AMENDMENT NO. 1 TO AGREEMENT FOR GEOTECHNICAL
SERVICES CAG-18-078
THIS AMENDMENT, dated .J \ t , 2020, is by and between the City of Renton (the
"City"), a Washington municipal corporation, and The Riley Group("Consultant"),a Washington
Corporation. The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-18-078, dated
05/09/2018, to provide necessary services for the Family First Community Center (referred to
herein as the"Agreement");
Whereas, the Parties wish to amend the Agreement to provide necessary geotechnical
inspections to confirm conditions and work conform to specification requirements,work will be
done to coincide with and support project construction,and additional fees are estimated to be
$16,265.00.
NOW THEREFORE, It is mutually agreed upon that CAG-18-078 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add required field inspections
and analysis reviews and reporting to support the construction of the Family First
Community Center as specified in Exhibit A-1,which is attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule set forth in Exhibit A-1.All Work shall be performed by no later than December
31, 2021.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $16,265.00 from $7,950.00 to
$24,215.00, plus any applicable state and local sales taxes.The additional compensation
shall be paid based upon Work actually performed according to the rates or amounts
specified in Exhibit A-1 which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Wor<performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF,the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
k/By: By:
Kelly Beym°/, Print Name (,-' : t 'Af' r
Administrator Print Title ; r,-,c : 'e�# '')), ,e./.,,-
07/Zt. IA g 7.,,,
Date
Date
Approved as to Legal Form
By: .....Ad1L.e ��/I^
Shane Moloney
City Attorney
Contract Template Updated 09/17/2019(373)
PAGE 2 OF 2
III MI Exhibit A-1
I
RiLEYGROUP
January 7,2020
Mr.Russ Woodruff
Capital Project Coordinator
City of Renton
1055 South Grady Way
Renton,Washington 98057
Subject: Geotechnical Inspection Proposal
Family First Community Center
1055 South Grady Way
Renton,Washington 98057
RGI Proposal No.2018-130-PRP1
Reference: Geotechnical Engineering Report, prepared by The Riley Group, Inc.dated June 8,
2018
Dear Mr.Woodruff:
The Riley Group, Inc. (RGI) is pleased to present this proposal for performing geotechnical
construction inspection services for the proposed Family First Community Center in Renton,
Washington.The project will include a total area of about 14.9 acres.
In preparing this proposal, a construction schedule is not available. Based on the communication
with the client,the construction is expected to start in late April 2020 and will last for about 10 to
12 months. RGI expects that the major earthwork will be performed in dry season.
Based on our experience with similar construction, we expect that full time observation and
density testing will be needed during major site grading and deep utility installation. Other
services such as footing excavation observation, backfilling, shallow utility installation, verifying
bearing capacity, drainage installation, and pavement subgrade can be performed on part time
basis.We estimate that our field services will be approximately 100 hours and includes travel and
field reports.
We expect the geotechnical special inspections will include:
Preconstruction meetings with the city(if needed)
> Temporary erosion and sediment control(TESC)
> Structural fill compaction testing
> Observe and monitor excavation
Y Bearing capacity verification
> Utility installation and backfill testing
• Subsurface drainage installation
Pavement subgrade observation
Daily field reports will be provided for your review outlining activities, results, and
recommendations,if any. A final report will be prepared at the end of the project,as required.
Corporate Office
17522 Bothell Way Northeast
Bothell,Washington 98011
Phone 425.415.0551 0 Fax 425.415.0311
www.rrley-group.com
Family First Community Center Page 2 January 7,2020
Renton,Washington RGi Proposal No.2018-130-PRP1
The estimated time and costs are provided on the attached spreadsheet, however the actual
project cost will ultimately depend on the site conditions encountered during earthwork and the
resulting services provided for the duration of the project. The principal engineer will supervise
the field staff work,review and transmit field reports,and provide consulting services as needed.
We look forward to your favorable review and to working with you on this project.Please call us
if you have any questions or need additional information at(425)415-0551.
Sincerely,
THE RILEY GROUP,INC.
t _ `
Ri y R.Wang, Ph.D., P.E. Kristina M.Weller, PE
Principal Engineer Principal Geotechnical Engineer
Attachments: Addendum A Cost Estimate
2020 Schedule of Charge and General Conditions
CLIENT ACCEPTANCE SECTION
CLIENT: CITY OF RENTON
THE SITE: FAMILY FIRST COMMUNITY CENTER
RENTON,WASHINGTON
SCOPE OF WORK: GEOTECHNICAL CONSTRUCTION MONITORING
ESTIMATED PROJECT COST $16,265
attached 2020 Schedule of Charges and General Conditions are satisfactory and are hereby
accepted by the Client.
Print Name:
Date of Acceptance:
• IIII
RILEYGROUP
Geotechnical Construction Monitoring- Estimated Cost
Family First Community Center
Renton,Washington
Prepared on 1/7/20
CONSTRUCTION MONITORING FIELD SERVICES
Staff Assigned Estimated Unit Unit Rate Extended
Quantity* Total
Principal Engineer 20 hours $185.00 $3,700.00
Field Staff 100 hours $100.00 $10,000.00
Project Support 4 hours $90.00 $360.00
Mileage 1260 mile $0.75 $945.00
Subtotal: $15,005.00
*Estimate for hours assumes no overtime and
Field Staff: 50 hours full time for site grading and deep utility installation and 50 hours part time for TESC,
other utilities,drainage,and subgrade verification.
Principal: Project management,staff support and consulting services as needed.
LABORATORY TESTING
Test Estimated Unit Unit Rate Extended
Quantity Total
Sieves 2 test $100.00 $200.00
Proctor 2 test $235.00 $470.00
Subtotal: $670.00
PROJECT FINAL REVIEW AND CLOSE-OUT
Staff Assigned Estimated Unit Unit Rate Extended
Quantity Total
Principal Engineer 1 hours $185.00 $185.00
Project Geologist 3 hours $135.00 $405.00
Subtotal $590.00
ESTIMATED PROJECT COST $16,265.00
1I
11-
RILEYGROUP
UI
MI ,
Ii
RILEYGROU
2020 STANDARD SCHEDULE OF CHARGES AND GENERAL CONDITIONS
Compensation to The Riley Group,Inc.(RGI)for professional services is based on the conditions set forth:
CHARGES.Unless other arrangements have been made,charges for all work will be based on the following:
Professional Service Rates
Principal Level $185/hour Staff Level $110/hour
Senior Level $160/hour Solis Technician $90/hour
Project II Level $135/hour AutoCAD Drafter/Senior Drafter
$100-$120/hour
Project I Level $120/hour Project Support/Project Coordination $90-$120/hour
Frequently Utilized Geotechnical,Hydrogeological,and Environmental Equipment Rates
5035 Kit $10.50-$14/each Oil-Water Interface Probe $75/day
Air Bladder Groundwater Sampling System(QED M 50) $150/day Peristaltic Pump $40/day
Disposable Bailers $15/bailer Photolonization Detector(PID) $175/day
Dissolved Oxygen Meter(down well) $100/day Pressure Transducer $30/each/day
Equipment Van/Truck(local mileage) $150/day Submersible Groundwater Sampling Pump $100/day
General Field/Health and Safety Supplies 550/day Surveying Equipment $150/day
Generator(Honda EU2000) $75/day Tedlar Bags $30/each
Geo Chem Meter $150/day Tubing—Disposable—Groundwater Sampling $0.29 to$0.59/ft
Geosub Pump with Controller $280/day Turbidity/pH Meters $20/day
GPS(GNSS Handheld) $85/day Water Flow Meter $45/day
Hand Auger and Extensions $40/day Water Level Meter $45/day
High Vacuum Air Pump $30/day Water Sampling Filter(0.10 micron prefilter) $45/filter
Horiba U-SO with Flowcell Water Quality Meter $t50/day Water Sampling Filter(0.45 micron prefilter) $28/filter '
Magnehelic Gauges $40/day
'Pricing above doesn't Include all RGI field equipment.Pricing available upon request.
Other Surcharges and Rates
Litigation Support 2 x rate Per Diem,over 180 miles $74/day
Outside Services,Subcontractors,Materials cost+15% Per Diem,overnight $215/day
Parking,Permits cost+15% Mileage $0.75/mile
PROPOSAL EXPIRATION.Proposals are valid for 30 days after date of issuance.After expiration,RGI reserves the right to review proposed project
and adjust costs,as necessary.
RATES EXPIRATION.Rates listed above are valid until December 31,2020 after which time the rates may be adjusted.
OVERTIME/MINIMUM/RUSH CHARGES.Hours worked in excess of 8 hours per day and/or 40 hours per week,or that are worked on the weekend
and/or national holidays will be billed at 150 percent of the listed hourly rates when these overtime hours are requested by the Client or are
reasonable and/or necessary to meet job schedules and requirements.Technical time for all field work(including travel)will be billed on a 4-hour
daily minimum.Senior professional staff bill In 30 minute increments.Projects requested to be performed on an accelerated schedule will be subject
to a rush charge.
ESTIMATE OVERAGES AND CHANGE ORDERS. Additional charges may be Incurred during project completion due to several factors including but not
limited to:unforeseen changes to the scope of work,scheduling delays(outside of RGI's control),and limited property accessibility.Lump sum/fixed
fee project fees are determined based on the scope of work presented in the proposal. These prices, although fixed, are subject to increase if
additional work is required to meet recognized industry standards. RGI will mak-a eenteetcd effort attain Client approval in writing(i.e.In the
form of a change order,email and/or in proposal)prior to incurring additional charges.
BILLING.Unless stated otherwise,invoices will be submitted following completion of the report or monthly and are payable net 30 calendar days of
receipt.1
GI's hourly and proposed
rates do not generally include sales tax(if applicable).
Corporate 0//ke
17522 Bothell Way Northeast
Bothell,Washington 98011
Phone 425.415,0551•Fox 425,415.0311
www.rlley-group_com Revised December23,2019
2020 SCHEDULE OF CHARGES AND GENERAL CONDITIONS,Continued
records-aa-recjo4ed•te-place-eue -R61-cefssider-s -pFefessianatr ma }se e
basik
RIGHT-OF-ENTRY/CLIENT-FURNISHED INFORMATION. Unless otherwise agreed, RGI will be furnished right-of-entry on the land to perform the
agreed upon scope of work.The Client is responsible to provide(by map or drawing)a description of the property showing buried utilities and
•
improvements.
•
developed•by-RGtarebutruments-ef-serMice-and y-ofR6L The-Client-agrees
•
•
•
SAMPLE RETENTION.All samples(soil,water,and building materials)collected will be discarded 30 days after submittal to the laboratory,unless the
Client advises otherwise. •
{ . ate .;hewilll-fec
•
CLIENT REFERENCE PERMISSIONS.The Client agrees to allow RGI the use of their name and project information for marketing materials.
•
charges-of-attorneys;curt-fees and/er-preceedings,
•
Bent r inents;-or pellatents finer ante the-surf ,,-(e ebje ref
,
UI -
II Lill
RILEYGROUP