Loading...
HomeMy WebLinkAboutCO 6 CAG-18-240, CO #6-20 • . Community Services Facilities Division CONTRACT NO: CAG-18-240 CO NO. 6 CONTRACT CHANGE ORDER (CO) PROJECT TITLE: CITY OF RENTON PW-SIGN SHOP EXPANSION TO:OPTIMUS CONSTRUCTION (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s)are hereby incorporated by reference into the contract. Description Amount SIDING REVEAL CHANGES $ 3,780.90 CONTRACT SUM: ❑ NO CHANGE IO INCREASE OF: j$ 4,158.99I O DECREASE (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: O NO CHANGE ❑ INCREASE OF: 7 0, ❑ DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY(Internal Use Only) ORIGINAL CONTRACT SUM $ 627,386.03 PREVIOUS ADDITIONS/DELETIONS $ 16,899.34 PREVIOUS TOTAL $ 644,285.37 CHANGE AMOUNT THIS CHANGE ORDER $ 4:ISA qq REVISED CONTRACT TOTAL $ 648,444.36 PERCENT TOTAL CHANGE FROM ORIGINAL 3.36% NOTICE TO PROCEED DATE March 12,2019 PREVIOUS CONTRACT CALENDAR DAYS 150 PREVIOUS SUBSTANTIAL COMPLETION DATE August 9,2019 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 150 +y •CURRENT SUBSTANT • • ' • rt ION • August 9,2019 i�'+ reef z9 �� . i112o�2019 rc l ect �cknow '�g-ment Date Co�ract• know edgement D to The City of Renton hereby accepts the foregoing Change Order Proposal(s).This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed.Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Chan a Ord r. ///7A-d AUTHORIZING SI NATU DATE e LPTIMUS CONSTRUCTION FIND DEVELOPMENT INC PORT OF SEATTLE Gt ,Contractor Change Order Rquest Date 7.16.19 Project Name: City of Renton-Sign Shop Expansion COP# 6 PR# Project# 2019-01 RFI# Discription Siding reveal changes LABOR COST (GC Work Force Only) Employee Name Hr Rate Hour Extension Description Journeyman $ 81.93 0 $ $ - Journeyman $ 81.93 0 $ $ _ Foremen Dick McCullough $ 84.38 5 $ $ 421.90 Labor $ 68.03 0 - GC Labor Cost $ 421.90 P&O22% $ 92.82 GC Labor Total Cost $ 514.72 MATERIAL COST Material Cost $ - Suppliers Material Cost $ - EQUIPTMENT COST Rental Equipment $0.00 Ov 1 Equipment $0.00 Equipment Cost $ - Material&Equipment Const $ - OH&P@22% $ - Material&Equipment Total Cost $ - Backup documentation is Attached. Subcontractors Cost Name Item Sub-Profit Subs Cost Less Profit Vengryn Exteriors $491.60 $ 2,457.99 $0.00 Subcontractor Cost(less profit) 2,457.99 Subcontractor Profit 491.60 Subcontract Cost Total 2,949.59 GC Labor, Material&Equipment Total Cost $ 421.90 GC OH&P@22% $ 92.82 Subcontractors Total Cost $ 2,949.59 GC OH&P on Sub @ 7% $ 206.47 GC&Sub's Total Cost $ 3,670.78 Insurance @ 1% $ 36.71 Bond @ 2% $ 73.42 Total Cost $ 3,780.90 DSP Corttuctior„ LLC Addresc Phone: Email: ctloi) Address: SS JE 2SI Ric,. 4 96().56: Desalption of iNork to completed: Ow Proposal d is hereby amended as Mows: rpctIck no ‘-7 2.1! Libor Add: If, Material Add: $ Z. / 7 Sub Total: 112 Labor Add: Material Add: Sub Total:, 13 Labor Add: Material Add: Sub Total: #4 Labor Add: Material Add: Sub Total: Is Labor Add: Material Add: Sub Total: Original libroposal Sum: Currendy Authorized Amendseents/Chenge Orders: Prevloudy Authortniel AmendinenIs/Oiange Orders: t 2,49e 7 Arnenchnert/Change Order includes al necessary materials,equipment.War,and atherassodated casts required to complete the tvorkdesalbed above-The work covered by Mb Aniendmetordthange Order shall be performed trader the some terms andcanditlonscrs that Included In the ongkral Proposal unless otherwise stated hark Your occeptuoce old*Amendment/Change Order Is confirmed 14 Poililina blow Verle)k L.?<- LEL Qat None 4. Dar Ot7 / ay Dote:: ICU-14_4 01Y • Community Services Facilities Division Project No: CAG 518002996 COP r1 6 CHANGE ORDER PROPOSAL Project Name: RENTON POI SIGN - SHOP EXPANSION (COP) TO OPTIMUS CONS TRuC TION CONTRACTOR) Proposal Request Date 06/19/19 0,ez't,C to pleawe c,co d o, co IAEA o- 'eor-1,PO REVISIONS TO 1XTFRIOR SIDING REASON FOR CHANGE 4_1', Code AH Other EXPLANATION go. Ke12-e. DATE PRODOSAI RiTh'IR(I) 773/'9 CHANGE ORIGINATID 9Y '14c 1 I c-h FoQ(4,'D,tti 01-1010 priorOsAi REQUESTED BY WAGNER ARCHITECTS TO (A/E) TO COR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: /1.0 c* )4 iNcREA:,E — OF 2 99e; 7S- $ 1-11 - riE(REA,F (AASHAIGTON STATE SALES TAX INCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s)are attached hereto. CONTRACT TIME: ; I No CI-IAKIL,1 )1( OF CALENDAR DAYS I CiCtr4t-- - DECREA)E lo'vr;(-,,r‘t;dllrLutl de,4 Vt.,14h,r1i; .or rectIto.with the range A ()the.or- v,s.ons theit ctrefnAal totce a-o effect We urcerstard that:F s propcsa cot-,oc• oosto ,te to proceed wtrh:he sDectf$eO changes r the work unt I ,OpO 3t Cal 0 th;sC.U ,.-to ' ge C1,(1e,to,1.,e Co.p Rc—oct,r I ACN3 - BY ki CONTRACTOR t -feRP\ErttNATURE -" DATE 07. il 20/ We have carefully examined this proposal and find the cost to be reasonable. Therefore,we recommend acceptance. A/E DATE City of Renton Authorized Signature CITY OF RENTON DATE OPTIMUS ‘ppetolir t_ to Subcontract •.ud#c•i►ntruct Change Order Request ni_itfli -fttti— it,; t,tf , - Rt it, ft,'t t:kt i t li Of.; t thti,, ii if',tt, t.t tyt ttA t ti kt i tiff, , _ _ - +9 RI t►tt.Fitt xt t ,i it{ 404 i#,Ni Chit '. i3i i ,?S€xi 2 -- 'i iii tt'x lit 44 $ t iix\t.i +it{i)t if tit4wi i t.I - . - t5 t stri- Vet►4?5 xT to ycs . _37 -t ci 5 A4, ,h,0 iA;f 9eev1 1 . .. j , YF fi .. ` 355-5 ?/7 cf r fret 1 a i 4,•e .i C ai 1z. / Pai d „,nt.it d, . _ . x g 99E 41 2e. 7 9 / ;-;, e77 '2 2 v2c f'' '2,643_ /5µ '*rttq•.:iitra3it=r sLtc^r. Kitt; ittr At° .4 t€rgrs «sae i � ;tisittt<=a2. '4Fsfh ,t.-i ills: tr4et.. .,# (4114 444.4 fta�e#tt#9t 4 I N, Ni we (►Afate 'loft 1'\I '4i \t terC,i 140 i e/ , ,c/c 4 y J7,4� it ?O/4