.e ��/I^ Shane Moloney City Attorney Contract Template Updated 09/17/2019(373) PAGE 2 OF 2 III MI Exhibit A-1 I RiLEYGROUP January 7,2020 Mr.Russ Woodruff Capital Project Coordinator City of Renton 1055 South Grady Way Renton,Washington 98057 Subject: Geotechnical Inspection Proposal Family First Community Center 1055 South Grady Way Renton,Washington 98057 RGI Proposal No.2018-130-PRP1 Reference: Geotechnical Engineering Report, prepared by The Riley Group, Inc.dated June 8, 2018 Dear Mr.Woodruff: The Riley Group, Inc. (RGI) is pleased to present this proposal for performing geotechnical construction inspection services for the proposed Family First Community Center in Renton, Washington.The project will include a total area of about 14.9 acres. In preparing this proposal, a construction schedule is not available. Based on the communication with the client,the construction is expected to start in late April 2020 and will last for about 10 to 12 months. RGI expects that the major earthwork will be performed in dry season. Based on our experience with similar construction, we expect that full time observation and density testing will be needed during major site grading and deep utility installation. Other services such as footing excavation observation, backfilling, shallow utility installation, verifying bearing capacity, drainage installation, and pavement subgrade can be performed on part time basis.We estimate that our field services will be approximately 100 hours and includes travel and field reports. We expect the geotechnical special inspections will include: Preconstruction meetings with the city(if needed) > Temporary erosion and sediment control(TESC) > Structural fill compaction testing > Observe and monitor excavation Y Bearing capacity verification > Utility installation and backfill testing • Subsurface drainage installation Pavement subgrade observation Daily field reports will be provided for your review outlining activities, results, and recommendations,if any. A final report will be prepared at the end of the project,as required. Corporate Office 17522 Bothell Way Northeast Bothell,Washington 98011 Phone 425.415.0551 0 Fax 425.415.0311 www.rrley-group.com Family First Community Center Page 2 January 7,2020 Renton,Washington RGi Proposal No.2018-130-PRP1 The estimated time and costs are provided on the attached spreadsheet, however the actual project cost will ultimately depend on the site conditions encountered during earthwork and the resulting services provided for the duration of the project. The principal engineer will supervise the field staff work,review and transmit field reports,and provide consulting services as needed. We look forward to your favorable review and to working with you on this project.Please call us if you have any questions or need additional information at(425)415-0551. Sincerely, THE RILEY GROUP,INC. t _ ` Ri y R.Wang, Ph.D., P.E. Kristina M.Weller, PE Principal Engineer Principal Geotechnical Engineer Attachments: Addendum A Cost Estimate 2020 Schedule of Charge and General Conditions CLIENT ACCEPTANCE SECTION CLIENT: CITY OF RENTON THE SITE: FAMILY FIRST COMMUNITY CENTER RENTON,WASHINGTON SCOPE OF WORK: GEOTECHNICAL CONSTRUCTION MONITORING ESTIMATED PROJECT COST $16,265 attached 2020 Schedule of Charges and General Conditions are satisfactory and are hereby accepted by the Client. Print Name: Date of Acceptance: • IIII RILEYGROUP Geotechnical Construction Monitoring- Estimated Cost Family First Community Center Renton,Washington Prepared on 1/7/20 CONSTRUCTION MONITORING FIELD SERVICES Staff Assigned Estimated Unit Unit Rate Extended Quantity* Total Principal Engineer 20 hours $185.00 $3,700.00 Field Staff 100 hours $100.00 $10,000.00 Project Support 4 hours $90.00 $360.00 Mileage 1260 mile $0.75 $945.00 Subtotal: $15,005.00 *Estimate for hours assumes no overtime and Field Staff: 50 hours full time for site grading and deep utility installation and 50 hours part time for TESC, other utilities,drainage,and subgrade verification. Principal: Project management,staff support and consulting services as needed. LABORATORY TESTING Test Estimated Unit Unit Rate Extended Quantity Total Sieves 2 test $100.00 $200.00 Proctor 2 test $235.00 $470.00 Subtotal: $670.00 PROJECT FINAL REVIEW AND CLOSE-OUT Staff Assigned Estimated Unit Unit Rate Extended Quantity Total Principal Engineer 1 hours $185.00 $185.00 Project Geologist 3 hours $135.00 $405.00 Subtotal $590.00 ESTIMATED PROJECT COST $16,265.00 1I 11- RILEYGROUP UI MI , Ii RILEYGROU 2020 STANDARD SCHEDULE OF CHARGES AND GENERAL CONDITIONS Compensation to The Riley Group,Inc.(RGI)for professional services is based on the conditions set forth: CHARGES.Unless other arrangements have been made,charges for all work will be based on the following: Professional Service Rates Principal Level $185/hour Staff Level $110/hour Senior Level $160/hour Solis Technician $90/hour Project II Level $135/hour AutoCAD Drafter/Senior Drafter $100-$120/hour Project I Level $120/hour Project Support/Project Coordination $90-$120/hour Frequently Utilized Geotechnical,Hydrogeological,and Environmental Equipment Rates 5035 Kit $10.50-$14/each Oil-Water Interface Probe $75/day Air Bladder Groundwater Sampling System(QED M 50) $150/day Peristaltic Pump $40/day Disposable Bailers $15/bailer Photolonization Detector(PID) $175/day Dissolved Oxygen Meter(down well) $100/day Pressure Transducer $30/each/day Equipment Van/Truck(local mileage) $150/day Submersible Groundwater Sampling Pump $100/day General Field/Health and Safety Supplies 550/day Surveying Equipment $150/day Generator(Honda EU2000) $75/day Tedlar Bags $30/each Geo Chem Meter $150/day Tubing—Disposable—Groundwater Sampling $0.29 to$0.59/ft Geosub Pump with Controller $280/day Turbidity/pH Meters $20/day GPS(GNSS Handheld) $85/day Water Flow Meter $45/day Hand Auger and Extensions $40/day Water Level Meter $45/day High Vacuum Air Pump $30/day Water Sampling Filter(0.10 micron prefilter) $45/filter Horiba U-SO with Flowcell Water Quality Meter $t50/day Water Sampling Filter(0.45 micron prefilter) $28/filter ' Magnehelic Gauges $40/day 'Pricing above doesn't Include all RGI field equipment.Pricing available upon request. Other Surcharges and Rates Litigation Support 2 x rate Per Diem,over 180 miles $74/day Outside Services,Subcontractors,Materials cost+15% Per Diem,overnight $215/day Parking,Permits cost+15% Mileage $0.75/mile PROPOSAL EXPIRATION.Proposals are valid for 30 days after date of issuance.After expiration,RGI reserves the right to review proposed project and adjust costs,as necessary. RATES EXPIRATION.Rates listed above are valid until December 31,2020 after which time the rates may be adjusted. OVERTIME/MINIMUM/RUSH CHARGES.Hours worked in excess of 8 hours per day and/or 40 hours per week,or that are worked on the weekend and/or national holidays will be billed at 150 percent of the listed hourly rates when these overtime hours are requested by the Client or are reasonable and/or necessary to meet job schedules and requirements.Technical time for all field work(including travel)will be billed on a 4-hour daily minimum.Senior professional staff bill In 30 minute increments.Projects requested to be performed on an accelerated schedule will be subject to a rush charge. ESTIMATE OVERAGES AND CHANGE ORDERS. Additional charges may be Incurred during project completion due to several factors including but not limited to:unforeseen changes to the scope of work,scheduling delays(outside of RGI's control),and limited property accessibility.Lump sum/fixed fee project fees are determined based on the scope of work presented in the proposal. These prices, although fixed, are subject to increase if additional work is required to meet recognized industry standards. RGI will mak-a eenteetcd effort attain Client approval in writing(i.e.In the form of a change order,email and/or in proposal)prior to incurring additional charges. BILLING.Unless stated otherwise,invoices will be submitted following completion of the report or monthly and are payable net 30 calendar days of receipt.1 GI's hourly and proposed rates do not generally include sales tax(if applicable). Corporate 0//ke 17522 Bothell Way Northeast Bothell,Washington 98011 Phone 425.415,0551•Fox 425,415.0311 www.rlley-group_com Revised December23,2019 2020 SCHEDULE OF CHARGES AND GENERAL CONDITIONS,Continued records-aa-recjo4ed•te-place-eue -R61-cefssider-s -pFefessianatr ma }se e basik RIGHT-OF-ENTRY/CLIENT-FURNISHED INFORMATION. Unless otherwise agreed, RGI will be furnished right-of-entry on the land to perform the agreed upon scope of work.The Client is responsible to provide(by map or drawing)a description of the property showing buried utilities and • improvements. • developed•by-RGtarebutruments-ef-serMice-and y-ofR6L The-Client-agrees • • • SAMPLE RETENTION.All samples(soil,water,and building materials)collected will be discarded 30 days after submittal to the laboratory,unless the Client advises otherwise. • { . ate .;hewilll-fec • CLIENT REFERENCE PERMISSIONS.The Client agrees to allow RGI the use of their name and project information for marketing materials. • charges-of-attorneys;curt-fees and/er-preceedings, • Bent r inents;-or pellatents finer ante the-surf ,,-(e ebje ref , UI - II Lill RILEYGROUP