Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Adden 08
CAG-15-177 , Adden #8-20 � Washington State �I/ Department of Transportation Supplemental Agreement Organization and Address Number 8 Otak,Inc. Original Agreement Number 11241 Willows Road NE Redmond,wa 98052 CAG-15-177 Phone: Project Number Execution Date Completion Date 32468 August 26,2015 December 31,2021 Project Title New Maximum Amount Payable Lake Washington Loop Trail $788,463.00 Description of Work The Supplement No.8 scope of work provides additional services and changes to the 90%design,including the following: •Project Management and Coordination(Extended Design Schedule) •Airport Way and Logan Avenue Intersection Revisions(Revise from 90%Level) •Airport Way and Shattuck Avenue Intersection Revisions(Revise from 90%Level) •Specification Update(Update to 2020 Version) The Local Agency of City of Renton desires to supplement the agreement entered in to with Otak,Inc. and executed on August 26,2015 and identified as Agreement No. CAG-15-177 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Scope of Work is modified as shown in attached exhibit A-6 • I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: Original contract amount is$301,891.00.Supplement No. 1 in the amount of$34,870.00 increased Contract amount to$336,761. Supplement No 3($321,203.00)increased Contract amount to$657,964.00. Supplement 6($130,499.00)increased total contract amount to$788,463.00.Supplement 8 will increase the proposed maximum amount payable by$45,954 to a maximum of$834,417. as set f• h in the attached Exhibit A, and by this reference made a part of this supplement. If you s•encur with this supplement and agree to the changes as d abo -, please sign in the Appropriate space. below and return to this office for final action. LL •, By. © l( Z By: /� Ma or , rmo- •io P..vo•/ , ConsultantSignatur- �,.""��'"." , /i'�,, Jaso. � ",,, A. Se h, City Clerk • � � - 7i lD �'G ' _ _ 9 ate S'�1 DOT Form 140-063 tAb o Revised 09/2005 m 04, 'ORA 1 ED 9EQ EXHIBIT A SCOPE OF SERVICES FINAL DESIGN/ENGINEERING SERVICES City of Renton, Washington Lake Washington Loop Trail — Phase 3 — Supplement No. 8 Otak Project No. 32468 February 2020 Description of Project: The purpose of the Lake Washington Loop Trail Project is to design and eventually build a 7,000 lineal feet regional trail facility to connect the existing Lake Washington Trail from the Logan Avenue/Cedar River junction to a new trail at Rainier Avenue North.The project will complete a missing gap in the regional trail system.The Phase 3 segment of the proposed trail will be primarily located on the north side of Airport Way and will extend north along Logan Avenue to connect to the existing Cedar River Trail.The Phase 3 segment will end at the intersection of Rainier Avenue North.The trail segment along Airport Way will be an interim solution and will include a cycle track to minimize impacts to the existing roadway and right-of-way.The cycle track is proposed to be an interim solution until the Renton Municipal Airport finalizes their comprehensive Master Plan for zoning and use requirements along Airport Way. The Phase 3 trail will accommodate pedestrians, runners,bicyclists, and other non-motorized trail users.The trail will be designed to be accessible. The Supplement No. 8 scope of work provides additional services and changes to the 90% design, including the following: • Project Management and Coordination (Extended Design Schedule) • Airport Way and Logan Avenue Intersection Revisions (Revise from 90%Level) • Airport Way and Shattuck Avenue Intersection Revisions (Revise from 90%Level) • Specification Update (Update to 2020 Version) • Trail Extension to Rainier Avenue North (Additional Cycle Track—700 feet Extension) 1.0 PROJECT MANAGEMENT AND COORDINATION 1.1 Coordination with City of Renton OTAK will coordinate with the CITY of Renton on a regular basis to keep the CITY's project manager informed about project progress,project issues and schedule. OTAK will assist in scheduling project related meetings,reviews,and other coordination activities needed to keep the project moving forward. Regular communication with the CITY will occur on a weekly basis (by phone,regular meetings as described below, and/or by e-mail).Project management will include the City of Renton — Lake Washington Loop Trail 1 otak K:\Project\32400\32468\Contract\Supplement 8\Scope_Supplement 8_021820.doc Exhibit A — Scope of Work (Supplement No. 8) Continued coordination of design team members,internal project scheduling,and the preparation of a monthly progress report and a monthly billing statement. Supplement No. 8 will extend Task 1.1 approximately three (3) months. 2.0 SUPPLEMENTAL DESIGN TASKS 2.I Airport Way and Logan Avenue Intersection Revisions OTAK and TENW will prepare 90%and 100%PSE for the revised intersection concept developed for the Airport Way and Logan Avenue intersection (revised from previous update).The proposed intersection improvements will include revisions to layout/medians, signing,striping,and revisions to the existing signal system.The revised intersection concept will minimize new improvements within the intersection. Deliverables • Airport Way and Logan Avenue Intersection Revisions—90%and 100%Level 2.2 Airport Way and Shattuck Avenue Intersection Revisions OTAK and I'LNW will prepare 90% and 100%PSE for the revised intersection concept developed for the Airport Way and Shattuck Avenue Intersection Revisions.The purpose of the intersection revisions was to minimize impacts to Airport property and to the existing intersection configuration. Task 2.2 includes review of the existing signal system layout and recommendations for adjustments to signal heads and channelization. Deliverables • Airport Way and Shattuck Avenue Intersection Revisions—90% and 100%Level 2.3 Update Technical Specifications (2020 Update) Technical Specifications will be updated to the 2020 version of the WSDOT Standard Specifications. Special Provisions will address technical work,as well as issues such as inconvenience to the neighborhood and traveling public, allowable work hours, construction phasing,utility coordination and other items specific to the needs of the CITY. It is assumed that the CITY will provide us with a current"front-end"boilerplate that includes general conditions, the bid proposal, and the contract documents.The specifications will be prepared to adhere to State and Federal funding requirements. Deliverables • Final Specifications—100% (Updated to 2020 Standard Specifications) City of Renton — Lake Washington Loop Trail 2 otak K:\Project\32400\32468\Contract\Supplement 8\Scope_Supplement 8_021820.doc Exhibit A — Scope of Work (Supplement No. 8) Continued 2.4 Trail Extension to Rainier Avenue North OTAK will update the 90%PSE to include an extension of the cycle trail and sidewalk connections to the Rainier Avenue North/Airport Way intersection,including revisions to the connections along W. Perimeter Road.The extension of cycle track will be approximately 700 feet.Work will include • final engineering and layout/development of a revised plan concept and associated details.The revised plan concept will be updated to the 100%PSE level,including technical specification updates and construction cost updates.The revised plan concept will be based on the "Cycle Track to Rainier Avenue Transition—Option 1" Concept prepared by OTAK in February 2020. Deliverables • Trail Extension to Rainier Avenue—100%PSE SUBCONSULTANTS • Transportation Engineers NW o Traffic, street crossings, signal revisions—Logan Avenue/Airport Way Intersection. o Traffic, street crossings, signal revisions—Logan Avenue/Shattuck Avenue Intersection —including review of mast arm and signal pole coordination. o Trail Extension to Rainier Avenue—review of signal impacts and review of channelization and signage. EXPENSES • Reimbursable for Reproduction of Plans,Specifications,Reports,Etc. • Mileage • Other Misc. Expenses ASSUMPTIONS • The target date for Bid Advertisement is March/April 2020. • OTAK will provide five (5) sets of all deliverables and ten (10) sets of final plans and specifications unless otherwise noted. • If utility potholing is needed,it will be done by others. OTAK will assist with coordinating locations. • The CITY will pay for all required permit fees. • Environmental/permitting will be provided by others. OTAK will provide support as noted. • Construction management support, construction administration, and/or construction inspection services are not included in this scope of work but may be added later at the discretion of the CITY. City of Renton — Lake Washington Loop Trail 3 otak K:\Project\32400\32468\Contract\Supplement 8\Scope_Supplcment 8_021820.doc • Exhibit D • Lake Washington Loop Trail-City of Renton Otak Hours and Fees-Final Design/Engineering Services-Phase 3-Supplement No.8 X 5 ' a- 'u r, u L m m °0 G' '� u a E 60 '°Ss 6s a e ° ' .. A re H (3 (3 (3 (3 tap m F .�a 9 a} (U ,n e o A ,on u A a Total Total $85.10 $61.33 $57.69 $43.27 $40.50 $37.50 $27.00 $41.34 $31.25 $33.65 $13.27 $38.00 $36.50 $28.50 $25.00 Hoots Fees 1.0 Project Management and Coordination 1.1 Project Management Ond Coordination 8 0 0 4 0 0 0 0 0 0 0 0 0 0 8 20 51,054 Srbmrd Hamm 8 0 0 4 0 0 0 0 0 0 0 0 0 0 8 20 $1,054 • 2.0 Supplemental Design Tasks 2.1 Airport Wm and Logan Avenue Intersection Revisions 4 0 0 20 0 16 10 0 0 0 0 0 0 0 0 50 $2,076 2.2 Airport Wav/Shattuck Avenue Intersection Revisions ^ 4 11 16 II 12 10 0 I) 0 0 0 0 (I 0 44 $1.8228 2.3 Specification Update(2020 Specifications) 2 0 16 0 0 0 2 0 0 0 0 0 0 16 38 $1,468 2.4 Trail Extension to Ranier Avenue 8 2 0 48 0 32 24 12 8 0 0 0 0 0 0 134 $5,475 Subrotd Hon' 16 8- 0 100 0 60 44 14 8 0 0 0 0 0 16 266 $10,846 Subtotal Hours/labor Costs-Otak Labor-Tasks 1.0 to 2.0 24 8 0 104 0 60 44 14 8 0 0 0 0 0 24 286 $11900 Overhead(169.72%x labor Cost) $20,196 Profit(29.90%x Labor Cost) $3,558 Subtotal Fees fLabor Cost+Overhead+Profit)-Otak Labor-Tasks 1.0 to 20 135.654 • Subcoo sultaot Costa TENW-Traffic.Street Crossings,lighting(Ascort Way and Logan Avenue Intersection Revisions and Shattuck Intersection Revisions 170,000 Utak Markup on Subcnnsultants(0.0%) So Total Subconsuitaot Costs $10,000 Reimbunablc Expenses $100 Total Project Cost-Final Design/Engineering Services $45,954 "Note-Rates Sbetvn are for Budgeting.Purposes-Actual Rates per Core plus Negodated Fee • • w,m,\f2toa\3]ge\Conn,c,\,, ,to,ra,a\Hu„urmjE„A,Sgylaurn,e_afe]o.rh t N\r Mak