Loading...
HomeMy WebLinkAboutNOA_Project_Acceptance_200128DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR20-000030 7-Eleven UST Replacement/ LUA20-000014 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.: ____ __  I prefer to receive project information and documents in hard copy via US mail OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: January 28, 2020 PROJECT NAME/NUMBER: PR20-000030 7-Eleven UST Replacement/ LUA20- 000014 PROJECT LOCATION: 11505 SE 168th St (APN 2892600051 APPLICANT/PROJECT CONTACT PERSON:Pat Hopper, Barghausen Engineers/18215 72nd Ave South, Kent, WA 98032/phopper@barghausen.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2Gsln8O PERMITS/REVIEW REQUESTED: Environmental Review PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal of three (3) 12,000-gallon underground storage tanks (USTs) currently on site and the installation of two (2) replacement USTs, one (1) 15,000-gallon UST for the storage of regular unleaded fuel and one (1) 15,000-gallon split/dual UST for the storage of diesel fuel (8,000 gallons) and premium unleaded (7,000 gallons). Proposed improvements associated with the project proposal include: the removal of the concrete slabs covering the existing tanks and the drive slab beneath the fuel canopy; excavation and removal of the existing USTs; removal of the existing dispensers, including the existing fuel pump islands; removal of the existing fuel distribution system; sawcutting and trenching to accommodate the installation of new piping and conduits; installation of the new USTs, turbines, and vent box/risers; installation of new dispensers; installation of new sensors, electrical panel, breakers, wiring and intercom system; installation of a new air/water unit; and replacement of removed concrete slabs and patch asphalt to match existing pavement. The project site totals 29,611 square feet and is located within the CA zone and Urban Design District D. No changes in site access are proposed. No critical areas are mapped on the project site. DATE OF APPLICATION: January 21, 2020 NOTICE OF COMPLETE APPLICATION: January 28, 2020 Comments on the above application must be submitted in writing to Jill Ding, Senior Planner; CED , – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 11, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov NOTICE SE 168th St SE 168th St 116th Ave SE