HomeMy WebLinkAbout20200319114532.pdfTo:
Ea rth
'Sr�Iutkou
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
RJ Development Date: March 19, 2020
401 Central Street SE ESNW No.: ES- 895.06
Ol m ia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane(aaccrete.build
No. of
Uo ies uate uescri tton
1 1 3/9-3/13/20 Dailv Field Reports) # 147-151
Comments:
CC:
1:
John Wilson
ATTN:
Johnw@rinocon.com
2:
Mark Richardson
ATTN:
mark accrete.build
3:
Jeff Brain
ATTN:
Jeff@accrete. build
4:
Jennifer Vogele
ATTN:
jennifer@accrete build
5:
Jonathan Chavez
ATTN:
jchavez@rentonwa.gov
6:
Joe W
ATTN:joew@accrete.
build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel. L.G.. L.E.G.
15365 NE 901" Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
t
Earth Solutions NWLLC
} t 15365 NE 901 Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw. com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep.
Project No.
Page
Report No.
AK
0895.06
1/1
147
Time On Site
Time Off Site
Date
Day of Week
Monday
1:45 PM
2:45 PM
3/9/20
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
; Contact
Project No.
Weather
40s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC I/t 4
Project Manager Reviewed
Ray
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes, test pH of stormwater, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 10 2 NTU in a baker
tank. Rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was contained
onsite at 6.5 pH.
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill Tuesday, March 10,
2020. Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
WN15365 NE 90'h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
ESNW Rep. Project No. Page 1�2
AK 0895.06
Time On Site Time Off Site Date
12:30 PM 1 2:00 PM 1 3/10/20
Travel Time Weather
1.25 Hr. RT 40s°F, Clear
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Report No.
148
Day of Week
Tuesday
Client/Owner
RJ Developrriegy_ILC
Field Supervisor Reviewed
LAC Vlr"
Project Manager Reviewed
Ray
Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(Water Backfill)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
129
See map for approximate location
-4'
1
130.7
22.4
124.6
95
130
See map for approximate location
-2'
1
130.7
21.6
125.3
96
131
See map for approximate location
SG
1
130.7
20.7
124.4
95
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, water line backfill, footing backfill and
earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within, The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Rep observed contractor use a medium sized excavator to mix and cement treat native brown
silty sand with gravel material. Rep observed contractor treat native material with a 3% cement mix, Rep observed
contractor place 12"-18" lifts and compaction with a hoe pack. Rep took compaction tests on backfill and observed
material to be adequate of at least 95% of its maximum dry density that was adjusted based on calculations with
the cement treatment (130 7 lbs./cu. ft.).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place 8"-
8" lifts and compaction with a jumping jack. Rep took compaction tests on backfill and observed material to be
adequate of at least 95% of its maximum dry density that was adjusted based on calculations with the cement
treatment (130.7 Ibs /cu. ft.)
ESNW rep will
return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions N1+VLLC ESNW Rep. Project No. Page Report No
M AK 0895.06 2/2 148
15365 NE 90" Street, Suite 100
Redmond, WA 98052 Time On Site Time Off Site Date Day of Week
Main (425) 449-4704 1 Fax (425) 449-4711 Tuesday
www.esnw.com 12:30 PM 2:00 PM 3/10/20
DAILY FIELD REPORT
Travel Time Weather
1.25 Hr. RT 40s°F, Clear
Project Name Job Location 1-client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
- ._.........
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
I Are approved plans/permits on site? Project No. Permit No- f
Test
Test Location
Reference
Maximum
Fili
Test
% of
Number
(Footing Backfill)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
132
See ma for approximate location
P PP
SG
1
130.7
18.3
124.8
96
133
See map for approximate location
SG
1
130.7
16.8
125.2
96
134
See map for approximate location
SG
1
130.7
18,0
124.7
95
1 � 1 •_ _ _ ... � -• S � f� yam,... � e 1 ' � �.,� �� r ~� - . _ -w.�
aw ��
J ► is. yLS. .�r�+r tiid .. �. d ._ i
132 129, 130, 131 _
133 1134
oEarth Solutions NWLLC
15365 NE 901 Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep. Project No. Page Report No.
AK 0895.06 111 149
Time On Site Time Off Site Date Day of Week
Wed
12:30 PM 1:45 PM 3/11/20
Travel Time Weather
1.25 Hr. RT 40s°F, Clear
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC I* /
Project Manager Reviewed
Ray
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes, footing backfill, test pH of stormwater and
earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Rep observed contractor using a medium sized excavator to place 2" wash rock behind the wall. Rep observed
that contractor had placed miradrain to the top elevation of the cast -in -place wall. Contractor expressed plans to
continue working on wall backfill.
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place 8%
8" lifts and compaction with a jumping jack. Rep will return to take compaction tests as needed.
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 2.0 NTU and a pH of
6.5. Rep observed that pH level was contained onsite at 6.5 pH.
ESNW rep will return to observe earthwork activities when requested by client
_ Sf
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLC
15365 NE 901" Street, Suite 100
Redmond. WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw corn
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
ESNW Rep. Project No. Page Report No.
AK 0895.06 111 150
Time On Site Time Off Site Date Day of Week
3:45 PM 4:00 PM 3/12/20 Thursday
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
Weather
40sOF, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC �4,
Project Manager Reviewed
Ray
Permit No
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Rep observed contractor using a medium sized excavator to place 2" wash rock behind the wall. Rep observed
that contractor had placed miradrain to the top elevation of the cast -in -place wall. Contractor expressed plans to
continue working on wall backfill.
ESNW rep will return to observe earthwork activities when requested by clie
4-4-1 �_
Andrew Kimn, Senior Technician, 206-430-9183
M Earth Soiutil lns NWLLC
t 15365 NE 90"' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep. Project No. Page
AK 0895.06
Time On Site Time Off Site Date
1:30 PM 1 3:30 PM 1 3/13/20
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No
1/2
Weather
40sOF, Clear
Report No.
151
Day of Week
Friday
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC *3%15
Project Manager Reviewed
Ray
Permit No.
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, footing backfill and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75A (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place 8%
8" lifts and compaction with a jumping jack. Rep took compaction tests on backfill and observed material to be
adequate of at least 95% of its maximum dry density that was adjusted based on calculations with the cement
treatment (130.7 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client
4J__1 �_
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
ESNW Rep,
AK
15365 NE 901 Street, Suite 100
Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw.com
1:30 PM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Project No.
Page
Report No.
0895.06
2/2
151
Time Off Site
Date
Day of Week
Friday
3:30 PM
3/13/20
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Weather
40s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor
Reviewed
LAC
I
Project Manager
Reviewed
Ray
Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(Footing Backfill)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
N
(pcf)
Dry
Density
135
See map for approximate location
SG
1
130.7
f 23.3
125.2
96
136
See map for approximate location
SG
1
130.7
25.0
1 125.0
96
137
See map for approximate location
SG
1
130.7
22.8
124.8
96
.--
.r -� - .. • - .•
IL
ow
136
137