To: RJ Development
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane(a,accrete.build
No. of
Date: March 12, 2020
ESNW No.: ES- 895.06
Project: Weather!Inn
Copies Date Description
1 3/2-316/20 Daily Field Report(s) # 142-146
Comments:
CC:
1:
John Wilson
ATTN.
johnw@rinocon.com
rinocon.com
2:
Mark Richardson
ATTN
mark accrete. build
3:
Jeff Brain
ATTN.
jeff(cbaccrete.bUild
4:
Jennifer Vo ele
ATTN
Jennifer accrete. build
5:
Jonathan Chavez
ATTN:
jchavez@rentonwa.gov
6:
Joe W
ATTN.
ioew a accrete build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
Earth Solutions NWLLC ESNW Rep
" 15365 NE 901h Street, Suite 100 AK, TSH
t Redmond. WA 98052 Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw corn 11:45 AM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Protect Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved pproved plans/permits on site?
Project No
Page
Report No.
0895.06
1/1
142
Time Off Site
Date
Day of Week
Monday
2:00 PM
3/2/20
Job Location
4500 Talbot Rd. S., Renton, WA
Mike
Project No.
Weather
40sOF, Rain
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC W 3/°1
Project Manager Reviewed
5; 2 4--3(q
Permit No
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, test pH of
stormwater and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep will return to observe and test
the compaction of the wall backfill as needed.
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 9.46 NTU and a pH
of 6.5. Rep observed that pH level was contained onsite at 6.5 pH.
ESNW rep will return to observe earthwork activities when requested by client
,If-13 �—
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLC
r 15365 NE 90" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep. Project No_ Page
AK, 0895.06
Time On Site Time Off Site I Date
1:15 PM 1 1:30 PM 1 3/3/20
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
1/1
Report No.
143
Day of Week
Tuesday
Weather
40sOF, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
� ��9 LAC
Project Manager Reviewed
Ss 2 s2 *i
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes, footing excavations and earthwork
activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footings Excavations
Rep observed contractor use a medium sized excavator to excavate and the building footings. Rep recommended
and observed that contractor was over -excavating footings —4" from designed footing grade. Rep observed
contractor backfill the over -excavation with a Y-4" lift of 1 %" minus crushed rock for the footing subgrade to
increase stability during wall construction. Rep used a'/2" steel t-probe and observed the footing subgrade to be
very dense, firm, unyielding, and suitable for support of the proposed footings.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLC
15365 NE 901" Street, Suite 100
s Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
i Rino Construction
Contractor #2
Are approved plans/permits on site?
ESNW Rep. Project No Page
AK 0895.06
Time On Site Time Off Site Date
12:00 PM 1:30 PM 3/4/20
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
1/2
Weather
40s°F, Clear
Report No
144
Day of Week
Wed
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC W "A
Project Manager Reviewed
552 siL �q
Permit No
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6%8" lifts for a jumping jack during compaction. Rep took compaction tests on
backfill and observed material to be adequate of at least 95% of its maximum dry density that was adjusted based
on calculations with the cement treatment (130.7 lbs./cu. ft.).
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill tomorrow, March 5,
2020. Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client
f
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NW«C ESNW Rep. Project No. Page 2 2 Report No.
144
15365 NE 900' Street, Suite 100 AK 0895.06 -----
! Redmond, WA 98052 Time On Site Time Off Site Date Day of Week
Main (425) 449-4704 1 Fax (425) 449-4711 Wed
www.esnw com 12:00 PM 1:30 PM 3/4/20
DAILY FIELD REPORT
Travel Time Weather
1.25 Hr. RT 40s°F, Clear
Project Name Job Location Client/Owner
.................-- — - -
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor ` Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Projectanager R� wed
...............
Are approved plans/permits on site? Project No. Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(Wall Backfill)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
N
(pcf)
Dry Density
127
See map for approximate location
-10'
1
130.7
16.9
124.6
95
128
See map for approximate location
-8'
1
130.7
18.4
124.1
95
Supplementary Report
t . 7V z �.
v j
.-A
�
Earth Solutions NWLLo ESNW Rep. Project No- Page Report No.
AAMK 10895.06 1/1 145
# 15365 NE Street, Suite 100
Redmond,n WA 98052 Time On Site Time Off Site Date Day of Week
Main (425) 449-4704 i Fax (425) 449-4711 Thursday
M
www.esnw.com 12:00 Pm 1:15 PM 3/5/20
DAILY FIELD REPORT Travel Time — Weather
1.25 Hr. RT 40sOF, Clear
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA I RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC W-3�a
Contractor #2 Contact Project Manager Reviewed
I Are approved plans/permits on site? Project No. Permit No
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep will return to observe or test
backfill as needed.
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill tomorrow, March 6,
2020. Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLC
k i 15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep.
AK
Project No.
0895.06
Page
111
Date
Report No.
146
Day of Week
Time On Site Time Off Site
Friday
2:15 Pm 3:30 PM
3/6/20
Travel Time
Weather
1.25 Hr. RT
40s0F, Overcast
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC W 3�R
Project Manager Reviewed
S5YZ 5ra, 945
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep will return to observe or test
backfill as needed.
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill Monday, March 9, 2020.
Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183