HomeMy WebLinkAbout1125_001.pdfEarth Solutions NWLLC
I 15365 NE 901" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw.com
ESNW Rep.
Project No-
Page
Report No.
AJL
0895.06
1 of 2
102A
Time On Site
Time Off Site
Date
Day of Week
2:45
3:15
1/3/20
Friday
NPDES Permit No.
Reviewed
WAR -307963
e\.
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S, Renton
Erosion Control BMPs
(13 Elements)
Client/Owner
RJ Development, LLC
Overall Needs I
Condition Repair? Comments
Lood; Fair; Poor) Lyes; No)
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas G N Silt fence installed and working as intended. Should
• Silt Fence be repaired as needed
2. Establish Construction Access
• Fabric; Quarry Spalls Sweep frontage road as needed and daily when
• Wheel Wash G N trucking is taking place. Repair site entrance as
• Sweeper Truck
needed.
3. Control Flow Rates
• Stormwater Vault or Facility
• Straw Wattles G N Add check dams and straw wattles as needed.
• Check Dams
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
Straw G N
• Sediment Ponds, Traps & Filters
• Treatment
• Sediment Pond (Temp or Perm.)
• Water Truck
S. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass G N
• Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
6. Protect Slopes
• Benching; Track -Walking G N
• Pipe Slope Drains
• Plastic Sheeting; Anchors
7. Protect Drain Inlets
• Catch Basin Inserts G N CB inserts should be cleaned or replaced as
• Gutter; Roadneeded
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam G N
• Outlet Protection
• Nets and Blankets
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
10. Control Dewatering
11. Maintain BMPs G N
12. Maintain SWPPP & Site Logbook G N ESNW will provide upon request.
13. Protect Low -Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
Earth Solutions NWLLC
15365 NE 90" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
is www esnw corn
ESNW Rep.
AJL
Project No.
0895.06
Page
2 of 2
Report No.
102A
Time On Site
Time Off Site
Date
Day of Week
2:45
3:15
1/3/20
Friday
NPDES Permit No.
Reviewed
WAR -307963
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S, Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? 0 Yes ❑ No
List the completed, not -yet -completed, or ongoing action items in the table below:
Actions Items
Sweep road, stabilize expose soils, repair site entrance as needed
Cover exposed slopes and cuts with anchored plastic sheeting
Current Weather: 50° F Raining
Precipitation since last inspection (approximate): _0 35 inches
Precipitation in the last 24 hours (approximate): _0.00 inches
Was water quality sampling part of this inspection? ❑ Yes 0 No
If "Yes":
• Record results in the table below.
Completed? Date
(Yes; No; Ongoing) (If Completed)
(ongoing)
N
• Characterize the stormwater discharge, a g., the presence of suspended sediment, 'cloudiness", discoloration, or oil sheen, if
present:
• Hanna Turbidity Meter #
Monitoring Location Turbidity pH
(NTIJ)
Notes
Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No
If "No":
• Indicate the tasks necessary to bring the site into compliance in the table above.
• Has the non-compliance been reported to the Department of Ecology? ❑ Yes ❑ No
• Should the SWPPP be modified? ❑ Yes ❑ No
'This report is true, accurate, and complete .lo the best of my knowledge and belief "
fnspector Name: Adrien Leland CESCL Number: CESCL-EF8182312