HomeMy WebLinkAboutProspectus CAG-20-066
V� Washington State Local A enc Federal Aid
Department of Transportation g y
Project Prospectus
Prefix Route ( ) Date 03/02/2020
Federal Aid STP(UL)-1201(023) DUNS Number 092278894
Project Number
Local Agency CAG-18-171 r WSDOT Federal Employer 91-6001271
Project Number ` Use Only ) Tax ID Number
Agency CA Agency Federal Program Title
City of Renton ✓ Yes ❑ No 11120.205 ❑ Other
Project Title Start Latitude N 47-29-11.47 Start Longitude W 122-13-50.44
Renton Ave South Preservation Project End Latitude N 47-29-1.87 End Longitude W 122-13-12.16
Project Termini From-To Nearest City Name Project Zip Code(+4)
S 130th St Hardie Ave SW Renton 98057-5939
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A . 0.59 mi ✓ Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
N/A N/A N/A 1070 17 King
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 37 9 1
Total Local Agency Federal Funds Phase Start
Phase Estimated Cost Funding Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year
P.E. $ 280,000.00 $ 280,000.00 0 June 2017
R/W 0 0 0
Const. $ 1,450,000.00 $ 429,300.00 $ 1,020,700.00 November 2018
Total $ 1,730,000.00 $ 709,300.00 $ 1,020,700.00
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
Varies: 48-78 Varies: 4-5
Renton Ave S is a minor arterial with 4-5 lanes of travel and a daily traffic volume of 20,500 vehicles. It is
classified as a T-2 truck route.
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
This project will resurface (3-inch overlay) 0.59 miles of Renton Ave South from South 130th St to Hardie
Ave SW. This work will include curb ramp upgrades, utility improvements and the installation of a pedestrian
beacon.
Local Agency Contact Person Title Phone
Michelle Faltaous Transportation Project Manager 425-430-7301
Mailing Address City State Zip Code
1055 S Grady Way By ,/ Renton WA 98057
By ,
Project Prospectus Approving Authority
Title Transportation Design Manager Date✓/00
DOT Form 140-101 Page 1
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
City of Renton Renton Ave South Preservation Project 03/02/2020
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑ Path /Trail ❑3-R 48-78 4-5
❑✓ Reconstruction ❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking ❑Other
❑ Bridge
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑ Principal Arterial
Federal ✓ Minor Arterial
❑ Urban ❑ Minor Arterial
❑✓ Urban CollectorEl
Functional El Rural El Collector
Rural Collector
Classification ❑ NHS ❑ Major Collector ❑ NHS ❑Major Collector
❑Minor Collector ❑ Minor Collector
❑ Local Access ❑ Local Access
Terrain it Flat ❑ Roll ❑ Mountain ❑Flat ❑ Roll ❑Mountain
Posted Speed 35 mph N/A
Design Speed N/A N/A
Existing ADT 20,500 N/A
Design Year ADT N/A N/A
Design Year N/A N/A
Design Hourly Volume (DHV) N/A N/A
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
Consultant 99 oho 1
Construction Will Be Performed By Contract Agency
Contract 100 % 0
Environmental Classification
❑Class I - Environmental Impact Statement (EIS) ✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ✓ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
Environmental CE approved on 7/20/2018.
DOT Form 140-101 Page 2
Revised 04/2015 Previous Editions Obsolete
Agency Project Title Date
City of Renton Renton Ave South Preservation Project 03/02/2020
Right of Way
✓I No Right of Way Needed ❑ Right of Way Needed -
*All construction required by the ❑ No Relocation ❑ Relocation Required
contract can be accomplished
within the exiting right of way.
Utilities Railroad
❑ No utility work required . ✓ No railroad work required
❑AII utility work will be completed prior to the start ❑AII railroad work will be completed prior to the start of
of the construction contract the construction contract
✓ All utility work will be completed in coordination All the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
Utility work includes the replacement of approximately 540 feet of a 2 inch water main with an 8 inch water
main and appurtenances as well as the extension of approximately 190 feet of 8 inch sanitary sewer with two
48 inch manholes..
FM Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ✓ Yes ❑ No
Remarks
•
•
This project has been reviewed by the legislative body of the adminis�{ation;ppency or agencies, or it's
designee, and is not inconsistent with the ag cy's comprehensive'pkanccfo`t;conit}lunity development.
Agency
Date 3 /(// 24)Z0 By T TES T3
Mayo rmondo Paysine E on A eth
ity C erk
DOT Form 140-101 `c Page 3
Revised 04/2015 Previous Editions Obsole�d'",, ,-o