HomeMy WebLinkAboutCO 5 CAG-18-240, CO #5-20 . !'c> . Community Services Facilities Division CONTRACT NO: CAG-B18002996 CO NO. 5 CONTRACT CHANGE ORDER(CO) PROJECT TITLE: CITY OF RENTON PW-SIGN SHOP EXPANSION TO:OPTIMUS CONSTRUCTION (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s)are hereby incorporated by reference into the contract. Description Amount COP: $ 2,927.40 FIRE ALARM WORK IN THE EXISTING SHOP $ - $ - $ - $ - $ - CONTRACT SUM: ❑ NO CHANGE CI INCREASE OF: $ 3,220.14 ❑ DECREASE (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: ❑ NO CHANGE ❑ INCREASE OF: 0 ❑ DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY(Internal Use Only) ORIGINAL CONTRACT SUM $ 627,386.03 PREVIOUS ADDITIONS/DELETIONS $ 13,679.20 PREVIOUS TOTAL $ 641,065.23 CHANGE AMOUNT THIS CHANGE ORDER $ 3,220.14 REVISED CONTRACT TOTAL $ 644,285.37 PERCENT TOTAL CHANGE FROM ORIGINAL 2.69% NOTICE TO PROCEED DATE March 12,2019 PREVIOUS CONTRACT CALENDAR DAYS 150 PREVIOUS SUBSTANTIAL COMPLETION DATE August 9,2019 R ISE II CONTRACT CALENDAR DAYS THIS CHANGE ORDER 150 OP CURRENT SUBSTANTI. = ETIO DATE__)„�August 9,2019 47/1 ;4 1 604 7/4 ams _r amzeict A hi •ct Ack owle. . ' . t Date Con ra cknowledgement iDatt The City of Renton hereby accepts the foregoing Change Order Proposal(s).This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed.Invoices Incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this ChR,e Order. ii' AUTHORIZING S NATU TE , reit PTIMUS CONSTRUCTION FIND DEVELOPMENT INC City of Renton -SIGN SHOP EXPANSION General Contractor Change Order Rquest Date 7.16.19 Project Name: City of Renton-Sign Shop Expansion COP# 5 PR# Project# 2019-01 RR# Fire alarm work in existing shop LABOR COST (GC Work Force Only) Employee Name Hr Rate Hour Extension Description Journeyman $ 81.93 0 $ $ - Journeyman $ 81.93 0 $ $ - Foremen Dick McCullough $ 84.38 1 $ $ 84.38 Labor $ 68.03 0 $ $ - GC Labor Cost $ 84.38 P&022% $ 18.56 GC Labor Total Cost $ 102.94 MATERIAL COST Material Cost $ - Suppliers Material Cost $ - EQUIPTMENT COST Rental Equipment $0.00 Owned Equipment $0.00 Equipment Cost $ - Material&Equipment Const $ - OH&P@22% $ - Material&Equipment Total Cost $ - Backup documentation is Attached. Subcontractors Cost Name Item Sub-Profit Subs Cost Less Profit Modular Electric(R&H Fire) $426.67 $ 2,133.33 $0.00 Subcontractor Cost(less profit) 2,133.33 Subcontractor Profit 426.67 Subcontract Cost Total 2,560.00 GC Labor, Material&Equipment Total Cost $ 84.38 GC OH&P@22% $ 18.56 Subcontractors Total Cost $ 2,560.00 GC OH&Pon Sub@7% $ 179.20 GC&Sub's Total Cost $ 2,842.14 Insurance @ 1% $ 28.42 Bond @ 2% $ 56.84 Total Cost $ 2,927.40 n ; ® f 4-� Fireand Security, �.LC.• PO BOX3711 !"D VIEff.O D� IDEI[E�1�R ARLINGTON,WA 98223 LIC.#BHFIRHF842KW PH:425-244-1445 CUSTOMER: Modular Electric DATE:7/12/2019 Kirkland,WA Attn:Scott Anderson PROJECT: Renton Sign Shop Expansion 3555 NE 2'St Renton,WA 98056 SCOPE: Cost and Scope difference between a Design Build Fire Alarm based upon drawings provided,version 3 dated 8/27/2018,and installation of fire alarm devices indicated on the drawings, MATERIALS USED IN SCOPE: 1- Silent Knight NAC Panel 4• System Sensor Smoke Detectors 2- System Sensor Heat Detectors 2 Spectra Alert Strobes 2- 12 Volt 7 Amp Hour Batteries COST DIFFERNCE PRICING: 52,560 00 plus applicable sales tax