HomeMy WebLinkAboutMFP20000416.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20000416
IVR Number: 20000416
Permit Informaon
Permit Name:Puget Sound Energy Gas Permits
Address/Locaon :01/29/2020Application Date:3123059067Parcel Number:4550 TALBOT RD S
Permit Type:02/26/2020Issue Date:Franchise
Permit Work Class:02/25/2021Expiration Date:Minor Utility
Job Number:106363158Franchise Type:Natural Gas
Description:TIE INTO EXISTING 4" MPE IP MAIN (109098374) AND INSTALL NEW GAS SERVICE, APPROX. 54' IN ROW. 3: 3'X5
HS CUTS ANTICIPATED . POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (425) 892-0416ApplicantX
Stuart Bennett
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRACL899CZ
Construction Contractor: INFRASL871C2
WEATHERLY INN-RENTON LLC 606 COLUMBIA ST NW STE #101
OLYMPIA , WA 98501
Owner
Marita Bond
Puget Sound Energy - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
4550 TALBOT RD S
TBD TBD TBD TBD
INFRASOURCE 425 892 0416
RANDY DEBOLT RANDALL.DEBOLT@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP20000416
Scott Warlick C.E.D 2/11/2020
Monday - Friday 9:00am - 3:00pm
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG 01/29/2020
4550
11 111111
STOP
FLAGGER
STOP
FLAGGER
STOP
FLAGGER
111111ONLY11ONLY2011
S 46TH PL
S 45TH PL
S 45TH PL TALBOT RD SS 47TH STW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD350'350'350'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD350'350'350'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
100'100'100'TALBOT RD SX'X'PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA
ROAD
WORKAHEAD W20-1ROADWORKAHEADW20-1500
43RD ST
FROM TO
TOW AWAY AREA
PHONE 888-9999INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
AHEAD
USE OTHER SIDE
SIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDCHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
JOB106363158
4550 Talbot Rd S, Renton, WA 98055
1/15/2020
jason.bisenius@pse.com
425-424-7316
SHEET 1 of 1
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 23' SCL of S 45th PL & 3' ECL of
Talbot Rd S, 23' SCL of S 45th PL & 15' ECL of Talbot
Rd S, 23' SCL of S 45th PL & 29' ECL of Talbot Rd S, 23'
SCL of S 45th PL & 53' ECL of Talbot Rd S.
MFP20000416
Est. Start Date:
&
&
&
&TALBOT RD S 3X5 SOFT
Tie-In Fitting
Route #'s:Bollards:2.5" #4" #2 ADA Ramps #:
Del Press:2 PSI Traffic Signal:Bus Stop:
No Parks #:
Meter Loc:02 - OFL Trolley Lines:Mtr Hoods #:
Meter:Speed Limit:
New Commercial Svc
EFV:2" - 10000 9998737 Police #:TCP:Yes
Diameter:2" PE Flaggers #:Arterial:Yes
of CL TALBOT RD S 3X5 CONCRETE
Service Information Street Information Job Type
of CL TALBOT RD S 3X5 ASPHALT
23'South of CL S 45TH PL 29'East
23'South of CL S 45TH PL 53'East of CL
of CL TALBOT RD S 3X5 ASPHALT
23'South of CL S 45TH PL 15'East
23'South of CL S 45TH PL 3'East
PLAT Map:214.081
N
Work Location Size of Cut Surface Type
Job Description / Scope of Work
TIE INTO EXISTING 4" MPE IP MAIN(109098374) AND INSTALL SCAT 2" 234FT SERVICE(54FT
SCAT STUB/180FT PLAT EXTN) WITH 10,000 EFV.
New Construction:
Construction Method
Scat ROW / Plat Property
1/27/20 PM / Inspector:RANDY DEBOLT 206-276-2081
Est. Duration:1-1/2 Days (12 hours)
Jurisdiction:RENTON City / Zip:RENTON, 98055
ROW Permit:Yes Customer:MARK RICHARDSON 253-286-3948
Job #:106363158
Date:12/16/19 Address:4550 TALBOT RD S
Puget Sound Energy Gas Pre-Inspect Form
4500
TALBOT RD S4" MPE IP 3'E109098374PL
CL
PL
PLWATER 14FTW OFC/LWASTEWATER53'E OF C/LROW 98FT8" STWHP 16'W802254WATER 15FTE OFC/LSTORMWATER29' E OF C/LWORK AREA
4500
SQ FT
S 45TH PL
MFP20000416
RESTORATION PER CITY OF RENTON STANDARDS
318312
4509
4445
4430
4512
MORRIS AVE SS 46TH
P
L
COPPER RIDGE APARTMENTS TALBOT RD S78'S
112'E190'E103'N
4" MPE IP 3'E 109098374-20162" MPE IP 13'N 109098374-20164" MPE IP 3'E 109098374-20164" MPE IP 3'E 109098374-20162" MPE IP 24'N 109098374-2016 4" MPE IP CL 109098374-20164" MPE IP CL 109098374-20161 1/4" MPE IP 9620227
2" MPE IP 24'N 9620227
1 1/4" MPE IP 112'E 1 1/4" MPE IP 190'E 1 1/4" MPE IP 461'E 96202271 1/4" MPE IP 508'E 9620227
1 1 /4" M P E IP 1 0 'S
96202 271 1/4" MPE I
P 523'E 96202278" STW HP 30'W 802254DEACT 2" PE-A 30'W 802-2542" MPE IP 17'N 107016757-2004
2" MPE IP 30'N 9620227
2" MPE IP 24'N 9620227
1 1/4" MPE IP 172'E 96202271 1/4" MPE IP 180'E 9620227 1 1/4" MPE I
P 27
7'E 96202271 1/4" MPE IP 322'E 96202271 1/4" MPE IP 356'E 9620227
1 1/4" MPE IP 388'E 9620227
2" MPE IP 23'N
9620227 2" MPE I
P 22'E 96202271 1/4" MPE IP 103'N
9620227
1 1/4" MPE
78'S1 1/4" MPE 501'E1 1/4" MPE 400'E8" STW HP 16'W 802254DEACT 2" PE-A 16'W 802-2541 1/8" MPEI2016-E1 1/8" MPEI2016-E
1 1/8" MPEI2016-E
5/8" PE1983
1 1/4" MPE1997
Unknown" Unknown
1 1/4" MPE1997
5/8" MPE1997 5/8" MPE1997
5/8" MPE1997 5/8" MPE1997
5/8" MPE1997 5/8" MPE1997 5/8" MPE1997
5/8" MPE2012
5/8" MPE1997
5/8" MPE1997 5/8" MPE19975/8" MPE1997 5/8" MPE1997
Unknown" Unknown 5/8" PE
5/8" MPE1997
5/8" MPE2001
5/8" MPE19975/8" MPE19975/8" MPE1997
1 1/4" STW-U1969
5/8" MPE1997
5/8" MPE1997
2
9
9
2
9
9
2
9
2
2
2
1'W3'W6'E320'N,@CL
5'E55'E@PL
103'N111'W
NR30'S181'E133'W
NR2 7 'N
32
2'E 78'W10'S
unset3 5 6'E
393'E
133'W
498'S
15'W
64'N
802'S &30'W
836'S &16'W
33'E39'E33'ERO P E
39'EEOM -30'N
1 8 'EROPE
TLT
T
T
T
71'N5'E3'E16'W40'WH42'W37'NH
H13'N
28'NH H7'E6'EH
25'NH
22'N
23'N
23'N
22'N
25'N
29'N
29'N
29'N 29'N 22'E25'N
1
9'E
23'N
25'N
29'N
23'N
21'E18'W24'N510'S30'N24'E26'S26'W20'S
31'N29'N26'S26'S24 'E24'N43'WT
T
7'E8'ET322'N106'NEC
35'NE C B306 #A #B
#B
#A-I402
#A-I425
D2305E124, R2305E121, A2305E121S212080, Q214081
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
01-10-2020
Scale 1:1206
Lat\Long=47.4386, -122.2121
MFP20000416