Loading...
HomeMy WebLinkAboutProspectus CAG-20-066 V� Washington State Local A enc Federal Aid Department of Transportation g y Project Prospectus Prefix Route ( ) Date 03/02/2020 Federal Aid STP(UL)-1201(023) DUNS Number 092278894 Project Number Local Agency CAG-18-171 r WSDOT Federal Employer 91-6001271 Project Number ` Use Only ) Tax ID Number Agency CA Agency Federal Program Title City of Renton ✓ Yes ❑ No 11120.205 ❑ Other Project Title Start Latitude N 47-29-11.47 Start Longitude W 122-13-50.44 Renton Ave South Preservation Project End Latitude N 47-29-1.87 End Longitude W 122-13-12.16 Project Termini From-To Nearest City Name Project Zip Code(+4) S 130th St Hardie Ave SW Renton 98057-5939 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A . 0.59 mi ✓ Local❑Local Forces❑State❑Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name N/A N/A N/A 1070 17 King WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Northwest Region 37 9 1 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date (Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year P.E. $ 280,000.00 $ 280,000.00 0 June 2017 R/W 0 0 0 Const. $ 1,450,000.00 $ 429,300.00 $ 1,020,700.00 November 2018 Total $ 1,730,000.00 $ 709,300.00 $ 1,020,700.00 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes Varies: 48-78 Varies: 4-5 Renton Ave S is a minor arterial with 4-5 lanes of travel and a daily traffic volume of 20,500 vehicles. It is classified as a T-2 truck route. Description of Proposed Work Description of Proposed Work(Attach additional sheet(s)if necessary) This project will resurface (3-inch overlay) 0.59 miles of Renton Ave South from South 130th St to Hardie Ave SW. This work will include curb ramp upgrades, utility improvements and the installation of a pedestrian beacon. Local Agency Contact Person Title Phone Michelle Faltaous Transportation Project Manager 425-430-7301 Mailing Address City State Zip Code 1055 S Grady Way By ,/ Renton WA 98057 By , Project Prospectus Approving Authority Title Transportation Design Manager Date✓/00 DOT Form 140-101 Page 1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of Renton Renton Ave South Preservation Project 03/02/2020 Type of Proposed Work Project Type(Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path /Trail ❑3-R 48-78 4-5 ❑✓ Reconstruction ❑ Pedestrian / Facilities ❑2-R ❑ Railroad ❑ Parking ❑Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ✓ Minor Arterial ❑ Urban ❑ Minor Arterial ❑✓ Urban CollectorEl Functional El Rural El Collector Rural Collector Classification ❑ NHS ❑ Major Collector ❑ NHS ❑Major Collector ❑Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain it Flat ❑ Roll ❑ Mountain ❑Flat ❑ Roll ❑Mountain Posted Speed 35 mph N/A Design Speed N/A N/A Existing ADT 20,500 N/A Design Year ADT N/A N/A Design Year N/A N/A Design Hourly Volume (DHV) N/A N/A Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 99 oho 1 Construction Will Be Performed By Contract Agency Contract 100 % 0 Environmental Classification ❑Class I - Environmental Impact Statement (EIS) ✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ✓ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations Environmental CE approved on 7/20/2018. DOT Form 140-101 Page 2 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of Renton Renton Ave South Preservation Project 03/02/2020 Right of Way ✓I No Right of Way Needed ❑ Right of Way Needed - *All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required . ✓ No railroad work required ❑AII utility work will be completed prior to the start ❑AII railroad work will be completed prior to the start of of the construction contract the construction contract ✓ All utility work will be completed in coordination All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Utility work includes the replacement of approximately 540 feet of a 2 inch water main with an 8 inch water main and appurtenances as well as the extension of approximately 190 feet of 8 inch sanitary sewer with two 48 inch manholes.. FM Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ✓ Yes ❑ No Remarks • • This project has been reviewed by the legislative body of the adminis�{ation;ppency or agencies, or it's designee, and is not inconsistent with the ag cy's comprehensive'pkanccfo`t;conit}lunity development. Agency Date 3 /(// 24)Z0 By T TES T3 Mayo rmondo Paysine E on A eth ity C erk DOT Form 140-101 `c Page 3 Revised 04/2015 Previous Editions Obsole�d'",, ,-o