To: RJ Development
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane2accrete.build
No. of
Date: February 25, 2020
ESNW No.: ES- 895.06
Project: Weatherly Inn
Copies Date Description
1 2/18-2/21/20 Daily Field Report(s) # 134-137
Comments:
CC:
1:
John Wilson
ATTN
johnw@rinocon.com
2:
Mark Richardson
ATTN:
markCcDaccrete.bUild
3:
Jeff Brain
ATTN:
Jeff cz accrete.build
4:
Jennifer Vogele
ATTN.
jennifer@accrete. build
5:
Jonathan Chavez
ATTN:
ichavez@rentonwa.gov
6
Joe W
ATTN.
joew@accrete. build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
15365 NE 90t" Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
y Earth Solutions NWLLc
i 15365 NE 901' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep Project No. Page Report No.
AK 0895.06 1/1 134
Time On Site Time Off Site Date Day of Week
Tuesday
11:45 AM 12:00 PM 2/18/20
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No
Supplementary Report:
Weather
40s0F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor
LAC
Project Manager
Ray
Permit No
Reviewed
* Y"
Reviewed
At the client's request, ESNW rep was onsite to observe or test cut slopes, test pH of stormwater, footing
excavations and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 12.23 in a baker tank.
Rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was contained
onsite at a 6.5 pH.
Footings Excavations
Rep observed contractor use a medium sized excavator to excavate and the building footings. Rep recommended
and observed that contractor was over -excavating footings —4" from designed footing grade. Rep observed
contractor backfill the over -excavation with a Y-4" lift of 1 '/4' minus crushed rock for the footing subgrade to
increase stability during wall construction. Along the base of the footings, rep observed contractor install miradrain,
6" perforated pipe along the footings, and embed the pipe in a 12" lift of 2" wash rock.
ESNW rep will return to observe earthwork activities when requested by client
4-1-1 �_
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLC
15365 NE 90' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Are approved plans/permits on site?
Yes
ESNW Rep. Project No. Page Report No.
SZS/AK ES-0895.06 1 of 1 1115
Time On Site Time Off Site Date Day of Week
12:00 pm 3:00 pm 12/19/20 Wednesday
Travel Time
1.25 Hour RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
IWeather
Clear, 50s F
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC W Vzy
Project Manager I Reviewed
RAC
Permit No.
Supplementary Report: 1
At the client's request, ESNW rep. was onsite to observe condition of cut slopes and test pH of stormwater and
footing excavation backfill. j
Cut Slope Observations:
While onsite, ESNW rep. observed the south slopes of the cut
slopes to be near vertical at a ratio of H0.75:V1. Although over -
steepened, slopes are stable in current configuration and stable
to work within. At the time of visit, no changes were observed in
the conditions of the cut slopes. The contractor is responsible for
providing all safety measures in accordance with state and
federal regulation.
Test pH of Stormwater:
While onsite, ESNW rep took pH tests to determine the pH of
stormwater. In the filled baker tanks, ESNW rep. observed <25
NTU in a baker tank. ESNW rep. observed the contractor added
dry ice to the baker tank to lower the pH level. ESNW rep.
observed that pH level was contained onsite.
Footing Excavation Backfill:
While onsite, ESNW rep. observed contractor bucket mixing
cement mix with saturated native fill material. Cement treated
footing excavation backfill was placed in approx. 12-inch loose
lifts and thoroughly compacted with a medium sized hoepack.
ESNW rep. will return as requested by client.
Stuart Sullivan
Field Technician
(206)945-3348
Photo 1: Cement treated fill material backfill and
compaction operations in progress.
,. Earth Solutions NWLLc
' F 15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep,
AK
Time On Site
9:45 AM;
12:15 PM
Travel Time
1.25 Hr. RT
Project No. Page Report No.
0895.06 1/1 136
Time Off Site Date Day of Week
11:00 AM; Thursday
1:15 PM 2/20/20
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Weather
40s0F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC w&A4
Project Manager Reviewed
Ray
Permit No
At the client's request, ESNW rep was onsite to observe or test cut slopes, test pH of stormwater, footing
excavations & backfill and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 13.8 NTU in a baker
tank. Rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was contained
onsite at 6.5 pH.
Footings Excavations & Backfill
Rep observed contractor use a medium sized excavator to excavate and the building footings. Rep recommended
and observed that contractor was over -excavating footings —4" from designed footing grade. Rep observed
contractor backfill the over -excavation with a Y-4" lift of 1 '/" minus crushed rock for the footing subgrade to
increase stability during wall construction. Along the base of the footings, rep observed contractor install miradrain,
6" perforated pipe along the footings, and embed the pipe in a 12" lift of 2" wash rock.
Rep observed contractor use a medium sized excavator to mix cement and treat native soils. Rep observed
contractor then place mixed material in loose 12"-18" lifts and compact with a hoe pack. Rep took compaction test
and will return to observe and test compaction as needed. Rep will release corrected compaction results after
more fill is placed and when more tests are taken.
ESNW rep will return to observe earthwork activities when requested by client
4-16 �_
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NW«C
ESNW Rep.
Project No. Page
Report No.
AK
0895.06 1/2
137
15365 NE Street, Suite 100
# i Redmond,n WA 98052
Time On Site
Time Off Site Date
Da Y of Week
Main (425) 449-4704 1 Fax (425) 449-4711
12:00 PM;
12:45 PM;
Friday
www.esnw.com
2:00 PM
2:30 PM 2/21/20
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
50s0F, Clear
Project Name Job Location
Client/Owner
Weatherly Inn 4500 Talbot Rd.
S., Renton, WA RJ Development, LLC
Contractor #1 Contact
Field Supervisor Reviewed
Rino Construction Mike
LAC
LA-2/Z4
Contractor #2 Contact
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No
Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test wall backfill with cement, cut slopes,
footing
excavations and earthwork activities.
Wall Backfill with Cement
While onsite, rep observed contractor use a medium sized excavator to mix and cement treat native brown silty
sand with gravel material. Rep observed contractor treat native material with a 3% cement mix. Rep observed
contractor place 12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep took
compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density that
was adjusted based on calculations with the cement treatment (130.7 lbs./cu. ft.).
Cut Slopes
Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed
that the east slopes of the excavation were near a 0.75A (H:V) slope. Although over -steepened, slopes are stable
in current configuration and stable to work within. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of
the footing excavation to a 1:1 (H:V).
Footings Excavations
Rep observed contractor use a medium sized excavator to excavate and the building footings. Rep
recommended and observed that contractor was over -excavating footings - 4" from designed footing grade. Rep
recommended that contractor backfill and place a Y-4" lift of clean crushed rock for the footing subgrade to
increase stability during wall construction.
ESNW rep will return to observe earthwork activities when requested by client
4-l" �_
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NW«C ESNW Rep.
t rrT I 15365 NE 90'" Street, Suite 100 AK
Redmond, WA 98052 Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711 12:00 PM;
www.esnw.com 2:00 PM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Project No,
Page
��2
Report No,
0895.06
137
Time Off Site
Date
Day of Week
12:45 PM;
Friday
2:30 PM
2/21/20
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No.
Test Test Location
Number (Wall Backfill)
120 See map for approximate location
121 See map for approximate location
Supplementary Report
Weather
50s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
Permit No.
Reference
Maximum
Fill
Test
% of
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
N
(pcf)
Dry Density
-18'
-- 1
130.7
23.3
124.2
95
-16'
1
130.7
22.9
123.9
95
_. .. 120 .
` � k