Loading...
HomeMy WebLinkAbout20200122143035.pdfI !"It th )Sui on U.c Earth Solutions NW, LLC LETTER OF TRANSMITTAL To: RJ Development Date: January 22, 2020 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Duane Meyer Email: duane accrete.build No. of uppies nate uescri tion 1 1/3-1/17/20 Daily Field Report(s) # 102 & 108-112 Comments: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. 1805 — 136" PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 CC: 1: John Wilson ATTN: johnw@rinocon.com 2: Mark Richardson ATTN: markgaccrete.build 3: Jeff Brain ATTN: ieff@.accrete.build 4: Jennifer Vo ele ATTN jennifer@accrete.build 5: Jonathan Chavez ATTN: jchavez@rentonwa.gov rentonwa.gov 6: Joe W ATTN joew accrete. build Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. 1805 — 136" PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 " Earth Solutions NW«C ESNW Rep. Project No. Page AJ L 0895.06 1 of 1 15365 NE 901h Street, Suite 100 Redmond, WA 98052 Time On Site Time Off Site Date Main (425) 449-4704 1 Fax (425) 449-4711 2:00 AM 2:45 PM 1/3/20 www esnw com Travel Time DAILY FIELD REPORT 1.25 Hr. RT Project Name Job Location Weatherly Inn 4500 Talbot Rd. S., Renton, WA Contractor #1 Rino Construction Contractor #2 Are approved plans/permits on site? Contact Mike Contact Project No Weather 50° F, Cloudy Report No. 102 Day of Week Friday Client/Owner RJ Development, LLC Field Supervisor Reviewed LAC * t%iv Project Manager Reviewed SSR Permit No At the client's request, ESNW rep was onsite to observe water main backfill and to observe the over steepened excavation. While onsite, ESNW rep observed the following: Water main Backfill Rep observed that the contractor was installing water main on the north east corner of the site. ESNW rep observed that the contractor had backfilled the shallow water main and compacted the backfill to a dense and solid state using a medium track hoe pack. ESNW rep will return on Monday to take surface tests on the water main backfill. Excavation Observations While on-site, ESNW rep. observed the grading contractor continuing to work next to the over steepened temporary excavation cuts. At the time of visit, ESNW rep. observed the temporary excavation to be stable in its current condition and configuration, suitable for work to be conducted within the excavation. It is the responsibility of the contractor to perform and implement all necessary safety measures in accordance with state and federal regulations. ESNW rep recommends that the contractor cover the exposed soil slopes of the excavation with plastic anchored using stakes and sandbags. ESNW rep will return when requested. Adrien Leland ESNW Assistant Field Manager Farlh Solutions NWux: Project Name Weatherly Inn Contractor #1 Rino Construction Contractor #2 Earth Solutions NW LLC ESNW Rep. AK Project No. 0895.06 Page _ 1/1 Date Report No. 108 Day of Week 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Time On Site Time Off Site Main (425) 449-4704 1 Fax (425) 449-4711 Monday www esnw. com 10:45 AM 11:15 AM 1/13/20 DAILY FIELD REPORT Travel Time Weather 1.25 Hr. RT 30s°F, Overcast Job Location 4500 Talbot Rd. S., Renton, WA Mike RJ Development, LLC Field Supervisor Reviewed LAC * 1/2,Z Project Manager Reviewed Ray Are approved plans/permits on site? Project No Permit No. Supplementary Report: At the client's request, ESNW rep was onsite to observe or test pH of stormwater, cut slopes and earthwork activities. Test pH of Stormwater While onsite, rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall entrance and observed a pH level of 7 pH. At the west of the quarry spall entrance stormwater (temporary) collection pit and observed a pH level of 9 pH. On the street, north and south of the west entrance, rep took a pH tests and observed stormwater to be a 6.5/7 pH. In tested baker tank, rep observed a pH level of 8.5 pH. Rep observed that pH level was contained onsite and not leaving the site. The stormwater pH level in street was in compliance of required pH level at 6.5/7 pH Cut Slopes Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V) ESNW rep will return to observe earthwork activities when requested by client Andrew Kimn, Senior Technician, 206-430-9183 J Project Name Weatherly Inn Contractor #1 Rino Construction Contractor #2 Earth Solutions NWLLC ESNW Rep. 15365 NE 90' Street, Suite 100 AK Redmond, WA 98052 Time On Site Main (425) 449-4704 i Fax (425) 449-4711 www esnw.com 11:00 AM DAILY FIELD REPORT Travel Time 1.25 Hr. RT Project No. Page Report No 0895.06 1/1 109 Time Off Site Date Day of Week Tuesday 11:30 AM 1/14/20 Job Location 4500 Talbot Rd. S., Renton, WA Contact Mike Contact Are approved plans/permits on site? Project No. Weather 30s°F, Snow Client/Owner RJ Development, LLC Field Supervisor Reviewed LAC * t/m Project Manager Reviewed Ray Permit No. Supplementary Report: At the client's request, ESNW rep was onsite to observe cut slopes and earthwork activities. Cut Slopes While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of the footing excavation to a 1:1 (H -.V). ESNW rep will return to observe earthwork activities when requested by client Andrew Kimn, Senior Technician, 206-430-9183 6Earth SOIutIO11$ NWLLC ESNW Rep Project No. Page Report No- " 15365 NE 90" Street, Suite 100 AK 0895.06 1/2 110 E Redmond, WA 98052 Time On Site Time Off Site Date Day of Week Main (425) 449-4704 1 Fax (425) 449-4711 3:0 Wed www esnw com 10:30 AM; 3PM; 2:00 PM 3:30 PM 1/15/20 DAILY FIELD REPORT -.....- -- Travel Time Weather 1.25 Hr. RT (x2) 30s0F, Snow Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Vk V, Contractor #2 Contact Project Manager Reviewed Ray Are approved plans/permits on site? Project No. Permit No. Supplementary Report: At the client's request, ESNW rep was onsite to observe or test water line backfill, pH of stormwater, cut slopes and earthwork activities. Water Line Backfill While onsite, rep observed contractor use a medium sized excavator to excavate and install the water line. Rep observed contractor install a 10" ductile iron pipe at the toe of the excavation (W4'xD4') embedded in a 12" lift pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.). Test pH of Stormwater Rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall entrance and observed a pH level of 8 pH. At the west of the quarry spall entrance stormwater (temporary) collection pit and observed a pH level of 6.5/7 pH. On the street, north and south of the west entrance, rep took a pH tests and observed stormwater to be a 6.5/7 pH. In baker tank next to the main street rep observed a pH of 8.5/9. Rep observed that pH level was contained onsite and that stormwater pH level in street was in compliance of required pH level at 6.5/7 pH. Cut Slopes Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope- Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V). ESNW rep will return to observe earthwork activities when requested by client Andrew Kimn, Senior Technician, 206-430-9183 s Earth Solutions NWLLC 15365 NE 901 Street, Suite 100 s Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 www esnw com DAILY FIELD REPORT Project Name Weatherly Inn Contractor #1 Rino Construction Contractor #2 ESNW Rep. Project No. AK 0895.06 Time On Site Time Off Site travel Tine Weather 1.25 Hr. RT (x2) 30s°F, Snow Client/Owner RJ Development, LLC Field Supervisor Reviewed LAC Project Manager Reviewed Ray Page 2/2 Report No. 110 Date Day of Week Wed 1/15/20 Job Location 4500 Talbot Rd. S., Renton, WA Contact Mike € Contact Are approved plans/permits on site? Project No. Permit No. Test Test Location ! 10:30 AM; 12:15 PM; 2:00 PM 330 PM Page 2/2 Report No. 110 Date Day of Week Wed 1/15/20 Job Location 4500 Talbot Rd. S., Renton, WA Contact Mike € Contact Are approved plans/permits on site? Project No. Permit No. Test Test Location Reference Maximum Fill Test % of Number (Water Line) Elevation Compaction Dry Density Moisture Dry Density Maximum Curve (pcf) (%) (pcf) Dry Density 108 See map forapproximate pP location SG 1 130.7 10.2 124.4 W W 95 -......:.. 109 See map for approximate location SG 1 130.7 9,8 124.6 95 Supplementary Report: 108 .. - 109 . �... o44 j. Earth Solutions NWLLC 15365 NE 901' Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 vvm.esnw.com DAILY FIELD REPORT ESNW Rep. Project No Page Report No. AK 0895.06 1/2 111 Time On Site Time Off Site Date Day of Week 10:45 AM 12:15 PM 1/16/20 Thursday Travel Time 1.25 Hr. RT Weather 40s°F, Clear Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton, WA — Client/Owner RJ Development, LLC - Contractor #1 Rino Construction — — Contact Mike Field Supervisor LAC ---...---.. Reviewed W VI Contractor #2 Contact Project Manager Ray Reviewed Are approved plans/permits on site? Project No Permit No. J Supplementary Report: At the client's request, ESNW rep was onsite to observe or test water line backfill, cut slopes and earthwork activities. Water Line Backfill While onsite, rep observed contractor use a medium sized excavator to excavate and install the water line. Rep observed contractor install a 10" ductile iron pipe at the toe of the excavation (W4'xD4') embedded in a 12" lift pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.). Cut Slopes Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed that the east slopes of the excavation were near a 0.75:1 (H -.V) slope. Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V). ESNW rep will return to observe earthwork activities when requested by client /,L— Andrew Kimn, Senior Technician, 206-430-9183 '" Earth Solutions NWLLC ESNW Rep. Maximum AK 15365 NE 901h Street, Suite 100 % of i Redmond, WA 98052 Time On Site �kqk Ir Main (425) 449-4704 1 Fax (425) 449-4711 Moisture www esnw com 10:45 AM DAILY FIELD REPORT Curve (pcf) Travel Time (pcf) 1.25 Hr. RT Weatherly Inn Contractor #1 Rino Construction Contractor #2 Project No Page Report No 0895.06 2�2 111 Time Off Site Date Day of Week 12:15 PM 1/16/20 Thursday Job Location 4500 Talbot Rd. S., Renton, WA Mike Contact Weather 40s°F, Clear Client/Owner RJ Development, LLC Field Supervisor Reviewed LAC Project Manager Reviewed Ray Are approved plans/permits on site? Project No Permit No. Test Test Location Reference Maximum Fill Test % of Number (Water Line) Elevation Compaction Dry Density Moisture Dry Density Maximum Curve (pcf) (%) (pcf) Dry Density 110 See map for approximate location SG 1 130.7 9.7 124.9 96 111 See map for approximate location SG 1 130.7 10.0 1252 96 Supplementary Report: 110 111 � ~ Earth Solutions NWLLC ESNW Rep, Project No. Page Report No. AK 0895.06 1/2 112 15365 NE 901h Street, Suite 100 1- — - i Redmond, WA 98052 Time On Site Time Off Site Date Day of Week Main (425) 449-4704 1 Fax (425) 449-4711 10:15 AM; 12:30 PM; Friday www.esnw.com 1.3o PM 1/17/20 3:45 PM DAILY FIELD REPORT Travel Time I Weather 1.25 Hr. RT (x2) 40s°F, Overcast Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC �t2 Contractor #2 Contact Project Manager Reviewed Ray Are approved plans/permits on site? Project No Permit No. Supplementary Report: At the client's request, ESNW rep was onsite to observe or test water line backfill, footing excavations, cut slopes and earthwork activities. Water Line Backfill While onsite, rep observed contractor use a medium sized excavator to excavate and install the water line. Rep observed contractor install a 10" ductile iron pipe at the toe of the excavation (W4'xD4') embedded in a 12" lift pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.). Footing Excavations Rep observed contractor use a large excavator to excavate the footings for the north footings of the building. Rep used a'/" steel t -probe and observed that the subgrade was very dense, firm, unyielding, and suitable for support of the proposed building footings. Cut Slopes Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V). ESNW rep will return to observe earthwork activities when requested by client Andrew Kimn, Senior Technician, 206-430-9183 Earth Solutions NWIULC ESNW Rep. Project No. AK 0895.06 15365 NE mond Street, Suite 100 Redmond. WA 98052 Time On Site Time Off Site Main (425) 449-4704 1 Fax (425) 449-4711 10:15 AM; 12:30 PM; www.esnw.com 1:30 PM 3:45 PM DAILY FIELD REPORT ; Travel Time 1 1.25 Hr. RT (x2) Project Name Job Location Weatherly Inn 4500 Talbot Rd. S., Renton, WA Contractor #1 Contact Rino Construction Mike Contractor #2 Contact Page 2/2 Report No. 112 Date Day of Week 1/17/20 Friday Weather 40s°F, Overcast RJ Development, LLC Field Suoervisor FiReviewed LAC Project Manager Reviewed Ray Are approved plans/permits on site? Project No Permit No.