HomeMy WebLinkAboutCO 1 CAG-19-243, CO #1-20 CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT 3.4.2020 CONTRACT: City of Renton CAG-19-243 Sunset Neighborhood Park,Phase 2 CONTRACTOR: Terra Dynamics,Inc. CHANGE ORDER: No.1 SUMMARY OF PROPOSED CHANGE: Reason/Justification: CIP Concrete Modification to Decorative Mist Feature,HBB Landscape Architecture,12.20.2019 DESCRIPTION: Item Qty. Description Unit Price Amount No. w/WSST 1 1 CIP Modification to Decorative Mist Feature $ 4,597.23 L-6/1,12.20.2019 Total this Change Order: $ 4,597.23 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT(W/WSST) AMOUNT THIS ORDER(W/WSST) TOTAL AFTER CHANGE $ 4,059,000.00 $ 4,059,000.00 $ 4,597.23 $ 4,063,597.23 Additional Calendar Days: (0 calendar days)Substantial Completion Date is May 31,2020. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES: / Contractor: µt`�— — Date: y/,i-/ 0 2-_ Project Manager: 4 '4 — Date 5 /'/G t 20 , ��/ Date: 3��7�Zo Approved By: iiTERRA DYNAMICS. PO Box 2479•Auburn,WA 98071 253-880-3100•Fax:253-880-3109 SNP2 COP-001 Colored Concrete at Mist Feature 2/27/2020 Labor Rate/MH No. Hours Subtotal Foreman $ 64.26 1 6 $ 385.56 Group 4 Operator $ 66.23 1 4 $ 264.92 General Labor $ 61.72 2 8 $ 987.52 Labor $ 1,638.00 Overhead 12% $ 196.56 Profit 6% $ 110.07 Total $ 1,944.63 Equipment Rate/MH No. Hours Subtotal Takeuchi TB 285 Excavator $ 45.81 1 4 $ 183.24 Equipment $ 183.24 Overhead 12% $ 21.99 Profit 6% $ 12.31 Total $ 217.54 Materials Qty Unit Cost/Unit Subtotal Concrete disposal 1.00 CY $ 22.00 $ 22.00 Materials $ 22.00 Overhead 12% $ 2.64 Profit 6% $ 1.48 Total $ 26.12 Subcontractors Qty Unit Cost/Unit Subtotal Caliber Concrete 60 SF $ 28.66 $ 1,719.60 $ Subcontactors $ 1,719.60 Overhead 4% $ 68.78 Profit 4% $ 71.54 Total $ 1,859.92 Small Tools 3% $ 49.14 Sub Total $ 4,097.35 Insurance/bond 2.0% $ 81.95 GRAND TOTAL $ 4,179.30 verve.Orr /� Vern Orr Project Manager .1—\O/c -ta 4 11,i3 ,f 1-19q723 COXC*Z?E PATTERNED CONCRETE CONSTRUCTION INC. OF SEATTLE Date Due : February 17,2020 12:00 AM Prospective Project Contractor -' - -- - -�- [t�)R I'N.f f,yt)!_l_i Ctf.C'If'll �a"t (1yt.t 4.11.411110109.44,. Att. : Estimator or Bid Coordinator Proposal# : 1 Re. : Sunset Neighborhood Park PH 2-Added Integral Colored Paving Authored by : Todd Loc. : Renton,WA Approved by Todd ITEM# BID ITEM&DESCRIPTION QUANTITY UNIT PRICE AMOUNT Cement Concrete Sidewalk(6"Thick)Integral Color W/WWM 60 SF $28.66 $1,719.60 ProjectTotal:I $1,719.60 SECTION 1.0-NOTES The pricing contained herein is dependant on all work items listed being performed by Caliber Concrete Construction Inc. Any addition/deletion of work items or quantities could result in amended pricing.All above quantities are approximated based on information given at time of bid. All final payments will be based on field measurements. Due to current backlog Caliber Concrete Construction Inc.cannot guarantee meeting the exact schedule. The insurance coverage included in this proposal is the Master Pak Endorsement"CG 84 12 03". Any additional endorsements will be provided at$1,000.00 per project. SECTION 1.1 -EXCLUDED Pumping,night work,sub grade,layout,embeds, joint seal&sealant,saw cutting,concrete washout(eco pan),sand blasting,traffic control,flagging,barricades,scaffolding,fall protection, extruded curbing,pipe bollards,job water,bonds costs,permits,material testing, pretreat,design fees,inspection fees,engineering,exterior site,retaining,or masonry walls or footings, precast concrete hardeners and sealers,water proofing, shade sand,demolition and removal of any existing(including asphalt),utility adjustments,assessed penalty clauses. • SECTION 1.2-EXPIRATION Caliber Concrete Construction Inc.reserves the right to withdraw this proposal if not accepted in writing via signed letter of Internet or proposal within 30 days of bid due date. Acceptance of the prices contained herein constitutes agreement of all the terms and conditions in the above sections Caliber Concrete Authorized Sianature Acceptance of Proposal The above prices,specifications,and conditions are satisfactory and are 0`'" hereby accepted. Caliber Concrete is authorized to do the work as specified. 7 Payment will be made as outlined above. Acceptance: P.O.Box 1881 •Milton,WA.98354.Office(253)927-0707•Fax(253)927-0706•CALIBCC115CA