HomeMy WebLinkAboutCO 8 CAG-1 8-240, CO#8-20
, .r+ , Community Services
4r ti;3" Facilities Division CONTRACT NO: CAG-18-240 CO NO. 8
CONTRACT CHANGE ORDER(CO) PROJECT TITLE: CITY OF RENTON PW-SIGN SHOP EXPANSION
TO:OPTIMUS CONSTRUCTION (CONTRACTOR)
The following mutually agreed to and Owner approved Change Order Proposal(s)are hereby incorporated by reference into
the contract.
Description Amount
COP:
8 REPLACE HOT WATER TANK IN THE EXISTING SHOP $ 1,538.76
9 ROOF ACCESS LADDERS AND FALL PROTECTION SAFETY ANCHORS $ 4,154.47
10 FURNISH AND INSTALL THRESHOLDS FOR DOORS 1.102&1.105 $ 1,068.84
11 TRANSFORMER BREAKER, LOW VOLTAGE WIRE,OH. LIGHT STEMS $ 2,885.30
12 CHANGE WINDOW SIZES/FRAMING, INTERIOR WALL FRAMING,DOOR $ 11,202.46
CONTRACT SUM:
❑ NO CHANGE
0 INCREASE OF: 1 $ 22,$4.81 I
O DECREASE (WASHINGTON STATE SALES TAX INCLUDED)
CONTRACT TIME:
O NO CHANGE
O INCREASE OF: 0
• DECREASE CALENDAR DAYS
The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and
effect.
CONTRACT SUMMARY(Internal Use Only)
ORIGINAL CONTRACT SUM $ 627,386.03
PREVIOUS ADDITIONS/DELETIONS $ 21,058.33
PREVIOUS TOTAL $ 648,444.36
CHANGE AMOUNT THIS CHANGE ORDER $ 22,934.81
REVISED CONTRACT TOTAL $ 671,379.17
PERCENT TOTAL CHANGE FROM ORIGINAL 7.01%
NOTICE TO PROCEED DATE March 12, 2019
PREVIOUS CONTRACT CALENDAR DAYS 148
PREVIOUS SUBSTANTIAL COMPLETION DATE August 7,2019
R V SED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 148
CS , CU ENT SUBSTANTIAL • ,, ' ETI• • • August 7,2019
IV Iv /,,.. L 2 SIR
Architect Acka.wled:ement to Con . Acknowledgement I Dat
The City of Renton hereby accepts the foregoing Change Order Proposal(s).This formal acceptance constitutes a Change to the contract only
when authorizing signature is affixed.Invoices incorporating this Change Order constitute acceptance by the Contractorct as total
reimbursement due in connection with this�e Ord 1r/,?l
AUTHORIZIN IGNAT E DATE
ral PTIMUS
CONSTRUCTION RNO DEVELOPMENT INC
City of Renton -SIGN SHOP EXPANSION
Gc Contractor Change Order Rquest
Date 8/8/2019
Project Name: City of Renton-Sign Shop Expansion. COP# 8
PR#
Project# 2019-01 RFI#
tank Replace hot water tank in the Existing sign shop
LABOR COST (GC Work Force Only)
Employee Name Hr Rate Hour Extension Description
Journeyman Misha Balika $ 81.93 0 $ $ -
Journeyman Peter Chebotarev $ 81.93 0 $ $ -
Supervisor Dick McCullough $ 84.38 1 $ $ 84.38
Labor $ 68.03 0
GC Labor Cost $ 84.38
P&O22% $ 18.56
GC Labor Total Cost $ 102.94
MATERIAL COST
Material Cost $ -
Suppliers Material Cost $ -
EQUIPTMENT COST
Rental Equipment $0.00
Ov -I Equipment $0.00 Equipment Cost $ -
Material&Equipment Const $ -
OH&P@22% $ -
Material&Equipment Total Cost $ -
Backup documentation is Attached.
Subcontractors Cost
Name Item Sub-Profit Subs Cost Less Profit
Hendrickson Plumbing $234.43 $ 1,065.57
$0.00
Subcontractor Cost(less profit) 1,065.57
Subcontractor Profit 234.43
Subcontract Cost Total 1,300.00
GC Labor, Material&Equipment Total Cost $ 84.38
GC OH&P@22% $ 18.56
Subcontractors Total Cost $ 1,300.00
GC OH&Pon Sub@7% $ 91.00
GC&Sub's Total Cost $ 1,493.94
Insurance @ 1% $ 14.94
Bond @ 2% $ 29.88
Total Cost $ 1,538.76
tr 11 Hendrickson Plumbing, LLC Estimate
![II 212 Haberman Road DATE ESTIMATE NO.
Woodland, WA 98674
tipPICKSO11 7/24/2019 19-67
PLUMING WA State License HENDRPL962RZ
OR COB License 163351
Optimus Construction
P. 0 Box 84206 360-225-5,387 office
Seattle, WA 98124 360-225-09 i 7 fax
360-798-0268 Randy
DESCRIPTION TOTAL
Renton sign shop
Water heater
Supply and install Bradford White LE16U3-1NCN 6 gallon
Plumbing fixture-water heater 700.00
Plumbing Materials 150.00
Plumbing Labor 450.00
Tankyou for allowing us to 6id your project. TOTAL
$1,300.00
Acceptance of Proposal-
The above prices, specifications and conditions are satisfactory and are
hereby accepted.
SIGNATURE
:• Community Services
Facilities Division Project No: CAG-818002996 COP# 8
CHANGE ORDER PROPOSAL Project Name: RENTON PW SIGN-SHOP EXPANSION
(COP)
TO:OPTIMUS CONSTRUCTION (CONTRACTOR) Proposal Request Date: 08/07/19
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to:
REPLACEMENT OF THE HOT WATER TANK IN THE EXISTING SIGN SHOP.
REASON FOR CHANGE: D Design Errors 0 Design Omissions 0 Owner 0 Unknown Conditions 0 Code/AH1 0 Other
EXPLANATION: THE EXISTING HOT WATER TANK WAS NOT COMPATIBLE WITH THE NEW CIRCUIT.
DATE PROPOSAL REQUIRED: 8/21/19 CHANGE ORIGINATED BY:
14 days from Request Date,unless other date agreed to)
— _—
PROPOSAL REQUESTED BY:WAGNER ARCHITECTS
TO: (A/E) TO: COR PM
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
❑ NO CHANGE
❑ INCREASE OF $`
❑ DECREASE
(WASHINGTON STATE SALES TAX INCLUDED)
In accordance with the general condition,Cost Estimate Detail Sheet(s)are attached hereto.
CONTRACT TIME:
❑ NO CHANGE
❑ INCREASE OF CALENDAR DAYS
❑ DECREASE
The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full
force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the City of Renton.
BY:
CONTRACTOR SIGNATURE DATE
We have carefully examined this proposal and find the cost to be reasonable. Therefore,we recommend acceptance.
Q/E—__ __ ------ ---_-_-------... DATE
City of Renton Authorized Signature
CITY OF RENTON DATE
OPTIMUS
CONSTRUCTION RNO DEVELOPMENT INC
City of Renton -SIGN SHOP EXPANSION
Ge Contractor Change Order Rquest
Date 8/8/2019
Project Name: City of Renton-Sign Shop Expansion CoP# 9
PR#
Project# 2019-01 RFi#
Description: Provide and install roof access ladder and fall protection safety anchors.
LABOR COST (GC Work Force Only)
Employee Name Hr Rate Hour Extension Description
Journeyman Misha Balika $ 81.93 9 $ $ 737.37
Journeyman Peter Chebotarev $ 81.93 9 $ $ 737.37
Supervisor Dick McCullough $ 84.38 1 $ $ 84.38
Labor $ 68.03 0 $ $ -
GC Labor Cost $ 1,559.12
P&O 22% $ 343.01
GC Labor Total Cost $ 1,902.13
MATERIAL COST
Material Cost
Suppliers Attached vendors Material Cost $ 1,697.00
EQUIPTMENT COST
Rental Equipment $0.00
Truce"cue! $0.00 Pickup/Delivery Equipment Cost $ 50.00
Material&Equipment Const $ 1,747.00
OH&P@22% $ 384.34
Material&Equipment Total Cost $ 2,131.34
Backup documentation is Attached.
Subcontractors Cost
Name Item Sub-Profit Subs Cost Less Profit
$0.00
Subcontractor Cost(less profit) 0.00
Subcontractor Profit 0.00
Subcontract Cost Total 0.00
GC Labor,Material&Equipment Total Cost $ 3,306.12
GC OH &P@22% $ 727.35
Subcontractors Total Cost $ -
GCOH&Pon Sub @7% $ -
GC&Sub's Total Cost $ 4,033.47
Insurance @ 1% $ 40.33
Bond @ 2% $ 80.67
Total Cost $ 4,154.47
{ �. r76o:��sw CASH C.O.D
.. ._, ., PLY
CRC CAi: fUSTRIAL
r;SA SA : SITE CAP
Csc= `,,,iwx“,(xQ66' RECEIPT 34027836
cEc, i
Balch 1092 **REPRINT**
ittru,CE 3ii;27636
App,o,a C e C6447G
�r CI10\d Ship T o: CASH OFFICE I765"49.11t0020tOtts"
Er F1C Iddn,3i I0t2 IS) \\'1
h�C�f �nl RI'RII N,WA,9516s
ratAmount :��C Job Site Contact DOL e .
ton J;ta Phone 2116-4401 2ha1
A,5 CCdf '(yj Man
Car.:CcCe y
:IFIC Ordered By: Mt G . Contact Phone: 206-499-2ti5u
-ILL '"' .J.1 I ::23 :�J Order Date RettleaDa`. 'y-'Invohx Ontc I Salesperson
0"31 2019 It' 31 2019 No Sales
Credit
Shipping Method Customer PO ' Created BY
�iTGt f e i %t O.Will Call OP I VACS Stephen I
Description .-Qusnt#9 . DOM Price. Amount
)T/SN ORD SHP 8KO Unit WT COO
ILL CALL
DIRECT AT
GUARDIAN!
i 1
JLANNIL
206-243-2000 j
I I 21 N;29' CONCRETE:Sq'1\'i{1 01 EA - SL';Et-, S2'0 tti
ANC'IIOR Kt
1-Dirt-): GI IARDI SN I I I (RS
T
Shipped amount S270.01
Order charges S0.0(I
Tay amount S27 00
I wither Tay rate amount I.0O'o SO.OU
Order total Sw'.OII
Deposit funds tendered SO Oil
Ha lance due S29'Oil
REPORT DISCREPANCIES Rl I III\24!IRS
IF 1'tY'DIDN'T'RECEIVE TIIE SERVICE YOtI E\PECTEDCALI JAMES IAC'KSOA 916-S 9->I>6
NO REFUNDS OR FXC-I \NGES( N NON STOCK MERCHANDISE
SEE REVERSE SIDE FOR TERMS AND CONDITIONS
\A WA"\}'}i1 ELCAP CO\I
PRINT SIGN
•IIIPEI;)VV'F1(ilf F 2.00 I RS PI I.(.ED BY C HOCKED in LOADED B\
Do, nload any needed Satetp Data Sheen I SDS t online today at ids hdscapl!..con-.
Page I of I
Mail - Rick McNeill - Outlook Page 1 of 1
... Outlook O Simple Safety Solutions via Square x ? T 0 RNb
New message ] Delete Archive r Junk L, Move to 2 C tegnroe the new Outlook
v Favorites Simple Safety Solutions via... tz Receipt from Simple Safety Solutions
receipts@messagingsgiareupcom
t' Sent Items Rick McNeil
(4, —a ...
Send email RM Tue 7/23/2019 3 39 PM
L' Drafts Joleen McNeill v
All results Latter receipt below.
Add fa'varite
O Simple Safety Solutions via Square Ricky/Optimus Construction
v Folders Receipt from Simple Safety, Tue 7/23 Project Manager
Receipt for$1,40000 at Simple S . tnha= P:206.243.2000 C:206.778.5838
• Inbox 2 PO BOX 84206 Seattle WA 98124
O Junk Email 63
li Drafts 0 Getting too much email?ii,uv,tx=',::,_
0 You forwarded this message on Tue 7/23/2019 3.39 PM
✓- Sent Items
Simple Safety Solutions vi
Scheduled a Square<receipts@mess
aging.squareup.com>
17 Deleted Items 137
Tue 7/23/2019 3 36 PM
Rick McNeill Y
• Archive
Now when you shop at sellers who use
Clutter Square your receipts will be delivered
automatically
Conversation Hist.. Not ycvr rece pt"t
Notes
RSS Feeds
New folder
u Groups Simple Safety Solutions
New quip How was your experience?
t'7i5CrJVPr f3 rOJj.75
Meirege groups
$ 1 ,400 . oa
Custom Amount $1,40000
Total $1,400.00
0
Simple Safety Solutions
13023 Ne Hwy 99,Ste 7-744
Vancouver,WA 98686
360.719-0452
https://outlook.office.com/mailtsearchlid/AAQkADE 1 MGRlY2Q2LThhZDAtNGJkYy04Y... 8/7/2019
Page 2 of 3
*11
7"--- .--- ." ',,y0 ifitrips, „„ .1111°11:- * .. -------—,,,,, , " ' --..'"*.... '-*--..'..'—
...jil
,,, .„ lc, __
.4111..„ 40 ,,_
, ..,
_,......,
- ...,,,,_ ...,,
„..\,... • ...
, ...,,,.,,,,,--- - ,,,
, , , ...., .440,.
- _,,,. . .
....,•• .... .
,, ,
� yr.
,„. ‘....„.„ . _ , .. .
•
tr
r1
I.Q./
V
1
https://outlook.office.com/mail/inbox/id/AAQkADE 1 MGR1Y2Q2LThhZDAtNGJkYy04Y... 8/1/2019
Page 3 of 3
-. ' 6 •
A. w k. •�+ `. *"Tt'.• *a '• } $
�tks 1
w P c s' ry-, ^'. 4 . y. ,. ,y SIP 4_
'-e;:: , :., , r-t.d.''it-'\--''' !''.,'-It'44•ri . 4•1•4`''. ' ,:'-'i•:*:1 . l'eg.--;.4. - ;, - .` ''' .. - .,''.,-:. , .. '' ,.
't 4
4r
y yt- L % `-t •ate ,, 2
tY rg {\V�., tax E3 n,. 4 :� '* d j `•l
5 cd e z� -. , , r ,may r Cr,
`� a"
tax t a Via'. r
• " ` ,' 1
a. .
Get Outlook for Android
https://outlook.office.com/mail/inbox/id/AAQkADE 1 MGRIY2Q2LThhZDAtNGJkYy04Y... 8/1/2019
OPTIMUS
CONSTRUCTION RNO OEVELOPMENT INC
City of Renton -SIGN SHOP EXPANSION
i Contractor Change Order Rquest
Date 8/9/2019
Project Name: City of Renton-Sign Shop Expansion COP# 10
PR#
Project# 2019-01 RFI#
Description: Furnish and install thresholds for doors 1.102&1.105
LABOR COST (GC Work Force Only)
Employee Name Hr Rate Hour Extension Description
Journeyman Misha Balika $ 81.93 6 $ $ 491.58
Journeyman Peter Chebotarev $ 81.93 0 $ $ -
Supervisor Dick McCullough $ 84.38 0 $ $ -
Labor $ 68.03 0 $ $ -
GC Labor Cost $ 491.58
P&O22% $ 108.15
GC Labor Total Cost $ 599.73
MATERIAL COST
Material Cost $ 284.00
Suppliers Material Cost $ 284.00
EQUIPTMENT COST
Equipment/Van/Tools $75.00 Pickup Deliver
0% 1 Equipment $0.00 Equipment Cost $ 75.00
Material&Equipment Const $ 359.00
OH&P@22% $ 78.98
Material&Equipment Total Cost $ 437.98
Backup documentation is Attached.
Subcontractors Cost
Name Item Sub-Profit Subs Cost Less Profit
$0.00
$0.00
Subcontractor Cost(less profit) 0.00
Subcontractor Profit 0.00
Subcontract Cost Total 0.00
GC Labor,Material&Equipment Total Cost $ 850.58
GC OH&P@22% $ 187.13
Subcontractors Total Cost $ -
GCOH&Pon Sub @7% $ -
GC&Sub's Total Cost $ 1,037.71
Insurance @ 1% $ 10.38
Bond @ 2% $ 20.75
Total Cost $ 1,068.84
BUILDERS CHANGE PROPOSAL
-IARDWARE &SUPPLY CP# 004-R1
DATE: 8/7/2019
TO: OPTIMUS CONSTRUCTION&DEV. PROJECT: RENTON SIGN SHOP EXPANSION
PO BOX 84206 3555 NE 2ND ST
SEATTLE,WA 98124-5506 RENTON,WA 98056
ATTN: DICK MCCULLOUGH
SALES PERSON JOB NUMBER SECTIONS FOR: ACTION IMPORTANCE
Travis Wolfley 11137-TW 08 71 00 EMAIL 07/25/19 FOR APPROVAL HIGH
DESCRIPTION I NET AMOUNT
SECTION 08 71 00- DOOR HARDWARE
Add Pemko Ramp Thresholds
1 Ramp Threshold R.75FA x 48" $ 105.00
•
1 Ramp Threshold R.75FA x 84" $ 179.00
Lead time: 4-6 weeks after receipt of change order.
To Proceed with this change,please issue a formal TOTAL $ 284.00
Change Order to append the contract amount or
ign and return this change proposal.
BUYER/APPROVED BY DATE:
1516 15TH AVE W SEATTLE,WA 98119-3185 PHONE:206-281-3700/1-800-999-5158 FAX:206-281-3717
OPTIMUS
CONSTRUCTION RNO❑EVELOPMENT INC
Cin"of Renton -SIGN SHOP EXPANSION
Gt I Contractor Change Order Rquest
Date 8/9/2019
Project Name: City of Renton Sign Shop Expansion COP# 11
PR#
Project# 2019-01 RFt#
Description: Change existing transformer breaker, pull low votage wiring for City of Renton,change 4'light
stems to adjustable aircraft cable.
LABOR COST (GC Work Force Only)
Employee Name Hr Rate Hour Extension Description
Journeyman Misha Balika $ 81.93 $ $ -
Journeyman Peter Chebotarev $ 81.93 0 $ $ -
Supervisor Dick McCullough $ 84.38 1 $ $ 84.38
Labor $ 68.03 0 $ $ -
GC Labor Cost $ 84.38
P&022% $ 18.56
GC Labor Total Cost $ 102.94
MATERIAL COST
Material Cost
Suppliers Material Cost $ -
EQUIPTMENT COST
Equipment/Van/Tools Pickup Deliver
O '1 Equipment $0.00 Equipment Cost $ -
Material&Equipment Const $ -
OH&P@22% $ -
Material&Equipment Total Cost $ -
Backup documentation is Attached.
Subcontractors Cost
Name Item Sub-Profit Subs Cost Less Profit
Modular Electric $454.75 $ 2,067.04
$0.00
Subcontractor Cost(less profit) 2,067.04
Subcontractor Profit 454.75
Subcontract Cost Total 2,521.79
GC Labor, Material& Equipment Total Cost $ 84.38
GC OH&P@22% $ 18.56
Subcontractors Total Cost $ 2,521.79
GC OH&Pon Sub@7% $ 176.53
GC&Sub's Total Cost $ 2,801.26
Insurance @ 1% $ 28.01
Bond @ 2% $ 56.03
Total Cost $ 2,885.30
MODULAR
ELECTRIC
909 Seventh Avenue * P.O. Bois: 484 * Kirkland WA 98083-0484 Phone 42.5 * 822 ` 2012
Submitted To: Phone: 206-243-2000 Date. 8/8/19
OPTIMUS CONSTRUCTION INC Fax: 206-453-5415
Street: Job Name:
13822 1ST AVE S RENTON SIGN SHOP CO#4 5 & 6
City, State& Zip Code, Job Location:
BURIEN, WA 98168
E-mail: rick@optimusconst.com Attn: RICK
COP#4-$897.00 + SALES TAX
PULL LOW VOLTAGE WIRING PER CITY OF RENTON ELECTRICAL INSPECTOR
COP#5-$451.80
REPLACE 480 VOLT BOLT ON BREAKER WITH PROPER SIZE BREAKER
1 —480 VOLT 3 PHASE 50 AMP CIRCUIT BREAKER
1 - LABOR
COP#6 -$1173.00
AIRCRAFT CABLE KITS -$808.00
2": AIR FREIGHT$365 00
Price Does Not Include:
WA STATE SALES TAX
CUTTING. PATCHING OR PAINTING, CORING
We Propose hereby to furnish material and labor, complete in accordance with above specifications; for
the sum of:
A' mater ais a:e g.,ara^reed to be as scren.1ed A-work to be.comoet_c n a
workmanlike manner accororng to toe starcarc practices Any aiterato c- Authorized
dea aton from the axove spec'L'cat0 news rg extra costs w be executed cry Signature
soon writer.orders and wilt become ar extra coarge over are above tna est.:nate
Ai agreements cortmgert sporstrikes accidents or delays beyond our co..ro'
awner to carry fire torrado ara other necessary 'rsurarce fvfodarar Erecthc Note This proposal may be withdrawn by us if not accepted
..or s are fjly covered by V5mrer.a s Cor pensatlor within 45 days from date of bid.
Acceptance of Proposal—The above paces.specificat.ons and hood twos are satssfar.tory and are hereby accepted You are authorized to do toe
work as specified Payment will be made as outlined above
DATE OF ACCEPTANCE
Signature
—_-- Signature
OPTIMUS
CONSTRUCTION RNO DEVELOPMENT INC
City of Renton -SIGN SHOP EXPANSION
General Contractor Change Order Rquest
Date 7.16.19
Project Name: City of Renton-Sign Shop Expansion COP# 12
PProject# 2019-01 F R #
I#
Description: Change window sizes&framing,change interior wall framing add one additional door&hardware
Revise sheer wall detail,add plywood to server room
LABOR COST (GC Work Force Only)
Employee Name Hr Rate Hour Extension Description
Journeyman Petr Chebotarev $ 81.93 20 $ $ 1,638.60
Journeyman Mikhail Balika $ 81.93 16 $ $ 1,310.88
Journeyman Scott Dietrich $ 81.93 20 $ $ 1,638.60
Supervisor Dick McCullough $ 84.38 5 $ $ 421.90
GC Labor Cost $ 5,009.98
P&0 22% $ 1,102.20
GC Labor Total Cost $ 6,112.18
MATERIAL COST
Material Cost $ 297.92
Suppliers $ 3,462.00 Material Cost $ 3,759.92
EQUIPTMENT COST
Rental Equipment $145.00
Owned Equipment $0.00 Equipment Cost $ 145.00
Material&Equipment Const $ 3,904.92
OH&P@22% $ 859.08
Material&Equipment Total Cost $ 4,764.00
Backup documentation is Attached.
Subcontractors Cost
Name Item Sub-Profit Subs Cost Less Profit
$0.00
$0.00
Subcontractor Cost(less profit) 0.00
Subcontractor Profit 0.00
Subcontract Cost Total 0.00
GC Labor, Material&Equipment Total Cost $ 8,914.90
GC OH&P@22% $ 1,961.28
Subcontractors Total Cost $ -
GCOH&Pon Sub @7% $ -
GC&Sub's Total Cost $ 10,876.18
Insurance @ 1% $ 108.76
Bond @ 2% $ 217.52
Total Cost $ 11,202.46